MPB Economy & Tech Tree
Track listed allocations, repeat-title levels, and named structures by barangay using BetterGov map records for FY2015–FY2027.
Tech Tree scores sum each structure’s highest observed level. In MPB Base, the central tower marks the barangay’s highest recorded MPB level; it is not the actual town hall or main building. Economy ranks listed allocations from BetterGov’s public MPB map export. Place assignment uses the map’s official barangay PSGC code and its title- or GPS-based placement method.
Scout controls
The Tech Tree score is cumulative through the selected year; the Economy ranking includes allocations through that year. “All years” uses the 13 available fiscal-year slices, FY2015–FY2027.
Building levels · Cost depth
Each column is one named structure. Its height shows its highest observed level. Up to eight barangays are arranged in spaced depth bands, with up to five buildings per band; cost sets each building’s depth in ₱ millions through the selected year. Colors identify barangays, and filters apply. Levels are repeat-title screening indicators, not verified physical storeys or completed upgrades.
Upgrades · Top 20
Ranks barangays by the highest upgrade level observed for any named structure through the selected fiscal year. It shows the highest level alone; it does not add levels across separate structures. The table lists the same top 20 as the chart.
| Rank | Barangay · locality | MPB Base | Highest level | Named structures | Project records |
|---|
Tech Tree · Upgrade levels
Score = sum of the highest level for each named structure identity. For example, Level 2 + Level 3 + Level 1 = 6. One Level 2 structure plus three Level 1 structures scores 5. Structure counts and levels are record-based review indicators, not verified physical construction.
| Barangay · locality | MPB Base | Highest tier | Named structures | Sum of tiers · score | Project records |
|---|
Economy · Total allocations
Ranks the sum of listed MPB allocations for each barangay in the selected period. This is not verified spending or completed construction cost.
| Barangay · locality | MPB Base | Listed allocation | Project rows | Project records |
|---|
Build history · How levels are assigned
Level 1 is the first year a matching normalized title appears in that barangay. Each later distinct fiscal year with the same normalized title adds a level. Identical titles duplicated in one year are kept separate and marked unresolved. Where the title is too generic or duplicated, the page avoids counting that record as a repeat.
ODV project classification, title parsing, and barangay-name resolution can miss projects or leave ambiguous locations unmatched. See source references on each project row. This is a screening inventory, not proof of a physical building, upgrade, payment, or wrongdoing.
Loading MPB barangay data…
Barangay MPB lookup
Filter the MPB records by the barangay shown in MPB Base and fiscal year. FY2027 lines include a DPWH proposal document link only when the project title has a unique normalized title match; historical GAA lines remain in the table without a DPWH proposal link.
Choose a barangay to list its MPB project records.
| Fiscal year | MPB project line | Allocation | Source record | Project documents |
|---|---|---|---|---|
| Choose a barangay to begin. | ||||
Scope and interpretation
This page uses BetterGov’s public MPB map line export. FY2015–FY2026 rows use listed GAA allocations; FY2027 rows use House Bill allocations. A row enters a barangay ranking only when the source assigns it an official barangay PSGC code. The source’s place basis may be a title match or GPS placement. Rows assigned only to cities, provinces, districts, regions, or no place are excluded. The list includes official barangays without matched MPB rows, shown with zero allocation.
Amounts are listed budget allocations, not verified expenditures, completed construction costs, or money received by a barangay. A repeat level means a normalized project title appears again in the same official barangay in another available fiscal year. This is a title-based review signal, not proof that the same physical building was constructed or upgraded. A source line assigned to a barangay at its full amount can make the barangay totals overlap.