Compared within the same program and similar stated-length group.
For FMR, connectivity screens coordinates for all listed projects; endpoint gaps are not stated construction lengths. See road connectivity.
1. Stated-meter rates
Which projects have unusually high allocation per meter?
The first tables compare each rate with the typical rate in the same official program and a similar stated-length group. A high-rate candidate is more than twice the typical peer rate and unusually high within its peer group. This is a scope-review queue, not a verified overpricing finding. Extreme values remain visible as individual points in rate charts. Printed segments under 10m remain in tables and CSV but are excluded from rate charts. Coverage denominators include all selected extracted occurrences in each category, including those without a usable length.
These are whole line-item allocations divided by stated segment lengths, not verified construction unit costs. Bridge chainage may cover approaches rather than bridge span. Missing percentage means no usable length was recovered from the current title/project context; it does not establish that the original budget or engineering documents omit length.
Download all records and length evidence · Compare stated-meter allocations across available GAA years ↗
Outliers remain visible in rate charts as individual points. Printed segments under 10m remain in tables and CSV but are not plotted. Peer screening needs at least 20 usable records. Missing or sparse peers do not establish a normal price.
How high-rate candidates are identified
Peers share category, structure group (overpasses/flyovers, viaducts and pedestrian structures separated), official PAP, a data-derived length band, and matched surface/condition/assessment-year context. Unknown context is pooled only with unknown context and remains explicitly unadjusted. At least 20 peers with stated length ≥10m. Candidate rate exceeds both 2× peer median and Q3+1.5×IQR. Chart extremes exceed max(2×median,Q3+3×IQR); sub-10m printed ranges also stay off rate charts. Lane inventory estimates do not enter these per-meter flags.
Project tables load as you reach this section.
2. Lane-meter analysis
Lane-meter calculations divide allocation by meters × lanes. Title-stated lanes, existing-inventory lane estimates and whole-bridge asset estimates are displayed separately. See matching rules, exclusions and source vintage. Existing asset size does not fill a missing funded length.
Roads and bridges · length, lanes and allocation density
Each chart stacks projects in planes of five parallel road strips: five side by side, then the next five above them. Strips share a starting edge. Length runs along each strip, lane count sets its crosswise width, and allocation per lane-meter sets gently log-scaled thickness. The charts show the 30 projects with the highest allocation density in each group; all eligible projects remain in the tables. Each group's thickness scale is separate. This is a screening comparison, not a verified construction cost.
Roads · 30 highest density
Bridges · 30 highest density
Drag to rotate and zoom. Hover on a strip for the project, exact dimensions, lane-count basis, allocation and source. Thickness uses a gentler, slightly expanded log₁₀ allocation-per-lane-meter scale within each group; each plane is separated for visibility. Projects without a usable length and lane-count basis stay in their tables.
4. Length and allocation-density exploration
Length bands are compared within the same category and official work program. Allocation density is pesos per stated meter. A shorter denominator can raise this ratio without an unusually large allocation, so the tables also show total allocation and a separate model of allocation versus length.
These are exploratory grouping boundaries, not engineering price standards or evidence of overpricing. Sparse samples, missing lengths and unmeasured project scope limit interpretation.
Where median density changes by at least 2×
Only comparisons with at least 20 rows in each band are included. A ratio above 1 means the shorter-length band has higher allocation per meter. Bands with fewer observations remain in the complete band tables below.
| Category | Official program | Shorter band | Longer band | Shorter rows | Longer rows | Shorter median pesos/meter | Longer median pesos/meter | Density ratio · shorter / longer | Allocation ratio · shorter / longer |
|---|---|---|---|---|---|---|---|---|---|
| Roads | Construction of Missing Links/ New Roads | 0–<277.43 m | 277.43–<989 m | 22 | 23 | ₱744,734.515 | ₱100,000.0 | 7.45 | 1.56 |
| Roads | Construction of By-Pass and Diversion Roads | 0–<148.535 m | 148.535–<341.5 m | 36 | 35 | ₱1,314,335.06 | ₱209,790.21 | 6.26 | 1.32 |
| Roads | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads | 0–<40.5 m | 40.5–<60 m | 22 | 21 | ₱212,698.40999999997 | ₱625,000.0 | 0.34 | 0.16 |
| Bridges | BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | 0–<40.8 m | ≥40.8 m | 22 | 21 | ₱1,410,000.0 | ₱607,142.86 | 2.32 | 0.47 |
| Roads | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads | 0–<122.5 m | 122.5–<291 m | 44 | 23 | ₱402,286.455 | ₱173,983.74 | 2.31 | 0.73 |
| Roads | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads | 40.5–<60 m | 60–<108 m | 21 | 21 | ₱625,000.0 | ₱301,886.79 | 2.07 | 1.59 |
Does total allocation show a length boundary too?
The segmented model fits log total allocation against log stated length within each PAP. It needs 80 records and 20 per side, excludes lengths below 10 meters, and requires BIC improvement ≥6 over a single slope. The boundary is selected from observed-length candidates, not a fixed 100-meter threshold; bootstrap frequency describes how consistently it is selected. The 10th–90th percentile of bootstrap-selected boundaries describes an empirical stability window, not a confidence interval. The ≥25-meter sensitivity boundary is also shown.
| Category | Official program | Model rows | Candidate boundary meters | BIC improvement | Model conclusion | Bootstrap 10th–90th boundary meters | Bootstrap same-boundary % | Sensitivity ≥25m boundary meters |
|---|---|---|---|---|---|---|---|---|
| Bridges | BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | 42 | Insufficient observations for breakpoint search | |||||
| Bridges | Construction of By-Pass and Diversion Roads | 8 | Insufficient observations for breakpoint search | |||||
| Bridges | Construction of Missing Links/ New Roads | 4 | Insufficient observations for breakpoint search | |||||
| Bridges | Construction of New Bridges | 6 | Insufficient observations for breakpoint search | |||||
| Bridges | Off-Carriageway Improvement - Secondary Roads | 2 | Insufficient observations for breakpoint search | |||||
| Bridges | Widening of Permanent Bridges | 1 | Insufficient observations for breakpoint search | |||||
| FMR | FMR | 3 | Insufficient observations for breakpoint search | |||||
| Roads | BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | 1055 | 374.5 | 53.29 | Exploratory slope change supported | 181.2–617.0 | 40.0 | 374.5 |
| Roads | BIP - Coastal Roads to augment Resiliency of Coastal Communities | 6 | Insufficient observations for breakpoint search | |||||
| Roads | Construction of By-Pass and Diversion Roads | 283 | 278.42 | -4.91 | No supported slope change | 156.9–1344.0 | 12.0 | 218.67 |
| Roads | Construction of Missing Links/ New Roads | 134 | 854.99 | -7.04 | No supported slope change | 242.8–3556.1 | 15.0 | 854.99 |
| Roads | Off-Carriageway Improvement - Primary Roads | 37 | Insufficient observations for breakpoint search | |||||
| Roads | Off-Carriageway Improvement - Secondary Roads | 63 | Insufficient observations for breakpoint search | |||||
| Roads | Off-Carriageway Improvement - Tertiary Roads | 39 | Insufficient observations for breakpoint search | |||||
| Roads | Paving of Unpaved Roads - Primary Roads | 1 | Insufficient observations for breakpoint search | |||||
| Roads | Paving of Unpaved Roads - Secondary Roads | 3 | Insufficient observations for breakpoint search | |||||
| Roads | Paving of Unpaved Roads - Tertiary Roads | 13 | Insufficient observations for breakpoint search | |||||
| Roads | Preventive Maintenance - Primary Roads | 229 | 230.5 | -8.06 | No supported slope change | 230.5–2867.0 | 31.0 | 233.5 |
| Roads | Preventive Maintenance - Secondary Roads | 317 | 4806.5 | 5.22 | No supported slope change | 717.0–4806.5 | 44.0 | 4806.5 |
| Roads | Preventive Maintenance - Tertiary Roads | 177 | 2100.46 | -6.95 | No supported slope change | 821.0–2435.3 | 13.0 | 2100.46 |
| Roads | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads | 27 | Insufficient observations for breakpoint search | |||||
| Roads | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads | 128 | 48.48 | 10.93 | Exploratory slope change supported | 45.5–53.5 | 54.0 | 46.5 |
| Roads | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads | 89 | 57.18 | -3.2 | No supported slope change | 57.2–228.5 | 33.0 | 62.45 |
| Roads | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads | 118 | 2817.3 | 14.08 | Exploratory slope change supported | 1307.7–2817.3 | 30.0 | 2817.3 |
| Roads | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | 178 | 445.55 | -7.55 | No supported slope change | 282.2–1919.9 | 19.0 | 447.55 |
| Roads | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | 108 | 1645.49 | 8.52 | Exploratory slope change supported | 156.0–1645.5 | 37.0 | 1645.49 |
| Roads | Road Widening - Primary Roads | 71 | Insufficient observations for breakpoint search | |||||
| Roads | Road Widening - Secondary Roads | 211 | 735.92 | 1.21 | No supported slope change | 469.0–856.5 | 36.0 | 735.92 |
| Roads | Road Widening - Tertiary Roads | 37 | Insufficient observations for breakpoint search |
Complete length bands · separate categories and programs
These descriptive medians remain separate by PAP. FMR and bridge samples may be too sparse for breakpoint inference.
Roads · full band statistics
| Official program | Length band | Rows | Median meters | Median allocation pesos | Median pesos/meter | Sample below 20 rows |
|---|---|---|---|---|---|---|
| BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | 0–<719 m | 528 | 355.0 | ₱10,000,000.0 | ₱28,571.43 | No |
| BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | 719–<2290 m | 395 | 1100.0 | ₱25,000,000 | ₱22,727.27 | No |
| BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | ≥2290 m | 132 | 3255.0 | ₱100,000,000.0 | ₱30,655.675 | No |
| BIP - Coastal Roads to augment Resiliency of Coastal Communities | ≥0 m | 6 | 656.0 | ₱100,000,000.0 | ₱180,555.55500000002 | Yes |
| Construction of By-Pass and Diversion Roads | 0–<148.535 m | 36 | 70.11500000000001 | ₱66,071,500.0 | ₱1,314,335.06 | No |
| Construction of By-Pass and Diversion Roads | 148.535–<341.5 m | 35 | 243.75 | ₱50,000,000 | ₱209,790.21 | No |
| Construction of By-Pass and Diversion Roads | 341.5–<512.62 m | 36 | 459.35 | ₱57,143,000.0 | ₱127,211.245 | No |
| Construction of By-Pass and Diversion Roads | 512.62–<780.5 m | 35 | 632.0 | ₱75,000,000 | ₱116,272.38 | No |
| Construction of By-Pass and Diversion Roads | 780.5–<1180.59 m | 36 | 1000.0 | ₱100,000,000.0 | ₱101,546.39 | No |
| Construction of By-Pass and Diversion Roads | 1180.59–<1692.25 m | 36 | 1400.0 | ₱101,862,000.0 | ₱74,430.535 | No |
| Construction of By-Pass and Diversion Roads | 1692.25–<2805.82 m | 35 | 2265.0 | ₱100,000,000 | ₱51,387.46 | No |
| Construction of By-Pass and Diversion Roads | ≥2805.82 m | 36 | 4000.0 | ₱182,500,000.0 | ₱39,959.04 | No |
| Construction of Missing Links/ New Roads | 0–<277.43 m | 22 | 121.61500000000001 | ₱132,350,000.0 | ₱744,734.515 | No |
| Construction of Missing Links/ New Roads | 277.43–<989 m | 23 | 736.0 | ₱84,700,000 | ₱100,000.0 | No |
| Construction of Missing Links/ New Roads | 989–<1516.5 m | 23 | 1200.0 | ₱75,000,000 | ₱62,500.0 | No |
| Construction of Missing Links/ New Roads | 1516.5–<2712.5 m | 22 | 1838.35 | ₱145,900,500.0 | ₱71,186.91500000001 | No |
| Construction of Missing Links/ New Roads | 2712.5–<3556.5 m | 22 | 3046.0 | ₱150,000,000.0 | ₱46,991.869999999995 | No |
| Construction of Missing Links/ New Roads | ≥3556.5 m | 23 | 5370.0 | ₱185,000,000 | ₱35,714.29 | No |
| Off-Carriageway Improvement - Primary Roads | ≥0 m | 37 | 1522.0 | ₱20,000,000 | ₱12,106.54 | No |
| Off-Carriageway Improvement - Secondary Roads | 0–<1886.5 m | 21 | 1110.0 | ₱12,080,000 | ₱12,638.3 | No |
| Off-Carriageway Improvement - Secondary Roads | ≥1886.5 m | 42 | 3500.0 | ₱40,000,000.0 | ₱10,390.69 | No |
| Off-Carriageway Improvement - Tertiary Roads | ≥0 m | 39 | 1705.0 | ₱24,970,000 | ₱9,073.9 | No |
| Paving of Unpaved Roads - Primary Roads | ≥0 m | 1 | 45.0 | ₱5,000,000 | ₱111,111.11 | Yes |
| Paving of Unpaved Roads - Secondary Roads | ≥0 m | 3 | 190.0 | ₱9,352,000 | ₱28,061.86 | Yes |
| Paving of Unpaved Roads - Tertiary Roads | ≥0 m | 13 | 1433.0 | ₱45,818,000 | ₱31,973.42 | Yes |
| Preventive Maintenance - Primary Roads | 0–<322 m | 29 | 192.0 | ₱9,659,000 | ₱45,400.0 | No |
| Preventive Maintenance - Primary Roads | 322–<575 m | 28 | 441.0 | ₱18,750,000.0 | ₱39,513.21 | No |
| Preventive Maintenance - Primary Roads | 575–<893.5 m | 29 | 699.0 | ₱29,500,000 | ₱44,562.04 | No |
| Preventive Maintenance - Primary Roads | 893.5–<1153.5 m | 28 | 1005.5 | ₱52,032,500.0 | ₱51,526.395000000004 | No |
| Preventive Maintenance - Primary Roads | 1153.5–<1468.11 m | 29 | 1300.05 | ₱48,100,000 | ₱36,792.41 | No |
| Preventive Maintenance - Primary Roads | 1468.11–<2768 m | 57 | 2000.0 | ₱80,854,000 | ₱38,950.0 | No |
| Preventive Maintenance - Primary Roads | ≥2768 m | 29 | 4100.0 | ₱148,530,000 | ₱34,368.35 | No |
| Preventive Maintenance - Secondary Roads | 0–<317.5 m | 40 | 225.5 | ₱7,862,500.0 | ₱50,714.07 | No |
| Preventive Maintenance - Secondary Roads | 317.5–<809.5 m | 79 | 557.0 | ₱17,795,000 | ₱33,842.84 | No |
| Preventive Maintenance - Secondary Roads | 809.5–<1050.5 m | 40 | 986.475 | ₱27,750,000.0 | ₱30,430.0 | No |
| Preventive Maintenance - Secondary Roads | 1050.5–<1521.5 m | 40 | 1241.5 | ₱40,165,000.0 | ₱33,910.51 | No |
| Preventive Maintenance - Secondary Roads | 1521.5–<2145.5 m | 39 | 1882.0 | ₱58,579,000 | ₱30,506.72 | No |
| Preventive Maintenance - Secondary Roads | 2145.5–<3509 m | 40 | 2726.5 | ₱51,463,500.0 | ₱17,781.665 | No |
| Preventive Maintenance - Secondary Roads | ≥3509 m | 40 | 4806.5 | ₱100,000,000.0 | ₱16,531.39 | No |
| Preventive Maintenance - Tertiary Roads | 0–<277.5 m | 22 | 138.0 | ₱4,134,000.0 | ₱33,873.67 | No |
| Preventive Maintenance - Tertiary Roads | 277.5–<707 m | 22 | 451.5 | ₱11,818,000.0 | ₱20,755.2 | No |
| Preventive Maintenance - Tertiary Roads | 707–<1380.5 m | 44 | 1000.0 | ₱28,005,500.0 | ₱29,911.0 | No |
| Preventive Maintenance - Tertiary Roads | 1380.5–<1886.65 m | 23 | 1603.0 | ₱33,572,000 | ₱21,091.43 | No |
| Preventive Maintenance - Tertiary Roads | 1886.65–<2518 m | 22 | 2100.5 | ₱59,606,000.0 | ₱29,972.495000000003 | No |
| Preventive Maintenance - Tertiary Roads | 2518–<3721.5 m | 22 | 3050.5 | ₱49,014,000.0 | ₱15,844.265 | No |
| Preventive Maintenance - Tertiary Roads | ≥3721.5 m | 22 | 4391.5 | ₱72,431,500.0 | ₱15,082.255000000001 | No |
| Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads | ≥0 m | 27 | 57.0 | ₱33,250,000 | ₱333,333.33 | No |
| Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads | 0–<40.5 m | 22 | 28.5 | ₱5,645,000.0 | ₱212,698.40999999997 | No |
| Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads | 40.5–<60 m | 21 | 50.0 | ₱35,000,000 | ₱625,000.0 | No |
| Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads | 60–<108 m | 21 | 77.0 | ₱22,000,000 | ₱301,886.79 | No |
| Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads | 108–<235.5 m | 22 | 186.0 | ₱40,250,000.0 | ₱187,086.77500000002 | No |
| Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads | 235.5–<369 m | 22 | 294.5 | ₱48,090,000.0 | ₱174,767.195 | No |
| Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads | ≥369 m | 21 | 569.0 | ₱56,500,000 | ₱103,448.28 | No |
| Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads | 0–<122.5 m | 44 | 60.0 | ₱22,772,500.0 | ₱402,286.455 | No |
| Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads | 122.5–<291 m | 23 | 212.0 | ₱31,200,000 | ₱173,983.74 | No |
| Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads | ≥291 m | 22 | 471.5 | ₱45,038,000.0 | ₱92,679.16500000001 | No |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads | 0–<241.5 m | 24 | 139.5 | ₱5,000,000.0 | ₱39,500.354999999996 | No |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads | 241.5–<455 m | 23 | 331.0 | ₱9,306,000 | ₱28,653.3 | No |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads | 455–<1417 m | 24 | 772.0 | ₱19,640,000.0 | ₱23,630.239999999998 | No |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads | 1417–<2175.5 m | 23 | 1774.0 | ₱41,717,000 | ₱24,869.71 | No |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads | ≥2175.5 m | 24 | 4259.0 | ₱132,777,000.0 | ₱32,638.42 | No |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | 0–<179.5 m | 22 | 91.25 | ₱3,619,500.0 | ₱47,202.615000000005 | No |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | 179.5–<340.5 m | 22 | 268.0 | ₱16,781,500.0 | ₱60,000.0 | No |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | 340.5–<664.75 m | 45 | 500.0 | ₱20,767,000 | ₱39,783.52 | No |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | 664.75–<1269.5 m | 45 | 1000.0 | ₱29,579,000 | ₱30,376.67 | No |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | 1269.5–<1820.5 m | 22 | 1404.0 | ₱42,839,000.0 | ₱30,399.769999999997 | No |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | ≥1820.5 m | 22 | 2649.0 | ₱70,000,000.0 | ₱26,550.86 | No |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | 0–<180.5 m | 22 | 100.5 | ₱4,515,000.0 | ₱51,081.035 | No |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | 180.5–<432.5 m | 21 | 285.0 | ₱8,932,000 | ₱35,015.77 | No |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | 432.5–<806 m | 22 | 605.5 | ₱19,784,500.0 | ₱35,903.740000000005 | No |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | 806–<1623.5 m | 21 | 1019.0 | ₱28,245,000 | ₱28,521.79 | No |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | ≥1623.5 m | 22 | 2098.5 | ₱55,677,000.0 | ₱21,511.13 | No |
| Road Widening - Primary Roads | 0–<1011.5 m | 24 | 454.385 | ₱17,200,000.0 | ₱48,836.33 | No |
| Road Widening - Primary Roads | 1011.5–<1870 m | 23 | 1429.0 | ₱64,850,000 | ₱44,673.54 | No |
| Road Widening - Primary Roads | ≥1870 m | 24 | 2987.875 | ₱130,000,000.0 | ₱35,178.165 | No |
| Road Widening - Secondary Roads | 0–<364.5 m | 26 | 246.5 | ₱13,076,000.0 | ₱50,000.0 | No |
| Road Widening - Secondary Roads | 364.5–<567.5 m | 27 | 479.0 | ₱26,000,000 | ₱51,400.0 | No |
| Road Widening - Secondary Roads | 567.5–<804.5 m | 26 | 661.0 | ₱43,636,500.0 | ₱60,234.845 | No |
| Road Widening - Secondary Roads | 804.5–<1005.5 m | 27 | 957.0 | ₱43,400,000 | ₱50,760.23 | No |
| Road Widening - Secondary Roads | 1005.5–<1262 m | 26 | 1140.5 | ₱55,777,000.0 | ₱50,733.625 | No |
| Road Widening - Secondary Roads | 1262–<1648.5 m | 26 | 1499.2 | ₱47,677,500.0 | ₱32,837.205 | No |
| Road Widening - Secondary Roads | 1648.5–<2283.5 m | 27 | 1963.0 | ₱56,182,000 | ₱30,194.47 | No |
| Road Widening - Secondary Roads | ≥2283.5 m | 26 | 3000.0 | ₱84,454,500.0 | ₱26,250.47 | No |
| Road Widening - Tertiary Roads | ≥0 m | 37 | 1211.0 | ₱43,496,000 | ₱38,999.05 | No |
Bridges · full band statistics
| Official program | Length band | Rows | Median meters | Median allocation pesos | Median pesos/meter | Sample below 20 rows |
|---|---|---|---|---|---|---|
| BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | 0–<40.8 m | 22 | 25.0 | ₱28,850,000.0 | ₱1,410,000.0 | No |
| BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | ≥40.8 m | 21 | 90.0 | ₱62,000,000 | ₱607,142.86 | No |
| Construction of By-Pass and Diversion Roads | ≥0 m | 8 | 359.745 | ₱99,979,500.0 | ₱640,541.575 | Yes |
| Construction of Missing Links/ New Roads | ≥0 m | 4 | 355.9 | ₱82,750,000.0 | ₱205,759.805 | Yes |
| Construction of New Bridges | ≥0 m | 7 | 255.0 | ₱147,259,000 | ₱1,141,552.51 | Yes |
| Off-Carriageway Improvement - Secondary Roads | ≥0 m | 2 | 172.5 | ₱15,000,000.0 | ₱88,461.54000000001 | Yes |
| Widening of Permanent Bridges | ≥0 m | 1 | 301.16 | ₱20,000,000 | ₱66,409.88 | Yes |
FMR · full band statistics
| Official program | Length band | Rows | Median meters | Median allocation pesos | Median pesos/meter | Sample below 20 rows |
|---|---|---|---|---|---|---|
| FMR | ≥0 m | 3 | 650.0 | ₱10,000,000 | ₱15,384.62 | Yes |
Method and limitations
Length bands are derived separately within each PAP using approximately equal-count groups (up to eight, targeting at least 20 records per group). Equal observed lengths stay together. Breakpoint candidates are geometric midpoints between adjacent observed distinct lengths, requiring at least 20 records on either side; up to 31 candidates cover the eligible boundaries. No 100-meter boundary is prescribed. The searched boundary counts as an extra model parameter in BIC.
- Density=allocation/length; declining density can follow mechanically from a fixed budget.
- Quantile-band counts and 2×/BIC screens are editorial exploratory choices, not calibrated corruption thresholds.
- Models use total allocation rather than density to reduce the arithmetic-denominator trap.
- Bootstrap votes measure selection stability in this sample, not the probability of a real engineering threshold.
- Dependence between allocation occurrences, unknown width/terrain/structures and non-random missing lengths remain uncontrolled.
- Sub-10m rows stay visible in bands but are excluded from model fits; ≥25m sensitivity is reported.
- Multiple exploratory program/boundary searches are not confirmatory significance tests; no p-values or multiplicity-adjusted claims are made.
- Sparse bridge/FMR data cannot establish an engineering threshold. No pooled cross-category rate model.
Download all groups, model slopes, bootstrap votes and methodology. Patterns direct source and engineering review; there is no universal safe or suspicious length.
4. Coordinate-distance approximations
Coordinate-distance estimates stay separate from stated-meter rates and high-rate flags. Detailed asset matching, recovered dimensions, length coverage and extraction methods are on Asset matching and length coverage.
Coordinate-based allocation per meter · approximation
Additional tables below divide whole allocations by straight-line separation between two printed endpoints. Separately labeled FMR segment chords are summed. A road can curve or include structures, so this distance is not a measured road or bridge length. These approximate rates are kept outside stated-length coverage, historical price comparisons and high-rate flags. Review flags, coincident endpoints, unpaired coordinate lists and mixed road/bridge rates are withheld. No distance between different projects supplies a project-length denominator.
Bridge rehabilitation · inventory condition and document-list cross-check
This review covers Rehabilitation/Major Repair of Permanent Bridges and BIP bridge rows explicitly titled rehabilitation or repair. Retrofitting/strengthening is excluded. A listed document count is not a construction-completion status.
290 bridge rehabilitation/repair rows · 270 have a matched bridge ID in the offline DPWH inventory · 226 have a recorded inventory condition. Of the rows with a condition: 167 are marked Good/Fair and 59 Poor/Bad. Assessment dates are unavailable in these matched records.
| DPWH Transparency title status · snapshot | Bridge rows |
|---|---|
| 5+ documents listed | 3 |
| Fewer than 5 listed | 254 |
| Candidate title match · review | 0 |
| No verified title match in snapshot | 33 |
| No exact-title record in snapshot | 0 |
The Transparency snapshot was retrieved 18 October 2026. “5+ documents listed” describes the portal’s document count only; it does not verify that a bridge was built or that rehabilitation is complete. An incomplete or unmatched title is not proof that a project or its documents are absent. Inventory condition dates are not available here, so Good/Fair and Poor/Bad describe the retained condition label without a dated condition comparison.
Existing inventory spans are asset dimensions, not funded rehabilitation lengths. The broader inventory cross-check found existing spans for 754 bridge line items, including rows without a usable stated funded length. These asset spans do not fill in the missing work length.
Largest allocations · project-by-project review sample
| Project | HGAB allocation | Stated length (m) | Inventory bridge ID | Inventory span (m) | Inventory condition | Transparency document status |
|---|---|---|---|---|---|---|
| Rehabilitation of Wawa Bridge, Pilar, Bataan, 0+000 - 0+045, (14.672155, 120.563000) | ₱210,000,000 | 45.0 | No supported ID match | None | No inventory condition match | Fewer than 5 listed |
| Rehabilitation of Burol Overpass, Sta. 1+120 - Sta. 1+145, Provincial Road, Borol 2nd, Balagtas, Bulacan | ₱150,000,000 | 25.0 | No supported ID match | None | No inventory condition match | 5+ documents listed |
| Iyam Br. (B02935LZ) along Maharlika Highway (MSR Diversion Rd) | ₱130,000,000 | None | B02935LZ | 93 | Poor · assessment year unknown | Fewer than 5 listed |
| Carmen Br. (B00322MN) along Bukidnon-Cotabato Rd | ₱100,000,000 | None | B00322MN | 223 | Good · assessment year unknown | Fewer than 5 listed |
| Colongolo Br. (B01040MN) along Surallah-Lake Sebu-Maitum Rd | ₱90,240,000 | None | B01040MN | 94 | Poor · assessment year unknown | Fewer than 5 listed |
| Calbiga Br. (B00387SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br) | ₱85,000,000 | None | B00387SM | 106 | Poor · assessment year unknown | Fewer than 5 listed |
| EDSA/Ortigas Interchange (B03316LZ) along EDSA/Ortigas Interchange | ₱62,000,000 | None | B03316LZ | 492 | Fair · assessment year unknown | Fewer than 5 listed |
| Rehabilitation of Santol - Bunsuran II Bridge, Sta. 3+580 - Sta. 3+596, Bunsuran II, Pandi, Bulacan (120.923015, 14.856319) | ₱60,000,000 | 16.0 | No supported ID match | None | No inventory condition match | No verified title match in snapshot |
| EDSA/Ortigas Flyover (B03315LZ) along EDSA/Ortigas Flyover | ₱53,000,000 | None | B03315LZ | 348 | Fair · assessment year unknown | Fewer than 5 listed |
| Pagalungan Br. (B00305MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect) | ₱50,000,000 | None | B00305MN | 243 | Fair · assessment year unknown | Fewer than 5 listed |
| Batang Batang Br. (B00035PW) along Puerto Princesa South Rd | ₱50,000,000 | None | B00035PW | 93 | No inventory condition match | Fewer than 5 listed |
| Mambaling Flyover (B00626CB) along N Bacalso Ave (Cebu South Rd) | ₱50,000,000 | None | B00626CB | 210 | Fair · assessment year unknown | Fewer than 5 listed |
| Tual Br. (B01077MN) along Sarangani-Sultan Kudarat Coastal Rd | ₱47,260,000 | None | B01077MN | 53 | Poor · assessment year unknown | Fewer than 5 listed |
| Daniog Br. 1 (B00664MN) along Surigao-Davao Coastal Rd | ₱45,500,000 | None | B00664MN | 82 | Poor · assessment year unknown | Fewer than 5 listed |
| Makati-Mandaluyong Br. (B04891LZ) along Makati-Mandaluyong Br. | ₱42,200,000 | None | B04891LZ | 339 | No inventory condition match | Fewer than 5 listed |
| Rehabilitation of Riyungan Bridge, Barangay Pandan, South Upi, Maguindanao del Sur | ₱40,000,000 | None | No supported ID match | None | No inventory condition match | Fewer than 5 listed |
| Rehabilitation of Bridge, Barangay Sinalhan, City of Santa Rosa, Laguna | ₱40,000,000 | None | No supported ID match | None | No inventory condition match | Fewer than 5 listed |
| Maludbalud Br. (B00238SM) along Maharlika Highway (Sn Isidro-Sn Juanico Br) | ₱36,102,000 | None | B00238SM | 60 | Fair · assessment year unknown | Fewer than 5 listed |
| Rehabilitation of Bridge, Barangay Malitlit, City of Santa Rosa, Laguna, 14.26841389, 121.11262528 | ₱35,000,000 | None | No supported ID match | None | No inventory condition match | No verified title match in snapshot |
| Rehabilitation of Bridge, Barangay Aplaya, City of Santa Rosa, Laguna | ₱35,000,000 | None | No supported ID match | None | No inventory condition match | Fewer than 5 listed |
| Araniw Br. (B00776LZ) along Laoag-Airport Rd | ₱34,000,000 | None | B00776LZ | 46 | Fair · assessment year unknown | Fewer than 5 listed |
| Kalawaig Br. (B02086MN) along Bukidnon Bdry - North Cotabato Rd | ₱30,000,000 | None | B02086MN | 17 | No inventory condition match | Fewer than 5 listed |
| Delpan Br. (B02291LZ) along M Roxas Jr Bridge | ₱30,000,000 | None | B02291LZ | 150 | No inventory condition match | Fewer than 5 listed |
| Mabini Br. (Nagtahan Br.) (B01733LZ) along Nagtahan Bridge / Fly-Over | ₱30,000,000 | None | B01733LZ | 150 | No inventory condition match | Fewer than 5 listed |
| Butuanon Br. 2 (B00589CB) along Cebu North Hagnaya Wharf Rd | ₱30,000,000 | None | B00589CB | 50 | Fair · assessment year unknown | Fewer than 5 listed |
Showing the 25 largest allocations; the JSON contains the full review population, inventory IDs, conditions, document-list status and source pages. Download all bridge rehabilitation review rows as JSON.