Loading DPWH bill records…
BetterGov
BetterGov · Budget research

Cost per Unit · peer comparison

Compare unit costs by bill and unit, with source pages available for review.

DPWH · POW analysis

Compare like-for-like bill items

Choose a bill and unit below to see its project count, median and outliers. Check each cited source page before comparing values.

—projects with usable unit costs
—median · selected unit
—outliers · 1.5×IQR rule

Road and bridge project billboards · price per each

Billboard/signboard line items are separated from the overall road or bridge allocation. The chart compares the same parsed item and unit across project groups; the table gives high extracted rates for source review.

A unit price alone cannot show whether a signboard was installed, what specification was required, or whether its quality was acceptable. High values are review leads, not findings.

Loading road and bridge billboards…

One bill · project cost distribution

Unit cost is calculated as the selected cost-basis amount divided by quantity. The compact table ranks projects from highest to lowest unit cost. Open a project for its full POW bill details; verify extracted values against the cited pages. The chart uses a logarithmic price scale; compare only the same bill and unit.

Projects with this bill · highest unit cost first

Loading project rows…
RankProject / officeCalculated cost per unitPOW pages

Top summaries by project group

Category summaries are combined using the reviewed label rules. Original printed labels and source pages remain linked from the compact table; open a project for full evidence.

Combined category / printed labelProject / officePrinted summarySource

Project summaries and parsed document evidence

Projects · top summary and top bills

Select a project to see its highest printed summary category and leading bill items. Switch between its summary and itemized details. The project list is kept compact; open a project for its bill rows, source pages, signatories, and other evidence.

Summary

Printed category summaries and qualitative scope facts from the selected project POW.

Printed cost categoryPrinted summary valuesSource

Project evidence and signatories

The cost columns show the largest three printed general categories with their percentage and total, then the largest three recovered specific items within each category. Specific items retain quantity, unit, direct-cost share and amount when recoverable. Details lists missing fields and pages that need human review. Names and roles below are extracted from the cited documents. Exact name and designation matches to ODV roster entries add historical locality and year context; they do not establish current office, project sponsorship or responsibility. A Governor may govern a different province from the project location. Some Rainwater Collector System POWs identify schools; system-level schedules may have no school or building contexts. Other projects may list buildings or components.

Project / officeNEP allocationPOW snapshotProject documents
How to read this evidence
  • Only bill rows with an explicit item heading are included in the cost chart. Quantities retain their original units. Direct costs exclude markup, VAT and engineering/administrative overhead unless the source explicitly says otherwise.
  • The cost columns show the largest three printed category summaries and the largest three specific items within each category, with percentage, total, quantity and unit when recovered. Details lists school or component names, missing numeric fields, unusually small shares compared with the NEP allocation and pages needing manual review.
  • A matching printed direct-cost subtotal establishes that itemized table’s reconciliation only. It does not reconcile the full project allocation, contract or actual spending. Category summaries are not added to itemized rows.
  • Unit prices and amount ÷ quantity are displayed separately. Printed rounding and arithmetic discrepancies remain visible for source review.
  • Signatories require a name next to an explicit role in the same signature column. DE and ADE remain separate. Governor and mayor designations are matched by exact name to ODV roster records when available; roster dates and localities provide context, not proof of current office or project responsibility. Missing or unreadable evidence remains unassigned; no official is inferred from project geography.
  • Photos open as direct source PDF links. POW and Development Council source links include page references. Downloadable records show the values and source references included in this review. Original documents remain at their cited sources.
  • The project evidence table covers the currently reviewed NEP proposal-document set; it is not a complete programme inventory. The coverage and peer sections separately use HGAB 3rd project rows title-matched to the FY2027 DPWH Transparency snapshot; stage scopes may differ. Peer rates are screening comparisons only and do not adjust for project dimensions or site conditions.
  • Access failures indicate retrieval problems, not absent or incomplete official documentation. The coverage note is a dated data snapshot, not a live claim about the entire DPWH programme.