BetterGov
BetterGov · Budget research

Cost per meter and lane-meter

Which projects stand out on cost per meter?

HGAB 3rd reading · stated lengths
191high-rate candidates for scope review

Compared within the same program and similar stated-length group.

Roads48.64%3153 of 6482 line items lack a usable length
Bridges94.39%1094 of 1159 line items lack a usable length
FMR99.69%961 of 964 line items lack a usable length
Mixed roads / bridges61.21%71 of 116 line items lack a usable length

For FMR, connectivity screens coordinates for all listed projects; endpoint gaps are not stated construction lengths. See road connectivity.

1. Stated-meter rates

Which projects have unusually high allocation per meter?

The first tables compare each rate with the typical rate in the same official program and a similar stated-length group. A high-rate candidate is more than twice the typical peer rate and unusually high within its peer group. This is a scope-review queue, not a verified overpricing finding. Extreme values remain visible as individual points in rate charts. Printed segments under 10m remain in tables and CSV but are excluded from rate charts. Coverage denominators include all selected extracted occurrences in each category, including those without a usable length.

These are whole line-item allocations divided by stated segment lengths, not verified construction unit costs. Bridge chainage may cover approaches rather than bridge span. Missing percentage means no usable length was recovered from the current title/project context; it does not establish that the original budget or engineering documents omit length.

Download all records and length evidence · Compare stated-meter allocations across available GAA years ↗

Outliers remain visible in rate charts as individual points. Printed segments under 10m remain in tables and CSV but are not plotted. Peer screening needs at least 20 usable records. Missing or sparse peers do not establish a normal price.

How high-rate candidates are identified

Peers share category, structure group (overpasses/flyovers, viaducts and pedestrian structures separated), official PAP, a data-derived length band, and matched surface/condition/assessment-year context. Unknown context is pooled only with unknown context and remains explicitly unadjusted. At least 20 peers with stated length ≥10m. Candidate rate exceeds both 2× peer median and Q3+1.5×IQR. Chart extremes exceed max(2×median,Q3+3×IQR); sub-10m printed ranges also stay off rate charts. Lane inventory estimates do not enter these per-meter flags.

Project tables load as you reach this section.

2. Lane-meter analysis

Lane-meter calculations divide allocation by meters × lanes. Title-stated lanes, existing-inventory lane estimates and whole-bridge asset estimates are displayed separately. See matching rules, exclusions and source vintage. Existing asset size does not fill a missing funded length.

Roads and bridges · length, lanes and allocation density

Each chart stacks projects in planes of five parallel road strips: five side by side, then the next five above them. Strips share a starting edge. Length runs along each strip, lane count sets its crosswise width, and allocation per lane-meter sets gently log-scaled thickness. The charts show the 30 projects with the highest allocation density in each group; all eligible projects remain in the tables. Each group's thickness scale is separate. This is a screening comparison, not a verified construction cost.

Roads · 30 highest density

Bridges · 30 highest density

Drag to rotate and zoom. Hover on a strip for the project, exact dimensions, lane-count basis, allocation and source. Thickness uses a gentler, slightly expanded log₁₀ allocation-per-lane-meter scale within each group; each plane is separated for visibility. Projects without a usable length and lane-count basis stay in their tables.

4. Length and allocation-density exploration

Length bands are compared within the same category and official work program. Allocation density is pesos per stated meter. A shorter denominator can raise this ratio without an unusually large allocation, so the tables also show total allocation and a separate model of allocation versus length.

These are exploratory grouping boundaries, not engineering price standards or evidence of overpricing. Sparse samples, missing lengths and unmeasured project scope limit interpretation.

Where median density changes by at least 2×

Only comparisons with at least 20 rows in each band are included. A ratio above 1 means the shorter-length band has higher allocation per meter. Bands with fewer observations remain in the complete band tables below.

Density ratio · shorter band / longer band · up to 12 largest magnitudes
Construction of Missing Links/ New RoadsConstruction of Missing Links/ New RoadsConstruction of Missing Links/ New Roads: 7.457.45Construction of By-Pass and Diversion RoadsConstruction of By-Pass and Diversion RoadsConstruction of By-Pass and Diversion Roads: 6.266.26BIP - Access Roads and/or Bridges from the National Roads leadBIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ FacilitiesBIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities: 2.322.32Rehabilitation/ Reconstruction of Roads with Slips, Slope CollRehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary RoadsRehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads: 2.312.31Rehabilitation/ Reconstruction of Roads with Slips, Slope CollRehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary RoadsRehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads: 2.072.07Rehabilitation/ Reconstruction of Roads with Slips, Slope CollRehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary RoadsRehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads: 0.340.34
CategoryOfficial programShorter bandLonger bandShorter rowsLonger rowsShorter median pesos/meterLonger median pesos/meterDensity ratio · shorter / longerAllocation ratio · shorter / longer
RoadsConstruction of Missing Links/ New Roads0–<277.43 m277.43–<989 m2223₱744,734.515₱100,000.07.451.56
RoadsConstruction of By-Pass and Diversion Roads0–<148.535 m148.535–<341.5 m3635₱1,314,335.06₱209,790.216.261.32
RoadsRehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads0–<40.5 m40.5–<60 m2221₱212,698.40999999997₱625,000.00.340.16
BridgesBIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities0–<40.8 m≥40.8 m2221₱1,410,000.0₱607,142.862.320.47
RoadsRehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads0–<122.5 m122.5–<291 m4423₱402,286.455₱173,983.742.310.73
RoadsRehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads40.5–<60 m60–<108 m2121₱625,000.0₱301,886.792.071.59

Does total allocation show a length boundary too?

The segmented model fits log total allocation against log stated length within each PAP. It needs 80 records and 20 per side, excludes lengths below 10 meters, and requires BIC improvement ≥6 over a single slope. The boundary is selected from observed-length candidates, not a fixed 100-meter threshold; bootstrap frequency describes how consistently it is selected. The 10th–90th percentile of bootstrap-selected boundaries describes an empirical stability window, not a confidence interval. The ≥25-meter sensitivity boundary is also shown.

Model BIC improvement · positive favors a slope change · up to 12 largest magnitudes
BIP - Access Roads and/or Bridges from the National Roads leadBIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ FacilitiesBIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities: 53.2953.29Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved RoaRehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary RoadsRehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads: 14.0814.08Rehabilitation/ Reconstruction of Roads with Slips, Slope CollRehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary RoadsRehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads: 10.9310.93Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved RoaRehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary RoadsRehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads: 8.528.52Preventive Maintenance - Primary RoadsPreventive Maintenance - Primary RoadsPreventive Maintenance - Primary Roads: -8.06-8.06Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved RoaRehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary RoadsRehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads: -7.55-7.55Construction of Missing Links/ New RoadsConstruction of Missing Links/ New RoadsConstruction of Missing Links/ New Roads: -7.04-7.04Preventive Maintenance - Tertiary RoadsPreventive Maintenance - Tertiary RoadsPreventive Maintenance - Tertiary Roads: -6.95-6.95Preventive Maintenance - Secondary RoadsPreventive Maintenance - Secondary RoadsPreventive Maintenance - Secondary Roads: 5.225.22Construction of By-Pass and Diversion RoadsConstruction of By-Pass and Diversion RoadsConstruction of By-Pass and Diversion Roads: -4.91-4.91Rehabilitation/ Reconstruction of Roads with Slips, Slope CollRehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary RoadsRehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads: -3.20-3.20Road Widening - Secondary RoadsRoad Widening - Secondary RoadsRoad Widening - Secondary Roads: 1.211.21
CategoryOfficial programModel rowsCandidate boundary metersBIC improvementModel conclusionBootstrap 10th–90th boundary metersBootstrap same-boundary %Sensitivity ≥25m boundary meters
BridgesBIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities42Insufficient observations for breakpoint search
BridgesConstruction of By-Pass and Diversion Roads8Insufficient observations for breakpoint search
BridgesConstruction of Missing Links/ New Roads4Insufficient observations for breakpoint search
BridgesConstruction of New Bridges6Insufficient observations for breakpoint search
BridgesOff-Carriageway Improvement - Secondary Roads2Insufficient observations for breakpoint search
BridgesWidening of Permanent Bridges1Insufficient observations for breakpoint search
FMRFMR3Insufficient observations for breakpoint search
RoadsBIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities1055374.553.29Exploratory slope change supported181.2–617.040.0374.5
RoadsBIP - Coastal Roads to augment Resiliency of Coastal Communities6Insufficient observations for breakpoint search
RoadsConstruction of By-Pass and Diversion Roads283278.42-4.91No supported slope change156.9–1344.012.0218.67
RoadsConstruction of Missing Links/ New Roads134854.99-7.04No supported slope change242.8–3556.115.0854.99
RoadsOff-Carriageway Improvement - Primary Roads37Insufficient observations for breakpoint search
RoadsOff-Carriageway Improvement - Secondary Roads63Insufficient observations for breakpoint search
RoadsOff-Carriageway Improvement - Tertiary Roads39Insufficient observations for breakpoint search
RoadsPaving of Unpaved Roads - Primary Roads1Insufficient observations for breakpoint search
RoadsPaving of Unpaved Roads - Secondary Roads3Insufficient observations for breakpoint search
RoadsPaving of Unpaved Roads - Tertiary Roads13Insufficient observations for breakpoint search
RoadsPreventive Maintenance - Primary Roads229230.5-8.06No supported slope change230.5–2867.031.0233.5
RoadsPreventive Maintenance - Secondary Roads3174806.55.22No supported slope change717.0–4806.544.04806.5
RoadsPreventive Maintenance - Tertiary Roads1772100.46-6.95No supported slope change821.0–2435.313.02100.46
RoadsRehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads27Insufficient observations for breakpoint search
RoadsRehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads12848.4810.93Exploratory slope change supported45.5–53.554.046.5
RoadsRehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads8957.18-3.2No supported slope change57.2–228.533.062.45
RoadsRehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads1182817.314.08Exploratory slope change supported1307.7–2817.330.02817.3
RoadsRehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads178445.55-7.55No supported slope change282.2–1919.919.0447.55
RoadsRehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads1081645.498.52Exploratory slope change supported156.0–1645.537.01645.49
RoadsRoad Widening - Primary Roads71Insufficient observations for breakpoint search
RoadsRoad Widening - Secondary Roads211735.921.21No supported slope change469.0–856.536.0735.92
RoadsRoad Widening - Tertiary Roads37Insufficient observations for breakpoint search

Complete length bands · separate categories and programs

These descriptive medians remain separate by PAP. FMR and bridge samples may be too sparse for breakpoint inference.

Roads · full band statistics
Median allocation density vs median length · separate curves for up to five programs with most observations; both axes logarithmic
70.1 m4,806.5 m₱1,314,335/m₱16,531/mBIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities · 528 rows · 355.0 m · ₱28,571.43/mBIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities · 395 rows · 1100.0 m · ₱22,727.27/mBIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities · 132 rows · 3255.0 m · ₱30,655.67/mBIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ FacilitiesPreventive Maintenance - Secondary Roads · 40 rows · 225.5 m · ₱50,714.07/mPreventive Maintenance - Secondary Roads · 79 rows · 557.0 m · ₱33,842.84/mPreventive Maintenance - Secondary Roads · 40 rows · 986.5 m · ₱30,430.00/mPreventive Maintenance - Secondary Roads · 40 rows · 1241.5 m · ₱33,910.51/mPreventive Maintenance - Secondary Roads · 39 rows · 1882.0 m · ₱30,506.72/mPreventive Maintenance - Secondary Roads · 40 rows · 2726.5 m · ₱17,781.67/mPreventive Maintenance - Secondary Roads · 40 rows · 4806.5 m · ₱16,531.39/mPreventive Maintenance - Secondary RoadsConstruction of By-Pass and Diversion Roads · 36 rows · 70.1 m · ₱1,314,335.06/mConstruction of By-Pass and Diversion Roads · 35 rows · 243.8 m · ₱209,790.21/mConstruction of By-Pass and Diversion Roads · 36 rows · 459.4 m · ₱127,211.24/mConstruction of By-Pass and Diversion Roads · 35 rows · 632.0 m · ₱116,272.38/mConstruction of By-Pass and Diversion Roads · 36 rows · 1000.0 m · ₱101,546.39/mConstruction of By-Pass and Diversion Roads · 36 rows · 1400.0 m · ₱74,430.54/mConstruction of By-Pass and Diversion Roads · 35 rows · 2265.0 m · ₱51,387.46/mConstruction of By-Pass and Diversion Roads · 36 rows · 4000.0 m · ₱39,959.04/mConstruction of By-Pass and Diversion RoadsPreventive Maintenance - Primary Roads · 29 rows · 192.0 m · ₱45,400.00/mPreventive Maintenance - Primary Roads · 28 rows · 441.0 m · ₱39,513.21/mPreventive Maintenance - Primary Roads · 29 rows · 699.0 m · ₱44,562.04/mPreventive Maintenance - Primary Roads · 28 rows · 1005.5 m · ₱51,526.40/mPreventive Maintenance - Primary Roads · 29 rows · 1300.0 m · ₱36,792.41/mPreventive Maintenance - Primary Roads · 57 rows · 2000.0 m · ₱38,950.00/mPreventive Maintenance - Primary Roads · 29 rows · 4100.0 m · ₱34,368.35/mPreventive Maintenance - Primary RoadsRoad Widening - Secondary Roads · 26 rows · 246.5 m · ₱50,000.00/mRoad Widening - Secondary Roads · 27 rows · 479.0 m · ₱51,400.00/mRoad Widening - Secondary Roads · 26 rows · 661.0 m · ₱60,234.85/mRoad Widening - Secondary Roads · 27 rows · 957.0 m · ₱50,760.23/mRoad Widening - Secondary Roads · 26 rows · 1140.5 m · ₱50,733.62/mRoad Widening - Secondary Roads · 26 rows · 1499.2 m · ₱32,837.21/mRoad Widening - Secondary Roads · 27 rows · 1963.0 m · ₱30,194.47/mRoad Widening - Secondary Roads · 26 rows · 3000.0 m · ₱26,250.47/mRoad Widening - Secondary Roads
Official programLength bandRowsMedian metersMedian allocation pesosMedian pesos/meterSample below 20 rows
BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities0–<719 m528355.0₱10,000,000.0₱28,571.43No
BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities719–<2290 m3951100.0₱25,000,000₱22,727.27No
BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities≥2290 m1323255.0₱100,000,000.0₱30,655.675No
BIP - Coastal Roads to augment Resiliency of Coastal Communities≥0 m6656.0₱100,000,000.0₱180,555.55500000002Yes
Construction of By-Pass and Diversion Roads0–<148.535 m3670.11500000000001₱66,071,500.0₱1,314,335.06No
Construction of By-Pass and Diversion Roads148.535–<341.5 m35243.75₱50,000,000₱209,790.21No
Construction of By-Pass and Diversion Roads341.5–<512.62 m36459.35₱57,143,000.0₱127,211.245No
Construction of By-Pass and Diversion Roads512.62–<780.5 m35632.0₱75,000,000₱116,272.38No
Construction of By-Pass and Diversion Roads780.5–<1180.59 m361000.0₱100,000,000.0₱101,546.39No
Construction of By-Pass and Diversion Roads1180.59–<1692.25 m361400.0₱101,862,000.0₱74,430.535No
Construction of By-Pass and Diversion Roads1692.25–<2805.82 m352265.0₱100,000,000₱51,387.46No
Construction of By-Pass and Diversion Roads≥2805.82 m364000.0₱182,500,000.0₱39,959.04No
Construction of Missing Links/ New Roads0–<277.43 m22121.61500000000001₱132,350,000.0₱744,734.515No
Construction of Missing Links/ New Roads277.43–<989 m23736.0₱84,700,000₱100,000.0No
Construction of Missing Links/ New Roads989–<1516.5 m231200.0₱75,000,000₱62,500.0No
Construction of Missing Links/ New Roads1516.5–<2712.5 m221838.35₱145,900,500.0₱71,186.91500000001No
Construction of Missing Links/ New Roads2712.5–<3556.5 m223046.0₱150,000,000.0₱46,991.869999999995No
Construction of Missing Links/ New Roads≥3556.5 m235370.0₱185,000,000₱35,714.29No
Off-Carriageway Improvement - Primary Roads≥0 m371522.0₱20,000,000₱12,106.54No
Off-Carriageway Improvement - Secondary Roads0–<1886.5 m211110.0₱12,080,000₱12,638.3No
Off-Carriageway Improvement - Secondary Roads≥1886.5 m423500.0₱40,000,000.0₱10,390.69No
Off-Carriageway Improvement - Tertiary Roads≥0 m391705.0₱24,970,000₱9,073.9No
Paving of Unpaved Roads - Primary Roads≥0 m145.0₱5,000,000₱111,111.11Yes
Paving of Unpaved Roads - Secondary Roads≥0 m3190.0₱9,352,000₱28,061.86Yes
Paving of Unpaved Roads - Tertiary Roads≥0 m131433.0₱45,818,000₱31,973.42Yes
Preventive Maintenance - Primary Roads0–<322 m29192.0₱9,659,000₱45,400.0No
Preventive Maintenance - Primary Roads322–<575 m28441.0₱18,750,000.0₱39,513.21No
Preventive Maintenance - Primary Roads575–<893.5 m29699.0₱29,500,000₱44,562.04No
Preventive Maintenance - Primary Roads893.5–<1153.5 m281005.5₱52,032,500.0₱51,526.395000000004No
Preventive Maintenance - Primary Roads1153.5–<1468.11 m291300.05₱48,100,000₱36,792.41No
Preventive Maintenance - Primary Roads1468.11–<2768 m572000.0₱80,854,000₱38,950.0No
Preventive Maintenance - Primary Roads≥2768 m294100.0₱148,530,000₱34,368.35No
Preventive Maintenance - Secondary Roads0–<317.5 m40225.5₱7,862,500.0₱50,714.07No
Preventive Maintenance - Secondary Roads317.5–<809.5 m79557.0₱17,795,000₱33,842.84No
Preventive Maintenance - Secondary Roads809.5–<1050.5 m40986.475₱27,750,000.0₱30,430.0No
Preventive Maintenance - Secondary Roads1050.5–<1521.5 m401241.5₱40,165,000.0₱33,910.51No
Preventive Maintenance - Secondary Roads1521.5–<2145.5 m391882.0₱58,579,000₱30,506.72No
Preventive Maintenance - Secondary Roads2145.5–<3509 m402726.5₱51,463,500.0₱17,781.665No
Preventive Maintenance - Secondary Roads≥3509 m404806.5₱100,000,000.0₱16,531.39No
Preventive Maintenance - Tertiary Roads0–<277.5 m22138.0₱4,134,000.0₱33,873.67No
Preventive Maintenance - Tertiary Roads277.5–<707 m22451.5₱11,818,000.0₱20,755.2No
Preventive Maintenance - Tertiary Roads707–<1380.5 m441000.0₱28,005,500.0₱29,911.0No
Preventive Maintenance - Tertiary Roads1380.5–<1886.65 m231603.0₱33,572,000₱21,091.43No
Preventive Maintenance - Tertiary Roads1886.65–<2518 m222100.5₱59,606,000.0₱29,972.495000000003No
Preventive Maintenance - Tertiary Roads2518–<3721.5 m223050.5₱49,014,000.0₱15,844.265No
Preventive Maintenance - Tertiary Roads≥3721.5 m224391.5₱72,431,500.0₱15,082.255000000001No
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads≥0 m2757.0₱33,250,000₱333,333.33No
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads0–<40.5 m2228.5₱5,645,000.0₱212,698.40999999997No
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads40.5–<60 m2150.0₱35,000,000₱625,000.0No
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads60–<108 m2177.0₱22,000,000₱301,886.79No
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads108–<235.5 m22186.0₱40,250,000.0₱187,086.77500000002No
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads235.5–<369 m22294.5₱48,090,000.0₱174,767.195No
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads≥369 m21569.0₱56,500,000₱103,448.28No
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads0–<122.5 m4460.0₱22,772,500.0₱402,286.455No
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads122.5–<291 m23212.0₱31,200,000₱173,983.74No
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads≥291 m22471.5₱45,038,000.0₱92,679.16500000001No
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads0–<241.5 m24139.5₱5,000,000.0₱39,500.354999999996No
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads241.5–<455 m23331.0₱9,306,000₱28,653.3No
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads455–<1417 m24772.0₱19,640,000.0₱23,630.239999999998No
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads1417–<2175.5 m231774.0₱41,717,000₱24,869.71No
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads≥2175.5 m244259.0₱132,777,000.0₱32,638.42No
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads0–<179.5 m2291.25₱3,619,500.0₱47,202.615000000005No
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads179.5–<340.5 m22268.0₱16,781,500.0₱60,000.0No
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads340.5–<664.75 m45500.0₱20,767,000₱39,783.52No
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads664.75–<1269.5 m451000.0₱29,579,000₱30,376.67No
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads1269.5–<1820.5 m221404.0₱42,839,000.0₱30,399.769999999997No
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads≥1820.5 m222649.0₱70,000,000.0₱26,550.86No
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads0–<180.5 m22100.5₱4,515,000.0₱51,081.035No
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads180.5–<432.5 m21285.0₱8,932,000₱35,015.77No
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads432.5–<806 m22605.5₱19,784,500.0₱35,903.740000000005No
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads806–<1623.5 m211019.0₱28,245,000₱28,521.79No
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads≥1623.5 m222098.5₱55,677,000.0₱21,511.13No
Road Widening - Primary Roads0–<1011.5 m24454.385₱17,200,000.0₱48,836.33No
Road Widening - Primary Roads1011.5–<1870 m231429.0₱64,850,000₱44,673.54No
Road Widening - Primary Roads≥1870 m242987.875₱130,000,000.0₱35,178.165No
Road Widening - Secondary Roads0–<364.5 m26246.5₱13,076,000.0₱50,000.0No
Road Widening - Secondary Roads364.5–<567.5 m27479.0₱26,000,000₱51,400.0No
Road Widening - Secondary Roads567.5–<804.5 m26661.0₱43,636,500.0₱60,234.845No
Road Widening - Secondary Roads804.5–<1005.5 m27957.0₱43,400,000₱50,760.23No
Road Widening - Secondary Roads1005.5–<1262 m261140.5₱55,777,000.0₱50,733.625No
Road Widening - Secondary Roads1262–<1648.5 m261499.2₱47,677,500.0₱32,837.205No
Road Widening - Secondary Roads1648.5–<2283.5 m271963.0₱56,182,000₱30,194.47No
Road Widening - Secondary Roads≥2283.5 m263000.0₱84,454,500.0₱26,250.47No
Road Widening - Tertiary Roads≥0 m371211.0₱43,496,000₱38,999.05No
Bridges · full band statistics
Median allocation density vs median length · separate curves for up to five programs with most observations; both axes logarithmic
25.0 m359.7 m₱1,410,000/m₱88,462/mBIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities · 22 rows · 25.0 m · ₱1,410,000.00/mBIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities · 21 rows · 90.0 m · ₱607,142.86/mBIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ FacilitiesConstruction of By-Pass and Diversion Roads · 8 rows · 359.7 m · ₱640,541.57/mConstruction of By-Pass and Diversion RoadsConstruction of New Bridges · 7 rows · 255.0 m · ₱1,141,552.51/mConstruction of New BridgesConstruction of Missing Links/ New Roads · 4 rows · 355.9 m · ₱205,759.80/mConstruction of Missing Links/ New RoadsOff-Carriageway Improvement - Secondary Roads · 2 rows · 172.5 m · ₱88,461.54/mOff-Carriageway Improvement - Secondary Roads
Official programLength bandRowsMedian metersMedian allocation pesosMedian pesos/meterSample below 20 rows
BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities0–<40.8 m2225.0₱28,850,000.0₱1,410,000.0No
BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities≥40.8 m2190.0₱62,000,000₱607,142.86No
Construction of By-Pass and Diversion Roads≥0 m8359.745₱99,979,500.0₱640,541.575Yes
Construction of Missing Links/ New Roads≥0 m4355.9₱82,750,000.0₱205,759.805Yes
Construction of New Bridges≥0 m7255.0₱147,259,000₱1,141,552.51Yes
Off-Carriageway Improvement - Secondary Roads≥0 m2172.5₱15,000,000.0₱88,461.54000000001Yes
Widening of Permanent Bridges≥0 m1301.16₱20,000,000₱66,409.88Yes
FMR · full band statistics
Median allocation density vs median length · separate curves for up to five programs with most observations; both axes logarithmic
650.0 m650.0 m₱15,385/m₱15,385/mFMR · 3 rows · 650.0 m · ₱15,384.62/mFMR
Official programLength bandRowsMedian metersMedian allocation pesosMedian pesos/meterSample below 20 rows
FMR≥0 m3650.0₱10,000,000₱15,384.62Yes

Method and limitations

Length bands are derived separately within each PAP using approximately equal-count groups (up to eight, targeting at least 20 records per group). Equal observed lengths stay together. Breakpoint candidates are geometric midpoints between adjacent observed distinct lengths, requiring at least 20 records on either side; up to 31 candidates cover the eligible boundaries. No 100-meter boundary is prescribed. The searched boundary counts as an extra model parameter in BIC.

Download all groups, model slopes, bootstrap votes and methodology. Patterns direct source and engineering review; there is no universal safe or suspicious length.

4. Coordinate-distance approximations

Coordinate-distance estimates stay separate from stated-meter rates and high-rate flags. Detailed asset matching, recovered dimensions, length coverage and extraction methods are on Asset matching and length coverage.

Coordinate-based allocation per meter · approximation

Additional tables below divide whole allocations by straight-line separation between two printed endpoints. Separately labeled FMR segment chords are summed. A road can curve or include structures, so this distance is not a measured road or bridge length. These approximate rates are kept outside stated-length coverage, historical price comparisons and high-rate flags. Review flags, coincident endpoints, unpaired coordinate lists and mixed road/bridge rates are withheld. No distance between different projects supplies a project-length denominator.

Bridge rehabilitation · inventory condition and document-list cross-check

This review covers Rehabilitation/Major Repair of Permanent Bridges and BIP bridge rows explicitly titled rehabilitation or repair. Retrofitting/strengthening is excluded. A listed document count is not a construction-completion status.

290 bridge rehabilitation/repair rows · 270 have a matched bridge ID in the offline DPWH inventory · 226 have a recorded inventory condition. Of the rows with a condition: 167 are marked Good/Fair and 59 Poor/Bad. Assessment dates are unavailable in these matched records.

Inventory condition recorded for the matched bridge asset. “No condition match” means the current crosswalk did not supply a condition; it does not mean the bridge was unassessed.
BadBad · assessment year unknown · 11PoorPoor · assessment year unknown · 5858FairFair · assessment year unknown · 138138GoodGood · assessment year unknown · 2929No inventory condition matchNo inventory condition match · 6464
DPWH Transparency title status · snapshotBridge rows
5+ documents listed3
Fewer than 5 listed254
Candidate title match · review0
No verified title match in snapshot33
No exact-title record in snapshot0

The Transparency snapshot was retrieved 18 October 2026. “5+ documents listed” describes the portal’s document count only; it does not verify that a bridge was built or that rehabilitation is complete. An incomplete or unmatched title is not proof that a project or its documents are absent. Inventory condition dates are not available here, so Good/Fair and Poor/Bad describe the retained condition label without a dated condition comparison.

Existing inventory spans are asset dimensions, not funded rehabilitation lengths. The broader inventory cross-check found existing spans for 754 bridge line items, including rows without a usable stated funded length. These asset spans do not fill in the missing work length.

Largest allocations · project-by-project review sample

ProjectHGAB allocationStated length (m)Inventory bridge IDInventory span (m)Inventory conditionTransparency document status
Rehabilitation of Wawa Bridge, Pilar, Bataan, 0+000 - 0+045, (14.672155, 120.563000)₱210,000,00045.0No supported ID matchNoneNo inventory condition matchFewer than 5 listed
Rehabilitation of Burol Overpass, Sta. 1+120 - Sta. 1+145, Provincial Road, Borol 2nd, Balagtas, Bulacan₱150,000,00025.0No supported ID matchNoneNo inventory condition match5+ documents listed
Iyam Br. (B02935LZ) along Maharlika Highway (MSR Diversion Rd)₱130,000,000NoneB02935LZ93Poor · assessment year unknownFewer than 5 listed
Carmen Br. (B00322MN) along Bukidnon-Cotabato Rd₱100,000,000NoneB00322MN223Good · assessment year unknownFewer than 5 listed
Colongolo Br. (B01040MN) along Surallah-Lake Sebu-Maitum Rd₱90,240,000NoneB01040MN94Poor · assessment year unknownFewer than 5 listed
Calbiga Br. (B00387SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)₱85,000,000NoneB00387SM106Poor · assessment year unknownFewer than 5 listed
EDSA/Ortigas Interchange (B03316LZ) along EDSA/Ortigas Interchange₱62,000,000NoneB03316LZ492Fair · assessment year unknownFewer than 5 listed
Rehabilitation of Santol - Bunsuran II Bridge, Sta. 3+580 - Sta. 3+596, Bunsuran II, Pandi, Bulacan (120.923015, 14.856319)₱60,000,00016.0No supported ID matchNoneNo inventory condition matchNo verified title match in snapshot
EDSA/Ortigas Flyover (B03315LZ) along EDSA/Ortigas Flyover₱53,000,000NoneB03315LZ348Fair · assessment year unknownFewer than 5 listed
Pagalungan Br. (B00305MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect)₱50,000,000NoneB00305MN243Fair · assessment year unknownFewer than 5 listed
Batang Batang Br. (B00035PW) along Puerto Princesa South Rd₱50,000,000NoneB00035PW93No inventory condition matchFewer than 5 listed
Mambaling Flyover (B00626CB) along N Bacalso Ave (Cebu South Rd)₱50,000,000NoneB00626CB210Fair · assessment year unknownFewer than 5 listed
Tual Br. (B01077MN) along Sarangani-Sultan Kudarat Coastal Rd₱47,260,000NoneB01077MN53Poor · assessment year unknownFewer than 5 listed
Daniog Br. 1 (B00664MN) along Surigao-Davao Coastal Rd₱45,500,000NoneB00664MN82Poor · assessment year unknownFewer than 5 listed
Makati-Mandaluyong Br. (B04891LZ) along Makati-Mandaluyong Br.₱42,200,000NoneB04891LZ339No inventory condition matchFewer than 5 listed
Rehabilitation of Riyungan Bridge, Barangay Pandan, South Upi, Maguindanao del Sur₱40,000,000NoneNo supported ID matchNoneNo inventory condition matchFewer than 5 listed
Rehabilitation of Bridge, Barangay Sinalhan, City of Santa Rosa, Laguna₱40,000,000NoneNo supported ID matchNoneNo inventory condition matchFewer than 5 listed
Maludbalud Br. (B00238SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br)₱36,102,000NoneB00238SM60Fair · assessment year unknownFewer than 5 listed
Rehabilitation of Bridge, Barangay Malitlit, City of Santa Rosa, Laguna, 14.26841389, 121.11262528₱35,000,000NoneNo supported ID matchNoneNo inventory condition matchNo verified title match in snapshot
Rehabilitation of Bridge, Barangay Aplaya, City of Santa Rosa, Laguna₱35,000,000NoneNo supported ID matchNoneNo inventory condition matchFewer than 5 listed
Araniw Br. (B00776LZ) along Laoag-Airport Rd₱34,000,000NoneB00776LZ46Fair · assessment year unknownFewer than 5 listed
Kalawaig Br. (B02086MN) along Bukidnon Bdry - North Cotabato Rd₱30,000,000NoneB02086MN17No inventory condition matchFewer than 5 listed
Delpan Br. (B02291LZ) along M Roxas Jr Bridge₱30,000,000NoneB02291LZ150No inventory condition matchFewer than 5 listed
Mabini Br. (Nagtahan Br.) (B01733LZ) along Nagtahan Bridge / Fly-Over₱30,000,000NoneB01733LZ150No inventory condition matchFewer than 5 listed
Butuanon Br. 2 (B00589CB) along Cebu North Hagnaya Wharf Rd₱30,000,000NoneB00589CB50Fair · assessment year unknownFewer than 5 listed

Showing the 25 largest allocations; the JSON contains the full review population, inventory IDs, conditions, document-list status and source pages. Download all bridge rehabilitation review rows as JSON.