Archived: DPWH NEP → HGAB pre-OO2 comparison

Archived pre-OO2 baseline; use the OO2-adjusted comparison for current HGAB-only counts.

DPWH · FY2027 NEP to 3rd-reading HGAB
5,549potential domestic insertion candidates
₱158.36BHGAB allocation across domestic candidates · not alleged losses
Full 3rd-reading DPWH allocation₱587.08B16,275 extracted allocation records
Ambiguous / already paired556held out of the insertion shortlist

This excludes 4 unmatched FAP records carrying ₱806.9M; they are reviewed separately. Unmatched titles are review leads, not confirmed legislative insertions. Inspect source pages, scope and plausible counterpart links.

Office changes · 61

Compare the NEP and HGAB 3rd implementing-office areas for the 61 candidate line items without project coordinates. The maps show DPWH engineering-district boundaries; Central Office is shown with the DPWH seal. The listed office change is a comparison signal, not proof that the project moved geographically. The Isabela record is scope-adjusted; two Camiguin operations-center candidates are excluded pending identity review.

Source comparison: CSIIIV snapshot 34ef5d8cbbac. Engineering-district boundaries: DPWH layer snapshot, data edited August 2024. The 6 records with printed project coordinates remain on Out of Place.

Loading office maps…

NEP office → HGAB 3rd office

Loading engineering-district boundaries…

Each shape is shown in its own fitted map panel. The arrow indicates the office assignment listed in the two source schedules; it is not a project-location arrow.

Office-change projects

Show the 61 office-change records as a table
Project line itemOffice change · NEP → HGAB 3rdNEP → HGAB PDF pageNEP → HGAB allocation
Jose Abad Santos Ave (JASA) - K0120 + 000 - K0122+059NEP: Pampanga 2nd District Engineering Office → HGAB 3rd: Central Office201 → 112₱27,170,000 → ₱64,500,000
Bacolod South Rd - K0007 + 000 - K0007 + 604, K0007 + 627 - K0008 + 000, K0008 + 000 - K0008 + 144, K0008 + 819 - K0008 + 980NEP: Bacolod City District Engineering Office → HGAB 3rd: Central Office202 → 113₱36,336,000 → ₱55,843,000
Jose Abad Santos Ave (JASA) - K0118 + 565 - K0119 + 022NEP: Pampanga 2nd District Engineering Office → HGAB 3rd: Zambales 2nd District Engineering Office201 → 119₱33,859,000 → ₱17,500,000
Jose Abad Santos Ave (JASA) - K0124 + 170 - K0124+949NEP: Central Office → HGAB 3rd: Zambales 2nd District Engineering Office195 → 119₱62,918,000 → ₱29,500,000
Batangas-Quezon Rd - K0108 + 000 - K0108 + 259, K0110 + 000 - K0110 + 259, K0121 + 444 - K0121 + 968, K0122 + 824 - K0122 + 920, K0122 + 931 - K0124 + 198, K0124 + 206 - K0124 + 606, K0124 + 706 - K0125 + 106, K0126 + 700 - K0126 + 885, K0127 + 004 - K0127 + 386, K0127 + 610 - K0127 + 844, K0128 + 000 - K0128 + 940, K0130 + 944 - K0130 + 958, K0131 + 016 - K0131 + 088NEP: Batangas 4th District Engineering Office → HGAB 3rd: Central Office210 → 125₱25,697,000 → ₱150,000,000
Batangas-Quezon Rd - K0111 + 000 - K0111 + 965, K0125 + 717 - K0125 + 831, K0129 + 420 - K0129 + 705, K0129 + 855 - K0129 + 958, K0130 + 464 - K0130 + 944NEP: Batangas 4th District Engineering Office → HGAB 3rd: Central Office210 → 125₱14,313,000 → ₱58,819,000
Rosario-Sn Juan Rd - K0127 + 000 - K0127 + 402, K0127 + 800 - K0128 + 684, K0131 + 324 - K0132 + 000, K0134 + 000 - K0134 + 004, K0136 + 000 - K0136 + 103, K0136 + 394 - K0137 + 000, K0141 + 393 - K0141 + 772, K0141 + 781 - K0142 + 000, K0130 + 000 - K0130 + 439, K0133 + 679 - K0134 + 000, K0134 + 004 - K0134+ 151, K0134 + 237 - K0134 + 591, K0139 + 185 - K0140 + 327, K0140 + 752 - K0140 + 842NEP: Batangas 4th District Engineering Office → HGAB 3rd: Central Office210 → 125₱15,030,000 → ₱128,833,000
Siquijor Circumferential Rd - K0004 + 100 - K0004 + 786, K0009 + 720 - K0012 + 000, K0051 + 330 - K0051 + 731, K0074 + 520 - K0075 + 339NEP: Siguijor District Engineering Office → HGAB 3rd: Central Office214 → 126₱2,534,000 → ₱138,900,000
Biliran Circumferential Rd - K1025 + 448 - K1027 + 544NEP: Biliran District Engineering Office → HGAB 3rd: Central Office214 → 127₱10,500,000 → ₱80,000,000
Batangas-Lobo Rd - K0130 + 074 - K0131 + 114NEP: Batangas 4th District Engineering Office → HGAB 3rd: Batangas 2nd District Engineering Office210 → 131₱7,938,000 → ₱41,120,000
Palico-Balayan-Batangas Rd - K0138 + 604 - K0139 + 760NEP: Central Office → HGAB 3rd: Batangas 3rd District Engineering Office206 → 131₱81,473,000 → ₱46,473,000
Palico-Balayan-Batangas Rd - K0147 + 520 - K0148 + 219NEP: Central Office → HGAB 3rd: Batangas 2nd District Engineering Office206 → 131₱80,000,000 → ₱48,000,000
Talisay-Laurel-Agoncillo Rd - K0083 + 734 - K0084 + 808NEP: Central Office → HGAB 3rd: Batangas 3rd District Engineering Office217 → 144₱54,258,000 → ₱40,000,000
Famy-Real-Infanta-Dinahican Port Rd - K0099 + 004 - K0100 + 004, K0100 + 488 - K0100 + 894NEP: Quezon 1st District Engineering Office → HGAB 3rd: Central Office233 → 156₱28,619,000 → ₱55,000,000
Kalinga-Abra Rd - K0496 + 850 - K0497 + 859, K0497 + 879 - K0499+015NEP: Upper Kalinga District Engineering Office → HGAB 3rd: Central Office231 → 156₱22,660,000 → ₱107,160,000
Cagayan-Apayao Rd (Tuao-Rizal Sect) - K0530 + (-1771) - K0530 + 480NEP: Cagayan 2nd District Engineering Office → HGAB 3rd: Central Office239 → 166₱28,499,000 → ₱105,000,000
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0464 + 800 - K0465 + 000, K0465 + 400 - K0466 + 450NEP: Mountain Province 2nd District Engineering Office → HGAB 3rd: Central Office239 → 166₱22,244,000 → ₱55,000,000
Banaue-Hungduan-Benguet Bdry Rd - K0350 + 282 - K0350 + 321, K0350 + 376 - K0350 + 409NEP: Ifugao 1st District Engineering Office → HGAB 3rd: Ifugao 2nd District Engineering Office252 → 185₱31,600,000 → ₱9,700,000
Jct Logac-Lasam-Gagabutan Rd - K0741 + 819 - K0741 + 957NEP: Central Office → HGAB 3rd: Cagayan 2nd District Engineering Office251 → 186₱75,000,000 → ₱45,000,000
Butuan City-Malaybalay Rd - K1253 + 040 - K1253 + 162NEP: Central Office → HGAB 3rd: Butuan City District Engineering Office251 → 187₱110,000,000 → ₱50,000,000
Barotac Nuevo-Dumangas-Dacutan Wharf Rd - K0275 + 417 - K0275 + 537, K0275 + 637 - K0276 + 870, K0280 + 723 - K0280 + 992NEP: Central Office → HGAB 3rd: Iloilo 2nd District Engineering Office258 → 193₱74,459,000 → ₱44,085,000
Iloilo-Capiz Rd (New Route) - K0098 + 1004 - K0100 + 100NEP: Capiz 2nd District Engineering Office → HGAB 3rd: Central Office264 → 198₱5,473,000 → ₱84,747,000
Aklan West Rd (Kalibo-Nabas) – K0251 + 122 – K0252 + 020NEP: Aklan District Engineering Office → HGAB 3rd: Central Office272 → 203₱47,143,000 → ₱76,777,000
Dinagat-Loreto Rd - K0058 + 240 - K0061 + 000NEP: Dinagat Islands District Engineering Office → HGAB 3rd: Central Office274 → 205₱23,462,000 → ₱65,527,000
Cawag-Philseco Bypass Road, Sta. 1+925 - Sta. 3+600, ZambalesNEP: Zambales 2nd District Engineering Office → HGAB 3rd: Central Office290 → 217₱44,500,000 → ₱80,000,000
Barotac Viejo Bypass Road, Sta. 0 + 480 - Sta. 0 + 568.47 & Sta. 0 + 673.47 - Sta. 1 + 455.47, IloiloNEP: Iloilo 3rd District Engineering Office → HGAB 3rd: Central Office291 → 222₱33,800,000 → ₱150,000,000
Malvar-Sto. Tomas Road, Sta. 5+636 - Sta. 5+889, BatangasNEP: Central Office → HGAB 3rd: Batangas 3rd District Engineering Office280 → 230₱100,000,000 → ₱40,000,000
Anilao Bypass Road, Sta. 0 + 000 - Sta. 2 + 242.73, IloiloNEP: Central Office → HGAB 3rd: Iloilo 2nd District Engineering Office282 → 231₱71,057,000 → ₱40,057,000
Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 5+000, AlbayNEP: Central Office → HGAB 3rd: Albay 1st District Engineering Office282 → 231₱150,000,000 → ₱50,000,000
Quezon - Alabat - Perez Circumferential Road - Sta. 20+110 - Sta. 21+910NEP: Quezon 4th District Engineering Office → HGAB 3rd: Central Office301 → 236₱50,000,000 → ₱100,000,000
Besao-Tubo (via Tamboan) Road, Sta.11+387 - Sta.11+567, Besao, Mountain ProvinceNEP: Central Office → HGAB 3rd: Mountain Province 1st District Engineering Office295 → 241₱119,100,000 → ₱8,600,000
Tanudan-Barlig - Ifugao Road (Barlig - Banaue Section) - Sta. 3+600 - Sta. 4+000NEP: Central Office → HGAB 3rd: Mountain Province 2nd District Engineering Office295 → 241₱150,000,000 → ₱30,000,000
Atimonan-Mauban Road - STA 003+660 - STA 004+460NEP: Central Office → HGAB 3rd: Quezon 4th District Engineering Office295 → 242₱100,000,000 → ₱50,000,000
Tanudan-Barlig - Ifugao Road (Tanudan-Barlig Section) - Sta. 1+396 - Sta. 1+796NEP: Central Office → HGAB 3rd: Mountain Province 2nd District Engineering Office295 → 242₱200,000,000 → ₱20,000,000
Naga-Carolina-Panicuason Rd - K0438 + (-325) - K0438 + 600NEP: Central Office → HGAB 3rd: Camarines Sur 3rd District Engineering Office308 → 254₱100,000,000 → ₱50,000,000
Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 10118 - Chainage 11698NEP: Lanao del Norte 2nd District Engineering Office → HGAB 3rd: Central Office311 → 256₱45,826,000 → ₱50,518,000
Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 13131 - Chainage 14883NEP: Lanao del Norte 2nd District Engineering Office → HGAB 3rd: Central Office311 → 256₱46,169,000 → ₱56,064,000
Mapangpang Br. (Muñoz) (B01271LZ) along Muñoz-Lupao RdNEP: Nueva Ecija 1st District Engineering Office → HGAB 3rd: Central Office316 → 257₱35,000,000 → ₱95,000,000
Poblacion West Br. 2 (B03405LZ) along San Jose City-Rizal Rd via Pinili-Porais-Villa Joson (Palarilla) RdNEP: Nueva Ecija 1st District Engineering Office → HGAB 3rd: Central Office316 → 257₱40,000,000 → ₱90,000,000
Señora Br. (B00008SJ) along Siquijor Circumferential RdNEP: Siguijor District Engineering Office → HGAB 3rd: Central Office317 → 258₱50,000,000 → ₱75,000,000
Pagnamitan Br. Along Guiuan-Sulangan Peninsula RoadNEP: Central Office → HGAB 3rd: Eastern Samar District Engineering Office345 → 295₱150,000,000 → ₱50,000,000
Rehabilitation of Damaged Flood Control Structure, Barangay Banalo, Lobo, BatangasNEP: Central Office → HGAB 3rd: Batangas 2nd District Engineering Office355 → 344₱100,000,000 → ₱25,000,000
Rehabilitation of Damaged Flood Control Structure, Barangay Malabrigo, Lobo, BatangasNEP: Central Office → HGAB 3rd: Batangas 2nd District Engineering Office355 → 344₱100,000,000 → ₱25,000,000
Construction of Flood Control Structure, Balimbing Creek (Sta. 1+400 - Sta. 1+510), Muntinlupa CityNEP: Las Pi ñ as Muntinlupa District Engineering Office → HGAB 3rd: Central Office401 → 364₱20,000,000 → ₱70,000,000
Construction of Flood Mitigation Structure along Guadalupe River, Sta. 7+502 - Sta. 7+727, Barangay Kalunasan, Cebu CityNEP: Central Office → HGAB 3rd: Cebu City District Engineering Office399 → 373₱124,200,000 → ₱50,000,000
BARMMNEP: BARMM → HGAB 3rd: Central Office430 → 409₱38,400,000 → ₱38,400,000
Construction of Bridge, Barangay Malitam, Batangas CityNEP: Batangas 2nd District Engineering Office → HGAB 3rd: Central Office504 → 426₱35,000,000 → ₱115,000,000
Construction of O-ong-Dalligan Road, Sta. 2+250 - Sta. 4+000, Kiangan, IfugaoNEP: Central Office → HGAB 3rd: Ifugao 1st District Engineering Office435 → 478₱100,000,000 → ₱30,000,000
Construction of Panubtuban-Jolowon Road, Sta. 16+000 - Sta. 16+800, Lamut, IfugaoNEP: Central Office → HGAB 3rd: Ifugao 1st District Engineering Office435 → 478₱100,000,000 → ₱30,000,000
Construction of Road Concreting, JJ Linao-Bagac-Mariveles Road, Bagac, BataanNEP: Bataan 2nd District Engineering Office → HGAB 3rd: Bataan 3rd District Engineering Office485 → 506₱20,000,000 → ₱20,000,000
Construction of Road, Gen Luna, Dinalupihan, BataanNEP: Bataan 2nd District Engineering Office → HGAB 3rd: Bataan 3rd District Engineering Office485 → 507₱25,000,000 → ₱25,000,000
Construction of Road, Barangay Sapul, Calapan City, Oriental MindoroNEP: Central Office → HGAB 3rd: Mindoro Oriental District Engineering Office443 → 554₱55,000,000 → ₱20,000,000
Construction of Road, Isaub to San Juan, Aborlan, PalawanNEP: Central Office → HGAB 3rd: Palawan 3rd District Engineering Office443 → 556₱208,000,000 → ₱18,000,000
Construction of Road, Sta. 0 + 000 - Sta. 1 + 200, Barangay Macatunao - Barangay Tambaliza, Concepcion, IloiloNEP: Central Office → HGAB 3rd: Iloilo 3rd District Engineering Office446 → 572₱114,000,000 → ₱20,000,000
Construction of 2-units Multi-Purpose Building, Barangay District 3, San Manuel, IsabelaNEP: Isabela 2nd District Engineering Office → HGAB 3rd: Central Office590 → 635₱41,500,000 → ₱62,350,000
Construction of Malabuyoc Multi-Purpose Building, Malabuyoc, CebuNEP: Cebu 7th District Engineering Office → HGAB 3rd: Central Office647 → 646₱50,000,000 → ₱65,000,000
Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, CebuNEP: Cebu City District Engineering Office → HGAB 3rd: Central Office647 → 646₱50,000,000 → ₱100,000,000
Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, CagayanNEP: Central Office → HGAB 3rd: Cagayan 2nd District Engineering Office563 → 703₱100,000,000 → ₱20,000,000
Construction (Completion) of Multi-Purpose Building (Evacuation Center - Left Wing), Barangay San Isidro, Batangas CityNEP: Central Office → HGAB 3rd: Batangas 2nd District Engineering Office567 → 751₱75,000,000 → ₱50,000,000
Construction (Completion) of Multi-Purpose Building (Evacuation Center - Right Wing), Barangay San Isidro, Batangas CityNEP: Central Office → HGAB 3rd: Batangas 2nd District Engineering Office567 → 751₱75,000,000 → ₱50,000,000
Rehabilitation of Boatlanding, barangay Dagohoy, Dapa, Siargao Island, Surigao del NorteNEP: Surigao del Norte 2nd District Engineering Office → HGAB 3rd: Surigao del Norte 1st District Engineering Office677 → 926₱5,000,000 → ₱5,000,000

Potential repeated line items: FY2027 NEP → FY2026 GAA, then FY2025 GAA

Multi-purpose buildings, roads, bridges, and flood-control projects. The name screen found 283 FY2027 NEP lines with a 90% or higher title match in the FY2026 enacted GAA, and 454 with a 90% or higher title match in the FY2025 enacted GAA. Bridge candidates require overlapping plus-form chainage. Road matches are excluded when both stated ranges are disjoint; missing chainage is flagged for review. Different package, phase, stage, lot or segment labels require scope review. They may identify legitimate separate work or changes in how the same work is described; overlapping chainage still signals shared extent. Explicit opposing directions are excluded. For all categories, verify location, scope, phase, and completion status before treating a row as the same project. Explicit opposing directions are excluded as location conflicts. Amounts are in pesos. Title similarity is a screening lead, not proof that two appropriations cover the same scope.

PH location DB supplies current 20th Congress names through qualified geographic context and the strict local-map screening rules. Uncertain locations stay blank. Names describe geographic coverage, not sponsorship.

Potential repeat matches by enacted GAA yearMatch counts and enacted GAA allocations for the current search and year filter.
ProgramFY2027 NEP line itemNEP chainageDistrict officeRepresentative(s) by named project locationFY2027 NEPGAA yearEnacted GAA line itemGAA chainageChainage / tranche checkGAA amountTitle matchGAA source

Where are the potential insertions and removals?

Our corrected comparison identifies 5,549 domestic insertion candidates and 1,002 domestic removal candidates. Another 4 unpaired FAP records are reviewed separately, giving 5,553 HGAB-only review records in these breakdowns. 0 FAP removal candidates remain. These are provisional line-item matches, not confirmed legislative changes.

The externally reported 5,837 insertions / 2,139 removals belong to a different comparison and are not the totals generated by this pipeline. Our removal shortlist excludes 252 unpaired NEP records with plausible HGAB counterparts. Retained projects with allocation increases or decreases belong to allocation adjustments below.

Implementing offices and programs come from each source schedule, not inferred project geography. Missing offices remain unspecified, including the 4 unpaired FAP records. Insertion amounts are HGAB allocations; removal amounts are original NEP allocations, not certified savings.

Central Office versus DEOs and other implementing officesTeal: insertion candidates · Orange: removal candidates. FAP insertions are unpaired review records, shown separately from domestic candidates.
Central Office · insertionCount: 931931Central Office · removalCount: 00Central OfficeDEOs · insertionCount: 4,6184,618DEOs · removalCount: 994994DEOsRegional Offices · insertionCount: 00Regional Offices · removalCount: 88Regional OfficesOther / unspecified · insertionCount: 44Other / unspecified · removalCount: 00Other / unspecified
Implementing office categoryInsertion candidate linesHGAB allocationRemoval candidate linesOriginal NEP allocation
Central Office931₱97,965,612,0000₱0
DEOs4,618₱60,397,713,000994₱63,738,438,000
Regional Offices0₱08₱678,794,000
Other / unspecified4₱806,910,0000₱0
Insertion and removal candidates by source programTeal: insertion candidates · Orange: removal candidates. FAP insertions are unpaired review records, shown separately from domestic candidates.
Asset Preservation · insertionCount: 382382Asset Preservation · removalCount: 164164Asset PreservationNetwork Development · insertionCount: 233233Network Development · removalCount: 150150Network DevelopmentBridges · insertionCount: 5454Bridges · removalCount: 3737BridgesFlood Management · insertionCount: 421421Flood Management · removalCount: 234234Flood ManagementCSSP · insertionCount: 4,4344,434CSSP · removalCount: 400400CSSPLocal Program · insertionCount: 2525Local Program · removalCount: 1717Local ProgramFAPs · insertionCount: 44FAPs · removalCount: 00FAPs
ProgramInsertion candidate linesHGAB allocationRemoval candidate linesOriginal NEP allocation
Asset Preservation382₱21,520,227,000164₱9,076,886,000
Network Development233₱18,932,271,000150₱14,787,201,000
Bridges54₱2,705,504,00037₱2,333,761,000
Flood Management421₱25,453,800,000234₱18,692,081,000
CSSP4,434₱88,419,876,000400₱18,472,803,000
Local Program25₱1,331,647,00017₱1,054,500,000
FAPs4₱806,910,0000₱0

Potential insertions · domestic HGAB-only line items

The domestic 3rd-reading title screen leaves 5,549 HGAB lines without a plausible NEP counterpart, carrying ₱158.36B. Foreign assisted projects are excluded and reviewed separately below. Unmatched titles are review leads, not confirmed additions.

PH location DB supplies current 20th Congress names through qualified geographic context and the strict local-map screening rules. Uncertain locations stay blank. Names describe geographic coverage, not sponsorship.

Largest allocations in the selected domestic insertion candidatesTop ten by allocation; hover a bar for its complete title. Filters update the chart and table. Table order follows the selected sort.
HGAB projectProgramImplementing officeRepresentative(s) by named project locationRegionExtracted amountClosest NEP titleScreen resultHB source page

Source: local HB 10858 Volume I-C text extraction and FY2027 NEP project extract. HB amounts are allocations attached to extracted candidate rows. The corrected native-text parser reconciles the printed program totals; still check each project against the original bill page; matching does not verify project scope, chainage, direction, package, or completion status.

Potential removals · domestic NEP-only line items

1,002 NEP lines have no selected or plausible HGAB counterpart, carrying ₱64.417B in NEP allocations. The reverse title screen holds out another 252 lines with compatible counterparts scoring at least 83%. These are candidates for line-item removal, pending scope verification. A lower allocation on a retained project is not a removal. Renaming and segmentation may conceal a counterpart; absence from this matching result does not certify deletion.

Selected counterparts10,141 linesRemoval candidates1,002 lines
StatusReview basisNEP projectNEP allocationImplementing officeNEP source

Allocation adjustments · retained domestic projects

These selected NEP/HGAB counterparts remain in both stages with different allocations. Positive changes are increases; negative changes are decreases. Nonexact title counterparts remain provisional. These lines are excluded from the insertion and removal shortlists.

Match basisNEP projectHGAB projectNEP allocationHGAB allocationAdjustmentOffice / sources
Read this as a review list, not a finding of wrongdoing. Amounts are shown in pesos. NEP values and FY2025 GAA values are stored in thousands of pesos and multiplied by 1,000; the FY2026 DPWH enrolled-copy GAA already stores pesos. Project descriptions do not include quantities, dimensions, engineering specifications, or bills of quantities.

Projects by region

Project counts by region for the selected fiscal year. This is not adjusted for population or need.

Rainwater Collector System (RCS): district allocation

Evaluated separately from category rankings. The key question is whether the same allocation across districts matches rainfall exposure, local demand, and project capacity.

District count by allocation

Need comparison

Rainfall is not uniform across districts. This budget extract has no rainfall, collection capacity, or project scope fields, so equal amounts are a clear allocation pattern but cannot establish whether the distribution matches need. A defensible comparison needs rainfall normals joined to the implementing districts.

The office name may not define the exact project boundary; verify district service areas before matching climate data.

YearDistrict Engineering OfficeRegionProject entriesAllocationProject title

INSPIRE Building: single-project comparison

Kept separate from program-category totals. This compares individual NEP entries while excluding records whose category or title mentions roads or bridges.

Site accessibility question

The listed INSPIRE site is in Laoag, at the northern end of Luzon. If the facility is meant to serve users from across the country, test whether that location is accessible to its intended users. Batangas is a possible comparison site: the Philippine Ports Authority describes Batangas Port as providing access to the Visayas region. Compare travel time, expected users, transport links, land and operating costs before concluding which site would serve the purpose better. PPA on Batangas Port access.

INSPIRE project allocationProject allocations shown for the current search.
RankDistrict Engineering OfficeRegionProgram categoryProjectRepresentative(s) for project locationAllocation

Other priority programs by district

District rankings for multi-purpose buildings, access roads and bridges, and flood control. INSPIRE is shown separately above as an individual project; adjacent water supply categories remain in the name-shift watchlist.

District allocations

How to read the pattern: compare office totals and project counts, then verify project titles and scope.

YearRankDistrict Engineering OfficeRegionProjectsAllocationShare of programMost common amountCount at common amountLargest projectRepresentative(s) for largest project location

Exact ₱5M roads/bridges and flood-control allocations

District offices with one or more project entries budgeted at exactly ₱5,000,000 in the access roads/bridges category or flood mitigation categories. Counts are entries, not distinct projects verified against source documents.

Methods: hypergeometric overlap test and region-stratified randomization test. The hypergeometric test treats the 199 district offices as equally likely to receive each program’s ₱5M entry, fixes the observed counts (96 road/bridge offices and 45 flood offices), and calculates how often random independent placement would produce 35 or more shared offices. The region-stratified test is a second check: it keeps the observed road/bridge offices fixed and repeatedly reassigns the 45 flood-office flags among offices in the same region, preserving each region’s flood count. Its p-value is the share of 100,000 reshuffles with overlap at least as large as observed. Small p-values mean this degree of overlap is rare under these chance models. They do not prove deliberate allocation or a “consolation” motive. The analysis is exploratory because ₱5M and these programs were selected after noticing the pattern; the models also do not adjust for project need, workload, or project mix.

District offices with entries in both programs

Exact ₱5M entries by programRoad/bridge and flood-control entry counts for the current search.
YearDistrict Engineering OfficeRegionRoad/bridge entriesFlood entriesCombined listed amountRepresentative(s), if province has one seat

Water-sector name-shift watchlist

Includes projects under the shared PAP2 water-sector umbrella plus district project titles containing rainwater, water collector, catchment, cistern, water supply, water system, or water storage terms outside that umbrella. Keyword matches are review candidates, not confirmed reclassifications.

Water-sector candidates by subcategoryCandidate allocation totals for the current search.
YearMatch basisDistrict Engineering OfficeSubcategoryProject titleRepresentative(s) for project locationAllocation

District Engineering Office allocation ranking

Ranked by the selected measure in the selected year. In this single-year dataset, allocation and share have the same order because each share uses the same annual total. The concentration figures do not adjust for district population, project needs, scope, or cost.

District allocation rankingTop offices by the selected ranking measure.
YearCurrent sort rankDistrict Engineering OfficeRegionProjectsTotal allocation*Share of district totalLargest projectLargest project shareRepresentative(s) for largest project location

Repeated amounts across offices

Groups require at least three offices within the same category. Rainwater Collector System is assessed in its own section above; other category labels can still cover different project sizes.

Repeated amount groups by office countNumber of offices sharing each category and amount.
YearProgram / categorySource amountEntriesOffices

Largest statistical outliers

The current score compares each amount with the median for its broad category. A high score can reflect a genuinely larger project, not an inflated unit cost. Use this list to locate records that need scope checks.

Largest statistical outlier scoresHighest robust scores among the current search results.
Fiscal yearProjectProgram / categoryOfficeAmount*Category median*Robust score

Most frequent exact amounts

Across all categories. Rounded figures recur often in budget proposals and are not suspicious by themselves.

What this screen did not find

Next useful data Physical scope (length, area, capacity), detailed cost breakdowns, implementation and completion status, and procurement outcomes would let us compare like with like and distinguish recurring programs from unusual pricing.

Insertion candidates · what the matching can establish

These four statuses partition native HGAB rows; they are not four certified outcomes. Schedule totals can reconcile while individual titles, offices or occurrence links remain wrong.

NEP counterpart screenNative HGAB allocation records
Exact normalized title found in NEP9626
Plausible NEP title counterpart; review scope540
No plausible NEP title counterpart; review candidate5553
Multiple or already paired NEP counterparts; review scope556

5,491 domestic candidate lines carry ₱149.559B. The 4 unpaired FAP lines carrying ₱806.910M remain a separate review. Neither bucket is proof of insertion; new wording, combined occurrences or parser fragments can hide existing NEP projects.

Investigators should manually audit a stratified sample by program, office class and amount band, oversampling high-value candidates, and review original NEP/HGAB pages. Report adjudicated false-positive rates with uncertainty before extrapolating. The supplied analyst export has 5,797 comparison rows, not 5,837 certified added projects; grouped rows and non-project headers use different count units.

Independent source cross-check · current snapshot

Comparative source: csiiiv FY2027 budget analysis · GitHub snapshot 34ef5d8cbbac. Downloaded 2026-10-18T08:46:20Z. Primary budget PDFs remain authoritative. Reconciliation, source hashes and update details (JSON).

Supporting methodology · NEP baseline screens

These explanations describe the NEP baseline screens on the DPWH patterns page. They are distinct from the HGAB insertion and removal comparison above.

Potential repeated line items: FY2027 NEP → FY2026 GAA, then FY2025 GAA

Multi-purpose buildings, roads, bridges, and flood-control projects. The name screen found 283 FY2027 NEP lines with a 90% or higher title match in the FY2026 enacted GAA, and 454 with a 90% or higher title match in the FY2025 enacted GAA. Bridge candidates require overlapping plus-form chainage. Road matches are excluded when both stated ranges are disjoint; missing chainage is flagged for review. Different package, phase, stage, lot or segment labels require scope review. They may identify legitimate separate work or changes in how the same work is described; overlapping chainage still signals shared extent. Explicit opposing directions are excluded. For all categories, verify location, scope, phase, and completion status before treating a row as the same project. Explicit opposing directions are excluded as location conflicts. Amounts are in pesos. Title similarity is a screening lead, not proof that two appropriations cover the same scope.

Projects by region

Project counts by region for the selected fiscal year. This is not adjusted for population or need.

Rainwater Collector System (RCS): district allocation

Evaluated separately from category rankings. The key question is whether the same allocation across districts matches rainfall exposure, local demand, and project capacity.

Rainfall is not uniform across districts. This budget extract has no rainfall, collection capacity, or project scope fields, so equal amounts are a clear allocation pattern but cannot establish whether the distribution matches need. A defensible comparison needs rainfall normals joined to the implementing districts.

The office name may not define the exact project boundary; verify district service areas before matching climate data.

INSPIRE Building: single-project comparison

Kept separate from program-category totals. This compares individual NEP entries while excluding records whose category or title mentions roads or bridges.

The listed INSPIRE site is in Laoag, at the northern end of Luzon. If the facility is meant to serve users from across the country, test whether that location is accessible to its intended users. Batangas is a possible comparison site: the Philippine Ports Authority describes Batangas Port as providing access to the Visayas region. Compare travel time, expected users, transport links, land and operating costs before concluding which site would serve the purpose better. PPA on Batangas Port access.

Other priority programs by district

District rankings for multi-purpose buildings, access roads and bridges, and flood control. INSPIRE is shown separately above as an individual project; adjacent water supply categories remain in the name-shift watchlist.

How to read the pattern: compare office totals and project counts, then verify project titles and scope.

Exact ₱5M roads/bridges and flood-control allocations

District offices with one or more project entries budgeted at exactly ₱5,000,000 in the access roads/bridges category or flood mitigation categories. Counts are entries, not distinct projects verified against source documents.

Methods: hypergeometric overlap test and region-stratified randomization test. The hypergeometric test treats the 199 district offices as equally likely to receive each program’s ₱5M entry, fixes the observed counts (96 road/bridge offices and 45 flood offices), and calculates how often random independent placement would produce 35 or more shared offices. The region-stratified test is a second check: it keeps the observed road/bridge offices fixed and repeatedly reassigns the 45 flood-office flags among offices in the same region, preserving each region’s flood count. Its p-value is the share of 100,000 reshuffles with overlap at least as large as observed. Small p-values mean this degree of overlap is rare under these chance models. They do not prove deliberate allocation or a “consolation” motive. The analysis is exploratory because ₱5M and these programs were selected after noticing the pattern; the models also do not adjust for project need, workload, or project mix.

Water-sector name-shift watchlist

Includes projects under the shared PAP2 water-sector umbrella plus district project titles containing rainwater, water collector, catchment, cistern, water supply, water system, or water storage terms outside that umbrella. Keyword matches are review candidates, not confirmed reclassifications.

District Engineering Office allocation ranking

Ranked by the selected measure in the selected year. In this single-year dataset, allocation and share have the same order because each share uses the same annual total. The concentration figures do not adjust for district population, project needs, scope, or cost.

Repeated amounts across offices

Groups require at least three offices within the same category. Rainwater Collector System is assessed in its own section above; other category labels can still cover different project sizes.

Largest statistical outliers

The current score compares each amount with the median for its broad category. A high score can reflect a genuinely larger project, not an inflated unit cost. Use this list to locate records that need scope checks.

Most frequent exact amounts

Across all categories. Rounded figures recur often in budget proposals and are not suspicious by themselves.

Historical analysis · NEP → HGAB 2nd reading

This historical section is now on the archive page. Current budget-stage comparison is maintained on csiiiv ↗.

Foreign assisted projects · allocation adjustments and reconciliation

The printed FAP schedule contains 29 lines, ₱44,749,011,000. All are excluded from the domestic additions shortlist. This excludes 4 unmatched FAP lines carrying ₱806,910,000; it does not establish that those projects are absent from NEP. Loan identity, counterpart funding and project scope need separate verification.

4 unpaired FAP lines · ₱806,910,000

Excluded from the domestic insertion shortlist. These records have no selected or plausible NEP counterpart under the current matching rules; this does not confirm a new foreign assisted project or loan. The closest titles below are review hints, not established matches. No zero NEP baseline or allocation increase is assumed.

HGAB allocation of each unpaired FAP lineBar numbers identify the corresponding table rows. Hover for the complete project title.
Priority Bridges Crossing Pasig-Marikina and Manggahan Floodway Bridges Construction Project, under China Government Financing Facility · ₱326,075,000₱326.075M#1Metro Manila Bridges Project, ADB 4168-PHI · ₱310,763,000₱310.763M#2Road Network Development Project in Conflict-Affected Areas in Mindanao (RNDP- CAAM), JICA PH-F-P1 · ₱115,254,000₱115.254M#3Samal Island - Davao City Connector (SIDC) Project, China GCL no. 202200600763 · ₱54,818,000₱54.818M#4
#Unpaired FAP projectHGAB allocationClosest NEP title · not matchedTitle similarityHGAB source
1Priority Bridges Crossing Pasig-Marikina and Manggahan Floodway Bridges Construction Project, under China Government Financing Facility₱326,075,000Cebu-Mactan Bridge (4th Bridge) and Coastal Road Construction Project, JICA Loan No. PH-P27443.24%3- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 941
HB10858-3-0941-016266
2Metro Manila Bridges Project, ADB 4168-PHI₱310,763,000Metro Manila Priority Bridges Seismic Improvement Project (MMPBSIP ), JICA Loan No. PH-P27253.54%3- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 941
HB10858-3-0941-016268
3Road Network Development Project in Conflict-Affected Areas in Mindanao (RNDP- CAAM), JICA PH-F-P1₱115,254,000Accelerated Water and Sanitation Project in Selected Areas (AWSPSA ), World Bank- Assisted43.58%3- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 941
HB10858-3-0941-016262
4Samal Island - Davao City Connector (SIDC) Project, China GCL no. 202200600763₱54,818,000Davao City Bypass Construction Project (II ) (South and Center Sections ), Package 1, JICA Loan No. PH-P27345.88%3- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 941
HB10858-3-0941-016267

25 FAP lines with selected NEP counterparts

25 selected counterparts are compared below. Unpaired lines have no assumed zero NEP baseline. Fuzzy counterparts remain provisional. PDF page numbers use the parser’s physical-page convention.

Paired NEP FAP₱117,749,011,000Paired HGAB FAP₱43,942,101,000
Foreign assisted projectNEP matchNEP allocationHGAB allocationChangeSource
Bataan-Cavite Interlink Bridge (BCIB) Project, ADB Loan No. 4432-PHI and AIIB Loan No. L0724AExact normalized title found in NEP₱22,494,406,000₱8,494,406,000₱-14,000,000,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 940
Laguna Lakeshore Road Network (LLRN) Project - Phase I, KEDCF Loan No. PHL-27, ADB Loan No. 4523-PHI and AIIB Loan No. L0725AExact normalized title found in NEP₱35,209,919,000₱8,209,919,000₱-27,000,000,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 940
Davao City Bypass Construction Project (III) (South and Center Sections), Package I, JICA Loan No. PH-P282Exact normalized title found in NEP₱7,420,440,000₱3,920,440,000₱-3,500,000,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 940
Cavite Industrial Area Flood Risk Management Project (CIA-FRIMP), JICA Loan Nos. PH- P265 and PH-P284Exact normalized title found in NEP₱6,566,805,000₱3,066,805,000₱-3,500,000,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 942
Pasig - Marikina River Channel Improvement Project (PMRCIP), Phase IV, JICA Loan Nos. PH-P271 and PH-P283Exact normalized title found in NEP₱8,539,933,000₱3,039,933,000₱-5,500,000,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 942
Cebu-Mactan Bridge (4th Bridge) and Coastal Road Construction Project, JICA Loan No. PH-P274Exact normalized title found in NEP₱8,570,911,000₱2,570,911,000₱-6,000,000,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 940
Davao City Bypass Construction Project (II) (South and Center Sections), Package 1, JICA Loan No. PH-P273Plausible NEP title counterpart; review scope₱4,393,942,000₱2,393,942,000₱-2,000,000,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 940
Mindanao Transport Connectivity Improvement Project, IBRD Loan No. 9775-PHExact normalized title found in NEP₱5,211,754,000₱1,711,754,000₱-3,500,000,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 939
Integrated Flood Resilience and Adaptation 1 (InFRA 1) Project, ADB Loan No. 4345- PHIPlausible NEP title counterpart; review scope₱3,081,329,000₱1,581,329,000₱-1,500,000,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 942
Improving Growth Corridors in Mindanao Road Sector Project (IGCMRSP), ADB Loan No. 3631-PHIExact normalized title found in NEP₱2,112,530,000₱1,362,530,000₱-750,000,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 941
Reconstruction and Development Plan for Greater Marawi, Stage 2, (Bangon Marawi Output 2), ADB Loan No. 3769-PHIExact normalized title found in NEP₱2,870,547,000₱1,120,547,000₱-1,750,000,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 939
Accelerated Bridge Construction Project for Greater Economic Mobility and Calamity Response, France-AssistedExact normalized title found in NEP₱1,764,891,000₱957,981,000₱-806,910,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 941
Infrastructure Preparation and Innovation Facility (IPIF), 2nd Additional Financing, Output 2; Water Projects, ADB Loan No. 4424 - PHIPlausible NEP title counterpart; review scope₱1,148,904,000₱898,904,000₱-250,000,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 942
Metro Manila Priority Bridges Seismic Improvement Project (MMPBSIP), JICA Loan No. PH-P260Plausible NEP title counterpart; review scope₱2,864,678,000₱864,678,000₱-2,000,000,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 941
Metro Manila Priority Bridges Seismic Improvement Project (MMPBSIP), JICA Loan No. PH-P272Exact normalized title found in NEP₱792,964,000₱792,964,000₱03- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 941
Samar Pacific Coastal Road II Project (Laoang II Bridge and Calomotan Bridge), KEDCF Loan No. PHL-26Exact normalized title found in NEP₱1,460,372,000₱710,372,000₱-750,000,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 941
Infrastructure Preparation and Innovation Facility (IPIF), 2nd Additional Financing, Output 1: Roads and Bridges, ADB 4424-PHIPlausible NEP title counterpart; review scope₱1,057,967,000₱557,967,000₱-500,000,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 940
Dalton Pass East Alignment Road Project, JICA Loan No. PH-P280Plausible NEP title counterpart; review scope₱1,054,475,000₱554,475,000₱-500,000,0003- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 940
Philippines-Korea Project Preparation Facility (PK-PPF), KEDCF PHL-20, Roads and Bridges FacilityPlausible NEP title counterpart; review scope₱283,528,000₱283,528,000₱03- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 940
Infrastructure Preparation and Innovation Facility (IPIF), Additional Financing, Output 2: Water Projects, ADB 3886-PHIPlausible NEP title counterpart; review scope₱193,636,000₱193,636,000₱03- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 942
Philippines Seismic Risk Reduction and Resilience Project (PSRRRP), IBRD Loan No. 9251-PHExact normalized title found in NEP₱182,970,000₱182,970,000₱03- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 942
Panglao-Tagbilaran City Offshore Bridge Connector (PTCOBC) Project, France-AssistedPlausible NEP title counterpart; review scope₱166,191,000₱166,191,000₱03- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 940
Davao City Bypass Construction Project (South and Center Sections), Package I, JICA Loan No. PH-P261Plausible NEP title counterpart; review scope₱145,817,000₱145,817,000₱03- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 940
Central Mindanao High Standard Highway, Cagayan de Oro-Malaybalay Section, JICA PH-P287Exact normalized title found in NEP₱87,222,000₱87,222,000₱03- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 940
Accelerated Water and Sanitation Project in Selected Areas (AWSPSA), World Bank- AssistedExact normalized title found in NEP₱72,880,000₱72,880,000₱03- HB 10858 FOR 3RD READING VOL I-C .pdf · PDF p. 942