Ongoing research. Figures are provisional and may change as documents are recovered, extracted data is corrected, records are reconciled, and calculations are checked against source documents. Use the deployment timestamp and commit shown here to identify this version; newer build details supersede older copies.
Deployment build information unavailable
Disclaimer. This site is updated as additional source documents are ingested and reviewed. Its records and calculations are preliminary and open to correction. Additional documents, stakeholder input, and independent review can surface missing information, errors, or context and improve accuracy over time; they may support more complete calculations but do not by themselves verify a record. Inviting people to examine the underlying sources and share corrections is part of the purpose of this work. These are preliminary, document-based observations, not allegations or findings that any person, office, contractor or other entity acted unlawfully. A flag, unmatched record, repeated amount or title, price or location outlier, or missing document is a prompt for review; it does not establish intent, responsibility, benefit, overpayment, duplicate scope or wrongdoing. Names and geographic or district associations indicate possible coverage only, not sponsorship, authorship, control, receipt or personal involvement. Source documents, data completeness, parsing, matching, categories, timing and boundaries may affect results. Verify cited primary records and seek relevant context before drawing or publishing conclusions.
How to read this comparison. A POW is a project estimate, not actual expenditure. Allocation and POW estimates may cover different scope, phases, or cost bases. Differences are review leads, not proof of overrun or savings.
Matched project totals Aggregate comparison includes only unique HGAB project rows with one exact-title-matched POW file and a readable project-wide printed category summary.
How this comparison is calculated
Project-level differences Sorted by largest absolute gap between the HGAB allocation and the POW printed category estimate. Multiple distinct POW files for one project are shown as review cases and excluded from totals.
Search Estimate status All statuses Comparable printed estimate Multiple POW files · review Conflicting parse results Itemized subtotal only No recovered total estimate Sort Largest absolute difference Largest allocation Largest POW estimate Project title Office
HGAB project / office HGAB allocation POW category estimate Difference · estimate − allocation Difference % POW file / basis
Sources: FY2027 HGAB 3rd-reading project ledger and Senate-provided HGAB POWs. Source PDF links are not published. Return to Senate HGAB document coverage →
Generated data are preliminary machine extraction. Verify source pages and project scope before interpretation.
Sources: Common source catalog . Each page identifies the years and records used in that analysis.
Budget Trivia · play the game
AI assistance: OpenAI Codex contributed to software implementation and data-processing workflows for this site. This credit does not represent independent verification of the underlying sources, calculations, or conclusions.