{
  "method": "Join repeat source_code to the NEP API code carried by the current native HGAB comparison. Selected one-to-one links only establish retention classes. Closest unselected candidates do not establish survival. Missing links do not certify removal.",
  "scope": "FY2027 DPWH NEP repeat candidates compared with HGAB 3rd reading; historical GAA comparison pairs retained as separate occurrences.",
  "summary": {
    "comparisonPairs": 2598,
    "uniqueNEPProposals": 1576,
    "pairStatuses": {
      "Potential retained link": 143,
      "Clear retained link": 2263,
      "No selected or cited counterpart": 192
    },
    "uniqueStatuses": {
      "Potential retained link": 84,
      "Clear retained link": 1370,
      "No selected or cited counterpart": 122
    }
  },
  "groups": [
    {
      "status": "Clear retained link",
      "comparisonPairs": 2263,
      "uniqueNEPProposals": 1370,
      "nepPesos": 41113637750,
      "selectedHgabPesos": 40543637750
    },
    {
      "status": "Potential retained link",
      "comparisonPairs": 143,
      "uniqueNEPProposals": 84,
      "nepPesos": 3420416000,
      "selectedHgabPesos": 3564205000
    },
    {
      "status": "Unselected counterpart requires review",
      "comparisonPairs": 0,
      "uniqueNEPProposals": 0,
      "nepPesos": 0,
      "selectedHgabPesos": null
    },
    {
      "status": "No selected or cited counterpart",
      "comparisonPairs": 192,
      "uniqueNEPProposals": 122,
      "nepPesos": 6758951000,
      "selectedHgabPesos": null
    }
  ],
  "proposals": [
    {
      "sourceCode": "2027DPWH-Proposal-31793",
      "nepTitle": "CDO-New Western Diversion Road (Macabalan-Bonbon Bridge and Access Road), Barangay Macabalan, Sta. 0+738- Sta. 0+754, Cagayan de Oro City",
      "nepPesos": 100000000,
      "category": "Bridge",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0225-002113",
      "hgabTitle": "CDO-New Western Diversion Road (Macabalan-Bonbon Bridge and Access Road), Barangay Macabalan, Sta. 0+738- Sta. 0+778, Cagayan de Oro City",
      "hgabPesos": 120000000,
      "nepPage": "285",
      "hgabPage": "225",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-06098",
      "nepTitle": "Construction of Bridge, Sitio Naswak, Sta. 0 + 000.000 - Sta. 0 + 216.00, Barangay Lisap, Bongabong, Oriental Mindoro",
      "nepPesos": 15000000,
      "category": "Bridge",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0557-008723",
      "hgabTitle": "Construction of Bridge, Sitio Naswak, Sta. 0 + 000.000 - Sta. 0 + 216.00, Barangay Lisap, Bongabong, Oriental Mindoro",
      "hgabPesos": 15000000,
      "nepPage": "517",
      "hgabPage": "557",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32964",
      "nepTitle": "Eastern Interior Bypass Road (Gusa-Puerto/Jct. Sayre Highway), Barangay Tablon-Barangay Agusan (Agusan Bridge 3), Sta. 7+716 - Sta. 7+916, Cagayan de Oro City",
      "nepPesos": 350000000,
      "category": "Bridge",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0226-002124",
      "hgabTitle": "Eastern Interior Bypass Road (Gusa-Puerto/Jct. Sayre Highway), Barangay Tablon- Barangay Agusan (Agusan Bridge 3), Sta. 7+716 - Sta. 7+916, Cagayan de Oro City",
      "hgabPesos": 350000000,
      "nepPage": "286",
      "hgabPage": "226",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32934",
      "nepTitle": "Sayre Highway Parallel Road II (Valencia City Section), Bantal Bridge, Brgy. Sinayawan, Sta. 134+800 - Sta. 134+960, Valencia City, Bukidnon",
      "nepPesos": 59507000,
      "category": "Bridge",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0227-002151",
      "hgabTitle": "Sayre Highway Parallel Road II (Valencia City Section), Bantal Bridge, Barangay Sinayawan, Sta. 134+800 - Sta. 134+960, Valencia City, Bukidnon",
      "hgabPesos": 59507000,
      "nepPage": "288",
      "hgabPage": "227",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20318",
      "nepTitle": "Tuguegarao City Boulevard (Pinacanauan Bridge 2 and Approaches) (Sta.0+000 - Sta. 1+632.82) , Tuguegarao City, Cagayan",
      "nepPesos": 337000000,
      "category": "Bridge",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0235-002278",
      "hgabTitle": "Tuguegarao City Boulevard (Pinacanauan Bridge 2 and Approaches) (Sta.0+000 - Sta. 1+632.82) , Tuguegarao City, Cagayan",
      "hgabPesos": 337000000,
      "nepPage": "295",
      "hgabPage": "235",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20602",
      "nepTitle": "Tuguegarao-Enrile Diversion Road (Tuguegarao-Enrile Bridge) (Sta. 0+172.60 - Sta. 0+781.9), Cagayan",
      "nepPesos": 100000000,
      "category": "Bridge",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0216-001932",
      "hgabTitle": "Tuguegarao-Enrile Diversion Road (Tuguegarao-Enrile Bridge) (Sta. 0+172.60 - Sta. 0+781.9), Cagayan",
      "hgabPesos": 100000000,
      "nepPage": "279",
      "hgabPage": "216",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39090",
      "nepTitle": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
      "nepPesos": 10000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0608-009820",
      "hgabTitle": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
      "hgabPesos": 10000000,
      "nepPage": "549",
      "hgabPage": "608",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21103",
      "nepTitle": "Construction of Bacradal Flood Control Structure, Barangay Bacradal, Echague, Isabela",
      "nepPesos": 135000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-25322",
      "nepTitle": "Construction of Baras Flood Mitigation Structure and Drainage System, Baras, Catanduanes",
      "nepPesos": 150000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0309-003689",
      "hgabTitle": "Construction of Baras Flood Mitigation Structure and Drainage System, Baras, Catanduanes",
      "hgabPesos": 150000000,
      "nepPage": "355",
      "hgabPage": "309",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35466",
      "nepTitle": "Construction of Drainage Canal at Barangay San Miguel, Tarlac City, Tarlac",
      "nepPesos": 20000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0343-004333",
      "hgabTitle": "Construction of Drainage Canal at Barangay San Miguel, Tarlac City, Tarlac",
      "hgabPesos": 20000000,
      "nepPage": "379",
      "hgabPage": "343",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03546",
      "nepTitle": "Construction of Drainage Canal, Sta. 0+943 - Sta. 1+085, Parulan, Plaridel. Bulacan",
      "nepPesos": 1950000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0338-004249",
      "hgabTitle": "Construction of Drainage Canal, Sta. 0+943 - Sta. 1+085, Parulan, Plaridel. Bulacan",
      "hgabPesos": 1950000,
      "nepPage": "375",
      "hgabPage": "338",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34112",
      "nepTitle": "Construction of Drainage Structure along Barangay Quesban, Calasiao, Pangasinan",
      "nepPesos": 10000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0333-004151",
      "hgabTitle": "Construction of Drainage Structure along Barangay Quesban, Calasiao, Pangasinan",
      "hgabPesos": 10000000,
      "nepPage": "371",
      "hgabPage": "333",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38542",
      "nepTitle": "Construction of Drainage Structure along Road, Barangay Gredu, Panabo City, Davao del Norte",
      "nepPesos": 6000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0618-010010",
      "hgabTitle": "Construction of Drainage Structure along Road, Barangay Gredu, Panabo City, Davao del Norte",
      "hgabPesos": 6000000,
      "nepPage": "553",
      "hgabPage": "618",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-02641",
      "nepTitle": "Construction of Drainage Structure, Barangay Hipusngo, Baybay City, Leyte (Sta. 0+596.40 - 1+320.20)",
      "nepPesos": 90000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0314-003783",
      "hgabTitle": "Construction of Drainage Structure, Barangay Hipusngo, Baybay City, Leyte (Sta. 0+596.40 - 1+320.20)",
      "hgabPesos": 90000000,
      "nepPage": "360",
      "hgabPage": "314",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39095",
      "nepTitle": "Construction of Drainage Structure, Barangay Tablon, Cagayan de Oro City",
      "nepPesos": 8000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0360-004678",
      "hgabTitle": "Construction of Drainage Structure, Barangay Tablon, Cagayan de Oro City",
      "hgabPesos": 8000000,
      "nepPage": "391",
      "hgabPage": "360",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-07977",
      "nepTitle": "Construction of Drainage Structure, Sta. 0+000 - Sta. 0+303, Barangay Kasambagan, Cebu City",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-07976",
      "nepTitle": "Construction of Drainage Structure, Sta. 0+057 - Sta. 0+357, Barangay Carreta, Cebu City",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0357-004616",
      "hgabTitle": "Construction of Drainage Structure, Sta. 0+057 - Sta. 0+357, Barangay Carreta, Cebu City",
      "hgabPesos": 5000000,
      "nepPage": "389",
      "hgabPage": "357",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-07979",
      "nepTitle": "Construction of Drainage Structure, Sta. 0+591 - Sta. 0+861, Barangay Kamputhaw, Cebu City",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0357-004620",
      "hgabTitle": "Construction of Drainage Structure, Sta. 0+591 - Sta. 0+861, Barangay Kamputhaw, Cebu City",
      "hgabPesos": 5000000,
      "nepPage": "389",
      "hgabPage": "357",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33854",
      "nepTitle": "Construction of Drainage System At Poblacion, Lipa City, Batangas",
      "nepPesos": 30000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0346-004394",
      "hgabTitle": "Construction of Drainage System At Poblacion, Lipa City, Batangas",
      "hgabPesos": 30000000,
      "nepPage": "381",
      "hgabPage": "346",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35142",
      "nepTitle": "Construction of Drainage System along Caritan- Balzain Creek, Caritan, Tuguegarao City, Cagayan",
      "nepPesos": 50000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0336-004206",
      "hgabTitle": "Construction of Drainage System along Caritan-Balzain Creek, Caritan, Tuguegarao City, Cagayan",
      "hgabPesos": 70000000,
      "nepPage": "373",
      "hgabPage": "336",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37700",
      "nepTitle": "Construction of Drainage System at Barangay Buaya, Lapu-Lapu City, Cebu",
      "nepPesos": 30000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0356-004596",
      "hgabTitle": "Construction of Drainage System at Barangay Buaya, Lapu-Lapu City, Cebu",
      "hgabPesos": 30000000,
      "nepPage": "388",
      "hgabPage": "356",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36304",
      "nepTitle": "Construction of Drainage System at Barangay Lalayat, San Jose, Batangas",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0346-004390",
      "hgabTitle": "Construction of Drainage System at Barangay Lalayat, San Jose, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "381",
      "hgabPage": "346",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28794",
      "nepTitle": "Construction of Drainage System at Barangay Muntingpulo, Lipa City, Batangas",
      "nepPesos": 8000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0346-004392",
      "hgabTitle": "Construction of Drainage System at Barangay Muntingpulo, Lipa City, Batangas",
      "hgabPesos": 8000000,
      "nepPage": "381",
      "hgabPage": "346",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09812",
      "nepTitle": "Construction of Drainage System at Barangay Sampiruhan, Calamba City, Laguna",
      "nepPesos": 90000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0306-003640",
      "hgabTitle": "Construction of Drainage System at Barangay Sampiruhan, Calamba City, Laguna",
      "hgabPesos": 90000000,
      "nepPage": "353",
      "hgabPage": "306",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36377",
      "nepTitle": "Construction of Drainage System at Barangay Sta. Catalina, Pagbilao, Quezon",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0348-004453",
      "hgabTitle": "Rehabilitation of Drainage System at Barangay Sta. Catalina, Pagbilao, Quezon",
      "hgabPesos": 5000000,
      "nepPage": "383",
      "hgabPage": "348",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34455",
      "nepTitle": "Construction of Drainage System, Barangay Nibaliw Center, San Fabian, Pangasinan",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0333-004141",
      "hgabTitle": "Construction of Drainage System, Barangay Nibaliw Center, San Fabian, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "370",
      "hgabPage": "333",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34447",
      "nepTitle": "Construction of Drainage System, Barangay Pag Asa, San Jacinto, Pangasinan",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0333-004142",
      "hgabTitle": "Construction of Drainage System, Barangay Pag Asa, San Jacinto, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "370",
      "hgabPage": "333",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34456",
      "nepTitle": "Construction of Drainage System, Barangay Poblacion, San Fabian, Pangasinan",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0333-004143",
      "hgabTitle": "Construction of Drainage System, Barangay Poblacion, San Fabian, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "370",
      "hgabPage": "333",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34448",
      "nepTitle": "Construction of Drainage System, Barangay San Roque, San Jacinto, Pangasinan",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0333-004144",
      "hgabTitle": "Construction of Drainage System, Barangay San Roque, San Jacinto, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "371",
      "hgabPage": "333",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34531",
      "nepTitle": "Construction of Drainage System, Barangay Sta. Maria, San Jacinto, Pangasinan",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0333-004145",
      "hgabTitle": "Construction of Drainage System, Barangay Sta. Maria, San Jacinto, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "371",
      "hgabPage": "333",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34452",
      "nepTitle": "Construction of Drainage System, Barangay Talogtog, Mangaldan, Pangasinan",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0333-004146",
      "hgabTitle": "Construction of Drainage System, Barangay Talogtog, Mangaldan, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "371",
      "hgabPage": "333",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-08287",
      "nepTitle": "Construction of Drainage System, Barangay Tipolo, Mandaue City, Cebu",
      "nepPesos": 9500000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0356-004599",
      "hgabTitle": "Construction of Drainage System, Barangay Tipolo, Mandaue City, Cebu",
      "hgabPesos": 9500000,
      "nepPage": "388",
      "hgabPage": "356",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09793",
      "nepTitle": "Construction of Drainage at Barangay Soro-soro, Biñan City, Laguna",
      "nepPesos": 25000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-08183",
      "nepTitle": "Construction of Drainage at Barangay Tawason, Mandaue City - Sta. 0+000.00 - Sta. 0+340.00",
      "nepPesos": 4250000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10774",
      "nepTitle": "Construction of Drainage, Barangay Amsic, Angeles City Pampanga, Sta. 0+000 - Sta. 0+576, Sta. 0+000 - Sta. 0+180, Sta. 0+000 - Sta. 0+380, Sta. 0+000 - Sta. 0+035, Sta. 0+000 - Sta. 0+028",
      "nepPesos": 5669000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10775",
      "nepTitle": "Construction of Drainage, Barangay Balibago, Angeles City Pampanga, Sta. 0+000 - Sta. 0+501, Sta. 0+000 - Sta. 0+209",
      "nepPesos": 2117000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10776",
      "nepTitle": "Construction of Drainage, Barangay Cutcut, Angeles City Pampanga, Sta. 0+000 - Sta. 0+195, Sta. 0+000 - Sta. 0+392",
      "nepPesos": 3859000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10799",
      "nepTitle": "Construction of Drainage, Barangay Dapdap, Mabalacat City, Pampanga Sta. 0+000 - Sta. 1+380",
      "nepPesos": 14500000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0342-004323",
      "hgabTitle": "Construction of Drainage, Barangay Dapdap, Mabalacat City, Pampanga Sta. 0+000 - Sta. 1+380",
      "hgabPesos": 14500000,
      "nepPage": "378",
      "hgabPage": "342",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10754",
      "nepTitle": "Construction of Drainage, Barangay Dau, Mabalacat City, Pampanga, Sta. 0+000 - Sta. 0+198, Sta. 0+000 - Sta. 0+245, Sta. 0+000 - Sta. 0+213, Sta. 0+000 - Sta. 0+465",
      "nepPesos": 2084000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10744",
      "nepTitle": "Construction of Drainage, Barangay Malabanias, Angeles City Pampanga, Sta. 0+000 - Sta. 0+360, Sta. 0+000 - Sta. 0+350, Sta. 0+000 - Sta. 0+320, Sta. 0+000 - Sta. 0+290, Sta. 0+000 - Sta. 0+260, Sta. 0+000 - Sta. 0+240, Sta. 0+000 - Sta. 0+350 & Sta. 0+000 - Sta. 0+670",
      "nepPesos": 29500000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0342-004324",
      "hgabTitle": "Construction of Drainage, Barangay Malabanias, Angeles City Pampanga, Sta. 0+000 - Sta. 0+360, Sta. 0+000 - Sta. 0+350, Sta. 0+000 - Sta. 0+320, Sta. 0+000 - Sta. 0+290, Sta. 0+000 - Sta. 0+260, Sta. 0+000 - Sta. 0+240, Sta. 0+000 - Sta. 0+350 & Sta. 0+000 - Sta. 0+670",
      "hgabPesos": 29500000,
      "nepPage": "378",
      "hgabPage": "342",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10773",
      "nepTitle": "Construction of Drainage, Barangay Ninoy Aquino, Angeles City Pampanga, Sta. 0+000 - Sta. 0+550, Sta. 0+000 - Sta. 0+615",
      "nepPesos": 5571000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10752",
      "nepTitle": "Construction of Drainage, Barangay Pampang, Angeles City Pampanga, Sta. 0+000 - Sta. 0+375, Sta. 0+000 - Sta. 0+400, Sta. 0+000 - Sta. 0+390, Sta. 0+000 - Sta. 0+650",
      "nepPesos": 3545000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10790",
      "nepTitle": "Construction of Drainage, Barangay Pulung Maragul, Angeles City, Pampanga, Sta. 0+000 - Sta. 0+315, Sta. 0+000 - Sta. 0+170, Sta. 0+000 - Sta. 0+217, Sta. 0+000 - Sta. 0+250, Sta. 0+000 - Sta. 0+259",
      "nepPesos": 3069000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10807",
      "nepTitle": "Construction of Drainage, Barangay San Francisco, Mabalacat City, Pampanga, Sta. 0+000.00 - Sta. 0+526.00, Sta. 0+000.00 - Sta. 0+359.00, Sta. 0+000.00 - Sta. 0+147.00, Sta. 0+000.00 - Sta. 0+146.00",
      "nepPesos": 5180000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10750",
      "nepTitle": "Construction of Drainage, Barangay Sta. Teresita, Angeles City Pampanga, Sta. 0+000 - Sta. 0+644, Sta. 0+000 - Sta. 0+366, Sta. 0+000 - Sta. 0+155",
      "nepPesos": 6523000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10791",
      "nepTitle": "Construction of Drainage, Barangay Sto. Domingo, Angeles City, Pampanga Sta. 0+000 - Sta. 1+111",
      "nepPesos": 11800000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0343-004330",
      "hgabTitle": "Construction of Drainage, Barangay Sto. Domingo, Angeles City, Pampanga Sta. 0+000 - Sta. 1+111",
      "hgabPesos": 11800000,
      "nepPage": "379",
      "hgabPage": "343",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10747",
      "nepTitle": "Construction of Drainage, Barangay Sto. Rosario, Angeles City Pampanga, Sta. 0+000 - Sta. 1+000, Sta. 0+000 - Sta. 0+165",
      "nepPesos": 10129000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34800",
      "nepTitle": "Construction of Drainage, Barangay Tocucan, Bontoc, Mountain Province",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0336-004198",
      "hgabTitle": "Construction of Drainage, Barangay Tocucan, Bontoc, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "372",
      "hgabPage": "336",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10793",
      "nepTitle": "Construction of Drainage, Barangay Virgen Delos Remedios, Angeles City, Pampanga Sta. 0+000 - Sta. 0+443.1",
      "nepPesos": 5300000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0343-004331",
      "hgabTitle": "Construction of Drainage, Barangay Virgen Delos Remedios, Angeles City, Pampanga Sta. 0+000 - Sta. 0+443.1",
      "hgabPesos": 5300000,
      "nepPage": "379",
      "hgabPage": "343",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21902",
      "nepTitle": "Construction of Flood Control Structure Along Jalaur River, Barangay Bongco, Pototan, Iloilo",
      "nepPesos": 60000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-08102",
      "nepTitle": "Construction of Flood Control Structure along Butuanon River, Barangay Alang-Alang, Mandaue City, Cebu",
      "nepPesos": 44000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0356-004601",
      "hgabTitle": "Construction of Flood Control Structure along Butuanon River, Barangay Alang-Alang, Mandaue City, Cebu",
      "hgabPesos": 44000000,
      "nepPage": "388",
      "hgabPage": "356",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21949",
      "nepTitle": "Construction of Flood Control Structure along Cagayan River, Sta. 0+000 - Sta. 0+150, Sta. 0+000 - Sta. 0+262.46, Barangay Dugo, Camalaniugan, Cagayan",
      "nepPesos": 150000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21963",
      "nepTitle": "Construction of Flood Control Structure along Cagayan River, Sta. 0+000 - Sta. 0+300, Barangay Casicallan, Gattaran, Cagayan",
      "nepPesos": 110000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0366-004780",
      "hgabTitle": "Construction of Flood Control Structure along Cagayan River, Sta. 0+000 - Sta. 0+300, Barangay Casicallan, Gattaran, Cagayan",
      "hgabPesos": 110000000,
      "nepPage": "396",
      "hgabPage": "366",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21964",
      "nepTitle": "Construction of Flood Control Structure along Cagayan River, Sta. 0+164 - Sta. 0+365, Barangay L. Adviento, Gattaran, Cagayan",
      "nepPesos": 80000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0366-004781",
      "hgabTitle": "Construction of Flood Control Structure along Cagayan River, Sta. 0+164 - Sta. 0+365, Barangay L. Adviento, Gattaran, Cagayan",
      "hgabPesos": 80000000,
      "nepPage": "396",
      "hgabPage": "366",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-08099",
      "nepTitle": "Construction of Flood Control Structure along Cansaga River, Barangay Garing to Barangay Panas, Consolacion, Cebu",
      "nepPesos": 150000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0313-003767",
      "hgabTitle": "Construction of Flood Control Structure along Cansaga River, Barangay Garing to Barangay Panas, Consolacion, Cebu",
      "hgabPesos": 150000000,
      "nepPage": "359",
      "hgabPage": "313",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-08098",
      "nepTitle": "Construction of Flood Control Structure along Cansaga River, Barangay Tilhaong, Consolacion, Cebu",
      "nepPesos": 150000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0313-003768",
      "hgabTitle": "Construction of Flood Control Structure along Cansaga River, Barangay Tilhaong, Consolacion, Cebu",
      "hgabPesos": 150000000,
      "nepPage": "359",
      "hgabPage": "313",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-06672",
      "nepTitle": "Construction of Flood Control Structure along Cotcot River (Upstream), Liloan, Cebu",
      "nepPesos": 300000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21425",
      "nepTitle": "Construction of Flood Control Structure along Curuan River, Barangay Curuan, Zamboanga City",
      "nepPesos": 40150000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0359-004653",
      "hgabTitle": "Construction of Flood Control Structure along Curuan River, Barangay Curuan, Zamboanga City",
      "hgabPesos": 40150000,
      "nepPage": "390",
      "hgabPage": "359",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34101",
      "nepTitle": "Construction of Flood Control Structure along Ingalera River, Barangay Talospatang, Malasiqui, Pangasinan",
      "nepPesos": 20000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0333-004157",
      "hgabTitle": "Construction of Flood Control Structure along Ingalera River, Barangay Talospatang, Malasiqui, Pangasinan",
      "hgabPesos": 20000000,
      "nepPage": "371",
      "hgabPage": "333",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28929",
      "nepTitle": "Construction of Flood Control Structure along Pansipit River, Lemery, Batangas",
      "nepPesos": 200000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21434",
      "nepTitle": "Construction of Flood Control Structure along Quiniput River, Barangay Quiniput, Zamboanga City",
      "nepPesos": 59792000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0316-003814",
      "hgabTitle": "Construction of Flood Control Structure along Quiniput River, Barangay Quiniput, Zamboanga City",
      "hgabPesos": 59792000,
      "nepPage": "361",
      "hgabPage": "316",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21430",
      "nepTitle": "Construction of Flood Control Structure at Bunguiao River, Barangay Bunguiao, Zamboanga City",
      "nepPesos": 63884000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-05124",
      "nepTitle": "Construction of Flood Control Structure at Cumawas - Poblacion, Sta. 0+000 - Sta. 0+420, Sta. 0+000 - Sta. 0+520, Bislig City, Surigao del Sur",
      "nepPesos": 40000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0364-004741",
      "hgabTitle": "Construction of Flood Control Structure at Cumawas - Poblacion, Sta. 0+000 - Sta. 0+420, Sta. 0+000 - Sta. 0+520, Bislig City, Surigao del Sur",
      "hgabPesos": 40000000,
      "nepPage": "394",
      "hgabPage": "364",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-22563",
      "nepTitle": "Construction of Flood Control Structure, Alabang Bayanan River (Sta.0+802 - Sta.0+912), Muntinlupa City",
      "nepPesos": 20000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0370-004855",
      "hgabTitle": "Construction of Flood Control Structure, Alabang Bayanan River (Sta.0+802 - Sta.0+912), Muntinlupa City",
      "hgabPesos": 20000000,
      "nepPage": "401",
      "hgabPage": "370",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-22564",
      "nepTitle": "Construction of Flood Control Structure, Alabang Cupang River (Sta.0+000 - Sta. 0+110), Muntinlupa City",
      "nepPesos": 30000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0370-004856",
      "hgabTitle": "Construction of Flood Control Structure, Alabang Cupang River (Sta.0+000 - Sta. 0+110), Muntinlupa City",
      "hgabPesos": 30000000,
      "nepPage": "401",
      "hgabPage": "370",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10096",
      "nepTitle": "Construction of Flood Control Structure, Kabisig Creek, sta 00+964 - sta 01+336, Barangay San Jose, Antipolo City, Rizal",
      "nepPesos": 30000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0350-004477",
      "hgabTitle": "Construction of Flood Control Structure, Kabisig Creek, sta 00+964 - sta 01+336, Barangay San Jose, Antipolo City, Rizal",
      "hgabPesos": 30000000,
      "nepPage": "384",
      "hgabPage": "350",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-22557",
      "nepTitle": "Construction of Flood Control Structure, Mangangate River (Sta.1+400 - Sta. 2+619.93), Muntinlupa City",
      "nepPesos": 150000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0364-004742",
      "hgabTitle": "Construction of Flood Control Structure, Mangangate River (Sta.1+400 - Sta. 2+619.93), Muntinlupa City",
      "hgabPesos": 80000000,
      "nepPage": "395",
      "hgabPage": "364",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-22522",
      "nepTitle": "Construction of Flood Control Structure, Sta. 0+214.70 to Sta. 0+230.50, Barangay Gulod, Quezon City",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0327-004030",
      "hgabTitle": "Construction of Flood Control Structure, Sta. 0+214.70 to Sta. 0+230.50, Barangay Gulod, Quezon City",
      "hgabPesos": 5000000,
      "nepPage": "370",
      "hgabPage": "327",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-22559",
      "nepTitle": "Construction of Flood Control Structure, Tunasan River (Sta.0+000 - Sta. 0+135), Muntinlupa City",
      "nepPesos": 30000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0371-004860",
      "hgabTitle": "Construction of Flood Control Structure, Tunasan River (Sta.0+000 - Sta. 0+135), Muntinlupa City",
      "hgabPesos": 30000000,
      "nepPage": "401",
      "hgabPage": "371",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-29770",
      "nepTitle": "Construction of Flood Control along Binahaan River, Barangay Cogon, Palo, Leyte (11.145992, 125.001724)",
      "nepPesos": 4780000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21554",
      "nepTitle": "Construction of Flood Control along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, part of Sibuguey River, Barangay Pilar, Diplahan, Zamboanga Sibugay",
      "nepPesos": 120000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0315-003810",
      "hgabTitle": "Construction of Flood Control along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, part of Sibuguey River, Barangay Pilar, Diplahan, Zamboanga Sibugay",
      "hgabPesos": 85000000,
      "nepPage": "361",
      "hgabPage": "315",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-01915",
      "nepTitle": "Construction of Flood Control along Layawan River Sta.1+140 - Sta.1+460, Barangay Layawan, Oroquieta City, Misamis Occidental",
      "nepPesos": 73600000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0317-003847",
      "hgabTitle": "Construction of Flood Control along Layawan River Sta.1+140 - Sta.1+460, Barangay Layawan, Oroquieta City, Misamis Occidental",
      "hgabPesos": 73600000,
      "nepPage": "362",
      "hgabPage": "317",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10135",
      "nepTitle": "Construction of Flood Control, Sta. 4+962 - 5+622, Barangay Zarah, San Luis, Aurora",
      "nepPesos": 75000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28922",
      "nepTitle": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
      "nepPesos": 150000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0307-003652",
      "hgabTitle": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
      "hgabPesos": 150000000,
      "nepPage": "354",
      "hgabPage": "307",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-08080",
      "nepTitle": "Construction of Flood Mitigation Structure along Guadalupe River, Sta. 7+543 - Sta. 7+957, Barangay Kalunasan, Cebu City",
      "nepPesos": 124200000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-00396",
      "nepTitle": "Construction of Flood Mitigation Structure and Drainage System at Maria, Siquijor",
      "nepPesos": 10000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0355-004586",
      "hgabTitle": "Construction of Flood Mitigation Structure and Drainage System at Maria, Siquijor",
      "hgabPesos": 10000000,
      "nepPage": "387",
      "hgabPage": "355",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21417",
      "nepTitle": "Construction of Flood Mitigation Structure at Barangay Talisayan, Zamboanga City",
      "nepPesos": 100000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0316-003818",
      "hgabTitle": "Construction of Flood Mitigation Structure at Barangay Talisayan, Zamboanga City",
      "hgabPesos": 100000000,
      "nepPage": "361",
      "hgabPage": "316",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21419",
      "nepTitle": "Construction of Flood Mitigation Structure, Barangay San Roque, Zamboanga City",
      "nepPesos": 100000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0316-003819",
      "hgabTitle": "Construction of Flood Mitigation Structure, Barangay San Roque, Zamboanga City",
      "hgabPesos": 100000000,
      "nepPage": "361",
      "hgabPage": "316",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10134",
      "nepTitle": "Construction of Kinalapan Flood Control, Sta. 3+080 - 3+740, Barangay Pingit, Baler, Aurora",
      "nepPesos": 75000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0305-003617",
      "hgabTitle": "Construction of Kinalapan Flood Control, Sta. 3+080 - 3+740, Barangay Pingit, Baler, Aurora",
      "hgabPesos": 75000000,
      "nepPage": "353",
      "hgabPage": "305",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38926",
      "nepTitle": "Construction of Marina Development Project, Butuan City Riverpark and Riverwalk with Drainage and Sidewalks, Butuan City, Agusan Del Norte, 8.951115, 125.543812",
      "nepPesos": 300000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0319-003878",
      "hgabTitle": "Construction of Marina Development Project, Butuan City Riverpark and Riverwalk with Drainage and Sidewalks, Butuan City, Agusan Del Norte, 8.951115, 125.543812",
      "hgabPesos": 300000000,
      "nepPage": "364",
      "hgabPage": "319",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21680",
      "nepTitle": "Construction of Revetment Wall along Aklan River, Barangay Daja Sur, Banga, Aklan",
      "nepPesos": 150000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0311-003731",
      "hgabTitle": "Construction of Revetment Wall along Aklan River, Barangay Daja Sur, Banga, Aklan",
      "hgabPesos": 150000000,
      "nepPage": "357",
      "hgabPage": "311",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21696",
      "nepTitle": "Construction of Revetment Wall along Aklan River, Barangay Mina, Lezo, Aklan",
      "nepPesos": 150000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0368-004815",
      "hgabTitle": "Construction of Revetment Wall along Aklan River, Barangay Mina, Lezo, Aklan",
      "hgabPesos": 150000000,
      "nepPage": "398",
      "hgabPage": "368",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21710",
      "nepTitle": "Construction of Revetment Wall along Aklan River, Barangay Pusiw, Numancia, Aklan",
      "nepPesos": 12000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0373-004889",
      "hgabTitle": "Construction of Revetment Wall along Aklan River, Barangay Pusiw, Numancia, Aklan",
      "hgabPesos": 12000000,
      "nepPage": "403",
      "hgabPage": "373",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28844",
      "nepTitle": "Construction of Revetment along Carmona River, Barangay Cabilang Baybay, Carmona City, Cavite",
      "nepPesos": 450000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0307-003661",
      "hgabTitle": "Construction of Revetment along Carmona River, Barangay Cabilang Baybay, Carmona City, Cavite",
      "hgabPesos": 150000000,
      "nepPage": "354",
      "hgabPage": "307",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09663",
      "nepTitle": "Construction of Revetment along Cañas River, Barangay Tejero, General Trias City, Cavite",
      "nepPesos": 130000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0307-003660",
      "hgabTitle": "Construction of Revetment along Cañas River, Barangay Tejero, General Trias City, Cavite",
      "hgabPesos": 130000000,
      "nepPage": "354",
      "hgabPage": "307",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28948",
      "nepTitle": "Construction of Revetment along Julian River, Barangay Anabu I-D, Imus, Cavite",
      "nepPesos": 70000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0308-003666",
      "hgabTitle": "Construction of Revetment along Julian River, Barangay Anabu I-D, Imus, Cavite",
      "hgabPesos": 70000000,
      "nepPage": "354",
      "hgabPage": "308",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28950",
      "nepTitle": "Construction of Revetment along Julian River, Barangay Malagasang I-C, Imus, Cavite",
      "nepPesos": 60000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0308-003667",
      "hgabTitle": "Construction of Revetment along Julian River, Barangay Malagasang I-C, Imus, Cavite",
      "hgabPesos": 60000000,
      "nepPage": "355",
      "hgabPage": "308",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34230",
      "nepTitle": "Construction of Road & Drainage, Barangay Salisay, Dagupan City, Pangasinan",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0470-006853",
      "hgabTitle": "Construction of Road & Drainage, Barangay Salisay, Dagupan City, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "466",
      "hgabPage": "470",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10770",
      "nepTitle": "Construction of Road and Drainage Barangay San Pedro II, Magalang, Pampanga, Sta. 0+000 - Sta. 0+100, Sta 0+000 - Sta 0+345",
      "nepPesos": 7600000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09800",
      "nepTitle": "Construction of Road and Drainage System at Barangay San Jose, Binan City, Laguna",
      "nepPesos": 30000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0546-008474",
      "hgabTitle": "Construction of Road and Drainage System at Barangay San Jose, Binan City, Laguna",
      "hgabPesos": 30000000,
      "nepPage": "510",
      "hgabPage": "546",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10814",
      "nepTitle": "Construction of Road and Drainage, Barangay Ayala, Magalang, Pampanga, Sta. 0+000 - Sta. 0+568",
      "nepPesos": 12500000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0532-008176",
      "hgabTitle": "Construction of Road and Drainage, Barangay Ayala, Magalang, Pampanga, Sta. 0+000 - Sta. 0+568",
      "hgabPesos": 12500000,
      "nepPage": "501",
      "hgabPage": "532",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-26362",
      "nepTitle": "Construction of Road and Drainage, Barangay Dela Paz, Biñan City, Laguna",
      "nepPesos": 102000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37078",
      "nepTitle": "Construction of Road and Drainage, Barangay Javellana, Jaro, Iloilo City, Iloilo",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0573-009075",
      "hgabTitle": "Construction of Road and Drainage, Barangay Javellana, Jaro, Iloilo City, Iloilo",
      "hgabPesos": 5000000,
      "nepPage": "528",
      "hgabPage": "573",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09790",
      "nepTitle": "Construction of Road and Drainage, Barangay Macabling, Santa Rosa City, Laguna",
      "nepPesos": 50000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0546-008475",
      "hgabTitle": "Construction of Road and Drainage, Barangay Macabling, Santa Rosa City, Laguna",
      "hgabPesos": 50000000,
      "nepPage": "510",
      "hgabPage": "546",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10777",
      "nepTitle": "Construction of Road and Drainage, Barangay Pandan, Angeles City Pampanga, Sta. 0+000 - Sta. 0+850, Sta. 0+000 - Sta. 0+071, Sta. 0+000 - Sta. 0+248",
      "nepPesos": 8580000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0532-008180",
      "hgabTitle": "Construction of Road and Drainage, Barangay Pandan, Angeles City Pampanga, Sta. 0+000 - Sta. 0+850, Sta. 0+000 - Sta. 0+071, Sta. 0+000 - Sta. 0+248",
      "hgabPesos": 8580000,
      "nepPage": "501",
      "hgabPage": "532",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10780",
      "nepTitle": "Construction of Road and Drainage, Barangay Pulung Cacutud, Angeles City Pampanga, Sta. 0+000 - Sta. 0+300, Sta. 0+000 - Sta. 0+295, Sta. 0+000 - Sta. 0+560, Sta. 0+000 - Sta. 0+392",
      "nepPesos": 16000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0533-008183",
      "hgabTitle": "Construction of Road and Drainage, Barangay Pulung Cacutud, Angeles City Pampanga, Sta. 0+000 - Sta. 0+300, Sta. 0+000 - Sta. 0+295, Sta. 0+000 - Sta. 0+560, Sta. 0+000 - Sta. 0+392",
      "hgabPesos": 16000000,
      "nepPage": "501",
      "hgabPage": "533",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10821",
      "nepTitle": "Construction of Road and Drainage, Barangay San Isidro, Magalang, Pampanga, Sta. 0+000 - Sta. 0+420, Sta. 0+000 - Sta. 0+158, Sta. 0+000 - Sta. 0+585",
      "nepPesos": 13000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0533-008184",
      "hgabTitle": "Construction of Road and Drainage, Barangay San Isidro, Magalang, Pampanga, Sta. 0+000 - Sta. 0+420, Sta. 0+000 - Sta. 0+158, Sta. 0+000 - Sta. 0+585",
      "hgabPesos": 13000000,
      "nepPage": "501",
      "hgabPage": "533",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10781",
      "nepTitle": "Construction of Road and Drainage, Barangay Sto. Cristo, Angeles City Pampanga, Sta. 0+000 - Sta. 0+191, Sta. 0+000 - Sta. 0+130, Sta. 0+000 - Sta. 0+285",
      "nepPesos": 11800000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0533-008194",
      "hgabTitle": "Construction of Road and Drainage, Barangay Sto. Cristo, Angeles City Pampanga, Sta. 0+000 - Sta. 0+191, Sta. 0+000 - Sta. 0+130, Sta. 0+000 - Sta. 0+285",
      "hgabPesos": 11800000,
      "nepPage": "501",
      "hgabPage": "533",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36089",
      "nepTitle": "Construction of Road with Drainage Canal, Barangay Pandayan, Meycauayan, City, Bulacan",
      "nepPesos": 8000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0513-007771",
      "hgabTitle": "Construction of Road with Drainage Canal, Barangay Pandayan, Meycauayan, City, Bulacan",
      "hgabPesos": 8000000,
      "nepPage": "490",
      "hgabPage": "513",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-08154",
      "nepTitle": "Construction of Road with Drainage at Barangay Jagobiao, Mandaue City, Cebu",
      "nepPesos": 10000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0587-009398",
      "hgabTitle": "Construction of Road with Drainage at Barangay Jagobiao, Mandaue City, Cebu",
      "hgabPesos": 10000000,
      "nepPage": "537",
      "hgabPage": "587",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-08180",
      "nepTitle": "Construction of Road with Drainage at Barangay Tawason, Mandaue City - Sta. 0+000.00 - Sta. 0+475.00",
      "nepPesos": 8700000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-08172",
      "nepTitle": "Construction of Road with Drainage at Barangay Tawason, Mandaue City, Sta 0+000.00 - Sta 0+450.00",
      "nepPesos": 13875000,
      "category": "Flood control",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0587-009400",
      "hgabTitle": "Construction of Road with Drainage, Barangay Cabancalan, Mandaue City, Cebu - Sta. 0+000.00 - Sta. 0+450.00",
      "hgabPesos": 5625000,
      "nepPage": "537",
      "hgabPage": "587",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36539",
      "nepTitle": "Construction of Road with Drainage, Barangay Adlas, Silang, Cavite",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0545-008460",
      "hgabTitle": "Construction of Road with Drainage, Barangay Adlas, Silang, Cavite",
      "hgabPesos": 5000000,
      "nepPage": "510",
      "hgabPage": "545",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36535",
      "nepTitle": "Construction of Road with Drainage, Barangay Balite I, Silang, Cavite",
      "nepPesos": 10000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36536",
      "nepTitle": "Construction of Road with Drainage, Barangay Calubcob, Silang, Cavite",
      "nepPesos": 10000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0545-008463",
      "hgabTitle": "Construction of Road with Drainage, Barangay Calubcob, Silang, Cavite",
      "hgabPesos": 10000000,
      "nepPage": "510",
      "hgabPage": "545",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10555",
      "nepTitle": "Construction of Road with Drainage, Barangay Poblacion, City of San Jose del Monte, Bulacan (121.043616, 14.813899)",
      "nepPesos": 30000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0514-007788",
      "hgabTitle": "Construction of Road with Drainage, Barangay Poblacion, City of San Jose del Monte, Bulacan (121.043616, 14.813899)",
      "hgabPesos": 30000000,
      "nepPage": "491",
      "hgabPage": "514",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36541",
      "nepTitle": "Construction of Road with Drainage, Barangay Sabutan, Silang, Cavite",
      "nepPesos": 8000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36552",
      "nepTitle": "Construction of Road with Drainage, Barangay Yakal, Silang, Cavite",
      "nepPesos": 10000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0545-008468",
      "hgabTitle": "Construction of Road with Drainage, Barangay Yakal, Silang, Cavite",
      "hgabPesos": 10000000,
      "nepPage": "510",
      "hgabPage": "545",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03243",
      "nepTitle": "Construction of San Jose Flood Control Structure, Sta 9+660 -10+070, Maria Aurora, Aurora",
      "nepPesos": 50000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-29445",
      "nepTitle": "Construction of Simayung Flood Control along Abulug River, Abulug, Cagayan",
      "nepPesos": 100000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0366-004784",
      "hgabTitle": "Construction of Simayung Flood Control along Abulug River, Abulug, Cagayan",
      "hgabPesos": 100000000,
      "nepPage": "396",
      "hgabPage": "366",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21602",
      "nepTitle": "Construction of Tumaga River Flood Control (Tugbungan Section), Zamboanga City",
      "nepPesos": 200000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-08200",
      "nepTitle": "Construction of drainage facilities at Barangay Cubacub, Mandaue City, Cebu, Sta. 0+000.00 - Sta. 0+962.00",
      "nepPesos": 60000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0313-003761",
      "hgabTitle": "Construction of drainage facilities at Barangay Cubacub, Mandaue City, Cebu, Sta. 0+000.00 - Sta. 0+962.00",
      "hgabPesos": 60000000,
      "nepPage": "358",
      "hgabPage": "313",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-08109",
      "nepTitle": "Construction of drainage system at Barangay Poblacion, Cordova, Cebu",
      "nepPesos": 5000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0356-004598",
      "hgabTitle": "Construction of drainage system at Barangay Poblacion, Cordova, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "388",
      "hgabPage": "356",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-02669",
      "nepTitle": "Construction/Improvement of Catarman Comprehensive Drainage System, Sta. 000+000 - Sta. 002+631.57, Catarman, Northern Samar",
      "nepPesos": 60000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0315-003804",
      "hgabTitle": "Construction/Improvement of Catarman Comprehensive Drainage System, Sta. 000+000 - Sta. 002+631.57, Catarman, Northern Samar",
      "hgabPesos": 60000000,
      "nepPage": "360",
      "hgabPage": "315",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33478",
      "nepTitle": "Improvement of Road and Drainage System along Taft Ave. (From UN Ave. to Ayala Blvd.), Manila City",
      "nepPesos": 575000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-08150",
      "nepTitle": "Improvement of Road with Drainage System at Fuentes Road in Barangays Agus and Pajac, Lapu-Lapu City, Cebu",
      "nepPesos": 5500000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0588-009405",
      "hgabTitle": "Improvement of Road with Drainage System at Fuentes Road in Barangays Agus and Pajac, Lapu-Lapu City, Cebu",
      "hgabPesos": 5500000,
      "nepPage": "537",
      "hgabPage": "588",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37698",
      "nepTitle": "Rehabilitation of Drainage Structure at Barangay Basak, Lapu-Lapu City, Cebu",
      "nepPesos": 50000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0356-004608",
      "hgabTitle": "Rehabilitation of Drainage Structure at Barangay Basak, Lapu-Lapu City, Cebu",
      "hgabPesos": 50000000,
      "nepPage": "388",
      "hgabPage": "356",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34025",
      "nepTitle": "Rehabilitation of Drainage System at Barangay Pinagbuhatan, Pasig City",
      "nepPesos": 20000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0322-003927",
      "hgabTitle": "Rehabilitation of Drainage System at Barangay Pinagbuhatan, Pasig City",
      "hgabPesos": 20000000,
      "nepPage": "366",
      "hgabPage": "322",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33997",
      "nepTitle": "Rehabilitation of Drainage System, Barangay Loyola Heights, Quezon City",
      "nepPesos": 140000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0300-003522",
      "hgabTitle": "Rehabilitation of Drainage System, Barangay Loyola Heights, Quezon City",
      "hgabPesos": 140000000,
      "nepPage": "349",
      "hgabPage": "300",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34073",
      "nepTitle": "Rehabilitation of Drainage at Barangay 150, Zone 13, Manila City",
      "nepPesos": 6000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0324-003977",
      "hgabTitle": "Rehabilitation of Drainage at Barangay 150, Zone 13, Manila City",
      "hgabPesos": 6000000,
      "nepPage": "368",
      "hgabPage": "324",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-31032",
      "nepTitle": "Rehabilitation of Drainage at Brgy. Basak, Lapu-Lapu City Cebu",
      "nepPesos": 50000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-00416",
      "nepTitle": "Rehabilitation of Drainage of Pilak Pilak Creek, Sta. 0+000 - 5+930, Addalam River Irrigation System, Saguday, Quirino",
      "nepPesos": 14252000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0337-004226",
      "hgabTitle": "Rehabilitation of Drainage of Pilak Pilak Creek, Sta. 0+000 - 5+930, Addalam River Irrigation System, Saguday, Quirino",
      "hgabPesos": 14252000,
      "nepPage": "374",
      "hgabPage": "337",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-05577",
      "nepTitle": "Rehabilitation of Flood Control Structure along Agno River, Warding Section, Bayambang, Pangasinan",
      "nepPesos": 100000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36146",
      "nepTitle": "Rehabilitation of Flood Control Structure along Saluysoy-Pandayan Creek, Barangay Saluysoy, Meycauayan, Bulacan",
      "nepPesos": 45000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0340-004273",
      "hgabTitle": "Rehabilitation of Flood Control Structure along Saluysoy-Pandayan Creek, Barangay Saluysoy, Meycauayan, Bulacan",
      "hgabPesos": 45000000,
      "nepPage": "376",
      "hgabPage": "340",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-26388",
      "nepTitle": "Rehabilitation of Road and Drainage, Brgy Dila, City of Santa Rosa, Laguna",
      "nepPesos": 65000000,
      "category": "Flood control",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0427-006008",
      "hgabTitle": "Rehabilitation of Road and Drainage, Dila, City of Santa Rosa, Laguna",
      "hgabPesos": 65000000,
      "nepPage": "442",
      "hgabPage": "427",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10559",
      "nepTitle": "Rehabilitation of Road with Drainage, Barangay Dulong Bayan, City of San Jose del Monte, Bulacan (121.026121, 14.822209)",
      "nepPesos": 50000000,
      "category": "Flood control",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0516-007821",
      "hgabTitle": "Rehabilitation of Road with Drainage, Barangay Dulong Bayan, City of San Jose del Monte, Bulacan (14.828343, 121.040905)",
      "hgabPesos": 50000000,
      "nepPage": "492",
      "hgabPage": "516",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10579",
      "nepTitle": "Rehabilitation of Road with drainage, Barangay Minuyan Proper, City of San Jose Del Monte, Bulacan (121.080917, 14.836105)",
      "nepPesos": 50000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0516-007822",
      "hgabTitle": "Rehabilitation of Road with drainage, Barangay Minuyan Proper, City of San Jose Del Monte, Bulacan (121.080917, 14.836105)",
      "hgabPesos": 50000000,
      "nepPage": "492",
      "hgabPage": "516",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37907",
      "nepTitle": "Completion of Multi-Purpose Building (Covered Court), Barangay Mag-Aso, Jaro, Leyte (11.221369, 124.745542)",
      "nepPesos": 6500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0856-014720",
      "hgabTitle": "Completion of Multi-Purpose Building (Covered Court), Barangay Mag-Aso, Jaro, Leyte (11.221369, 124.745542)",
      "hgabPesos": 6500000,
      "nepPage": "648",
      "hgabPage": "856",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-23169",
      "nepTitle": "Completion of Multi-Purpose Building, Barangay San Agustin, Malabon City (14.662042, 120.952531)",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0656-010704",
      "hgabTitle": "Completion of Multi-Purpose Building, Barangay San Agustin, Malabon City (14.662042, 120.952531)",
      "hgabPesos": 5000000,
      "nepPage": "572",
      "hgabPage": "656",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-23172",
      "nepTitle": "Completion of Multi-Purpose Building, Barangay Santulan, Malabon City (14.685711, 120.958868)",
      "nepPesos": 60000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0630-010244",
      "hgabTitle": "Completion of Multi-Purpose Building, Barangay Santulan, Malabon City (14.685711, 120.958868)",
      "hgabPesos": 60000000,
      "nepPage": "560",
      "hgabPage": "630",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33710",
      "nepTitle": "Construction (Completion) of Carmen Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0890-015365",
      "hgabTitle": "Construction (Completion) of Carmen Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
      "hgabPesos": 50000000,
      "nepPage": "665",
      "hgabPage": "890",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34725",
      "nepTitle": "Construction (Completion) of Multi Purpose Building at Wangal, La Trinidad, Benguet",
      "nepPesos": 150000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0634-010327",
      "hgabTitle": "Construction (Completion) of Multi Purpose Building at Wangal, La Trinidad, Benguet",
      "hgabPesos": 150000000,
      "nepPage": "562",
      "hgabPage": "634",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36285",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Barangay Hall) at Barangay Mataas na Lupa, Taysan, Batangas",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0757-012747",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Barangay Hall) at Barangay Mataas na Lupa, Taysan, Batangas",
      "hgabPesos": 7000000,
      "nepPage": "611",
      "hgabPage": "757",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09606",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay Alalum, San Pascual, Batangas",
      "nepPesos": 25000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0751-012615",
      "hgabTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Alalum, San Pascual, Batangas (Phase 2)",
      "hgabPesos": 10000000,
      "nepPage": "608",
      "hgabPage": "751",
      "chainageStatus": "not stated",
      "trancheStatus": "one side stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39089",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay Camaman-an, Cagayan de Oro City",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0874-015049",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay Camaman-an, Cagayan de Oro City",
      "hgabPesos": 10000000,
      "nepPage": "657",
      "hgabPage": "874",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28896",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) Barangay Nueva, San Pedro City, Laguna",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0771-013027",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) Barangay Nueva, San Pedro City, Laguna",
      "hgabPesos": 5000000,
      "nepPage": "616",
      "hgabPage": "771",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09554",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Bagong Tubig, San Luis, Batangas",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0751-012617",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Bagong Tubig, San Luis, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "608",
      "hgabPage": "751",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09563",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Gamao, Tingloy, Batangas",
      "nepPesos": 12000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0752-012619",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Gamao, Tingloy, Batangas",
      "hgabPesos": 12000000,
      "nepPage": "608",
      "hgabPage": "752",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36284",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Palahanan I, San Juan, Batangas",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0758-012748",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Palahanan I, San Juan, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "611",
      "hgabPage": "758",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36282",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Sta. Cruz, Rosario, Batangas",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0758-012750",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Sta. Cruz, Rosario, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "611",
      "hgabPage": "758",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38448",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Purok 1, Barangay Salvacion, Santo Tomas, Davao del Norte",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0891-015377",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Purok 1, Barangay Salvacion, Santo Tomas, Davao del Norte",
      "hgabPesos": 5000000,
      "nepPage": "665",
      "hgabPage": "891",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38793",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Lingayao, Las Nieves, Agusan del Norte",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0915-015824",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Lingayao, Las Nieves, Agusan del Norte",
      "hgabPesos": 7000000,
      "nepPage": "671",
      "hgabPage": "915",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38794",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Mahogany, Butuan City, Agusan del Norte",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0915-015835",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Mahogany, Butuan City, Agusan del Norte",
      "hgabPesos": 7000000,
      "nepPage": "672",
      "hgabPage": "915",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38605",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Miguel Macasarte, Banisilan, Cotabato",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0899-015522",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Miguel Macasarte, Banisilan, Cotabato",
      "hgabPesos": 5000000,
      "nepPage": "669",
      "hgabPage": "899",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37891",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Poblacion, Kawayan, Biliran (124.357710°, 11.677362°)",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0853-014660",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Poblacion, Kawayan, Biliran (124.357710°, 11.677362°)",
      "hgabPesos": 5000000,
      "nepPage": "647",
      "hgabPage": "853",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-22741",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Perfecto, San Juan City (121.022818, 14.602757)",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0656-010708",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Perfecto, San Juan City (121.022818, 14.602757)",
      "hgabPesos": 15000000,
      "nepPage": "572",
      "hgabPage": "656",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09594",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Teodoro, Bauan, Batangas",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0752-012623",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Teodoro, Bauan, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "608",
      "hgabPage": "752",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38796",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Sitio Bokbokon, Barangay Lawan-Lawan, Las Nieves, Agusan del Norte",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0915-015826",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Sitio Bokbokon, Barangay Lawan-Lawan, Las Nieves, Agusan del Norte",
      "hgabPesos": 7000000,
      "nepPage": "671",
      "hgabPage": "915",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-11120",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered court), Acacia Street, Barangay Gordon Heights, Olongapo City, Zambales (14.855419, 120.290497)",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-05182",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (DPWH Building), Laoag City, Ilocos Norte",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0932-016149",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (DPWH Building), Laoag City, Ilocos Norte",
      "hgabPesos": 10000000,
      "nepPage": "682",
      "hgabPage": "932",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34879",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Evacuation Center), Barangay Nueva Era, San Manuel, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0706-011690",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Evacuation Center), Barangay Nueva Era, San Manuel, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "588",
      "hgabPage": "706",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-02651",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar (12.447525, 124.313751)",
      "nepPesos": 25000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0860-014793",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar (12.447525, 124.313751)",
      "hgabPesos": 25000000,
      "nepPage": "650",
      "hgabPage": "860",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39119",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Operations Center), Barangay Poblacion, Municipality of Catarman, Province of Camiguin",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0876-015089",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Municipality of Catarman, Province of Camiguin",
      "hgabPesos": 7000000,
      "nepPage": "657",
      "hgabPage": "876",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36174",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (San Pablo City Hall), Barangay V-A, San Pablo City, Laguna",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0774-013084",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (San Pablo City Hall), Barangay V- A, San Pablo City, Laguna",
      "hgabPesos": 6000000,
      "nepPage": "618",
      "hgabPage": "774",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36529",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building (Senior Citizen's Building), Barangay Gregoria De Jesus, Gen. Mariano Alvarez, Cavite",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0769-012972",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Senior Citizen's Building), Barangay Gregoria De Jesus, Gen. Mariano Alvarez, Cavite",
      "hgabPesos": 5000000,
      "nepPage": "615",
      "hgabPage": "769",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33541",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building Barangay Namaltugan, Sudipen, La Union",
      "nepPesos": 9200000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0677-011104",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building Barangay Namaltugan, Sudipen, La Union",
      "hgabPesos": 9200000,
      "nepPage": "577",
      "hgabPage": "677",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33542",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building Barangay Pandan, Bacnotan, La Union",
      "nepPesos": 5750000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0678-011128",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building Barangay Pandan, Bacnotan, La Union",
      "hgabPesos": 5750000,
      "nepPage": "577",
      "hgabPage": "678",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33543",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0678-011129",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
      "hgabPesos": 30000000,
      "nepPage": "577",
      "hgabPage": "678",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33544",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building Barangay Rimos 5, Luna, La Union",
      "nepPesos": 14950000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0678-011130",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building Barangay Rimos 5, Luna, La Union",
      "hgabPesos": 14950000,
      "nepPage": "577",
      "hgabPage": "678",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37327",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building Facility, Barangay Poblacion Ilaya, San Enrique, Iloilo",
      "nepPesos": 15500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0818-013963",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building Facility, Barangay Poblacion Ilaya, San Enrique, Iloilo",
      "hgabPesos": 15500000,
      "nepPage": "638",
      "hgabPage": "818",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36763",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0771-013028",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
      "hgabPesos": 10000000,
      "nepPage": "617",
      "hgabPage": "771",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35071",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Fugu, Gattaran, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0700-011569",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Fugu, Gattaran, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "585",
      "hgabPage": "700",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35055",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Ganzano, Gattaran, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0700-011570",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Ganzano, Gattaran, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "585",
      "hgabPage": "700",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37064",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Maasin, Bulalacao Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0794-013480",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Maasin, Bulalacao Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "628",
      "hgabPage": "794",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36345",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Mahabang Lalim, General Nakar, Quezon",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34083",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Manresa, Quezon City",
      "nepPesos": 72000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0631-010258",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Manresa, Quezon City",
      "hgabPesos": 72000000,
      "nepPage": "560",
      "hgabPage": "631",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37438",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Palaka, Municipality of Valladolid, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0835-014298",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Palaka, Municipality of Valladolid, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "643",
      "hgabPage": "835",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35241",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion 1, Santa Maria, Isabela, 17.467914, 121.752852",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0705-011671",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion 1, Santa Maria, Isabela, 17.467914, 121.752852",
      "hgabPesos": 10000000,
      "nepPage": "588",
      "hgabPage": "705",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37066",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0794-013481",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "628",
      "hgabPage": "794",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34292",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Laoac, Pangasinan",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0632-010281",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Laoac, Pangasinan",
      "hgabPesos": 15000000,
      "nepPage": "561",
      "hgabPage": "632",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36625",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay San Gabriel, San Pablo City, Laguna",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0775-013101",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay San Gabriel, San Pablo City, Laguna",
      "hgabPesos": 50000000,
      "nepPage": "618",
      "hgabPage": "775",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35066",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Tagumay, Gattaran, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0700-011573",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Tagumay, Gattaran, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "585",
      "hgabPage": "700",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37602",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building in Barangay 1, Hinoba-an, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21359",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building including Support Facilities, DPWH Davao del Norte 2nd DEO, Carmen, Davao del Norte",
      "nepPesos": 150000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0928-016051",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building including Support Facilities, DPWH Davao del Norte 2nd DEO, Carmen, Davao del Norte",
      "hgabPesos": 150000000,
      "nepPage": "678",
      "hgabPage": "928",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35401",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building of Barangay Santor, Reina Mercedes, Isabela",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0709-011751",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building of Barangay Santor, Reina Mercedes, Isabela",
      "hgabPesos": 6000000,
      "nepPage": "590",
      "hgabPage": "709",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10599",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, (Motorpool), Bulacan 2nd District Engineering Office, Santa Maria, Bulacan (120.99926, 14.885576)",
      "nepPesos": 12000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0934-016178",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, (Motorpool), Bulacan 2nd District Engineering Office, Santa Maria, Bulacan (120.999525, 14.886337)",
      "hgabPesos": 12000000,
      "nepPage": "683",
      "hgabPage": "934",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37347",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Hinoba-an, Negros Occidental",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0834-014274",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Hinoba-an, Negros Occidental",
      "hgabPesos": 36000000,
      "nepPage": "643",
      "hgabPage": "834",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37349",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Ilog, Negros Occidental",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0834-014275",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Ilog, Negros Occidental",
      "hgabPesos": 30000000,
      "nepPage": "643",
      "hgabPage": "834",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35381",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Abagao, Camalaniugan, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0700-011576",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Abagao, Camalaniugan, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "585",
      "hgabPage": "700",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37121",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Alibunan, Calinog, Iloilo",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0826-014123",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Alibunan, Calinog, Iloilo",
      "hgabPesos": 10000000,
      "nepPage": "640",
      "hgabPage": "826",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09601",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Aplaya, Bauan, Batangas",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0751-012608",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Kumintang Ibaba, Batangas City",
      "hgabPesos": 20000000,
      "nepPage": "609",
      "hgabPage": "751",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35388",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Asinga-Via, Baggao, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0700-011577",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Asinga-Via, Baggao, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "585",
      "hgabPage": "700",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35382",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baculod, Alcala, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0700-011578",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baculod, Alcala, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "585",
      "hgabPage": "700",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38494",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bagongon, Compostela, Davao de Oro",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0889-015336",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bagongon, Compostela, Davao de Oro",
      "hgabPesos": 7000000,
      "nepPage": "664",
      "hgabPage": "889",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36700",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baguio, Tayabas City, Quezon",
      "nepPesos": 8000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0777-013138",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baguio, Tayabas City, Quezon",
      "hgabPesos": 8000000,
      "nepPage": "619",
      "hgabPage": "777",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34883",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0706-011692",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
      "hgabPesos": 6000000,
      "nepPage": "589",
      "hgabPage": "706",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35168",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bangatan, Gattaran, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0700-011579",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bangatan, Gattaran, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "585",
      "hgabPage": "700",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33633",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "nepPesos": 75000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0635-010356",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "hgabPesos": 75000000,
      "nepPage": "563",
      "hgabPage": "635",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35150",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Barbarit, Gattaran, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0701-011580",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Barbarit, Gattaran, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "585",
      "hgabPage": "701",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37622",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Basac, Larena, Siquijor",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0841-014395",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Basac, Larena, Siquijor",
      "hgabPesos": 5000000,
      "nepPage": "645",
      "hgabPage": "841",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35023",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Batangan, Gonzaga, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0701-011581",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Batangan, Gonzaga, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "585",
      "hgabPage": "701",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36170",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Batong Dalig, Kawit, Cavite",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0762-012839",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Batong Dalig, Kawit, Cavite",
      "hgabPesos": 20000000,
      "nepPage": "613",
      "hgabPage": "762",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34960",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bisag, Palanan, Isabela",
      "nepPesos": 5500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0711-011804",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bisag, Palanan, Isabela",
      "hgabPesos": 5500000,
      "nepPage": "590",
      "hgabPage": "711",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34963",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0711-011805",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "590",
      "hgabPage": "711",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38598",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0911-015761",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
      "hgabPesos": 5000000,
      "nepPage": "670",
      "hgabPage": "911",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35868",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Buasao, Sto. Domingo, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0737-012326",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Buasao, Sto. Domingo, Nueva Ecija",
      "hgabPesos": 6000000,
      "nepPage": "600",
      "hgabPage": "737",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37262",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Buenaflor Embarkadero, Dumangas, Iloilo, 10.819806, 122.712086",
      "nepPesos": 11000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0820-013987",
      "hgabTitle": "Construction (Completion) of 2 units Multi-Purpose Building, Barangay Buenaflor Embarkadero, Dumangas, Iloilo, 10.819806, 122.712086",
      "hgabPesos": 40000000,
      "nepPage": "638",
      "hgabPage": "820",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36043",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bulac, Talavera, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0737-012327",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bulac, Talavera, Nueva Ecija",
      "hgabPesos": 6000000,
      "nepPage": "600",
      "hgabPage": "737",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37620",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Cabal-asan, Maria, Siquijor",
      "nepPesos": 5500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0841-014410",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Cabal-asan, Maria, Siquijor",
      "hgabPesos": 5500000,
      "nepPage": "645",
      "hgabPage": "841",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36048",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Cabugao, Sto. Domingo, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0737-012328",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Cabugao, Sto. Domingo, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "601",
      "hgabPage": "737",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39542",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Calatagan Proper, Virac, Catanduanes",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0804-013677",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Calatagan Proper, Virac, Catanduanes",
      "hgabPesos": 5000000,
      "nepPage": "633",
      "hgabPage": "804",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35018",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Capissayan Sur, Gattaran, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0701-011584",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Capissayan Sur, Gattaran, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "585",
      "hgabPage": "701",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37269",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Capuling, Dueñas, Iloilo ,11.059806 ,122.617673",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0820-013989",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Capuling, Dueñas, Iloilo ,11.059806 ,122.617673",
      "hgabPesos": 10000000,
      "nepPage": "638",
      "hgabPage": "820",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36038",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Cardinal, Guimba, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34962",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Centro East (Poblacion), Palanan, Isabela",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0711-011808",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Centro East (Poblacion), Palanan, Isabela",
      "hgabPesos": 6000000,
      "nepPage": "590",
      "hgabPage": "711",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34874",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0707-011713",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Building 1, Barangay Cullalabo del Sur, Burgos, Isabela",
      "hgabPesos": 20000000,
      "nepPage": "589",
      "hgabPage": "707",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33637",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Dampol, Pulilan, Bulacan",
      "nepPesos": 35000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38584",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0912-015771",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
      "hgabPesos": 6000000,
      "nepPage": "671",
      "hgabPage": "912",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34964",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Disulap, San Mariano, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0711-011810",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Disulap, San Mariano, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "590",
      "hgabPage": "711",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34156",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Eguia, Dasol, Pangasinan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0679-011162",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Eguia, Dasol, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "578",
      "hgabPage": "679",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35859",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Faigal, Guimba, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0737-012332",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Faigal, Guimba, Nueva Ecija",
      "hgabPesos": 6000000,
      "nepPage": "601",
      "hgabPage": "737",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34177",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Germinal, Bolinao, Pangasinan",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0679-011163",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Germinal, Bolinao, Pangasinan",
      "hgabPesos": 50000000,
      "nepPage": "578",
      "hgabPage": "679",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34759",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Gonogon, Bontoc, Mountain Province",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0695-011480",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Gonogon, Bontoc, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "583",
      "hgabPage": "695",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35046",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Jurisdiccion, Alcala, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0701-011587",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Jurisdiccion, Alcala, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "585",
      "hgabPage": "701",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36692",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Kalangay, Lucban, Quezon",
      "nepPesos": 8000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0777-013141",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Kalangay, Lucban, Quezon",
      "hgabPesos": 8000000,
      "nepPage": "619",
      "hgabPage": "777",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38579",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Keytodac, Lebak, Sultan Kudarat",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0912-015772",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Keytodac, Lebak, Sultan Kudarat",
      "hgabPesos": 7000000,
      "nepPage": "671",
      "hgabPage": "912",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37790",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "nepPesos": 70000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0646-010510",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "hgabPesos": 70000000,
      "nepPage": "569",
      "hgabPage": "646",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36695",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Lipata, Panukulan, Quezon",
      "nepPesos": 8000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0777-013142",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Lipata, Panukulan, Quezon",
      "hgabPesos": 8000000,
      "nepPage": "619",
      "hgabPage": "777",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34878",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0707-011714",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "589",
      "hgabPage": "707",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35384",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Mabanguc, Aparri, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0701-011589",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mabanguc, Aparri, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "585",
      "hgabPage": "701",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37489",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Mabini, Cadiz City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0832-014232",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Mabini, Cadiz City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "642",
      "hgabPage": "832",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35845",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Macamias, Guimba, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0737-012333",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Macamias, Guimba, Nueva Ecija",
      "hgabPesos": 6000000,
      "nepPage": "601",
      "hgabPage": "737",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35856",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Maeling, Nampicuan, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0737-012334",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Maeling, Nampicuan, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "601",
      "hgabPage": "737",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09806",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0772-013048",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna",
      "hgabPesos": 5000000,
      "nepPage": "617",
      "hgabPage": "772",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34922",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Mangandingay, Angadanan, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0712-011813",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Mangandingay, Angadanan, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "591",
      "hgabPage": "712",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-31412",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Manggahan, Pasig City 14.597582,121.102681",
      "nepPesos": 70000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0631-010259",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Manggahan, Pasig City 14.597582,121.102681",
      "hgabPesos": 70000000,
      "nepPage": "560",
      "hgabPage": "631",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34961",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Marikit, Palanan, Isabela",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0712-011814",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Marikit, Palanan, Isabela",
      "hgabPesos": 6000000,
      "nepPage": "591",
      "hgabPage": "712",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38798",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Mat-I, Las Nieves, Agusan del Norte",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0915-015827",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Mat-I, Las Nieves, Agusan del Norte",
      "hgabPesos": 7000000,
      "nepPage": "671",
      "hgabPage": "915",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35841",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Maycaban, Cuyapo, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0737-012337",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Maycaban, Cuyapo, Nueva Ecija",
      "hgabPesos": 6000000,
      "nepPage": "601",
      "hgabPage": "737",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35236",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Olango, Mallig, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0707-011716",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Olango, Mallig, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "589",
      "hgabPage": "707",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35019",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0701-011592",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "586",
      "hgabPage": "701",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35021",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Piggatan, Alcala, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0701-011593",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Piggatan, Alcala, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "586",
      "hgabPage": "701",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35849",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Licab, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0738-012339",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Licab, Nueva Ecija",
      "hgabPesos": 6000000,
      "nepPage": "601",
      "hgabPage": "738",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37625",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Maria, Siquijor",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0842-014415",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Maria, Siquijor",
      "hgabPesos": 5000000,
      "nepPage": "645",
      "hgabPage": "842",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35560",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Municipality of Mayantoc, Province of Tarlac",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0744-012477",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Municipality of Mayantoc, Province of Tarlac",
      "hgabPesos": 30000000,
      "nepPage": "604",
      "hgabPage": "744",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34178",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Agno, Pangasinan",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0680-011177",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Agno, Pangasinan",
      "hgabPesos": 20000000,
      "nepPage": "578",
      "hgabPage": "680",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37266",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Anilao, Iloilo",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0820-013990",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Anilao, Iloilo",
      "hgabPesos": 30000000,
      "nepPage": "638",
      "hgabPage": "820",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37267",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Banate, Iloilo, 11.002222,122.821944",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0820-013991",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Banate, Iloilo, 11.002222,122.821944",
      "hgabPesos": 10000000,
      "nepPage": "638",
      "hgabPage": "820",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38495",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
      "nepPesos": 8000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0889-015337",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
      "hgabPesos": 8000000,
      "nepPage": "664",
      "hgabPage": "889",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34176",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0680-011178",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
      "hgabPesos": 20000000,
      "nepPage": "578",
      "hgabPage": "680",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34179",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0680-011179",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan",
      "hgabPesos": 20000000,
      "nepPage": "578",
      "hgabPage": "680",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38492",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Monkayo, Davao de Oro",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0889-015338",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Monkayo, Davao de Oro",
      "hgabPesos": 50000000,
      "nepPage": "664",
      "hgabPage": "889",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33635",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Pulilan, Bulacan",
      "nepPesos": 35000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0730-012176",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Pulilan, Bulacan",
      "hgabPesos": 35000000,
      "nepPage": "596",
      "hgabPage": "730",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37732",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0850-014587",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
      "hgabPesos": 30000000,
      "nepPage": "646",
      "hgabPage": "850",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34894",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Rang-ayan, Roxas, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0707-011717",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Rang-ayan, Roxas, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "589",
      "hgabPage": "707",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36499",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal Poblacion, Lopez, Quezon",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0785-013311",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal Poblacion, Lopez, Quezon",
      "hgabPesos": 5000000,
      "nepPage": "623",
      "hgabPage": "785",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34904",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal, Quirino, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0707-011719",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal, Quirino, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "589",
      "hgabPage": "707",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36690",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sablang, General Nakar, Quezon",
      "nepPesos": 8500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0777-013145",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sablang, General Nakar, Quezon",
      "hgabPesos": 8500000,
      "nepPage": "619",
      "hgabPage": "777",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34875",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0707-011720",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "589",
      "hgabPage": "707",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36046",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Carlos, Aliaga, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0738-012341",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Carlos, Aliaga, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "601",
      "hgabPage": "738",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34880",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Francisco, San Manuel, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0707-011721",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Francisco, San Manuel, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "589",
      "hgabPage": "707",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37123",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Ward, Pototan, Iloilo",
      "nepPesos": 62000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0645-010494",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Ward, Pototan, Iloilo",
      "hgabPesos": 62000000,
      "nepPage": "569",
      "hgabPage": "645",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35698",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Botolan, Zambales",
      "nepPesos": 12000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0748-012560",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Botolan, Zambales",
      "hgabPesos": 12000000,
      "nepPage": "606",
      "hgabPage": "748",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36047",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Licab, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0738-012342",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Licab, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "601",
      "hgabPage": "738",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34873",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Burgos, Isabela",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0707-011723",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Burgos, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "589",
      "hgabPage": "707",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36040",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Guimba, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0738-012343",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Guimba, Nueva Ecija",
      "hgabPesos": 6000000,
      "nepPage": "601",
      "hgabPage": "738",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-01288",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Mahinog, Camiguin(124.783466,9.131037)",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0876-015085",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Mahinog, Camiguin(124.783466,9.131037)",
      "hgabPesos": 5000000,
      "nepPage": "658",
      "hgabPage": "876",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35878",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Ricardo, Talavera, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0738-012344",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Ricardo, Talavera, Nueva Ecija",
      "hgabPesos": 6000000,
      "nepPage": "601",
      "hgabPage": "738",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36493",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Roque Ilaya, Calauag, Quezon",
      "nepPesos": 8000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0785-013312",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Roque Ilaya, Calauag, Quezon",
      "hgabPesos": 8000000,
      "nepPage": "623",
      "hgabPage": "785",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34898",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sandiat Centro, San Manuel, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0707-011724",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sandiat Centro, San Manuel, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "589",
      "hgabPage": "707",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37623",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sandugan, Larena, Siquijor",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0842-014416",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sandugan, Larena, Siquijor",
      "hgabPesos": 5000000,
      "nepPage": "645",
      "hgabPage": "842",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34991",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sisim, Peñablanca, Cagayan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0703-011648",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sisim, Peñablanca, Cagayan",
      "hgabPesos": 10000000,
      "nepPage": "587",
      "hgabPage": "703",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35855",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay South West Poblacion, Nampicuan, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34954",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sto. Tomas, Naguilian, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0712-011818",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sto. Tomas, Naguilian, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "591",
      "hgabPage": "712",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34952",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sunlife, Naguilian, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0712-011819",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sunlife, Naguilian, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "591",
      "hgabPage": "712",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36045",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tabacao, Talavera, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0738-012350",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tabacao, Talavera, Nueva Ecija",
      "hgabPesos": 6000000,
      "nepPage": "601",
      "hgabPage": "738",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35765",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tabing Ilog, Samal, Bataan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0725-012076",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tabing Ilog, Samal, Bataan",
      "hgabPesos": 10000000,
      "nepPage": "594",
      "hgabPage": "725",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35077",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Takiki, Gattaran, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0701-011596",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Takiki, Gattaran, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "586",
      "hgabPage": "701",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35017",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0701-011597",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "586",
      "hgabPage": "701",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36696",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Talisoy, Jomalig, Quezon",
      "nepPesos": 8000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0777-013146",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Talisoy, Jomalig, Quezon",
      "hgabPesos": 8000000,
      "nepPage": "619",
      "hgabPage": "777",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38578",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0912-015774",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
      "hgabPesos": 6000000,
      "nepPage": "671",
      "hgabPage": "912",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39541",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tubli, Caramoran, Catanduanes",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0804-013679",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tubli, Caramoran, Catanduanes",
      "hgabPesos": 5000000,
      "nepPage": "633",
      "hgabPage": "804",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34893",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Turod, Quezon, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0707-011726",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Turod, Quezon, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "589",
      "hgabPage": "707",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34914",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Victoria, Alicia, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0712-011820",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Victoria, Alicia, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "591",
      "hgabPage": "712",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34881",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Villa Nuesa, Aurora, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0707-011728",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Villa Nuesa, Aurora, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "589",
      "hgabPage": "707",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34884",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Vira, Roxas, Isabela",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0707-011729",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Vira, Roxas, Isabela",
      "hgabPesos": 6000000,
      "nepPage": "589",
      "hgabPage": "707",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03564",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangca, Baliwag, Bulacan (120.896441, 14.987998)",
      "nepPesos": 12000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0730-012177",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangca, Baliwag, Bulacan (120.896441, 14.987998)",
      "hgabPesos": 12000000,
      "nepPage": "596",
      "hgabPage": "730",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34054",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, M. de Vera St., Barangay Sipac-Almacen, Navotas City (14.657236, 120.948131)",
      "nepPesos": 84000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0631-010260",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, M. de Vera St., Barangay Sipac- Almacen, Navotas City (14.657236, 120.948131)",
      "hgabPesos": 84000000,
      "nepPage": "560",
      "hgabPage": "631",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37778",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Pitalo, San Fernando, Cebu",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0846-014505",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Pitalo, San Fernando, Cebu",
      "hgabPesos": 10000000,
      "nepPage": "646",
      "hgabPage": "846",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37143",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, San Joaquin, Iloilo",
      "nepPesos": 6500000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0817-013921",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tapikan, San Joaquin, Iloilo",
      "hgabPesos": 6500000,
      "nepPage": "637",
      "hgabPage": "817",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34986",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Solana, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0704-011660",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Solana, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "587",
      "hgabPage": "704",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33631",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Tarlac City Convention Hall, Tarlac City, Tarlac",
      "nepPesos": 75000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0636-010357",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Tarlac City Convention Hall, Tarlac City, Tarlac",
      "hgabPesos": 75000000,
      "nepPage": "563",
      "hgabPage": "636",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37779",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0846-014506",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "646",
      "hgabPage": "846",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35053",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, at Barangay Cullit, Gattaran, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34653",
      "nepTitle": "Construction (Completion) of Talite Multi-purpose Building, Talite, Aguinaldo, Ifugao",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0693-011431",
      "hgabTitle": "Construction (Completion) of Talite Multi-purpose Building, Talite, Aguinaldo, Ifugao",
      "hgabPesos": 5000000,
      "nepPage": "582",
      "hgabPage": "693",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34629",
      "nepTitle": "Construction (Completion) of Ubao Multi-Purpose Building, Ubao, Aguinaldo, Ifugao",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0693-011432",
      "hgabTitle": "Construction (Completion) of Ubao Multi-Purpose Building, Ubao, Aguinaldo, Ifugao",
      "hgabPesos": 5000000,
      "nepPage": "582",
      "hgabPage": "693",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35081",
      "nepTitle": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0713-011842",
      "hgabTitle": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "592",
      "hgabPage": "713",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33963",
      "nepTitle": "Construction Multi-Purpose Building (Covered Court), Villa Angelica, Barangay 166, Caloocan City",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0658-010751",
      "hgabTitle": "Construction (Completion) Multi-Purpose Building (Covered Court), Villa Angelica, Barangay 166, Caloocan City",
      "hgabPesos": 5000000,
      "nepPage": "573",
      "hgabPage": "658",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34815",
      "nepTitle": "Construction of Bangued Multi-Purpose Building, Calaba, Bangued, Abra",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0690-011369",
      "hgabTitle": "Construction of Bangued Multi-Purpose Building, Calaba, Bangued, Abra",
      "hgabPesos": 50000000,
      "nepPage": "581",
      "hgabPage": "690",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34811",
      "nepTitle": "Construction of Dangoy Multi-Purpose Building, Barangay Dangoy, Lubuagan, Kalinga",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0698-011523",
      "hgabTitle": "Construction of Dangoy Multi-Purpose Building, Barangay Dangoy, Lubuagan, Kalinga",
      "hgabPesos": 5000000,
      "nepPage": "584",
      "hgabPage": "698",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34647",
      "nepTitle": "Construction of Hapao Multi-Purpose Building, Hapao, Hungduan, Ifugao",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0693-011427",
      "hgabTitle": "Construction of Hapao Multi-Purpose Building, Hapao, Hungduan, Ifugao",
      "hgabPesos": 7000000,
      "nepPage": "582",
      "hgabPage": "693",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37787",
      "nepTitle": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0646-010513",
      "hgabTitle": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
      "hgabPesos": 100000000,
      "nepPage": "647",
      "hgabPage": "646",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38486",
      "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall) Barangay Camansa, Asuncion, Davao del Norte",
      "nepPesos": 17000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0894-015424",
      "hgabTitle": "Construction of Multi-Purpose Building (Barangay Hall) Barangay Camansa, Asuncion, Davao del Norte",
      "hgabPesos": 17000000,
      "nepPage": "667",
      "hgabPage": "894",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39430",
      "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall) Poblacion, Talisay ,Camarines Norte",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0642-010449",
      "hgabTitle": "Construction of Multi-Purpose Building (Barangay Hall) Poblacion, Talisay ,Camarines Norte",
      "hgabPesos": 5000000,
      "nepPage": "568",
      "hgabPage": "642",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-11098",
      "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Asinan Proper, Subic, Zambales (14.88227, 120.22973)",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0750-012586",
      "hgabTitle": "Construction of Multi-Purpose Building Barangay Hall , Barangay Asinan Proper, Subic, Zambales (14.88227 ,120.22973)",
      "hgabPesos": 20000000,
      "nepPage": "606",
      "hgabPage": "750",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-11106",
      "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay East Bajac - Bajac, Olongapo City, Zambales (14.83624, 120.28795)",
      "nepPesos": 25000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0749-012571",
      "hgabTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay East Bajac - Bajac, Olongapo City, Zambales (14.83624, 120.28795)",
      "hgabPesos": 25000000,
      "nepPage": "606",
      "hgabPage": "749",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-11088",
      "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Magsaysay, Castillejos, Zambales (14.943376, 120.190068)",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0749-012568",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Magsaysay, Castillejos, Zambales (14.943376, 120.190068)",
      "hgabPesos": 30000000,
      "nepPage": "606",
      "hgabPage": "749",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-11096",
      "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay San Isidro, Subic, Zambales (14.86376864, 120.25706855)",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0749-012576",
      "hgabTitle": "Construction of Multi-Purpose Building Barangay Hall , Barangay San Isidro, Subic, Zambales (14.86376864 ,120.25706855)",
      "hgabPesos": 20000000,
      "nepPage": "606",
      "hgabPage": "749",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-11109",
      "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Sta. Rita, Olongapo City (14.84897, 120.29113)",
      "nepPesos": 25000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0749-012577",
      "hgabTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Sta. Rita, Olongapo City (14.84897, 120.29113)",
      "hgabPesos": 50000000,
      "nepPage": "606",
      "hgabPage": "749",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37632",
      "nepTitle": "Construction of Multi-Purpose Building (Completion) at DPWH-Bacolod City DEO Compound, Bacolod City",
      "nepPesos": 8000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0830-014181",
      "hgabTitle": "Construction of Multi-Purpose Building (Completion) at DPWH-Bacolod City DEO Compound, Bacolod City",
      "hgabPesos": 8000000,
      "nepPage": "640",
      "hgabPage": "830",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34988",
      "nepTitle": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Natappian East, Solana, Cagayan",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0704-011663",
      "hgabTitle": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Natappian East, Solana, Cagayan",
      "hgabPesos": 7000000,
      "nepPage": "588",
      "hgabPage": "704",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-11095",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court) at Barangay Mangan-Vaca, Subic, Zambales (14.889039, 120.237729)",
      "nepPesos": 12000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36287",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court) at Barangay San Agustin, Ibaan, Batangas",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0760-012797",
      "hgabTitle": "Construction of Multi-Purpose Building (Covered Court) at Barangay San Agustin, Ibaan, Batangas",
      "hgabPesos": 10000000,
      "nepPage": "611",
      "hgabPage": "760",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09568",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court) at Sitio Nabalagbag, Barangay Jaybanga, Lobo, Batangas",
      "nepPesos": 12000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0752-012633",
      "hgabTitle": "Construction of Multi-Purpose Building (Covered Court) at Sitio Nabalagbag, Barangay Jaybanga, Lobo, Batangas",
      "hgabPesos": 12000000,
      "nepPage": "609",
      "hgabPage": "752",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39015",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court) in Barangay Gumaod, Claveria, Misamis Oriental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0885-015250",
      "hgabTitle": "Construction of Multi-Purpose Building (Covered Court) in Barangay Gumaod, Claveria, Misamis Oriental",
      "hgabPesos": 6000000,
      "nepPage": "663",
      "hgabPage": "885",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-22951",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay 178, Caloocan City 14.753695, 121.064569",
      "nepPesos": 12000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0658-010757",
      "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay 178, Caloocan City 14.753695, 121.064569",
      "hgabPesos": 12000000,
      "nepPage": "573",
      "hgabPage": "658",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36924",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Alcate, Victoria, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0790-013397",
      "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Alcate, Victoria, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "625",
      "hgabPage": "790",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-11097",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Aningway-Sacatihan, Subic, Zambales (14.913389, 120.228420)",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0749-012574",
      "hgabTitle": "Construction of Multi-Purpose Barangay Aningway-Sacatihan, Subic, Zambales (14.913277, 120.228128)",
      "hgabPesos": 30000000,
      "nepPage": "607",
      "hgabPage": "749",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38610",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Aroman, Carmen, Cotabato",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0899-015533",
      "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Aroman, Carmen, Cotabato",
      "hgabPesos": 5000000,
      "nepPage": "670",
      "hgabPage": "899",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37893",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Bilwang, Kawayan, Biliran (124.398290°, 11.699000°)",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0854-014668",
      "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Bilwang, Kawayan, Biliran (124.398290°, 11.699000°)",
      "hgabPesos": 10000000,
      "nepPage": "648",
      "hgabPage": "854",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-22740",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Corazon De Jesus, San Juan City (121.031630, 14.606733)",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0657-010737",
      "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Corazon De Jesus, San Juan City (121.031630, 14.606733)",
      "hgabPesos": 30000000,
      "nepPage": "572",
      "hgabPage": "657",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36906",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Gulod, City of Calapan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-11089",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Magsaysay, Castillejos, Zambales (14.943196, 120.189947)",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0749-012579",
      "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Magsaysay, Castillejos, Zambales (14.943196, 120.189947)",
      "hgabPesos": 10000000,
      "nepPage": "607",
      "hgabPage": "749",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34940",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Malakdang, Sabtang, Batanes",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0698-011534",
      "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Malakdang, Sabtang, Batanes",
      "hgabPesos": 6000000,
      "nepPage": "584",
      "hgabPage": "698",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-01461",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Poblacion, Kapatagan, Lanao del Norte (123.76929°, 7.89914°)",
      "nepPesos": 5500000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34215",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Salapingao, Dagupan City, Pangasinan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0683-011222",
      "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Salapingao, Dagupan City, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "579",
      "hgabPage": "683",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36626",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay San Juan, San Pablo City, Laguna",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0775-013110",
      "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay San Juan, San Pablo City, Laguna",
      "hgabPesos": 7000000,
      "nepPage": "618",
      "hgabPage": "775",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-01271",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Bug-ong, Mambajao, Camiguin (124.676971666, 9.250525)",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0876-015094",
      "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Bug-ong, Mambajao, Camiguin (124.676971666, 9.250525)",
      "hgabPesos": 7000000,
      "nepPage": "658",
      "hgabPage": "876",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33964",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court), PLC, Barangay 167, Caloocan City",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0659-010769",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) , PLC, Barangay 167, Caloocan City",
      "hgabPesos": 5000000,
      "nepPage": "574",
      "hgabPage": "659",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21338",
      "nepTitle": "Construction of Multi-Purpose Building (DPWH 2nd Engineering District Office), Barangay Maparat, Compostela, Davao de Oro",
      "nepPesos": 150000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0930-016105",
      "hgabTitle": "Construction of Multi-Purpose Building (DPWH 2nd Engineering District Office), Barangay Maparat, Compostela, Davao de Oro",
      "hgabPesos": 150000000,
      "nepPage": "680",
      "hgabPage": "930",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-11105",
      "nepTitle": "Construction of Multi-Purpose Building (DSWD SWAD- Zambales Office), Olongapo City, Zambales (14.827742, 120.285479)",
      "nepPesos": 25000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38172",
      "nepTitle": "Construction of Multi-Purpose Building (Gymnasium), Tandu- Bato, Luuk, Sulu",
      "nepPesos": 60000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0647-010542",
      "hgabTitle": "Construction of Multi-Purpose Building, Tandu- Bato, Luuk, Sulu",
      "hgabPesos": 60000000,
      "nepPage": "569",
      "hgabPage": "647",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-05152",
      "nepTitle": "Construction of Multi-Purpose Building (INSPIRE BUILDING), Laoag City, Ilocos Norte",
      "nepPesos": 835000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0633-010302",
      "hgabTitle": "Construction of Multi-Purpose Building (INSPIRE BUILDING), Laoag City, Ilocos Norte",
      "hgabPesos": 835000000,
      "nepPage": "561",
      "hgabPage": "633",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37764",
      "nepTitle": "Construction of Multi-Purpose Building - Minglanilla, Poblacion Ward I, Minglanilla, Cebu",
      "nepPesos": 25000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0850-014586",
      "hgabTitle": "Construction of Multi-Purpose Building - Minglanilla, Poblacion Ward I, Minglanilla, Cebu",
      "hgabPesos": 25000000,
      "nepPage": "646",
      "hgabPage": "850",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33608",
      "nepTitle": "Construction of Multi-Purpose Building Bagumbayan, Bocaue, Bulacan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0730-012196",
      "hgabTitle": "Construction of Multi-Purpose Building Bagumbayan, Bocaue, Bulacan",
      "hgabPesos": 10000000,
      "nepPage": "597",
      "hgabPage": "730",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33607",
      "nepTitle": "Construction of Multi-Purpose Building Bambang, Bocaue, Bulacan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0730-012197",
      "hgabTitle": "Construction of Multi-Purpose Building Bambang, Bocaue, Bulacan",
      "hgabPesos": 10000000,
      "nepPage": "597",
      "hgabPage": "730",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34125",
      "nepTitle": "Construction of Multi-Purpose Building Barangay Hall (Completion), Barangay San Lorenzo, San Nicolas, Ilocos Norte",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0675-011073",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Ildefonso, San Nicolas, Ilocos Norte",
      "hgabPesos": 5000000,
      "nepPage": "576",
      "hgabPage": "675",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-11092",
      "nepTitle": "Construction of Multi-Purpose Building Evacuation Facility and Command Center, Subic, Zambales (14.878675, 120.229466)",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0750-012585",
      "hgabTitle": "Construction of Multi-Purpose Building Evacuation Facility and Command Center, Subic, Zambales (14.878675, 120.229466)",
      "hgabPesos": 50000000,
      "nepPage": "607",
      "hgabPage": "750",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37326",
      "nepTitle": "Construction of Multi-Purpose Building Facility, Barangay Cabalabaguan, Mina, Iloilo",
      "nepPesos": 20500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0828-014157",
      "hgabTitle": "Construction of Multi-Purpose Building Facility, Barangay Cabalabaguan, Mina, Iloilo",
      "hgabPesos": 20500000,
      "nepPage": "640",
      "hgabPage": "828",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33600",
      "nepTitle": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0731-012199",
      "hgabTitle": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
      "hgabPesos": 10000000,
      "nepPage": "597",
      "hgabPage": "731",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33596",
      "nepTitle": "Construction of Multi-Purpose Building Tambubong, Bocaue, Bulacan",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0731-012205",
      "hgabTitle": "Construction of Multi-Purpose Building Tambubong, Bocaue, Bulacan",
      "hgabPesos": 15000000,
      "nepPage": "597",
      "hgabPage": "731",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33921",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay 390 Zone 40 (Completion), Manila City (14.5984620, 120.9898245)",
      "nepPesos": 70000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0631-010266",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay 390 Zone 40 (Completion), Manila City (14.5984620, 120.9898245)",
      "hgabPesos": 70000000,
      "nepPage": "560",
      "hgabPage": "631",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36351",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Abiawin, Infanta, Quezon",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0777-013149",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Abiawin, Infanta, Quezon",
      "hgabPesos": 5500000,
      "nepPage": "620",
      "hgabPage": "777",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36098",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Alalay Grande, Lupao, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0738-012352",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Alalay Grande, Lupao, Nueva Ecija",
      "hgabPesos": 6000000,
      "nepPage": "602",
      "hgabPage": "738",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35069",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Alba, Baggao, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0702-011602",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Alba, Baggao, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "586",
      "hgabPage": "702",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33902",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Alicia, Quezon City",
      "nepPesos": 73000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0631-010267",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Alicia, Quezon City",
      "hgabPesos": 73000000,
      "nepPage": "560",
      "hgabPage": "631",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36342",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Alupay, Sampaloc, Quezon",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0777-013151",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Alupay, Sampaloc, Quezon",
      "hgabPesos": 5000000,
      "nepPage": "620",
      "hgabPage": "777",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36364",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Amaga, Patnanungan, Quezon",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0777-013152",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Amaga, Patnanungan, Quezon",
      "hgabPesos": 6000000,
      "nepPage": "620",
      "hgabPage": "777",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28745",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Antipolo Del Sur, Lipa City, Batangas",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0760-012803",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Antipolo Del Sur, Lipa City, Batangas",
      "hgabPesos": 20000000,
      "nepPage": "612",
      "hgabPage": "760",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36365",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0777-013154",
      "hgabTitle": "Construction/Completion of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon",
      "hgabPesos": 3000000,
      "nepPage": "620",
      "hgabPage": "777",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33905",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
      "nepPesos": 54000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0631-010268",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
      "hgabPesos": 54000000,
      "nepPage": "560",
      "hgabPage": "631",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28763",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Banay-Banay Lipa City, Batangas",
      "nepPesos": 9000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0760-012804",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Banay-Banay Lipa City, Batangas",
      "hgabPesos": 9000000,
      "nepPage": "612",
      "hgabPage": "760",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33586",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Baraka, Norzagaray, Bulacan",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0733-012251",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Baraka, Norzagaray, Bulacan",
      "hgabPesos": 15000000,
      "nepPage": "598",
      "hgabPage": "733",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37431",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Batuan, La Carlota City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0835-014299",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Batuan, La Carlota City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "643",
      "hgabPage": "835",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35475",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Buenlag, Gerona, Tarlac (15.627114, 120.581505)",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0745-012498",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Buenlag, Gerona, Tarlac (15.627114, 120.581505)",
      "hgabPesos": 15000000,
      "nepPage": "605",
      "hgabPage": "745",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36226",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Buhay na Tubig, Imus, Cavite",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0767-012928",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Buhay na Tubig, Imus, Cavite",
      "hgabPesos": 5000000,
      "nepPage": "613",
      "hgabPage": "767",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-31415",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Buting, Pasig City 14.55329035, 121.0689975",
      "nepPesos": 25000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0658-010739",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Buting, Pasig City 14.55329035, 121.0689975",
      "hgabPesos": 25000000,
      "nepPage": "573",
      "hgabPage": "658",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36761",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0773-013058",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
      "hgabPesos": 10000000,
      "nepPage": "617",
      "hgabPage": "773",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34483",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Canarvacanan, Alcala, Pangasinan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0633-010308",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Canarvacanan, Alcala, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "561",
      "hgabPage": "633",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34271",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Canarvacanan, Binalonan, Pangasinan",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0633-010309",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Canarvacanan, Binalonan, Pangasinan",
      "hgabPesos": 30000000,
      "nepPage": "561",
      "hgabPage": "633",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37678",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Candabong, Dumanjug, Cebu",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0852-014643",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Candabong, Dumanjug, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "647",
      "hgabPage": "852",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37784",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Canduman, Mandaue City, Cebu",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0852-014632",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Canduman, Mandaue City, Cebu",
      "hgabPesos": 15000000,
      "nepPage": "647",
      "hgabPage": "852",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36366",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36420",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0773-013059",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "hgabPesos": 20000000,
      "nepPage": "617",
      "hgabPage": "773",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33866",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0760-012805",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
      "hgabPesos": 10000000,
      "nepPage": "612",
      "hgabPage": "760",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35585",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Dakila, City of Malolos, Bulacan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0730-012188",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Dakila, City of Malolos, Bulacan",
      "hgabPesos": 5000000,
      "nepPage": "597",
      "hgabPage": "730",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33903",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Damar, Quezon City",
      "nepPesos": 69500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0631-010269",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Damar, Quezon City",
      "hgabPesos": 69500000,
      "nepPage": "560",
      "hgabPage": "631",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36337",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Del Carmen, Pagbilao, Quezon",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36355",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Dinahican, Infanta, Quezon",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0778-013164",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Dinahican, Infanta, Quezon",
      "hgabPesos": 7500000,
      "nepPage": "620",
      "hgabPage": "778",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37429",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Don Jorge L. Araneta, Bago City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0835-014301",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Don Jorge L. Araneta, Bago City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "643",
      "hgabPage": "835",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37058",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Don Pedro, Mansalay, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0794-013483",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Don Pedro, Mansalay, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "628",
      "hgabPage": "794",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37057",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Happy Valley, Roxas, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0794-013485",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Happy Valley, Roxas, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "628",
      "hgabPage": "794",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36096",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Inanama, Llanera, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0738-012353",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Inanama, Llanera, Nueva Ecija",
      "hgabPesos": 6000000,
      "nepPage": "602",
      "hgabPage": "738",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36339",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Kalyaat, Lucban, Quezon",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0778-013165",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Kalyaat, Lucban, Quezon",
      "hgabPesos": 5000000,
      "nepPage": "620",
      "hgabPage": "778",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36769",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Kanluran Talaongan, Cavinti, Laguna",
      "nepPesos": 6500000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36762",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Langgam, San Pedro City, Laguna",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0773-013060",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Langgam, San Pedro City, Laguna",
      "hgabPesos": 10000000,
      "nepPage": "617",
      "hgabPage": "773",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36243",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Lewin, Lumban, Laguna",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0771-013015",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Lewin, Lumban, Laguna",
      "hgabPesos": 50000000,
      "nepPage": "616",
      "hgabPage": "771",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35587",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Lumbac, Pulilan, Bulacan",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0730-012189",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Lumbac, Pulilan, Bulacan",
      "hgabPesos": 15000000,
      "nepPage": "597",
      "hgabPage": "730",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37051",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Luna, Bongabong, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0794-013486",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Luna, Bongabong, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "628",
      "hgabPage": "794",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37430",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Malingin, Bago City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0836-014302",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Malingin, Bago City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "644",
      "hgabPage": "836",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36779",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Pacita 1, San Pedro City Laguna",
      "nepPesos": 80000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0641-010425",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Pacita 1, San Pedro City Laguna",
      "hgabPesos": 80000000,
      "nepPage": "567",
      "hgabPage": "641",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36760",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Pacita 2, San Pedro City Laguna",
      "nepPesos": 70000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0641-010426",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Pacita 2, San Pedro City Laguna",
      "hgabPesos": 70000000,
      "nepPage": "567",
      "hgabPage": "641",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28786",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Pagolingin East, Lipa City, Batangas",
      "nepPesos": 22000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0760-012807",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Pagolingin East, Lipa City, Batangas",
      "hgabPesos": 22000000,
      "nepPage": "612",
      "hgabPage": "760",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37059",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Panaytayan, Mansalay, Oriental Mindoro",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0794-013488",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Panaytayan, Mansalay, Oriental Mindoro",
      "hgabPesos": 7000000,
      "nepPage": "628",
      "hgabPage": "794",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28768",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Pangao, Lipa City, Batangas",
      "nepPesos": 18000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0761-012808",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Pangao, Lipa City, Batangas",
      "hgabPesos": 18000000,
      "nepPage": "612",
      "hgabPage": "761",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33587",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0733-012256",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
      "hgabPesos": 30000000,
      "nepPage": "599",
      "hgabPage": "733",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35588",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0730-012190",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan",
      "hgabPesos": 15000000,
      "nepPage": "597",
      "hgabPage": "730",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34481",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Pindangan Centro, Alcala, Pangasinan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0633-010315",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Pindangan Centro, Alcala, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "562",
      "hgabPage": "633",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37053",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Poblacion, Bongabong, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0794-013489",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Poblacion, Bongabong, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "628",
      "hgabPage": "794",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35589",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, Bulacan",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0730-012191",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, Bulacan",
      "hgabPesos": 15000000,
      "nepPage": "597",
      "hgabPage": "730",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37040",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Rosario, Pinamalayan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0794-013491",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Rosario, Pinamalayan, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "628",
      "hgabPage": "794",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37041",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Sabang, Pinamalayan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0794-013492",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Sabang, Pinamalayan, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "628",
      "hgabPage": "794",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36349",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Sablang, General Nakar, Quezon",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0782-013259",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sumilang, Municipality General Luna, Quezon",
      "hgabPesos": 10000000,
      "nepPage": "621",
      "hgabPage": "782",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37054",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Sagana, Bongabong, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0794-013493",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Sagana, Bongabong, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "628",
      "hgabPage": "794",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36773",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay San Diego, Luisiana, Laguna",
      "nepPesos": 6500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0771-013017",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Diego, Luisiana, Laguna",
      "hgabPesos": 6500000,
      "nepPage": "616",
      "hgabPage": "771",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39396",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay San Francisco, Legazpi City, Albay",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0796-013523",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Francisco, Legazpi City, Albay",
      "hgabPesos": 5000000,
      "nepPage": "629",
      "hgabPage": "796",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28753",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay San Isidro, Lipa City, Batangas",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0761-012809",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Isidro, Lipa City, Batangas",
      "hgabPesos": 20000000,
      "nepPage": "612",
      "hgabPage": "761",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37433",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay San Juan, Municipality of Pontevedra, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0836-014303",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Juan, Municipality of Pontevedra, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "644",
      "hgabPage": "836",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35240",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay San Pedro, Tumauini, Isabela, 17.288839, 121.807212",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0705-011687",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Pedro, Tumauini, Isabela, 17.288839, 121.807212",
      "hgabPesos": 20000000,
      "nepPage": "588",
      "hgabPage": "705",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36363",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay San Rafael, Burdeos, Quezon",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0779-013182",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Rafael, Burdeos, Quezon",
      "hgabPesos": 5000000,
      "nepPage": "621",
      "hgabPage": "779",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36148",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay San Rafael, Tarlac City, Tarlac",
      "nepPesos": 39500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0745-012504",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Rafael, Tarlac City, Tarlac",
      "hgabPesos": 39500000,
      "nepPage": "605",
      "hgabPage": "745",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37072",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay San Roque, Bulalacao, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0794-013494",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Roque, Bulalacao, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "628",
      "hgabPage": "794",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35597",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0730-012192",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
      "hgabPesos": 15000000,
      "nepPage": "597",
      "hgabPage": "730",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35600",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay San Vicente, City of Malolos, Bulacan",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0730-012193",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Vicente, City of Malolos, Bulacan",
      "hgabPesos": 15000000,
      "nepPage": "597",
      "hgabPage": "730",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33566",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay San Vicente, Santa Maria, Bulacan",
      "nepPesos": 25000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0733-012258",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Vicente, Santa Maria, Bulacan",
      "hgabPesos": 25000000,
      "nepPage": "599",
      "hgabPage": "733",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36097",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Sta. Barbara, Llanera, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0738-012355",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Sta. Barbara, Llanera, Nueva Ecija",
      "hgabPesos": 6000000,
      "nepPage": "602",
      "hgabPage": "738",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-23015",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0661-010814",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
      "hgabPesos": 15000000,
      "nepPage": "575",
      "hgabPage": "661",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35579",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Taal, City of Malolos, Bulacan",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0730-012194",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Taal, City of Malolos, Bulacan",
      "hgabPesos": 15000000,
      "nepPage": "597",
      "hgabPage": "730",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39397",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Tamaoyan, Legazpi City, Albay",
      "nepPesos": 8500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0796-013525",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Tamaoyan, Legazpi City, Albay",
      "hgabPesos": 8500000,
      "nepPage": "629",
      "hgabPage": "796",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39367",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Taplacon, Camalig, Albay",
      "nepPesos": 7500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0796-013526",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Taplacon, Camalig, Albay",
      "hgabPesos": 7500000,
      "nepPage": "629",
      "hgabPage": "796",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36770",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Tibatib, Cavinti, Laguna",
      "nepPesos": 6500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0771-013022",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Tibatib, Cavinti, Laguna",
      "hgabPesos": 6500000,
      "nepPage": "616",
      "hgabPage": "771",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37435",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Tibsoc, Municipality of San Enrique, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0836-014304",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Tibsoc, Municipality of San Enrique, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "644",
      "hgabPage": "836",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28760",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Tipacan, Lipa City, Batangas",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0761-012810",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Tipacan, Lipa City, Batangas",
      "hgabPesos": 15000000,
      "nepPage": "612",
      "hgabPage": "761",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36358",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Tongohin, Infanta, Quezon",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0780-013213",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Tongohin, Infanta, Quezon",
      "hgabPesos": 6000000,
      "nepPage": "621",
      "hgabPage": "780",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37063",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Waygan, Mansalay, Oriental Mindoro",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0795-013498",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Waygan, Mansalay, Oriental Mindoro",
      "hgabPesos": 10000000,
      "nepPage": "629",
      "hgabPage": "795",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37434",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Zamora, Municipality of Pontevedra, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0836-014306",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Zamora, Municipality of Pontevedra, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "644",
      "hgabPage": "836",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39168",
      "nepTitle": "Construction of Multi-Purpose Building at Brgy. Abaga (Covered Court), Lala, Lanao del Norte",
      "nepPesos": 8000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0880-015171",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Abaga (Covered Court), Lala, Lanao del Norte",
      "hgabPesos": 8000000,
      "nepPage": "662",
      "hgabPage": "880",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34195",
      "nepTitle": "Construction of Multi-Purpose Building at Lingayen, Pangasinan",
      "nepPesos": 13000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0683-011226",
      "hgabTitle": "Construction of Multi-Purpose Building at Lingayen, Pangasinan",
      "hgabPesos": 13000000,
      "nepPage": "579",
      "hgabPage": "683",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36428",
      "nepTitle": "Construction of Multi-Purpose Building at Molino 4, Bacoor City, Cavite",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0769-012984",
      "hgabTitle": "Construction of Multi-Purpose Building at Molino 4, Bacoor City, Cavite",
      "hgabPesos": 10000000,
      "nepPage": "615",
      "hgabPage": "769",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36149",
      "nepTitle": "Construction of Multi-Purpose Building at Municipality of Gerona, Tarlac",
      "nepPesos": 40000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0745-012505",
      "hgabTitle": "Construction of Multi-Purpose Building at Municipality of Gerona, Tarlac",
      "hgabPesos": 40000000,
      "nepPage": "605",
      "hgabPage": "745",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36329",
      "nepTitle": "Construction of Multi-Purpose Building at Tongko, Tayabas City, Quezon",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0777-013148",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Tamlong, Tayabas City, Quezon",
      "hgabPesos": 5000000,
      "nepPage": "621",
      "hgabPage": "777",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37566",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0830-014200",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "641",
      "hgabPage": "830",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37596",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay 4, Isabela, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0834-014263",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay 4, Isabela, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "643",
      "hgabPage": "834",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37567",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Alangilan, Bacolod City, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37568",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0831-014202",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "641",
      "hgabPage": "831",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37569",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0831-014203",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "641",
      "hgabPage": "831",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37570",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Estefania, Bacolod City, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0831-014204",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Estefania, Bacolod City, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "641",
      "hgabPage": "831",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37606",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Galicia, Ilog, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0835-014294",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Galicia, Ilog, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "643",
      "hgabPage": "835",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37572",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Handumanan, Bacolod City, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0831-014205",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Handumanan, Bacolod City, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "641",
      "hgabPage": "831",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37599",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay III, Hinigaran, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0834-014270",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay III, Hinigaran, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "643",
      "hgabPage": "834",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38185",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Kigay, Malangas, Zamboanga Sibugay",
      "nepPesos": 40000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0869-014963",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Kigay, Malangas, Zamboanga Sibugay",
      "hgabPesos": 40000000,
      "nepPage": "654",
      "hgabPage": "869",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37581",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Luna, Cadiz, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0833-014248",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Luna, Cadiz, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "642",
      "hgabPage": "833",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38177",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Maganay, Buug, Zamboanga Sibugay",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0870-014973",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Maganay, Buug, Zamboanga Sibugay",
      "hgabPesos": 6000000,
      "nepPage": "654",
      "hgabPage": "870",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37579",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Minapasuk, Calatrava, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0836-014314",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Minapasuk, Calatrava, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "644",
      "hgabPage": "836",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37601",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Poblacion East, Candoni, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0835-014295",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Poblacion East, Candoni, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "643",
      "hgabPage": "835",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37591",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0836-014309",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "644",
      "hgabPage": "836",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37593",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Poblacion, Valladolid, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0836-014310",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Poblacion, Valladolid, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "644",
      "hgabPage": "836",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37595",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Robles, La Castellana, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0834-014271",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Robles, La Castellana, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "643",
      "hgabPage": "834",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37594",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay San Pedro, Binalbagan, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0834-014272",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay San Pedro, Binalbagan, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "643",
      "hgabPage": "834",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39526",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Sta. Maria, Iriga City, Camarines Sur",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0803-013653",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Sta. Maria, Iriga City, Camarines Sur",
      "hgabPesos": 5000000,
      "nepPage": "632",
      "hgabPage": "803",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37575",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0831-014207",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "641",
      "hgabPage": "831",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37576",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Villamonte, Bacolod City, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0831-014208",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Villamonte, Bacolod City, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "641",
      "hgabPage": "831",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38341",
      "nepTitle": "Construction of Multi-Purpose Building in Brgy. Kapatagan, Alicia, Zamboanga Sibugay",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0870-014974",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Kapatagan, Alicia, Zamboanga Sibugay",
      "hgabPesos": 10000000,
      "nepPage": "654",
      "hgabPage": "870",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38334",
      "nepTitle": "Construction of Multi-Purpose Building in Brgy. Lapirawan, Alicia, Zamboanga Sibugay",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0870-014975",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Lapirawan, Alicia, Zamboanga Sibugay",
      "hgabPesos": 50000000,
      "nepPage": "654",
      "hgabPage": "870",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38340",
      "nepTitle": "Construction of Multi-Purpose Building in Brgy. Nanan, Payao, Zamboanga Sibugay",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38338",
      "nepTitle": "Construction of Multi-Purpose Building in Brgy. Pulo Mabao, Olutanga, Zamboanga Sibugay",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0870-014979",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Pulo Mabao, Olutanga, Zamboanga Sibugay",
      "hgabPesos": 5000000,
      "nepPage": "655",
      "hgabPage": "870",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36645",
      "nepTitle": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
      "nepPesos": 47520000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0761-012811",
      "hgabTitle": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
      "hgabPesos": 47520000,
      "nepPage": "612",
      "hgabPage": "761",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35276",
      "nepTitle": "Construction of Multi-Purpose Building of Barangay Poblacion, San Pablo, Isabela, 17.44767, 121.79493",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0705-011688",
      "hgabTitle": "Construction of Multi-Purpose Building of Barangay Poblacion, San Pablo, Isabela, 17.44767, 121.79493",
      "hgabPesos": 30000000,
      "nepPage": "588",
      "hgabPage": "705",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33621",
      "nepTitle": "Construction of Multi-Purpose Building of Barangay San Jose, Baliwag City, Bulacan",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0731-012202",
      "hgabTitle": "Construction of Multi-Purpose Building of Barangay San Jose, Baliwag City, Bulacan",
      "hgabPesos": 30000000,
      "nepPage": "597",
      "hgabPage": "731",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-11100",
      "nepTitle": "Construction of Multi-Purpose Building, (Covered Court), Barangay Asinan Proper, Subic, Zambales (14.88227, 120.22969)",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0637-010388",
      "hgabTitle": "Construction of Multi-Purpose Building Barangay Asinan-Proper, Subic, Zambales (14.892332, 120.226488)",
      "hgabPesos": 100000000,
      "nepPage": "607",
      "hgabPage": "637",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34770",
      "nepTitle": "Construction of Multi-Purpose Building, Ampusongan, Bakun, Benguet",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0691-011401",
      "hgabTitle": "Construction of Multi-Purpose Building, Ampusongan, Bakun, Benguet",
      "hgabPesos": 5000000,
      "nepPage": "582",
      "hgabPage": "691",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-26620",
      "nepTitle": "Construction of Multi-Purpose Building, Apa Mimbalay, Masiu, Lanao del Sur",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0651-010617",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Apa Mimbalay, Masiu, Lanao del Sur",
      "hgabPesos": 30000000,
      "nepPage": "570",
      "hgabPage": "651",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35084",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0635-010340",
      "hgabTitle": "Construction of 2-units Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "hgabPesos": 55000000,
      "nepPage": "592",
      "hgabPage": "635",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37182",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay 1, San Miguel, Iloilo",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0824-014066",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay 1, San Miguel, Iloilo",
      "hgabPesos": 5000000,
      "nepPage": "639",
      "hgabPage": "824",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36752",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay 3, Calamba City, Laguna",
      "nepPesos": 100000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0641-010431",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay 3, Calamba City, Laguna",
      "hgabPesos": 100000000,
      "nepPage": "567",
      "hgabPage": "641",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36450",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay 37A, Cavite City, Cavite",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0767-012944",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay 37A, Cavite City, Cavite",
      "hgabPesos": 10000000,
      "nepPage": "614",
      "hgabPage": "767",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37385",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay 40, Bacolod City",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0831-014211",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay 40, Bacolod City",
      "hgabPesos": 20000000,
      "nepPage": "641",
      "hgabPage": "831",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36451",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City, Cavite",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0767-012945",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City, Cavite",
      "hgabPesos": 10000000,
      "nepPage": "614",
      "hgabPage": "767",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36478",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay 5, Lucena City, Quezon",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0780-013220",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay 5, Lucena City, Quezon",
      "hgabPesos": 6000000,
      "nepPage": "621",
      "hgabPage": "780",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36454",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay 8, Cavite City, Cavite",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0767-012946",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay 8, Cavite City, Cavite",
      "hgabPesos": 10000000,
      "nepPage": "614",
      "hgabPage": "767",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37348",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay 8, Kabankalan, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0835-014297",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay 8, Kabankalan, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "643",
      "hgabPage": "835",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34682",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Abatan, Bauko, Mountain Province",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0695-011483",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Abatan, Bauko, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "583",
      "hgabPage": "695",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36964",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Aberawan, El Nido, Palawan",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0791-013415",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Aberawan, El Nido, Palawan",
      "hgabPesos": 6000000,
      "nepPage": "626",
      "hgabPage": "791",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36551",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Acacia, Silang, Cavite",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0769-012986",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Acacia, Silang, Cavite",
      "hgabPesos": 10000000,
      "nepPage": "615",
      "hgabPage": "769",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37096",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Aganan, Dao, Capiz",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0816-013906",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Aganan, Dao, Capiz",
      "hgabPesos": 5000000,
      "nepPage": "636",
      "hgabPage": "816",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34687",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Agawa, Besao, Mountain Province",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0695-011484",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Agawa, Besao, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "583",
      "hgabPage": "695",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35166",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Aguiguican, Gattaran, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0702-011608",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Aguiguican, Gattaran, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "586",
      "hgabPage": "702",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37659",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Alacaygan, EB Magalona, Negros Occidental",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0833-014250",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Alacaygan, EB Magalona, Negros Occidental",
      "hgabPesos": 10000000,
      "nepPage": "642",
      "hgabPage": "833",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35242",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Alibadabad, San Mariano, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0712-011830",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Alibadabad, San Mariano, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "591",
      "hgabPage": "712",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37387",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Alijis, Bacolod City",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0831-014212",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Alijis, Bacolod City",
      "hgabPesos": 10000000,
      "nepPage": "641",
      "hgabPage": "831",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34224",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Ambalangan Dalin, San Fabian, Pangasinan",
      "nepPesos": 5500000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0683-011228",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Ambalangan Dalin, San Fabian, Pangasinan",
      "hgabPesos": 2500000,
      "nepPage": "579",
      "hgabPage": "683",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36687",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Apasan, Sampaloc, Quezon",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0780-013215",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Apasan, Sampaloc, Quezon",
      "hgabPesos": 10000000,
      "nepPage": "621",
      "hgabPage": "780",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38682",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Bagumbayan, Magpet, North Cotabato",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0896-015468",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Bagumbayan, Magpet, North Cotabato",
      "hgabPesos": 6000000,
      "nepPage": "668",
      "hgabPage": "896",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36717",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Balibago, Rosario Batangas",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0761-012814",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Balibago, Rosario Batangas",
      "hgabPesos": 10000000,
      "nepPage": "612",
      "hgabPage": "761",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38696",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Balite, Magpet, North Cotabato",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0896-015469",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Balite, Magpet, North Cotabato",
      "hgabPesos": 6000000,
      "nepPage": "668",
      "hgabPage": "896",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35639",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Banawang, Bagac, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0728-012135",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Banawang, Bagac, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "595",
      "hgabPage": "728",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37002",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
      "nepPesos": 7500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0792-013443",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
      "hgabPesos": 7500000,
      "nepPage": "627",
      "hgabPage": "792",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-11099",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales (14.877165, 120.234107)",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37000",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Barake, Aborlan, Palawan",
      "nepPesos": 7500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0792-013449",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Barake, Aborlan, Palawan",
      "hgabPesos": 7500000,
      "nepPage": "627",
      "hgabPage": "792",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38589",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Baranayan, Palimbang, Sultan Kudarat",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0914-015813",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Baranayan, Palimbang, Sultan Kudarat",
      "hgabPesos": 30000000,
      "nepPage": "671",
      "hgabPage": "914",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34149",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Baresbes, Dingras, Ilocos Norte",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0676-011098",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Baresbes, Dingras, Ilocos Norte",
      "hgabPesos": 15000000,
      "nepPage": "577",
      "hgabPage": "676",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36966",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Barotuan, El Nido, Palawan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0791-013416",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Barotuan, El Nido, Palawan",
      "hgabPesos": 10000000,
      "nepPage": "626",
      "hgabPage": "791",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38581",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Barurao I, Lebak, Sultan Kudarat",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0912-015777",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Barurao I, Lebak, Sultan Kudarat",
      "hgabPesos": 5500000,
      "nepPage": "671",
      "hgabPage": "912",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37710",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Basak, Compostela, Cebu",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0851-014614",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Basak, Compostela, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "646",
      "hgabPage": "851",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38692",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Basak, Magpet, North Cotabato",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0896-015470",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Basak, Magpet, North Cotabato",
      "hgabPesos": 6000000,
      "nepPage": "668",
      "hgabPage": "896",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35095",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Bautista, San Agustin, Isabela",
      "nepPesos": 11000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0718-011934",
      "hgabTitle": "Construction of Multi-Purpose Building (Building 1), Barangay Bautista, San Agustin, Isabela",
      "hgabPesos": 6000000,
      "nepPage": "592",
      "hgabPage": "718",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34684",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Bila, Bauko, Mountain Province",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0696-011497",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bila, Bauko, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "583",
      "hgabPage": "696",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36247",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Binagbag, Municipality of Agdangan, Quezon",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0783-013263",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Binagbag, Municipality of Agdangan, Quezon",
      "hgabPesos": 10000000,
      "nepPage": "622",
      "hgabPage": "783",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35678",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Binaritan, Morong, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0728-012137",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Binaritan, Morong, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "595",
      "hgabPage": "728",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38571",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0912-015778",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
      "hgabPesos": 7000000,
      "nepPage": "671",
      "hgabPage": "912",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36953",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Borac, Coron, Palawan",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0791-013417",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Borac, Coron, Palawan",
      "hgabPesos": 6000000,
      "nepPage": "626",
      "hgabPage": "791",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36739",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Bulilan Sur, Pila, Laguna",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0771-013023",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Bulilan Sur, Pila, Laguna",
      "hgabPesos": 5000000,
      "nepPage": "616",
      "hgabPage": "771",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36476",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Bungoy, Dolores, Quezon",
      "nepPesos": 7500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0781-013237",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Bungoy, Dolores, Quezon",
      "hgabPesos": 7500000,
      "nepPage": "621",
      "hgabPage": "781",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34908",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Bustamante, Luna, Isabela",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0708-011734",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Bustamante, Luna, Isabela",
      "hgabPesos": 6000000,
      "nepPage": "589",
      "hgabPage": "708",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34330",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Cabaritan, San Manuel, Pangasinan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0688-011335",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Cabaritan, San Manuel, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "580",
      "hgabPage": "688",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35634",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Cabcaben, Mariveles, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0728-012138",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Cabcaben, Mariveles, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "595",
      "hgabPage": "728",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37164",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Cabugao Sur, Santa Barbara, Iloilo",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0826-014101",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Cabugao Sur, Santa Barbara, Iloilo",
      "hgabPesos": 7000000,
      "nepPage": "639",
      "hgabPage": "826",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37477",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Caduha-an, Cadiz City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0833-014253",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Caduha-an, Cadiz City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "642",
      "hgabPage": "833",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37162",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Cagamutan Norte, Leganes, Iloilo",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0826-014102",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Cagamutan Norte, Leganes, Iloilo",
      "hgabPesos": 15000000,
      "nepPage": "639",
      "hgabPage": "826",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36751",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Caingin, City of Santa Rosa. Laguna",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0773-013061",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Caingin, City of Santa Rosa. Laguna",
      "hgabPesos": 50000000,
      "nepPage": "617",
      "hgabPage": "773",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34689",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Caluttit, Bontoc, Mountain Province",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0696-011499",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Caluttit, Bontoc, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "583",
      "hgabPage": "696",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34186",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Camaley, Binmaley, Pangasinan",
      "nepPesos": 8000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0683-011231",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Camaley, Binmaley, Pangasinan",
      "hgabPesos": 8000000,
      "nepPage": "579",
      "hgabPage": "683",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35094",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0718-011935",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "hgabPesos": 7000000,
      "nepPage": "592",
      "hgabPage": "718",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37295",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Caticlan, Malay, Aklan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0813-013848",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Caticlan, Malay, Aklan",
      "hgabPesos": 5000000,
      "nepPage": "635",
      "hgabPage": "813",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35100",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Centro 1, Claveria, Cagayan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0703-011644",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Centro 1, Claveria, Cagayan",
      "hgabPesos": 10000000,
      "nepPage": "587",
      "hgabPage": "703",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35788",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Centro II, Orani, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0725-012091",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Centro II, Orani, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "594",
      "hgabPage": "725",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36856",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Concepcion, Calintaan, Occidental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0787-013351",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Concepcion, Calintaan, Occidental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "624",
      "hgabPage": "787",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35253",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Culalabat, Cauayan City, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0718-011937",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Culalabat, Cauayan City, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "592",
      "hgabPage": "718",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35329",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Cullalabo Del Sur, Burgos, Isabela",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0708-011736",
      "hgabTitle": "Construction of Multi-Purpose Building, Building 2, Barangay Cullalabo Del Sur, Burgos, Isabela",
      "hgabPesos": 50000000,
      "nepPage": "590",
      "hgabPage": "708",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35036",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Cullit, Camalaniugan, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0702-011614",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Cullit, Camalaniugan, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "586",
      "hgabPage": "702",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35244",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Daragutan East, San Mariano, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0713-011833",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Daragutan East, San Mariano, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "591",
      "hgabPage": "713",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35572",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Daungan, Guiguinto, Bulacan",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0731-012206",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Daungan, Guiguinto, Bulacan",
      "hgabPesos": 20000000,
      "nepPage": "597",
      "hgabPage": "731",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35324",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0718-011939",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
      "hgabPesos": 50000000,
      "nepPage": "592",
      "hgabPage": "718",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35086",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Disimpit, Jones, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0718-011941",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Disimpit, Jones, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "592",
      "hgabPage": "718",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35336",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay District 3, San Manuel, Isabela",
      "nepPesos": 41500000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0635-010344",
      "hgabTitle": "Construction of 2-units Multi-Purpose Building, Barangay District 3, San Manuel, Isabela",
      "hgabPesos": 62350000,
      "nepPage": "590",
      "hgabPage": "635",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34565",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Dorongan Linmansangan, Mangatarem, Pangasinan",
      "nepPesos": 11000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0683-011232",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Dorongan Linmansangan, Mangatarem, Pangasinan",
      "hgabPesos": 11000000,
      "nepPage": "579",
      "hgabPage": "683",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36916",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Dulangan, Puerto Galera, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37722",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0851-014615",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "646",
      "hgabPage": "851",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34896",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0708-011738",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
      "hgabPesos": 6000000,
      "nepPage": "590",
      "hgabPage": "708",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-06346",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Gabawan, Odiongan, Romblon",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0793-013477",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Gabawan, Odiongan, Romblon",
      "hgabPesos": 6000000,
      "nepPage": "628",
      "hgabPage": "793",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36135",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Gomez, Llanera, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0739-012360",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Gomez, Llanera, Nueva Ecija",
      "hgabPesos": 6000000,
      "nepPage": "602",
      "hgabPage": "739",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35200",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Guiddam, Abulug, Cagayan",
      "nepPesos": 100000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0635-010350",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Guiddam, Abulug, Cagayan",
      "hgabPesos": 100000000,
      "nepPage": "563",
      "hgabPage": "635",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34690",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Guina-ang, Bontoc, Mountain Province",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0696-011502",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Guina-ang, Bontoc, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "583",
      "hgabPage": "696",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37365",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Handumanan, Bacolod City",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0831-014213",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Handumanan, Bacolod City",
      "hgabPesos": 30000000,
      "nepPage": "641",
      "hgabPage": "831",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35899",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Iba, Meycauayan City, Bulacan",
      "nepPesos": 8000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0734-012264",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Iba, Meycauayan City, Bulacan",
      "hgabPesos": 8000000,
      "nepPage": "599",
      "hgabPage": "734",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35673",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Ibaba, Bagac, Bataan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0728-012139",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Ibaba, Bagac, Bataan",
      "hgabPesos": 10000000,
      "nepPage": "595",
      "hgabPage": "728",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35677",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Ibis, Bagac, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0728-012140",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Ibis, Bagac, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "595",
      "hgabPage": "728",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39346",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Igualdad, Naga City, Camarines Sur",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0801-013613",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Igualdad, Naga City, Camarines Sur",
      "hgabPesos": 5000000,
      "nepPage": "631",
      "hgabPage": "801",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36397",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Kanluran, City of Santa Rosa, Laguna",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0773-013062",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Kanluran, City of Santa Rosa, Laguna",
      "hgabPesos": 50000000,
      "nepPage": "617",
      "hgabPage": "773",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36519",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Kaybagal South, Tagaytay City, Cavite",
      "nepPesos": 80000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0641-010422",
      "hgabTitle": "Construction of Multi Purpose Facility, Kaybagal South, Tagaytay City, Cavite",
      "hgabPesos": 40000000,
      "nepPage": "568",
      "hgabPage": "641",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38580",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Kiadsam, Sen. Ninoy Aquino, Sultan Kudarat",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36477",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Kinabuhayan, Dolores, Quezon",
      "nepPesos": 12000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0781-013238",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Kinabuhayan, Dolores, Quezon",
      "hgabPesos": 12000000,
      "nepPage": "621",
      "hgabPage": "781",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38582",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Kraan, Palimbang, Sultan Kudarat",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38573",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Kulaman, Sen. Ninoy Aquino, Sultan Kudarat",
      "nepPesos": 13000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0912-015780",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Kulaman, Sen. Ninoy Aquino, Sultan Kudarat",
      "hgabPesos": 13000000,
      "nepPage": "671",
      "hgabPage": "912",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37281",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Laguinbanua, Ibajay, Aklan",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0813-013850",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Laguinbanua, Ibajay, Aklan",
      "hgabPesos": 15000000,
      "nepPage": "636",
      "hgabPage": "813",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38717",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0897-015482",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
      "hgabPesos": 6000000,
      "nepPage": "669",
      "hgabPage": "897",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34563",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Laoag, Aguilar, Pangasinan",
      "nepPesos": 11000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34188",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Laois, Labrador, Pangasinan",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0683-011236",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Laois, Labrador, Pangasinan",
      "hgabPesos": 20000000,
      "nepPage": "579",
      "hgabPage": "683",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35078",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Laurel, Cordon, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0718-011943",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Laurel, Cordon, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "592",
      "hgabPage": "718",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35650",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Layac, Dinalupihan, Bataan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0728-012141",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Layac, Dinalupihan, Bataan",
      "hgabPesos": 10000000,
      "nepPage": "595",
      "hgabPage": "728",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36824",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Libas, Buenavista, Marinduque",
      "nepPesos": 14000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0787-013339",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Libas, Buenavista, Marinduque",
      "hgabPesos": 14000000,
      "nepPage": "624",
      "hgabPage": "787",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35105",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
      "nepPesos": 100000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0635-010351",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
      "hgabPesos": 150000000,
      "nepPage": "563",
      "hgabPage": "635",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34187",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Libsong West, Lingayen, Pangasinan",
      "nepPesos": 25000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0683-011237",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Libsong West, Lingayen, Pangasinan",
      "hgabPesos": 25000000,
      "nepPage": "579",
      "hgabPage": "683",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36841",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Ligaya, Sablayan, Occidental Mindoro",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0787-013354",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Ligaya, Sablayan, Occidental Mindoro",
      "hgabPesos": 10000000,
      "nepPage": "624",
      "hgabPage": "787",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36144",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Loma de Gato, Marilao, Bulacan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0734-012265",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Loma de Gato, Marilao, Bulacan",
      "hgabPesos": 10000000,
      "nepPage": "599",
      "hgabPage": "734",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34242",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Longos Central, San Fabian, Pangasinan",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0683-011239",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Longos Central, San Fabian, Pangasinan",
      "hgabPesos": 7000000,
      "nepPage": "579",
      "hgabPage": "683",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37458",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Lopez Jaena, Sagay City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0833-014255",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Lopez Jaena, Sagay City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "642",
      "hgabPage": "833",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35679",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Lourdes, City of San Fernando, Pampanga",
      "nepPesos": 57000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0637-010392",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Lourdes, City of San Fernando, Pampanga",
      "hgabPesos": 57000000,
      "nepPage": "565",
      "hgabPage": "637",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35633",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Lucanin, Mariveles, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0728-012142",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Lucanin, Mariveles, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "595",
      "hgabPage": "728",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35335",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0708-011740",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "hgabPesos": 50000000,
      "nepPage": "590",
      "hgabPage": "708",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36965",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Mabini, El Nido, Palawan",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0791-013422",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mabini, El Nido, Palawan",
      "hgabPesos": 6000000,
      "nepPage": "626",
      "hgabPage": "791",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37714",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Macaas, Catmon, Cebu",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0851-014616",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Macaas, Catmon, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "646",
      "hgabPage": "851",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34153",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Macaleeng, Anda, Pangasinan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0680-011180",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Macaleeng, Anda, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "578",
      "hgabPage": "680",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35745",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Macalong, La Paz, Tarlac",
      "nepPesos": 8000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0742-012446",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Macalong, La Paz, Tarlac",
      "hgabPesos": 8000000,
      "nepPage": "604",
      "hgabPage": "742",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28905",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Maharlika San Pedro Laguna",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0773-013063",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Maharlika San Pedro Laguna",
      "hgabPesos": 10000000,
      "nepPage": "617",
      "hgabPage": "773",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35047",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Malalatan, Alcala, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0702-011621",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Malalatan, Alcala, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "587",
      "hgabPage": "702",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36864",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Maligaya, Lubang, Occidental Mindoro",
      "nepPesos": 5500000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37411",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Malongcay Dacu, Dauin, Negros Oriental",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0840-014393",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Malongcay Dacu, Dauin, Negros Oriental",
      "hgabPesos": 10000000,
      "nepPage": "645",
      "hgabPage": "840",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36501",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Manato Central, Tagkawayan, Quezon",
      "nepPesos": 7500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0786-013318",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Manato Central, Tagkawayan, Quezon",
      "hgabPesos": 7500000,
      "nepPage": "623",
      "hgabPage": "786",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36385",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Manggahan, General Trias City Cavite",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0768-012951",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Manggahan, General Trias City Cavite",
      "hgabPesos": 5000000,
      "nepPage": "614",
      "hgabPage": "768",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-26599",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Mantapoli, Marantao, Lanao del Sur",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0651-010620",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mantapoli, Marantao, Lanao del Sur",
      "hgabPesos": 10000000,
      "nepPage": "570",
      "hgabPage": "651",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37460",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0833-014256",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "642",
      "hgabPage": "833",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35234",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0708-011741",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
      "hgabPesos": 6000000,
      "nepPage": "590",
      "hgabPage": "708",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36396",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Market Area, City of Santa Rosa, Laguna",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0773-013064",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Market Area, City of Santa Rosa, Laguna",
      "hgabPesos": 50000000,
      "nepPage": "617",
      "hgabPage": "773",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36609",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Masiit, Calauan, Laguna",
      "nepPesos": 40000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0776-013119",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Masiit, Calauan, Laguna",
      "hgabPesos": 40000000,
      "nepPage": "619",
      "hgabPage": "776",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36480",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0781-013240",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon",
      "hgabPesos": 10000000,
      "nepPage": "621",
      "hgabPage": "781",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36252",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Milagrosa, Municipality of Catanauan, Quezon",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0783-013271",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Milagrosa, Municipality of Catanauan, Quezon",
      "hgabPesos": 10000000,
      "nepPage": "622",
      "hgabPage": "783",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38590",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Milbuk, Palimbang, Sultan Kudarat",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35334",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Minagbag, Quezon, Isabela",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0708-011742",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Minagbag, Quezon, Isabela",
      "hgabPesos": 20000000,
      "nepPage": "590",
      "hgabPage": "708",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35245",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Minanga, San Mariano, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0713-011834",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Minanga, San Mariano, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "591",
      "hgabPage": "713",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37188",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0815-013895",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
      "hgabPesos": 7000000,
      "nepPage": "636",
      "hgabPage": "815",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37297",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Motag, Malay, Aklan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0813-013851",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Motag, Malay, Aklan",
      "hgabPesos": 5000000,
      "nepPage": "636",
      "hgabPage": "813",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35627",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Mt. View, Mariveles, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0728-012143",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mt. View, Mariveles, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "595",
      "hgabPage": "728",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36919",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Mulawin, Naujan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34205",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Nalsian, Manaoag, Pangasinan",
      "nepPesos": 5500000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0683-011244",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Nalsian, Manaoag, Pangasinan",
      "hgabPesos": 3500000,
      "nepPage": "579",
      "hgabPage": "683",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34338",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Nampalcan, Umingan, Pangasinan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0689-011346",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Nampalcan, Umingan, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "580",
      "hgabPage": "689",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34990",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Nangalasauan, Amulung, Cagayan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0704-011665",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Nangalasauan, Amulung, Cagayan",
      "hgabPesos": 10000000,
      "nepPage": "588",
      "hgabPage": "704",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35096",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Nemmatan, San Agustin, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0718-011944",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Nemmatan, San Agustin, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "592",
      "hgabPage": "718",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38700",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay New Israel, Makilala, North Cotabato",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0897-015484",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay New Israel, Makilala, North Cotabato",
      "hgabPesos": 6000000,
      "nepPage": "669",
      "hgabPage": "897",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37719",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0851-014617",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "646",
      "hgabPage": "851",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37508",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Obogon, Tanjay City, Negros Oriental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0840-014385",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Obogon, Tanjay City, Negros Oriental",
      "hgabPesos": 5000000,
      "nepPage": "645",
      "hgabPage": "840",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34219",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Osiem, Mangaldan, Pangasinan",
      "nepPesos": 5500000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0684-011245",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Osiem, Mangaldan, Pangasinan",
      "hgabPesos": 3000000,
      "nepPage": "579",
      "hgabPage": "684",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35676",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Pag-asa, Bagac, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0728-012145",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pag-asa, Bagac, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "595",
      "hgabPage": "728",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34206",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Pao, Manaoag, Pangasinan",
      "nepPesos": 5500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0684-011247",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pao, Manaoag, Pangasinan",
      "hgabPesos": 5500000,
      "nepPage": "579",
      "hgabPage": "684",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34506",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Papallasen, Umingan, Pangasinan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0689-011347",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Papallasen, Umingan, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "580",
      "hgabPage": "689",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36379",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0768-012953",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
      "hgabPesos": 10000000,
      "nepPage": "614",
      "hgabPage": "768",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32304",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Payompon, Mamburao, Occidental Mindoro",
      "nepPesos": 55000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34507",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Pemienta, Umingan, Pangasinan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0689-011348",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pemienta, Umingan, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "580",
      "hgabPage": "689",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35106",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
      "nepPesos": 100000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0635-010352",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
      "hgabPesos": 100000000,
      "nepPage": "563",
      "hgabPage": "635",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35648",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0728-012146",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
      "hgabPesos": 10000000,
      "nepPage": "595",
      "hgabPage": "728",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35829",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion East, Pantabangan, Nueva Ecija",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0739-012363",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion East, Pantabangan, Nueva Ecija",
      "hgabPesos": 30000000,
      "nepPage": "602",
      "hgabPage": "739",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37465",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion II, Sagay City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0833-014257",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion II, Sagay City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "643",
      "hgabPage": "833",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37274",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion Ilaya, San Enrique,Iloilo",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0820-013994",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion Ilaya, San Enrique,Iloilo",
      "hgabPesos": 15000000,
      "nepPage": "638",
      "hgabPage": "820",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34871",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion South, Solano, Nueva Vizcaya",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0720-011985",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion South, Solano, Nueva Vizcaya",
      "hgabPesos": 20000000,
      "nepPage": "593",
      "hgabPage": "720",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36036",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion Sur, Licab, Nueva Ecija",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0739-012364",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion Sur, Licab, Nueva Ecija",
      "hgabPesos": 15000000,
      "nepPage": "602",
      "hgabPage": "739",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36133",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion West, Pantabangan, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0739-012365",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion West, Pantabangan, Nueva Ecija",
      "hgabPesos": 6000000,
      "nepPage": "602",
      "hgabPage": "739",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36849",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Abra de Ilog, Occidental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0788-013366",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Abra de Ilog, Occidental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "625",
      "hgabPage": "788",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37184",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Alimodian, Iloilo",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0826-014110",
      "hgabTitle": "Construction of 2-units Multi-Purpose Building, Barangay Poblacion, Alimodian, Iloilo",
      "hgabPesos": 40500000,
      "nepPage": "639",
      "hgabPage": "826",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37321",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Banate, Iloilo",
      "nepPesos": 25500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0820-013995",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Banate, Iloilo",
      "hgabPesos": 25500000,
      "nepPage": "638",
      "hgabPage": "820",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-06373",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Bansud, Oriental Mindoro (121.457500°,12.863888°)",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0795-013499",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Bansud, Oriental Mindoro (121.457500°,12.863888°)",
      "hgabPesos": 20000000,
      "nepPage": "629",
      "hgabPage": "795",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37731",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Boljoon, Cebu",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0851-014608",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Boljoon, Cebu",
      "hgabPesos": 30000000,
      "nepPage": "646",
      "hgabPage": "851",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34691",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Bontoc, Mountain Province",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0697-011504",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Bontoc, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "583",
      "hgabPage": "697",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34443",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Bugallon, Pangasinan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0684-011248",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Bugallon, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "579",
      "hgabPage": "684",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38745",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Buluan, Maguindanao del Sur",
      "nepPesos": 7500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0654-010675",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Buluan, Maguindanao del Sur",
      "hgabPesos": 7500000,
      "nepPage": "571",
      "hgabPage": "654",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38742",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Anggal Midtimbang, Maguindanao del Sur",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0654-010676",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Anggal Midtimbang, Maguindanao del Sur",
      "hgabPesos": 20000000,
      "nepPage": "571",
      "hgabPage": "654",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38748",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Paglas, Maguindanao del Sur",
      "nepPesos": 7500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0654-010677",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Paglas, Maguindanao del Sur",
      "hgabPesos": 7500000,
      "nepPage": "571",
      "hgabPage": "654",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34191",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Labrador, Pangasinan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0684-011249",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Labrador, Pangasinan",
      "hgabPesos": 10000000,
      "nepPage": "579",
      "hgabPage": "684",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37181",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Leon, Iloilo",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0826-014111",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Leon, Iloilo",
      "hgabPesos": 30000000,
      "nepPage": "639",
      "hgabPage": "826",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35644",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Morong, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0728-012147",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Morong, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "596",
      "hgabPage": "728",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37324",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, San Miguel, Iloilo",
      "nepPesos": 20500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0826-014112",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, San Miguel, Iloilo",
      "hgabPesos": 20500000,
      "nepPage": "639",
      "hgabPage": "826",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37183",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Santa Barbara, Iloilo",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0826-014113",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Santa Barbara, Iloilo",
      "hgabPesos": 15000000,
      "nepPage": "639",
      "hgabPage": "826",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38737",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Tantangan, South Cotabato",
      "nepPesos": 25000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0900-015547",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Tantangan, South Cotabato",
      "hgabPesos": 25000000,
      "nepPage": "670",
      "hgabPage": "900",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37185",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0826-014114",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo",
      "hgabPesos": 15000000,
      "nepPage": "639",
      "hgabPage": "826",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03053",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo (10.823217, 122.609097)",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38738",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Popol, Buluan, Maguindanao del Sur",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0654-010681",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Popol, Buluan, Maguindanao del Sur",
      "hgabPesos": 10000000,
      "nepPage": "571",
      "hgabPage": "654",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37723",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Puertobello, Tudela, Cebu",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37629",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Punta TayTay, Bacolod City",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0831-014214",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Punta TayTay, Bacolod City",
      "hgabPesos": 30000000,
      "nepPage": "641",
      "hgabPage": "831",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33864",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Pusil, Lipa City, Batangas",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0761-012819",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pusil, Lipa City, Batangas",
      "hgabPesos": 10000000,
      "nepPage": "612",
      "hgabPage": "761",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36678",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Quilib, Rosario, Batangas",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0761-012820",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Quilib, Rosario, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "612",
      "hgabPage": "761",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36677",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Quilo- Quilo North, Padre Garcia, Batangas",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0761-012821",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Quilo- Quilo North, Padre Garcia, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "612",
      "hgabPage": "761",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34164",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Quinaoayanan, Bani, Pangasinan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0680-011181",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Quinaoayanan, Bani, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "578",
      "hgabPage": "680",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34935",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0699-011553",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
      "hgabPesos": 5000000,
      "nepPage": "584",
      "hgabPage": "699",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34508",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Resurreccion, Umingan, Pangasinan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0689-011350",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Resurreccion, Umingan, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "580",
      "hgabPage": "689",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35258",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Rizal, Cauayan City, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0718-011945",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Rizal, Cauayan City, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "593",
      "hgabPage": "718",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35409",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0718-011946",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "593",
      "hgabPage": "718",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34694",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Saclit, Sadanga, Mountain Province",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0697-011505",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Saclit, Sadanga, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "583",
      "hgabPage": "697",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35779",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Sacrifice Valley, Hermosa, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0726-012096",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sacrifice Valley, Hermosa, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "594",
      "hgabPage": "726",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38577",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Sagasa, Esperanza, Sultan Kudarat",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0912-015782",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sagasa, Esperanza, Sultan Kudarat",
      "hgabPesos": 7000000,
      "nepPage": "671",
      "hgabPage": "912",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37005",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Sagpangan, Aborlan, Palawan",
      "nepPesos": 7500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0792-013454",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sagpangan, Aborlan, Palawan",
      "hgabPesos": 7500000,
      "nepPage": "627",
      "hgabPage": "792",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35097",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Salay, San Agustin, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0718-011947",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Salay, San Agustin, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "593",
      "hgabPage": "718",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36169",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Salcedo II, Noveleta, Cavite",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0768-012954",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Salcedo II, Noveleta, Cavite",
      "hgabPesos": 10000000,
      "nepPage": "614",
      "hgabPage": "768",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35900",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Saluysoy, Meycauayan City, Bulacan",
      "nepPesos": 8000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0734-012269",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Saluysoy, Meycauayan City, Bulacan",
      "hgabPesos": 8000000,
      "nepPage": "599",
      "hgabPage": "734",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35415",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
      "nepPesos": 100000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0703-011633",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
      "hgabPesos": 20000000,
      "nepPage": "563",
      "hgabPage": "703",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35407",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0699-011554",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes",
      "hgabPesos": 10000000,
      "nepPage": "584",
      "hgabPage": "699",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-26354",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Antonio, San Pedro City, Laguna",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0773-013065",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Antonio, San Pedro City, Laguna",
      "hgabPesos": 10000000,
      "nepPage": "617",
      "hgabPage": "773",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35346",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "nepPesos": 75000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0635-010353",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "hgabPesos": 75000000,
      "nepPage": "563",
      "hgabPage": "635",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36393",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0768-012955",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
      "hgabPesos": 5000000,
      "nepPage": "614",
      "hgabPage": "768",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34995",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Isidro, Iguig, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0704-011667",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Isidro, Iguig, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "588",
      "hgabPage": "704",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35092",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Isidro, Santiago City, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0718-011948",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Isidro, Santiago City, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "593",
      "hgabPage": "718",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35614",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Jose, Balanga City, Bataan (14.671365, 120.535013)",
      "nepPesos": 25000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0727-012123",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Jose, Balanga City, Bataan (14.671365, 120.535013)",
      "hgabPesos": 25000000,
      "nepPage": "595",
      "hgabPage": "727",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36954",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Jose, Coron, Palawan",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0791-013427",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Jose, Coron, Palawan",
      "hgabPesos": 6000000,
      "nepPage": "626",
      "hgabPage": "791",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35087",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Jose, Jones, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0718-011949",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Jose, Jones, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "593",
      "hgabPage": "718",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37160",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Jose, San Miguel, Iloilo",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0826-014117",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Jose, San Miguel, Iloilo",
      "hgabPesos": 10000000,
      "nepPage": "639",
      "hgabPage": "826",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36960",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Juan, Dumaran, Palawan",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0791-013428",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Juan, Dumaran, Palawan",
      "hgabPesos": 6000000,
      "nepPage": "626",
      "hgabPage": "791",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36110",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Juan, San Narciso, Zambales 15.003452, 120.095337",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0636-010366",
      "hgabTitle": "Construction of Multi-Purpose Building (Main Building), Barangay San Juan, San Narciso, Zambales 15.003452, 120.095337",
      "hgabPesos": 100000000,
      "nepPage": "606",
      "hgabPage": "636",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35263",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Luis, Cauayan City, Isabela",
      "nepPesos": 535000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0635-010354",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Luis, Cauayan City, Isabela",
      "hgabPesos": 535000000,
      "nepPage": "563",
      "hgabPage": "635",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-23541",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Alaminos, Laguna (14.051387, 121.258098)",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0776-013120",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Alaminos, Laguna (14.051387, 121.258098)",
      "hgabPesos": 7000000,
      "nepPage": "619",
      "hgabPage": "776",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38718",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Arakan, North Cotabato",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0897-015487",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Arakan, North Cotabato",
      "hgabPesos": 6000000,
      "nepPage": "669",
      "hgabPage": "897",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34326",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Balungao, Pangasinan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0689-011352",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Balungao, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "581",
      "hgabPage": "689",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36991",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Puerto Princesa City, Palawan",
      "nepPesos": 9000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0792-013457",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Puerto Princesa City, Palawan",
      "hgabPesos": 9000000,
      "nepPage": "627",
      "hgabPage": "792",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37199",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Pedro, Pilar, Capiz",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0816-013897",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Pedro, Pilar, Capiz",
      "hgabPesos": 7000000,
      "nepPage": "636",
      "hgabPage": "816",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38583",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Roque, Palimbang, Sultan Kudarat",
      "nepPesos": 8000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0914-015819",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Roque, Palimbang, Sultan Kudarat",
      "hgabPesos": 7000000,
      "nepPage": "671",
      "hgabPage": "914",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36644",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0761-012823",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
      "hgabPesos": 30000000,
      "nepPage": "612",
      "hgabPage": "761",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34324",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Vicente East, Asingan, Pangasinan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0689-011355",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Vicente East, Asingan, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "581",
      "hgabPage": "689",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34996",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay San Vicente, Iguig, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0704-011668",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Vicente, Iguig, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "588",
      "hgabPage": "704",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35670",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Saysain, Bagac, Bataan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0728-012148",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Saysain, Bagac, Bataan",
      "hgabPesos": 10000000,
      "nepPage": "596",
      "hgabPage": "728",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37369",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Singcang-Airport, Bacolod City",
      "nepPesos": 25000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0830-014193",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Singcang-Airport, Bacolod City",
      "hgabPesos": 5000000,
      "nepPage": "641",
      "hgabPage": "830",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38244",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Sinunuc, Zamboanga City",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0864-014871",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sinunuc, Zamboanga City",
      "hgabPesos": 30000000,
      "nepPage": "653",
      "hgabPage": "864",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36907",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, City of Calapan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35618",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Dinalupihan, Bataan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0728-012149",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Dinalupihan, Bataan",
      "hgabPesos": 10000000,
      "nepPage": "596",
      "hgabPage": "728",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34711",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Natonin, Mountain Province",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0697-011521",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Natonin, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "584",
      "hgabPage": "697",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33562",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Sta. Monica, Floridablanca, Pampanga",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0742-012438",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sta. Monica, Floridablanca, Pampanga",
      "hgabPesos": 50000000,
      "nepPage": "604",
      "hgabPage": "742",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38698",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Sto. Nino, Kidapawan City, North Cotabato",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0897-015488",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sto. Nino, Kidapawan City, North Cotabato",
      "hgabPesos": 6000000,
      "nepPage": "669",
      "hgabPage": "897",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33924",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
      "nepPesos": 25000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0656-010702",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
      "hgabPesos": 25000000,
      "nepPage": "572",
      "hgabPage": "656",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37471",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Taba-ao, Sagay City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0833-014258",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Taba-ao, Sagay City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "643",
      "hgabPage": "833",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37496",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Taclobo, Dumaguete City, Negros Oriental",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0840-014386",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Taclobo, Dumaguete City, Negros Oriental",
      "hgabPesos": 20000000,
      "nepPage": "645",
      "hgabPage": "840",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36715",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Talaibon, Ibaan, Batangas",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0761-012825",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Talaibon, Ibaan, Batangas",
      "hgabPesos": 10000000,
      "nepPage": "612",
      "hgabPage": "761",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38587",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0914-015821",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
      "hgabPesos": 5500000,
      "nepPage": "671",
      "hgabPage": "914",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37403",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Tomongtong, EB Magalona, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0833-014259",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Tomongtong, EB Magalona, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "643",
      "hgabPage": "833",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36845",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Tuban, Sablayan, Occidental Mindoro",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0788-013370",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Tuban, Sablayan, Occidental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "625",
      "hgabPage": "788",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35658",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Tucop, Dinalupihan, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0728-012151",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Tucop, Dinalupihan, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "596",
      "hgabPage": "728",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35088",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Tupax, Jones, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0718-011951",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Tupax, Jones, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "593",
      "hgabPage": "718",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35079",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Turod Sur, Cordon, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0718-011952",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Turod Sur, Cordon, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "593",
      "hgabPage": "718",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37751",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Ubaub, Argao, Cebu",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0851-014610",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Ubaub, Argao, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "646",
      "hgabPage": "851",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35830",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Victoria, Llanera, Nueva Ecija",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0739-012367",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Victoria, Llanera, Nueva Ecija",
      "hgabPesos": 30000000,
      "nepPage": "602",
      "hgabPage": "739",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35261",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Villa Luna, Cauayan City, Isabela",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0718-011953",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Villa Luna, Cauayan City, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "593",
      "hgabPage": "718",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37370",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Villamonte, Bacolod City",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0831-014215",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Villamonte, Bacolod City",
      "hgabPesos": 5000000,
      "nepPage": "641",
      "hgabPage": "831",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37161",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Wari Wari, New Lucena, Iloilo",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0826-014119",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Wari Wari, New Lucena, Iloilo",
      "hgabPesos": 10000000,
      "nepPage": "639",
      "hgabPage": "826",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35766",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay West Calaguiman, Samal, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0726-012097",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay West Calaguiman, Samal, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "594",
      "hgabPage": "726",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35037",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Ziminila, Camalaniugan, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0703-011631",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Ziminila, Camalaniugan, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "587",
      "hgabPage": "703",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37484",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Zone 6, Cadiz City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0833-014260",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Zone 6, Cadiz City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "643",
      "hgabPage": "833",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37973",
      "nepTitle": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
      "nepPesos": 25000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0860-014785",
      "hgabTitle": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
      "hgabPesos": 25000000,
      "nepPage": "650",
      "hgabPage": "860",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38951",
      "nepTitle": "Construction of Multi-Purpose Building, Brgy Abaga, Municipality of Madalum, Lanao del Sur",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0652-010628",
      "hgabTitle": "Construction of Multi-Purpose Building, Abaga, Municipality of Madalum, Lanao del Sur",
      "hgabPesos": 10000000,
      "nepPage": "570",
      "hgabPage": "652",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38949",
      "nepTitle": "Construction of Multi-Purpose Building, Brgy Daguan, Municipality of Kapatagan, Lanao del Sur",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0652-010629",
      "hgabTitle": "Construction of Multi-Purpose Building, Daguan, Municipality of Kapatagan, Lanao del Sur",
      "hgabPesos": 30000000,
      "nepPage": "570",
      "hgabPage": "652",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38953",
      "nepTitle": "Construction of Multi-Purpose Building, Brgy Tongantongan, Municipality of Madalum, Lanao del Sur",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0652-010632",
      "hgabTitle": "Construction of Multi-Purpose Building, Tongantongan, Municipality of Madalum, Lanao del Sur",
      "hgabPesos": 10000000,
      "nepPage": "570",
      "hgabPage": "652",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38248",
      "nepTitle": "Construction of Multi-Purpose Building, Brgy. Likud Tabawan, South Ubian, Tawi-Tawi",
      "nepPesos": 16000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0647-010543",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Likud Tabawan, South Ubian, Tawi- Tawi",
      "hgabPesos": 16000000,
      "nepPage": "569",
      "hgabPage": "647",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38213",
      "nepTitle": "Construction of Multi-Purpose Building, Brgy. Little Margos, Tungawan, Zamboanga Sibugay",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0871-014998",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Little Margos, Tungawan, Zamboanga Sibugay",
      "hgabPesos": 7000000,
      "nepPage": "655",
      "hgabPage": "871",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39027",
      "nepTitle": "Construction of Multi-Purpose Building, Brgy. Poblacion, Lugait, Misamis Oriental",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0648-010554",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Balingoan, Misamis Oriental (124.847967°, 9.002995°)",
      "hgabPesos": 90000000,
      "nepPage": "664",
      "hgabPage": "648",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38254",
      "nepTitle": "Construction of Multi-Purpose Building, Brgy. Poblacion, Sibutad, Zamboanga del Norte",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0865-014886",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Sibutad, Zamboanga del Norte",
      "hgabPesos": 15000000,
      "nepPage": "653",
      "hgabPage": "865",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35514",
      "nepTitle": "Construction of Multi-Purpose Building, Buas, Candaba, Pampanga",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0741-012424",
      "hgabTitle": "Construction of Multi-Purpose Building, Mandili, Candaba, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "603",
      "hgabPage": "741",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-26642",
      "nepTitle": "Construction of Multi-Purpose Building, Bubong, Lanao del Sur",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0652-010633",
      "hgabTitle": "Construction of Multi-Purpose Building, Bubong, Lanao del Sur",
      "hgabPesos": 50000000,
      "nepPage": "570",
      "hgabPage": "652",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35478",
      "nepTitle": "Construction of Multi-Purpose Building, Bulac, Minalin, Pampanga",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0741-012408",
      "hgabTitle": "Construction of Multi-Purpose Building, Bulac, Minalin, Pampanga",
      "hgabPesos": 7000000,
      "nepPage": "603",
      "hgabPage": "741",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34987",
      "nepTitle": "Construction of Multi-Purpose Building, CSU Solana, Solana, Cagayan",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0704-011670",
      "hgabTitle": "Construction of Multi-Purpose Building, CSU Solana, Solana, Cagayan",
      "hgabPesos": 15000000,
      "nepPage": "588",
      "hgabPage": "704",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39301",
      "nepTitle": "Construction of Multi-Purpose Building, Cabusao, Camarines Sur",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0798-013572",
      "hgabTitle": "Construction of Multi-Purpose Building, Cabusao, Camarines Sur",
      "hgabPesos": 20000000,
      "nepPage": "630",
      "hgabPage": "798",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39347",
      "nepTitle": "Construction of Multi-Purpose Building, Calabanga, Camarines Sur",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0801-013615",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Sibobo, Calabanga, CamarinesSur",
      "hgabPesos": 50000000,
      "nepPage": "631",
      "hgabPage": "801",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34776",
      "nepTitle": "Construction of Multi-Purpose Building, Camdas, Baguio City",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0691-011398",
      "hgabTitle": "Construction of Multi-Purpose Building, Camdas, Baguio City",
      "hgabPesos": 10000000,
      "nepPage": "582",
      "hgabPage": "691",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-27338",
      "nepTitle": "Construction of Multi-Purpose Building, Capitol Complex, Barangay Cadlan, Pili, Camarines Sur",
      "nepPesos": 75000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37306",
      "nepTitle": "Construction of Multi-Purpose Building, Capitol Grounds, San Miguel, Jordan, Guimaras",
      "nepPesos": 25000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0816-013914",
      "hgabTitle": "Construction of Multi-Purpose Building, Capitol Grounds, San Miguel, Jordan, Guimaras",
      "hgabPesos": 25000000,
      "nepPage": "637",
      "hgabPage": "816",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35742",
      "nepTitle": "Construction of Multi-Purpose Building, Covered Court, Barangay San Isidro, La Paz, Tarlac",
      "nepPesos": 8000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0742-012447",
      "hgabTitle": "Construction of Multi-Purpose Building, Covered Court, Barangay San Isidro, La Paz, Tarlac",
      "hgabPesos": 8000000,
      "nepPage": "604",
      "hgabPage": "742",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35486",
      "nepTitle": "Construction of Multi-Purpose Building, Dela Paz, San Simon, Pampanga",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0741-012410",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Dela Paz, San Simon, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "603",
      "hgabPage": "741",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09637",
      "nepTitle": "Construction of Multi-Purpose Building, Department of Agriculture, Barangay Marawoy, Lipa City, Batangas (13.962243, 121.173008)",
      "nepPesos": 100000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0642-010438",
      "hgabTitle": "Construction of Multi-Purpose Building, Department of Agriculture, Barangay Marawoy, Lipa City, Batangas (13.962243, 121.173008)",
      "hgabPesos": 100000000,
      "nepPage": "568",
      "hgabPage": "642",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03492",
      "nepTitle": "Construction of Multi-Purpose Building, Frances, Calumpit, Bulacan (120.762592, 14.919208)",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0731-012208",
      "hgabTitle": "Construction of Multi-Purpose Building, Frances, Calumpit, Bulacan (120.762592, 14.919208)",
      "hgabPesos": 15000000,
      "nepPage": "598",
      "hgabPage": "731",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35515",
      "nepTitle": "Construction of Multi-Purpose Building, Lanang, Candaba, Pampanga",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0741-012411",
      "hgabTitle": "Construction of Multi-Purpose Building, Lanang, Candaba, Pampanga",
      "hgabPesos": 7000000,
      "nepPage": "603",
      "hgabPage": "741",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38855",
      "nepTitle": "Construction of Multi-Purpose Building, Municipality of Del Carmen, Siargao Island, Surigao del Norte",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0922-015956",
      "hgabTitle": "Construction of Multi-Purpose Building, Municipality of Del Carmen, Siargao Island, Surigao del Norte",
      "hgabPesos": 5000000,
      "nepPage": "674",
      "hgabPage": "922",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34441",
      "nepTitle": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0684-011264",
      "hgabTitle": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
      "hgabPesos": 10000000,
      "nepPage": "580",
      "hgabPage": "684",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38433",
      "nepTitle": "Construction of Multi-Purpose Building, Purok 4 Fatima, Barangay Napnapan, Pantukan, Davao de Oro",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0889-015334",
      "hgabTitle": "Construction of Multi-Purpose Building, Purok 4 Fatima, Barangay Napnapan, Pantukan, Davao de Oro",
      "hgabPesos": 10000000,
      "nepPage": "664",
      "hgabPage": "889",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37273",
      "nepTitle": "Construction of Multi-Purpose Building, San Enrique, Iloilo",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0820-013996",
      "hgabTitle": "Construction of Multi-Purpose Building, San Enrique, Iloilo",
      "hgabPesos": 10000000,
      "nepPage": "638",
      "hgabPage": "820",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35508",
      "nepTitle": "Construction of Multi-Purpose Building, San Matias, Sto. Tomas, Pampanga",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0741-012414",
      "hgabTitle": "Construction of Multi-Purpose Building, San Matias, Sto. Tomas, Pampanga",
      "hgabPesos": 7000000,
      "nepPage": "603",
      "hgabPage": "741",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35525",
      "nepTitle": "Construction of Multi-Purpose Building, San Rafael, Macabebe Pampanga",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0742-012431",
      "hgabTitle": "Construction of Multi-Purpose Building, San Rafael, Macabebe Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "603",
      "hgabPage": "742",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35492",
      "nepTitle": "Construction of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0742-012432",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "604",
      "hgabPage": "742",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-22726",
      "nepTitle": "Construction of Multi-Purpose Building, Saniboy St., Barangay Hulo, Mandaluyong City",
      "nepPesos": 40000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0658-010741",
      "hgabTitle": "Construction of Multi-Purpose Building, Saniboy St., Barangay Hulo, Mandaluyong City",
      "hgabPesos": 40000000,
      "nepPage": "573",
      "hgabPage": "658",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-11091",
      "nepTitle": "Construction of Multi-Purpose Building, Subic Fishing Port, Subic Zambales (14.8762, 120.2324)",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33595",
      "nepTitle": "Construction of Multi-Purpose Building, Turo, Bocaue, Bulacan",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0731-012209",
      "hgabTitle": "Construction of Multi-Purpose Building, Turo, Bocaue, Bulacan",
      "hgabPesos": 15000000,
      "nepPage": "598",
      "hgabPage": "731",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33980",
      "nepTitle": "Construction of Multi-Purpose Building, United Hillcrest, Barangay 173, Caloocan City",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0660-010780",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building United Hillcrest, Barangay 173, Caloocan City",
      "hgabPesos": 5000000,
      "nepPage": "574",
      "hgabPage": "660",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03052",
      "nepTitle": "Construction of Multi-Purpose Building, Zarraga, Iloilo (10.823044, 122.609778)",
      "nepPesos": 5500000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38298",
      "nepTitle": "Construction of Multi-Purpose building in Liloy, Zamboanga del Norte",
      "nepPesos": 12000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0868-014933",
      "hgabTitle": "Construction of Multi-Purpose building in Liloy, Zamboanga del Norte",
      "hgabPesos": 12000000,
      "nepPage": "654",
      "hgabPage": "868",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-05312",
      "nepTitle": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "nepPesos": 200000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0634-010323",
      "hgabTitle": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "hgabPesos": 200000000,
      "nepPage": "562",
      "hgabPage": "634",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39491",
      "nepTitle": "Construction of Multi-purpose Building , Barangay Dagang, Paracale, Camarines Norte",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0797-013554",
      "hgabTitle": "Construction of Multi-purpose Building , Barangay Dagang, Paracale, Camarines Norte",
      "hgabPesos": 5000000,
      "nepPage": "630",
      "hgabPage": "797",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34799",
      "nepTitle": "Construction of Multi-purpose building, Barangay Tue, Tadian, Mountain Province",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0697-011509",
      "hgabTitle": "Construction of Multi-purpose building, Barangay Tue, Tadian, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "583",
      "hgabPage": "697",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39139",
      "nepTitle": "Construction of Multipurpose Building in Barangay Tumpagon, Cagayan de Oro City, Misamis Oriental",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0873-015043",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Tumpagon, Cagayan de Oro City, Misamis Oriental",
      "hgabPesos": 10000000,
      "nepPage": "656",
      "hgabPage": "873",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34812",
      "nepTitle": "Construction of Western Uma Multi-Purpose Building, Barangay Western Uma, Lubuagan, Kalinga",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0698-011531",
      "hgabTitle": "Construction of Western Uma Multi-Purpose Building, Barangay Western Uma, Lubuagan, Kalinga",
      "hgabPesos": 5000000,
      "nepPage": "584",
      "hgabPage": "698",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35231",
      "nepTitle": "Construction of of Multi-Purpose Building, Barangay San Placido, Roxas, Isabela",
      "nepPesos": 100000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0635-010355",
      "hgabTitle": "Construction of of Multi-Purpose Building, Barangay San Placido, Roxas, Isabela",
      "hgabPesos": 100000000,
      "nepPage": "563",
      "hgabPage": "635",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35141",
      "nepTitle": "Construction(Completion) of Multi-Purpose Building, Barangay Gangalan, San Mariano, Isabela",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0713-011840",
      "hgabTitle": "Construction(Completion) of Multi-Purpose Building, Barangay Gangalan, San Mariano, Isabela",
      "hgabPesos": 7000000,
      "nepPage": "592",
      "hgabPage": "713",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-22738",
      "nepTitle": "Construction/Completion of Multi-Purpose Building, Barangay Maybunga, Pasig City",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0658-010743",
      "hgabTitle": "Construction/Completion of Multi-Purpose Building, Barangay Maybunga, Pasig City",
      "hgabPesos": 15000000,
      "nepPage": "573",
      "hgabPage": "658",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37666",
      "nepTitle": "Improvement of Moalboal Multi-Purpose Building at Barangay Poblacion West, Moalboal, Cebu",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0853-014650",
      "hgabTitle": "Improvement of Moalboal Multi-Purpose Building at Barangay Poblacion West, Moalboal, Cebu",
      "hgabPesos": 20000000,
      "nepPage": "647",
      "hgabPage": "853",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36222",
      "nepTitle": "Rehabilitation (Completion) of Multi-Purpose Building at Barangay Bagong Silang, Imus, Cavite",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0768-012961",
      "hgabTitle": "Rehabilitation (Completion) of Multi-Purpose Building at Barangay Bagong Silang, Imus, Cavite",
      "hgabPesos": 5000000,
      "nepPage": "615",
      "hgabPage": "768",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37437",
      "nepTitle": "Rehabilitation (Completion) of Multi-Purpose Building at Barangay Dulao, Bago City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0836-014311",
      "hgabTitle": "Rehabilitation (Completion) of Multi-Purpose Building at Barangay Dulao, Bago City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "644",
      "hgabPage": "836",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39170",
      "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Agusan, Cagayan de Oro City, Misamis Oriental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0875-015074",
      "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Agusan, Cagayan de Oro City, Misamis Oriental",
      "hgabPesos": 5000000,
      "nepPage": "657",
      "hgabPage": "875",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39171",
      "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bugo, Cagayan de Oro City, Misamis Oriental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0875-015075",
      "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Bugo, Cagayan de Oro City, Misamis Oriental",
      "hgabPesos": 6000000,
      "nepPage": "657",
      "hgabPage": "875",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39172",
      "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bulua, Cagayan de Oro City, Misamis Oriental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0874-015044",
      "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Bulua, Cagayan de Oro City, Misamis Oriental",
      "hgabPesos": 5000000,
      "nepPage": "656",
      "hgabPage": "874",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39173",
      "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Camaman-an, Cagayan de Oro City, Misamis Oriental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0875-015076",
      "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Camaman-an, Cagayan de Oro City, Misamis Oriental",
      "hgabPesos": 5000000,
      "nepPage": "657",
      "hgabPage": "875",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39175",
      "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0874-015046",
      "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Carmen, Cagayan de Oro City, Misamis Oriental",
      "hgabPesos": 10000000,
      "nepPage": "656",
      "hgabPage": "874",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39176",
      "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Consolacion, Cagayan de Oro City, Misamis Oriental",
      "nepPesos": 5500000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0875-015077",
      "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Consolacion, Cagayan de Oro City, Misamis Oriental",
      "hgabPesos": 5500000,
      "nepPage": "657",
      "hgabPage": "875",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39177",
      "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Cugman, Cagayan de Oro City, Misamis Oriental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0875-015078",
      "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Cugman, Cagayan de Oro City, Misamis Oriental",
      "hgabPesos": 5000000,
      "nepPage": "657",
      "hgabPage": "875",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39178",
      "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Dansolihon, Cagayan de Oro City, Misamis Oriental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0874-015047",
      "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Dansolihon, Cagayan de Oro City, Misamis Oriental",
      "hgabPesos": 5000000,
      "nepPage": "656",
      "hgabPage": "874",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39179",
      "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0875-015079",
      "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Lapasan, Cagayan de Oro City, Misamis Oriental",
      "hgabPesos": 6000000,
      "nepPage": "657",
      "hgabPage": "875",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39180",
      "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Macabalan, Cagayan de Oro City, Misamis Oriental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0875-015080",
      "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Macabalan, Cagayan de Oro City, Misamis Oriental",
      "hgabPesos": 5000000,
      "nepPage": "657",
      "hgabPage": "875",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39181",
      "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Mambuaya Cagayan de Oro City, Misamis Oriental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0874-015048",
      "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Mambuaya Cagayan de Oro City, Misamis Oriental",
      "hgabPesos": 6000000,
      "nepPage": "656",
      "hgabPage": "874",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39182",
      "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Tablon, Cagayan de Oro City, Misamis Oriental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0876-015081",
      "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Tablon, Cagayan de Oro City, Misamis Oriental",
      "hgabPesos": 5000000,
      "nepPage": "657",
      "hgabPage": "876",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-31397",
      "nepTitle": "Rehabilitation of La Colina Subdivision Multi-Purpose Building, Barangay Fortune, Marikina City",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38440",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Barangay Gym), Barangay San Vicente, Panabo City, Davao del Norte",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0893-015406",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building (Barangay Gym), Barangay San Vicente, Panabo City, Davao del Norte",
      "hgabPesos": 5000000,
      "nepPage": "666",
      "hgabPage": "893",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36270",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court) at Barangay Bacao, Taysan, Batangas",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0761-012828",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court) at Barangay Bacao, Taysan, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "613",
      "hgabPage": "761",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36271",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court) at Barangay Sico 1, San Juan, Batangas",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0761-012829",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court) at Barangay Sico 1, San Juan, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "613",
      "hgabPage": "761",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-23280",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Batiawan, Subic, Zambales (14.931047, 120.411425)",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35446",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Diniog, Dilasag, Aurora",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0725-012075",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Diniog, Dilasag, Aurora",
      "hgabPesos": 5000000,
      "nepPage": "594",
      "hgabPage": "725",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38894",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Mahay, Butuan City, Agusan del Norte",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0918-015886",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Mahay, Butuan City, Agusan del Norte",
      "hgabPesos": 10000000,
      "nepPage": "672",
      "hgabPage": "918",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38896",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Maon, Butuan City, Agusan del Norte",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0918-015888",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Maon, Butuan City, Agusan del Norte",
      "hgabPesos": 10000000,
      "nepPage": "673",
      "hgabPage": "918",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-11101",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Pamatawan, Subic, Zambales (14.92417645, 120.22210897)",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36534",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Pooc I, Silang, Cavite",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0770-012994",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Pooc I, Silang, Cavite",
      "hgabPesos": 10000000,
      "nepPage": "616",
      "hgabPage": "770",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34936",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Radiwan, Ivana Batanes",
      "nepPesos": 9000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0699-011555",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Radiwan, Ivana Batanes",
      "hgabPesos": 9000000,
      "nepPage": "584",
      "hgabPage": "699",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-11102",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay San Isidro, Subic, Zambales (14.86388044, 120.25723454)",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39132",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Sto. Niño, Municipality of Catarman, Province of Camiguin",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38904",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Taligaman, Butuan City, Agusan del Norte",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0918-015896",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Taligaman, Butuan City, Agusan del Norte",
      "hgabPesos": 10000000,
      "nepPage": "673",
      "hgabPage": "918",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39133",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Yumbing, Municipality of Mambajao, Province of Camiguin",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0876-015087",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, Municipality of Mambajao, Province of Camiguin",
      "hgabPesos": 26000000,
      "nepPage": "658",
      "hgabPage": "876",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-01273",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Sto. Niño, Catarman, Camiguin (124.6731227, 9.1492746)",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0877-015102",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Sto. Niño, Catarman, Camiguin (124.6731227, 9.1492746)",
      "hgabPesos": 5000000,
      "nepPage": "658",
      "hgabPage": "877",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-01274",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Yumbing, Mambajao, Camiguin (124.6636647, 9.2429296)",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0877-015103",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Yumbing, Mambajao, Camiguin (124.6636647, 9.2429296)",
      "hgabPesos": 5000000,
      "nepPage": "658",
      "hgabPage": "877",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38570",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Gymnasium), Barangay Bai Saripinang, Bagumbayan, Sultan Kudarat",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0914-015822",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building (Gymnasium), Barangay Bai Saripinang, Bagumbayan, Sultan Kudarat",
      "hgabPesos": 5000000,
      "nepPage": "671",
      "hgabPage": "914",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33605",
      "nepTitle": "Rehabilitation of Multi-Purpose Building Biñang 1st, Bocaue, Bulacan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0731-012216",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building Biñang 1st, Bocaue, Bulacan",
      "hgabPesos": 10000000,
      "nepPage": "598",
      "hgabPage": "731",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33602",
      "nepTitle": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0731-012217",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
      "hgabPesos": 10000000,
      "nepPage": "598",
      "hgabPage": "731",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33597",
      "nepTitle": "Rehabilitation of Multi-Purpose Building Taal, Bocaue, Bulacan",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0731-012218",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building Taal, Bocaue, Bulacan",
      "hgabPesos": 15000000,
      "nepPage": "598",
      "hgabPage": "731",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33594",
      "nepTitle": "Rehabilitation of Multi-Purpose Building Wakas, Bocaue, Bulacan",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0731-012219",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building Wakas, Bocaue, Bulacan",
      "hgabPesos": 10000000,
      "nepPage": "598",
      "hgabPage": "731",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28819",
      "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay 7, Lipa City Batangas",
      "nepPesos": 30000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0761-012831",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay 7, Lipa City Batangas",
      "hgabPesos": 30000000,
      "nepPage": "613",
      "hgabPage": "761",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33867",
      "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0762-012832",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
      "hgabPesos": 10000000,
      "nepPage": "613",
      "hgabPage": "762",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36422",
      "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay Narra, San Pedro City, Laguna",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0774-013082",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay Narra, San Pedro City, Laguna",
      "hgabPesos": 7000000,
      "nepPage": "618",
      "hgabPage": "774",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28748",
      "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay San Celestino, Lipa City, Batangas",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0762-012833",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay San Celestino, Lipa City, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "613",
      "hgabPage": "762",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33904",
      "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay Siena, Quezon City",
      "nepPesos": 18000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0662-010822",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay Siena, Quezon City",
      "hgabPesos": 18000000,
      "nepPage": "575",
      "hgabPage": "662",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35595",
      "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay Sto. Niño, Calumpit, Bulacan",
      "nepPesos": 13000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0731-012215",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay Sto. Niño, Calumpit, Bulacan",
      "hgabPesos": 13000000,
      "nepPage": "598",
      "hgabPage": "731",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37626",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay 1, Bacolod, City",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0831-014218",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay 1, Bacolod, City",
      "hgabPesos": 15000000,
      "nepPage": "641",
      "hgabPage": "831",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37627",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay 14, Bacolod City",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0831-014219",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay 14, Bacolod City",
      "hgabPesos": 5000000,
      "nepPage": "641",
      "hgabPage": "831",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37375",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay 3, Bacolod City",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0831-014222",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay 3, Bacolod City",
      "hgabPesos": 5000000,
      "nepPage": "641",
      "hgabPage": "831",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37383",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay 35, Bacolod City",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0832-014223",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay 35, Bacolod City",
      "hgabPesos": 6000000,
      "nepPage": "641",
      "hgabPage": "832",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37384",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay 39, Bacolod City",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37386",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Alangilan, Bacolod City",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0832-014225",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Alangilan, Bacolod City",
      "hgabPesos": 5000000,
      "nepPage": "642",
      "hgabPage": "832",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35675",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Atilano Ricardo, Bagac, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0728-012152",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Atilano Ricardo, Bagac, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "596",
      "hgabPage": "728",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36721",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Balete, San Nicolas, Batangas",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0757-012737",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Balete, San Nicolas, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "611",
      "hgabPage": "757",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35667",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Batangas II, Mariveles, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0729-012154",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Batangas II, Mariveles, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "596",
      "hgabPage": "729",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36495",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Calantipayan, Lopez, Quezon",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0786-013321",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Calantipayan, Lopez, Quezon",
      "hgabPesos": 5000000,
      "nepPage": "623",
      "hgabPage": "786",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35665",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Camaya, Mariveles, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0729-012156",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Camaya, Mariveles, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "596",
      "hgabPage": "729",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35204",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0703-011646",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "587",
      "hgabPage": "703",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36811",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Gomez, Lopez, Quezon",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0786-013322",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Gomez, Lopez, Quezon",
      "hgabPesos": 50000000,
      "nepPage": "623",
      "hgabPage": "786",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37372",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Granada, Bacolod City",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0832-014226",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Granada, Bacolod City",
      "hgabPesos": 20000000,
      "nepPage": "642",
      "hgabPage": "832",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35759",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Lalawigan, Samal, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0726-012099",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Lalawigan, Samal, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "594",
      "hgabPage": "726",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35653",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Luacan, Dinalupihan, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0729-012157",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Luacan, Dinalupihan, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "596",
      "hgabPage": "729",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35642",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Mabayo, Morong, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0729-012158",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Mabayo, Morong, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "596",
      "hgabPage": "729",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35663",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Malaya, Mariveles, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0729-012159",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Malaya, Mariveles, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "596",
      "hgabPage": "729",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39551",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Mambalite, Daet, Camarines Norte",
      "nepPesos": 5100000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0645-010493",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Mambalite, Daet, Camarines Norte",
      "hgabPesos": 5100000,
      "nepPage": "569",
      "hgabPage": "645",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37366",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Mandalagan, Bacolod City",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0832-014227",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Mandalagan, Bacolod City",
      "hgabPesos": 10000000,
      "nepPage": "642",
      "hgabPage": "832",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35641",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Nagbalayong, Morong, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0729-012160",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Nagbalayong, Morong, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "596",
      "hgabPage": "729",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38572",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0914-015823",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
      "hgabPesos": 5000000,
      "nepPage": "671",
      "hgabPage": "914",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35671",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Paysawan, Bagac, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0729-012161",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Paysawan, Bagac, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "596",
      "hgabPage": "729",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36723",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0757-012741",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "hgabPesos": 10000000,
      "nepPage": "611",
      "hgabPage": "757",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35638",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0729-012162",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "596",
      "hgabPage": "729",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35643",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Sabang, Morong, Bataan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0729-012163",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Sabang, Morong, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "596",
      "hgabPage": "729",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37373",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Villamonte, Bacolod City",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0832-014228",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Villamonte, Bacolod City",
      "hgabPesos": 15000000,
      "nepPage": "642",
      "hgabPage": "832",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33599",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Poblacion, Bocaue, Bulacan",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0732-012221",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Poblacion, Bocaue, Bulacan",
      "hgabPesos": 15000000,
      "nepPage": "598",
      "hgabPage": "732",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35582",
      "nepTitle": "Rehabilitation/Improvement of Multi-Purpose Building at Barangay Pinagbakahan, City of Malolos, Bulacan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0732-012222",
      "hgabTitle": "Rehabilitation/Improvement of Multi-Purpose Building at Barangay Pinagbakahan, City of Malolos, Bulacan",
      "hgabPesos": 5000000,
      "nepPage": "598",
      "hgabPage": "732",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36559",
      "nepTitle": "Rehabilitation/Improvement of Multi-Purpose Building, Barangay Balete, San Nicolas, Batangas",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0757-012746",
      "hgabTitle": "Rehabilitation/Improvement of Multi-Purpose Building, Barangay Balete, San Nicolas, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "611",
      "hgabPage": "757",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20272",
      "nepTitle": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
      "nepPesos": 25284000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0241-002393",
      "hgabTitle": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
      "hgabPesos": 25284000,
      "nepPage": "301",
      "hgabPage": "241",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20282",
      "nepTitle": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
      "nepPesos": 150000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0234-002261",
      "hgabTitle": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
      "hgabPesos": 150000000,
      "nepPage": "294",
      "hgabPage": "234",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32770",
      "nepTitle": "Alcala Bypass Road, Sta. 5+460 - Sta. 5+510, Cagayan",
      "nepPesos": 120000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0214-001899",
      "hgabTitle": "Alcala Bypass Road, Sta. 5+460 - Sta. 5+510, Cagayan",
      "hgabPesos": 120000000,
      "nepPage": "277",
      "hgabPage": "214",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20309",
      "nepTitle": "Alilem-Sugpon (Ilocos Sur)-Bakun (Benguet) Road, Sta. 0+000 - Sta. 12+000",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20406",
      "nepTitle": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22+183 - Sta. 24+733), Eastern Samar",
      "nepPesos": 59349000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0239-002352",
      "hgabTitle": "Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22 + 783 - Sta. 24 + 733), Eastern Samar",
      "hgabPesos": 265000000,
      "nepPage": "298",
      "hgabPage": "239",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20580",
      "nepTitle": "Balagtas Diversion Road, Sta.0+335.80 - Sta.0+383.80, Balagtas, Bulacan",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0216-001935",
      "hgabTitle": "Balagtas Diversion Road, Sta.0+335.80 - Sta.0+383.80, Balagtas, Bulacan",
      "hgabPesos": 100000000,
      "nepPage": "279",
      "hgabPage": "216",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-23894",
      "nepTitle": "Balete Bypass Road, Sta. 1+080.00 - Sta. 1+140.00, Aklan",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0222-002045",
      "hgabTitle": "Balete Bypass Road, Sta. 1+080.00 - Sta. 1+140.00, Aklan",
      "hgabPesos": 100000000,
      "nepPage": "282",
      "hgabPage": "222",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33041",
      "nepTitle": "Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25+569 - Sta. 25+942, Sta. 25+987 - Sta. 27+317, South Cotabato",
      "nepPesos": 122000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0228-002161",
      "hgabTitle": "Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25+569 - Sta. 25+942, Sta. 25+987 - Sta. 27+317, South Cotabato",
      "hgabPesos": 122000000,
      "nepPage": "289",
      "hgabPage": "228",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33042",
      "nepTitle": "Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25+942 - 25+987, South Cotabato",
      "nepPesos": 72000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33047",
      "nepTitle": "Banga-Tupi-Malungon Road (Banga-Tupi Section) - Sta. 17+285 - Sta. 17+316.5, South Cotabato",
      "nepPesos": 11970000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0233-002245",
      "hgabTitle": "Banga-Tupi-Malungon Road (Banga-Tupi Section) - Sta. 17+285 - Sta. 17+316.5, South Cotabato",
      "hgabPesos": 11970000,
      "nepPage": "293",
      "hgabPage": "233",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20769",
      "nepTitle": "Banga-Tupi-Malungon Road (Malungon-Tupi Section), Sta. 77+170 - Sta. 77+183 , Sarangani",
      "nepPesos": 1500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0233-002244",
      "hgabTitle": "Banga-Tupi-Malungon Road (Malungon-Tupi Section), Sta. 77+170 - Sta. 77+183 , Sarangani",
      "hgabPesos": 1500000,
      "nepPage": "292",
      "hgabPage": "233",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20644",
      "nepTitle": "Bantay-San Ildefonso Bypass Road, Ilocos Sur",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32893",
      "nepTitle": "Basey-Maydolong Road (Sta. 21+676 - Sta. 22+066, Sta. 28+276 - Sta. 30+960.13), Eastern Samar",
      "nepPesos": 300000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0223-002077",
      "hgabTitle": "Basey-Maydolong Road (Sta. 21+676 - Sta. 22+066, Sta. 28+276 - Sta. 30+960.13), Eastern Samar",
      "hgabPesos": 300000000,
      "nepPage": "284",
      "hgabPage": "223",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37905",
      "nepTitle": "Basey-Maydolong Road, Barangay Del Pilar, Maydolong, Eastern Samar",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0223-002078",
      "hgabTitle": "Basey-Maydolong Road, Barangay Del Pilar, Maydolong, Eastern Samar",
      "hgabPesos": 100000000,
      "nepPage": "284",
      "hgabPage": "223",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32888",
      "nepTitle": "Bato By-Pass Road, Sta. 2+501 - 3+059.01, Barangay Tabunok, Bato, Leyte",
      "nepPesos": 62070000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0223-002079",
      "hgabTitle": "Bato By-Pass Road, Sta. 2+501 - 3+059.01, Barangay Tabunok, Bato, Leyte",
      "hgabPesos": 62070000,
      "nepPage": "284",
      "hgabPage": "223",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-31734",
      "nepTitle": "Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union",
      "nepPesos": 119874000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0213-001876",
      "hgabTitle": "Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union",
      "hgabPesos": 119874000,
      "nepPage": "277",
      "hgabPage": "213",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20280",
      "nepTitle": "Besao-Tubo (via Tamboan) Road, Sta. 11+387 - Sta. 13+587, Besao, Mountain Province",
      "nepPesos": 119100000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0241-002397",
      "hgabTitle": "Besao-Tubo (via Tamboan) Road, Sta.11+387 - Sta.11+567, Besao, Mountain Province",
      "hgabPesos": 8600000,
      "nepPage": "295",
      "hgabPage": "241",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32767",
      "nepTitle": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
      "nepPesos": 480000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0214-001879",
      "hgabTitle": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
      "hgabPesos": 480000000,
      "nepPage": "277",
      "hgabPage": "214",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-31745",
      "nepTitle": "Bocaue-Balagtas Diversion Road, Sta. 3+900 - Sta. 3+976.43, Bulacan",
      "nepPesos": 50956000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0217-001949",
      "hgabTitle": "Bocaue-Balagtas Diversion Road, Sta. 3+900 - Sta. 3+976.43, Bulacan",
      "hgabPesos": 50956000,
      "nepPage": "279",
      "hgabPage": "217",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-31625",
      "nepTitle": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0233-002250",
      "hgabTitle": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
      "hgabPesos": 100000000,
      "nepPage": "294",
      "hgabPage": "233",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20313",
      "nepTitle": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
      "nepPesos": 107687000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0233-002251",
      "hgabTitle": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
      "hgabPesos": 107687000,
      "nepPage": "294",
      "hgabPage": "233",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20699",
      "nepTitle": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
      "nepPesos": 88100000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0223-002080",
      "hgabTitle": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
      "hgabPesos": 88100000,
      "nepPage": "284",
      "hgabPage": "223",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20460",
      "nepTitle": "Bukidnon-Compostela Valley Road, Namnam, San Fernando, Bukidnon-Laak, Compostela Valley, Sta. 1556+708 - Sta. 1560+120.05",
      "nepPesos": 220000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33051",
      "nepTitle": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0233-002247",
      "hgabTitle": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
      "hgabPesos": 20000000,
      "nepPage": "293",
      "hgabPage": "233",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38928",
      "nepTitle": "Butuan City West Diversion Road, Butuan City",
      "nepPesos": 300000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0228-002168",
      "hgabTitle": "Butuan City West Diversion Road, Butuan City",
      "hgabPesos": 300000000,
      "nepPage": "289",
      "hgabPage": "228",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20869",
      "nepTitle": "CDO-New Western Diversion Road (Kauswagan-Bonbon Section), Barangay Bonbon-Barangay Bayabas, Sta. 0+000 - Sta. 0+160, Sta. 0+224 - Sta. 0+271, Sta. 0+400 - Sta. 1+110, Sta. 1+540 - Sta. 1+970, Cagayan de Oro City",
      "nepPesos": 60000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0225-002112",
      "hgabTitle": "CDO-New Western Diversion Road (Kauswagan-Bonbon Section), Barangay Bonbon- Barangay Bayabas, Sta. 0+000 - Sta. 0+160, Sta. 0+224 - Sta. 0+271, Sta. 0+400 - Sta. 1+110, Sta. 1+540 - Sta. 1+970, Cagayan de Oro City",
      "hgabPesos": 60000000,
      "nepPage": "285",
      "hgabPage": "225",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-18726",
      "nepTitle": "Cadapaan Br. (B02112MN) along Marawi-Malabang Road",
      "nepPesos": 25000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0260-002681",
      "hgabTitle": "Cadapaan Br. (B02112MN) along Marawi-Malabang Road",
      "hgabPesos": 25000000,
      "nepPage": "314",
      "hgabPage": "260",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32755",
      "nepTitle": "Cagaluan Bypass Road, Sta. 0+500 - Sta. 2+500, Kalinga",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-31729",
      "nepTitle": "Cagaluan Bypass Road, Sta. 3+360 - Sta. 4+060, Kalinga",
      "nepPesos": 35000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0230-002191",
      "hgabTitle": "Cagaluan Bypass Road, Sta. 3+360 - Sta. 4+060, Kalinga",
      "hgabPesos": 35000000,
      "nepPage": "290",
      "hgabPage": "230",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20691",
      "nepTitle": "Caiguit-Cabungaan Diversion Road, (Sta.0+423 - Sta.0+507, Sta.0+816 - Sta.0+921, Sta.1+073 - Sta.1+203), Villaba, Leyte",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0232-002222",
      "hgabTitle": "Caiguit-Cabungaan Diversion Road, (Sta.0+423 - Sta.0+507, Sta.0+816 - Sta.0+921, Sta.1+073 - Sta.1+203), Villaba, Leyte",
      "hgabPesos": 5000000,
      "nepPage": "291",
      "hgabPage": "232",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33472",
      "nepTitle": "Cantao-an-Cogon Road leading to Naga Valley (NAVA) Industrial Park, Naga City, Cebu",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0434-006141",
      "hgabTitle": "Cantao-an-Cogon Road leading to Naga Valley (NAVA) Industrial Park, Naga City, Cebu",
      "hgabPesos": 30000000,
      "nepPage": "447",
      "hgabPage": "434",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20766",
      "nepTitle": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
      "nepPesos": 71400000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0228-002169",
      "hgabTitle": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
      "hgabPesos": 71400000,
      "nepPage": "289",
      "hgabPage": "228",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32465",
      "nepTitle": "Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac",
      "nepPesos": 400000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0235-002279",
      "hgabTitle": "Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac",
      "hgabPesos": 400000000,
      "nepPage": "295",
      "hgabPage": "235",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-18753",
      "nepTitle": "Capulong Br. (B01790LZ) along C-2 Road",
      "nepPesos": 1000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0273-002961",
      "hgabTitle": "Capulong Br. (B01790LZ) along C-2 Road",
      "hgabPesos": 1000000,
      "nepPage": "327",
      "hgabPage": "273",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20945",
      "nepTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela",
      "nepPesos": 138682000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0215-001908",
      "hgabTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela",
      "hgabPesos": 138682000,
      "nepPage": "278",
      "hgabPage": "215",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-31827",
      "nepTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 165 - Sta. 1+407, Sta. 1+669 - Sta. 2+154. Sta. 2+841 - Sta. 3+634, Isabela",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20576",
      "nepTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela",
      "nepPesos": 131318000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0215-001909",
      "hgabTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela",
      "hgabPesos": 131318000,
      "nepPage": "278",
      "hgabPage": "215",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20606",
      "nepTitle": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
      "nepPesos": 144726000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0215-001915",
      "hgabTitle": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
      "hgabPesos": 144726000,
      "nepPage": "278",
      "hgabPage": "215",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20613",
      "nepTitle": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
      "nepPesos": 143906000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0215-001916",
      "hgabTitle": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
      "hgabPesos": 143906000,
      "nepPage": "278",
      "hgabPage": "215",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-23832",
      "nepTitle": "Cawag-Philseco Bypass Road, Sta. 1+925 - Sta. 3+415.75, Zambales",
      "nepPesos": 44500000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0217-001943",
      "hgabTitle": "Cawag-Philseco Bypass Road, Sta. 1+925 - Sta. 3+600, Zambales",
      "hgabPesos": 80000000,
      "nepPage": "290",
      "hgabPage": "217",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20466",
      "nepTitle": "Columbio - Lutayan - Koronadal Road, Sta.12+501 - Sta.12+687, Sultan Kudarat",
      "nepPesos": 161820000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0240-002380",
      "hgabTitle": "Columbio - Lutayan - Koronadal Road, Sta.12+501 - Sta.12+687, Sultan Kudarat",
      "hgabPesos": 161820000,
      "nepPage": "300",
      "hgabPage": "240",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20467",
      "nepTitle": "Columbio - Lutayan - Koronadal Road, Sta.13+369 - Sta.13+663, Sultan Kudarat",
      "nepPesos": 255780000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0240-002381",
      "hgabTitle": "Columbio - Lutayan - Koronadal Road, Sta.13+369 - Sta.13+663, Sultan Kudarat",
      "hgabPesos": 255780000,
      "nepPage": "300",
      "hgabPage": "240",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20475",
      "nepTitle": "Columbio - Lutayan - Koronadal Road, Sta.20+310 - Sta.29+869, Sultan Kudarat",
      "nepPesos": 240000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0240-002382",
      "hgabTitle": "Columbio - Lutayan - Koronadal Road, Sta.20+310 - Sta.29+869, Sultan Kudarat",
      "hgabPesos": 240000000,
      "nepPage": "300",
      "hgabPage": "240",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35074",
      "nepTitle": "Concreting of Barangay Road at Sitio Agnaoan, Barangay Mabuno, Gattaran, Cagayan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0484-007153",
      "hgabTitle": "Concreting of Barangay Road at Sitio Agnaoan, Barangay Mabuno, Gattaran, Cagayan",
      "hgabPesos": 10000000,
      "nepPage": "475",
      "hgabPage": "484",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35075",
      "nepTitle": "Concreting of Barangay Road at Sitio Rissik, Barangay Mabuno, Gattaran, Cagayan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0484-007154",
      "hgabTitle": "Concreting of Barangay Road at Sitio Rissik, Barangay Mabuno, Gattaran, Cagayan",
      "hgabPesos": 10000000,
      "nepPage": "475",
      "hgabPage": "484",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35151",
      "nepTitle": "Concreting of Barangay Road, Barangay Nabaccayan, Gattaran, Cagayan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0484-007164",
      "hgabTitle": "Concreting of Barangay Road, Barangay Nabaccayan, Gattaran, Cagayan",
      "hgabPesos": 10000000,
      "nepPage": "475",
      "hgabPage": "484",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35149",
      "nepTitle": "Concreting of Barangay Road, Barangay Nassiping, Gattaran, Cagayan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0484-007165",
      "hgabTitle": "Concreting of Barangay Road, Barangay Nassiping, Gattaran, Cagayan",
      "hgabPesos": 10000000,
      "nepPage": "475",
      "hgabPage": "484",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39556",
      "nepTitle": "Concreting of Barangay Road, Barangay San Isidro, Daet, Camarines Norte",
      "nepPesos": 7500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0429-006051",
      "hgabTitle": "Concreting of Barangay Road, Barangay San Isidro, Daet, Camarines Norte",
      "hgabPesos": 7500000,
      "nepPage": "444",
      "hgabPage": "429",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35034",
      "nepTitle": "Concreting of Barangay Road, Barangay San Vicente, Buguey, Cagayan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0485-007168",
      "hgabTitle": "Concreting of Barangay Road, Barangay San Vicente, Buguey, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "475",
      "hgabPage": "485",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35299",
      "nepTitle": "Concreting of Quezon Road, Quezon, San Isidro, Isabela",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0497-007433",
      "hgabTitle": "Concreting of Quezon Road, Quezon, San Isidro, Isabela",
      "hgabPesos": 20000000,
      "nepPage": "481",
      "hgabPage": "497",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35099",
      "nepTitle": "Concreting of Road along Barangay Libertad, Abulug, Cagayan",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0485-007179",
      "hgabTitle": "Concreting of Road along Barangay Libertad, Abulug, Cagayan",
      "hgabPesos": 20000000,
      "nepPage": "476",
      "hgabPage": "485",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36052",
      "nepTitle": "Concreting of Road in Barangay Santa Cruz, Angat, Bulacan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0512-007746",
      "hgabTitle": "Concreting of Road in Barangay Santa Cruz, Angat, Bulacan",
      "hgabPesos": 10000000,
      "nepPage": "489",
      "hgabPage": "512",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-00478",
      "nepTitle": "Concreting of Road of Brgy. Guilingan to Brgy. Tappa, Brgy. Tappa, San Mariano, Isabela",
      "nepPesos": 9603000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0494-007362",
      "hgabTitle": "Concreting of Road of Barangay Guilingan to Barangay Tappa, Barangay Tappa, San Mariano, Isabela",
      "hgabPesos": 9603000,
      "nepPage": "479",
      "hgabPage": "494",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39520",
      "nepTitle": "Concreting of Road, Barangay Antipolo, Baao, Camarines Sur",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0563-008862",
      "hgabTitle": "Concreting of Road, Barangay Antipolo, Baao, Camarines Sur",
      "hgabPesos": 15000000,
      "nepPage": "521",
      "hgabPage": "563",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34900",
      "nepTitle": "Concreting of Road, Barangay Bimonton, Mallig, Isabela",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0492-007307",
      "hgabTitle": "Concreting of Road, Barangay Bimonton, Mallig, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "478",
      "hgabPage": "492",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37831",
      "nepTitle": "Concreting of Road, Barangay Bojo, Aloguinsan, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0585-009344",
      "hgabTitle": "Concreting of Road, Barangay Bojo, Aloguinsan, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "535",
      "hgabPage": "585",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37817",
      "nepTitle": "Concreting of Road, Barangay Cabadiangan, Alcantara, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0588-009413",
      "hgabTitle": "Concreting of Road, Barangay Cabadiangan, Alcantara, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "537",
      "hgabPage": "588",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37834",
      "nepTitle": "Concreting of Road, Barangay Capitan Claudio, Toledo City, Cebu",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0585-009346",
      "hgabTitle": "Concreting of Road, Barangay Capitan Claudio, Toledo City, Cebu",
      "hgabPesos": 10000000,
      "nepPage": "535",
      "hgabPage": "585",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37839",
      "nepTitle": "Concreting of Road, Barangay Curva, Medellin, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0586-009352",
      "hgabTitle": "Concreting of Road, Barangay Curva, Medellin, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "535",
      "hgabPage": "586",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39514",
      "nepTitle": "Concreting of Road, Barangay De La Fe and Barangay Salvacion, Buhi, Camarines Sur",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0563-008863",
      "hgabTitle": "Concreting of Road, Barangay De La Fe and Barangay Salvacion, Buhi, Camarines Sur",
      "hgabPesos": 50000000,
      "nepPage": "521",
      "hgabPage": "563",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37849",
      "nepTitle": "Concreting of Road, Barangay Ipil, Carmen, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0586-009364",
      "hgabTitle": "Concreting of Road, Barangay Ipil, Carmen, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "536",
      "hgabPage": "586",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37832",
      "nepTitle": "Concreting of Road, Barangay Kaluangan, Asturias, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0585-009347",
      "hgabTitle": "Concreting of Road, Barangay Kaluangan, Asturias, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "535",
      "hgabPage": "585",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37806",
      "nepTitle": "Concreting of Road, Barangay Kawasan, Aloguinsan, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0585-009348",
      "hgabTitle": "Concreting of Road, Barangay Kawasan, Aloguinsan, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "535",
      "hgabPage": "585",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37816",
      "nepTitle": "Concreting of Road, Barangay Lupa, Compostela, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0586-009365",
      "hgabTitle": "Concreting of Road, Barangay Lupa, Compostela, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "536",
      "hgabPage": "586",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37850",
      "nepTitle": "Concreting of Road, Barangay Manga, Alcantara, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0588-009415",
      "hgabTitle": "Concreting of Road, Barangay Manga, Alcantara, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "537",
      "hgabPage": "588",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37837",
      "nepTitle": "Concreting of Road, Barangay Maya, Daanbantayan, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0586-009355",
      "hgabTitle": "Concreting of Road, Barangay Maya, Daanbantayan, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "535",
      "hgabPage": "586",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34905",
      "nepTitle": "Concreting of Road, Barangay Minagbag, Quezon, Isabela",
      "nepPesos": 6000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0492-007320",
      "hgabTitle": "Concreting of Road, Barangay Minagbag, Quezon, Isabela",
      "hgabPesos": 6000000,
      "nepPage": "478",
      "hgabPage": "492",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37840",
      "nepTitle": "Concreting of Road, Barangay Poblacion, Tabuelan, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0586-009357",
      "hgabTitle": "Concreting of Road, Barangay Poblacion, Tabuelan, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "535",
      "hgabPage": "586",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37848",
      "nepTitle": "Concreting of Road, Barangay Puertobello, Tudela, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0586-009367",
      "hgabTitle": "Concreting of Road, Barangay Puertobello, Tudela, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "536",
      "hgabPage": "586",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35371",
      "nepTitle": "Concreting of Road, Barangay San Antonio, Roxas, Isabela",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0492-007322",
      "hgabTitle": "Concreting of Road, Barangay San Antonio, Roxas, Isabela",
      "hgabPesos": 30000000,
      "nepPage": "478",
      "hgabPage": "492",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39515",
      "nepTitle": "Concreting of Road, Barangay San Francisco - Barangay Sta. Eulalia, Baao, Camarines Sur",
      "nepPesos": 80000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0430-006063",
      "hgabTitle": "Concreting of Road, Barangay San Francisco - Barangay Sta. Eulalia, Baao, Camarines Sur",
      "hgabPesos": 80000000,
      "nepPage": "444",
      "hgabPage": "430",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34913",
      "nepTitle": "Concreting of Road, Barangay San Jose, Quirino, Isabela",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0492-007325",
      "hgabTitle": "Concreting of Road, Barangay San Jose, Quirino, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "478",
      "hgabPage": "492",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34891",
      "nepTitle": "Concreting of Road, Barangay San Miguel, Luna, Isabela",
      "nepPesos": 6000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34912",
      "nepTitle": "Concreting of Road, Barangay San Vicente, Quirino, Isabela",
      "nepPesos": 6000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0492-007327",
      "hgabTitle": "Concreting of Road, Barangay San Vicente, Quirino, Isabela",
      "hgabPesos": 6000000,
      "nepPage": "478",
      "hgabPage": "492",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37827",
      "nepTitle": "Concreting of Road, Barangay Tulang, Argao, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0584-009315",
      "hgabTitle": "Concreting of Road, Barangay Tulang, Argao, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "534",
      "hgabPage": "584",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37765",
      "nepTitle": "Concreting of Road, North Poblacion, San Fernando, Cebu",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0583-009301",
      "hgabTitle": "Concreting of Road, North Poblacion, San Fernando, Cebu",
      "hgabPesos": 10000000,
      "nepPage": "534",
      "hgabPage": "583",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38527",
      "nepTitle": "Concreting of Road, Padada, Davao del Sur",
      "nepPesos": 40000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37686",
      "nepTitle": "Concreting of Tomonoy-Agbalanga Road at Barangay Tomonoy and Agbalanga, Moalboal, Cebu",
      "nepPesos": 7000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0589-009424",
      "hgabTitle": "Concreting of Tomonoy-Agbalanga Road at Barangay Tomonoy and Agbalanga, Moalboal, Cebu",
      "hgabPesos": 7000000,
      "nepPage": "538",
      "hgabPage": "589",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35300",
      "nepTitle": "Concreting of Villaflor Road, Villaflor, San Isidro, Isabela",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0497-007435",
      "hgabTitle": "Concreting of Villaflor Road, Villaflor, San Isidro, Isabela",
      "hgabPesos": 15000000,
      "nepPage": "481",
      "hgabPage": "497",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33546",
      "nepTitle": "Construction of Access Road leading to Sitio of Pines, Tubaday, Santol, La Union",
      "nepPesos": 75000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0414-005727",
      "hgabTitle": "Construction of Access Road leading to Sitio of Pines, Tubaday, Santol, La Union",
      "hgabPesos": 75000000,
      "nepPage": "434",
      "hgabPage": "414",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35376",
      "nepTitle": "Construction of Andabuen-Ara-Capuseran Road, Barangay Andabuen-Ara-Capuseran, Benito Soliven, Isabela",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0496-007397",
      "hgabTitle": "Construction of Andabuen-Ara-Capuseran Road, Barangay Andabuen-Ara-Capuseran, Benito Soliven, Isabela",
      "hgabPesos": 50000000,
      "nepPage": "480",
      "hgabPage": "496",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34778",
      "nepTitle": "Construction of Apao, Tineg - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub, Abra",
      "nepPesos": 144039000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0416-005778",
      "hgabTitle": "Construction of Apao, Tineg - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub, Abra",
      "hgabPesos": 144039000,
      "nepPage": "435",
      "hgabPage": "416",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34779",
      "nepTitle": "Construction of Bacag - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub Abra",
      "nepPesos": 142837000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0416-005779",
      "hgabTitle": "Construction of Bacag - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub Abra",
      "hgabPesos": 142837000,
      "nepPage": "435",
      "hgabPage": "416",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-05775",
      "nepTitle": "Construction of Bacawan-Buhay na Tubig-Calima Road, Pola, Oriental Mindoro",
      "nepPesos": 120000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0428-006013",
      "hgabTitle": "Construction of Bacawan-Buhay na Tubig-Calima Road, Pola, Oriental Mindoro",
      "hgabPesos": 120000000,
      "nepPage": "442",
      "hgabPage": "428",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-23281",
      "nepTitle": "Construction of Bagong Buhay Road, Naujan, Oriental Mindoro",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0552-008616",
      "hgabTitle": "Construction of Bagong Buhay Road, Naujan, Oriental Mindoro",
      "hgabPesos": 30000000,
      "nepPage": "514",
      "hgabPage": "552",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34634",
      "nepTitle": "Construction of Barangay Mongol to Barangay Talboc Access Road, Mongol, Mayoyao, Ifugao",
      "nepPesos": 40000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0479-007031",
      "hgabTitle": "Construction of Barangay Mongol to Barangay Talboc Access Road, Mongol, Mayoyao, Ifugao",
      "hgabPesos": 40000000,
      "nepPage": "471",
      "hgabPage": "479",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34633",
      "nepTitle": "Construction of Barangay Nalbu Access Road, Nalbu, Mayoyao, Ifugao",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0479-007033",
      "hgabTitle": "Construction of Barangay Nalbu Access Road, Nalbu, Mayoyao, Ifugao",
      "hgabPesos": 5000000,
      "nepPage": "471",
      "hgabPage": "479",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33853",
      "nepTitle": "Construction of Barangay Road at Barangay Marawoy, Lipa City, Batangas",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0540-008355",
      "hgabTitle": "Construction of Barangay Road at Barangay Marawoy, Lipa City, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "507",
      "hgabPage": "540",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35318",
      "nepTitle": "Construction of Barangay Road, Barangay Estrella, San Mateo, Isabela",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0496-007401",
      "hgabTitle": "Construction of Barangay Road, Barangay Estrella, San Mateo, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "480",
      "hgabPage": "496",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39504",
      "nepTitle": "Construction of Barangay Road, Barangay Lugui, Labo, Camarines Norte",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0559-008781",
      "hgabTitle": "Construction of Barangay Road, Barangay Lugui, Labo, Camarines Norte",
      "hgabPesos": 30000000,
      "nepPage": "519",
      "hgabPage": "559",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35311",
      "nepTitle": "Construction of Barangay Road, Barangay Minallo, Naguilian, Isabela",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0496-007402",
      "hgabTitle": "Construction of Barangay Road, Barangay Minallo, Naguilian, Isabela",
      "hgabPesos": 20000000,
      "nepPage": "480",
      "hgabPage": "496",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35312",
      "nepTitle": "Construction of Barangay Road, Barangay Rang-ayan, Naguilian, Isabela",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0496-007403",
      "hgabTitle": "Construction of Barangay Road, Barangay Rang-ayan, Naguilian, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "480",
      "hgabPage": "496",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39502",
      "nepTitle": "Construction of Barangay Road, Barangay Villa Belen, Capalonga, Camarines Norte",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0559-008784",
      "hgabTitle": "Construction of Barangay Road, Barangay Villa Belen, Capalonga, Camarines Norte",
      "hgabPesos": 30000000,
      "nepPage": "519",
      "hgabPage": "559",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35315",
      "nepTitle": "Construction of Barangay Road, Barangay Villa Cruz, San Mateo, Isabela",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0496-007406",
      "hgabTitle": "Construction of Barangay Road, Barangay Villa Cruz, San Mateo, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "480",
      "hgabPage": "496",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-00473",
      "nepTitle": "Construction of Barangay Road, Guilingan to Tappa, Barangay Guilingan, Benito Soliven, Isabela",
      "nepPesos": 9795000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0496-007409",
      "hgabTitle": "Construction of Barangay Road, Guilingan to Tappa, Barangay Guilingan, Benito Soliven, Isabela",
      "hgabPesos": 9795000,
      "nepPage": "480",
      "hgabPage": "496",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39499",
      "nepTitle": "Construction of Barangay Road, Tulay na Lupa, Labo, Camarines Norte",
      "nepPesos": 40000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0559-008786",
      "hgabTitle": "Construction of Barangay Road, Tulay na Lupa, Labo, Camarines Norte",
      "hgabPesos": 40000000,
      "nepPage": "519",
      "hgabPage": "559",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-02647",
      "nepTitle": "Construction of Cag-abaca - Cularima - General Malvar Road, Sta. 002+584.50 - Sta. 002+972, Catarman, Northern Samar",
      "nepPesos": 60000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0435-006162",
      "hgabTitle": "Construction of Cag-abaca - Cularima - General Malvar Road, Sta. 002+584.50 - Sta. 002+972, Catarman, Northern Samar",
      "hgabPesos": 60000000,
      "nepPage": "448",
      "hgabPage": "435",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-00630",
      "nepTitle": "Construction of Camiling - Bayambang Diversion Road (Segment 2), Camiling, Tarlac",
      "nepPesos": 13500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0534-008214",
      "hgabTitle": "Construction of Camiling - Bayambang Diversion Road (Segment 2), Camiling, Tarlac",
      "hgabPesos": 13500000,
      "nepPage": "502",
      "hgabPage": "534",
      "chainageStatus": "not stated",
      "trancheStatus": "same tranche",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33527",
      "nepTitle": "Construction of Canubing I - Balingayan Road, City of Calapan, Oriental Mindoro",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0552-008617",
      "hgabTitle": "Construction of Canubing I - Balingayan Road, City of Calapan, Oriental Mindoro",
      "hgabPesos": 30000000,
      "nepPage": "514",
      "hgabPage": "552",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10834",
      "nepTitle": "Construction of Clark - Mabalacat Access Road, Mabalacat City, Pampanga (Sta. 0+000 to Sta. 1+100)",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0420-005862",
      "hgabTitle": "Construction of Clark - Mabalacat Access Road, Mabalacat City, Pampanga (Sta. 0+000 to Sta. 1+100)",
      "hgabPesos": 100000000,
      "nepPage": "437",
      "hgabPage": "420",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36486",
      "nepTitle": "Construction of Cogorin Ilaya to Binahian B. Barangay Road, Lopez, Quezon",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0549-008557",
      "hgabTitle": "Construction of Cogorin Ilaya to Binahian B. Barangay Road, Sta. 0+400 - Sta. 1+000, Lopez, Quezon",
      "hgabPesos": 20000000,
      "nepPage": "512",
      "hgabPage": "549",
      "chainageStatus": "incomplete",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32897",
      "nepTitle": "Construction of Diversion Road, Brgy. Alvenda, Mutia - Pob. Sergio Osmeña Sr. Road, Zamboanga del Norte - Sta. 7+872 - Sta. 8+308, Sta. 9+540 - Sta. 9+660.84",
      "nepPesos": 131900000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0224-002094",
      "hgabTitle": "Construction of Diversion Road, Barangay Alvenda, Mutia - Pob. Sergio Osmeña Sr. Road, Zamboanga del Norte - Sta. 7+872 - Sta. 8+308, Sta. 9+540 - Sta. 9+660.84",
      "hgabPesos": 131900000,
      "nepPage": "284",
      "hgabPage": "224",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32896",
      "nepTitle": "Construction of Diversion Road, Brgy. Banonong, Dapitan City - Pob. Sibutad Road, Zamboanga del Norte - Sta. 0+000 - Sta. 0+285, Sta. 2+897.10 - Sta. 3+187, Sta. 12+823 - Sta. 12+853",
      "nepPesos": 28108000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0232-002226",
      "hgabTitle": "Construction of Diversion Road, Barangay Banonong, Dapitan City - Pob. Sibutad Road, Zamboanga del Norte - Sta. 0+000 - Sta. 0+285, Sta. 2+897.10 - Sta. 3+187, Sta. 12+823 - Sta. 12+853",
      "hgabPesos": 28108000,
      "nepPage": "292",
      "hgabPage": "232",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34774",
      "nepTitle": "Construction of Guinzadan Central Road, Barangay Guinzadan Central, Bauko, Mountain Province",
      "nepPesos": 13000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0480-007066",
      "hgabTitle": "Construction of Guinzadan Central Road, Barangay Guinzadan Central, Bauko, Mountain Province",
      "hgabPesos": 13000000,
      "nepPage": "472",
      "hgabPage": "480",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34485",
      "nepTitle": "Construction of Local Road, Barangay Bongato East, Bayambang, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0475-006951",
      "hgabTitle": "Construction of Local Road, Barangay Bongato East, Bayambang, Pangasinan",
      "hgabPesos": 10000000,
      "nepPage": "468",
      "hgabPage": "475",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34469",
      "nepTitle": "Construction of Local Road, Barangay Taloyan, Malasiqui, Pangasinan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0475-006952",
      "hgabTitle": "Construction of Local Road, Barangay Taloyan, Malasiqui, Pangasinan",
      "hgabPesos": 10000000,
      "nepPage": "468",
      "hgabPage": "475",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34417",
      "nepTitle": "Construction of Local Road, Barangay Telbang, Bayambang, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0475-006953",
      "hgabTitle": "Construction of Local Road, Barangay Telbang, Bayambang, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "469",
      "hgabPage": "475",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39101",
      "nepTitle": "Construction of Local Roads at Barangay Indahag, Cagayan de Oro City",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0608-009824",
      "hgabTitle": "Construction of Local Roads at Barangay Indahag, Cagayan de Oro City",
      "hgabPesos": 10000000,
      "nepPage": "549",
      "hgabPage": "608",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37029",
      "nepTitle": "Construction of Looban - Upper Dapawan Access Road, Odiongan, Romblon",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0556-008714",
      "hgabTitle": "Construction of Looban - Upper Dapawan Access Road, Odiongan, Romblon",
      "hgabPesos": 20000000,
      "nepPage": "517",
      "hgabPage": "556",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33807",
      "nepTitle": "Construction of Mabini-Bauan-San Luis-Lemery Road, Batangas",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0426-005974",
      "hgabTitle": "Construction of Mabini-Bauan-San Luis-Lemery Road, Batangas",
      "hgabPesos": 100000000,
      "nepPage": "441",
      "hgabPage": "426",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09265",
      "nepTitle": "Construction of Magpet (Pangao-An - Don Panaca) to Davao City Via Salaysay (Indawhong-Ballah-Masawang) to Lumondao (Junction Bukidnon to Davao) Road, Cotabato",
      "nepPesos": 36000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0620-010060",
      "hgabTitle": "Construction of Magpet (Pangao-An - Don Panaca) to Davao City Via Salaysay (Indawhong-Ballah-Masawang) to Lumondao (Junction Bukidnon to Davao) Road, Cotabato",
      "hgabPesos": 36000000,
      "nepPage": "554",
      "hgabPage": "620",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34606",
      "nepTitle": "Construction of Makilo-Aselap Road, Barangay Calaccad, Tabuk City, Kalinga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0480-007055",
      "hgabTitle": "Construction of Makilo-Aselap Road, Barangay Calaccad, Tabuk City, Kalinga",
      "hgabPesos": 5000000,
      "nepPage": "472",
      "hgabPage": "480",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37426",
      "nepTitle": "Construction of Najalin Relocation Site Road, Barangay Nagasi, La Carlota City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0578-009173",
      "hgabTitle": "Construction of Najalin Relocation Site Road, Barangay Nagasi, La Carlota City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "531",
      "hgabPage": "578",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37423",
      "nepTitle": "Construction of Nanas-Batuan Road, Barangay Bagonawa and Barangay Batuan, Municipality of San Enrique, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0578-009175",
      "hgabTitle": "Construction of Nanas-Batuan Road, Barangay Bagonawa and Barangay Batuan, Municipality of San Enrique, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "531",
      "hgabPage": "578",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39485",
      "nepTitle": "Construction of Pantao - Moroponros Road, Oas, Albay",
      "nepPesos": 70000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0431-006073",
      "hgabTitle": "Construction of Pantao - Moroponros Road, Oas, Albay",
      "hgabPesos": 70000000,
      "nepPage": "444",
      "hgabPage": "431",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37671",
      "nepTitle": "Construction of Patong-Basak Road at Barangay Patong, Badian, Cebu",
      "nepPesos": 32000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0589-009429",
      "hgabTitle": "Construction of Patong-Basak Road at Barangay Patong, Badian, Cebu",
      "hgabPesos": 15000000,
      "nepPage": "538",
      "hgabPage": "589",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09655",
      "nepTitle": "Construction of Poblacion Bypass Road, General Trias City, Cavite",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0426-005977",
      "hgabTitle": "Construction of Poblacion Bypass Road, General Trias City, Cavite",
      "hgabPesos": 100000000,
      "nepPage": "441",
      "hgabPage": "426",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34736",
      "nepTitle": "Construction of Poblacion, Pidigan Road, Barangay Poblacion, Pidigan, Abra",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0417-005799",
      "hgabTitle": "Rehabilitation of Poblacion, Pidigan Road, Barangay Poblacion, Pidigan, Abra",
      "hgabPesos": 100000000,
      "nepPage": "435",
      "hgabPage": "417",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-02679",
      "nepTitle": "Construction of Quezon to Magsaysay Road (Sta. 1+200 - Sta. 3+450), Mapanas, Northern Samar",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0436-006186",
      "hgabTitle": "Construction of Quezon to Magsaysay Road (Sta. 2+250 - Sta. 4+500), Mapanas, Northern Samar",
      "hgabPesos": 100000000,
      "nepPage": "448",
      "hgabPage": "436",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37656",
      "nepTitle": "Construction of Road (Sta. 0- Sta. 580, Sta. 3+470 - Sta. 4+738) Jct. Ruins to Banoceh, Talisay, Negros Occidental (10.7150581, 122.9615514)",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0575-009110",
      "hgabTitle": "Construction of Road (Sta. 0- Sta. 580, Sta. 3+470 - Sta. 4+738) Jct. Ruins to Banoceh, Talisay, Negros Occidental (10.7150581, 122.9615514)",
      "hgabPesos": 50000000,
      "nepPage": "528",
      "hgabPage": "575",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38061",
      "nepTitle": "Construction of Road (Sta. 1+210 - Sta. 1+775) in Barangay Inamlan, Laoang, Northern Samar",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0597-009593",
      "hgabTitle": "Construction of Road (Sta. 1+404 - Sta. 1+969) in Barangay Inamlan, Laoang, Northern Samar",
      "hgabPesos": 30000000,
      "nepPage": "542",
      "hgabPage": "597",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36930",
      "nepTitle": "Construction of Road Along Barangay Balite, City of Calapan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0553-008635",
      "hgabTitle": "Construction of Road Along Barangay Balite, City of Calapan, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "515",
      "hgabPage": "553",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36937",
      "nepTitle": "Construction of Road Along Barangay Caagutayan, San Teodoro, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0553-008637",
      "hgabTitle": "Construction of Road Along Barangay Caagutayan, San Teodoro, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "515",
      "hgabPage": "553",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36934",
      "nepTitle": "Construction of Road Along Barangay Canubing 2, City of Calapan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0553-008638",
      "hgabTitle": "Construction of Road Along Barangay Canubing 2, City of Calapan, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "515",
      "hgabPage": "553",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36936",
      "nepTitle": "Construction of Road Along Barangay Managpi, City of Calapan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0553-008640",
      "hgabTitle": "Construction of Road Along Barangay Managpi, City of Calapan, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "515",
      "hgabPage": "553",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36931",
      "nepTitle": "Construction of Road Along Barangay Pachoca, City of Calapan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0553-008642",
      "hgabTitle": "Construction of Road Along Barangay Pachoca, City of Calapan, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "515",
      "hgabPage": "553",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36933",
      "nepTitle": "Construction of Road Along Barangay Parang, City of Calapan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0553-008643",
      "hgabTitle": "Construction of Road Along Barangay Parang, City of Calapan, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "515",
      "hgabPage": "553",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36928",
      "nepTitle": "Construction of Road Along Barangay Sta. Rita, City of Calapan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0553-008645",
      "hgabTitle": "Construction of Road Along Barangay Sta. Rita, City of Calapan, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "515",
      "hgabPage": "553",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35887",
      "nepTitle": "Construction of Road Barangay Balbalino, Guimba, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0518-007859",
      "hgabTitle": "Construction of Road Barangay Balbalino, Guimba, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "494",
      "hgabPage": "518",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35888",
      "nepTitle": "Construction of Road Barangay Batitang, Zaragoza, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0519-007890",
      "hgabTitle": "Construction of Road Barangay Batitang, Zaragoza, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "494",
      "hgabPage": "519",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-00474",
      "nepTitle": "Construction of Road Barangay San Jose to Barangay Casala, San Mariano, Isabela",
      "nepPesos": 14844000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0496-007412",
      "hgabTitle": "Construction of Road Barangay San Jose to Barangay Casala, San Mariano, Isabela",
      "hgabPesos": 14844000,
      "nepPage": "480",
      "hgabPage": "496",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35732",
      "nepTitle": "Construction of Road Concreting at Sitio Lingunan, Barangay Partida, Norzagaray, Bulacan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0513-007766",
      "hgabTitle": "Construction of Road Concreting at Sitio Lingunan, Barangay Partida, Norzagaray, Bulacan",
      "hgabPesos": 5000000,
      "nepPage": "490",
      "hgabPage": "513",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37792",
      "nepTitle": "Construction of Road Slope Protection Structure, Barangay Buot, Cebu City, Cebu",
      "nepPesos": 40000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0590-009445",
      "hgabTitle": "Construction of Road Slope Protection Structure, Barangay Buot, Cebu City, Cebu",
      "hgabPesos": 40000000,
      "nepPage": "539",
      "hgabPage": "590",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37788",
      "nepTitle": "Construction of Road Slope Protection Structure, Barangay Sudlon I, Cebu City, Cebu",
      "nepPesos": 40000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0590-009457",
      "hgabTitle": "Construction of Road Slope Protection Structure, Barangay Sudlon I, Cebu City, Cebu",
      "hgabPesos": 40000000,
      "nepPage": "539",
      "hgabPage": "590",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-08083",
      "nepTitle": "Construction of Road Slope Protection Structure, Sta. 2+800 - Sta. 2+850.00 Barangay Bonbon, Cebu City, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28790",
      "nepTitle": "Construction of Road at Barangay Anilao Labac, Lipa City, Batangas",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0541-008360",
      "hgabTitle": "Construction of Road at Barangay Anilao Labac, Lipa City, Batangas",
      "hgabPesos": 10000000,
      "nepPage": "507",
      "hgabPage": "541",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37048",
      "nepTitle": "Construction of Road at Barangay Anilao, Bongabong, Oriental Mindoro",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0557-008724",
      "hgabTitle": "Construction of Road at Barangay Anilao, Bongabong, Oriental Mindoro",
      "hgabPesos": 10000000,
      "nepPage": "517",
      "hgabPage": "557",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37049",
      "nepTitle": "Construction of Road at Barangay Bagong Bayan II, Bongabong, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0557-008725",
      "hgabTitle": "Construction of Road at Barangay Bagong Bayan II, Bongabong, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "517",
      "hgabPage": "557",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35271",
      "nepTitle": "Construction of Road at Barangay Balasig, Cabagan, Isabela",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0490-007283",
      "hgabTitle": "Construction of Road at Barangay Balasig, Cabagan, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "477",
      "hgabPage": "490",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37070",
      "nepTitle": "Construction of Road at Barangay Balatasan, Bulalacao, Oriental Mindoro",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0557-008727",
      "hgabTitle": "Construction of Road at Barangay Balatasan, Bulalacao, Oriental Mindoro",
      "hgabPesos": 20000000,
      "nepPage": "517",
      "hgabPage": "557",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35198",
      "nepTitle": "Construction of Road at Barangay Caliguian, Burgos, Isabela",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0493-007333",
      "hgabTitle": "Construction of Road at Barangay Caliguian, Burgos, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "479",
      "hgabPage": "493",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37050",
      "nepTitle": "Construction of Road at Barangay Cawayan, Bongabong, Oriental Mindoro",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0557-008728",
      "hgabTitle": "Construction of Road at Barangay Cawayan, Bongabong, Oriental Mindoro",
      "hgabPesos": 10000000,
      "nepPage": "517",
      "hgabPage": "557",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33846",
      "nepTitle": "Construction of Road at Barangay Lumbang, Lipa City, Batangas",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0426-005987",
      "hgabTitle": "Construction of Road at Barangay Lumbang, Lipa City, Batangas",
      "hgabPesos": 100000000,
      "nepPage": "441",
      "hgabPage": "426",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35590",
      "nepTitle": "Construction of Road at Barangay Paltao, Pulilan, Bulacan",
      "nepPesos": 13000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0508-007664",
      "hgabTitle": "Construction of Road and Drainage Canal at Barangay Paltao, Pulilan, Bulacan",
      "hgabPesos": 13000000,
      "nepPage": "486",
      "hgabPage": "508",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09687",
      "nepTitle": "Construction of Road at Barangay Poblacion 5, Amadeo, Cavite",
      "nepPesos": 6300000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0544-008432",
      "hgabTitle": "Construction of Road at Barangay Poblacion 5, Amadeo, Cavite",
      "hgabPesos": 6300000,
      "nepPage": "509",
      "hgabPage": "544",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33622",
      "nepTitle": "Construction of Road at Barangay Pulong Yantok, Angat, Bulacan",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0513-007764",
      "hgabTitle": "Construction of Road at Barangay Pulong Yantok, Angat, Bulacan",
      "hgabPesos": 20000000,
      "nepPage": "490",
      "hgabPage": "513",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28814",
      "nepTitle": "Construction of Road at Barangay San Guillermo, Lipa City, Batangas",
      "nepPesos": 12000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0541-008366",
      "hgabTitle": "Construction of Road at Barangay San Guillermo, Lipa City, Batangas",
      "hgabPesos": 12000000,
      "nepPage": "507",
      "hgabPage": "541",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09692",
      "nepTitle": "Construction of Road at Barangay Tamacan, Amadeo, Cavite",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0544-008433",
      "hgabTitle": "Construction of Road at Barangay Tamacan, Amadeo, Cavite",
      "hgabPesos": 15000000,
      "nepPage": "509",
      "hgabPage": "544",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35272",
      "nepTitle": "Construction of Road at Barangay Union, Cabagan, Isabela",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0490-007284",
      "hgabTitle": "Construction of Road at Barangay Union, Cabagan, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "477",
      "hgabPage": "490",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36071",
      "nepTitle": "Construction of Road at Cabetican, Bacolor, Pampanga",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0526-008036",
      "hgabTitle": "Construction of Road at Cabetican, Bacolor, Pampanga",
      "hgabPesos": 10000000,
      "nepPage": "498",
      "hgabPage": "526",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35294",
      "nepTitle": "Construction of Road at Nagbukel, Nagbukel, San Isidro, Isabela",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0500-007494",
      "hgabTitle": "Construction of Road at Nagbukel, Nagbukel, San Isidro, Isabela",
      "hgabPesos": 15000000,
      "nepPage": "482",
      "hgabPage": "500",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39105",
      "nepTitle": "Construction of Road at Purok 8, Upper Puerto, Barangay Puerto, Cagayan de Oro City",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0608-009828",
      "hgabTitle": "Construction of Road at Upper Puerto, Barangay Puerto, Cagayan de Oro City",
      "hgabPesos": 10000000,
      "nepPage": "549",
      "hgabPage": "608",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35302",
      "nepTitle": "Construction of Road at Rizal West, San Isidro, Isabela",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0500-007495",
      "hgabTitle": "Construction of Road at Rizal West, San Isidro, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "482",
      "hgabPage": "500",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35303",
      "nepTitle": "Construction of Road at Victoria, San Isidro, Isabela",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0500-007496",
      "hgabTitle": "Construction of Road at Victoria, San Isidro, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "482",
      "hgabPage": "500",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39529",
      "nepTitle": "Construction of Road in Awayan, Sipocot, Camarines Sur",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0559-008787",
      "hgabTitle": "Construction of Road in Awayan, Sipocot, Camarines Sur",
      "hgabPesos": 10000000,
      "nepPage": "519",
      "hgabPage": "559",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38299",
      "nepTitle": "Construction of Road in Barangay Dalaon, Molave, Zamboanga del Sur",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0603-009723",
      "hgabTitle": "Construction of Road in Barangay Dalaon, Molave, Zamboanga del Sur",
      "hgabPesos": 15000000,
      "nepPage": "546",
      "hgabPage": "603",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38279",
      "nepTitle": "Construction of Road in Barangay Dao, Pagadian City, Zamboanga del Sur",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0604-009724",
      "hgabTitle": "Construction of Road in Barangay Dao, Pagadian City, Zamboanga del Sur",
      "hgabPesos": 20000000,
      "nepPage": "546",
      "hgabPage": "604",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36594",
      "nepTitle": "Construction of Road in Barangay Ping-As, Alitagtag, Batangas",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0539-008315",
      "hgabTitle": "Construction of Road in Barangay Ping-As, Alitagtag, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "506",
      "hgabPage": "539",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39528",
      "nepTitle": "Construction of Road in Lipilip, Sipocot, Camarines Sur",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0560-008789",
      "hgabTitle": "Construction of Road in Lipilip, Sipocot, Camarines Sur",
      "hgabPesos": 10000000,
      "nepPage": "519",
      "hgabPage": "560",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35396",
      "nepTitle": "Construction of Road of Barangay Roxas, Naguilian, Isabela",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0496-007413",
      "hgabTitle": "Construction of Road of Barangay Roxas, Naguilian, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "480",
      "hgabPage": "496",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-00450",
      "nepTitle": "Construction of Road of Barangay Songsong, Gamu to Barangay Tomines, Naguilian, Isabela",
      "nepPesos": 9896000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0496-007414",
      "hgabTitle": "Construction of Road of Barangay Songsong, Gamu to Barangay Tomines, Naguilian, Isabela",
      "hgabPesos": 9896000,
      "nepPage": "480",
      "hgabPage": "496",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35984",
      "nepTitle": "Construction of Road, Aliaga IS, Barangay Macabucod, Aliaga, Nueva Ecija",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0519-007891",
      "hgabTitle": "Construction of Road, Aliaga IS, Barangay Macabucod, Aliaga, Nueva Ecija",
      "hgabPesos": 10000000,
      "nepPage": "494",
      "hgabPage": "519",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35132",
      "nepTitle": "Construction of Road, Andres Bonifacio, Diffun, Quirino",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0505-007593",
      "hgabTitle": "Construction of Road, Andres Bonifacio, Diffun, Quirino",
      "hgabPesos": 10000000,
      "nepPage": "484",
      "hgabPage": "505",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35134",
      "nepTitle": "Construction of Road, Aurora West, Diffun, Quirino",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0505-007594",
      "hgabTitle": "Construction of Road, Aurora West, Diffun, Quirino",
      "hgabPesos": 10000000,
      "nepPage": "484",
      "hgabPage": "505",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35516",
      "nepTitle": "Construction of Road, Bahay Pare, Candaba, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0526-008037",
      "hgabTitle": "Construction of Road, Bahay Pare, Candaba, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "498",
      "hgabPage": "526",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34666",
      "nepTitle": "Construction of Road, Balili-Alab, Bontoc, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0480-007067",
      "hgabTitle": "Construction of Road, Balili-Alab, Bontoc, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "472",
      "hgabPage": "480",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37378",
      "nepTitle": "Construction of Road, Barangay 8, Bacolod City",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0573-009079",
      "hgabTitle": "Construction of Road, Barangay 8, Bacolod City",
      "hgabPesos": 5000000,
      "nepPage": "528",
      "hgabPage": "573",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28995",
      "nepTitle": "Construction of Road, Barangay 9, Isabela, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0577-009149",
      "hgabTitle": "Construction of Road, Barangay 9, Isabela, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "530",
      "hgabPage": "577",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34700",
      "nepTitle": "Construction of Road, Barangay Alunogan, Natonin, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0482-007117",
      "hgabTitle": "Construction of Road, Barangay Alunogan, Natonin, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "474",
      "hgabPage": "482",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37969",
      "nepTitle": "Construction of Road, Barangay Amagos, Sta. 0+000 - 0+376, Bato, Leyte",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0595-009555",
      "hgabTitle": "Construction of Road, Barangay Amagos, Sta. 0+000 - 0+376, Bato, Leyte",
      "hgabPesos": 5000000,
      "nepPage": "541",
      "hgabPage": "595",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34158",
      "nepTitle": "Construction of Road, Barangay Ambabaay, Bani, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0467-006789",
      "hgabTitle": "Construction of Road, Barangay Ambabaay, Bani, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "466",
      "hgabPage": "467",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34253",
      "nepTitle": "Construction of Road, Barangay Ambalite, Pugo, La Union",
      "nepPesos": 12500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0466-006749",
      "hgabTitle": "Construction of Road, Barangay Ambalite, Pugo, La Union",
      "hgabPesos": 12500000,
      "nepPage": "464",
      "hgabPage": "466",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34792",
      "nepTitle": "Construction of Road, Barangay Ambasing, Sagada, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0480-007069",
      "hgabTitle": "Construction of Road, Barangay Ambasing, Sagada, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "472",
      "hgabPage": "480",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37237",
      "nepTitle": "Construction of Road, Barangay Ambolong, Batan, Aklan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0566-008931",
      "hgabTitle": "Construction of Road, Barangay Ambolong, Batan, Aklan",
      "hgabPesos": 5000000,
      "nepPage": "523",
      "hgabPage": "566",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37110",
      "nepTitle": "Construction of Road, Barangay Amiroy to Barangay Badiangan, Mina, Iloilo",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0572-009058",
      "hgabTitle": "Construction of Road, Barangay Amiroy to Barangay Badiangan, Mina, Iloilo",
      "hgabPesos": 10000000,
      "nepPage": "527",
      "hgabPage": "572",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35352",
      "nepTitle": "Construction of Road, Barangay Angoluan, Echague, Isabela",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0501-007501",
      "hgabTitle": "Construction of Road, Barangay Angoluan, Echague, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "482",
      "hgabPage": "501",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34528",
      "nepTitle": "Construction of Road, Barangay Anolid, Mangaldan, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0471-006854",
      "hgabTitle": "Construction of Road, Barangay Anolid, Mangaldan, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "466",
      "hgabPage": "471",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34703",
      "nepTitle": "Construction of Road, Barangay Anonat, Paracelis, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0482-007118",
      "hgabTitle": "Construction of Road, Barangay Anonat, Paracelis, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "474",
      "hgabPage": "482",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39289",
      "nepTitle": "Construction of Road, Barangay Apale, Ragay, Camarines Sur",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0560-008790",
      "hgabTitle": "Construction of Road, Barangay Apale, Ragay, Camarines Sur",
      "hgabPesos": 10000000,
      "nepPage": "519",
      "hgabPage": "560",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37517",
      "nepTitle": "Construction of Road, Barangay Arebasore, Mabinay, Negros Oriental",
      "nepPesos": 6000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0579-009210",
      "hgabTitle": "Construction of Road, Barangay Arebasore, Mabinay, Negros Oriental",
      "hgabPesos": 6000000,
      "nepPage": "532",
      "hgabPage": "579",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37966",
      "nepTitle": "Construction of Road, Barangay Atabay, Sta. 0+000 - 0+371, Hilongos, Leyte",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0595-009556",
      "hgabTitle": "Construction of Road, Barangay Atabay, Sta. 0+000 - 0+371, Hilongos, Leyte",
      "hgabPesos": 5000000,
      "nepPage": "541",
      "hgabPage": "595",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34513",
      "nepTitle": "Construction of Road, Barangay Baay, Bagulin, La Union",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0466-006751",
      "hgabTitle": "Construction of Road, Barangay Baay, Bagulin, La Union",
      "hgabPesos": 5000000,
      "nepPage": "465",
      "hgabPage": "466",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35353",
      "nepTitle": "Construction of Road, Barangay Babaran, Echague, Isabela",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0501-007503",
      "hgabTitle": "Construction of Road, Barangay Babaran, Echague, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "482",
      "hgabPage": "501",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34457",
      "nepTitle": "Construction of Road, Barangay Bacayao Sur, Dagupan City, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0471-006856",
      "hgabTitle": "Construction of Road, Barangay Bacayao Sur, Dagupan City, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "466",
      "hgabPage": "471",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36895",
      "nepTitle": "Construction of Road, Barangay Baclayan, Puerto Galera, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0553-008647",
      "hgabTitle": "Construction of Road, Barangay Baclayan, Puerto Galera, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "515",
      "hgabPage": "553",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37999",
      "nepTitle": "Construction of Road, Barangay Baco, Leyte Leyte (Station 0+000 - 0+200)",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0593-009517",
      "hgabTitle": "Construction of Road, Barangay Baco, Leyte Leyte (Station 0+000 - 0+200)",
      "hgabPesos": 5000000,
      "nepPage": "540",
      "hgabPage": "593",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39329",
      "nepTitle": "Construction of Road, Barangay Badiang, Cataingan to Barangay Guindawahan, Pio V. Corpuz, Masbate, Sta. 5+330 - Sta. 6+163",
      "nepPesos": 25000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0565-008894",
      "hgabTitle": "Construction of Road, Barangay Badiang, Cataingan to Barangay Guindawahan, Pio V. Corpuz, Masbate, Sta. 5+330 - Sta. 6+163",
      "hgabPesos": 25000000,
      "nepPage": "522",
      "hgabPage": "565",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34654",
      "nepTitle": "Construction of Road, Barangay Bagnen Proper, Bauko, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007071",
      "hgabTitle": "Construction of Road, Barangay Bagnen Proper, Bauko, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "472",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35930",
      "nepTitle": "Construction of Road, Barangay Bagong Barrio, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0516-007835",
      "hgabTitle": "Construction of Road, Barangay Bagong Barrio, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "hgabPesos": 10000000,
      "nepPage": "493",
      "hgabPage": "516",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34208",
      "nepTitle": "Construction of Road, Barangay Baguinay, Manaoag, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0471-006857",
      "hgabTitle": "Construction of Road, Barangay Baguinay, Manaoag, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "466",
      "hgabPage": "471",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35743",
      "nepTitle": "Construction of Road, Barangay Balanoy, La Paz, Tarlac",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0534-008202",
      "hgabTitle": "Construction of Road, Barangay Balanoy, La Paz, Tarlac",
      "hgabPesos": 5000000,
      "nepPage": "502",
      "hgabPage": "534",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34655",
      "nepTitle": "Construction of Road, Barangay Balintaugan, Bauko, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007072",
      "hgabTitle": "Construction of Road, Barangay Balintaugan, Bauko, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "472",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36018",
      "nepTitle": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0520-007898",
      "hgabTitle": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "494",
      "hgabPage": "520",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35889",
      "nepTitle": "Construction of Road, Barangay Baluga, Talavera, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34793",
      "nepTitle": "Construction of Road, Barangay Bana-ao, Tadian, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007073",
      "hgabTitle": "Construction of Road, Barangay Bana-ao, Tadian, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "472",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36155",
      "nepTitle": "Construction of Road, Barangay Banaba Kanluran, Batangas City",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0537-008275",
      "hgabTitle": "Construction of Road, Barangay Banaba Kanluran, Batangas City",
      "hgabPesos": 10000000,
      "nepPage": "505",
      "hgabPage": "537",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34656",
      "nepTitle": "Construction of Road, Barangay Banao, Bauko, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007074",
      "hgabTitle": "Construction of Road, Barangay Banao, Bauko, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "472",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37924",
      "nepTitle": "Construction of Road, Barangay Banawang - Barangay Astorga, Tunga, Leyte",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0592-009497",
      "hgabTitle": "Construction of Road, Barangay Banawang - Barangay Astorga, Tunga, Leyte",
      "hgabPesos": 10000000,
      "nepPage": "539",
      "hgabPage": "592",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36576",
      "nepTitle": "Construction of Road, Barangay Bangin, San Nicolas, Batangas",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0539-008323",
      "hgabTitle": "Construction of Road, Barangay Bangin, San Nicolas, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "506",
      "hgabPage": "539",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34159",
      "nepTitle": "Construction of Road, Barangay Banog Norte, Bani, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0469-006827",
      "hgabTitle": "Construction of Road, Barangay Banog Norte, Bani, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "466",
      "hgabPage": "469",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34237",
      "nepTitle": "Construction of Road, Barangay Bantayan, Mangaldan, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0471-006858",
      "hgabTitle": "Construction of Road, Barangay Bantayan, Mangaldan, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "467",
      "hgabPage": "471",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36571",
      "nepTitle": "Construction of Road, Barangay Banyaga, Agoncillo, Batangas",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0539-008324",
      "hgabTitle": "Construction of Road, Barangay Banyaga, Agoncillo, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "506",
      "hgabPage": "539",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34474",
      "nepTitle": "Construction of Road, Barangay Barangobong, Villasis, Pangasinan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0415-005765",
      "hgabTitle": "Construction of Road, Barangay Barangobong, Villasis, Pangasinan",
      "hgabPesos": 10000000,
      "nepPage": "434",
      "hgabPage": "415",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34170",
      "nepTitle": "Construction of Road, Barangay Baruan, Agno, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0469-006828",
      "hgabTitle": "Construction of Road, Barangay Baruan, Agno, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "466",
      "hgabPage": "469",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36001",
      "nepTitle": "Construction of Road, Barangay Basang Hamog, Talavera, Nueva Ecija",
      "nepPesos": 6380000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0520-007900",
      "hgabTitle": "Construction of Road, Barangay Basang Hamog, Talavera, Nueva Ecija",
      "hgabPesos": 6380000,
      "nepPage": "494",
      "hgabPage": "520",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37454",
      "nepTitle": "Construction of Road, Barangay Baviera, Sagay City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0576-009126",
      "hgabTitle": "Construction of Road, Barangay Baviera, Sagay City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "529",
      "hgabPage": "576",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39285",
      "nepTitle": "Construction of Road, Barangay Belwang, Lupi, Camarines Sur",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0560-008791",
      "hgabTitle": "Construction of Road, Barangay Belwang, Lupi, Camarines Sur",
      "hgabPesos": 15000000,
      "nepPage": "519",
      "hgabPage": "560",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35862",
      "nepTitle": "Construction of Road, Barangay Bertese, Quezon, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0520-007902",
      "hgabTitle": "Construction of Road, Barangay Bertese, Quezon, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "494",
      "hgabPage": "520",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34789",
      "nepTitle": "Construction of Road, Barangay Betwagan, Sadanga, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007076",
      "hgabTitle": "Construction of Road, Barangay Betwagan, Sadanga, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "472",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35833",
      "nepTitle": "Construction of Road, Barangay Bibiclat, Aliaga, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0520-007903",
      "hgabTitle": "Construction of Road, Barangay Bibiclat, Aliaga, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "495",
      "hgabPage": "520",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35837",
      "nepTitle": "Construction of Road, Barangay Bibiclat, Cuyapo, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0520-007904",
      "hgabTitle": "Construction of Road, Barangay Bibiclat, Cuyapo, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "495",
      "hgabPage": "520",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35949",
      "nepTitle": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0517-007836",
      "hgabTitle": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
      "hgabPesos": 10000000,
      "nepPage": "493",
      "hgabPage": "517",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37500",
      "nepTitle": "Construction of Road, Barangay Bio-os, Amlan, Negros Oriental",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0580-009212",
      "hgabTitle": "Construction of Road, Barangay Bio-os, Amlan, Negros Oriental",
      "hgabPesos": 10000000,
      "nepPage": "532",
      "hgabPage": "580",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34458",
      "nepTitle": "Construction of Road, Barangay Bonuan Binloc, Dagupan City, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0471-006859",
      "hgabTitle": "Construction of Road, Barangay Bonuan Binloc, Dagupan City, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "467",
      "hgabPage": "471",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34459",
      "nepTitle": "Construction of Road, Barangay Bonuan Boquig, Dagupan City, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0471-006860",
      "hgabTitle": "Construction of Road, Barangay Bonuan Boquig, Dagupan City, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "467",
      "hgabPage": "471",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35931",
      "nepTitle": "Construction of Road, Barangay Bubulong Malaki, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0517-007837",
      "hgabTitle": "Construction of Road, Barangay Bubulong Malaki, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "hgabPesos": 10000000,
      "nepPage": "493",
      "hgabPage": "517",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39335",
      "nepTitle": "Construction of Road, Barangay Buenasuerte to Barangay Libertad, Uson, Masbate",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35873",
      "nepTitle": "Construction of Road, Barangay Bugtong na Buli, Talavera, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0520-007906",
      "hgabTitle": "Construction of Road, Barangay Bugtong na Buli, Talavera, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "495",
      "hgabPage": "520",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36667",
      "nepTitle": "Construction of Road, Barangay Bukal, Tiaong, Quezon",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0548-008519",
      "hgabTitle": "Construction of Road, Barangay Bukal, Tiaong, Quezon",
      "hgabPesos": 15000000,
      "nepPage": "512",
      "hgabPage": "548",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36465",
      "nepTitle": "Construction of Road, Barangay Bulihan, San Antonio, Quezon",
      "nepPesos": 11000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0548-008534",
      "hgabTitle": "Construction of Road, Barangay Bulihan, San Antonio, Quezon",
      "hgabPesos": 11000000,
      "nepPage": "512",
      "hgabPage": "548",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37291",
      "nepTitle": "Construction of Road, Barangay Bulwang, Numancia, Aklan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0566-008932",
      "hgabTitle": "Construction of Road, Barangay Bulwang, Numancia, Aklan",
      "hgabPesos": 5000000,
      "nepPage": "523",
      "hgabPage": "566",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34755",
      "nepTitle": "Construction of Road, Barangay Bun-ayan, Sabangan, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007077",
      "hgabTitle": "Construction of Road, Barangay Bun-ayan, Sabangan, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "472",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36000",
      "nepTitle": "Construction of Road, Barangay Bunol, Guimba, Nueva Ecija",
      "nepPesos": 6875000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0520-007907",
      "hgabTitle": "Construction of Road, Barangay Bunol, Guimba, Nueva Ecija",
      "hgabPesos": 6875000,
      "nepPage": "495",
      "hgabPage": "520",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34706",
      "nepTitle": "Construction of Road, Barangay Buringal, Paracelis, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0483-007120",
      "hgabTitle": "Construction of Road, Barangay Buringal, Paracelis, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "474",
      "hgabPage": "483",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35355",
      "nepTitle": "Construction of Road, Barangay Busilelao, Echague, Isabela",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0501-007508",
      "hgabTitle": "Construction of Road, Barangay Busilelao, Echague, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "482",
      "hgabPage": "501",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34803",
      "nepTitle": "Construction of Road, Barangay Butigue, Paracelis, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0483-007121",
      "hgabTitle": "Construction of Road, Barangay Butigue, Paracelis, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "474",
      "hgabPage": "483",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-00460",
      "nepTitle": "Construction of Road, Barangay Buyasan to Barangay Cadsalan, San Mariano, Isabela",
      "nepPesos": 9797000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0497-007418",
      "hgabTitle": "Construction of Road, Barangay Buyasan to Barangay Cadsalan, San Mariano, Isabela",
      "hgabPesos": 9797000,
      "nepPage": "480",
      "hgabPage": "497",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36028",
      "nepTitle": "Construction of Road, Barangay Caaninaplahan, Talavera, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0520-007908",
      "hgabTitle": "Construction of Road, Barangay Caaninaplahan, Talavera, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "495",
      "hgabPage": "520",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38058",
      "nepTitle": "Construction of Road, Barangay Cababto-an (Sta. 0+214.50 - Sta. 0+274.50), Pambujan, Northern Samar",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0597-009596",
      "hgabTitle": "Construction of Road, Barangay Cababto-an (Sta. 0+214.50 - Sta. 0+274.50), Pambujan, Northern Samar",
      "hgabPesos": 5000000,
      "nepPage": "542",
      "hgabPage": "597",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-02675",
      "nepTitle": "Construction of Road, Barangay Cabarasan - Barangay Dao (Sta. 4+760 - Sta. 4+964), Gamay, Northern Samar",
      "nepPesos": 8000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0597-009597",
      "hgabTitle": "Construction of Road, Barangay Cabarasan - Barangay Dao (Sta. 4+760 - Sta. 4+900), Gamay, Northern Samar",
      "hgabPesos": 8000000,
      "nepPage": "542",
      "hgabPage": "597",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35838",
      "nepTitle": "Construction of Road, Barangay Cabileo, Cuyapo, Nueva Ecija",
      "nepPesos": 7700000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0520-007910",
      "hgabTitle": "Construction of Road, Barangay Cabileo, Cuyapo, Nueva Ecija",
      "hgabPesos": 7700000,
      "nepPage": "495",
      "hgabPage": "520",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35410",
      "nepTitle": "Construction of Road, Barangay Cabulay, Santiago City, Isabela",
      "nepPesos": 6000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0501-007509",
      "hgabTitle": "Construction of Road, Barangay Cabulay, Santiago City, Isabela",
      "hgabPesos": 6000000,
      "nepPage": "482",
      "hgabPage": "501",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37264",
      "nepTitle": "Construction of Road, Barangay Cag-an, Anilao, Iloilo",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0572-009039",
      "hgabTitle": "Construction of Road, Barangay Cag-an, Anilao, Iloilo",
      "hgabPesos": 5000000,
      "nepPage": "527",
      "hgabPage": "572",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34162",
      "nepTitle": "Construction of Road, Barangay Calabeng, Bani, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0470-006829",
      "hgabTitle": "Construction of Road, Barangay Calabeng, Bani, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "466",
      "hgabPage": "470",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35932",
      "nepTitle": "Construction of Road, Barangay Calawitan, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0517-007839",
      "hgabTitle": "Rehabilitation of Road, Barangay Calawitan, San Ildefonso, Bulacan, Sta. 00+000 - 00+200",
      "hgabPesos": 10000000,
      "nepPage": "493",
      "hgabPage": "517",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37240",
      "nepTitle": "Construction of Road, Barangay Camaligan, Batan, Aklan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0567-008934",
      "hgabTitle": "Construction of Road, Barangay Camaligan, Batan, Aklan",
      "hgabPesos": 5000000,
      "nepPage": "523",
      "hgabPage": "567",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36873",
      "nepTitle": "Construction of Road, Barangay Camansihan , City of Calapan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0554-008654",
      "hgabTitle": "Construction of Road, Barangay Camansihan , City of Calapan, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "515",
      "hgabPage": "554",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34247",
      "nepTitle": "Construction of Road, Barangay Camil-Bucutan, San Fermin, Caba, La Union",
      "nepPesos": 22500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0466-006754",
      "hgabTitle": "Construction of Road, Barangay Camil-Bucutan, San Fermin, Caba, La Union",
      "hgabPesos": 22500000,
      "nepPage": "465",
      "hgabPage": "466",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34667",
      "nepTitle": "Construction of Road, Barangay Can-eo, Bontoc, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007078",
      "hgabTitle": "Construction of Road, Barangay Can-eo, Bontoc, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "472",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37560",
      "nepTitle": "Construction of Road, Barangay Canluto, Bindoy, Negros Oriental",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0579-009190",
      "hgabTitle": "Construction of Road, Barangay Canluto, Bindoy, Negros Oriental",
      "hgabPesos": 5000000,
      "nepPage": "531",
      "hgabPage": "579",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37712",
      "nepTitle": "Construction of Road, Barangay Cantukong, Carmen, Cebu",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0586-009375",
      "hgabTitle": "Construction of Road, Barangay Cantukong, Carmen, Cebu",
      "hgabPesos": 10000000,
      "nepPage": "536",
      "hgabPage": "586",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34225",
      "nepTitle": "Construction of Road, Barangay Capaoay, San Jacinto, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0471-006865",
      "hgabTitle": "Construction of Road, Barangay Capaoay, San Jacinto, Pangasinan",
      "hgabPesos": 10000000,
      "nepPage": "467",
      "hgabPage": "471",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37922",
      "nepTitle": "Construction of Road, Barangay Capilla, Pastrana, Leyte",
      "nepPesos": 7000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0593-009505",
      "hgabTitle": "Construction of Road, Barangay Capilla, Pastrana, Leyte",
      "hgabPesos": 7000000,
      "nepPage": "539",
      "hgabPage": "593",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34211",
      "nepTitle": "Construction of Road, Barangay Caranglaan, Dagupan City, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0471-006868",
      "hgabTitle": "Construction of Road, Barangay Caranglaan, Dagupan City, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "467",
      "hgabPage": "471",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34982",
      "nepTitle": "Construction of Road, Barangay Carig Sur, Tuguegarao City, Cagayan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0486-007200",
      "hgabTitle": "Construction of Road, Barangay Carig Sur, Tuguegarao City, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "476",
      "hgabPage": "486",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35982",
      "nepTitle": "Construction of Road, Barangay Carmen, Zaragoza Nueva Ecija",
      "nepPesos": 11000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0520-007912",
      "hgabTitle": "Construction of Road, Barangay Carmen, Zaragoza Nueva Ecija",
      "hgabPesos": 11000000,
      "nepPage": "495",
      "hgabPage": "520",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37709",
      "nepTitle": "Construction of Road, Barangay Catarman, Liloan, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0586-009376",
      "hgabTitle": "Construction of Road, Barangay Catarman, Liloan, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "536",
      "hgabPage": "586",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34222",
      "nepTitle": "Construction of Road, Barangay Cayanga, San Fabian, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0471-006869",
      "hgabTitle": "Construction of Road, Barangay Cayanga, San Fabian, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "467",
      "hgabPage": "471",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35876",
      "nepTitle": "Construction of Road, Barangay Collado, Talavera, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0520-007915",
      "hgabTitle": "Construction of Road, Barangay Collado, Talavera, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "495",
      "hgabPage": "520",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36019",
      "nepTitle": "Construction of Road, Barangay Comitang, Sto. Domingo, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0520-007917",
      "hgabTitle": "Construction of Road, Barangay Comitang, Sto. Domingo, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "495",
      "hgabPage": "520",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36878",
      "nepTitle": "Construction of Road, Barangay Comunal , City of Calapan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0554-008656",
      "hgabTitle": "Construction of Road, Barangay Comunal , City of Calapan, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "515",
      "hgabPage": "554",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35884",
      "nepTitle": "Construction of Road, Barangay Concepcion, Zaragoza, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0520-007918",
      "hgabTitle": "Construction of Road, Barangay Concepcion, Zaragoza, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "495",
      "hgabPage": "520",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36010",
      "nepTitle": "Construction of Road, Barangay Culong, Guimba, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0520-007919",
      "hgabTitle": "Construction of Road, Barangay Culong, Guimba, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "495",
      "hgabPage": "520",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34794",
      "nepTitle": "Construction of Road, Barangay Dacudac, Tadian, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007079",
      "hgabTitle": "Construction of Road, Barangay Dacudac, Tadian, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "472",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-02655",
      "nepTitle": "Construction of Road, Barangay Daganas, Sta. 000+000 - Sta. 000+260, Catarman, Northern Samar",
      "nepPesos": 6168000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0596-009579",
      "hgabTitle": "Construction of Road, Barangay Daganas, Sta. 000+000 - Sta. 000+260, Catarman, Northern Samar",
      "hgabPesos": 6168000,
      "nepPage": "541",
      "hgabPage": "596",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35108",
      "nepTitle": "Construction of Road, Barangay Dicamay 2, Jones, Isabela",
      "nepPesos": 26000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0501-007511",
      "hgabTitle": "Construction of Road, Sta. 0+000 - Sta. 0+750, Barangay Dicamay 2, Jones, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "482",
      "hgabPage": "501",
      "chainageStatus": "incomplete",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35890",
      "nepTitle": "Construction of Road, Barangay Dimasalang Sur, Talavera, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0521-007921",
      "hgabTitle": "Construction of Road, Barangay Dimasalang Sur, Talavera, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "495",
      "hgabPage": "521",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35339",
      "nepTitle": "Construction of Road, Barangay District 2, San Manuel, Isabela",
      "nepPesos": 59680000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0418-005827",
      "hgabTitle": "Construction of Road, Barangay District 2, San Manuel, Isabela",
      "hgabPesos": 59680000,
      "nepPage": "436",
      "hgabPage": "418",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36009",
      "nepTitle": "Construction of Road, Barangay District V, Cuyapo, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0521-007922",
      "hgabTitle": "Construction of Road, Barangay District V, Cuyapo, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "495",
      "hgabPage": "521",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35863",
      "nepTitle": "Construction of Road, Barangay Dulong Bayan, Quezon, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0521-007923",
      "hgabTitle": "Construction of Road, Barangay Dulong Bayan, Quezon, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "495",
      "hgabPage": "521",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36030",
      "nepTitle": "Construction of Road, Barangay Esguerra, Talavera, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0521-007924",
      "hgabTitle": "Construction of Road, Barangay Esguerra, Talavera, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "495",
      "hgabPage": "521",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37720",
      "nepTitle": "Construction of Road, Barangay Esperanza, San Francisco, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0586-009377",
      "hgabTitle": "Construction of Road, Barangay Esperanza, San Francisco, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "536",
      "hgabPage": "586",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36014",
      "nepTitle": "Construction of Road, Barangay Estacion, Nampicuan, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0521-007925",
      "hgabTitle": "Construction of Road, Barangay Estacion, Nampicuan, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "495",
      "hgabPage": "521",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-26344",
      "nepTitle": "Construction of Road, Barangay Estrella, San Pedro City, Laguna",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0546-008484",
      "hgabTitle": "Construction of Road, Barangay Estrella, San Pedro City, Laguna",
      "hgabPesos": 30000000,
      "nepPage": "510",
      "hgabPage": "546",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34677",
      "nepTitle": "Construction of Road, Barangay Fidelisan, Sagada, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007080",
      "hgabTitle": "Construction of Road, Barangay Fidelisan, Sagada, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "472",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37964",
      "nepTitle": "Construction of Road, Barangay Gacat, Sta. 0+000 - 0+380, Baybay City, Leyte",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0595-009560",
      "hgabTitle": "Construction of Road, Barangay Gacat, Sta. 0+000 - 0+380, Baybay City, Leyte",
      "hgabPesos": 5000000,
      "nepPage": "541",
      "hgabPage": "595",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34165",
      "nepTitle": "Construction of Road, Barangay Gais-Guipe, Dasol, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0470-006831",
      "hgabTitle": "Construction of Road, Barangay Gais-Guipe, Dasol, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "466",
      "hgabPage": "470",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34672",
      "nepTitle": "Construction of Road, Barangay Gayang, Sabangan, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007081",
      "hgabTitle": "Construction of Road, Barangay Gayang, Sabangan, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "472",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10624",
      "nepTitle": "Construction of Road, Barangay Gen. Luna, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+900",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0521-007928",
      "hgabTitle": "Construction of Road, Barangay Gen. Luna, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+900",
      "hgabPesos": 10000000,
      "nepPage": "495",
      "hgabPage": "521",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37724",
      "nepTitle": "Construction of Road, Barangay General, Tudela, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0587-009379",
      "hgabTitle": "Construction of Road, Barangay General, Tudela, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "536",
      "hgabPage": "587",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37019",
      "nepTitle": "Construction of Road, Barangay Gogognan, Aborlan, Palawan",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0556-008701",
      "hgabTitle": "Construction of Road, Barangay Gogognan, Aborlan, Palawan",
      "hgabPesos": 30000000,
      "nepPage": "516",
      "hgabPage": "556",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21286",
      "nepTitle": "Construction of Road, Barangay Goma, Digos City-Sitio Bagong Silang, Managa, Sta. 8+841.896 - Sta. 9+841.896, Bansalan, Davao del Sur",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0619-010038",
      "hgabTitle": "Construction of Road, Barangay Goma, Digos City-Sitio Bagong Silang, Managa, Sta. 8+841.896 - Sta. 9+841.896, Bansalan, Davao del Sur",
      "hgabPesos": 50000000,
      "nepPage": "554",
      "hgabPage": "619",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35351",
      "nepTitle": "Construction of Road, Barangay Gucab, Echague, Isabela",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0501-007519",
      "hgabTitle": "Construction of Road, Barangay Gucab, Echague, Isabela",
      "hgabPesos": 15000000,
      "nepPage": "482",
      "hgabPage": "501",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34665",
      "nepTitle": "Construction of Road, Barangay Gueday, Besao, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007082",
      "hgabTitle": "Construction of Road, Barangay Gueday, Besao, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "472",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35375",
      "nepTitle": "Construction of Road, Barangay Guibang, Gamu, Isabela",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0497-007420",
      "hgabTitle": "Construction of Road, Barangay Guibang, Gamu, Isabela",
      "hgabPesos": 50000000,
      "nepPage": "481",
      "hgabPage": "497",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34657",
      "nepTitle": "Construction of Road, Barangay Guinzadan Central, Bauko, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007083",
      "hgabTitle": "Construction of Road, Barangay Guinzadan Central, Bauko, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "472",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37998",
      "nepTitle": "Construction of Road, Barangay Hinabuyan, Villaba, Leyte (Station 0+340 - 0+690)",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0594-009535",
      "hgabTitle": "Construction of Road, Barangay Hinabuyan, Villaba, Leyte (Station 0+340 - 0+690)",
      "hgabPesos": 15000000,
      "nepPage": "540",
      "hgabPage": "594",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36020",
      "nepTitle": "Construction of Road, Barangay Hulo, Sto. Domingo, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0521-007939",
      "hgabTitle": "Construction of Road, Barangay Hulo, Sto. Domingo, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "495",
      "hgabPage": "521",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35864",
      "nepTitle": "Construction of Road, Barangay Ilog Baliwag, Quezon, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0521-007940",
      "hgabTitle": "Construction of Road, Barangay Ilog Baliwag, Quezon, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "495",
      "hgabPage": "521",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34983",
      "nepTitle": "Construction of Road, Barangay Iraga, Solana, Cagayan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0486-007202",
      "hgabTitle": "Construction of Road, Barangay Iraga, Solana, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "476",
      "hgabPage": "486",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37013",
      "nepTitle": "Construction of Road, Barangay Isaub, Aborlan, Palawan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0556-008702",
      "hgabTitle": "Construction of Road, Barangay Isaub, Aborlan, Palawan",
      "hgabPesos": 10000000,
      "nepPage": "517",
      "hgabPage": "556",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34428",
      "nepTitle": "Construction of Road, Barangay Iton, Bayambang, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0475-006964",
      "hgabTitle": "Construction of Road, Barangay Iton, Bayambang, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "469",
      "hgabPage": "475",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37486",
      "nepTitle": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0576-009129",
      "hgabTitle": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "529",
      "hgabPage": "576",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38014",
      "nepTitle": "Construction of Road, Barangay Jubay, Calubian, Leyte (Station 21+349.3 - 22+169.3)",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0594-009536",
      "hgabTitle": "Construction of Road, Barangay Jubay, Calubian, Leyte (Station 21+349.3 - 22+169.3)",
      "hgabPesos": 30000000,
      "nepPage": "540",
      "hgabPage": "594",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34699",
      "nepTitle": "Construction of Road, Barangay Kaleo, Barlig, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0483-007122",
      "hgabTitle": "Construction of Road, Barangay Kaleo, Barlig, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "474",
      "hgabPage": "483",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36031",
      "nepTitle": "Construction of Road, Barangay Kinalanguyan, Talavera, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0521-007942",
      "hgabTitle": "Construction of Road, Barangay Kinalanguyan, Talavera, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "495",
      "hgabPage": "521",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34218",
      "nepTitle": "Construction of Road, Barangay Landas, Mangaldan, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0471-006871",
      "hgabTitle": "Construction of Road, Barangay Landas, Mangaldan, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "467",
      "hgabPage": "471",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21301",
      "nepTitle": "Construction of Road, Barangay Langka , Municipality of Lupon - Barangay Poblacion, Municipality of Banaybanay, Davao Oriental - (Sta. 0+500.000 – Sta. 2+882.000)",
      "nepPesos": 70000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39025",
      "nepTitle": "Construction of Road, Barangay Lanise, Claveria, Misamis Oriental",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0616-009977",
      "hgabTitle": "Construction of Road, Barangay Lanise, Claveria, Misamis Oriental",
      "hgabPesos": 5000000,
      "nepPage": "552",
      "hgabPage": "616",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35174",
      "nepTitle": "Construction of Road, Barangay Laoag, San Agustin, Isabela",
      "nepPesos": 13100000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0501-007520",
      "hgabTitle": "Construction of Road, Sta. 0+000 - Sta. 0+635, Barangay Laoag, San Agustin, Isabela",
      "hgabPesos": 8500000,
      "nepPage": "482",
      "hgabPage": "501",
      "chainageStatus": "incomplete",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35840",
      "nepTitle": "Construction of Road, Barangay Latap, Cuyapo, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0521-007943",
      "hgabTitle": "Construction of Road, Barangay Latap, Cuyapo, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "496",
      "hgabPage": "521",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34579",
      "nepTitle": "Construction of Road, Barangay Legaspi, Tayug, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0473-006907",
      "hgabTitle": "Construction of Road, Barangay Legaspi, Tayug, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "468",
      "hgabPage": "473",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34756",
      "nepTitle": "Construction of Road, Barangay Lenga, Tadian, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007086",
      "hgabTitle": "Construction of Road, Barangay Lenga, Tadian, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "473",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34659",
      "nepTitle": "Construction of Road, Barangay Leseb, Bauko, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007087",
      "hgabTitle": "Construction of Road, Barangay Leseb, Bauko, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "473",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37228",
      "nepTitle": "Construction of Road, Barangay Libas, Banga, Aklan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0567-008936",
      "hgabTitle": "Construction of Road, Barangay Libas, Banga, Aklan",
      "hgabPesos": 5000000,
      "nepPage": "524",
      "hgabPage": "567",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35360",
      "nepTitle": "Construction of Road, Barangay Libertad , Echague, Isabela",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0501-007521",
      "hgabTitle": "Construction of Road, Barangay Libertad , Echague, Isabela",
      "hgabPesos": 15000000,
      "nepPage": "482",
      "hgabPage": "501",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-06091",
      "nepTitle": "Construction of Road, Barangay Linao leading to Barangay Talisay Road, Sta. 1+800 - Sta. 3+000, Calatrava, Romblon",
      "nepPesos": 52800000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0429-006031",
      "hgabTitle": "Construction of Road, Barangay Linao leading to Barangay Talisay Road, Sta. 1+800 - Sta. 3+000, Calatrava, Romblon",
      "hgabPesos": 52800000,
      "nepPage": "443",
      "hgabPage": "429",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34760",
      "nepTitle": "Construction of Road, Barangay Lingoy, Barlig, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0483-007123",
      "hgabTitle": "Construction of Road, Barangay Lingoy, Barlig, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "474",
      "hgabPage": "483",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35893",
      "nepTitle": "Construction of Road, Barangay Lomboy, Talavera, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0521-007944",
      "hgabTitle": "Construction of Road, Barangay Lomboy, Talavera, Nueva Ecija",
      "hgabPesos": 6000000,
      "nepPage": "496",
      "hgabPage": "521",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38315",
      "nepTitle": "Construction of Road, Barangay Lower Tambaking, Maimbung, Sulu Sta. 00+000 to Sta. 01+500",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0600-009650",
      "hgabTitle": "Construction of Road, Barangay Lower Tambaking, Maimbung, Sulu Sta. 00+000 to Sta. 01+500",
      "hgabPesos": 50000000,
      "nepPage": "544",
      "hgabPage": "600",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34228",
      "nepTitle": "Construction of Road, Barangay Lucao, Dagupan City, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0471-006873",
      "hgabTitle": "Construction of Road, Barangay Lucao, Dagupan City, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "467",
      "hgabPage": "471",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34235",
      "nepTitle": "Construction of Road, Barangay Maasin, Mangaldan, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0471-006874",
      "hgabTitle": "Construction of Road, Barangay Maasin, Mangaldan, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "467",
      "hgabPage": "471",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37959",
      "nepTitle": "Construction of Road, Barangay Mabunga, Sta. 0+000 - 0+355, Mahaplag, Leyte",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0595-009563",
      "hgabTitle": "Construction of Road, Barangay Mabunga, Sta. 0+000 - 0+355, Mahaplag, Leyte",
      "hgabPesos": 5000000,
      "nepPage": "541",
      "hgabPage": "595",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36008",
      "nepTitle": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
      "nepPesos": 5500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0521-007945",
      "hgabTitle": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
      "hgabPesos": 5500000,
      "nepPage": "496",
      "hgabPage": "521",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35363",
      "nepTitle": "Construction of Road, Barangay Madadamian , Echague, Isabela",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0501-007522",
      "hgabTitle": "Construction of Road, Barangay Madadamian , Echague, Isabela",
      "hgabPesos": 20000000,
      "nepPage": "482",
      "hgabPage": "501",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37501",
      "nepTitle": "Construction of Road, Barangay Mag-abo, Amlan, Negros Oriental",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0580-009217",
      "hgabTitle": "Construction of Road, Barangay Mag-abo, Amlan, Negros Oriental",
      "hgabPesos": 5000000,
      "nepPage": "532",
      "hgabPage": "580",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37488",
      "nepTitle": "Construction of Road, Barangay Magsaysay, Cadiz City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0576-009131",
      "hgabTitle": "Construction of Road, Barangay Magsaysay, Cadiz City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "529",
      "hgabPage": "576",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36191",
      "nepTitle": "Construction of Road, Barangay Mahacot Silangan, Batangas City",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36670",
      "nepTitle": "Construction of Road, Barangay Malaya, Rosario, Batangas",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0541-008371",
      "hgabTitle": "Construction of Road, Barangay Malaya, Rosario, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "508",
      "hgabPage": "541",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36021",
      "nepTitle": "Construction of Road, Barangay Malaya, Sto. Domingo, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0522-007948",
      "hgabTitle": "Construction of Road, Barangay Malaya, Sto. Domingo, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "496",
      "hgabPage": "522",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34668",
      "nepTitle": "Construction of Road, Barangay Maligcong, Bontoc, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007089",
      "hgabTitle": "Construction of Road, Barangay Maligcong, Bontoc, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "473",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35361",
      "nepTitle": "Construction of Road, Barangay Malitao, Echague, Isabela",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0501-007523",
      "hgabTitle": "Construction of Road, Barangay Malitao, Echague, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "482",
      "hgabPage": "501",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36023",
      "nepTitle": "Construction of Road, Barangay Mambarao, Sto. Domingo, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0522-007951",
      "hgabTitle": "Construction of Road, Barangay Mambarao, Sto. Domingo, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "496",
      "hgabPage": "522",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36825",
      "nepTitle": "Construction of Road, Barangay Mampaitan, Mogpog, Marinduque",
      "nepPesos": 16000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0552-008603",
      "hgabTitle": "Construction of Road, Barangay Mampaitan, Mogpog, Marinduque",
      "hgabPesos": 16000000,
      "nepPage": "514",
      "hgabPage": "552",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36874",
      "nepTitle": "Construction of Road, Barangay Managpi, City of Calapan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0554-008661",
      "hgabTitle": "Rehabilitation of Road, Barangay Managpi, City of Calapan, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "516",
      "hgabPage": "554",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37009",
      "nepTitle": "Construction of Road, Barangay Manalo, Puerto Princesa City, Palawan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0556-008703",
      "hgabTitle": "Construction of Road, Barangay Manalo, Puerto Princesa City, Palawan",
      "hgabPesos": 10000000,
      "nepPage": "517",
      "hgabPage": "556",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37367",
      "nepTitle": "Construction of Road, Barangay Mandalagan, Bacolod City",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0573-009080",
      "hgabTitle": "Construction of Road, Barangay Mandalagan, Bacolod City",
      "hgabPesos": 5000000,
      "nepPage": "528",
      "hgabPage": "573",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37265",
      "nepTitle": "Construction of Road, Barangay Manganese, Anilao, Iloilo",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0572-009041",
      "hgabTitle": "Construction of Road, Barangay Manganese, Anilao, Iloilo",
      "hgabPesos": 5000000,
      "nepPage": "527",
      "hgabPage": "572",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36889",
      "nepTitle": "Construction of Road, Barangay Mangangan II, Baco, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0554-008662",
      "hgabTitle": "Construction of Road, Barangay Mangangan II, Baco, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "516",
      "hgabPage": "554",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34427",
      "nepTitle": "Construction of Road, Barangay Mangayao, Bayambang, Pangasinan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0475-006965",
      "hgabTitle": "Construction of Road, Barangay Mangayao, Bayambang, Pangasinan",
      "hgabPesos": 10000000,
      "nepPage": "469",
      "hgabPage": "475",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34212",
      "nepTitle": "Construction of Road, Barangay Mangin, Dagupan City, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0471-006875",
      "hgabTitle": "Construction of Road, Barangay Mangin, Dagupan City, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "467",
      "hgabPage": "471",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37368",
      "nepTitle": "Construction of Road, Barangay Mansilingan, Bacolod City",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0573-009081",
      "hgabTitle": "Construction of Road, Barangay Mansilingan, Bacolod City",
      "hgabPesos": 15000000,
      "nepPage": "528",
      "hgabPage": "573",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36671",
      "nepTitle": "Construction of Road, Barangay Marilag, Rosario, Batangas",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0541-008372",
      "hgabTitle": "Construction of Road, Barangay Marilag, Rosario, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "508",
      "hgabPage": "541",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36880",
      "nepTitle": "Construction of Road, Barangay Masipit, City of Calapan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10535",
      "nepTitle": "Construction of Road, Barangay Matictic Bayan to Barangay Matictic Coral (Junction), Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.066754, 14.915913)",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0514-007794",
      "hgabTitle": "Construction of Road, Barangay Matictic Bayan to Barangay Matictic Coral (Junction), Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.066754, 14.915913)",
      "hgabPesos": 30000000,
      "nepPage": "491",
      "hgabPage": "514",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10534",
      "nepTitle": "Construction of Road, Barangay Matictic Coral (Junction) to Barangay Baraka, Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.096979, 14.910598)",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0514-007795",
      "hgabTitle": "Construction of Road, Barangay Matictic Coral (Junction) to Barangay Baraka, Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.096979, 14.910598)",
      "hgabPesos": 30000000,
      "nepPage": "491",
      "hgabPage": "514",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36002",
      "nepTitle": "Construction of Road, Barangay Matingkis, Talavera, Nueva Ecija",
      "nepPesos": 6220500,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0522-007953",
      "hgabTitle": "Construction of Road, Barangay Matingkis, Talavera, Nueva Ecija",
      "hgabPesos": 6220500,
      "nepPage": "496",
      "hgabPage": "522",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36890",
      "nepTitle": "Construction of Road, Barangay Mayabig , Baco, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0554-008664",
      "hgabTitle": "Construction of Road, Barangay Mayabig , Baco, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "516",
      "hgabPage": "554",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34660",
      "nepTitle": "Construction of Road, Barangay Mayag, Bauko, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007091",
      "hgabTitle": "Construction of Road, Barangay Mayag, Bauko, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "473",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37522",
      "nepTitle": "Construction of Road, Barangay Mayaposi, Mabinay, Negros Oriental",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0580-009219",
      "hgabTitle": "Construction of Road, Barangay Mayaposi, Mabinay, Negros Oriental",
      "hgabPesos": 10000000,
      "nepPage": "532",
      "hgabPage": "580",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34098",
      "nepTitle": "Construction of Road, Barangay Mestizo Norte, San Carlos City, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0475-006966",
      "hgabTitle": "Construction of Road, Barangay Mestizo Norte, San Carlos City, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "469",
      "hgabPage": "475",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35996",
      "nepTitle": "Construction of Road, Barangay Minabuyoc, Talavera, Nueva Ecija",
      "nepPesos": 7800000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0522-007954",
      "hgabTitle": "Construction of Road, Barangay Minabuyoc, Talavera, Nueva Ecija",
      "hgabPesos": 7800000,
      "nepPage": "496",
      "hgabPage": "522",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37726",
      "nepTitle": "Construction of Road, Barangay Montserrat - Barangay Biasong, Pilar, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0587-009382",
      "hgabTitle": "Construction of Road, Barangay Montserrat - Barangay Biasong, Pilar, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "536",
      "hgabPage": "587",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35941",
      "nepTitle": "Construction of Road, Barangay Nabaong Garlang, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0517-007841",
      "hgabTitle": "Construction of Road, Barangay Nabaong Garlang, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "hgabPesos": 10000000,
      "nepPage": "493",
      "hgabPage": "517",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21576",
      "nepTitle": "Construction of Road, Barangay Naga-Naga, Alicia, Zamboanga Sibugay",
      "nepPesos": 29500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0606-009772",
      "hgabTitle": "Construction of Road, Barangay Naga-Naga, Alicia, Zamboanga Sibugay",
      "hgabPesos": 29500000,
      "nepPage": "548",
      "hgabPage": "606",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37010",
      "nepTitle": "Construction of Road, Barangay Napsan, Puerto Princesa City, Palawan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0556-008705",
      "hgabTitle": "Construction of Road, Barangay Napsan, Puerto Princesa City, Palawan",
      "hgabPesos": 10000000,
      "nepPage": "517",
      "hgabPage": "556",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36032",
      "nepTitle": "Construction of Road, Barangay Narvacan II, Guimba, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0522-007956",
      "hgabTitle": "Construction of Road, Barangay Narvacan II, Guimba, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "496",
      "hgabPage": "522",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-26332",
      "nepTitle": "Construction of Road, Barangay Navarro, General Trias City, Cavite",
      "nepPesos": 48628000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0544-008442",
      "hgabTitle": "Construction of Road, Barangay Navarro, General Trias City, Cavite",
      "hgabPesos": 48628000,
      "nepPage": "509",
      "hgabPage": "544",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37287",
      "nepTitle": "Construction of Road, Barangay Navitas, Malinao, Aklan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0567-008940",
      "hgabTitle": "Construction of Road, Barangay Navitas, Malinao, Aklan",
      "hgabPesos": 5000000,
      "nepPage": "524",
      "hgabPage": "567",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-00459",
      "nepTitle": "Construction of Road, Barangay New Magsaysay to Barangay Sinipit, Benito Soliven, Isabela",
      "nepPesos": 15661000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0497-007423",
      "hgabTitle": "Construction of Road, Barangay New Magsaysay to Barangay Sinipit, Benito Soliven, Isabela",
      "hgabPesos": 15661000,
      "nepPage": "481",
      "hgabPage": "497",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38607",
      "nepTitle": "Construction of Road, Barangay New Rizal, M'lang, Cotabato",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0620-010069",
      "hgabTitle": "Construction of Road, Barangay New Rizal, M'lang, Cotabato",
      "hgabPesos": 30000000,
      "nepPage": "555",
      "hgabPage": "620",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35857",
      "nepTitle": "Construction of Road, Barangay North Poblacion, Nampicuan, Nueva Ecija",
      "nepPesos": 5510000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0522-007957",
      "hgabTitle": "Construction of Road, Barangay North Poblacion, Nampicuan, Nueva Ecija",
      "hgabPesos": 5510000,
      "nepPage": "496",
      "hgabPage": "522",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35858",
      "nepTitle": "Construction of Road, Barangay Northwest Poblacion, Nampicuan, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0522-007958",
      "hgabTitle": "Construction of Road, Barangay Northwest Poblacion, Nampicuan, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "496",
      "hgabPage": "522",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34232",
      "nepTitle": "Construction of Road, Barangay Oraan East, Manaoag, Pangasinan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0471-006878",
      "hgabTitle": "Construction of Road, Barangay Oraan East, Manaoag, Pangasinan",
      "hgabPesos": 10000000,
      "nepPage": "467",
      "hgabPage": "471",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34753",
      "nepTitle": "Construction of Road, Barangay Otucan Sur, Bauko, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007093",
      "hgabTitle": "Construction of Road, Barangay Otucan Sur, Bauko, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "473",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35951",
      "nepTitle": "Construction of Road, Barangay Pacalag, San Miguel. Bulacan Sta. 00+000 - 00+400",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0517-007842",
      "hgabTitle": "Construction of Road, Barangay Pacalag, San Miguel. Bulacan Sta. 00+000 - 00+400",
      "hgabPesos": 10000000,
      "nepPage": "493",
      "hgabPage": "517",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34182",
      "nepTitle": "Construction of Road, Barangay Palamis, Alaminos City, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0470-006833",
      "hgabTitle": "Construction of Road, Barangay Palamis, Alaminos City, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "466",
      "hgabPage": "470",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34416",
      "nepTitle": "Construction of Road, Barangay Palintucang, Bauang, La Union",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0467-006766",
      "hgabTitle": "Construction of Road, Barangay Palintucang, Bauang, La Union",
      "hgabPesos": 10000000,
      "nepPage": "465",
      "hgabPage": "467",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34707",
      "nepTitle": "Construction of Road, Barangay Palitod, Paracelis, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0483-007124",
      "hgabTitle": "Construction of Road, Barangay Palitod, Paracelis, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "474",
      "hgabPage": "483",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37099",
      "nepTitle": "Construction of Road, Barangay Pangabat, Jamindan, Capiz",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0569-008982",
      "hgabTitle": "Construction of Road, Barangay Pangabat, Jamindan, Capiz",
      "hgabPesos": 20000000,
      "nepPage": "525",
      "hgabPage": "569",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39340",
      "nepTitle": "Construction of Road, Barangay Panisijan, Uson, Masbate",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0565-008900",
      "hgabTitle": "Construction of Road, Barangay Panisijan, Uson, Masbate",
      "hgabPesos": 5000000,
      "nepPage": "523",
      "hgabPage": "565",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35846",
      "nepTitle": "Construction of Road, Barangay Partida II, Guimba, Nueva Ecija",
      "nepPesos": 6226000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0522-007960",
      "hgabTitle": "Construction of Road, Barangay Partida II, Guimba, Nueva Ecija",
      "hgabPesos": 6226000,
      "nepPage": "496",
      "hgabPage": "522",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36011",
      "nepTitle": "Construction of Road, Barangay Pasong Inchic, Guimba, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0522-007961",
      "hgabTitle": "Construction of Road, Barangay Pasong Inchic, Guimba, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "496",
      "hgabPage": "522",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38086",
      "nepTitle": "Construction of Road, Barangay Payahan, Sta. 0+000 - Sta. 0+247, Calbayog City, Samar",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0598-009615",
      "hgabTitle": "Construction of Road, Barangay Payahan, Sta. 0+000 - Sta. 0+247, Calbayog City, Samar",
      "hgabPesos": 5000000,
      "nepPage": "543",
      "hgabPage": "598",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35842",
      "nepTitle": "Construction of Road, Barangay Piglisan, Cuyapo, Nueva Ecija",
      "nepPesos": 5500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0522-007962",
      "hgabTitle": "Construction of Road, Barangay Piglisan, Cuyapo, Nueva Ecija",
      "hgabPesos": 5500000,
      "nepPage": "496",
      "hgabPage": "522",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35990",
      "nepTitle": "Construction of Road, Barangay Pinagpanaan, Talavera, Nueva Ecija",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0522-007963",
      "hgabTitle": "Construction of Road, Barangay Pinagpanaan, Talavera, Nueva Ecija",
      "hgabPesos": 10000000,
      "nepPage": "496",
      "hgabPage": "522",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35952",
      "nepTitle": "Construction of Road, Barangay Pinambaran, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0517-007843",
      "hgabTitle": "Construction of Road, Barangay Pinambaran, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "hgabPesos": 10000000,
      "nepPage": "493",
      "hgabPage": "517",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37950",
      "nepTitle": "Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0595-009566",
      "hgabTitle": "Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte",
      "hgabPesos": 5000000,
      "nepPage": "541",
      "hgabPage": "595",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10604",
      "nepTitle": "Construction of Road, Barangay Piut, Carranglan, Nueva Ecija Sta. 0+000 - Sta. 0+620",
      "nepPesos": 7000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0522-007964",
      "hgabTitle": "Construction of Road, Barangay Piut, Carranglan, Nueva Ecija Sta. 0+000 - Sta. 0+620",
      "hgabPesos": 7000000,
      "nepPage": "496",
      "hgabPage": "522",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37466",
      "nepTitle": "Construction of Road, Barangay Plaridel, Sagay City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0576-009134",
      "hgabTitle": "Construction of Road, Barangay Plaridel, Sagay City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "529",
      "hgabPage": "576",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34298",
      "nepTitle": "Construction of Road, Barangay Poblacion, Binalonan, Pangasinan",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0415-005768",
      "hgabTitle": "Construction of Road, Barangay Poblacion, Binalonan, Pangasinan",
      "hgabPesos": 20000000,
      "nepPage": "435",
      "hgabPage": "415",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34678",
      "nepTitle": "Construction of Road, Barangay Poblacion, Sagada, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37511",
      "nepTitle": "Construction of Road, Barangay Polo, Tanjay City, Negros Oriental",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0580-009221",
      "hgabTitle": "Construction of Road, Barangay Polo, Tanjay City, Negros Oriental",
      "hgabPesos": 5000000,
      "nepPage": "532",
      "hgabPage": "580",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37234",
      "nepTitle": "Construction of Road, Barangay Polocate, Banga, Aklan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0567-008942",
      "hgabTitle": "Construction of Road, Barangay Polocate, Banga, Aklan",
      "hgabPesos": 5000000,
      "nepPage": "524",
      "hgabPage": "567",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37961",
      "nepTitle": "Construction of Road, Barangay Pomponan, Sta. 0+000 - 0+372, Baybay City, Leyte",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0595-009567",
      "hgabTitle": "Construction of Road, Barangay Pomponan, Sta. 0+000 - 0+372, Baybay City, Leyte",
      "hgabPesos": 5000000,
      "nepPage": "541",
      "hgabPage": "595",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34462",
      "nepTitle": "Construction of Road, Barangay Pugaro, Dagupan City, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0472-006881",
      "hgabTitle": "Construction of Road, Barangay Pugaro, Dagupan City, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "467",
      "hgabPage": "472",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35865",
      "nepTitle": "Construction of Road, Barangay Pulong Bahay, Quezon, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0522-007967",
      "hgabTitle": "Construction of Road, Barangay Pulong Bahay, Quezon, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "496",
      "hgabPage": "522",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35954",
      "nepTitle": "Construction of Road, Barangay Pulong Bayabas, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0517-007845",
      "hgabTitle": "Construction of Road, Barangay Pulong Bayabas, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "hgabPesos": 10000000,
      "nepPage": "493",
      "hgabPage": "517",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35958",
      "nepTitle": "Construction of Road, Barangay Pulong Duhat, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0517-007846",
      "hgabTitle": "Rehabilitation of Road, Barangay Pulong Duhat, San Miguel, Bulacan Sta. 00+000 - 00+230",
      "hgabPesos": 10000000,
      "nepPage": "493",
      "hgabPage": "517",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37968",
      "nepTitle": "Construction of Road, Barangay Rivilla, Sta. 0+800 - 1+156, Bato, Leyte",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0596-009569",
      "hgabTitle": "Construction of Road, Barangay Rivilla, Sta. 0+800 - 1+156, Bato, Leyte",
      "hgabPesos": 5000000,
      "nepPage": "541",
      "hgabPage": "596",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37753",
      "nepTitle": "Construction of Road, Barangay Road, Barangay Anajao, Argao, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0584-009314",
      "hgabTitle": "Construction of Road, Barangay Balaas, Argao, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "534",
      "hgabPage": "584",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37750",
      "nepTitle": "Construction of Road, Barangay Road, Barangay Colawin, Argao, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0584-009323",
      "hgabTitle": "Construction of Road, Barangay Road, Barangay Colawin, Argao, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "534",
      "hgabPage": "584",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37754",
      "nepTitle": "Construction of Road, Barangay Road, Barangay Sumaguan, Argao, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0585-009328",
      "hgabTitle": "Construction of Road, Barangay Road, Barangay Sumaguan, Argao, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "534",
      "hgabPage": "585",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-05849",
      "nepTitle": "Construction of Road, Barangay Rosacara, Bansud, Oriental Mindoro",
      "nepPesos": 69000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0429-006038",
      "hgabTitle": "Construction of Road, Barangay Rosacara, Bansud, Oriental Mindoro",
      "hgabPesos": 69000000,
      "nepPage": "443",
      "hgabPage": "429",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35180",
      "nepTitle": "Construction of Road, Barangay Rosario, Santiago City, Isabela",
      "nepPesos": 10800000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36853",
      "nepTitle": "Construction of Road, Barangay Rumbang, Rizal, Occidental Mindoro",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0552-008614",
      "hgabTitle": "Construction of Road, Barangay Rumbang, Rizal, Occidental Mindoro",
      "hgabPesos": 15000000,
      "nepPage": "514",
      "hgabPage": "552",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21502",
      "nepTitle": "Construction of Road, Barangay S. Cabral, Siocon, Zamboanga del Norte",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0603-009710",
      "hgabTitle": "Construction of Road, Barangay S. Cabral, Siocon, Zamboanga del Norte",
      "hgabPesos": 30000000,
      "nepPage": "546",
      "hgabPage": "603",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37515",
      "nepTitle": "Construction of Road, Barangay Sab-ahan, Bais City, Negros Oriental",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0580-009222",
      "hgabTitle": "Construction of Road, Barangay Sab-ahan, Bais City, Negros Oriental",
      "hgabPesos": 10000000,
      "nepPage": "532",
      "hgabPage": "580",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34791",
      "nepTitle": "Construction of Road, Barangay Saclit, Sadanga, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0481-007095",
      "hgabTitle": "Construction of Road, Barangay Saclit, Sadanga, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "473",
      "hgabPage": "481",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38713",
      "nepTitle": "Construction of Road, Barangay Saguing, Makilala, North Cotabato",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0620-010062",
      "hgabTitle": "Construction of Road, Barangay Saguing, Makilala, North Cotabato",
      "hgabPesos": 10000000,
      "nepPage": "554",
      "hgabPage": "620",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34525",
      "nepTitle": "Construction of Road, Barangay Salaan, Mangaldan, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0472-006882",
      "hgabTitle": "Construction of Road, Barangay Salaan, Mangaldan, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "467",
      "hgabPage": "472",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34524",
      "nepTitle": "Construction of Road, Barangay Salay, Mangaldan, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0472-006883",
      "hgabTitle": "Construction of Road, Barangay Salay, Mangaldan, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "467",
      "hgabPage": "472",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37012",
      "nepTitle": "Construction of Road, Barangay Salvacion, Puerto Princesa City, Palawan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0556-008706",
      "hgabTitle": "Construction of Road, Barangay Salvacion, Puerto Princesa City, Palawan",
      "hgabPesos": 10000000,
      "nepPage": "517",
      "hgabPage": "556",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39288",
      "nepTitle": "Construction of Road, Barangay Samay, Ragay, Camarines Sur",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0560-008800",
      "hgabTitle": "Construction of Road, Barangay Samay, Ragay, Camarines Sur",
      "hgabPesos": 15000000,
      "nepPage": "520",
      "hgabPage": "560",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36012",
      "nepTitle": "Construction of Road, Barangay San Andres, Guimba, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0523-007972",
      "hgabTitle": "Construction of Road, Barangay San Andres, Guimba, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "496",
      "hgabPage": "523",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35834",
      "nepTitle": "Construction of Road, Barangay San Eustacio, Aliaga, Nueva Ecija",
      "nepPesos": 5730000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0523-007977",
      "hgabTitle": "Construction of Road, Barangay San Eustacio, Aliaga, Nueva Ecija",
      "hgabPesos": 5730000,
      "nepPage": "497",
      "hgabPage": "523",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36025",
      "nepTitle": "Construction of Road, Barangay San Fabian, Sto. Domingo, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0523-007978",
      "hgabTitle": "Construction of Road, Barangay San Fabian, Sto. Domingo, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "497",
      "hgabPage": "523",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34406",
      "nepTitle": "Construction of Road, Barangay San Fermin, Caba, La Union",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0467-006771",
      "hgabTitle": "Construction of Road, Barangay San Fermin, Caba, La Union",
      "hgabPesos": 15000000,
      "nepPage": "465",
      "hgabPage": "467",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34248",
      "nepTitle": "Construction of Road, Barangay San Fermin-San Jose, Caba, La Union",
      "nepPesos": 12500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0467-006772",
      "hgabTitle": "Construction of Road, Barangay San Fermin-San Jose, Caba, La Union",
      "hgabPesos": 12500000,
      "nepPage": "465",
      "hgabPage": "467",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36026",
      "nepTitle": "Construction of Road, Barangay San Francisco, Sto. Domingo, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0523-007979",
      "hgabTitle": "Construction of Road, Barangay San Francisco, Sto. Domingo, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "497",
      "hgabPage": "523",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38802",
      "nepTitle": "Construction of Road, Barangay San Isidro to Barangay MAHABA, Marihatag, Surigao del Sur",
      "nepPesos": 40000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0628-010218",
      "hgabTitle": "Construction of Road, Barangay San Isidro to Barangay MAHABA, Marihatag, Surigao del Sur",
      "hgabPesos": 40000000,
      "nepPage": "557",
      "hgabPage": "628",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37505",
      "nepTitle": "Construction of Road, Barangay San Isidro, Pamplona, Negros Oriental",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0580-009223",
      "hgabTitle": "Construction of Road, Barangay San Isidro, Pamplona, Negros Oriental",
      "hgabPesos": 10000000,
      "nepPage": "532",
      "hgabPage": "580",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39338",
      "nepTitle": "Construction of Road, Barangay San Jose to Barangay Madao, Uson, Masbate",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0565-008901",
      "hgabTitle": "Construction of Road, Barangay San Jose to Barangay Madao, Uson, Masbate",
      "hgabPesos": 20000000,
      "nepPage": "523",
      "hgabPage": "565",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35851",
      "nepTitle": "Construction of Road, Barangay San Jose, Licab, Nueva Ecija",
      "nepPesos": 5500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0523-007982",
      "hgabTitle": "Construction of Road, Barangay San Jose, Licab, Nueva Ecija",
      "hgabPesos": 5500000,
      "nepPage": "497",
      "hgabPage": "523",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36663",
      "nepTitle": "Construction of Road, Barangay San Jose, San Pablo City, Laguna",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0547-008497",
      "hgabTitle": "Construction of Road, Barangay San Jose, San Pablo City, Laguna",
      "hgabPesos": 5000000,
      "nepPage": "511",
      "hgabPage": "547",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37021",
      "nepTitle": "Construction of Road, Barangay San Juan, Aborlan, Palawan",
      "nepPesos": 25000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0556-008707",
      "hgabTitle": "Construction of Road, Barangay San Juan, Aborlan, Palawan",
      "hgabPesos": 25000000,
      "nepPage": "517",
      "hgabPage": "556",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35998",
      "nepTitle": "Construction of Road, Barangay San Juan, Aliaga, Nueva Ecija",
      "nepPesos": 7000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0523-007983",
      "hgabTitle": "Construction of Road, Barangay San Juan, Aliaga, Nueva Ecija",
      "hgabPesos": 7000000,
      "nepPage": "497",
      "hgabPage": "523",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39350",
      "nepTitle": "Construction of Road, Barangay San Juan, Canaman, Camarines Sur",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0561-008818",
      "hgabTitle": "Construction of Road, Barangay San Juan, Canaman, Camarines Sur",
      "hgabPesos": 20000000,
      "nepPage": "520",
      "hgabPage": "561",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35866",
      "nepTitle": "Construction of Road, Barangay San Manuel, Quezon, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0523-007985",
      "hgabTitle": "Construction of Road, Barangay San Manuel, Quezon, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "497",
      "hgabPage": "523",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35248",
      "nepTitle": "Construction of Road, Barangay San Miguel, Echague, Isabela",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0502-007538",
      "hgabTitle": "Construction of Road, Barangay San Miguel, Echague, Isabela",
      "hgabPesos": 50000000,
      "nepPage": "483",
      "hgabPage": "502",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35330",
      "nepTitle": "Construction of Road, Barangay San Miguel, Luna, Isabela",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0493-007343",
      "hgabTitle": "Construction of Road, Barangay San Miguel, Luna, Isabela",
      "hgabPesos": 36000000,
      "nepPage": "479",
      "hgabPage": "493",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36007",
      "nepTitle": "Construction of Road, Barangay San Pascual, Sto. Domingo, Nueva Ecija",
      "nepPesos": 5500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0523-007986",
      "hgabTitle": "Construction of Road, Barangay San Pascual, Sto. Domingo, Nueva Ecija",
      "hgabPesos": 5500000,
      "nepPage": "497",
      "hgabPage": "523",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35847",
      "nepTitle": "Construction of Road, Barangay San Rafael, Guimba, Nueva Ecija",
      "nepPesos": 7130750,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0523-007987",
      "hgabTitle": "Construction of Road, Barangay San Rafael, Guimba, Nueva Ecija",
      "hgabPesos": 7130750,
      "nepPage": "497",
      "hgabPage": "523",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34210",
      "nepTitle": "Construction of Road, Barangay San Ramon, Manaoag, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0472-006885",
      "hgabTitle": "Construction of Road, Barangay San Ramon, Manaoag, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "467",
      "hgabPage": "472",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35746",
      "nepTitle": "Construction of Road, Barangay San Roque, La Paz, Tarlac.",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0534-008203",
      "hgabTitle": "Construction of Road, Barangay San Roque, La Paz, Tarlac.",
      "hgabPesos": 5000000,
      "nepPage": "502",
      "hgabPage": "534",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37708",
      "nepTitle": "Construction of Road, Barangay San Roque, Liloan, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0587-009385",
      "hgabTitle": "Construction of Road, Barangay San Roque, Liloan, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "536",
      "hgabPage": "587",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34166",
      "nepTitle": "Construction of Road, Barangay San Vicente, Burgos, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0470-006837",
      "hgabTitle": "Construction of Road, Barangay San Vicente, Burgos, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "466",
      "hgabPage": "470",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36314",
      "nepTitle": "Construction of Road, Barangay Santo Domingo, Batangas City",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35943",
      "nepTitle": "Construction of Road, Barangay Sapang Dayap, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0517-007848",
      "hgabTitle": "Construction of Road, Barangay Sapang Dayap, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "hgabPesos": 10000000,
      "nepPage": "494",
      "hgabPage": "517",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35947",
      "nepTitle": "Construction of Road, Barangay Sapang Pahalang, San Rafael, Bulacan Sta. 00+000 - 00+400",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0517-007849",
      "hgabTitle": "Construction of Road, Barangay Sapang Pahalang, San Rafael, Bulacan Sta. 00+000 - 00+400",
      "hgabPesos": 10000000,
      "nepPage": "494",
      "hgabPage": "517",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35939",
      "nepTitle": "Construction of Road, Barangay Sapang Putik, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0517-007850",
      "hgabTitle": "Construction of Road, Barangay Sapang Putik, San Ildefonso, Bulacan, Sta. 00+000 - 00+420",
      "hgabPesos": 10000000,
      "nepPage": "494",
      "hgabPage": "517",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34233",
      "nepTitle": "Construction of Road, Barangay Sapang, Manaoag, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0472-006886",
      "hgabTitle": "Construction of Road, Barangay Sapang, Manaoag, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "467",
      "hgabPage": "472",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35992",
      "nepTitle": "Construction of Road, Barangay Sicsican, Matanda, Talavera, Nueva Ecija",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0523-007989",
      "hgabTitle": "Construction of Road, Barangay Sicsican, Matanda, Talavera, Nueva Ecija",
      "hgabPesos": 10000000,
      "nepPage": "497",
      "hgabPage": "523",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36581",
      "nepTitle": "Construction of Road, Barangay Sinturisan, San Nicolas, Batangas",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0539-008328",
      "hgabTitle": "Construction of Road, Barangay Sinturisan, San Nicolas, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "506",
      "hgabPage": "539",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35235",
      "nepTitle": "Construction of Road, Barangay Sta. Catalina, Quirino, Isabela",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0493-007345",
      "hgabTitle": "Construction of Road, Barangay Sta. Catalina, Quirino, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "479",
      "hgabPage": "493",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36006",
      "nepTitle": "Construction of Road, Barangay Sta. Cruz, Cuyapo, Nueva Ecija",
      "nepPesos": 5500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0524-007992",
      "hgabTitle": "Construction of Road, Barangay Sta. Cruz, Cuyapo, Nueva Ecija",
      "hgabPesos": 5500000,
      "nepPage": "497",
      "hgabPage": "524",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35107",
      "nepTitle": "Construction of Road, Barangay Sta. Isabel, Jones, Isabela",
      "nepPesos": 24000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0502-007539",
      "hgabTitle": "Construction of Road, Sta. 0+000 - Sta. 0+375, Barangay Sta. Isabel, Jones, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "483",
      "hgabPage": "502",
      "chainageStatus": "incomplete",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36596",
      "nepTitle": "Construction of Road, Barangay Sta. Maria, Sto. Tomas City, Batangas",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0539-008329",
      "hgabTitle": "Construction of Road, Barangay Sta. Maria, Sto. Tomas City, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "507",
      "hgabPage": "539",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37020",
      "nepTitle": "Construction of Road, Barangay Sta. Monica, Puerto Princesa City, Palawan",
      "nepPesos": 25000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0556-008708",
      "hgabTitle": "Construction of Road, Barangay Sta. Monica, Puerto Princesa City, Palawan",
      "hgabPesos": 25000000,
      "nepPage": "517",
      "hgabPage": "556",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36887",
      "nepTitle": "Construction of Road, Barangay Sta. Putican Cabulo, Baco, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35955",
      "nepTitle": "Construction of Road, Barangay Sta. Rita Matanda, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0517-007851",
      "hgabTitle": "Construction of Road, Barangay Sta. Rita Matanda, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "hgabPesos": 10000000,
      "nepPage": "494",
      "hgabPage": "517",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36877",
      "nepTitle": "Construction of Road, Barangay Sta. Rita, City of Calapan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35867",
      "nepTitle": "Construction of Road, Barangay Sta. Rita, Quezon, Nueva Ecija",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0524-007994",
      "hgabTitle": "Construction of Road, Barangay Sta. Rita, Quezon, Nueva Ecija",
      "hgabPesos": 5000000,
      "nepPage": "497",
      "hgabPage": "524",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35870",
      "nepTitle": "Construction of Road, Barangay Sta. Rita, Sto. Domingo, Nueva Ecija",
      "nepPesos": 5670000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0524-007995",
      "hgabTitle": "Construction of Road, Barangay Sta. Rita, Sto. Domingo, Nueva Ecija",
      "hgabPesos": 5670000,
      "nepPage": "497",
      "hgabPage": "524",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34396",
      "nepTitle": "Construction of Road, Barangay Sta. Rosa, Sta. Maria, Pangasinan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0473-006908",
      "hgabTitle": "Construction of Road, Barangay Sta. Rosa, Sta. Maria, Pangasinan",
      "hgabPesos": 10000000,
      "nepPage": "468",
      "hgabPage": "473",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35983",
      "nepTitle": "Construction of Road, Barangay Sto. Tomas, Aliaga, Nueva Ecija",
      "nepPesos": 11754500,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0524-007999",
      "hgabTitle": "Construction of Road, Barangay Sto. Tomas, Aliaga, Nueva Ecija",
      "hgabPesos": 11754500,
      "nepPage": "497",
      "hgabPage": "524",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34795",
      "nepTitle": "Construction of Road, Barangay Sumadel, Tadian, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0482-007097",
      "hgabTitle": "Construction of Road, Barangay Sumadel, Tadian, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "473",
      "hgabPage": "482",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37317",
      "nepTitle": "Construction of Road, Barangay Tacbuyan, Estancia, Iloilo",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0572-009048",
      "hgabTitle": "Construction of Road, Barangay Tacbuyan, Estancia, Iloilo",
      "hgabPesos": 10000000,
      "nepPage": "527",
      "hgabPage": "572",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35879",
      "nepTitle": "Construction of Road, Barangay Tagaytay, Talavera, Nueva Ecija",
      "nepPesos": 6500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0524-008000",
      "hgabTitle": "Construction of Road, Barangay Tagaytay, Talavera, Nueva Ecija",
      "hgabPesos": 6500000,
      "nepPage": "498",
      "hgabPage": "524",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36469",
      "nepTitle": "Construction of Road, Barangay Tagbakin, Tiaong, Quezon",
      "nepPesos": 16000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0549-008543",
      "hgabTitle": "Construction of Road, Barangay Tagbakin, Tiaong, Quezon",
      "hgabPesos": 16000000,
      "nepPage": "512",
      "hgabPage": "549",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37516",
      "nepTitle": "Construction of Road, Barangay Tagpo, Bais City, Negros Oriental",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0580-009226",
      "hgabTitle": "Construction of Road, Barangay Tagpo, Bais City, Negros Oriental",
      "hgabPesos": 10000000,
      "nepPage": "532",
      "hgabPage": "580",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36470",
      "nepTitle": "Construction of Road, Barangay Talisay, Tiaong, Quezon",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0549-008544",
      "hgabTitle": "Construction of Road, Barangay Talisay, Tiaong, Quezon",
      "hgabPesos": 15000000,
      "nepPage": "512",
      "hgabPage": "549",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34669",
      "nepTitle": "Construction of Road, Barangay Talubin, Bontoc, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0482-007099",
      "hgabTitle": "Construction of Road, Barangay Talubin, Bontoc, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "473",
      "hgabPage": "482",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34679",
      "nepTitle": "Construction of Road, Barangay Tanulong, Sagada, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0482-007101",
      "hgabTitle": "Construction of Road, Barangay Tanulong, Sagada, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "473",
      "hgabPage": "482",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34664",
      "nepTitle": "Construction of Road, Barangay Tapapan, Bauko, Mountain Province",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0482-007102",
      "hgabTitle": "Construction of Road, Barangay Tapapan, Bauko, Mountain Province",
      "hgabPesos": 5000000,
      "nepPage": "473",
      "hgabPage": "482",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34217",
      "nepTitle": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0472-006889",
      "hgabTitle": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "467",
      "hgabPage": "472",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35956",
      "nepTitle": "Construction of Road, Barangay Tibagan, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0517-007852",
      "hgabTitle": "Construction of Road, Barangay Tibagan, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "hgabPesos": 10000000,
      "nepPage": "494",
      "hgabPage": "517",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37491",
      "nepTitle": "Construction of Road, Barangay Tiglawigan, Cadiz City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0576-009136",
      "hgabTitle": "Construction of Road, Barangay Tiglawigan, Cadiz City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "529",
      "hgabPage": "576",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37422",
      "nepTitle": "Construction of Road, Barangay Timbao, Bacong, Negros Oriental",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0581-009248",
      "hgabTitle": "Construction of Road, Barangay Timbao, Bacong, Negros Oriental",
      "hgabPesos": 10000000,
      "nepPage": "533",
      "hgabPage": "581",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34163",
      "nepTitle": "Construction of Road, Barangay Tipor, Bani, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0470-006838",
      "hgabTitle": "Construction of Road, Barangay Tipor, Bani, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "466",
      "hgabPage": "470",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34221",
      "nepTitle": "Construction of Road, Barangay Tocok, San Fabian, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0472-006892",
      "hgabTitle": "Construction of Road, Barangay Tocok, San Fabian, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "467",
      "hgabPage": "472",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37957",
      "nepTitle": "Construction of Road, Barangay Tuy-a, Sta. 0+600 - 0+968, Abuyog, Leyte",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0596-009575",
      "hgabTitle": "Construction of Road, Barangay Tuy-a, Sta. 0+600 - 0+968, Abuyog, Leyte",
      "hgabPesos": 5000000,
      "nepPage": "541",
      "hgabPage": "596",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35945",
      "nepTitle": "Construction of Road, Barangay Umpucan, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0517-007853",
      "hgabTitle": "Construction of Road, Barangay Umpucan, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "hgabPesos": 10000000,
      "nepPage": "494",
      "hgabPage": "517",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38313",
      "nepTitle": "Construction of Road, Barangay Upper Tambaking, Maimbung, Sulu Sta. 00+500 to Sta. 02+000",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0600-009651",
      "hgabTitle": "Construction of Road, Barangay Upper Tambaking, Maimbung, Sulu Sta. 00+500 to Sta. 02+000",
      "hgabPesos": 50000000,
      "nepPage": "544",
      "hgabPage": "600",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34183",
      "nepTitle": "Construction of Road, Barangay Viga, Agno, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0470-006839",
      "hgabTitle": "Construction of Road, Barangay Viga, Agno, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "466",
      "hgabPage": "470",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37963",
      "nepTitle": "Construction of Road, Barangay Villa Mag-aso, Sta. 0+000 - 0+370, Baybay City, Leyte",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0596-009576",
      "hgabTitle": "Construction of Road, Barangay Villa Mag-aso, Sta. 0+000 - 0+370, Baybay City, Leyte",
      "hgabPesos": 5000000,
      "nepPage": "541",
      "hgabPage": "596",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-05847",
      "nepTitle": "Construction of Road, Barangay Villa Pag-asa, Bansud, Oriental Mindoro",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0557-008737",
      "hgabTitle": "Construction of Road, Barangay Villa Pag-asa, Bansud, Oriental Mindoro",
      "hgabPesos": 15000000,
      "nepPage": "518",
      "hgabPage": "557",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36033",
      "nepTitle": "Construction of Road, Barangay Villaflores, Cuyapo, Nueva Ecija",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0524-008004",
      "hgabTitle": "Construction of Road, Barangay Villaflores, Cuyapo, Nueva Ecija",
      "hgabPesos": 10000000,
      "nepPage": "498",
      "hgabPage": "524",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34249",
      "nepTitle": "Construction of Road, Barangay of San Cornelio-Bautista, Caba, La Union",
      "nepPesos": 18750000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0466-006764",
      "hgabTitle": "Construction of Road, Barangay of San Cornelio-Bautista, Caba, La Union",
      "hgabPesos": 18750000,
      "nepPage": "465",
      "hgabPage": "466",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36838",
      "nepTitle": "Construction of Road, Batong Buhay, Sablayan, Occidental Mindoro",
      "nepPesos": 8000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0552-008615",
      "hgabTitle": "Construction of Road, Batong Buhay, Sablayan, Occidental Mindoro",
      "hgabPesos": 8000000,
      "nepPage": "514",
      "hgabPage": "552",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38803",
      "nepTitle": "Construction of Road, Baucawe, Lianga, Surigao del Sur",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0628-010223",
      "hgabTitle": "Construction of Road, Baucawe, Lianga, Surigao del Sur",
      "hgabPesos": 30000000,
      "nepPage": "558",
      "hgabPage": "628",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39203",
      "nepTitle": "Construction of Road, Brgy. Princesa to Brgy. Andil, Baroy Lanao Del Norte",
      "nepPesos": 40000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0611-009879",
      "hgabTitle": "Construction of Road, Barangay Princesa to Barangay Andil, Baroy Lanao Del Norte",
      "hgabPesos": 40000000,
      "nepPage": "551",
      "hgabPage": "611",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38224",
      "nepTitle": "Construction of Road, Brgy. Sanao, Katipunan, Zamboanga del Norte",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0601-009676",
      "hgabTitle": "Construction of Road, Barangay Sanao, Katipunan, Zamboanga del Norte",
      "hgabPesos": 5000000,
      "nepPage": "544",
      "hgabPage": "601",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38260",
      "nepTitle": "Construction of Road, Brgy. Tulapok, Margosatubig, Zamboanga del Sur",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0605-009753",
      "hgabTitle": "Construction of Road, Barangay Tulapok, Margosatubig, Zamboanga del Sur",
      "hgabPesos": 20000000,
      "nepPage": "547",
      "hgabPage": "605",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35528",
      "nepTitle": "Construction of Road, Caduang Tete, Macabebe, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0526-008041",
      "hgabTitle": "Construction of Road, Caduang Tete, Macabebe, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "498",
      "hgabPage": "526",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35530",
      "nepTitle": "Construction of Road, Candelaria, Macabebe, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0526-008043",
      "hgabTitle": "Construction of Road, Candelaria, Macabebe, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "498",
      "hgabPage": "526",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35519",
      "nepTitle": "Construction of Road, Dalayap, Candaba, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0526-008053",
      "hgabTitle": "Construction of Road, Dalayap, Candaba, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "526",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-06079",
      "nepTitle": "Construction of Road, F-Rafols Road, Sta. 00+504 - Sta. 00+979, Barangay Sta. Monica, Puerto Princesa City, Palawan",
      "nepPesos": 60000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0429-006041",
      "hgabTitle": "Construction of Road, F-Rafols Road, Sta. 00+504 - Sta. 00+979, Barangay Sta. Monica, Puerto Princesa City, Palawan",
      "hgabPesos": 60000000,
      "nepPage": "443",
      "hgabPage": "429",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35135",
      "nepTitle": "Construction of Road, Gabriela Silang, Diffun, Quirino",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0505-007599",
      "hgabTitle": "Construction of Road, Gabriela Silang, Diffun, Quirino",
      "hgabPesos": 10000000,
      "nepPage": "484",
      "hgabPage": "505",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35131",
      "nepTitle": "Construction of Road, Guribang, Diffun, Quirino",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0505-007600",
      "hgabTitle": "Construction of Road, Guribang, Diffun, Quirino",
      "hgabPesos": 10000000,
      "nepPage": "484",
      "hgabPage": "505",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35802",
      "nepTitle": "Construction of Road, Labina Street, Barangay Talimundoc, Orani, Bataan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0506-007621",
      "hgabTitle": "Construction of Road, Labina Street, Barangay Talimundoc, Orani, Bataan",
      "hgabPesos": 5000000,
      "nepPage": "484",
      "hgabPage": "506",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37739",
      "nepTitle": "Construction of Road, Langub Barangay Road, Barangay Langub, Argao, Cebu",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0585-009336",
      "hgabTitle": "Construction of Road, Langub Barangay Road, Barangay Langub, Argao, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "535",
      "hgabPage": "585",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35354",
      "nepTitle": "Construction of Road, Mabbayad To Benguet, Barangay Mabbayad And Barangay Benguet, Echague, Isabela",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0502-007544",
      "hgabTitle": "Construction of Road, Mabbayad To Benguet, Barangay Mabbayad And Barangay Benguet, Echague, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "483",
      "hgabPage": "502",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35521",
      "nepTitle": "Construction of Road, Mandasig, Candaba, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0526-008056",
      "hgabTitle": "Construction of Road, Mandasig, Candaba, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "526",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35127",
      "nepTitle": "Construction of Road, Mataddi, Nagtipunan, Quirino",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0505-007601",
      "hgabTitle": "Construction of Road, Mataddi, Nagtipunan, Quirino",
      "hgabPesos": 15000000,
      "nepPage": "484",
      "hgabPage": "505",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35531",
      "nepTitle": "Construction of Road, Mataguiti, Macabebe, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0526-008057",
      "hgabTitle": "Construction of Road, Mataguiti, Macabebe, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "526",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35510",
      "nepTitle": "Construction of Road, Moras Dela Paz, Sto. Tomas, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0526-008058",
      "hgabTitle": "Construction of Road, Moras Dela Paz, Sto. Tomas, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "526",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21337",
      "nepTitle": "Construction of Road, Panansalan, (Sta. 5+820 - Sta. 6+620), Compostela, Davao de Oro",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0617-010006",
      "hgabTitle": "Construction of Road, Panansalan, (Sta. 5+820 - Sta. 6+620), Compostela, Davao de Oro",
      "hgabPesos": 50000000,
      "nepPage": "553",
      "hgabPage": "617",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37017",
      "nepTitle": "Construction of Road, Purok Pagkakaisa, Forbes Hill, Barangay Santa Monica, Puerto Princesa City, Palawan",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0556-008709",
      "hgabTitle": "Construction of Road, Purok Pagkakaisa, Forbes Hill, Barangay Santa Monica, Puerto Princesa City, Palawan",
      "hgabPesos": 15000000,
      "nepPage": "517",
      "hgabPage": "556",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35113",
      "nepTitle": "Construction of Road, Rambo Drive, Buyun, Santa Teresita, Cagayan",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0485-007175",
      "hgabTitle": "Construction of Road, Rambo Drive, Buyun, Santa Teresita, Cagayan",
      "hgabPesos": 20000000,
      "nepPage": "475",
      "hgabPage": "485",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35133",
      "nepTitle": "Construction of Road, Rizal, Diffun, Quirino",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0505-007603",
      "hgabTitle": "Construction of Road, Rizal, Diffun, Quirino",
      "hgabPesos": 10000000,
      "nepPage": "484",
      "hgabPage": "505",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35507",
      "nepTitle": "Construction of Road, Sagrada, Masantol, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008064",
      "hgabTitle": "Construction of Road, Sagrada, Masantol, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35126",
      "nepTitle": "Construction of Road, San Dionisio II, Nagtipunan, Quirino",
      "nepPesos": 40000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0505-007604",
      "hgabTitle": "Construction of Road, San Dionisio II, Nagtipunan, Quirino",
      "hgabPesos": 40000000,
      "nepPage": "484",
      "hgabPage": "505",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33653",
      "nepTitle": "Construction of Road, San Fernando, Sta Cruz, Zambales, Sta. 1+500.00 - Sta. 2+500.00",
      "nepPesos": 150000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35529",
      "nepTitle": "Construction of Road, San Francisco, Macabebe, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008065",
      "hgabTitle": "Construction of Road, San Francisco, Macabebe, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35481",
      "nepTitle": "Construction of Road, San Isidro, Minalin, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008067",
      "hgabTitle": "Construction of Road, San Isidro, Minalin, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35537",
      "nepTitle": "Construction of Road, San Jose, San Luis, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008068",
      "hgabTitle": "Construction of Road, San Jose, San Luis, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35539",
      "nepTitle": "Construction of Road, San Juan, San Luis, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008070",
      "hgabTitle": "Construction of Road, San Juan, San Luis, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35509",
      "nepTitle": "Construction of Road, San Matias, Sto. Tomas, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008071",
      "hgabTitle": "Construction of Road, San Matias, Sto. Tomas, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35491",
      "nepTitle": "Construction of Road, San Miguel, San Simon, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008072",
      "hgabTitle": "Construction of Road, San Miguel, San Simon, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35484",
      "nepTitle": "Construction of Road, San Nicolas, Minalin, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008073",
      "hgabTitle": "Construction of Road, San Nicolas, Minalin, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35488",
      "nepTitle": "Construction of Road, San Pablo Libutad, San Simon, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008075",
      "hgabTitle": "Construction of Road, San Pablo Libutad, San Simon, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35535",
      "nepTitle": "Construction of Road, San Roque, Macabebe, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008076",
      "hgabTitle": "Construction of Road, San Roque, Macabebe, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35495",
      "nepTitle": "Construction of Road, San Vicente, Apalit, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008077",
      "hgabTitle": "Construction of Road, San Vicente, Apalit, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38619",
      "nepTitle": "Construction of Road, Sitio Atras Barangay Liliongan, to Sitio Casia, Barangay Kibudtungan, Carmen, Cotabato",
      "nepPesos": 37000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0621-010071",
      "hgabTitle": "Construction of Road, Sitio Atras Barangay Liliongan, to Sitio Casia, Barangay Kibudtungan, Carmen, Cotabato",
      "hgabPesos": 37000000,
      "nepPage": "555",
      "hgabPage": "621",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34401",
      "nepTitle": "Construction of Road, Sitio Canubat, Barangay San Jose, Caba, La Union",
      "nepPesos": 11490000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0467-006781",
      "hgabTitle": "Construction of Road, Sitio Canubat, Barangay San Jose, Caba, La Union",
      "hgabPesos": 11490000,
      "nepPage": "465",
      "hgabPage": "467",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21460",
      "nepTitle": "Construction of Road, Sitio Macayas, Barangay Mandhi, Sindangan to Sitio Suminugod, Barangay Guibo, Siayan, Zamboanga del Norte",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0438-006212",
      "hgabTitle": "Construction of Road, Sitio Macayas, Barangay Mandhi, Sindangan to Sitio Suminugod, Barangay Guibo, Siayan, Zamboanga del Norte",
      "hgabPesos": 100000000,
      "nepPage": "449",
      "hgabPage": "438",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37239",
      "nepTitle": "Construction of Road, Sitio Pandan, Barangay Bay-ang, Batan, Aklan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0567-008955",
      "hgabTitle": "Construction of Road, Sitio Pandan, Barangay Bay-ang, Batan, Aklan",
      "hgabPesos": 5000000,
      "nepPage": "524",
      "hgabPage": "567",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34126",
      "nepTitle": "Construction of Road, Sitio Tamurong, Barangay San Lorenzo, San Nicolas, Ilocos Norte",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0465-006722",
      "hgabTitle": "Construction of Road, Sitio Tamurong, Barangay San Lorenzo, San Nicolas, Ilocos Norte",
      "hgabPesos": 5000000,
      "nepPage": "464",
      "hgabPage": "465",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03404",
      "nepTitle": "Construction of Road, Sta. 0+000 - Sta. 1+238, Tambubong, Bocaue, Bulacan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0509-007677",
      "hgabTitle": "Construction of Road, Sta. 0+000 - Sta. 1+238, Tambubong, Bocaue, Bulacan",
      "hgabPesos": 10000000,
      "nepPage": "486",
      "hgabPage": "509",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03472",
      "nepTitle": "Construction of Road, Sta. 0+763 - Sta. 2+013, Abulalas, Hagonoy, Bulacan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0509-007678",
      "hgabTitle": "Construction of Road, Sta. 0+763 - Sta. 2+013, Abulalas, Hagonoy, Bulacan",
      "hgabPesos": 10000000,
      "nepPage": "486",
      "hgabPage": "509",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35483",
      "nepTitle": "Construction of Road, Sta. Rita, Minalin, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008082",
      "hgabTitle": "Construction of Road, Sta. Rita, Minalin, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35538",
      "nepTitle": "Construction of Road, Sta. Rita, San Luis, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008083",
      "hgabTitle": "Construction of Road, Sta. Rita, San Luis, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35490",
      "nepTitle": "Construction of Road, Sta.Cruz, San Simon, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008084",
      "hgabTitle": "Construction of Road, Sta.Cruz, San Simon, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35489",
      "nepTitle": "Construction of Road, Sta.Monica, San Simon, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008085",
      "hgabTitle": "Construction of Road, Sta.Monica, San Simon, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35482",
      "nepTitle": "Construction of Road, Sto. Rosario, Minalin, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008086",
      "hgabTitle": "Construction of Road, Sto. Rosario, Minalin, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35497",
      "nepTitle": "Construction of Road, Sucad, Apalit, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0527-008087",
      "hgabTitle": "Construction of Road, Sucad, Apalit, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "499",
      "hgabPage": "527",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35524",
      "nepTitle": "Construction of Road, Tagulod, Candaba, Pampanga",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0528-008089",
      "hgabTitle": "Construction of Road, Tagulod, Candaba, Pampanga",
      "hgabPesos": 5000000,
      "nepPage": "500",
      "hgabPage": "528",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34526",
      "nepTitle": "Construction of Road, Tebag, Mangaldan, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0472-006897",
      "hgabTitle": "Construction of Road, Tebag, Mangaldan, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "468",
      "hgabPage": "472",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37655",
      "nepTitle": "Construction of Roads, Barangay Mansilingan, Bacolod City",
      "nepPesos": 25000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0574-009096",
      "hgabTitle": "Construction of Roads, Barangay Mansilingan, Bacolod City",
      "hgabPesos": 25000000,
      "nepPage": "528",
      "hgabPage": "574",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39273",
      "nepTitle": "Construction of Roads, Barangay Sagrada to Barangay Pag-asa, Tinambac, Camarines Sur",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0563-008857",
      "hgabTitle": "Construction of Roads, Barangay Sagrada to Barangay Pag-asa, Tinambac, Camarines Sur",
      "hgabPesos": 15000000,
      "nepPage": "521",
      "hgabPage": "563",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37654",
      "nepTitle": "Construction of Roads, Barangay Singcang-Airport, Bacolod City",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0574-009097",
      "hgabTitle": "Construction of Roads, Barangay Singcang-Airport, Bacolod City",
      "hgabPesos": 10000000,
      "nepPage": "528",
      "hgabPage": "574",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-04055",
      "nepTitle": "Construction of San Fernando Road, San Fernando, Sta Cruz, Zambales Sta. 0+000.00 - Sta. 1+500.00",
      "nepPesos": 135000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0422-005900",
      "hgabTitle": "Construction of San Fernando Road, San Fernando, Sta Cruz, Zambales Sta. 0+000.00 - Sta. 1+500.00",
      "hgabPesos": 135000000,
      "nepPage": "439",
      "hgabPage": "422",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-23368",
      "nepTitle": "Construction of San Francisco Barangay Road, Mabini, Batangas",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0538-008288",
      "hgabTitle": "Construction of San Francisco Barangay Road, Mabini, Batangas",
      "hgabPesos": 20000000,
      "nepPage": "505",
      "hgabPage": "538",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-23851",
      "nepTitle": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 15+940 – Sta. 16+200",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0427-005998",
      "hgabTitle": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 15+940 – Sta. 16+200",
      "hgabPesos": 70000000,
      "nepPage": "442",
      "hgabPage": "427",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-23847",
      "nepTitle": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 4+523 – Sta. 4+900",
      "nepPesos": 145000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0427-005999",
      "hgabTitle": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 4+523 – Sta. 4+900",
      "hgabPesos": 145000000,
      "nepPage": "442",
      "hgabPage": "427",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-05816",
      "nepTitle": "Construction of Upper Lapu-Lapu Road, Barangay Poblacion, Narra, Palawan",
      "nepPesos": 115000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0429-006043",
      "hgabTitle": "Construction of Upper Lapu-Lapu Road, Barangay Poblacion, Narra, Palawan",
      "hgabPesos": 115000000,
      "nepPage": "444",
      "hgabPage": "429",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32764",
      "nepTitle": "Construction of Vigan-Cabugao Coastal/Diversion Road, Ilocos Sur",
      "nepPesos": 195000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0214-001880",
      "hgabTitle": "Construction of Vigan-Cabugao Coastal/Diversion Road, Ilocos Sur",
      "hgabPesos": 195000000,
      "nepPage": "277",
      "hgabPage": "214",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35741",
      "nepTitle": "Construction/Concreting of Road, Barangay Mayang, La Paz, Tarlac",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0534-008205",
      "hgabTitle": "Construction/Concreting of Road, Barangay Mayang, La Paz, Tarlac",
      "hgabPesos": 5000000,
      "nepPage": "502",
      "hgabPage": "534",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37760",
      "nepTitle": "Construction/Rehabilitation of Road, Barangay Road, Barangay Binlod, Argao, Cebu",
      "nepPesos": 9000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0585-009341",
      "hgabTitle": "Construction/Rehabilitation of Road, Barangay Road, Barangay Binlod, Argao, Cebu",
      "hgabPesos": 5000000,
      "nepPage": "535",
      "hgabPage": "585",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-24013",
      "nepTitle": "Cordon Bypass Road, Sta. 3+555 - Sta. 3+582, Isabela",
      "nepPesos": 6000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20648",
      "nepTitle": "Dagupan-Mangaldan Diversion Road, Dagupan City-Mangaldan, Sta. 0+861-Sta.1+512, Sta.5+280-Sta.-Sta.6+089.9 Pangasinan",
      "nepPesos": 427765000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20477",
      "nepTitle": "Datu Paglas - Columbio - Matanao Road, Sta. 0+000 - Sta. 0+165, Sta. 2+030 - Sta. 2+290, Sta. 2+370 - Sta. 4+060, Sta. 7+885 - Sta. 9+065, Sultan Kudarat",
      "nepPesos": 150000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0241-002383",
      "hgabTitle": "Datu Paglas - Columbio - Matanao Road, Sta. 0+000 - Sta. 0+165, Sta. 2+030 - Sta. 2+290, Sta. 2+370 - Sta. 4+060, Sta. 7+885 - Sta. 9+065, Sultan Kudarat",
      "hgabPesos": 150000000,
      "nepPage": "300",
      "hgabPage": "241",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20478",
      "nepTitle": "Datu Paglas - Columbio - Matanao Road, Sta. 0+165 - Sta. 2+030, Sta. 2+290 - Sta. 2+370, Sta. 4+150 - Sta. 7+885, Sultan Kudarat",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0241-002384",
      "hgabTitle": "Datu Paglas - Columbio - Matanao Road, Sta. 0+165 - Sta. 2+030, Sta. 2+290 - Sta. 2+370, Sta. 4+150 - Sta. 7+885, Sultan Kudarat",
      "hgabPesos": 100000000,
      "nepPage": "300",
      "hgabPage": "241",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33035",
      "nepTitle": "Davao City Coastal Road (Talomo Section) - Davao Bukidnon Road (Catalunan Pequeño - Mintal Section-Calinan Section) Bypass Road (Viaduct), Brgy. Catalunan Pequeño - Brgy. Talomo, Sta. 1514+070 - Sta. 1517+128.43, Davao City",
      "nepPesos": 158605000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20464",
      "nepTitle": "Doroluman-President Roxas-Kadingilan Road, Sta. 10+354 - Sta. 12+354, Cotabato",
      "nepPesos": 165000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0241-002385",
      "hgabTitle": "Doroluman-President Roxas-Kadingilan Road, Sta. 10+354 - Sta. 12+354, Cotabato",
      "hgabPesos": 165000000,
      "nepPage": "300",
      "hgabPage": "241",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20300",
      "nepTitle": "Dr. Damian Reyes Memorial Road, Sta. 29+695.00 - Sta. 30+095.00, Sta. 32+026.00 - Sta. 32+826.00, Sta. 38+880.00 - Sta. 39+380.00, Boac, Marinduque,",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0237-002317",
      "hgabTitle": "Dr. Damian Reyes Memorial Road, Sta. 29+695.00 - Sta. 30+095.00, Sta. 32+026.00 - Sta. 32+826.00, Sta. 38+880.00 - Sta. 39+380.00, Boac, Marinduque,",
      "hgabPesos": 100000000,
      "nepPage": "296",
      "hgabPage": "237",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-31642",
      "nepTitle": "East-West Lateral Road Connecting Agusan del Sur / Agusan del Norte to Bukidnon, Sampaguita - Makilos (Agusan del Sur/ Bukidnon Boundary), (Sta. 72+020 - Sta. 74+520),Agusan del Sur",
      "nepPesos": 250000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33470",
      "nepTitle": "Estaka Road leading to Naga Valley (NAVA) Industrial Park, Cebu",
      "nepPesos": 300000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0435-006159",
      "hgabTitle": "Estaka Road leading to Naga Valley (NAVA) Industrial Park, Cebu",
      "hgabPesos": 300000000,
      "nepPage": "447",
      "hgabPage": "435",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32769",
      "nepTitle": "Gattaran Diversion Road, Sta. 6+000 - Sta. 7+250, Sta. 7+757 - Sta. 8+530, Cagayan",
      "nepPesos": 110002000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0216-001920",
      "hgabTitle": "Gattaran Diversion Road, Sta. 6+000 - Sta. 7+250, Sta. 7+757 - Sta. 8+530, Cagayan",
      "hgabPesos": 110002000,
      "nepPage": "278",
      "hgabPage": "216",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32768",
      "nepTitle": "Gattaran Diversion Road, Sta. 7+250 - Sta. 7+757, Cagayan",
      "nepPesos": 52500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0216-001921",
      "hgabTitle": "Gattaran Diversion Road, Sta. 7+250 - Sta. 7+757, Cagayan",
      "hgabPesos": 52500000,
      "nepPage": "278",
      "hgabPage": "216",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-24022",
      "nepTitle": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
      "nepPesos": 130000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0236-002290",
      "hgabTitle": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
      "hgabPesos": 130000000,
      "nepPage": "295",
      "hgabPage": "236",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33463",
      "nepTitle": "Gingoog Bypass Road, Brgy. 26 Section, Sta. 4+278 - Sta. 4+348, Gingoog City, Misamis Oriental",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0233-002243",
      "hgabTitle": "Gingoog Bypass Road, Barangay 26 Section, Sta. 4+278 - Sta. 4+348, Gingoog City, Misamis Oriental",
      "hgabPesos": 20000000,
      "nepPage": "292",
      "hgabPage": "233",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32775",
      "nepTitle": "Iguig Bypass Road, Sta. 0+100 - Sta. 0+274, Sta. 3+500 - Sta. 3+680, Cagayan",
      "nepPesos": 60000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0216-001922",
      "hgabTitle": "Iguig Bypass Road, Sta. 0+100 - Sta. 0+274, Sta. 3+500 - Sta. 3+680, Cagayan",
      "hgabPesos": 60000000,
      "nepPage": "278",
      "hgabPage": "216",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32880",
      "nepTitle": "Iloilo Circumferential Road 3, Sta. 3+580 - Sta. 4+780, Iloilo",
      "nepPesos": 200000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0222-002047",
      "hgabTitle": "Iloilo Circumferential Road 3, Sta. 3+330.50 - Sta. 3+993.50, Iloilo",
      "hgabPesos": 150000000,
      "nepPage": "283",
      "hgabPage": "222",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20715",
      "nepTitle": "Iloilo R-1 Bypass Road, Oton, Iloilo - Sta. 10+206.35 - Sta. 10+599.59",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0222-002048",
      "hgabTitle": "Iloilo R-1 Bypass Road, Oton, Iloilo - Sta. 10+206.35 - Sta. 10+599.59",
      "hgabPesos": 50000000,
      "nepPage": "283",
      "hgabPage": "222",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20717",
      "nepTitle": "Iloilo River North Bank Road, Sta. 4+700 - Sta. 5+000, Oton, Iloilo",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0222-002049",
      "hgabTitle": "Iloilo River North Bank Road, Sta. 4+700 - Sta. 5+000, Oton, Iloilo",
      "hgabPesos": 30000000,
      "nepPage": "283",
      "hgabPage": "222",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37680",
      "nepTitle": "Improvement of Barangay Lanao Road, at Barangay Lanao, Moalboal, Cebu",
      "nepPesos": 7000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0589-009438",
      "hgabTitle": "Improvement of Barangay Lanao Road, at Barangay Lanao, Moalboal, Cebu",
      "hgabPesos": 7000000,
      "nepPage": "538",
      "hgabPage": "589",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34747",
      "nepTitle": "Improvement of Calabigan-Cagandungan Road, Barangay Calabigan and Cagandungan, Luna, Apayao",
      "nepPesos": 123000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0417-005801",
      "hgabTitle": "Improvement of Calabigan-Cagandungan Road, Barangay Calabigan and Cagandungan, Luna, Apayao",
      "hgabPesos": 123000000,
      "nepPage": "435",
      "hgabPage": "417",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33592",
      "nepTitle": "Improvement of Malolos Paombong Hagonoy Calumpit Road, Municipality of Calumpit, Bulacan",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0422-005904",
      "hgabTitle": "Improvement of Malolos Paombong Hagonoy Calumpit Road, Municipality of Calumpit, Bulacan",
      "hgabPesos": 100000000,
      "nepPage": "439",
      "hgabPage": "422",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37695",
      "nepTitle": "Improvement of Panlaan-Balaygtiki Road at Barangay Panlaan and Balaygtiki, Dumanjug, Cebu",
      "nepPesos": 7000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0589-009441",
      "hgabTitle": "Construction of Panlaan-Balaygtiki Road at Barangay Panlaan and Balaygtiki, Dumanjug, Cebu",
      "hgabPesos": 9000000,
      "nepPage": "538",
      "hgabPage": "589",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33548",
      "nepTitle": "Improvement of Rissing to Paratong No.4 Road leading to Paratong District Beach, Bangar, La Union",
      "nepPesos": 75000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0416-005770",
      "hgabTitle": "Improvement of Rissing to Paratong No.4 Road leading to Paratong District Beach, Bangar, La Union",
      "hgabPesos": 75000000,
      "nepPage": "435",
      "hgabPage": "416",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33852",
      "nepTitle": "Improvement of Road At Barangay Bulacnin, Lipa City, Batangas",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0541-008378",
      "hgabTitle": "Improvement of Road At Barangay Bulacnin, Lipa City, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "508",
      "hgabPage": "541",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-00002",
      "nepTitle": "Improvement of Road along Balimbing Road, San Pascual, Batangas",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0538-008290",
      "hgabTitle": "Improvement of Road along Balimbing Road, San Pascual, Batangas",
      "hgabPesos": 10000000,
      "nepPage": "505",
      "hgabPage": "538",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39370",
      "nepTitle": "Improvement of Road along Barangay 15, Ilawod East, Legazpi City, Albay",
      "nepPesos": 7000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0558-008748",
      "hgabTitle": "Improvement of Road along Barangay 15, Ilawod East, Legazpi City, Albay",
      "hgabPesos": 7000000,
      "nepPage": "518",
      "hgabPage": "558",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39378",
      "nepTitle": "Improvement of Road along Barangay Gabawan, Daraga, Albay",
      "nepPesos": 6000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0558-008761",
      "hgabTitle": "Improvement of Road along Barangay Gabawan, Daraga, Albay",
      "hgabPesos": 6000000,
      "nepPage": "518",
      "hgabPage": "558",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39373",
      "nepTitle": "Improvement of Road along Barangay Namantao, Daraga, Albay",
      "nepPesos": 6000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0558-008763",
      "hgabTitle": "Improvement of Road along Barangay Namantao, Daraga, Albay",
      "hgabPesos": 6000000,
      "nepPage": "518",
      "hgabPage": "558",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-30002",
      "nepTitle": "Improvement of Road along Macbas-Botiao Road, Cattubo, Atok, Benguet",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0478-007008",
      "hgabTitle": "Improvement of Road along Macbas-Botiao Road, Cattubo, Atok, Benguet",
      "hgabPesos": 30000000,
      "nepPage": "470",
      "hgabPage": "478",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33849",
      "nepTitle": "Improvement of Road at Barangay Antipolo del Sur, Lipa City, Batangas",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0541-008376",
      "hgabTitle": "Improvement of Road at Barangay Antipolo del Sur, Lipa City, Batangas",
      "hgabPesos": 10000000,
      "nepPage": "508",
      "hgabPage": "541",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36294",
      "nepTitle": "Improvement of Road at Barangay Balagbag, San Juan, Batangas",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0541-008377",
      "hgabTitle": "Improvement of Road at Barangay Balagbag, San Juan, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "508",
      "hgabPage": "541",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-02353",
      "nepTitle": "Improvement of Road at Barangay Fairview, Quezon City",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0458-006579",
      "hgabTitle": "Improvement of Road at Barangay Fairview, Quezon City",
      "hgabPesos": 30000000,
      "nepPage": "462",
      "hgabPage": "458",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28792",
      "nepTitle": "Improvement of Road at Barangay Latag, Lipa City, Batangas",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0541-008379",
      "hgabTitle": "Improvement of Road at Barangay Latag, Lipa City, Batangas",
      "hgabPesos": 15000000,
      "nepPage": "508",
      "hgabPage": "541",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28801",
      "nepTitle": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0541-008381",
      "hgabTitle": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
      "hgabPesos": 20000000,
      "nepPage": "508",
      "hgabPage": "541",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28821",
      "nepTitle": "Improvement of Road at Barangay Sabang - Barangay Marawoy, Lipa City, Batangas",
      "nepPesos": 35000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0541-008382",
      "hgabTitle": "Improvement of Road at Barangay Sabang - Barangay Marawoy, Lipa City, Batangas",
      "hgabPesos": 35000000,
      "nepPage": "508",
      "hgabPage": "541",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33848",
      "nepTitle": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0542-008383",
      "hgabTitle": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
      "hgabPesos": 20000000,
      "nepPage": "508",
      "hgabPage": "542",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33851",
      "nepTitle": "Improvement of Road at Barangay San Lucas, Lipa City, Batangas",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0542-008384",
      "hgabTitle": "Improvement of Road at Barangay San Lucas, Lipa City, Batangas",
      "hgabPesos": 10000000,
      "nepPage": "508",
      "hgabPage": "542",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36153",
      "nepTitle": "Improvement of Road, Barangay Balete, Batangas City",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0538-008295",
      "hgabTitle": "Improvement of Road, Barangay Balete, Batangas City",
      "hgabPesos": 15000000,
      "nepPage": "506",
      "hgabPage": "538",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36156",
      "nepTitle": "Improvement of Road, Barangay Bilogo, Batangas City",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0538-008297",
      "hgabTitle": "Improvement of Road, Barangay Bilogo, Batangas City",
      "hgabPesos": 10000000,
      "nepPage": "506",
      "hgabPage": "538",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36157",
      "nepTitle": "Improvement of Road, Barangay Dumantay, Batangas City",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0538-008298",
      "hgabTitle": "Improvement of Road, Barangay Dumantay, Batangas City",
      "hgabPesos": 10000000,
      "nepPage": "506",
      "hgabPage": "538",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36159",
      "nepTitle": "Improvement of Road, Barangay Haligue Kanluran, Batangas City",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0538-008289",
      "hgabTitle": "Improvement of Road, Barangay Alangilan, Batangas City",
      "hgabPesos": 10000000,
      "nepPage": "506",
      "hgabPage": "538",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36308",
      "nepTitle": "Improvement of Road, Barangay Maruclap, Batangas City",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0538-008300",
      "hgabTitle": "Improvement of Road, Barangay Sorosoro Ilaya, Batangas City",
      "hgabPesos": 10000000,
      "nepPage": "506",
      "hgabPage": "538",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36160",
      "nepTitle": "Improvement of Road, Barangay Paharang Kanluran, Batangas City",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0538-008301",
      "hgabTitle": "Improvement of Road, Barangay Paharang Kanluran, Batangas City",
      "hgabPesos": 20000000,
      "nepPage": "506",
      "hgabPage": "538",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36161",
      "nepTitle": "Improvement of Road, Barangay Pinamucan Silangan, Batangas City",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0538-008302",
      "hgabTitle": "Improvement of Road, Barangay Pinamucan Silangan, Batangas City",
      "hgabPesos": 10000000,
      "nepPage": "506",
      "hgabPage": "538",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36162",
      "nepTitle": "Improvement of Road, Barangay San Miguel, Batangas City",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0538-008303",
      "hgabTitle": "Improvement of Road, Barangay San Miguel, Batangas City",
      "hgabPesos": 10000000,
      "nepPage": "506",
      "hgabPage": "538",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36316",
      "nepTitle": "Improvement of Road, Barangay Talumpok Kanluran, Batangas City",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36163",
      "nepTitle": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0538-008305",
      "hgabTitle": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
      "hgabPesos": 10000000,
      "nepPage": "506",
      "hgabPage": "538",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-02355",
      "nepTitle": "Improvement of Roads at Barangay Lagro, Quezon City",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0458-006581",
      "hgabTitle": "Improvement of Roads at Barangay Lagro, Quezon City",
      "hgabPesos": 30000000,
      "nepPage": "462",
      "hgabPage": "458",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37670",
      "nepTitle": "Improvement of Tubod-Bitoon - Kanghumaod Road at Barangay Tubod- Bitoon, Dumanjug, Cebu",
      "nepPesos": 12000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0590-009444",
      "hgabTitle": "Improvement of Tubod-Bitoon - Kanghumaod Road at Barangay Tubod- Bitoon, Dumanjug, Cebu",
      "hgabPesos": 12000000,
      "nepPage": "539",
      "hgabPage": "590",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33471",
      "nepTitle": "Inayagan-Cantao-an Road leading to Naga Valley (NAVA) Industrial Park, Naga City, Cebu",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0435-006160",
      "hgabTitle": "Inayagan-Cantao-an Road leading to Naga Valley (NAVA) Industrial Park, Naga City, Cebu",
      "hgabPesos": 20000000,
      "nepPage": "447",
      "hgabPage": "435",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20532",
      "nepTitle": "Infanta Bypass Road, Sta. 0+000 - Sta. 2+468.15, Infanta, Quezon",
      "nepPesos": 268862000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0219-001988",
      "hgabTitle": "Infanta Bypass Road, Sta. 0+000 - Sta. 1+380, Infanta, Quezon",
      "hgabPesos": 100000000,
      "nepPage": "280",
      "hgabPage": "219",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20676",
      "nepTitle": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
      "nepPesos": 120000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0221-002031",
      "hgabTitle": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
      "hgabPesos": 120000000,
      "nepPage": "282",
      "hgabPage": "221",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20286",
      "nepTitle": "Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet",
      "nepPesos": 195000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0234-002268",
      "hgabTitle": "Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet",
      "hgabPesos": 195000000,
      "nepPage": "295",
      "hgabPage": "234",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20278",
      "nepTitle": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0234-002269",
      "hgabTitle": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
      "hgabPesos": 100000000,
      "nepPage": "295",
      "hgabPage": "234",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20544",
      "nepTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0231-002206",
      "hgabTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
      "hgabPesos": 50000000,
      "nepPage": "291",
      "hgabPage": "231",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20545",
      "nepTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0219-001989",
      "hgabTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
      "hgabPesos": 100000000,
      "nepPage": "280",
      "hgabPage": "219",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20305",
      "nepTitle": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
      "nepPesos": 215000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0234-002253",
      "hgabTitle": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
      "hgabPesos": 215000000,
      "nepPage": "294",
      "hgabPage": "234",
      "chainageStatus": "incomplete",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-18785",
      "nepTitle": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
      "nepPesos": 38000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0267-002831",
      "hgabTitle": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
      "hgabPesos": 38000000,
      "nepPage": "321",
      "hgabPage": "267",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32753",
      "nepTitle": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City",
      "nepPesos": 22000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0229-002185",
      "hgabTitle": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City",
      "hgabPesos": 22000000,
      "nepPage": "290",
      "hgabPage": "229",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20495",
      "nepTitle": "Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao",
      "nepPesos": 16845000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0241-002396",
      "hgabTitle": "Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao",
      "hgabPesos": 16845000,
      "nepPage": "301",
      "hgabPage": "241",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20359",
      "nepTitle": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
      "nepPesos": 105000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0239-002356",
      "hgabTitle": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
      "hgabPesos": 105000000,
      "nepPage": "298",
      "hgabPage": "239",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20763",
      "nepTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
      "nepPesos": 180000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0229-002172",
      "hgabTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
      "hgabPesos": 180000000,
      "nepPage": "289",
      "hgabPage": "229",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-31731",
      "nepTitle": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
      "nepPesos": 101240000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0214-001883",
      "hgabTitle": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
      "hgabPesos": 101240000,
      "nepPage": "277",
      "hgabPage": "214",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-23974",
      "nepTitle": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
      "nepPesos": 120000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0229-002174",
      "hgabTitle": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
      "hgabPesos": 120000000,
      "nepPage": "289",
      "hgabPage": "229",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20649",
      "nepTitle": "Lingayen Baywalk-Bonuan Road, Pangasinan",
      "nepPesos": 250000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0214-001885",
      "hgabTitle": "Lingayen Baywalk-Bonuan Road, Pangasinan",
      "hgabPesos": 250000000,
      "nepPage": "277",
      "hgabPage": "214",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20651",
      "nepTitle": "Lingayen Bypass Road, Pangasinan",
      "nepPesos": 128155000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0214-001886",
      "hgabTitle": "Lingayen Bypass Road, Pangasinan",
      "hgabPesos": 128155000,
      "nepPage": "277",
      "hgabPage": "214",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20554",
      "nepTitle": "Lipa City-Padre Garcia Diversion Road, Sta. 95+288 - Sta. 96+631.48, Batangas",
      "nepPesos": 200000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0219-001990",
      "hgabTitle": "Lipa City-Padre Garcia Diversion Road - Sta. 88 + 400 - Sta. 99 + 923, Batangas",
      "hgabPesos": 200000000,
      "nepPage": "280",
      "hgabPage": "219",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20637",
      "nepTitle": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
      "nepPesos": 17500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0232-002238",
      "hgabTitle": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
      "hgabPesos": 17500000,
      "nepPage": "292",
      "hgabPage": "232",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32869",
      "nepTitle": "Maasin Bypass Road, Sta. 0+00 - Sta. 3+316, Iloilo",
      "nepPesos": 70484000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0222-002051",
      "hgabTitle": "Maasin Bypass Road, Sta. 0+00 - Sta. 3+316, Iloilo",
      "hgabPesos": 70484000,
      "nepPage": "283",
      "hgabPage": "222",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-23895",
      "nepTitle": "Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz",
      "nepPesos": 1420000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0231-002213",
      "hgabTitle": "Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz",
      "hgabPesos": 1420000,
      "nepPage": "291",
      "hgabPage": "231",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20955",
      "nepTitle": "Mabolo - Almeda Bypass Road - Sta. 433+951 - Sta. 436+073.13, Camarines Sur",
      "nepPesos": 14100000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-19483",
      "nepTitle": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0270-002904",
      "hgabTitle": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
      "hgabPesos": 30000000,
      "nepPage": "324",
      "hgabPage": "270",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20513",
      "nepTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0229-002186",
      "hgabTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1 + 917 - Sta. 2 + 202",
      "hgabPesos": 40000000,
      "nepPage": "290",
      "hgabPage": "229",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20656",
      "nepTitle": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
      "nepPesos": 60257000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0214-001887",
      "hgabTitle": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
      "hgabPesos": 60257000,
      "nepPage": "277",
      "hgabPage": "214",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20659",
      "nepTitle": "Malilipot Bypass Road, Sta. 1+020 - Sta. 1+363, Sta. 1+726 - Sta. 2+151, Sta. 3+097.5 - Sta. 3+183.3, Sta. 3+413.3 - Sta. 3+795.3, Sta. 3+940.3 - Sta. 4+282.3, Albay",
      "nepPesos": 51190000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32844",
      "nepTitle": "Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 6+275, Albay",
      "nepPesos": 150000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0231-002207",
      "hgabTitle": "Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 5+000, Albay",
      "hgabPesos": 50000000,
      "nepPage": "282",
      "hgabPage": "231",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-31744",
      "nepTitle": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
      "nepPesos": 55000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0217-001954",
      "hgabTitle": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
      "hgabPesos": 55000000,
      "nepPage": "279",
      "hgabPage": "217",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-24194",
      "nepTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0238-002331",
      "hgabTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
      "hgabPesos": 100000000,
      "nepPage": "297",
      "hgabPage": "238",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-24195",
      "nepTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
      "nepPesos": 75000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0238-002333",
      "hgabTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
      "hgabPesos": 75000000,
      "nepPage": "297",
      "hgabPage": "238",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20524",
      "nepTitle": "Malvar-Sto. Tomas Road, Sta. 5+636 - Sta. 6+105.02, Batangas",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0230-002199",
      "hgabTitle": "Malvar-Sto. Tomas Road, Sta. 5+636 - Sta. 5+889, Batangas",
      "hgabPesos": 40000000,
      "nepPage": "280",
      "hgabPage": "230",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20369",
      "nepTitle": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300",
      "nepPesos": 47000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0242-002408",
      "hgabTitle": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300",
      "hgabPesos": 47000000,
      "nepPage": "301",
      "hgabPage": "242",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-24196",
      "nepTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
      "nepPesos": 75000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0238-002335",
      "hgabTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
      "hgabPesos": 75000000,
      "nepPage": "297",
      "hgabPage": "238",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-24197",
      "nepTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
      "nepPesos": 75000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0238-002336",
      "hgabTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
      "hgabPesos": 75000000,
      "nepPage": "297",
      "hgabPage": "238",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20528",
      "nepTitle": "Mauban Bypass Road, Sta. 1+829 - Sta. 3+829, Mauban, Quezon",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0219-001999",
      "hgabTitle": "Mauban Bypass Road, Sta. 1+829 - Sta. 3+829, Mauban, Quezon",
      "hgabPesos": 100000000,
      "nepPage": "281",
      "hgabPage": "219",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20463",
      "nepTitle": "Mawab - Maragusan - Caraga Road, Sta. 1664+180 - Sta. 1664+577, Sta. 1664+622 - Sta. 1665+475",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20360",
      "nepTitle": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
      "nepPesos": 105000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0239-002359",
      "hgabTitle": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
      "hgabPesos": 105000000,
      "nepPage": "298",
      "hgabPage": "239",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20543",
      "nepTitle": "Morong Bypass Road, Sta 0+000 - Sta 1+860, Rizal",
      "nepPesos": 150000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20751",
      "nepTitle": "NRJ Agusan-Malaybalay Road-Brgy. Ambacon-Brgy. Malicato-NRJ Daang Maharlika, (Sta. 7+630 - Sta. 7+852.29), Agusan del Norte",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0229-002175",
      "hgabTitle": "NRJ Agusan-Malaybalay Road-Barangay Ambacon-Barangay Malicato-NRJ Daang Maharlika, (Sta. 7+630 - Sta. 7+852.29), Agusan del Norte",
      "hgabPesos": 20000000,
      "nepPage": "289",
      "hgabPage": "229",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20641",
      "nepTitle": "NRJ Baluno - La Paz (Sitio Pole) Diversion Road, Zamboanga City",
      "nepPesos": 38932000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0224-002097",
      "hgabTitle": "NRJ Baluno - La Paz (Sitio Pole) Diversion Road, Zamboanga City",
      "hgabPesos": 38932000,
      "nepPage": "284",
      "hgabPage": "224",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-23967",
      "nepTitle": "NRJ Dipolo - NRJ San Isidro Bypass Road (NRJ Dipolo - Rizal - Miligan - NRJ San Isidro Bypass Road) By-Pass Road, Zamboanga del Sur",
      "nepPesos": 130792000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0224-002098",
      "hgabTitle": "NRJ Dipolo - NRJ San Isidro Bypass Road (NRJ Dipolo - Rizal - Miligan - NRJ San Isidro Bypass Road) By-Pass Road, Zamboanga del Sur",
      "hgabPesos": 130792000,
      "nepPage": "285",
      "hgabPage": "224",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-25377",
      "nepTitle": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0233-002241",
      "hgabTitle": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
      "hgabPesos": 10000000,
      "nepPage": "292",
      "hgabPage": "233",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20630",
      "nepTitle": "NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur Sta. 6+738 - Sta. 7+988",
      "nepPesos": 43750000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0232-002230",
      "hgabTitle": "NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur Sta. 6+738 - Sta. 7+988",
      "hgabPesos": 43750000,
      "nepPage": "292",
      "hgabPage": "232",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20634",
      "nepTitle": "NRJ Poblacion Bayog Bypass Road, Zamboanga del Sur",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0232-002233",
      "hgabTitle": "NRJ Poblacion Bayog Bypass Road, Zamboanga del Sur",
      "hgabPesos": 30000000,
      "nepPage": "292",
      "hgabPage": "232",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20635",
      "nepTitle": "NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Sta. 1719+980 - Sta. 1720+646.5, Zamboanga del Sur",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0232-002235",
      "hgabTitle": "NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Sta. 1719+980 - Sta. 1720+646.5, Zamboanga del Sur",
      "hgabPesos": 30000000,
      "nepPage": "292",
      "hgabPage": "232",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20735",
      "nepTitle": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
      "nepPesos": 301120000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0221-002038",
      "hgabTitle": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
      "hgabPesos": 301120000,
      "nepPage": "282",
      "hgabPage": "221",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20671",
      "nepTitle": "Naga-Jct. Magarao-Canaman- Libmanan Jct. PPH Road (Skybridge) - Sta. 418+490 - Sta. 418+762, Barangay Umalo Section, Libmanan, Camarines Sur",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0231-002210",
      "hgabTitle": "Naga-Jct. Magarao-Canaman- Libmanan Jct. PPH Road (Skybridge) - Sta. 418+490 - Sta. 418+762, Barangay Umalo Section, Libmanan, Camarines Sur",
      "hgabPesos": 20000000,
      "nepPage": "291",
      "hgabPage": "231",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20732",
      "nepTitle": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur, Sta 419+082.25 - Sta 420+882.25",
      "nepPesos": 393217000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20960",
      "nepTitle": "Ormoc City Diversion Road,Brgy. San Juan-Lao-Naungan Section, Sta. 0+000 - Sta. 4+380, Leyte",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0224-002087",
      "hgabTitle": "Ormoc City Diversion Road,Barangay San Juan-Lao-Naungan Section, Sta. 0+000 - Sta. 4+380, Leyte",
      "hgabPesos": 100000000,
      "nepPage": "284",
      "hgabPage": "224",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20551",
      "nepTitle": "Padre Garcia-Rosario Diversion Road, Sta. 113+000 - Sta. 116+388.99, Padre Garcia, Batangas",
      "nepPesos": 200000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0219-002002",
      "hgabTitle": "Padre Garcia-Rosario Diversion Road, Sta. 113+000 - Sta. 116+388.99, Padre Garcia, Batangas",
      "hgabPesos": 200000000,
      "nepPage": "281",
      "hgabPage": "219",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20552",
      "nepTitle": "Padre Garcia-Rosario Diversion Road, Sta. 116+400 - Sta. 117+470.27, Padre Garcia, Batangas",
      "nepPesos": 200000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-19595",
      "nepTitle": "Pagnamitan Br. along Guiuan-Sulangan Peninsula Road",
      "nepPesos": 150000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0295-003434",
      "hgabTitle": "Pagnamitan Br. Along Guiuan-Sulangan Peninsula Road",
      "hgabPesos": 50000000,
      "nepPage": "345",
      "hgabPage": "295",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20581",
      "nepTitle": "Pandi By-pass Road, Sta.6+040 - Sta.6+640, Pandi, Bulacan",
      "nepPesos": 90000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0217-001960",
      "hgabTitle": "Pandi By-pass Road, Sta.6+040 - Sta.6+640, Pandi, Bulacan",
      "hgabPesos": 90000000,
      "nepPage": "280",
      "hgabPage": "217",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-31740",
      "nepTitle": "Pangasinan-Nueva Vizcaya Road connecting TPLEX, Rosales, Pangasinan",
      "nepPesos": 239681000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0214-001888",
      "hgabTitle": "Pangasinan-Nueva Vizcaya Road connecting TPLEX, Rosales, Pangasinan",
      "hgabPesos": 239681000,
      "nepPage": "277",
      "hgabPage": "214",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32993",
      "nepTitle": "Panguil Bay Access Road (Tangub - Business Section), Sta. 0+000 - Sta. 2+560, Tangub City, Misamis Occidental",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36815",
      "nepTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna",
      "nepPesos": 158845000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0220-002006",
      "hgabTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna",
      "hgabPesos": 158845000,
      "nepPage": "281",
      "hgabPage": "220",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32832",
      "nepTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna",
      "nepPesos": 300000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0220-002014",
      "hgabTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna",
      "hgabPesos": 300000000,
      "nepPage": "281",
      "hgabPage": "220",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32878",
      "nepTitle": "Passi Bypass Road, Sta. 3+676.10 - Sta. 4+573.94, Sta. 4+587.34 - Sta. 5+424.34, Iloilo",
      "nepPesos": 191627000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0222-002053",
      "hgabTitle": "Passi Bypass Road, Sta. 3+676.10 - Sta. 4+573.94, Sta. 4+587.34 - Sta. 5+424.34, Iloilo",
      "hgabPesos": 191627000,
      "nepPage": "283",
      "hgabPage": "222",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20496",
      "nepTitle": "Piddig-Carasi (Ilocos Norte) - Calanasan (Apayao) Connecting Cabugao-Conner (Apayao)-Tuao (Cagayan) Road, Sta. 36+236 - Sta. 38+588, Ilocos Norte",
      "nepPesos": 140000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0234-002255",
      "hgabTitle": "Piddig-Carasi (Ilocos Norte) - Calanasan (Apayao) Connecting Cabugao-Conner (Apayao)-Tuao (Cagayan) Road, Sta. 36+236 - Sta. 38+588, Ilocos Norte",
      "hgabPesos": 140000000,
      "nepPage": "294",
      "hgabPage": "234",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20353",
      "nepTitle": "Quezon - Alabat - Perez Circumferential Road - Sta. 21+070 - Sta. 21+709.67",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0236-002309",
      "hgabTitle": "Quezon - Alabat - Perez Circumferential Road - Sta. 20+110 - Sta. 21+910",
      "hgabPesos": 100000000,
      "nepPage": "301",
      "hgabPage": "236",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20746",
      "nepTitle": "Radial Road (NRJ BCIR - NRJ Mayor Democrito D. Plaza II Ave.), (Libertad-Bonbon Section) (Sta. 0+000 - Sta. 0+481, Sta. 1+940 - Sta. 1+960, Sta. 2+000 - Sta. 2+122, Sta. 2+230 - Sta. 2+637), Butuan City",
      "nepPesos": 45000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0233-002248",
      "hgabTitle": "Radial Road (NRJ BCIR - NRJ Mayor Democrito D. Plaza II Ave.), (Libertad-Bonbon Section) (Sta. 0+000 - Sta. 0+481, Sta. 1+940 - Sta. 1+960, Sta. 2+000 - Sta. 2+122, Sta. 2+230 - Sta. 2+637), Butuan City",
      "hgabPesos": 35000000,
      "nepPage": "293",
      "hgabPage": "233",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20745",
      "nepTitle": "Radial Road (NRJ BCIR-NRJ Mayor Democrito D. Plaza II Ave.), (Mahay - Baan) (Sta. 0+289 - Sta. 0+955.67), Butuan City",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0233-002249",
      "hgabTitle": "Radial Road (NRJ BCIR-NRJ Mayor Democrito D. Plaza II Ave.), (Mahay - Baan) (Sta. 0+289 - Sta. 0+955.67), Butuan City",
      "hgabPesos": 40000000,
      "nepPage": "293",
      "hgabPage": "233",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36070",
      "nepTitle": "Rehabilitation & Improvement of Road at San Isidro Nueva Ecija",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0525-008014",
      "hgabTitle": "Rehabilitation & Improvement of Road at San Isidro Nueva Ecija",
      "hgabPesos": 10000000,
      "nepPage": "498",
      "hgabPage": "525",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34088",
      "nepTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0449-006429",
      "hgabTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "hgabPesos": 10000000,
      "nepPage": "456",
      "hgabPage": "449",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33549",
      "nepTitle": "Rehabilitation of Barangay Road, Barangay Masicong, City of San Fernando, La Union",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03655",
      "nepTitle": "Rehabilitation of Barangay Road, Barangay Maugat, Sta. 0+000 - Sta. 0+800, San Antonio, Nueva Ecija",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03657",
      "nepTitle": "Rehabilitation of Barangay Road, Barangay San Mariano, Sta. 0+000 - Sta. 0+800, San Antonio, Nueva Ecija",
      "nepPesos": 14000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-22137",
      "nepTitle": "Rehabilitation of Colony Road, Sta. 0+000 - Sta. 0+350, Barangay Libertad, Abulug, Cagayan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0485-007188",
      "hgabTitle": "Rehabilitation of Colony Road, Sta. 0+000 - Sta. 0+350, Barangay Libertad, Abulug, Cagayan",
      "hgabPesos": 10000000,
      "nepPage": "476",
      "hgabPage": "485",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03527",
      "nepTitle": "Rehabilitation of Malolos - Paombong - Hagonoy - Calumpit Road, Sta. 0+000 - Sta. 2+800, Calumpit, Bulacan",
      "nepPesos": 150000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0423-005910",
      "hgabTitle": "Rehabilitation of Malolos - Paombong - Hagonoy - Calumpit Road, Sta. 0+000 - Sta. 2+800, Calumpit, Bulacan",
      "hgabPesos": 150000000,
      "nepPage": "439",
      "hgabPage": "423",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03529",
      "nepTitle": "Rehabilitation of Malolos - San Marcos via Bulihan Road, Sta. 0+000 - Sta. 0+230, City of Malolos, Bulacan",
      "nepPesos": 40000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0509-007687",
      "hgabTitle": "Rehabilitation of Malolos - San Marcos via Bulihan Road, Sta. 0+000 - Sta. 0+230, City of Malolos, Bulacan",
      "hgabPesos": 40000000,
      "nepPage": "487",
      "hgabPage": "509",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34781",
      "nepTitle": "Rehabilitation of Pilar South Road, Sta. 0+000-Sta. 1+100, Pilar, Abra",
      "nepPesos": 75800000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0417-005803",
      "hgabTitle": "Rehabilitation of Pilar South Road, Sta. 0+000-Sta. 1+100, Pilar, Abra",
      "hgabPesos": 75800000,
      "nepPage": "435",
      "hgabPage": "417",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03526",
      "nepTitle": "Rehabilitation of Polo - Obando - Bulakan Road, Sta. 0+000 - Sta. 0+700, Bulakan, Bulacan",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0509-007690",
      "hgabTitle": "Rehabilitation of Polo - Obando - Bulakan Road, Sta. 0+000 - Sta. 0+700, Bulakan, Bulacan",
      "hgabPesos": 30000000,
      "nepPage": "487",
      "hgabPage": "509",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34850",
      "nepTitle": "Rehabilitation of Road (Sta. 0+000 - Sta. 0+550), Barangay Garita, Cabagan, Isabela",
      "nepPesos": 6300000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0491-007294",
      "hgabTitle": "Rehabilitation of Road (Sta. 0+000 - Sta. 0+550), Barangay Garita, Cabagan, Isabela",
      "hgabPesos": 6300000,
      "nepPage": "477",
      "hgabPage": "491",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35218",
      "nepTitle": "Rehabilitation of Road (Sta. 0+000 - Sta.0+600) at Barangay Magassi, Cabagan, Isabela",
      "nepPesos": 6600000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0487-007219",
      "hgabTitle": "Rehabilitation of Road (Sta. 0+000 - Sta.0+600) at Barangay Magassi, Cabagan, Isabela",
      "hgabPesos": 6600000,
      "nepPage": "476",
      "hgabPage": "487",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35214",
      "nepTitle": "Rehabilitation of Road (Sta. 0+000-Sta. 0+800) at Barangay Catabayungan, Cabagan, Isabela",
      "nepPesos": 8300000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0491-007298",
      "hgabTitle": "Rehabilitation of Road (Sta. 0+000-Sta. 0+800) at Barangay Catabayungan, Cabagan, Isabela",
      "hgabPesos": 8300000,
      "nepPage": "477",
      "hgabPage": "491",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35223",
      "nepTitle": "Rehabilitation of Road (Sta. 0+040 - Sta. 1+140) at Barangay San Mateo, Tumauini, Isabela",
      "nepPesos": 11600000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0491-007299",
      "hgabTitle": "Rehabilitation of Road (Sta. 0+040 - Sta. 1+140) at Barangay San Mateo, Tumauini, Isabela",
      "hgabPesos": 11600000,
      "nepPage": "478",
      "hgabPage": "491",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33496",
      "nepTitle": "Rehabilitation of Road at Barangay Caluluan, Concepcion, Tarlac",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0423-005911",
      "hgabTitle": "Rehabilitation of Road at Barangay Caluluan, Concepcion, Tarlac",
      "hgabPesos": 100000000,
      "nepPage": "439",
      "hgabPage": "423",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09702",
      "nepTitle": "Rehabilitation of Road at Barangay Calumpang Cerca, Indang, Cavite",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0545-008454",
      "hgabTitle": "Rehabilitation of Road at Barangay Calumpang Cerca, Indang, Cavite",
      "hgabPesos": 5000000,
      "nepPage": "509",
      "hgabPage": "545",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36298",
      "nepTitle": "Rehabilitation of Road at Barangay Escribano, San Juan, Batangas",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0542-008395",
      "hgabTitle": "Rehabilitation of Road at Barangay Escribano, San Juan, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "508",
      "hgabPage": "542",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09784",
      "nepTitle": "Rehabilitation of Road at Barangay Langgam, San Pedro City, Laguna",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0546-008490",
      "hgabTitle": "Rehabilitation of Road at Barangay Langgam, San Pedro City, Laguna",
      "hgabPesos": 10000000,
      "nepPage": "511",
      "hgabPage": "546",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36289",
      "nepTitle": "Rehabilitation of Road at Barangay Macalamcam B, Rosario, Batangas",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0542-008396",
      "hgabTitle": "Rehabilitation of Road at Barangay Macalamcam B, Rosario, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "508",
      "hgabPage": "542",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33498",
      "nepTitle": "Rehabilitation of Road at Barangay Parulung, Concepcion, Tarlac",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0423-005915",
      "hgabTitle": "Rehabilitation of Road at Barangay Parulung, Concepcion, Tarlac",
      "hgabPesos": 100000000,
      "nepPage": "439",
      "hgabPage": "423",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33497",
      "nepTitle": "Rehabilitation of Road at Barangay San Agustin, Concepcion, Tarlac",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0423-005916",
      "hgabTitle": "Rehabilitation of Road at Barangay San Agustin, Concepcion, Tarlac",
      "hgabPesos": 100000000,
      "nepPage": "439",
      "hgabPage": "423",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33494",
      "nepTitle": "Rehabilitation of Road at Barangay San Nicolas Balas, Concepcion, Tarlac",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0423-005917",
      "hgabTitle": "Rehabilitation of Road at Barangay San Nicolas Balas, Concepcion, Tarlac",
      "hgabPesos": 100000000,
      "nepPage": "439",
      "hgabPage": "423",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33493",
      "nepTitle": "Rehabilitation of Road at Barangay Sta. Rosa, Concepcion, Tarlac",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0423-005920",
      "hgabTitle": "Rehabilitation of Road at Barangay Sta. Rosa, Concepcion, Tarlac",
      "hgabPesos": 100000000,
      "nepPage": "439",
      "hgabPage": "423",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33492",
      "nepTitle": "Rehabilitation of Road at Barangay Tinang, Concepcion, Tarlac",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0423-005922",
      "hgabTitle": "Rehabilitation of Road at Barangay Tinang, Concepcion, Tarlac",
      "hgabPesos": 100000000,
      "nepPage": "439",
      "hgabPage": "423",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34716",
      "nepTitle": "Rehabilitation of Road at Fort Del Pilar Barangay, Sta. 0+000 - Sta. 0+502, Baguio City",
      "nepPesos": 40320000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0477-006988",
      "hgabTitle": "Rehabilitation of Road at Fort Del Pilar Barangay, Sta. 0+000 - Sta. 0+502, Baguio City",
      "hgabPesos": 40320000,
      "nepPage": "469",
      "hgabPage": "477",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36634",
      "nepTitle": "Rehabilitation of Road, Barangay Aya, Talisay, Batangas",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0540-008350",
      "hgabTitle": "Rehabilitation of Road, Barangay Aya, Talisay, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "507",
      "hgabPage": "540",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37875",
      "nepTitle": "Rehabilitation of Road, Barangay Bato to Sitio Bantilan, Biliran, Biliran (Sta. 0+000 - Sta. 0+500)",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0591-009464",
      "hgabTitle": "Rehabilitation of Road, Barangay Bato to Sitio Bantilan, Biliran, Biliran (Sta. 0+000 - Sta. 0+500)",
      "hgabPesos": 10000000,
      "nepPage": "539",
      "hgabPage": "591",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34387",
      "nepTitle": "Rehabilitation of Road, Barangay Dalumpinas Oeste, City of San Fernando, La Union",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0465-006738",
      "hgabTitle": "Rehabilitation of Road, Barangay Dalumpinas Oeste, City of San Fernando, La Union",
      "hgabPesos": 10000000,
      "nepPage": "464",
      "hgabPage": "465",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36755",
      "nepTitle": "Rehabilitation of Road, Barangay Kanluran, Calauan, Laguna",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0547-008500",
      "hgabTitle": "Rehabilitation of Road, Barangay Kanluran, Calauan, Laguna",
      "hgabPesos": 10000000,
      "nepPage": "511",
      "hgabPage": "547",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36754",
      "nepTitle": "Rehabilitation of Road, Barangay Luquin, Liliw, Laguna",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0547-008501",
      "hgabTitle": "Rehabilitation of Road, Barangay Luquin, Liliw, Laguna",
      "hgabPesos": 20000000,
      "nepPage": "511",
      "hgabPage": "547",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36579",
      "nepTitle": "Rehabilitation of Road, Barangay Maabud South, San Nicolas, Batangas",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0540-008353",
      "hgabTitle": "Rehabilitation of Road, Barangay Maabud South, San Nicolas, Batangas",
      "hgabPesos": 5000000,
      "nepPage": "507",
      "hgabPage": "540",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35257",
      "nepTitle": "Rehabilitation of Road, Barangay Maligaya, Cauayan City, Isabela",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0503-007551",
      "hgabTitle": "Rehabilitation of Road, Barangay Maligaya, Cauayan City, Isabela",
      "hgabPesos": 20000000,
      "nepPage": "483",
      "hgabPage": "503",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37873",
      "nepTitle": "Rehabilitation of Road, Barangay Manlabang, Caibiran, Biliran (Sta. 0+000 - Sta. 0+177)",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0591-009468",
      "hgabTitle": "Rehabilitation of Road, Barangay Manlabang, Caibiran, Biliran (Sta. 0+000 - Sta. 0+177)",
      "hgabPesos": 5000000,
      "nepPage": "539",
      "hgabPage": "591",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36175",
      "nepTitle": "Rehabilitation of Road, Barangay Maruclap, Batangas City",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0538-008306",
      "hgabTitle": "Rehabilitation of Road, Barangay Maruclap, Batangas City",
      "hgabPesos": 15000000,
      "nepPage": "506",
      "hgabPage": "538",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38084",
      "nepTitle": "Rehabilitation of Road, Barangay Migara, Sta. 0+000 - Sta. 0+200, Calbayog City, Samar",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0599-009629",
      "hgabTitle": "Rehabilitation of Road, Barangay Migara, Sta. 0+000 - Sta. 0+200, Calbayog City, Samar",
      "hgabPesos": 5000000,
      "nepPage": "543",
      "hgabPage": "599",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36593",
      "nepTitle": "Rehabilitation of Road, Barangay Niyugan, Laurel, Batangas",
      "nepPesos": 5500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0540-008354",
      "hgabTitle": "Rehabilitation of Road, Barangay Niyugan, Laurel, Batangas",
      "hgabPesos": 5500000,
      "nepPage": "507",
      "hgabPage": "540",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35942",
      "nepTitle": "Rehabilitation of Road, Barangay Poblacion, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0518-007855",
      "hgabTitle": "Rehabilitation of Road, Barangay Poblacion, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "hgabPesos": 5000000,
      "nepPage": "494",
      "hgabPage": "518",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34190",
      "nepTitle": "Rehabilitation of Road, Barangay San Marcos, San Nicolas, Ilocos Norte",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0465-006725",
      "hgabTitle": "Rehabilitation of Road, Barangay San Marcos, San Nicolas, Ilocos Norte",
      "hgabPesos": 15000000,
      "nepPage": "464",
      "hgabPage": "465",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35190",
      "nepTitle": "Rehabilitation of Road, Barangay San Miguel, Luna Isabela",
      "nepPesos": 25000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0494-007359",
      "hgabTitle": "Rehabilitation of Road, Barangay San Miguel, Luna Isabela",
      "hgabPesos": 25000000,
      "nepPage": "479",
      "hgabPage": "494",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38317",
      "nepTitle": "Rehabilitation of Road, Barangay Tandu Patong, Maimbung, Sulu Sta. 00+300 to Sta. 02+000",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0600-009654",
      "hgabTitle": "Rehabilitation of Road, Barangay Tandu Patong, Maimbung, Sulu Sta. 00+300 to Sta. 02+000",
      "hgabPesos": 50000000,
      "nepPage": "544",
      "hgabPage": "600",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36828",
      "nepTitle": "Rehabilitation of Road, Barangay Tapuyan, Gasan, Marinduque",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0552-008607",
      "hgabTitle": "Rehabilitation of Road, Barangay Tapuyan, Gasan, Marinduque",
      "hgabPesos": 20000000,
      "nepPage": "514",
      "hgabPage": "552",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36879",
      "nepTitle": "Rehabilitation of Road, Barangay Tawiran, City of Calapan, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38316",
      "nepTitle": "Rehabilitation of Road, Barangay Tubig Samin, Maimbung, Sulu Sta. 00+000 to Sta. 01+700",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0600-009655",
      "hgabTitle": "Rehabilitation of Road, Barangay Tubig Samin, Maimbung, Sulu Sta. 00+000 to Sta. 01+700",
      "hgabPesos": 50000000,
      "nepPage": "544",
      "hgabPage": "600",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33999",
      "nepTitle": "Rehabilitation of Road, Barangay Ugong Norte Quezon City",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0458-006592",
      "hgabTitle": "Rehabilitation of Road, Barangay Ugong Norte Quezon City",
      "hgabPesos": 50000000,
      "nepPage": "462",
      "hgabPage": "458",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33933",
      "nepTitle": "Rehabilitation of Road, Soldiers Hills, Barangay Putatan, Muntinlupa City",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0449-006421",
      "hgabTitle": "Rehabilitation of Road, Soldiers Hills, Barangay Putatan, Muntinlupa City",
      "hgabPesos": 20000000,
      "nepPage": "455",
      "hgabPage": "449",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35568",
      "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0510-007712",
      "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan",
      "hgabPesos": 20000000,
      "nepPage": "488",
      "hgabPage": "510",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03519",
      "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+142.60, San Vicente, Paombong, Bulacan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0510-007713",
      "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+142.60, San Vicente, Paombong, Bulacan",
      "hgabPesos": 10000000,
      "nepPage": "488",
      "hgabPage": "510",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03565",
      "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+640.53, Sulivan, Baliuag, Bulacan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0510-007717",
      "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+640.53, Sulivan, Baliuag, Bulacan",
      "hgabPesos": 5000000,
      "nepPage": "488",
      "hgabPage": "510",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-02729",
      "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+862, Barangay Dagum, Calbayog City, Samar",
      "nepPesos": 25000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0599-009641",
      "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+862, Barangay Dagum, Calbayog City, Samar",
      "hgabPesos": 25000000,
      "nepPage": "543",
      "hgabPage": "599",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03473",
      "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+092, Iba-Ibayo, Hagonoy, Bulacan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0511-007722",
      "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+092, Iba-Ibayo, Hagonoy, Bulacan",
      "hgabPesos": 10000000,
      "nepPage": "488",
      "hgabPage": "511",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03541",
      "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+320, Bagong Silang, Plaridel, Bulacan",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0511-007723",
      "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+320, Bagong Silang, Plaridel, Bulacan",
      "hgabPesos": 30000000,
      "nepPage": "488",
      "hgabPage": "511",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03491",
      "nepTitle": "Rehabilitation of Road, Sta. 2+627 - Sta. 2+927, Iba O' Este, Calumpit, Bulacan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0511-007725",
      "hgabTitle": "Rehabilitation of Road, Sta. 2+627 - Sta. 2+927, Iba O' Este, Calumpit, Bulacan",
      "hgabPesos": 10000000,
      "nepPage": "488",
      "hgabPage": "511",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39198",
      "nepTitle": "Rehabilitation of Roads in Barangay Canitoan, Cagayan de Oro City, Misamis Oriental",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0608-009814",
      "hgabTitle": "Rehabilitation of Roads in Barangay Canitoan, Cagayan de Oro City, Misamis Oriental",
      "hgabPesos": 10000000,
      "nepPage": "549",
      "hgabPage": "608",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36072",
      "nepTitle": "Rehabilitation/Improvement of Cabalantian Road, Bacolor Pampanga",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0528-008093",
      "hgabTitle": "Rehabilitation/Improvement of Cabalantian Road, Bacolor Pampanga",
      "hgabPesos": 15000000,
      "nepPage": "500",
      "hgabPage": "528",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35575",
      "nepTitle": "Rehabilitation/Improvement of Road at Barangay Balayong, City of Malolos, Bulacan",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0511-007730",
      "hgabTitle": "Rehabilitation/Improvement of Road at Barangay Balayong, City of Malolos, Bulacan",
      "hgabPesos": 15000000,
      "nepPage": "488",
      "hgabPage": "511",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35577",
      "nepTitle": "Rehabilitation/Improvement of Road at Barangay Bangkal, City of Malolos, Bulacan",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0511-007731",
      "hgabTitle": "Rehabilitation/Improvement of Road at Barangay Bangkal, City of Malolos, Bulacan",
      "hgabPesos": 15000000,
      "nepPage": "489",
      "hgabPage": "511",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35584",
      "nepTitle": "Rehabilitation/Improvement of Road at Barangay Caingin, City of Malolos, Bulacan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0511-007733",
      "hgabTitle": "Rehabilitation/Improvement of Road at Barangay Caingin, City of Malolos, Bulacan",
      "hgabPesos": 10000000,
      "nepPage": "489",
      "hgabPage": "511",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38149",
      "nepTitle": "Road Concreting in Brgy. Caracol, Salug, Zamboanga del Norte",
      "nepPesos": 8000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0603-009704",
      "hgabTitle": "Road Concreting in Barangay Caracol, Salug, Zamboanga del Norte",
      "hgabPesos": 8000000,
      "nepPage": "545",
      "hgabPage": "603",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20307",
      "nepTitle": "Road Connecting Santa-Rancho Road (S00089LZ) and Santa-Caoayan Road, Caoayan, Ilocos Sur",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20308",
      "nepTitle": "Road Connecting Santa-Rancho Road (S00089LZ) and Santa-Caoayan Road, Sta. 1+045.80 - Sta. 1+501.70, Ilocos Sur",
      "nepPesos": 100162000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0234-002256",
      "hgabTitle": "Road Connecting Santa-Rancho Road (S00089LZ) and Santa-Caoayan Road, Sta. 1+045.80 - Sta. 1+501.70, Ilocos Sur",
      "hgabPesos": 100162000,
      "nepPage": "294",
      "hgabPage": "234",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-31739",
      "nepTitle": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Villasis-Urdaneta City, Pangasinan",
      "nepPesos": 70000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0214-001891",
      "hgabTitle": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Villasis- Urdaneta City, Pangasinan",
      "hgabPesos": 70000000,
      "nepPage": "277",
      "hgabPage": "214",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32871",
      "nepTitle": "Roxas City Circumferential Road, C2 Section, Capiz - Sta. 0+000 - Sta. 1+300",
      "nepPesos": 150000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32872",
      "nepTitle": "Roxas City Circumferential Road, C3 Section, Capiz - Sta. 2+766 - Sta. 3+180, Sta. 3+500 - Sta. 5+228.5",
      "nepPesos": 250000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20281",
      "nepTitle": "Sagada-Besao-Quirino (via Laylaya) Road, Sta. 28+985 - Sta. 30+635, Besao, Mt. Province",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20657",
      "nepTitle": "San Carlos City Bypass Road, Pangasinan",
      "nepPesos": 346000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0214-001892",
      "hgabTitle": "San Carlos City Bypass Road, Pangasinan",
      "hgabPesos": 346000000,
      "nepPage": "277",
      "hgabPage": "214",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20583",
      "nepTitle": "San Jose City Bypass Road, Sta. 5+200 - Sta. 5+600, Sta. 5+651 - Sta. 6+060, Nueva Ecija",
      "nepPesos": 175000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0218-001962",
      "hgabTitle": "San Jose City Bypass Road, Sta. 5+200 - Sta. 5+600, Sta. 5+651 - Sta. 6+060, Nueva Ecija",
      "hgabPesos": 175000000,
      "nepPage": "280",
      "hgabPage": "218",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20584",
      "nepTitle": "San Jose City Bypass Road, Sta. 7+003 - Sta. 7+094, Nueva Ecija",
      "nepPesos": 87500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0218-001963",
      "hgabTitle": "San Jose City Bypass Road, Sta. 7+003 - Sta. 7+094, Nueva Ecija",
      "hgabPesos": 87500000,
      "nepPage": "280",
      "hgabPage": "218",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20553",
      "nepTitle": "San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Sta. 141+530 - Sta. 143+770, Sta. 143+830 – Sta. 145+240, Batangas",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0220-002015",
      "hgabTitle": "San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Sta. 141+530 - Sta. 143+770, Sta. 143+830 – Sta. 145+240, Batangas",
      "hgabPesos": 100000000,
      "nepPage": "281",
      "hgabPage": "220",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32845",
      "nepTitle": "San Lorenzo-Salvacion-Fatima-Tagas-San Roque-Tabaco Wharf Road, Tabaco City, Sta. 2+820.80- Sta. 3+020.80, Albay",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20314",
      "nepTitle": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020",
      "nepPesos": 170000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0234-002258",
      "hgabTitle": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020",
      "hgabPesos": 170000000,
      "nepPage": "294",
      "hgabPage": "234",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20310",
      "nepTitle": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union",
      "nepPesos": 96579000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0234-002259",
      "hgabTitle": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union",
      "hgabPesos": 96579000,
      "nepPage": "294",
      "hgabPage": "234",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32958",
      "nepTitle": "Sayre Highway Bypass Road-Carmen Puerto Section (Climbing Lanes), Barangay Puerto, Sta. 1+680-Sta. 2+805.71, Cagayan de Oro City",
      "nepPesos": 80000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0227-002140",
      "hgabTitle": "Sayre Highway Bypass Road-Carmen Puerto Section (Climbing Lanes), Barangay Puerto, Sta. 1+680-Sta. 2+805.71, Cagayan de Oro City",
      "hgabPesos": 80000000,
      "nepPage": "287",
      "hgabPage": "227",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20632",
      "nepTitle": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
      "nepPesos": 22540000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0232-002232",
      "hgabTitle": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
      "hgabPesos": 22540000,
      "nepPage": "292",
      "hgabPage": "232",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35978",
      "nepTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 2+580 - Sta. 3+805.61",
      "nepPesos": 150000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0218-001964",
      "hgabTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 2+580 - Sta. 3+805.61",
      "hgabPesos": 150000000,
      "nepPage": "280",
      "hgabPage": "218",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35979",
      "nepTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 3+805.61 - Sta. 5+031.30",
      "nepPesos": 150000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0218-001965",
      "hgabTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 3+805.61 - Sta. 5+031.30",
      "hgabPesos": 150000000,
      "nepPage": "280",
      "hgabPage": "218",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20585",
      "nepTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 1+580 - Sta. 2+580",
      "nepPesos": 200000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0218-001966",
      "hgabTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 1+580 - Sta. 2+580",
      "hgabPesos": 150000000,
      "nepPage": "280",
      "hgabPage": "218",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-24191",
      "nepTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 6+395 - Sta. 8+000",
      "nepPesos": 220000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0218-001971",
      "hgabTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 6+395 - Sta. 8+000",
      "hgabPesos": 150000000,
      "nepPage": "280",
      "hgabPage": "218",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20269",
      "nepTitle": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
      "nepPesos": 200000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0243-002415",
      "hgabTitle": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
      "hgabPesos": 200000000,
      "nepPage": "302",
      "hgabPage": "243",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20112",
      "nepTitle": "Sulangan Br. (B00596SM) along Guiuan-Sulangan Peninsula Road",
      "nepPesos": 3000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20661",
      "nepTitle": "Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay",
      "nepPesos": 150000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0221-002042",
      "hgabTitle": "Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay",
      "hgabPesos": 150000000,
      "nepPage": "282",
      "hgabPage": "221",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20377",
      "nepTitle": "Tabaco City-Malinao-Buhi-Iriga City Road, Camarines Sur, Sta. 40+300.00 - Sta. 41+100.00",
      "nepPesos": 85000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0238-002344",
      "hgabTitle": "Tabaco City-Malinao-Buhi-Iriga City Road, Camarines Sur, Sta. 40+300.00 - Sta. 41+100.00",
      "hgabPesos": 85000000,
      "nepPage": "297",
      "hgabPage": "238",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20703",
      "nepTitle": "Tacloban City Bypass Road Extension (Sta. 0+910 - Sta. 1+00, Sta. 1+040 - Sta. 1+169.35), Tacloban City",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0224-002090",
      "hgabTitle": "Tacloban City Bypass Road Extension (Sta. 0+910 - Sta. 1+00, Sta. 1+040 - Sta. 1+169.35), Tacloban City",
      "hgabPesos": 100000000,
      "nepPage": "284",
      "hgabPage": "224",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20747",
      "nepTitle": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0229-002181",
      "hgabTitle": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur",
      "hgabPesos": 100000000,
      "nepPage": "290",
      "hgabPage": "229",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20645",
      "nepTitle": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
      "nepPesos": 33628000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0214-001893",
      "hgabTitle": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
      "hgabPesos": 33628000,
      "nepPage": "277",
      "hgabPage": "214",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20662",
      "nepTitle": "Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay",
      "nepPesos": 150000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0221-002044",
      "hgabTitle": "Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay",
      "hgabPesos": 150000000,
      "nepPage": "282",
      "hgabPage": "221",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20825",
      "nepTitle": "Valencia City - Pangantucan Diversion Road, Brgy. La Roxas - Brgy. Bagong Silang, Sta. 16+600 - Sta. 20+600, Maramag, Bukidnon",
      "nepPesos": 265000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0227-002152",
      "hgabTitle": "Valencia City - Pangantucan Diversion Road, Barangay La Roxas - Barangay Bagong Silang, Sta. 16+600 - Sta. 20+600, Maramag, Bukidnon",
      "hgabPesos": 265000000,
      "nepPage": "288",
      "hgabPage": "227",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20655",
      "nepTitle": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
      "nepPesos": 280000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0214-001894",
      "hgabTitle": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
      "hgabPesos": 280000000,
      "nepPage": "277",
      "hgabPage": "214",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20285",
      "nepTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75",
      "nepPesos": 192237000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0234-002265",
      "hgabTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75",
      "hgabPesos": 192237000,
      "nepPage": "294",
      "hgabPage": "234",
      "chainageStatus": "overlap",
      "trancheStatus": "same tranche",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33023",
      "nepTitle": "Cagayan de Oro Diversion Road Extension (Jct. Sayre Highway (Balubal)-Manolo Fortich-Malitbog-Claveria-Eureka, Gingoog City Road), Mantibugao-Lunocan Section, Sta. 1+739 - Sta. Sta. 2+578.11, Manolo Fortich, Bukidnon",
      "nepPesos": 80000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32942",
      "nepTitle": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Brgy. Taglimao - Brgy. Bagocboc, Sta. 8+084 - Sta. 9+620, Cagayan de Oro City",
      "nepPesos": 200000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0225-002104",
      "hgabTitle": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Barangay Taglimao - Barangay Bagocboc, Sta. 8+084 - Sta. 9+620, Cagayan de Oro City",
      "hgabPesos": 200000000,
      "nepPage": "285",
      "hgabPage": "225",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09115",
      "nepTitle": "Construction of Manuel S. Agyao Boulevard-Ileb junc.-Dilag-San Julian-Balong-Tuao Circumferential Road, Tabuk City, Kalinga",
      "nepPesos": 150000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0417-005795",
      "hgabTitle": "Construction of Manuel S. Agyao Boulevard-Ileb junc.-Dilag-San Julian-Balong-Tuao Circumferential Road, Tabuk City, Kalinga",
      "hgabPesos": 150000000,
      "nepPage": "435",
      "hgabPage": "417",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20741",
      "nepTitle": "San Francisco (NRJ Hubang-Sta. Ana-San Isidro) Bypass Road (Daang Maharlika Alternate Route), Sta. 5 + 610 - Sta. 5+866.04, Agusan del Sur",
      "nepPesos": 20000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32988",
      "nepTitle": "CDOC-Iligan City Hinterland Road (Jct. CDO Camp Kibaritan Road-Dominorog Road, Dansolihon-Jct. IBR, Rogongon, Iligan City) Alternate Road, Brgy. Rogongon, Sta. 2+200-Sta. 5+000, Iligan City",
      "nepPesos": 300000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0225-002110",
      "hgabTitle": "CDOC-Iligan City Hinterland Road (Jct. CDO Camp Kibaritan Road-Dominorog Road, Dansolihon-Jct. IBR, Rogongon, Iligan City) Alternate Road, Barangay Rogongon, Sta. 2+200-Sta. 5+000, Iligan City",
      "hgabPesos": 300000000,
      "nepPage": "285",
      "hgabPage": "225",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09172",
      "nepTitle": "Construction (Completion) of National Bureau of Investigation (NBI) - Cordillera Administrative Region (NBI-CAR) Office Building, Upper Session Road, Baguio City",
      "nepPesos": 200000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0634-010333",
      "hgabTitle": "Construction (Completion) of National Bureau of Investigation (NBI) - Cordillera Administrative Region (NBI-CAR) Office Building, Upper Session Road, Baguio City",
      "hgabPesos": 200000000,
      "nepPage": "562",
      "hgabPage": "634",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20364",
      "nepTitle": "Managnag(Tigaon-Goa-Sn Jose-Lagonoy via Sn Vicente Rd)-Himanag Road, Lagonoy, Camarines Sur, Sta.13+484 - Sta.15+360.7",
      "nepPesos": 141801000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0238-002334",
      "hgabTitle": "Managnag(Tigaon-Goa-Sn Jose-Lagonoy via Sn Vicente Rd)-Himanag Road, Lagonoy, Camarines Sur, Sta.13+484 - Sta.15+360.7",
      "hgabPesos": 141801000,
      "nepPage": "297",
      "hgabPage": "238",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21355",
      "nepTitle": "NRJ Daang Maharlika Bunawan Proper - San Isidro - Kiotoy - Mabunao - Kauswagan - Jct. Panabo City Fatima - Malabog Road, Panabo City, Davo del Norte - Sta. 0+000 - Sta. 2+500",
      "nepPesos": 41250000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0618-010018",
      "hgabTitle": "NRJ Daang Maharlika Bunawan Proper - San Isidro - Kiotoy - Mabunao - Kauswagan - Jct. Panabo City Fatima - Malabog Road, Panabo City, Davao del Norte - Sta. 0+000 - Sta. 1+000, Sta. 1+100 - Sta. 1+895",
      "hgabPesos": 41250000,
      "nepPage": "553",
      "hgabPage": "618",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09016",
      "nepTitle": "Construction of Barren River (Downstream) Flood Control along Chico River Basin, Sta. 37 + 738 - Sta. 38 + 838 (L/S), Barangay Malama, Conner, Apayao",
      "nepPesos": 46000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0335-004188",
      "hgabTitle": "Construction of Barren River (Downstream) Flood Control along Chico River Basin, Sta. 37 + 738 - Sta. 38 + 838 (L/S), Barangay Malama, Conner, Apayao",
      "hgabPesos": 46000000,
      "nepPage": "372",
      "hgabPage": "335",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03641",
      "nepTitle": "Construction of Flood Mitigation Structure along Peñaranda River, Barangay Rio Chico, General Tinio, Nueva Ecija",
      "nepPesos": 72500000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0367-004797",
      "hgabTitle": "Construction of Flood Mitigation Structure along Peñaranda River, Barangay Rio Chico, General Tinio, Nueva Ecija",
      "hgabPesos": 72500000,
      "nepPage": "397",
      "hgabPage": "367",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-02666",
      "nepTitle": "Rehabilitation of Drainage Canal, Barangay UEP Zone III, Sta. 000+000 - Sta. 000+309, Catarman, Northern Samar",
      "nepPesos": 2300000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0358-004640",
      "hgabTitle": "Rehabilitation of Drainage Canal, Barangay UEP Zone III, Sta. 000+000 - Sta. 000+309, Catarman, Northern Samar",
      "hgabPesos": 2300000,
      "nepPage": "390",
      "hgabPage": "358",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35122",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Nappaccu Pequeño, Reina Mercedes, Isabela",
      "nepPesos": 150000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0635-010339",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Nappaccu Pequeño, Reina Mercedes, Isabela",
      "hgabPesos": 150000000,
      "nepPage": "563",
      "hgabPage": "635",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36380",
      "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Buenavista III, General Trias City, Cavite",
      "nepPesos": 20000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0766-012918",
      "hgabTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Buenavista III, General Trias City, Cavite",
      "hgabPesos": 20000000,
      "nepPage": "613",
      "hgabPage": "766",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34992",
      "nepTitle": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Cataggaman Viejo, Tuguegarao City, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0704-011661",
      "hgabTitle": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Cataggaman Viejo, Tuguegarao City, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "588",
      "hgabPage": "704",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37480",
      "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Zone I, Cadiz City, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0832-014241",
      "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Zone I, Cadiz City, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "642",
      "hgabPage": "832",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-26612",
      "nepTitle": "Construction of Multi-Purpose Building Barangay Gadongan, Ditsaan Ramain Lanao del Sur",
      "nepPesos": 15000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0651-010614",
      "hgabTitle": "Construction of Multi-Purpose Building Barangay Gadongan, Ditsaan Ramain Lanao del Sur",
      "hgabPesos": 15000000,
      "nepPage": "569",
      "hgabPage": "651",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-22782",
      "nepTitle": "Construction of Multi-Purpose Building at Welcome Village, Barangay San Antonio, Parañaque City (14.466670, 121.022711)",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0658-010749",
      "hgabTitle": "Construction of Multi-Purpose Building at Welcome Village, Barangay San Antonio, Parañaque City (14.466670, 121.022711)",
      "hgabPesos": 7000000,
      "nepPage": "573",
      "hgabPage": "658",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37580",
      "nepTitle": "Construction of Multi-Purpose Building in Barangay Igmaya-an, Salvador Benedicto, Negros Occidental",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0836-014312",
      "hgabTitle": "Construction of Multi-Purpose Building in Barangay Igmaya-an, Salvador Benedicto, Negros Occidental",
      "hgabPesos": 6000000,
      "nepPage": "644",
      "hgabPage": "836",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38702",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Sinkatulan, Makilala, North Cotabato",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39306",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Sta. Rita I, Del Gallego, Camarines Sur",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0798-013571",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sta. Rita I, Del Gallego, Camarines Sur",
      "hgabPesos": 5000000,
      "nepPage": "630",
      "hgabPage": "798",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35613",
      "nepTitle": "Construction of Multi-Purpose Building, Bataan Convention Center, Provincial Capitol Compound, Barangay San Jose, Balanga City, Bataan (14.674898, 120.529098)",
      "nepPesos": 40000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0727-012124",
      "hgabTitle": "Construction of Multi-Purpose Building, Bataan Convention Center, Provincial Capitol Compound, Barangay San Jose, Balanga City, Bataan (14.674898, 120.529098)",
      "hgabPesos": 40000000,
      "nepPage": "595",
      "hgabPage": "727",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20284",
      "nepTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573",
      "nepPesos": 74500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0234-002264",
      "hgabTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong- Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573",
      "hgabPesos": 74500000,
      "nepPage": "294",
      "hgabPage": "234",
      "chainageStatus": "overlap",
      "trancheStatus": "same tranche",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38059",
      "nepTitle": "Construction of Quezon to Magsaysasy Road (Sta. 1+700 - Sta. 2+250), Mapanas, Northern Samar",
      "nepPesos": 25000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0596-009586",
      "hgabTitle": "Construction of Quezon to Magsaysasy Road (Sta. 1+700 - Sta. 2+250), Mapanas, Northern Samar",
      "hgabPesos": 25000000,
      "nepPage": "542",
      "hgabPage": "596",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37389",
      "nepTitle": "Construction of Road (Sta. 3+353 - Sta. 5+669) at Barangay Canlusong, E.B. Magalona, Negros Occidental (10.7556040, 123.1613220)",
      "nepPesos": 32424000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0575-009121",
      "hgabTitle": "Construction of Road (Sta. 3+353 - Sta. 5+669) at Barangay Canlusong, E.B. Magalona, Negros Occidental (10.7556040, 123.1613220)",
      "hgabPesos": 32424000,
      "nepPage": "529",
      "hgabPage": "575",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37791",
      "nepTitle": "Construction of Road Slope Protection Structure, Barangay Tagba-o, Cebu City, Cebu",
      "nepPesos": 30000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0590-009458",
      "hgabTitle": "Construction of Road Slope Protection Structure, Barangay Tagba-o, Cebu City, Cebu",
      "hgabPesos": 30000000,
      "nepPage": "539",
      "hgabPage": "590",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-39416",
      "nepTitle": "Construction of Road, Barangay Man-ogob, San Vicente, Camarines Norte",
      "nepPesos": 8000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0431-006092",
      "hgabTitle": "Construction of Road, Barangay Man-ogob, San Vicente, Camarines Norte",
      "hgabPesos": 8000000,
      "nepPage": "445",
      "hgabPage": "431",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20449",
      "nepTitle": "East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Talakag-Baungon Section), Brgy. Lacolac Section, Sta. 12+750 - Sta. 13+275.33, Baungon, Bukidnon",
      "nepPesos": 40000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0239-002360",
      "hgabTitle": "East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Talakag- Baungon Section), Barangay Lacolac Section, Sta. 12+750 - Sta. 13+275.33, Baungon, Bukidnon",
      "hgabPesos": 40000000,
      "nepPage": "298",
      "hgabPage": "239",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20445",
      "nepTitle": "East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Talakag-Baungon Section), Brgy. Langaon Section, Sta. 24+360 - Sta. 25+894, Baungon, Bukidnon",
      "nepPesos": 65000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-31755",
      "nepTitle": "Lubao -Guagaua-Minalin-Sto Tomas Road, (Sta 019+070.80 - Sta 019+340.38), Pampanga",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20452",
      "nepTitle": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Brgy. Bal-ason - Brgy. Hindangon, Sta. 125+958 - Sta. 127+158, Gingoog City, Misamis Oriental",
      "nepPesos": 100000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0240-002367",
      "hgabTitle": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Barangay Bal-ason - Barangay Hindangon, Sta. 125+958 - Sta. 127+158, Gingoog City, Misamis Oriental",
      "hgabPesos": 100000000,
      "nepPage": "299",
      "hgabPage": "240",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32765",
      "nepTitle": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Binmaley, Pangasinan",
      "nepPesos": 438930000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0214-001889",
      "hgabTitle": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Binmaley, Pangasinan",
      "hgabPesos": 438930000,
      "nepPage": "277",
      "hgabPage": "214",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32766",
      "nepTitle": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Dagupan City, Pangasinan",
      "nepPesos": 250000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0214-001890",
      "hgabTitle": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Dagupan City, Pangasinan",
      "hgabPesos": 250000000,
      "nepPage": "277",
      "hgabPage": "214",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20516",
      "nepTitle": "Quezon Hill Road 1 to Magsaysay West Service Bypass Road, Sta. 1+524 - Sta. 1+742, Baguio City",
      "nepPesos": 15000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0230-002189",
      "hgabTitle": "Quezon Hill Road 1 to Magsaysay West Service Bypass Road, Sta. 1+524 - Sta. 1+742, Baguio City",
      "hgabPesos": 15000000,
      "nepPage": "290",
      "hgabPage": "230",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34388",
      "nepTitle": "Rehabilitation of Road, Barangay Dalumpinas Este, City of San Fernando, La Union",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0465-006737",
      "hgabTitle": "Rehabilitation of Road, Barangay Dalumpinas Este, City of San Fernando, La Union",
      "hgabPesos": 10000000,
      "nepPage": "464",
      "hgabPage": "465",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-01099",
      "nepTitle": "Construction of Drainage System Along Jct. BCIR-Jct. Eastern Interior Bypass Road (Access Road), Barangay Tablon, Sta.0+000 - Sta. 0+530, Cagayan De Oro City",
      "nepPesos": 180000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0369-004830",
      "hgabTitle": "Construction of Drainage System Along Jct. BCIR-Jct. Eastern Interior Bypass Road (Access Road), Barangay Tablon, Sta.0+000 - Sta. 0+530, Cagayan De Oro City",
      "hgabPesos": 180000000,
      "nepPage": "399",
      "hgabPage": "369",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09803",
      "nepTitle": "Construction of Drainage at Barangay Malinta, Los Baños, Laguna",
      "nepPesos": 20000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10788",
      "nepTitle": "Construction of Drainage, Barangay Pulungbulu, Angeles City, Pampanga, Sta. 0+000 - Sta. 0+530, Sta. 0+000 - Sta. 0+140, Sta. 0+000 - Sta. 0+360, Sta. 0+000 - Sta. 0+193",
      "nepPesos": 5114000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-21596",
      "nepTitle": "Construction of Flood Control Structure at Aguada River, Aguada Br. Section (B00001BL) with Esplanade along Basilan Circumferential Road (S00002BL), Isabela City",
      "nepPesos": 155000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10093",
      "nepTitle": "Construction of Flood Control Structure, Binayoyo River (Downstream), sta 03+279 - sta 03+739, Barangay Calawis, Antipolo City, Rizal",
      "nepPesos": 50000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0349-004471",
      "hgabTitle": "Construction of Flood Control Structure, Binayoyo River (Downstream), sta 03+279 - sta 03+739, Barangay Calawis, Antipolo City, Rizal",
      "hgabPesos": 50000000,
      "nepPage": "383",
      "hgabPage": "349",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10094",
      "nepTitle": "Construction of Flood Control Structure, Calawis River (Upstream), sta 02+134 - sta 02+594, Barangay Calawis, Antipolo City, Rizal",
      "nepPesos": 50000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0349-004473",
      "hgabTitle": "Construction of Flood Control Structure, Calawis River (Upstream), sta 02+134 - sta 02+594, Barangay Calawis, Antipolo City, Rizal",
      "hgabPesos": 50000000,
      "nepPage": "383",
      "hgabPage": "349",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10095",
      "nepTitle": "Construction of Flood Control Structure, Cupang River (Downstream), sta 01+779 - sta 02+239, Barangay Cupang, Antipolo City, Rizal",
      "nepPesos": 50000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0349-004475",
      "hgabTitle": "Construction of Flood Control Structure, Cupang River (Downstream), sta 01+779 - sta 02+239, Barangay Cupang, Antipolo City, Rizal",
      "hgabPesos": 50000000,
      "nepPage": "383",
      "hgabPage": "349",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-08104",
      "nepTitle": "Construction of Revetment Wall along Butuanon River, Barangay Tabok, Mandaue City, Cebu",
      "nepPesos": 43000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0356-004602",
      "hgabTitle": "Construction of Revetment Wall along Butuanon River, Barangay Tabok, Mandaue City, Cebu",
      "hgabPesos": 43000000,
      "nepPage": "388",
      "hgabPage": "356",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-28940",
      "nepTitle": "Construction of Revetment along Julian River, Barangay Anabu I-B, Imus, Cavite",
      "nepPesos": 82000000,
      "category": "Flood control",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0308-003665",
      "hgabTitle": "Construction of Revetment along Julian River, Barangay Anabu I-B, Imus, Cavite",
      "hgabPesos": 82000000,
      "nepPage": "354",
      "hgabPage": "308",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09797",
      "nepTitle": "Construction of Road and Drainage System at Barangay San Antonio, Binan City, Laguna",
      "nepPesos": 30000000,
      "category": "Flood control",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37023",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Guintigiban, Corcuera, Romblon",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0793-013470",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Guintigiban, Corcuera, Romblon",
      "hgabPesos": 5000000,
      "nepPage": "627",
      "hgabPage": "793",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36042",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bakal I, Talavera, Nueva Ecija",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0735-012298",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bakal I, Talavera, Nueva Ecija",
      "hgabPesos": 6000000,
      "nepPage": "600",
      "hgabPage": "735",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37621",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Can-asagan, San Juan, Siquijor",
      "nepPesos": 5300000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0841-014411",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Can-asagan, San Juan, Siquijor",
      "hgabPesos": 5300000,
      "nepPage": "645",
      "hgabPage": "841",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34872",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Muñoz West, Roxas, Isabela",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0707-011715",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Muñoz West, Roxas, Isabela",
      "hgabPesos": 10000000,
      "nepPage": "589",
      "hgabPage": "707",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33636",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Peñbatan, Pulilan, Bulacan",
      "nepPesos": 35000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34887",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Norte I, Mallig, Isabela",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0707-011722",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Norte I, Mallig, Isabela",
      "hgabPesos": 5000000,
      "nepPage": "589",
      "hgabPage": "707",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38948",
      "nepTitle": "Construction (Completion) of Multi-Purpose Building, Brgy Baraas, Municipality of Picong, Lanao del Sur",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0647-010547",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Baraas, Municipality of Picong, Lanao del Sur",
      "hgabPesos": 10000000,
      "nepPage": "569",
      "hgabPage": "647",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36423",
      "nepTitle": "Construction of Multi-Purpose Building (Museo de Bacoor) at Barangay Poblacion, formerly Tabing Dagat, Camposanto and Daaang Bukid, Bacoor City, Cavite",
      "nepPesos": 296500000,
      "category": "Multi-purpose building",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0640-010407",
      "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Museo de Bacoor) at Barangay Poblacion, formerly Tabing Dagat, Camposanto and Daaang Bukid, Bacoor City, Cavite",
      "hgabPesos": 334500000,
      "nepPage": "567",
      "hgabPage": "640",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36346",
      "nepTitle": "Construction of Multi-Purpose Building at Barangay Maligaya, General Nakar, Quezon",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0778-013169",
      "hgabTitle": "Construction of Multi-Purpose Building at Barangay Maligaya, General Nakar, Quezon",
      "hgabPesos": 7000000,
      "nepPage": "620",
      "hgabPage": "778",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-09638",
      "nepTitle": "Construction of Multi-Purpose Building including Facilities, Land Transportation Regional Office, Region 4A, Barangay Marawoy, Lipa City, Batangas (13.959513, 121.173809)",
      "nepPesos": 50000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0641-010430",
      "hgabTitle": "Construction of Multi-Purpose Building including Facilities, Land Transportation Regional Office, Region 4A, Barangay Marawoy, Lipa City, Batangas (13.959513, 121.173809)",
      "hgabPesos": 50000000,
      "nepPage": "567",
      "hgabPage": "641",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38685",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Bongolanon, Magpet, North Cotabato",
      "nepPesos": 6000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0896-015472",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Bongolanon, Magpet, North Cotabato",
      "hgabPesos": 6000000,
      "nepPage": "668",
      "hgabPage": "896",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-06359",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Guintigiban, Corcuera, Romblon",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "No selected or cited counterpart",
      "hgabId": null,
      "hgabTitle": null,
      "hgabPesos": null,
      "nepPage": null,
      "hgabPage": null,
      "chainageStatus": null,
      "trancheStatus": null,
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37447",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay I-A, Municipality of Manapla, Negros Occidental",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0833-014254",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay I-A, Municipality of Manapla, Negros Occidental",
      "hgabPesos": 5000000,
      "nepPage": "642",
      "hgabPage": "833",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35072",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Mala Weste, Buguey, Cagayan",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0702-011620",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mala Weste, Buguey, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "587",
      "hgabPage": "702",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36172",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Muzon I, Rosario, Cavite",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0768-012952",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Muzon I, Rosario, Cavite",
      "hgabPesos": 10000000,
      "nepPage": "614",
      "hgabPage": "768",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35894",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Prenza I, Marilao, Bulacan",
      "nepPesos": 8000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0734-012268",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Prenza I, Marilao, Bulacan",
      "hgabPesos": 8000000,
      "nepPage": "599",
      "hgabPage": "734",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36449",
      "nepTitle": "Construction of Multi-Purpose Building, Barangay Sapa III, Rosario, Cavite",
      "nepPesos": 10000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0768-012957",
      "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sapa III, Rosario, Cavite",
      "hgabPesos": 10000000,
      "nepPage": "614",
      "hgabPage": "768",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36588",
      "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay San Bartolome, Sto. Tomas City, Batangas",
      "nepPesos": 7000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0757-012736",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay San Bartolome, Sto. Tomas City, Batangas",
      "hgabPesos": 7000000,
      "nepPage": "611",
      "hgabPage": "757",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36456",
      "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay San Jose II, Noveleta, Cavite",
      "nepPesos": 5000000,
      "category": "Multi-purpose building",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0768-012966",
      "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay San Jose II, Noveleta, Cavite",
      "hgabPesos": 5000000,
      "nepPage": "615",
      "hgabPage": "768",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-20408",
      "nepTitle": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 9+560 - Sta. 9+640, Sta. 16+103 - Sta. 16+340, Sta. 16+340 - Sta. 16+420, Sta. 16+420 - Sta. 16+425), Northern Samar",
      "nepPesos": 448380000,
      "category": "Road",
      "status": "Potential retained link",
      "hgabId": "HB10858-3-0239-002353",
      "hgabTitle": "Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 16+103 - Sta. 16+340, Sta. 16+340 - Sta. 16+420, Sta. 16+420 - Sta. 16+425), Northern Samar",
      "hgabPesos": 448380000,
      "nepPage": "298",
      "hgabPage": "239",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35393",
      "nepTitle": "Concreting of Barangay Road, Barangay Ganzano, Gattran, Cagayan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0484-007161",
      "hgabTitle": "Concreting of Barangay Road, Barangay Ganzano, Gattran, Cagayan",
      "hgabPesos": 10000000,
      "nepPage": "475",
      "hgabPage": "484",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-23347",
      "nepTitle": "Construction of Barangay Road of Malimatoc I, Mabini, Batangas",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0536-008250",
      "hgabTitle": "Construction of Barangay Road of Malimatoc I, Mabini, Batangas",
      "hgabPesos": 10000000,
      "nepPage": "504",
      "hgabPage": "536",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-35872",
      "nepTitle": "Construction of Road, Barangay Bakal II, Talavera, Nueva Ecija",
      "nepPesos": 6050000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0520-007897",
      "hgabTitle": "Construction of Road, Barangay Bakal II, Talavera, Nueva Ecija",
      "hgabPesos": 6050000,
      "nepPage": "494",
      "hgabPage": "520",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34984",
      "nepTitle": "Construction of Road, Barangay Bical, Peñablanca, Cagayan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0486-007191",
      "hgabTitle": "Construction of Road, Barangay Bical, Peñablanca, Cagayan",
      "hgabPesos": 5000000,
      "nepPage": "476",
      "hgabPage": "486",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36666",
      "nepTitle": "Construction of Road, Barangay Guisguis Talon, Sariaya, Quezon",
      "nepPesos": 12000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0548-008536",
      "hgabTitle": "Construction of Road, Barangay Guisguis Talon, Sariaya, Quezon",
      "hgabPesos": 12000000,
      "nepPage": "512",
      "hgabPage": "548",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37109",
      "nepTitle": "Construction of Road, Barangay Janipa-an East, Mina, Iloilo",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0573-009065",
      "hgabTitle": "Construction of Road, Barangay Janipa-an East, Mina, Iloilo",
      "hgabPesos": 10000000,
      "nepPage": "527",
      "hgabPage": "573",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-37115",
      "nepTitle": "Construction of Road, Barangay Janipa-an West, Mina, Iloilo",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0573-009066",
      "hgabTitle": "Construction of Road, Barangay Janipa-an West, Mina, Iloilo",
      "hgabPesos": 10000000,
      "nepPage": "527",
      "hgabPage": "573",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-34152",
      "nepTitle": "Construction of Road, Barangay Sablig, Anda, Pangasinan",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0470-006835",
      "hgabTitle": "Construction of Road, Barangay Sablig, Anda, Pangasinan",
      "hgabPesos": 5000000,
      "nepPage": "466",
      "hgabPage": "470",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-36886",
      "nepTitle": "Construction of Road, Barangay Sta. Rosa I, Baco, Oriental Mindoro",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0554-008669",
      "hgabTitle": "Construction of Road, Barangay Sta. Rosa I, Baco, Oriental Mindoro",
      "hgabPesos": 5000000,
      "nepPage": "516",
      "hgabPage": "554",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38221",
      "nepTitle": "Construction of Road, Sitio Purok Bato, Brgy. Punta Blanca, Manukan, Zamboanga del Norte",
      "nepPesos": 5000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0602-009694",
      "hgabTitle": "Construction of Road, Sitio Purok Bato, Barangay Punta Blanca, Manukan, Zamboanga del Norte",
      "hgabPesos": 5000000,
      "nepPage": "545",
      "hgabPage": "602",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-03489",
      "nepTitle": "Construction of Road, Sta. 1+727 - Sta. 1+877, Iba Este, Calumpit, Bulacan",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0509-007679",
      "hgabTitle": "Construction of Road, Sta. 1+727 - Sta. 1+877, Iba Este, Calumpit, Bulacan",
      "hgabPesos": 10000000,
      "nepPage": "486",
      "hgabPage": "509",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-33850",
      "nepTitle": "Improvement of Road at Barangay Muntingpulo, Lipa City, Batangas",
      "nepPesos": 10000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0541-008380",
      "hgabTitle": "Improvement of Road at Barangay Muntingpulo, Lipa City, Batangas",
      "hgabPesos": 10000000,
      "nepPage": "508",
      "hgabPage": "541",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32864",
      "nepTitle": "Jct. Nato-Sabang Coastal Road, Dolo Section, San Jose, Camarines Sur, Sta.9+627 - Sta.10+368",
      "nepPesos": 145500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0221-002032",
      "hgabTitle": "Jct. Nato-Sabang Coastal Road, Dolo Section, San Jose, Camarines Sur, Sta.9+627 - Sta.10+368",
      "hgabPesos": 145500000,
      "nepPage": "282",
      "hgabPage": "221",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32863",
      "nepTitle": "Jct. Nato-Sabang Coastal Road, Manzana Section, San Jose , Camarines Sur, Sta.8+877 - Sta.9+627",
      "nepPesos": 147000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0221-002034",
      "hgabTitle": "Jct. Nato-Sabang Coastal Road, Manzana Section, San Jose , Camarines Sur, Sta.8+877 - Sta.9+627",
      "hgabPesos": 147000000,
      "nepPage": "282",
      "hgabPage": "221",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-32862",
      "nepTitle": "Jct. Nato-Sabang Coastal Road, Telegrafo Section, San Jose, Camarines Sur, Sta.8+127 - Sta.8+877",
      "nepPesos": 147000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0221-002037",
      "hgabTitle": "Jct. Nato-Sabang Coastal Road, Telegrafo Section, San Jose, Camarines Sur, Sta.8+127 - Sta.8+877",
      "hgabPesos": 147000000,
      "nepPage": "282",
      "hgabPage": "221",
      "chainageStatus": "overlap",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-10571",
      "nepTitle": "Rehabilitation of Road, Area B, Barangay Bagong Buhay City of San Jose Del Monte, Bulacan (121.057753, 14.853254)",
      "nepPesos": 50000000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0516-007827",
      "hgabTitle": "Rehabilitation of Road, Area B, Barangay Bagong Buhay City of San Jose Del Monte, Bulacan (121.057753, 14.853254)",
      "hgabPesos": 50000000,
      "nepPage": "493",
      "hgabPage": "516",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    },
    {
      "sourceCode": "2027DPWH-Proposal-38140",
      "nepTitle": "Road Concreting in Brgy. Tiniguiban, Leon T. Postigo, Zamboanga del Norte",
      "nepPesos": 14500000,
      "category": "Road",
      "status": "Clear retained link",
      "hgabId": "HB10858-3-0603-009705",
      "hgabTitle": "Road Concreting in Barangay Tiniguiban, Leon T. Postigo, Zamboanga del Norte",
      "hgabPesos": 14500000,
      "nepPage": "545",
      "hgabPage": "603",
      "chainageStatus": "not stated",
      "trancheStatus": "not stated",
      "unselectedCandidateIds": []
    }
  ],
  "comparisonPairs": [
    {
      "category": "Bridge",
      "project": "CDO-New Western Diversion Road (Macabalan-Bonbon Bridge and Access Road), Barangay Macabalan, Sta. 0+738- Sta. 0+754, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-31793",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 100000000,
      "comparison_year": 2026,
      "prior_project": "CDO-New Western Diversion Road (Macabalan-Bonbon Bridge and Access Road), Barangay Macabalan, Sta. 0+458-Sta. 0+778, Cagayan de Oro City",
      "prior_amount": 192762000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12384",
      "similarity_pct": 100,
      "current_chainage": "0+738.00–0+754.00",
      "prior_chainage": "0+458.00–0+778.00",
      "chainage_overlap": "0+738.00–0+754.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31793",
        "nepTitle": "CDO-New Western Diversion Road (Macabalan-Bonbon Bridge and Access Road), Barangay Macabalan, Sta. 0+738- Sta. 0+754, Cagayan de Oro City",
        "nepPesos": 100000000,
        "category": "Bridge",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0225-002113",
        "hgabTitle": "CDO-New Western Diversion Road (Macabalan-Bonbon Bridge and Access Road), Barangay Macabalan, Sta. 0+738- Sta. 0+778, Cagayan de Oro City",
        "hgabPesos": 120000000,
        "nepPage": "285",
        "hgabPage": "225",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Bridge",
      "project": "Construction of Bridge, Sitio Naswak, Sta. 0 + 000.000 - Sta. 0 + 216.00, Barangay Lisap, Bongabong, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-06098",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Bridge, Sitio Naswak, Sta. 0 + 000.000 - Sta. 0 + 216.00, Barangay Lisap, Bongabong, Oriental Mindoro",
      "prior_amount": 19244000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 22440",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+216.00",
      "prior_chainage": "0+000.00–0+216.00",
      "chainage_overlap": "0+000.00–0+216.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-06098",
        "nepTitle": "Construction of Bridge, Sitio Naswak, Sta. 0 + 000.000 - Sta. 0 + 216.00, Barangay Lisap, Bongabong, Oriental Mindoro",
        "nepPesos": 15000000,
        "category": "Bridge",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0557-008723",
        "hgabTitle": "Construction of Bridge, Sitio Naswak, Sta. 0 + 000.000 - Sta. 0 + 216.00, Barangay Lisap, Bongabong, Oriental Mindoro",
        "hgabPesos": 15000000,
        "nepPage": "517",
        "hgabPage": "557",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Bridge",
      "project": "Eastern Interior Bypass Road (Gusa-Puerto/Jct. Sayre Highway), Barangay Tablon-Barangay Agusan (Agusan Bridge 3), Sta. 7+716 - Sta. 7+916, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-32964",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 350000000,
      "comparison_year": 2026,
      "prior_project": "Eastern Interior Bypass Road (Gusa-Puerto/Jct. Sayre Highway), Barangay Tablon-Barangay Agusan (Agusan Bridge 3), Sta. 7+716 - Sta. 7+916, Cagayan de Oro City",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12396",
      "similarity_pct": 100,
      "current_chainage": "7+716.00–7+916.00",
      "prior_chainage": "7+716.00–7+916.00",
      "chainage_overlap": "7+716.00–7+916.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32964",
        "nepTitle": "Eastern Interior Bypass Road (Gusa-Puerto/Jct. Sayre Highway), Barangay Tablon-Barangay Agusan (Agusan Bridge 3), Sta. 7+716 - Sta. 7+916, Cagayan de Oro City",
        "nepPesos": 350000000,
        "category": "Bridge",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0226-002124",
        "hgabTitle": "Eastern Interior Bypass Road (Gusa-Puerto/Jct. Sayre Highway), Barangay Tablon- Barangay Agusan (Agusan Bridge 3), Sta. 7+716 - Sta. 7+916, Cagayan de Oro City",
        "hgabPesos": 350000000,
        "nepPage": "286",
        "hgabPage": "226",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Bridge",
      "project": "Sayre Highway Parallel Road II (Valencia City Section), Bantal Bridge, Brgy. Sinayawan, Sta. 134+800 - Sta. 134+960, Valencia City, Bukidnon",
      "source_code": "2027DPWH-Proposal-32934",
      "office": "Bukidnon 4th District Engineering Office",
      "region": "Region X",
      "amount_2027": 59507000,
      "comparison_year": 2026,
      "prior_project": "Sayre Highway Parallel Road II (Valencia City Section), Bantal Bridge, Brgy. Sinayawan, Sta. 134+800 - Sta. 134+960, Valencia City, Bukidnon",
      "prior_amount": 27493000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12438",
      "similarity_pct": 100,
      "current_chainage": "134+800.00–134+960.00",
      "prior_chainage": "134+800.00–134+960.00",
      "chainage_overlap": "134+800.00–134+960.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Laarni Roque"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32934",
        "nepTitle": "Sayre Highway Parallel Road II (Valencia City Section), Bantal Bridge, Brgy. Sinayawan, Sta. 134+800 - Sta. 134+960, Valencia City, Bukidnon",
        "nepPesos": 59507000,
        "category": "Bridge",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0227-002151",
        "hgabTitle": "Sayre Highway Parallel Road II (Valencia City Section), Bantal Bridge, Barangay Sinayawan, Sta. 134+800 - Sta. 134+960, Valencia City, Bukidnon",
        "hgabPesos": 59507000,
        "nepPage": "288",
        "hgabPage": "227",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Bridge",
      "project": "Tuguegarao City Boulevard (Pinacanauan Bridge 2 and Approaches) (Sta.0+000 - Sta. 1+632.82) , Tuguegarao City, Cagayan",
      "source_code": "2027DPWH-Proposal-20318",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 337000000,
      "comparison_year": 2026,
      "prior_project": "Tuguegarao City Boulevard (Pinacanauan Bridge 2 and Approaches), Tuguegarao City, Cagayan, Sta. 0+000 - Sta. 0+718.40",
      "prior_amount": 150000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12869",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+632.82",
      "prior_chainage": "0+000.00–0+718.40",
      "chainage_overlap": "0+000.00–0+718.40",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Lara"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20318",
        "nepTitle": "Tuguegarao City Boulevard (Pinacanauan Bridge 2 and Approaches) (Sta.0+000 - Sta. 1+632.82) , Tuguegarao City, Cagayan",
        "nepPesos": 337000000,
        "category": "Bridge",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0235-002278",
        "hgabTitle": "Tuguegarao City Boulevard (Pinacanauan Bridge 2 and Approaches) (Sta.0+000 - Sta. 1+632.82) , Tuguegarao City, Cagayan",
        "hgabPesos": 337000000,
        "nepPage": "295",
        "hgabPage": "235",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Bridge",
      "project": "Tuguegarao-Enrile Diversion Road (Tuguegarao-Enrile Bridge) (Sta. 0+172.60 - Sta. 0+781.9), Cagayan",
      "source_code": "2027DPWH-Proposal-20602",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2026,
      "prior_project": "Tuguegarao-Enrile Diversion Road (Tuguegarao-Enrile Bridge) (Sta. 0+172.60 - Sta. 2+000.50), Cagayan",
      "prior_amount": 98000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12041",
      "similarity_pct": 100,
      "current_chainage": "0+172.60–0+781.90",
      "prior_chainage": "0+172.60–2+000.50",
      "chainage_overlap": "0+172.60–0+781.90",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20602",
        "nepTitle": "Tuguegarao-Enrile Diversion Road (Tuguegarao-Enrile Bridge) (Sta. 0+172.60 - Sta. 0+781.9), Cagayan",
        "nepPesos": 100000000,
        "category": "Bridge",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0216-001932",
        "hgabTitle": "Tuguegarao-Enrile Diversion Road (Tuguegarao-Enrile Bridge) (Sta. 0+172.60 - Sta. 0+781.9), Cagayan",
        "hgabPesos": 100000000,
        "nepPage": "279",
        "hgabPage": "216",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-39090",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Flood Control at Brgy. Bugo, Cagayan de Oro City",
      "prior_amount": 15000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 488370",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39090",
        "nepTitle": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
        "nepPesos": 10000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0608-009820",
        "hgabTitle": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
        "hgabPesos": 10000000,
        "nepPage": "549",
        "hgabPage": "608",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-39090",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Flood Control at Brgy. Bugo, Cagayan de Oro City",
      "prior_amount": 11550000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 423641",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39090",
        "nepTitle": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
        "nepPesos": 10000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0608-009820",
        "hgabTitle": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
        "hgabPesos": 10000000,
        "nepPage": "549",
        "hgabPage": "608",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-39090",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575907",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39090",
        "nepTitle": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
        "nepPesos": 10000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0608-009820",
        "hgabTitle": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
        "hgabPesos": 10000000,
        "nepPage": "549",
        "hgabPage": "608",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-39090",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2016,
      "prior_project": "Concreting of Road with drainage at Barangay Bugo, Cagayan de Oro City",
      "prior_amount": 10000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050305958",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39090",
        "nepTitle": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
        "nepPesos": 10000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0608-009820",
        "hgabTitle": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
        "hgabPesos": 10000000,
        "nepPage": "549",
        "hgabPage": "608",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-39090",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Road with drainage at Barangay Bugo, Cagayan de Oro City",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050305958",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39090",
        "nepTitle": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
        "nepPesos": 10000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0608-009820",
        "hgabTitle": "Construction (Completion) of Road with Drainage Structure, Barangay Bugo, Cagayan de Oro City",
        "hgabPesos": 10000000,
        "nepPage": "549",
        "hgabPage": "608",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Bacradal Flood Control Structure, Barangay Bacradal, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-21103",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 135000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Bacradal Flood Control Drainage Structure Sta. 0+000 - Sta. 0+620, Echague, Isabela",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 655499",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+620.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21103",
        "nepTitle": "Construction of Bacradal Flood Control Structure, Barangay Bacradal, Echague, Isabela",
        "nepPesos": 135000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Baras Flood Mitigation Structure and Drainage System, Baras, Catanduanes",
      "source_code": "2027DPWH-Proposal-25322",
      "office": "Catanduanes District Engineering Office",
      "region": "Region V",
      "amount_2027": 150000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Flood Mitigation Structure and Drainage System, Baras, Catanduanes",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 656916",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-25322",
        "nepTitle": "Construction of Baras Flood Mitigation Structure and Drainage System, Baras, Catanduanes",
        "nepPesos": 150000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0309-003689",
        "hgabTitle": "Construction of Baras Flood Mitigation Structure and Drainage System, Baras, Catanduanes",
        "hgabPesos": 150000000,
        "nepPage": "355",
        "hgabPage": "309",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage Canal at Barangay San Miguel, Tarlac City, Tarlac",
      "source_code": "2027DPWH-Proposal-35466",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road and Drainage Canal at Barangay, San Miguel, Tarlac City, Tarlac",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526724",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35466",
        "nepTitle": "Construction of Drainage Canal at Barangay San Miguel, Tarlac City, Tarlac",
        "nepPesos": 20000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0343-004333",
        "hgabTitle": "Construction of Drainage Canal at Barangay San Miguel, Tarlac City, Tarlac",
        "hgabPesos": 20000000,
        "nepPage": "379",
        "hgabPage": "343",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage Canal, Sta. 0+943 - Sta. 1+085, Parulan, Plaridel. Bulacan",
      "source_code": "2027DPWH-Proposal-03546",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 1950000,
      "comparison_year": 2024,
      "prior_project": "Construction of Drainage Canal, Barangay Parulan, Plaridel, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 555770",
      "similarity_pct": 100,
      "current_chainage": "0+943.00–1+085.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03546",
        "nepTitle": "Construction of Drainage Canal, Sta. 0+943 - Sta. 1+085, Parulan, Plaridel. Bulacan",
        "nepPesos": 1950000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0338-004249",
        "hgabTitle": "Construction of Drainage Canal, Sta. 0+943 - Sta. 1+085, Parulan, Plaridel. Bulacan",
        "hgabPesos": 1950000,
        "nepPage": "375",
        "hgabPage": "338",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage Structure along Barangay Quesban, Calasiao, Pangasinan",
      "source_code": "2027DPWH-Proposal-34112",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Drainage, Barangay Quesban, Calasiao, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300109200289000 · PDF p. 1124 · printed p. 2589",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34112",
        "nepTitle": "Construction of Drainage Structure along Barangay Quesban, Calasiao, Pangasinan",
        "nepPesos": 10000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0333-004151",
        "hgabTitle": "Construction of Drainage Structure along Barangay Quesban, Calasiao, Pangasinan",
        "hgabPesos": 10000000,
        "nepPage": "371",
        "hgabPage": "333",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage Structure along Road, Barangay Gredu, Panabo City, Davao del Norte",
      "source_code": "2027DPWH-Proposal-38542",
      "office": "Davao del Norte 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Drainage Structure, Barangay Gredu, Panabo City, Davao del Norte",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 606190",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Manuel Lagdameo"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38542",
        "nepTitle": "Construction of Drainage Structure along Road, Barangay Gredu, Panabo City, Davao del Norte",
        "nepPesos": 6000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0618-010010",
        "hgabTitle": "Construction of Drainage Structure along Road, Barangay Gredu, Panabo City, Davao del Norte",
        "hgabPesos": 6000000,
        "nepPage": "553",
        "hgabPage": "618",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage Structure, Barangay Hipusngo, Baybay City, Leyte (Sta. 0+596.40 - 1+320.20)",
      "source_code": "2027DPWH-Proposal-02641",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 90000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Hipusngo Flood Control Structure, Brgy. Hipusngo, Baybay City, Leyte",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 563051",
      "similarity_pct": 100,
      "current_chainage": "0+596.40–1+320.20",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02641",
        "nepTitle": "Construction of Drainage Structure, Barangay Hipusngo, Baybay City, Leyte (Sta. 0+596.40 - 1+320.20)",
        "nepPesos": 90000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0314-003783",
        "hgabTitle": "Construction of Drainage Structure, Barangay Hipusngo, Baybay City, Leyte (Sta. 0+596.40 - 1+320.20)",
        "hgabPesos": 90000000,
        "nepPage": "360",
        "hgabPage": "314",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage Structure, Barangay Hipusngo, Baybay City, Leyte (Sta. 0+596.40 - 1+320.20)",
      "source_code": "2027DPWH-Proposal-02641",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 90000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Hipusngo Flood Control Structure, Barangay Hipusngo, Baybay City, Leyte",
      "prior_amount": 55000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 584486",
      "similarity_pct": 100,
      "current_chainage": "0+596.40–1+320.20",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02641",
        "nepTitle": "Construction of Drainage Structure, Barangay Hipusngo, Baybay City, Leyte (Sta. 0+596.40 - 1+320.20)",
        "nepPesos": 90000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0314-003783",
        "hgabTitle": "Construction of Drainage Structure, Barangay Hipusngo, Baybay City, Leyte (Sta. 0+596.40 - 1+320.20)",
        "hgabPesos": 90000000,
        "nepPage": "360",
        "hgabPage": "314",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage Structure, Barangay Hipusngo, Baybay City, Leyte (Sta. 0+596.40 - 1+320.20)",
      "source_code": "2027DPWH-Proposal-02641",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 90000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Hipusngo Flood Control Structure, Barangay Hipusngo, Baybay City, Leyte",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 544407",
      "similarity_pct": 100,
      "current_chainage": "0+596.40–1+320.20",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02641",
        "nepTitle": "Construction of Drainage Structure, Barangay Hipusngo, Baybay City, Leyte (Sta. 0+596.40 - 1+320.20)",
        "nepPesos": 90000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0314-003783",
        "hgabTitle": "Construction of Drainage Structure, Barangay Hipusngo, Baybay City, Leyte (Sta. 0+596.40 - 1+320.20)",
        "hgabPesos": 90000000,
        "nepPage": "360",
        "hgabPage": "314",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage Structure, Barangay Tablon, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-39095",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 8000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road with drainage, Barangay Tablon, Cagayan de Oro",
      "prior_amount": 10000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540879",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39095",
        "nepTitle": "Construction of Drainage Structure, Barangay Tablon, Cagayan de Oro City",
        "nepPesos": 8000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0360-004678",
        "hgabTitle": "Construction of Drainage Structure, Barangay Tablon, Cagayan de Oro City",
        "hgabPesos": 8000000,
        "nepPage": "391",
        "hgabPage": "360",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage Structure, Barangay Tablon, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-39095",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 8000000,
      "comparison_year": 2016,
      "prior_project": "Concreting of Road with drainage at Barangay Tablon, Cagayan de Oro City",
      "prior_amount": 5000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050305963",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39095",
        "nepTitle": "Construction of Drainage Structure, Barangay Tablon, Cagayan de Oro City",
        "nepPesos": 8000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0360-004678",
        "hgabTitle": "Construction of Drainage Structure, Barangay Tablon, Cagayan de Oro City",
        "hgabPesos": 8000000,
        "nepPage": "391",
        "hgabPage": "360",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage Structure, Barangay Tablon, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-39095",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 8000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Road with drainage at Barangay Tablon, Cagayan de Oro City",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050305963",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39095",
        "nepTitle": "Construction of Drainage Structure, Barangay Tablon, Cagayan de Oro City",
        "nepPesos": 8000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0360-004678",
        "hgabTitle": "Construction of Drainage Structure, Barangay Tablon, Cagayan de Oro City",
        "hgabPesos": 8000000,
        "nepPage": "391",
        "hgabPage": "360",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage Structure, Barangay Tablon, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-39095",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 8000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Road with Drainage System, Brgy. Tablon, Cagayan de Oro City",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117202052000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39095",
        "nepTitle": "Construction of Drainage Structure, Barangay Tablon, Cagayan de Oro City",
        "nepPesos": 8000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0360-004678",
        "hgabTitle": "Construction of Drainage Structure, Barangay Tablon, Cagayan de Oro City",
        "hgabPesos": 8000000,
        "nepPage": "391",
        "hgabPage": "360",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage Structure, Sta. 0+000 - Sta. 0+303, Barangay Kasambagan, Cebu City",
      "source_code": "2027DPWH-Proposal-07977",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Drainage System, Barangay Kasambagan, Cebu City",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 424103",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+303.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-07977",
        "nepTitle": "Construction of Drainage Structure, Sta. 0+000 - Sta. 0+303, Barangay Kasambagan, Cebu City",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage Structure, Sta. 0+000 - Sta. 0+303, Barangay Kasambagan, Cebu City",
      "source_code": "2027DPWH-Proposal-07977",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Drainage System, Barangay Kasambagan, Cebu City",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300109200445000 · PDF p. 1134 · printed p. 2599",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+303.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-07977",
        "nepTitle": "Construction of Drainage Structure, Sta. 0+000 - Sta. 0+303, Barangay Kasambagan, Cebu City",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage Structure, Sta. 0+057 - Sta. 0+357, Barangay Carreta, Cebu City",
      "source_code": "2027DPWH-Proposal-07976",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Barangay Carreta road with drainage , Cebu City",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117204648000 · PDF p. 1352 · printed p. 2817",
      "similarity_pct": 100,
      "current_chainage": "0+057.00–0+357.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-07976",
        "nepTitle": "Construction of Drainage Structure, Sta. 0+057 - Sta. 0+357, Barangay Carreta, Cebu City",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0357-004616",
        "hgabTitle": "Construction of Drainage Structure, Sta. 0+057 - Sta. 0+357, Barangay Carreta, Cebu City",
        "hgabPesos": 5000000,
        "nepPage": "389",
        "hgabPage": "357",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage Structure, Sta. 0+591 - Sta. 0+861, Barangay Kamputhaw, Cebu City",
      "source_code": "2027DPWH-Proposal-07979",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Drainage System, Barangay Kamputhaw, Cebu City",
      "prior_amount": 3000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300109200444000 · PDF p. 1134 · printed p. 2599",
      "similarity_pct": 100,
      "current_chainage": "0+591.00–0+861.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-07979",
        "nepTitle": "Construction of Drainage Structure, Sta. 0+591 - Sta. 0+861, Barangay Kamputhaw, Cebu City",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0357-004620",
        "hgabTitle": "Construction of Drainage Structure, Sta. 0+591 - Sta. 0+861, Barangay Kamputhaw, Cebu City",
        "hgabPesos": 5000000,
        "nepPage": "389",
        "hgabPage": "357",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System At Poblacion, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33854",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2020,
      "prior_project": "Construction/ Rehabilitation/ Improvement of Drainage System along Poblacion, Lipa City, Batangas",
      "prior_amount": 50000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 488382",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33854",
        "nepTitle": "Construction of Drainage System At Poblacion, Lipa City, Batangas",
        "nepPesos": 30000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0346-004394",
        "hgabTitle": "Construction of Drainage System At Poblacion, Lipa City, Batangas",
        "hgabPesos": 30000000,
        "nepPage": "381",
        "hgabPage": "346",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System At Poblacion, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33854",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2021,
      "prior_project": "Construction/ Rehabilitation/ Improvement of Drainage System along Poblacion, Lipa City, Batangas",
      "prior_amount": 40614000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 423647",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33854",
        "nepTitle": "Construction of Drainage System At Poblacion, Lipa City, Batangas",
        "nepPesos": 30000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0346-004394",
        "hgabTitle": "Construction of Drainage System At Poblacion, Lipa City, Batangas",
        "hgabPesos": 30000000,
        "nepPage": "381",
        "hgabPage": "346",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System At Poblacion, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33854",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Drainage System at Poblacion, Lipa City, Batangas",
      "prior_amount": 25000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 605593",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33854",
        "nepTitle": "Construction of Drainage System At Poblacion, Lipa City, Batangas",
        "nepPesos": 30000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0346-004394",
        "hgabTitle": "Construction of Drainage System At Poblacion, Lipa City, Batangas",
        "hgabPesos": 30000000,
        "nepPage": "381",
        "hgabPage": "346",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System At Poblacion, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33854",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2019,
      "prior_project": "Construction/ Rehabilitation/ Improvement of Drainage System along Poblacion, Lipa City, Batangas",
      "prior_amount": 50000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300109200386000 · PDF p. 1130 · printed p. 2595",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33854",
        "nepTitle": "Construction of Drainage System At Poblacion, Lipa City, Batangas",
        "nepPesos": 30000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0346-004394",
        "hgabTitle": "Construction of Drainage System At Poblacion, Lipa City, Batangas",
        "hgabPesos": 30000000,
        "nepPage": "381",
        "hgabPage": "346",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System along Caritan- Balzain Creek, Caritan, Tuguegarao City, Cagayan",
      "source_code": "2027DPWH-Proposal-35142",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Drainage System along Caritan- Balzain Creek, Caritan, Tuguegarao City, Cagayan",
      "prior_amount": 35000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 488314",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Lara"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35142",
        "nepTitle": "Construction of Drainage System along Caritan- Balzain Creek, Caritan, Tuguegarao City, Cagayan",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0336-004206",
        "hgabTitle": "Construction of Drainage System along Caritan-Balzain Creek, Caritan, Tuguegarao City, Cagayan",
        "hgabPesos": 70000000,
        "nepPage": "373",
        "hgabPage": "336",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System along Caritan- Balzain Creek, Caritan, Tuguegarao City, Cagayan",
      "source_code": "2027DPWH-Proposal-35142",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Drainage System along Caritan- Balzain Creek, Caritan, Tuguegarao City, Cagayan",
      "prior_amount": 7700000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 423615",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Lara"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35142",
        "nepTitle": "Construction of Drainage System along Caritan- Balzain Creek, Caritan, Tuguegarao City, Cagayan",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0336-004206",
        "hgabTitle": "Construction of Drainage System along Caritan-Balzain Creek, Caritan, Tuguegarao City, Cagayan",
        "hgabPesos": 70000000,
        "nepPage": "373",
        "hgabPage": "336",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System along Caritan- Balzain Creek, Caritan, Tuguegarao City, Cagayan",
      "source_code": "2027DPWH-Proposal-35142",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Drainage System along Caritan- Balzain Creek Sta.0+(-280) - Sta. 0+(-840), Caritan, Tuguegarao City, Cagayan",
      "prior_amount": 60000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 565100",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "-1+160.00–-1+720.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Lara"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35142",
        "nepTitle": "Construction of Drainage System along Caritan- Balzain Creek, Caritan, Tuguegarao City, Cagayan",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0336-004206",
        "hgabTitle": "Construction of Drainage System along Caritan-Balzain Creek, Caritan, Tuguegarao City, Cagayan",
        "hgabPesos": 70000000,
        "nepPage": "373",
        "hgabPage": "336",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System at Barangay Buaya, Lapu-Lapu City, Cebu",
      "source_code": "2027DPWH-Proposal-37700",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Drainage System at Barangay Buaya, Lapu-Lapu City, Cebu",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 657010",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37700",
        "nepTitle": "Construction of Drainage System at Barangay Buaya, Lapu-Lapu City, Cebu",
        "nepPesos": 30000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0356-004596",
        "hgabTitle": "Construction of Drainage System at Barangay Buaya, Lapu-Lapu City, Cebu",
        "hgabPesos": 30000000,
        "nepPage": "388",
        "hgabPage": "356",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System at Barangay Lalayat, San Jose, Batangas",
      "source_code": "2027DPWH-Proposal-36304",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Improvement of Road and Drainage System in Barangay Lalayat, San Jose, Batangas",
      "prior_amount": 2500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 423991",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36304",
        "nepTitle": "Construction of Drainage System at Barangay Lalayat, San Jose, Batangas",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0346-004390",
        "hgabTitle": "Construction of Drainage System at Barangay Lalayat, San Jose, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "381",
        "hgabPage": "346",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System at Barangay Muntingpulo, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28794",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 8000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation/Improvement of Drainage System at Barangay Muntingpulo, Lipa City, Batangas",
      "prior_amount": 8000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 423974",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28794",
        "nepTitle": "Construction of Drainage System at Barangay Muntingpulo, Lipa City, Batangas",
        "nepPesos": 8000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0346-004392",
        "hgabTitle": "Construction of Drainage System at Barangay Muntingpulo, Lipa City, Batangas",
        "hgabPesos": 8000000,
        "nepPage": "381",
        "hgabPage": "346",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System at Barangay Muntingpulo, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28794",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 8000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Drainage System at Barangay Muntingpulo, Lipa City, Batangas ",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 22029",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28794",
        "nepTitle": "Construction of Drainage System at Barangay Muntingpulo, Lipa City, Batangas",
        "nepPesos": 8000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0346-004392",
        "hgabTitle": "Construction of Drainage System at Barangay Muntingpulo, Lipa City, Batangas",
        "hgabPesos": 8000000,
        "nepPage": "381",
        "hgabPage": "346",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System at Barangay Sampiruhan, Calamba City, Laguna",
      "source_code": "2027DPWH-Proposal-09812",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 90000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Drainage, Brgy. Sampiruhan, Calamba City, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 606520",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Cha Hernandez"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09812",
        "nepTitle": "Construction of Drainage System at Barangay Sampiruhan, Calamba City, Laguna",
        "nepPesos": 90000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0306-003640",
        "hgabTitle": "Construction of Drainage System at Barangay Sampiruhan, Calamba City, Laguna",
        "hgabPesos": 90000000,
        "nepPage": "353",
        "hgabPage": "306",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System at Barangay Sta. Catalina, Pagbilao, Quezon",
      "source_code": "2027DPWH-Proposal-36377",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Rehabilitation of Flood Control Project, Brgy.Sta. Catalina, Pagbilao, Quezon",
      "prior_amount": 1000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292004020100536",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36377",
        "nepTitle": "Construction of Drainage System at Barangay Sta. Catalina, Pagbilao, Quezon",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0348-004453",
        "hgabTitle": "Rehabilitation of Drainage System at Barangay Sta. Catalina, Pagbilao, Quezon",
        "hgabPesos": 5000000,
        "nepPage": "383",
        "hgabPage": "348",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System, Barangay Nibaliw Center, San Fabian, Pangasinan",
      "source_code": "2027DPWH-Proposal-34455",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Drainage System at Brgy. Nibaliw Center, San Fabian, Pangasinan",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 423868",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34455",
        "nepTitle": "Construction of Drainage System, Barangay Nibaliw Center, San Fabian, Pangasinan",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0333-004141",
        "hgabTitle": "Construction of Drainage System, Barangay Nibaliw Center, San Fabian, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "370",
        "hgabPage": "333",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System, Barangay Pag Asa, San Jacinto, Pangasinan",
      "source_code": "2027DPWH-Proposal-34447",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Drainage System, Brgy. Pag-asa, San Jacinto, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292004020200511",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34447",
        "nepTitle": "Construction of Drainage System, Barangay Pag Asa, San Jacinto, Pangasinan",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0333-004142",
        "hgabTitle": "Construction of Drainage System, Barangay Pag Asa, San Jacinto, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "370",
        "hgabPage": "333",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System, Barangay Poblacion, San Fabian, Pangasinan",
      "source_code": "2027DPWH-Proposal-34456",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Drainage System at Barangay Poblacion, San Fabian, Pangasinan",
      "prior_amount": 1500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 423863",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34456",
        "nepTitle": "Construction of Drainage System, Barangay Poblacion, San Fabian, Pangasinan",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0333-004143",
        "hgabTitle": "Construction of Drainage System, Barangay Poblacion, San Fabian, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "370",
        "hgabPage": "333",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System, Barangay Poblacion, San Fabian, Pangasinan",
      "source_code": "2027DPWH-Proposal-34456",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road and Drainage Brgy. Poblacion, San Fabian, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551399",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34456",
        "nepTitle": "Construction of Drainage System, Barangay Poblacion, San Fabian, Pangasinan",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0333-004143",
        "hgabTitle": "Construction of Drainage System, Barangay Poblacion, San Fabian, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "370",
        "hgabPage": "333",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System, Barangay San Roque, San Jacinto, Pangasinan",
      "source_code": "2027DPWH-Proposal-34448",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Drainage System, Brgy. San Roque, San Jacinto, Pangasinan",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 488975",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34448",
        "nepTitle": "Construction of Drainage System, Barangay San Roque, San Jacinto, Pangasinan",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0333-004144",
        "hgabTitle": "Construction of Drainage System, Barangay San Roque, San Jacinto, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "371",
        "hgabPage": "333",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System, Barangay San Roque, San Jacinto, Pangasinan",
      "source_code": "2027DPWH-Proposal-34448",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Drainage System, Brgy. San Roque, San Jacinto, Pangasinan",
      "prior_amount": 1500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300109200047000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34448",
        "nepTitle": "Construction of Drainage System, Barangay San Roque, San Jacinto, Pangasinan",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0333-004144",
        "hgabTitle": "Construction of Drainage System, Barangay San Roque, San Jacinto, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "371",
        "hgabPage": "333",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System, Barangay Sta. Maria, San Jacinto, Pangasinan",
      "source_code": "2027DPWH-Proposal-34531",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Drainage System, Brgy. Sta. Maria, San Jacinto, Pangasinan",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 488973",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34531",
        "nepTitle": "Construction of Drainage System, Barangay Sta. Maria, San Jacinto, Pangasinan",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0333-004145",
        "hgabTitle": "Construction of Drainage System, Barangay Sta. Maria, San Jacinto, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "371",
        "hgabPage": "333",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System, Barangay Talogtog, Mangaldan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34452",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road and Drainage Brgy.Talogtog, Mangaldan, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551397",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34452",
        "nepTitle": "Construction of Drainage System, Barangay Talogtog, Mangaldan, Pangasinan",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0333-004146",
        "hgabTitle": "Construction of Drainage System, Barangay Talogtog, Mangaldan, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "371",
        "hgabPage": "333",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System, Barangay Tipolo, Mandaue City, Cebu",
      "source_code": "2027DPWH-Proposal-08287",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 9500000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road with Drainage Facilities, Barangay Tipolo, Mandaue City, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540728",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08287",
        "nepTitle": "Construction of Drainage System, Barangay Tipolo, Mandaue City, Cebu",
        "nepPesos": 9500000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0356-004599",
        "hgabTitle": "Construction of Drainage System, Barangay Tipolo, Mandaue City, Cebu",
        "hgabPesos": 9500000,
        "nepPage": "388",
        "hgabPage": "356",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System, Barangay Tipolo, Mandaue City, Cebu",
      "source_code": "2027DPWH-Proposal-08287",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 9500000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road with Drainage System, Barangay Tipolo, Mandaue City, Cebu - Sta. 0+000.00 - Sta. 0+382.00",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 28509",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+382.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08287",
        "nepTitle": "Construction of Drainage System, Barangay Tipolo, Mandaue City, Cebu",
        "nepPesos": 9500000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0356-004599",
        "hgabTitle": "Construction of Drainage System, Barangay Tipolo, Mandaue City, Cebu",
        "hgabPesos": 9500000,
        "nepPage": "388",
        "hgabPage": "356",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage at Barangay Soro-soro, Biñan City, Laguna",
      "source_code": "2027DPWH-Proposal-09793",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 25000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Drainage Structure, Barangay Soro-Soro, Biñan City, Laguna",
      "prior_amount": 40000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 606534",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09793",
        "nepTitle": "Construction of Drainage at Barangay Soro-soro, Biñan City, Laguna",
        "nepPesos": 25000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage at Barangay Tawason, Mandaue City - Sta. 0+000.00 - Sta. 0+340.00",
      "source_code": "2027DPWH-Proposal-08183",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 4250000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road with Drainage Facilities, Barangay Tawason, Mandaue City",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 561021",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+340.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08183",
        "nepTitle": "Construction of Drainage at Barangay Tawason, Mandaue City - Sta. 0+000.00 - Sta. 0+340.00",
        "nepPesos": 4250000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Amsic, Angeles City Pampanga, Sta. 0+000 - Sta. 0+576, Sta. 0+000 - Sta. 0+180, Sta. 0+000 - Sta. 0+380, Sta. 0+000 - Sta. 0+035, Sta. 0+000 - Sta. 0+028",
      "source_code": "2027DPWH-Proposal-10774",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5669000,
      "comparison_year": 2022,
      "prior_project": "Construction of Drainage in Amsic, Barangay Amsic, Angeles City, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 528638",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+576.00 · 0+000.00–0+180.00 · 0+000.00–0+380.00 · 0+000.00–0+035.00 · 0+000.00–0+028.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10774",
        "nepTitle": "Construction of Drainage, Barangay Amsic, Angeles City Pampanga, Sta. 0+000 - Sta. 0+576, Sta. 0+000 - Sta. 0+180, Sta. 0+000 - Sta. 0+380, Sta. 0+000 - Sta. 0+035, Sta. 0+000 - Sta. 0+028",
        "nepPesos": 5669000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Balibago, Angeles City Pampanga, Sta. 0+000 - Sta. 0+501, Sta. 0+000 - Sta. 0+209",
      "source_code": "2027DPWH-Proposal-10775",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 2117000,
      "comparison_year": 2022,
      "prior_project": "Construction of Drainage in Balibago, Barangay Balibago, Angeles City, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 528639",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+501.00 · 0+000.00–0+209.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10775",
        "nepTitle": "Construction of Drainage, Barangay Balibago, Angeles City Pampanga, Sta. 0+000 - Sta. 0+501, Sta. 0+000 - Sta. 0+209",
        "nepPesos": 2117000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Balibago, Angeles City Pampanga, Sta. 0+000 - Sta. 0+501, Sta. 0+000 - Sta. 0+209",
      "source_code": "2027DPWH-Proposal-10775",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 2117000,
      "comparison_year": 2023,
      "prior_project": "Improvement/Rehabilitation/Construction of Road and Drainage Brgy. Balibago, Angeles City, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 527881",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+501.00 · 0+000.00–0+209.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10775",
        "nepTitle": "Construction of Drainage, Barangay Balibago, Angeles City Pampanga, Sta. 0+000 - Sta. 0+501, Sta. 0+000 - Sta. 0+209",
        "nepPesos": 2117000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Cutcut, Angeles City Pampanga, Sta. 0+000 - Sta. 0+195, Sta. 0+000 - Sta. 0+392",
      "source_code": "2027DPWH-Proposal-10776",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 3859000,
      "comparison_year": 2023,
      "prior_project": "Improvement/Rehabilitation/Construction of Drainage Brgy. Cutcut, Angeles City, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 530550",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+195.00 · 0+000.00–0+392.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10776",
        "nepTitle": "Construction of Drainage, Barangay Cutcut, Angeles City Pampanga, Sta. 0+000 - Sta. 0+195, Sta. 0+000 - Sta. 0+392",
        "nepPesos": 3859000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Dapdap, Mabalacat City, Pampanga Sta. 0+000 - Sta. 1+380",
      "source_code": "2027DPWH-Proposal-10799",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 14500000,
      "comparison_year": 2022,
      "prior_project": "Construction of Drainage in Dapdap, Barangay Dapdap, Mabalacat City, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 528641",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+380.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10799",
        "nepTitle": "Construction of Drainage, Barangay Dapdap, Mabalacat City, Pampanga Sta. 0+000 - Sta. 1+380",
        "nepPesos": 14500000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0342-004323",
        "hgabTitle": "Construction of Drainage, Barangay Dapdap, Mabalacat City, Pampanga Sta. 0+000 - Sta. 1+380",
        "hgabPesos": 14500000,
        "nepPage": "378",
        "hgabPage": "342",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Dau, Mabalacat City, Pampanga, Sta. 0+000 - Sta. 0+198, Sta. 0+000 - Sta. 0+245, Sta. 0+000 - Sta. 0+213, Sta. 0+000 - Sta. 0+465",
      "source_code": "2027DPWH-Proposal-10754",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 2084000,
      "comparison_year": 2022,
      "prior_project": "Construction of Drainage in Dau, Barangay Dau, Mabalacat City, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 528642",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+198.00 · 0+000.00–0+245.00 · 0+000.00–0+213.00 · 0+000.00–0+465.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10754",
        "nepTitle": "Construction of Drainage, Barangay Dau, Mabalacat City, Pampanga, Sta. 0+000 - Sta. 0+198, Sta. 0+000 - Sta. 0+245, Sta. 0+000 - Sta. 0+213, Sta. 0+000 - Sta. 0+465",
        "nepPesos": 2084000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Malabanias, Angeles City Pampanga, Sta. 0+000 - Sta. 0+360, Sta. 0+000 - Sta. 0+350, Sta. 0+000 - Sta. 0+320, Sta. 0+000 - Sta. 0+290, Sta. 0+000 - Sta. 0+260, Sta. 0+000 - Sta. 0+240, Sta. 0+000 - Sta. 0+350 & Sta. 0+000 - Sta. 0+670",
      "source_code": "2027DPWH-Proposal-10744",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 29500000,
      "comparison_year": 2022,
      "prior_project": "Construction of Drainage in Malabanias, Barangay Malabanias, Angeles City, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 528643",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+360.00 · 0+000.00–0+350.00 · 0+000.00–0+320.00 · 0+000.00–0+290.00 · 0+000.00–0+260.00 · 0+000.00–0+240.00 · 0+000.00–0+350.00 · 0+000.00–0+670.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10744",
        "nepTitle": "Construction of Drainage, Barangay Malabanias, Angeles City Pampanga, Sta. 0+000 - Sta. 0+360, Sta. 0+000 - Sta. 0+350, Sta. 0+000 - Sta. 0+320, Sta. 0+000 - Sta. 0+290, Sta. 0+000 - Sta. 0+260, Sta. 0+000 - Sta. 0+240, Sta. 0+000 - Sta. 0+350 & Sta. 0+000 - Sta. 0+670",
        "nepPesos": 29500000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0342-004324",
        "hgabTitle": "Construction of Drainage, Barangay Malabanias, Angeles City Pampanga, Sta. 0+000 - Sta. 0+360, Sta. 0+000 - Sta. 0+350, Sta. 0+000 - Sta. 0+320, Sta. 0+000 - Sta. 0+290, Sta. 0+000 - Sta. 0+260, Sta. 0+000 - Sta. 0+240, Sta. 0+000 - Sta. 0+350 & Sta. 0+000 - Sta. 0+670",
        "hgabPesos": 29500000,
        "nepPage": "378",
        "hgabPage": "342",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Malabanias, Angeles City Pampanga, Sta. 0+000 - Sta. 0+360, Sta. 0+000 - Sta. 0+350, Sta. 0+000 - Sta. 0+320, Sta. 0+000 - Sta. 0+290, Sta. 0+000 - Sta. 0+260, Sta. 0+000 - Sta. 0+240, Sta. 0+000 - Sta. 0+350 & Sta. 0+000 - Sta. 0+670",
      "source_code": "2027DPWH-Proposal-10744",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 29500000,
      "comparison_year": 2023,
      "prior_project": "Improvement/Rehabilitation of Road and Drainage Brgy. Malabanias, Angeles City, Pampanga",
      "prior_amount": 25000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 527877",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+360.00 · 0+000.00–0+350.00 · 0+000.00–0+320.00 · 0+000.00–0+290.00 · 0+000.00–0+260.00 · 0+000.00–0+240.00 · 0+000.00–0+350.00 · 0+000.00–0+670.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10744",
        "nepTitle": "Construction of Drainage, Barangay Malabanias, Angeles City Pampanga, Sta. 0+000 - Sta. 0+360, Sta. 0+000 - Sta. 0+350, Sta. 0+000 - Sta. 0+320, Sta. 0+000 - Sta. 0+290, Sta. 0+000 - Sta. 0+260, Sta. 0+000 - Sta. 0+240, Sta. 0+000 - Sta. 0+350 & Sta. 0+000 - Sta. 0+670",
        "nepPesos": 29500000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0342-004324",
        "hgabTitle": "Construction of Drainage, Barangay Malabanias, Angeles City Pampanga, Sta. 0+000 - Sta. 0+360, Sta. 0+000 - Sta. 0+350, Sta. 0+000 - Sta. 0+320, Sta. 0+000 - Sta. 0+290, Sta. 0+000 - Sta. 0+260, Sta. 0+000 - Sta. 0+240, Sta. 0+000 - Sta. 0+350 & Sta. 0+000 - Sta. 0+670",
        "hgabPesos": 29500000,
        "nepPage": "378",
        "hgabPage": "342",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Ninoy Aquino, Angeles City Pampanga, Sta. 0+000 - Sta. 0+550, Sta. 0+000 - Sta. 0+615",
      "source_code": "2027DPWH-Proposal-10773",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5571000,
      "comparison_year": 2022,
      "prior_project": "Construction of Drainage in Ninoy Aquino, Barangay Ninoy Aquino, Angeles City, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 528644",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+550.00 · 0+000.00–0+615.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10773",
        "nepTitle": "Construction of Drainage, Barangay Ninoy Aquino, Angeles City Pampanga, Sta. 0+000 - Sta. 0+550, Sta. 0+000 - Sta. 0+615",
        "nepPesos": 5571000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Ninoy Aquino, Angeles City Pampanga, Sta. 0+000 - Sta. 0+550, Sta. 0+000 - Sta. 0+615",
      "source_code": "2027DPWH-Proposal-10773",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5571000,
      "comparison_year": 2023,
      "prior_project": "Construction of Drainage in Brgy. Ninoy Aquino, Angeles City, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 530546",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+550.00 · 0+000.00–0+615.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10773",
        "nepTitle": "Construction of Drainage, Barangay Ninoy Aquino, Angeles City Pampanga, Sta. 0+000 - Sta. 0+550, Sta. 0+000 - Sta. 0+615",
        "nepPesos": 5571000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Pampang, Angeles City Pampanga, Sta. 0+000 - Sta. 0+375, Sta. 0+000 - Sta. 0+400, Sta. 0+000 - Sta. 0+390, Sta. 0+000 - Sta. 0+650",
      "source_code": "2027DPWH-Proposal-10752",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 3545000,
      "comparison_year": 2022,
      "prior_project": "Construction of Drainage in Pampang, Barangay Pampang, Angeles City, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 528645",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+375.00 · 0+000.00–0+400.00 · 0+000.00–0+390.00 · 0+000.00–0+650.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10752",
        "nepTitle": "Construction of Drainage, Barangay Pampang, Angeles City Pampanga, Sta. 0+000 - Sta. 0+375, Sta. 0+000 - Sta. 0+400, Sta. 0+000 - Sta. 0+390, Sta. 0+000 - Sta. 0+650",
        "nepPesos": 3545000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Pulung Maragul, Angeles City, Pampanga, Sta. 0+000 - Sta. 0+315, Sta. 0+000 - Sta. 0+170, Sta. 0+000 - Sta. 0+217, Sta. 0+000 - Sta. 0+250, Sta. 0+000 - Sta. 0+259",
      "source_code": "2027DPWH-Proposal-10790",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 3069000,
      "comparison_year": 2023,
      "prior_project": "Improvement/Rehabilitation of Road and Drainage Brgy. Pulung Maragul, Angeles City , Pampanga",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 527878",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+315.00 · 0+000.00–0+170.00 · 0+000.00–0+217.00 · 0+000.00–0+250.00 · 0+000.00–0+259.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Carmelo Lazatin Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10790",
        "nepTitle": "Construction of Drainage, Barangay Pulung Maragul, Angeles City, Pampanga, Sta. 0+000 - Sta. 0+315, Sta. 0+000 - Sta. 0+170, Sta. 0+000 - Sta. 0+217, Sta. 0+000 - Sta. 0+250, Sta. 0+000 - Sta. 0+259",
        "nepPesos": 3069000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay San Francisco, Mabalacat City, Pampanga, Sta. 0+000.00 - Sta. 0+526.00, Sta. 0+000.00 - Sta. 0+359.00, Sta. 0+000.00 - Sta. 0+147.00, Sta. 0+000.00 - Sta. 0+146.00",
      "source_code": "2027DPWH-Proposal-10807",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5180000,
      "comparison_year": 2017,
      "prior_project": "Construction of Drainage System at Brgy. San Francisco, Mabalacat, Pampanga",
      "prior_amount": 1000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292004020100497",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+526.00 · 0+000.00–0+359.00 · 0+000.00–0+147.00 · 0+000.00–0+146.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10807",
        "nepTitle": "Construction of Drainage, Barangay San Francisco, Mabalacat City, Pampanga, Sta. 0+000.00 - Sta. 0+526.00, Sta. 0+000.00 - Sta. 0+359.00, Sta. 0+000.00 - Sta. 0+147.00, Sta. 0+000.00 - Sta. 0+146.00",
        "nepPesos": 5180000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Sta. Teresita, Angeles City Pampanga, Sta. 0+000 - Sta. 0+644, Sta. 0+000 - Sta. 0+366, Sta. 0+000 - Sta. 0+155",
      "source_code": "2027DPWH-Proposal-10750",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 6523000,
      "comparison_year": 2022,
      "prior_project": "Construction of Drainage in Sta. Teresita, Barangay Sta. Teresita, Angeles City, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 528646",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+644.00 · 0+000.00–0+366.00 · 0+000.00–0+155.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10750",
        "nepTitle": "Construction of Drainage, Barangay Sta. Teresita, Angeles City Pampanga, Sta. 0+000 - Sta. 0+644, Sta. 0+000 - Sta. 0+366, Sta. 0+000 - Sta. 0+155",
        "nepPesos": 6523000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Sta. Teresita, Angeles City Pampanga, Sta. 0+000 - Sta. 0+644, Sta. 0+000 - Sta. 0+366, Sta. 0+000 - Sta. 0+155",
      "source_code": "2027DPWH-Proposal-10750",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 6523000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Drainage at Brgy. Sta. Teresita, Angeles City, Pampanga",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292004020100500",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+644.00 · 0+000.00–0+366.00 · 0+000.00–0+155.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10750",
        "nepTitle": "Construction of Drainage, Barangay Sta. Teresita, Angeles City Pampanga, Sta. 0+000 - Sta. 0+644, Sta. 0+000 - Sta. 0+366, Sta. 0+000 - Sta. 0+155",
        "nepPesos": 6523000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Sto. Domingo, Angeles City, Pampanga Sta. 0+000 - Sta. 1+111",
      "source_code": "2027DPWH-Proposal-10791",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 11800000,
      "comparison_year": 2023,
      "prior_project": "Construction of Drainage at Brgy. Sto. Domingo , Angeles City, Pampanga",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 530535",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+111.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Carmelo Lazatin Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10791",
        "nepTitle": "Construction of Drainage, Barangay Sto. Domingo, Angeles City, Pampanga Sta. 0+000 - Sta. 1+111",
        "nepPesos": 11800000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0343-004330",
        "hgabTitle": "Construction of Drainage, Barangay Sto. Domingo, Angeles City, Pampanga Sta. 0+000 - Sta. 1+111",
        "hgabPesos": 11800000,
        "nepPage": "379",
        "hgabPage": "343",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Sto. Rosario, Angeles City Pampanga, Sta. 0+000 - Sta. 1+000, Sta. 0+000 - Sta. 0+165",
      "source_code": "2027DPWH-Proposal-10747",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10129000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road and Drainage along Brgy. Sto. Rosario, Angeles City, Pampanga",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 527869",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+000.00 · 0+000.00–0+165.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10747",
        "nepTitle": "Construction of Drainage, Barangay Sto. Rosario, Angeles City Pampanga, Sta. 0+000 - Sta. 1+000, Sta. 0+000 - Sta. 0+165",
        "nepPesos": 10129000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Tocucan, Bontoc, Mountain Province",
      "source_code": "2027DPWH-Proposal-34800",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Drainage Structure, Barangay Tocucan, Bontoc, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 544292",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maximo Dalog Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34800",
        "nepTitle": "Construction of Drainage, Barangay Tocucan, Bontoc, Mountain Province",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0336-004198",
        "hgabTitle": "Construction of Drainage, Barangay Tocucan, Bontoc, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "372",
        "hgabPage": "336",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Virgen Delos Remedios, Angeles City, Pampanga Sta. 0+000 - Sta. 0+443.1",
      "source_code": "2027DPWH-Proposal-10793",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5300000,
      "comparison_year": 2023,
      "prior_project": "Improvement/Rehabilitation/Construction of Drainage Brgy. Virgen delos Remedios, Angeles City, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 530549",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+443.10",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Carmelo Lazatin Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10793",
        "nepTitle": "Construction of Drainage, Barangay Virgen Delos Remedios, Angeles City, Pampanga Sta. 0+000 - Sta. 0+443.1",
        "nepPesos": 5300000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0343-004331",
        "hgabTitle": "Construction of Drainage, Barangay Virgen Delos Remedios, Angeles City, Pampanga Sta. 0+000 - Sta. 0+443.1",
        "hgabPesos": 5300000,
        "nepPage": "379",
        "hgabPage": "343",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure Along Jalaur River, Barangay Bongco, Pototan, Iloilo",
      "source_code": "2027DPWH-Proposal-21902",
      "office": "Iloilo 6th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 60000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Flood Control Structure along Jalaur River, Barangay Bongco, Pototan, Iloilo",
      "prior_amount": 35000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 621870",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21902",
        "nepTitle": "Construction of Flood Control Structure Along Jalaur River, Barangay Bongco, Pototan, Iloilo",
        "nepPesos": 60000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure Along Jalaur River, Barangay Bongco, Pototan, Iloilo",
      "source_code": "2027DPWH-Proposal-21902",
      "office": "Iloilo 6th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 60000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Flood Control Structure along Jalaur River, Barangay Bongco, Pototan, Iloilo",
      "prior_amount": 40000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 661575",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21902",
        "nepTitle": "Construction of Flood Control Structure Along Jalaur River, Barangay Bongco, Pototan, Iloilo",
        "nepPesos": 60000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure along Butuanon River, Barangay Alang-Alang, Mandaue City, Cebu",
      "source_code": "2027DPWH-Proposal-08102",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 44000000,
      "comparison_year": 2023,
      "prior_project": "Construction/Improvement of Flood Control Structure along Butuanon River, Brgy. Alang-Alang, Mandaue City, Cebu",
      "prior_amount": 40000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 588798",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08102",
        "nepTitle": "Construction of Flood Control Structure along Butuanon River, Barangay Alang-Alang, Mandaue City, Cebu",
        "nepPesos": 44000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0356-004601",
        "hgabTitle": "Construction of Flood Control Structure along Butuanon River, Barangay Alang-Alang, Mandaue City, Cebu",
        "hgabPesos": 44000000,
        "nepPage": "388",
        "hgabPage": "356",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure along Cagayan River, Sta. 0+000 - Sta. 0+150, Sta. 0+000 - Sta. 0+262.46, Barangay Dugo, Camalaniugan, Cagayan",
      "source_code": "2027DPWH-Proposal-21949",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 150000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Flood Control Structure along Cagayan River, Dugo, Camalaniugan, Cagayan",
      "prior_amount": 36000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 588626",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+150.00 · 0+000.00–0+262.46",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21949",
        "nepTitle": "Construction of Flood Control Structure along Cagayan River, Sta. 0+000 - Sta. 0+150, Sta. 0+000 - Sta. 0+262.46, Barangay Dugo, Camalaniugan, Cagayan",
        "nepPesos": 150000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure along Cagayan River, Sta. 0+000 - Sta. 0+300, Barangay Casicallan, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-21963",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 110000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Flood Control Structure along Cagayan River, Casicallan, Gattaran, Cagayan",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 588624",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+300.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21963",
        "nepTitle": "Construction of Flood Control Structure along Cagayan River, Sta. 0+000 - Sta. 0+300, Barangay Casicallan, Gattaran, Cagayan",
        "nepPesos": 110000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0366-004780",
        "hgabTitle": "Construction of Flood Control Structure along Cagayan River, Sta. 0+000 - Sta. 0+300, Barangay Casicallan, Gattaran, Cagayan",
        "hgabPesos": 110000000,
        "nepPage": "396",
        "hgabPage": "366",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure along Cagayan River, Sta. 0+164 - Sta. 0+365, Barangay L. Adviento, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-21964",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 80000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Flood Control Structure along Cagayan River, L. Adviento, Gattaran, Cagayan",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 588625",
      "similarity_pct": 100,
      "current_chainage": "0+164.00–0+365.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21964",
        "nepTitle": "Construction of Flood Control Structure along Cagayan River, Sta. 0+164 - Sta. 0+365, Barangay L. Adviento, Gattaran, Cagayan",
        "nepPesos": 80000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0366-004781",
        "hgabTitle": "Construction of Flood Control Structure along Cagayan River, Sta. 0+164 - Sta. 0+365, Barangay L. Adviento, Gattaran, Cagayan",
        "hgabPesos": 80000000,
        "nepPage": "396",
        "hgabPage": "366",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure along Cansaga River, Barangay Garing to Barangay Panas, Consolacion, Cebu",
      "source_code": "2027DPWH-Proposal-08099",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 150000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Flood Control Structure along Cansaga River, Barangay Garing to Barangay Panas, Consolacion, Cebu",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 656021",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08099",
        "nepTitle": "Construction of Flood Control Structure along Cansaga River, Barangay Garing to Barangay Panas, Consolacion, Cebu",
        "nepPesos": 150000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0313-003767",
        "hgabTitle": "Construction of Flood Control Structure along Cansaga River, Barangay Garing to Barangay Panas, Consolacion, Cebu",
        "hgabPesos": 150000000,
        "nepPage": "359",
        "hgabPage": "313",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure along Cansaga River, Barangay Tilhaong, Consolacion, Cebu",
      "source_code": "2027DPWH-Proposal-08098",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 150000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Flood Control Structure along Cansaga River, Barangay Tilhaong, Consolacion, Cebu",
      "prior_amount": 140000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 621453",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08098",
        "nepTitle": "Construction of Flood Control Structure along Cansaga River, Barangay Tilhaong, Consolacion, Cebu",
        "nepPesos": 150000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0313-003768",
        "hgabTitle": "Construction of Flood Control Structure along Cansaga River, Barangay Tilhaong, Consolacion, Cebu",
        "hgabPesos": 150000000,
        "nepPage": "359",
        "hgabPage": "313",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure along Cansaga River, Barangay Tilhaong, Consolacion, Cebu",
      "source_code": "2027DPWH-Proposal-08098",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 150000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Flood Control Structure along Cansaga River, Barangay Tilhaong, Consolacion, Cebu",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 606686",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08098",
        "nepTitle": "Construction of Flood Control Structure along Cansaga River, Barangay Tilhaong, Consolacion, Cebu",
        "nepPesos": 150000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0313-003768",
        "hgabTitle": "Construction of Flood Control Structure along Cansaga River, Barangay Tilhaong, Consolacion, Cebu",
        "hgabPesos": 150000000,
        "nepPage": "359",
        "hgabPage": "313",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure along Cotcot River (Upstream), Liloan, Cebu",
      "source_code": "2027DPWH-Proposal-06672",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 300000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Flood Control Structure along Cotcot River, Upstream, Liloan, Cebu",
      "prior_amount": 155284000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 616427",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-06672",
        "nepTitle": "Construction of Flood Control Structure along Cotcot River (Upstream), Liloan, Cebu",
        "nepPesos": 300000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure along Cotcot River (Upstream), Liloan, Cebu",
      "source_code": "2027DPWH-Proposal-06672",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 300000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Flood Control Structure along Cotcot River (Upstream), Liloan, Cebu",
      "prior_amount": 279086000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 662169",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-06672",
        "nepTitle": "Construction of Flood Control Structure along Cotcot River (Upstream), Liloan, Cebu",
        "nepPesos": 300000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure along Curuan River, Barangay Curuan, Zamboanga City",
      "source_code": "2027DPWH-Proposal-21425",
      "office": "Zamboanga City 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 40150000,
      "comparison_year": 2023,
      "prior_project": "Construction of Flood Control Structure along Curuan River, Barangay Curuan, Zamboanga City",
      "prior_amount": 30000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 585436",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21425",
        "nepTitle": "Construction of Flood Control Structure along Curuan River, Barangay Curuan, Zamboanga City",
        "nepPesos": 40150000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0359-004653",
        "hgabTitle": "Construction of Flood Control Structure along Curuan River, Barangay Curuan, Zamboanga City",
        "hgabPesos": 40150000,
        "nepPage": "390",
        "hgabPage": "359",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure along Ingalera River, Barangay Talospatang, Malasiqui, Pangasinan",
      "source_code": "2027DPWH-Proposal-34101",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Flood Control Structure along Ingalera River, Barangay Talospatang, Malasiqui, Pangasinan",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 605531",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34101",
        "nepTitle": "Construction of Flood Control Structure along Ingalera River, Barangay Talospatang, Malasiqui, Pangasinan",
        "nepPesos": 20000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0333-004157",
        "hgabTitle": "Construction of Flood Control Structure along Ingalera River, Barangay Talospatang, Malasiqui, Pangasinan",
        "hgabPesos": 20000000,
        "nepPage": "371",
        "hgabPage": "333",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure along Pansipit River, Lemery, Batangas",
      "source_code": "2027DPWH-Proposal-28929",
      "office": "Batangas 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 200000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Flood Control Structure along Pansipit River, Lemery, Batangas",
      "prior_amount": 100000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 584168",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28929",
        "nepTitle": "Construction of Flood Control Structure along Pansipit River, Lemery, Batangas",
        "nepPesos": 200000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure along Quiniput River, Barangay Quiniput, Zamboanga City",
      "source_code": "2027DPWH-Proposal-21434",
      "office": "Zamboanga City 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 59792000,
      "comparison_year": 2023,
      "prior_project": "Construction of Flood Control Structure along Quiniput River, Barangay Quiniput, Zamboanga City",
      "prior_amount": 30000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 585438",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21434",
        "nepTitle": "Construction of Flood Control Structure along Quiniput River, Barangay Quiniput, Zamboanga City",
        "nepPesos": 59792000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0316-003814",
        "hgabTitle": "Construction of Flood Control Structure along Quiniput River, Barangay Quiniput, Zamboanga City",
        "hgabPesos": 59792000,
        "nepPage": "361",
        "hgabPage": "316",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure at Bunguiao River, Barangay Bunguiao, Zamboanga City",
      "source_code": "2027DPWH-Proposal-21430",
      "office": "Zamboanga City 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 63884000,
      "comparison_year": 2023,
      "prior_project": "Construction of Flood Control Structure at Bunguiao River, Barangay Bunguiao, Zamboanga City",
      "prior_amount": 30000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 585439",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21430",
        "nepTitle": "Construction of Flood Control Structure at Bunguiao River, Barangay Bunguiao, Zamboanga City",
        "nepPesos": 63884000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure at Cumawas - Poblacion, Sta. 0+000 - Sta. 0+420, Sta. 0+000 - Sta. 0+520, Bislig City, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-05124",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 40000000,
      "comparison_year": 2022,
      "prior_project": "Construction of flood control structure at Cumawas-Poblacion, Sta. 0+000.00 - Sta. 2+000.00, Bislig City, Surigao del Sur",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 565703",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+420.00 · 0+000.00–0+520.00",
      "prior_chainage": "0+000.00–2+000.00",
      "chainage_overlap": "0+000.00–0+420.00 · 0+000.00–0+520.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alexander Pimentel"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-05124",
        "nepTitle": "Construction of Flood Control Structure at Cumawas - Poblacion, Sta. 0+000 - Sta. 0+420, Sta. 0+000 - Sta. 0+520, Bislig City, Surigao del Sur",
        "nepPesos": 40000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0364-004741",
        "hgabTitle": "Construction of Flood Control Structure at Cumawas - Poblacion, Sta. 0+000 - Sta. 0+420, Sta. 0+000 - Sta. 0+520, Bislig City, Surigao del Sur",
        "hgabPesos": 40000000,
        "nepPage": "394",
        "hgabPage": "364",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure, Alabang Bayanan River (Sta.0+802 - Sta.0+912), Muntinlupa City",
      "source_code": "2027DPWH-Proposal-22563",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "region": "NCR",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Flood Control Structure, Bayanan River, Barangay Alabang, Muntinlupa City",
      "prior_amount": 45301000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 565330",
      "similarity_pct": 100,
      "current_chainage": "0+802.00–0+912.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22563",
        "nepTitle": "Construction of Flood Control Structure, Alabang Bayanan River (Sta.0+802 - Sta.0+912), Muntinlupa City",
        "nepPesos": 20000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0370-004855",
        "hgabTitle": "Construction of Flood Control Structure, Alabang Bayanan River (Sta.0+802 - Sta.0+912), Muntinlupa City",
        "hgabPesos": 20000000,
        "nepPage": "401",
        "hgabPage": "370",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure, Alabang Cupang River (Sta.0+000 - Sta. 0+110), Muntinlupa City",
      "source_code": "2027DPWH-Proposal-22564",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "region": "NCR",
      "amount_2027": 30000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Flood Control Structures along Alabang River, Brgy. Alabang and Brgy. Cupang, Muntinlupa City, Sta. 0+000 - Sta. 0+195",
      "prior_amount": 50000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292003020401687",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+110.00",
      "prior_chainage": "0+000.00–0+195.00",
      "chainage_overlap": "0+000.00–0+110.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22564",
        "nepTitle": "Construction of Flood Control Structure, Alabang Cupang River (Sta.0+000 - Sta. 0+110), Muntinlupa City",
        "nepPesos": 30000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0370-004856",
        "hgabTitle": "Construction of Flood Control Structure, Alabang Cupang River (Sta.0+000 - Sta. 0+110), Muntinlupa City",
        "hgabPesos": 30000000,
        "nepPage": "401",
        "hgabPage": "370",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure, Kabisig Creek, sta 00+964 - sta 01+336, Barangay San Jose, Antipolo City, Rizal",
      "source_code": "2027DPWH-Proposal-10096",
      "office": "Rizal 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Flood Control Structure, Kabisig Creek, Barangay San Jose, Antipolo City, Rizal",
      "prior_amount": 30000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 617166",
      "similarity_pct": 100,
      "current_chainage": "0+964.00–1+336.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10096",
        "nepTitle": "Construction of Flood Control Structure, Kabisig Creek, sta 00+964 - sta 01+336, Barangay San Jose, Antipolo City, Rizal",
        "nepPesos": 30000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0350-004477",
        "hgabTitle": "Construction of Flood Control Structure, Kabisig Creek, sta 00+964 - sta 01+336, Barangay San Jose, Antipolo City, Rizal",
        "hgabPesos": 30000000,
        "nepPage": "384",
        "hgabPage": "350",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure, Mangangate River (Sta.1+400 - Sta. 2+619.93), Muntinlupa City",
      "source_code": "2027DPWH-Proposal-22557",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "region": "NCR",
      "amount_2027": 150000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Flood Control Structure, Mangangate River, Muntinlupa City",
      "prior_amount": 101267000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 620876",
      "similarity_pct": 100,
      "current_chainage": "1+400.00–2+619.93",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22557",
        "nepTitle": "Construction of Flood Control Structure, Mangangate River (Sta.1+400 - Sta. 2+619.93), Muntinlupa City",
        "nepPesos": 150000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0364-004742",
        "hgabTitle": "Construction of Flood Control Structure, Mangangate River (Sta.1+400 - Sta. 2+619.93), Muntinlupa City",
        "hgabPesos": 80000000,
        "nepPage": "395",
        "hgabPage": "364",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure, Mangangate River (Sta.1+400 - Sta. 2+619.93), Muntinlupa City",
      "source_code": "2027DPWH-Proposal-22557",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "region": "NCR",
      "amount_2027": 150000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Flood Control Structure, Mangangate River, Muntinlupa City",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 655221",
      "similarity_pct": 100,
      "current_chainage": "1+400.00–2+619.93",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22557",
        "nepTitle": "Construction of Flood Control Structure, Mangangate River (Sta.1+400 - Sta. 2+619.93), Muntinlupa City",
        "nepPesos": 150000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0364-004742",
        "hgabTitle": "Construction of Flood Control Structure, Mangangate River (Sta.1+400 - Sta. 2+619.93), Muntinlupa City",
        "hgabPesos": 80000000,
        "nepPage": "395",
        "hgabPage": "364",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure, Sta. 0+214.70 to Sta. 0+230.50, Barangay Gulod, Quezon City",
      "source_code": "2027DPWH-Proposal-22522",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Flood Control Structure, Barangay Gulod, Quezon City",
      "prior_amount": 78500000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 523589",
      "similarity_pct": 100,
      "current_chainage": "0+214.70–0+230.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22522",
        "nepTitle": "Construction of Flood Control Structure, Sta. 0+214.70 to Sta. 0+230.50, Barangay Gulod, Quezon City",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0327-004030",
        "hgabTitle": "Construction of Flood Control Structure, Sta. 0+214.70 to Sta. 0+230.50, Barangay Gulod, Quezon City",
        "hgabPesos": 5000000,
        "nepPage": "370",
        "hgabPage": "327",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure, Sta. 0+214.70 to Sta. 0+230.50, Barangay Gulod, Quezon City",
      "source_code": "2027DPWH-Proposal-22522",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Rehabilitation / Improvement of Drainage System, Barangay Gulod, Quezon City",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 538431",
      "similarity_pct": 100,
      "current_chainage": "0+214.70–0+230.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22522",
        "nepTitle": "Construction of Flood Control Structure, Sta. 0+214.70 to Sta. 0+230.50, Barangay Gulod, Quezon City",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0327-004030",
        "hgabTitle": "Construction of Flood Control Structure, Sta. 0+214.70 to Sta. 0+230.50, Barangay Gulod, Quezon City",
        "hgabPesos": 5000000,
        "nepPage": "370",
        "hgabPage": "327",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure, Tunasan River (Sta.0+000 - Sta. 0+135), Muntinlupa City",
      "source_code": "2027DPWH-Proposal-22559",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "region": "NCR",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Flood Control Structure along Tunasan River, Muntinlupa City",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 655224",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+135.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22559",
        "nepTitle": "Construction of Flood Control Structure, Tunasan River (Sta.0+000 - Sta. 0+135), Muntinlupa City",
        "nepPesos": 30000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0371-004860",
        "hgabTitle": "Construction of Flood Control Structure, Tunasan River (Sta.0+000 - Sta. 0+135), Muntinlupa City",
        "hgabPesos": 30000000,
        "nepPage": "401",
        "hgabPage": "371",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control along Binahaan River, Barangay Cogon, Palo, Leyte (11.145992, 125.001724)",
      "source_code": "2027DPWH-Proposal-29770",
      "office": "Leyte 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 4780000,
      "comparison_year": 2023,
      "prior_project": "Construction of Flood Control Structure along Binahaan River, Brgy. Cogon, Palo, Leyte",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 588827",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-29770",
        "nepTitle": "Construction of Flood Control along Binahaan River, Barangay Cogon, Palo, Leyte (11.145992, 125.001724)",
        "nepPesos": 4780000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control along Binahaan River, Barangay Cogon, Palo, Leyte (11.145992, 125.001724)",
      "source_code": "2027DPWH-Proposal-29770",
      "office": "Leyte 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 4780000,
      "comparison_year": 2024,
      "prior_project": "Construction of Flood Control along Binahaan River, Barangay Cogon, Palo, Leyte",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 621488",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-29770",
        "nepTitle": "Construction of Flood Control along Binahaan River, Barangay Cogon, Palo, Leyte (11.145992, 125.001724)",
        "nepPesos": 4780000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, part of Sibuguey River, Barangay Pilar, Diplahan, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-21554",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 120000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Flood Control along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, part of Sibuguey River, Barangay Pilar, Diplahan, Zamboanga Sibugay",
      "prior_amount": 43141000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 440298",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21554",
        "nepTitle": "Construction of Flood Control along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, part of Sibuguey River, Barangay Pilar, Diplahan, Zamboanga Sibugay",
        "nepPesos": 120000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0315-003810",
        "hgabTitle": "Construction of Flood Control along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, part of Sibuguey River, Barangay Pilar, Diplahan, Zamboanga Sibugay",
        "hgabPesos": 85000000,
        "nepPage": "361",
        "hgabPage": "315",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control along Layawan River Sta.1+140 - Sta.1+460, Barangay Layawan, Oroquieta City, Misamis Occidental",
      "source_code": "2027DPWH-Proposal-01915",
      "office": "Misamis Occidental 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 73600000,
      "comparison_year": 2021,
      "prior_project": "Construction of Flood Control along Layawan River, Oroquieta City, Misamis Occidental",
      "prior_amount": 20000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 440320",
      "similarity_pct": 100,
      "current_chainage": "1+140.00–1+460.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jason Almonte"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-01915",
        "nepTitle": "Construction of Flood Control along Layawan River Sta.1+140 - Sta.1+460, Barangay Layawan, Oroquieta City, Misamis Occidental",
        "nepPesos": 73600000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0317-003847",
        "hgabTitle": "Construction of Flood Control along Layawan River Sta.1+140 - Sta.1+460, Barangay Layawan, Oroquieta City, Misamis Occidental",
        "hgabPesos": 73600000,
        "nepPage": "362",
        "hgabPage": "317",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control along Layawan River Sta.1+140 - Sta.1+460, Barangay Layawan, Oroquieta City, Misamis Occidental",
      "source_code": "2027DPWH-Proposal-01915",
      "office": "Misamis Occidental 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 73600000,
      "comparison_year": 2025,
      "prior_project": "Construction of Flood Control along Layawan River, Oroquieta City, Misamis Occidental",
      "prior_amount": 70000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 656228",
      "similarity_pct": 100,
      "current_chainage": "1+140.00–1+460.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jason Almonte"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-01915",
        "nepTitle": "Construction of Flood Control along Layawan River Sta.1+140 - Sta.1+460, Barangay Layawan, Oroquieta City, Misamis Occidental",
        "nepPesos": 73600000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0317-003847",
        "hgabTitle": "Construction of Flood Control along Layawan River Sta.1+140 - Sta.1+460, Barangay Layawan, Oroquieta City, Misamis Occidental",
        "hgabPesos": 73600000,
        "nepPage": "362",
        "hgabPage": "317",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control, Sta. 4+962 - 5+622, Barangay Zarah, San Luis, Aurora",
      "source_code": "2027DPWH-Proposal-10135",
      "office": "Aurora District Engineering Office",
      "region": "Region III",
      "amount_2027": 75000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Flood Control Structure, Brgy. Zarah, San Luis, Aurora",
      "prior_amount": 30000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 524217",
      "similarity_pct": 100,
      "current_chainage": "4+962.00–5+622.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10135",
        "nepTitle": "Construction of Flood Control, Sta. 4+962 - 5+622, Barangay Zarah, San Luis, Aurora",
        "nepPesos": 75000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
      "source_code": "2027DPWH-Proposal-28922",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 150000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Flood Mitigation Structures along Bugaan River, Laurel, Batangas",
      "prior_amount": 39747000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 562697",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28922",
        "nepTitle": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
        "nepPesos": 150000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0307-003652",
        "hgabTitle": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
        "hgabPesos": 150000000,
        "nepPage": "354",
        "hgabPage": "307",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
      "source_code": "2027DPWH-Proposal-28922",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 150000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
      "prior_amount": 70000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 584205",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28922",
        "nepTitle": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
        "nepPesos": 150000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0307-003652",
        "hgabTitle": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
        "hgabPesos": 150000000,
        "nepPage": "354",
        "hgabPage": "307",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
      "source_code": "2027DPWH-Proposal-28922",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 150000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
      "prior_amount": 90000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 614233",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28922",
        "nepTitle": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
        "nepPesos": 150000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0307-003652",
        "hgabTitle": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
        "hgabPesos": 150000000,
        "nepPage": "354",
        "hgabPage": "307",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
      "source_code": "2027DPWH-Proposal-28922",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 150000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Flood Mitigation Structures along Bugaan River, Laurel, Batangas",
      "prior_amount": 40000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292003020402712",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28922",
        "nepTitle": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
        "nepPesos": 150000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0307-003652",
        "hgabTitle": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
        "hgabPesos": 150000000,
        "nepPage": "354",
        "hgabPage": "307",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
      "source_code": "2027DPWH-Proposal-28922",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 150000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Flood Mitigation Structures along Bugaan River, Laurel, Batangas",
      "prior_amount": 50000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101101369000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28922",
        "nepTitle": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
        "nepPesos": 150000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0307-003652",
        "hgabTitle": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
        "hgabPesos": 150000000,
        "nepPage": "354",
        "hgabPage": "307",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
      "source_code": "2027DPWH-Proposal-28922",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 150000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Flood Mitigation Structures along Bugaan River, Laurel, Batangas",
      "prior_amount": 45000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 320101101369000 · PDF p. 291 · printed p. 1756",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28922",
        "nepTitle": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
        "nepPesos": 150000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0307-003652",
        "hgabTitle": "Construction of Flood Mitigation Structure along Bugaan River, Laurel, Batangas",
        "hgabPesos": 150000000,
        "nepPage": "354",
        "hgabPage": "307",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Mitigation Structure along Guadalupe River, Sta. 7+543 - Sta. 7+957, Barangay Kalunasan, Cebu City",
      "source_code": "2027DPWH-Proposal-08080",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 124200000,
      "comparison_year": 2020,
      "prior_project": "Construction of Flood Mitigation Structure along Guadalupe River, Brgy. Kalunasan, Cebu City",
      "prior_amount": 50000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 522764",
      "similarity_pct": 100,
      "current_chainage": "7+543.00–7+957.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08080",
        "nepTitle": "Construction of Flood Mitigation Structure along Guadalupe River, Sta. 7+543 - Sta. 7+957, Barangay Kalunasan, Cebu City",
        "nepPesos": 124200000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Mitigation Structure along Guadalupe River, Sta. 7+543 - Sta. 7+957, Barangay Kalunasan, Cebu City",
      "source_code": "2027DPWH-Proposal-08080",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 124200000,
      "comparison_year": 2021,
      "prior_project": "Construction of Flood Mitigation Structure along Guadalupe River, Brgy. Kalunasan, Cebu City",
      "prior_amount": 11000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 439094",
      "similarity_pct": 100,
      "current_chainage": "7+543.00–7+957.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08080",
        "nepTitle": "Construction of Flood Mitigation Structure along Guadalupe River, Sta. 7+543 - Sta. 7+957, Barangay Kalunasan, Cebu City",
        "nepPesos": 124200000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Mitigation Structure along Guadalupe River, Sta. 7+543 - Sta. 7+957, Barangay Kalunasan, Cebu City",
      "source_code": "2027DPWH-Proposal-08080",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 124200000,
      "comparison_year": 2023,
      "prior_project": "Construction of Flood Mitigation Structure along Guadalupe River, Barangay Kalunasan, Cebu City",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 585371",
      "similarity_pct": 100,
      "current_chainage": "7+543.00–7+957.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08080",
        "nepTitle": "Construction of Flood Mitigation Structure along Guadalupe River, Sta. 7+543 - Sta. 7+957, Barangay Kalunasan, Cebu City",
        "nepPesos": 124200000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Mitigation Structure along Guadalupe River, Sta. 7+543 - Sta. 7+957, Barangay Kalunasan, Cebu City",
      "source_code": "2027DPWH-Proposal-08080",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 124200000,
      "comparison_year": 2024,
      "prior_project": "Construction of Flood Mitigation Structure along Guadalupe River, Barangay Kalunasan, Cebu City",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 621876",
      "similarity_pct": 100,
      "current_chainage": "7+543.00–7+957.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08080",
        "nepTitle": "Construction of Flood Mitigation Structure along Guadalupe River, Sta. 7+543 - Sta. 7+957, Barangay Kalunasan, Cebu City",
        "nepPesos": 124200000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Mitigation Structure along Guadalupe River, Sta. 7+543 - Sta. 7+957, Barangay Kalunasan, Cebu City",
      "source_code": "2027DPWH-Proposal-08080",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 124200000,
      "comparison_year": 2018,
      "prior_project": "Construction of Flood Mitigation Structure, Guadalupe River, Brgy. Kalunasan, Cebu City",
      "prior_amount": 35000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 8 · UACS PAP 320101101934000",
      "similarity_pct": 100,
      "current_chainage": "7+543.00–7+957.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08080",
        "nepTitle": "Construction of Flood Mitigation Structure along Guadalupe River, Sta. 7+543 - Sta. 7+957, Barangay Kalunasan, Cebu City",
        "nepPesos": 124200000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Mitigation Structure and Drainage System at Maria, Siquijor",
      "source_code": "2027DPWH-Proposal-00396",
      "office": "Siquijor District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Flood Mitigation Structure and Drainage System at Maria, Siquijor",
      "prior_amount": 60000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 584434",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-00396",
        "nepTitle": "Construction of Flood Mitigation Structure and Drainage System at Maria, Siquijor",
        "nepPesos": 10000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0355-004586",
        "hgabTitle": "Construction of Flood Mitigation Structure and Drainage System at Maria, Siquijor",
        "hgabPesos": 10000000,
        "nepPage": "387",
        "hgabPage": "355",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Mitigation Structure at Barangay Talisayan, Zamboanga City",
      "source_code": "2027DPWH-Proposal-21417",
      "office": "Zamboanga City 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Flood Mitigation Structure, Barangay Talisayan, Zamboanga City",
      "prior_amount": 30000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 530659",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21417",
        "nepTitle": "Construction of Flood Mitigation Structure at Barangay Talisayan, Zamboanga City",
        "nepPesos": 100000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0316-003818",
        "hgabTitle": "Construction of Flood Mitigation Structure at Barangay Talisayan, Zamboanga City",
        "hgabPesos": 100000000,
        "nepPage": "361",
        "hgabPage": "316",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Mitigation Structure, Barangay San Roque, Zamboanga City",
      "source_code": "2027DPWH-Proposal-21419",
      "office": "Zamboanga City 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 100000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Flood Mitigation Structure ( Drainage ) , Barangay San Roque, Zamboanga City",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 556107",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21419",
        "nepTitle": "Construction of Flood Mitigation Structure, Barangay San Roque, Zamboanga City",
        "nepPesos": 100000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0316-003819",
        "hgabTitle": "Construction of Flood Mitigation Structure, Barangay San Roque, Zamboanga City",
        "hgabPesos": 100000000,
        "nepPage": "361",
        "hgabPage": "316",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Kinalapan Flood Control, Sta. 3+080 - 3+740, Barangay Pingit, Baler, Aurora",
      "source_code": "2027DPWH-Proposal-10134",
      "office": "Aurora District Engineering Office",
      "region": "Region III",
      "amount_2027": 75000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Kinalapan Flood Control Structure, Barangay Pingit, Baler, Aurora",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 617032",
      "similarity_pct": 100,
      "current_chainage": "3+080.00–3+740.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Rommel T. Angara"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10134",
        "nepTitle": "Construction of Kinalapan Flood Control, Sta. 3+080 - 3+740, Barangay Pingit, Baler, Aurora",
        "nepPesos": 75000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0305-003617",
        "hgabTitle": "Construction of Kinalapan Flood Control, Sta. 3+080 - 3+740, Barangay Pingit, Baler, Aurora",
        "hgabPesos": 75000000,
        "nepPage": "353",
        "hgabPage": "305",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Kinalapan Flood Control, Sta. 3+080 - 3+740, Barangay Pingit, Baler, Aurora",
      "source_code": "2027DPWH-Proposal-10134",
      "office": "Aurora District Engineering Office",
      "region": "Region III",
      "amount_2027": 75000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Kinalapan Flood Control, Brgy. Pingit, Baler, Aurora",
      "prior_amount": 10000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300107200085000",
      "similarity_pct": 100,
      "current_chainage": "3+080.00–3+740.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10134",
        "nepTitle": "Construction of Kinalapan Flood Control, Sta. 3+080 - 3+740, Barangay Pingit, Baler, Aurora",
        "nepPesos": 75000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0305-003617",
        "hgabTitle": "Construction of Kinalapan Flood Control, Sta. 3+080 - 3+740, Barangay Pingit, Baler, Aurora",
        "hgabPesos": 75000000,
        "nepPage": "353",
        "hgabPage": "305",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Marina Development Project, Butuan City Riverpark and Riverwalk with Drainage and Sidewalks, Butuan City, Agusan Del Norte, 8.951115, 125.543812",
      "source_code": "2027DPWH-Proposal-38926",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 300000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Marina Development Project, Butuan City Riverpark and Riverwalk with Drainage and Sidewalks, Butuan City, Agusan Del Norte",
      "prior_amount": 180000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 555612",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Aquino II"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38926",
        "nepTitle": "Construction of Marina Development Project, Butuan City Riverpark and Riverwalk with Drainage and Sidewalks, Butuan City, Agusan Del Norte, 8.951115, 125.543812",
        "nepPesos": 300000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0319-003878",
        "hgabTitle": "Construction of Marina Development Project, Butuan City Riverpark and Riverwalk with Drainage and Sidewalks, Butuan City, Agusan Del Norte, 8.951115, 125.543812",
        "hgabPesos": 300000000,
        "nepPage": "364",
        "hgabPage": "319",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Revetment Wall along Aklan River, Barangay Daja Sur, Banga, Aklan",
      "source_code": "2027DPWH-Proposal-21680",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 150000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Revetment Wall along Aklan River, Brgy. Daja Sur, Banga, Aklan",
      "prior_amount": 20000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 565598",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jess Marquez"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21680",
        "nepTitle": "Construction of Revetment Wall along Aklan River, Barangay Daja Sur, Banga, Aklan",
        "nepPesos": 150000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0311-003731",
        "hgabTitle": "Construction of Revetment Wall along Aklan River, Barangay Daja Sur, Banga, Aklan",
        "hgabPesos": 150000000,
        "nepPage": "357",
        "hgabPage": "311",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Revetment Wall along Aklan River, Barangay Mina, Lezo, Aklan",
      "source_code": "2027DPWH-Proposal-21696",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 150000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Revetment Wall along Aklan River, Barangay Mina, Lezo, Aklan",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 562900",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21696",
        "nepTitle": "Construction of Revetment Wall along Aklan River, Barangay Mina, Lezo, Aklan",
        "nepPesos": 150000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0368-004815",
        "hgabTitle": "Construction of Revetment Wall along Aklan River, Barangay Mina, Lezo, Aklan",
        "hgabPesos": 150000000,
        "nepPage": "398",
        "hgabPage": "368",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Revetment Wall along Aklan River, Barangay Pusiw, Numancia, Aklan",
      "source_code": "2027DPWH-Proposal-21710",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 12000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Revetment Wall along Aklan River, Barangay Pusiw, Numancia, Aklan",
      "prior_amount": 90000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 588389",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21710",
        "nepTitle": "Construction of Revetment Wall along Aklan River, Barangay Pusiw, Numancia, Aklan",
        "nepPesos": 12000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0373-004889",
        "hgabTitle": "Construction of Revetment Wall along Aklan River, Barangay Pusiw, Numancia, Aklan",
        "hgabPesos": 12000000,
        "nepPage": "403",
        "hgabPage": "373",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Revetment along Carmona River, Barangay Cabilang Baybay, Carmona City, Cavite",
      "source_code": "2027DPWH-Proposal-28844",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 450000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Revetment along Carmona River, Brgy. Cabilang Baybay, Carmona, Cavite",
      "prior_amount": 90000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 562076",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28844",
        "nepTitle": "Construction of Revetment along Carmona River, Barangay Cabilang Baybay, Carmona City, Cavite",
        "nepPesos": 450000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0307-003661",
        "hgabTitle": "Construction of Revetment along Carmona River, Barangay Cabilang Baybay, Carmona City, Cavite",
        "hgabPesos": 150000000,
        "nepPage": "354",
        "hgabPage": "307",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Revetment along Carmona River, Barangay Cabilang Baybay, Carmona City, Cavite",
      "source_code": "2027DPWH-Proposal-28844",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 450000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Revetment along Carmona River, Brgy. Cabilang Baybay, Carmona, Cavite",
      "prior_amount": 130000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 621313",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28844",
        "nepTitle": "Construction of Revetment along Carmona River, Barangay Cabilang Baybay, Carmona City, Cavite",
        "nepPesos": 450000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0307-003661",
        "hgabTitle": "Construction of Revetment along Carmona River, Barangay Cabilang Baybay, Carmona City, Cavite",
        "hgabPesos": 150000000,
        "nepPage": "354",
        "hgabPage": "307",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Revetment along Cañas River, Barangay Tejero, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-09663",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 130000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Revetment along Cañas River, Barangay Tejero, General Trias, Cavite",
      "prior_amount": 87594000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 616089",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09663",
        "nepTitle": "Construction of Revetment along Cañas River, Barangay Tejero, General Trias City, Cavite",
        "nepPesos": 130000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0307-003660",
        "hgabTitle": "Construction of Revetment along Cañas River, Barangay Tejero, General Trias City, Cavite",
        "hgabPesos": 130000000,
        "nepPage": "354",
        "hgabPage": "307",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Revetment along Julian River, Barangay Anabu I-D, Imus, Cavite",
      "source_code": "2027DPWH-Proposal-28948",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 70000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Revetment along Julian River, Barangay Anabu I-D, Imus, Cavite",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 661988",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28948",
        "nepTitle": "Construction of Revetment along Julian River, Barangay Anabu I-D, Imus, Cavite",
        "nepPesos": 70000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0308-003666",
        "hgabTitle": "Construction of Revetment along Julian River, Barangay Anabu I-D, Imus, Cavite",
        "hgabPesos": 70000000,
        "nepPage": "354",
        "hgabPage": "308",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Revetment along Julian River, Barangay Malagasang I-C, Imus, Cavite",
      "source_code": "2027DPWH-Proposal-28950",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 60000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Revetment along Julian River, Barangay Malagasang I-C, Imus, Cavite",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 662454",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28950",
        "nepTitle": "Construction of Revetment along Julian River, Barangay Malagasang I-C, Imus, Cavite",
        "nepPesos": 60000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0308-003667",
        "hgabTitle": "Construction of Revetment along Julian River, Barangay Malagasang I-C, Imus, Cavite",
        "hgabPesos": 60000000,
        "nepPage": "355",
        "hgabPage": "308",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road & Drainage, Barangay Salisay, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34230",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Drainage System at Barangay Salisay, Dagupan City, Pangasinan",
      "prior_amount": 1500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 423866",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34230",
        "nepTitle": "Construction of Road & Drainage, Barangay Salisay, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0470-006853",
        "hgabTitle": "Construction of Road & Drainage, Barangay Salisay, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "470",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road & Drainage, Barangay Salisay, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34230",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Drainage System, Brgy. Salisay, Dagupan City, Pangasinan",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300109200046000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34230",
        "nepTitle": "Construction of Road & Drainage, Barangay Salisay, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0470-006853",
        "hgabTitle": "Construction of Road & Drainage, Barangay Salisay, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "470",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road & Drainage, Barangay Salisay, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34230",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Drainage System, Brgy. Salisay, Dagupan City, Pangasinan",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300109200046000 · PDF p. 1120 · printed p. 2585",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34230",
        "nepTitle": "Construction of Road & Drainage, Barangay Salisay, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0470-006853",
        "hgabTitle": "Construction of Road & Drainage, Barangay Salisay, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "470",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road and Drainage Barangay San Pedro II, Magalang, Pampanga, Sta. 0+000 - Sta. 0+100, Sta 0+000 - Sta 0+345",
      "source_code": "2027DPWH-Proposal-10770",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 7600000,
      "comparison_year": 2025,
      "prior_project": "Concreting of Roads and Drainage Brgy. San Pedro II, Magalang, Pampanga",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560580",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+100.00 · 0+000.00–0+345.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10770",
        "nepTitle": "Construction of Road and Drainage Barangay San Pedro II, Magalang, Pampanga, Sta. 0+000 - Sta. 0+100, Sta 0+000 - Sta 0+345",
        "nepPesos": 7600000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road and Drainage System at Barangay San Jose, Binan City, Laguna",
      "source_code": "2027DPWH-Proposal-09800",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Drainage Structure, Barangay San Jose, Biñan City, Laguna",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 606524",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09800",
        "nepTitle": "Construction of Road and Drainage System at Barangay San Jose, Binan City, Laguna",
        "nepPesos": 30000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0546-008474",
        "hgabTitle": "Construction of Road and Drainage System at Barangay San Jose, Binan City, Laguna",
        "hgabPesos": 30000000,
        "nepPage": "510",
        "hgabPage": "546",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road and Drainage, Barangay Ayala, Magalang, Pampanga, Sta. 0+000 - Sta. 0+568",
      "source_code": "2027DPWH-Proposal-10814",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 12500000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road (with Drainage System), Barangay Ayala, Magalang, Pampanga",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428111",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+568.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10814",
        "nepTitle": "Construction of Road and Drainage, Barangay Ayala, Magalang, Pampanga, Sta. 0+000 - Sta. 0+568",
        "nepPesos": 12500000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0532-008176",
        "hgabTitle": "Construction of Road and Drainage, Barangay Ayala, Magalang, Pampanga, Sta. 0+000 - Sta. 0+568",
        "hgabPesos": 12500000,
        "nepPage": "501",
        "hgabPage": "532",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road and Drainage, Barangay Ayala, Magalang, Pampanga, Sta. 0+000 - Sta. 0+568",
      "source_code": "2027DPWH-Proposal-10814",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 12500000,
      "comparison_year": 2025,
      "prior_project": "Construction of Roads and Drainage at Brgy. Ayala, Magalang, Pampanga",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560579",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+568.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10814",
        "nepTitle": "Construction of Road and Drainage, Barangay Ayala, Magalang, Pampanga, Sta. 0+000 - Sta. 0+568",
        "nepPesos": 12500000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0532-008176",
        "hgabTitle": "Construction of Road and Drainage, Barangay Ayala, Magalang, Pampanga, Sta. 0+000 - Sta. 0+568",
        "hgabPesos": 12500000,
        "nepPage": "501",
        "hgabPage": "532",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road and Drainage, Barangay Dela Paz, Biñan City, Laguna",
      "source_code": "2027DPWH-Proposal-26362",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 102000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Drainage System, Brgy. Dela Paz, Biñan, Laguna",
      "prior_amount": 40000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 488356",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-26362",
        "nepTitle": "Construction of Road and Drainage, Barangay Dela Paz, Biñan City, Laguna",
        "nepPesos": 102000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road and Drainage, Barangay Dela Paz, Biñan City, Laguna",
      "source_code": "2027DPWH-Proposal-26362",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 102000000,
      "comparison_year": 2018,
      "prior_project": "Drainage Improvement at Brgy. Dela Paz, Biñan, Laguna",
      "prior_amount": 20000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300108200051000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-26362",
        "nepTitle": "Construction of Road and Drainage, Barangay Dela Paz, Biñan City, Laguna",
        "nepPesos": 102000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road and Drainage, Barangay Javellana, Jaro, Iloilo City, Iloilo",
      "source_code": "2027DPWH-Proposal-37078",
      "office": "Iloilo City District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Drainage System in Barangay Javellana, Jaro, Iloilo City",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 424070",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Julienne Baronda"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37078",
        "nepTitle": "Construction of Road and Drainage, Barangay Javellana, Jaro, Iloilo City, Iloilo",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0573-009075",
        "hgabTitle": "Construction of Road and Drainage, Barangay Javellana, Jaro, Iloilo City, Iloilo",
        "hgabPesos": 5000000,
        "nepPage": "528",
        "hgabPage": "573",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road and Drainage, Barangay Macabling, Santa Rosa City, Laguna",
      "source_code": "2027DPWH-Proposal-09790",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Rehabilitation of Drainage at Barangay Macabling, Santa Rosa City, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 538706",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Roy Gonzales"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09790",
        "nepTitle": "Construction of Road and Drainage, Barangay Macabling, Santa Rosa City, Laguna",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0546-008475",
        "hgabTitle": "Construction of Road and Drainage, Barangay Macabling, Santa Rosa City, Laguna",
        "hgabPesos": 50000000,
        "nepPage": "510",
        "hgabPage": "546",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road and Drainage, Barangay Macabling, Santa Rosa City, Laguna",
      "source_code": "2027DPWH-Proposal-09790",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Drainage, Barangay Macabling, Santa Rosa City, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 606526",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Roy Gonzales"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09790",
        "nepTitle": "Construction of Road and Drainage, Barangay Macabling, Santa Rosa City, Laguna",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0546-008475",
        "hgabTitle": "Construction of Road and Drainage, Barangay Macabling, Santa Rosa City, Laguna",
        "hgabPesos": 50000000,
        "nepPage": "510",
        "hgabPage": "546",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road and Drainage, Barangay Pandan, Angeles City Pampanga, Sta. 0+000 - Sta. 0+850, Sta. 0+000 - Sta. 0+071, Sta. 0+000 - Sta. 0+248",
      "source_code": "2027DPWH-Proposal-10777",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 8580000,
      "comparison_year": 2023,
      "prior_project": "Improvement/Rehabilitation of Drainage Brgy. Pandan, Angeles City, Pampanga",
      "prior_amount": 7000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 530542",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+850.00 · 0+000.00–0+071.00 · 0+000.00–0+248.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10777",
        "nepTitle": "Construction of Road and Drainage, Barangay Pandan, Angeles City Pampanga, Sta. 0+000 - Sta. 0+850, Sta. 0+000 - Sta. 0+071, Sta. 0+000 - Sta. 0+248",
        "nepPesos": 8580000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0532-008180",
        "hgabTitle": "Construction of Road and Drainage, Barangay Pandan, Angeles City Pampanga, Sta. 0+000 - Sta. 0+850, Sta. 0+000 - Sta. 0+071, Sta. 0+000 - Sta. 0+248",
        "hgabPesos": 8580000,
        "nepPage": "501",
        "hgabPage": "532",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road and Drainage, Barangay Pulung Cacutud, Angeles City Pampanga, Sta. 0+000 - Sta. 0+300, Sta. 0+000 - Sta. 0+295, Sta. 0+000 - Sta. 0+560, Sta. 0+000 - Sta. 0+392",
      "source_code": "2027DPWH-Proposal-10780",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 16000000,
      "comparison_year": 2023,
      "prior_project": "Improvement/Rehabilitation/Construction of Drainage Brgy. Pulung Cacutud, Angeles City, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 530551",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+300.00 · 0+000.00–0+295.00 · 0+000.00–0+560.00 · 0+000.00–0+392.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10780",
        "nepTitle": "Construction of Road and Drainage, Barangay Pulung Cacutud, Angeles City Pampanga, Sta. 0+000 - Sta. 0+300, Sta. 0+000 - Sta. 0+295, Sta. 0+000 - Sta. 0+560, Sta. 0+000 - Sta. 0+392",
        "nepPesos": 16000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0533-008183",
        "hgabTitle": "Construction of Road and Drainage, Barangay Pulung Cacutud, Angeles City Pampanga, Sta. 0+000 - Sta. 0+300, Sta. 0+000 - Sta. 0+295, Sta. 0+000 - Sta. 0+560, Sta. 0+000 - Sta. 0+392",
        "hgabPesos": 16000000,
        "nepPage": "501",
        "hgabPage": "533",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road and Drainage, Barangay San Isidro, Magalang, Pampanga, Sta. 0+000 - Sta. 0+420, Sta. 0+000 - Sta. 0+158, Sta. 0+000 - Sta. 0+585",
      "source_code": "2027DPWH-Proposal-10821",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 13000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Drainage at Brgy. San Isidro, Magalang, Pampanga",
      "prior_amount": 1500000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292004020100504",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+420.00 · 0+000.00–0+158.00 · 0+000.00–0+585.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10821",
        "nepTitle": "Construction of Road and Drainage, Barangay San Isidro, Magalang, Pampanga, Sta. 0+000 - Sta. 0+420, Sta. 0+000 - Sta. 0+158, Sta. 0+000 - Sta. 0+585",
        "nepPesos": 13000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0533-008184",
        "hgabTitle": "Construction of Road and Drainage, Barangay San Isidro, Magalang, Pampanga, Sta. 0+000 - Sta. 0+420, Sta. 0+000 - Sta. 0+158, Sta. 0+000 - Sta. 0+585",
        "hgabPesos": 13000000,
        "nepPage": "501",
        "hgabPage": "533",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road and Drainage, Barangay Sto. Cristo, Angeles City Pampanga, Sta. 0+000 - Sta. 0+191, Sta. 0+000 - Sta. 0+130, Sta. 0+000 - Sta. 0+285",
      "source_code": "2027DPWH-Proposal-10781",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 11800000,
      "comparison_year": 2023,
      "prior_project": "Construction of Drainage in Brgy. Sto. Cristo, Angeles City, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 530548",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+191.00 · 0+000.00–0+130.00 · 0+000.00–0+285.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10781",
        "nepTitle": "Construction of Road and Drainage, Barangay Sto. Cristo, Angeles City Pampanga, Sta. 0+000 - Sta. 0+191, Sta. 0+000 - Sta. 0+130, Sta. 0+000 - Sta. 0+285",
        "nepPesos": 11800000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0533-008194",
        "hgabTitle": "Construction of Road and Drainage, Barangay Sto. Cristo, Angeles City Pampanga, Sta. 0+000 - Sta. 0+191, Sta. 0+000 - Sta. 0+130, Sta. 0+000 - Sta. 0+285",
        "hgabPesos": 11800000,
        "nepPage": "501",
        "hgabPage": "533",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road with Drainage Canal, Barangay Pandayan, Meycauayan, City, Bulacan",
      "source_code": "2027DPWH-Proposal-36089",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 8000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Roads with Drainage Canal, Brgy. Pandayan, Meycauayan City, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526577",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36089",
        "nepTitle": "Construction of Road with Drainage Canal, Barangay Pandayan, Meycauayan, City, Bulacan",
        "nepPesos": 8000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0513-007771",
        "hgabTitle": "Construction of Road with Drainage Canal, Barangay Pandayan, Meycauayan, City, Bulacan",
        "hgabPesos": 8000000,
        "nepPage": "490",
        "hgabPage": "513",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road with Drainage at Barangay Jagobiao, Mandaue City, Cebu",
      "source_code": "2027DPWH-Proposal-08154",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Drainage Structure, Barangay Jagobiao, Mandaue City, Cebu",
      "prior_amount": 80000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 605330",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08154",
        "nepTitle": "Construction of Road with Drainage at Barangay Jagobiao, Mandaue City, Cebu",
        "nepPesos": 10000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0587-009398",
        "hgabTitle": "Construction of Road with Drainage at Barangay Jagobiao, Mandaue City, Cebu",
        "hgabPesos": 10000000,
        "nepPage": "537",
        "hgabPage": "587",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road with Drainage at Barangay Tawason, Mandaue City - Sta. 0+000.00 - Sta. 0+475.00",
      "source_code": "2027DPWH-Proposal-08180",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 8700000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road with Drainage Facilities, Barangay Tawason, Mandaue City",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 561021",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+475.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08180",
        "nepTitle": "Construction of Road with Drainage at Barangay Tawason, Mandaue City - Sta. 0+000.00 - Sta. 0+475.00",
        "nepPesos": 8700000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road with Drainage at Barangay Tawason, Mandaue City, Sta 0+000.00 - Sta 0+450.00",
      "source_code": "2027DPWH-Proposal-08172",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 13875000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road with Drainage Facilities, Barangay Tawason, Mandaue City",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 561021",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+450.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08172",
        "nepTitle": "Construction of Road with Drainage at Barangay Tawason, Mandaue City, Sta 0+000.00 - Sta 0+450.00",
        "nepPesos": 13875000,
        "category": "Flood control",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0587-009400",
        "hgabTitle": "Construction of Road with Drainage, Barangay Cabancalan, Mandaue City, Cebu - Sta. 0+000.00 - Sta. 0+450.00",
        "hgabPesos": 5625000,
        "nepPage": "537",
        "hgabPage": "587",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road with Drainage, Barangay Adlas, Silang, Cavite",
      "source_code": "2027DPWH-Proposal-36539",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Drainage, Barangay Adlas, Silang, Cavite",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 524392",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36539",
        "nepTitle": "Construction of Road with Drainage, Barangay Adlas, Silang, Cavite",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0545-008460",
        "hgabTitle": "Construction of Road with Drainage, Barangay Adlas, Silang, Cavite",
        "hgabPesos": 5000000,
        "nepPage": "510",
        "hgabPage": "545",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road with Drainage, Barangay Balite I, Silang, Cavite",
      "source_code": "2027DPWH-Proposal-36535",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Drainage System, Barangay Balite I, Silang, Cavite",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300109200358000 · PDF p. 1128 · printed p. 2593",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36535",
        "nepTitle": "Construction of Road with Drainage, Barangay Balite I, Silang, Cavite",
        "nepPesos": 10000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road with Drainage, Barangay Calubcob, Silang, Cavite",
      "source_code": "2027DPWH-Proposal-36536",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Drainage System, Brgy. Calubcob, Silang, Cavite",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300109200117000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36536",
        "nepTitle": "Construction of Road with Drainage, Barangay Calubcob, Silang, Cavite",
        "nepPesos": 10000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0545-008463",
        "hgabTitle": "Construction of Road with Drainage, Barangay Calubcob, Silang, Cavite",
        "hgabPesos": 10000000,
        "nepPage": "510",
        "hgabPage": "545",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road with Drainage, Barangay Poblacion, City of San Jose del Monte, Bulacan (121.043616, 14.813899)",
      "source_code": "2027DPWH-Proposal-10555",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Flood Control Structures, Poblacion, San Jose Del Monte City, Bulacan",
      "prior_amount": 35145000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 522303",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10555",
        "nepTitle": "Construction of Road with Drainage, Barangay Poblacion, City of San Jose del Monte, Bulacan (121.043616, 14.813899)",
        "nepPesos": 30000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0514-007788",
        "hgabTitle": "Construction of Road with Drainage, Barangay Poblacion, City of San Jose del Monte, Bulacan (121.043616, 14.813899)",
        "hgabPesos": 30000000,
        "nepPage": "491",
        "hgabPage": "514",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road with Drainage, Barangay Poblacion, City of San Jose del Monte, Bulacan (121.043616, 14.813899)",
      "source_code": "2027DPWH-Proposal-10555",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Flood Control Structure, Barangay Poblacion, San Jose del Monte, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 544308",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10555",
        "nepTitle": "Construction of Road with Drainage, Barangay Poblacion, City of San Jose del Monte, Bulacan (121.043616, 14.813899)",
        "nepPesos": 30000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0514-007788",
        "hgabTitle": "Construction of Road with Drainage, Barangay Poblacion, City of San Jose del Monte, Bulacan (121.043616, 14.813899)",
        "hgabPesos": 30000000,
        "nepPage": "491",
        "hgabPage": "514",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road with Drainage, Barangay Sabutan, Silang, Cavite",
      "source_code": "2027DPWH-Proposal-36541",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 8000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Drainage, Barangay Sabutan, Silang, Cavite",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 524395",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36541",
        "nepTitle": "Construction of Road with Drainage, Barangay Sabutan, Silang, Cavite",
        "nepPesos": 8000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road with Drainage, Barangay Yakal, Silang, Cavite",
      "source_code": "2027DPWH-Proposal-36552",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Rehabilitation of Drainage System, Brgy. Yakal, Silang, Cavite",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300107200399000 · PDF p. 1099 · printed p. 2564",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36552",
        "nepTitle": "Construction of Road with Drainage, Barangay Yakal, Silang, Cavite",
        "nepPesos": 10000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0545-008468",
        "hgabTitle": "Construction of Road with Drainage, Barangay Yakal, Silang, Cavite",
        "hgabPesos": 10000000,
        "nepPage": "510",
        "hgabPage": "545",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of San Jose Flood Control Structure, Sta 9+660 -10+070, Maria Aurora, Aurora",
      "source_code": "2027DPWH-Proposal-03243",
      "office": "Aurora District Engineering Office",
      "region": "Region III",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Flood Control Structure, Barangay San Jose, Maria Aurora, Aurora",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 605062",
      "similarity_pct": 100,
      "current_chainage": "9+660.00–10+070.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03243",
        "nepTitle": "Construction of San Jose Flood Control Structure, Sta 9+660 -10+070, Maria Aurora, Aurora",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Simayung Flood Control along Abulug River, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-29445",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Simayung Flood Control Structure along Abulug River, Simayung, Abulug, Cagayan",
      "prior_amount": 27000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 524166",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-29445",
        "nepTitle": "Construction of Simayung Flood Control along Abulug River, Abulug, Cagayan",
        "nepPesos": 100000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0366-004784",
        "hgabTitle": "Construction of Simayung Flood Control along Abulug River, Abulug, Cagayan",
        "hgabPesos": 100000000,
        "nepPage": "396",
        "hgabPage": "366",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Simayung Flood Control along Abulug River, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-29445",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Simayung Flood Control along Abulug River, Abulug, Cagayan",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 621799",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-29445",
        "nepTitle": "Construction of Simayung Flood Control along Abulug River, Abulug, Cagayan",
        "nepPesos": 100000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0366-004784",
        "hgabTitle": "Construction of Simayung Flood Control along Abulug River, Abulug, Cagayan",
        "hgabPesos": 100000000,
        "nepPage": "396",
        "hgabPage": "366",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Tumaga River Flood Control (Tugbungan Section), Zamboanga City",
      "source_code": "2027DPWH-Proposal-21602",
      "office": "Zamboanga City 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 200000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Tumaga River Flood Control (Tugbungan Section), Zamboanga City",
      "prior_amount": 150000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 584553",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21602",
        "nepTitle": "Construction of Tumaga River Flood Control (Tugbungan Section), Zamboanga City",
        "nepPesos": 200000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of drainage facilities at Barangay Cubacub, Mandaue City, Cebu, Sta. 0+000.00 - Sta. 0+962.00",
      "source_code": "2027DPWH-Proposal-08200",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 60000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road with Drainage Facilities, Barangay Cubacub, Mandaue City, Cebu",
      "prior_amount": 12000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 561020",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+962.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08200",
        "nepTitle": "Construction of drainage facilities at Barangay Cubacub, Mandaue City, Cebu, Sta. 0+000.00 - Sta. 0+962.00",
        "nepPesos": 60000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0313-003761",
        "hgabTitle": "Construction of drainage facilities at Barangay Cubacub, Mandaue City, Cebu, Sta. 0+000.00 - Sta. 0+962.00",
        "hgabPesos": 60000000,
        "nepPage": "358",
        "hgabPage": "313",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of drainage facilities at Barangay Cubacub, Mandaue City, Cebu, Sta. 0+000.00 - Sta. 0+962.00",
      "source_code": "2027DPWH-Proposal-08200",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 60000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Drainage System at Brgy. Cubacub, Mandaue City, Cebu",
      "prior_amount": 3000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300109200439000 · PDF p. 1133 · printed p. 2598",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+962.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08200",
        "nepTitle": "Construction of drainage facilities at Barangay Cubacub, Mandaue City, Cebu, Sta. 0+000.00 - Sta. 0+962.00",
        "nepPesos": 60000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0313-003761",
        "hgabTitle": "Construction of drainage facilities at Barangay Cubacub, Mandaue City, Cebu, Sta. 0+000.00 - Sta. 0+962.00",
        "hgabPesos": 60000000,
        "nepPage": "358",
        "hgabPage": "313",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of drainage system at Barangay Poblacion, Cordova, Cebu",
      "source_code": "2027DPWH-Proposal-08109",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Flood Control Structure at Brgy. Poblacion, Cordova, Cebu",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 488040",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08109",
        "nepTitle": "Construction of drainage system at Barangay Poblacion, Cordova, Cebu",
        "nepPesos": 5000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0356-004598",
        "hgabTitle": "Construction of drainage system at Barangay Poblacion, Cordova, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "388",
        "hgabPage": "356",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction/Improvement of Catarman Comprehensive Drainage System, Sta. 000+000 - Sta. 002+631.57, Catarman, Northern Samar",
      "source_code": "2027DPWH-Proposal-02669",
      "office": "Northern Samar 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 60000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Catarman Comprehensive Drainage System, Catarman, Northern Samar",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 656153",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–2+631.57",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Niko Raul Daza"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02669",
        "nepTitle": "Construction/Improvement of Catarman Comprehensive Drainage System, Sta. 000+000 - Sta. 002+631.57, Catarman, Northern Samar",
        "nepPesos": 60000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0315-003804",
        "hgabTitle": "Construction/Improvement of Catarman Comprehensive Drainage System, Sta. 000+000 - Sta. 002+631.57, Catarman, Northern Samar",
        "hgabPesos": 60000000,
        "nepPage": "360",
        "hgabPage": "315",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Improvement of Road and Drainage System along Taft Ave. (From UN Ave. to Ayala Blvd.), Manila City",
      "source_code": "2027DPWH-Proposal-33478",
      "office": "South Manila District Engineering Office",
      "region": "NCR",
      "amount_2027": 575000000,
      "comparison_year": 2025,
      "prior_project": "Improvement of Road and Drainage System along Taft Ave. (From UN Ave. to Ayala Blvd.), Manila City",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 655284",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33478",
        "nepTitle": "Improvement of Road and Drainage System along Taft Ave. (From UN Ave. to Ayala Blvd.), Manila City",
        "nepPesos": 575000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Improvement of Road with Drainage System at Fuentes Road in Barangays Agus and Pajac, Lapu-Lapu City, Cebu",
      "source_code": "2027DPWH-Proposal-08150",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5500000,
      "comparison_year": 2023,
      "prior_project": "Improvement of Road with Drainage Facilities at Fuentes Road in Barangays Agus and Pajac, Lapu-Lapu City, Cebu",
      "prior_amount": 100000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 527392",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08150",
        "nepTitle": "Improvement of Road with Drainage System at Fuentes Road in Barangays Agus and Pajac, Lapu-Lapu City, Cebu",
        "nepPesos": 5500000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0588-009405",
        "hgabTitle": "Improvement of Road with Drainage System at Fuentes Road in Barangays Agus and Pajac, Lapu-Lapu City, Cebu",
        "hgabPesos": 5500000,
        "nepPage": "537",
        "hgabPage": "588",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Rehabilitation of Drainage Structure at Barangay Basak, Lapu-Lapu City, Cebu",
      "source_code": "2027DPWH-Proposal-37698",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 50000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Flood Control, Brgy. Basak, Lapu-Lapu City, Cebu",
      "prior_amount": 17000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300107200556000 · PDF p. 1109 · printed p. 2574",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37698",
        "nepTitle": "Rehabilitation of Drainage Structure at Barangay Basak, Lapu-Lapu City, Cebu",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0356-004608",
        "hgabTitle": "Rehabilitation of Drainage Structure at Barangay Basak, Lapu-Lapu City, Cebu",
        "hgabPesos": 50000000,
        "nepPage": "388",
        "hgabPage": "356",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Rehabilitation of Drainage System at Barangay Pinagbuhatan, Pasig City",
      "source_code": "2027DPWH-Proposal-34025",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 20000000,
      "comparison_year": 2024,
      "prior_project": "Rehabilitation of Drainage System, Barangay Pinagbuhatan, Pasig City",
      "prior_amount": 30000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 544203",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34025",
        "nepTitle": "Rehabilitation of Drainage System at Barangay Pinagbuhatan, Pasig City",
        "nepPesos": 20000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0322-003927",
        "hgabTitle": "Rehabilitation of Drainage System at Barangay Pinagbuhatan, Pasig City",
        "hgabPesos": 20000000,
        "nepPage": "366",
        "hgabPage": "322",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Rehabilitation of Drainage System at Barangay Pinagbuhatan, Pasig City",
      "source_code": "2027DPWH-Proposal-34025",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Drainage System at Barangay Pinagbuhatan, Pasig City",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 661657",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34025",
        "nepTitle": "Rehabilitation of Drainage System at Barangay Pinagbuhatan, Pasig City",
        "nepPesos": 20000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0322-003927",
        "hgabTitle": "Rehabilitation of Drainage System at Barangay Pinagbuhatan, Pasig City",
        "hgabPesos": 20000000,
        "nepPage": "366",
        "hgabPage": "322",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Rehabilitation of Drainage System, Barangay Loyola Heights, Quezon City",
      "source_code": "2027DPWH-Proposal-33997",
      "office": "Quezon City 2nd District Engineering Office",
      "region": "NCR",
      "amount_2027": 140000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Drainage System, Brgy. Loyola Heights, Quezon City",
      "prior_amount": 25000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 521973",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33997",
        "nepTitle": "Rehabilitation of Drainage System, Barangay Loyola Heights, Quezon City",
        "nepPesos": 140000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0300-003522",
        "hgabTitle": "Rehabilitation of Drainage System, Barangay Loyola Heights, Quezon City",
        "hgabPesos": 140000000,
        "nepPage": "349",
        "hgabPage": "300",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Rehabilitation of Drainage at Barangay 150, Zone 13, Manila City",
      "source_code": "2027DPWH-Proposal-34073",
      "office": "North Manila District Engineering Office",
      "region": "NCR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road with drainage improvement at Barangay 150 Zone 13, Manila City",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526063",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34073",
        "nepTitle": "Rehabilitation of Drainage at Barangay 150, Zone 13, Manila City",
        "nepPesos": 6000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0324-003977",
        "hgabTitle": "Rehabilitation of Drainage at Barangay 150, Zone 13, Manila City",
        "hgabPesos": 6000000,
        "nepPage": "368",
        "hgabPage": "324",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Rehabilitation of Drainage at Brgy. Basak, Lapu-Lapu City Cebu",
      "source_code": "2027DPWH-Proposal-31032",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 50000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Flood Control, Brgy. Basak, Lapu-Lapu City, Cebu",
      "prior_amount": 17000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300107200556000 · PDF p. 1109 · printed p. 2574",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31032",
        "nepTitle": "Rehabilitation of Drainage at Brgy. Basak, Lapu-Lapu City Cebu",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Rehabilitation of Drainage of Pilak Pilak Creek, Sta. 0+000 - 5+930, Addalam River Irrigation System, Saguday, Quirino",
      "source_code": "2027DPWH-Proposal-00416",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 14252000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Drainage of Pilak Pilak Creek, Sta. 0+000 - 5+930, Addalam River Irrigation System, Saguday, Quirino",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 656656",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–5+930.00",
      "prior_chainage": "0+000.00–5+930.00",
      "chainage_overlap": "0+000.00–5+930.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-00416",
        "nepTitle": "Rehabilitation of Drainage of Pilak Pilak Creek, Sta. 0+000 - 5+930, Addalam River Irrigation System, Saguday, Quirino",
        "nepPesos": 14252000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0337-004226",
        "hgabTitle": "Rehabilitation of Drainage of Pilak Pilak Creek, Sta. 0+000 - 5+930, Addalam River Irrigation System, Saguday, Quirino",
        "hgabPesos": 14252000,
        "nepPage": "374",
        "hgabPage": "337",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Rehabilitation of Flood Control Structure along Agno River, Warding Section, Bayambang, Pangasinan",
      "source_code": "2027DPWH-Proposal-05577",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Flood Control Structure along Agno River, Warding Section, Bayambang, Pangasinan",
      "prior_amount": 20000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 621754",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-05577",
        "nepTitle": "Rehabilitation of Flood Control Structure along Agno River, Warding Section, Bayambang, Pangasinan",
        "nepPesos": 100000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Rehabilitation of Flood Control Structure along Agno River, Warding Section, Bayambang, Pangasinan",
      "source_code": "2027DPWH-Proposal-05577",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Flood Control Structure along Agno River, Warding Section, Bayambang, Pangasinan",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 661459",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-05577",
        "nepTitle": "Rehabilitation of Flood Control Structure along Agno River, Warding Section, Bayambang, Pangasinan",
        "nepPesos": 100000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Rehabilitation of Flood Control Structure along Saluysoy-Pandayan Creek, Barangay Saluysoy, Meycauayan, Bulacan",
      "source_code": "2027DPWH-Proposal-36146",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 45000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Flood Control Structure Pandayan - Saluysoy Creek, Meycauayan City, Bulacan",
      "prior_amount": 99000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 562006",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36146",
        "nepTitle": "Rehabilitation of Flood Control Structure along Saluysoy-Pandayan Creek, Barangay Saluysoy, Meycauayan, Bulacan",
        "nepPesos": 45000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0340-004273",
        "hgabTitle": "Rehabilitation of Flood Control Structure along Saluysoy-Pandayan Creek, Barangay Saluysoy, Meycauayan, Bulacan",
        "hgabPesos": 45000000,
        "nepPage": "376",
        "hgabPage": "340",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Rehabilitation of Flood Control Structure along Saluysoy-Pandayan Creek, Barangay Saluysoy, Meycauayan, Bulacan",
      "source_code": "2027DPWH-Proposal-36146",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 45000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Flood Control Structure, Pandayan-Saluysoy Creek, Barangay Saluysoy, Meycauayan City, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 606390",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36146",
        "nepTitle": "Rehabilitation of Flood Control Structure along Saluysoy-Pandayan Creek, Barangay Saluysoy, Meycauayan, Bulacan",
        "nepPesos": 45000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0340-004273",
        "hgabTitle": "Rehabilitation of Flood Control Structure along Saluysoy-Pandayan Creek, Barangay Saluysoy, Meycauayan, Bulacan",
        "hgabPesos": 45000000,
        "nepPage": "376",
        "hgabPage": "340",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Rehabilitation of Road and Drainage, Brgy Dila, City of Santa Rosa, Laguna",
      "source_code": "2027DPWH-Proposal-26388",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 65000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Drainage, Barangay Dila, Santa Rosa City, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 606527",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Roy Gonzales"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-26388",
        "nepTitle": "Rehabilitation of Road and Drainage, Brgy Dila, City of Santa Rosa, Laguna",
        "nepPesos": 65000000,
        "category": "Flood control",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0427-006008",
        "hgabTitle": "Rehabilitation of Road and Drainage, Dila, City of Santa Rosa, Laguna",
        "hgabPesos": 65000000,
        "nepPage": "442",
        "hgabPage": "427",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Rehabilitation of Road with Drainage, Barangay Dulong Bayan, City of San Jose del Monte, Bulacan (121.026121, 14.822209)",
      "source_code": "2027DPWH-Proposal-10559",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 50000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Flood Control Structures, Dulong Bayan, San Jose Del Monte City, Bulacan",
      "prior_amount": 29330000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 522298",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10559",
        "nepTitle": "Rehabilitation of Road with Drainage, Barangay Dulong Bayan, City of San Jose del Monte, Bulacan (121.026121, 14.822209)",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0516-007821",
        "hgabTitle": "Rehabilitation of Road with Drainage, Barangay Dulong Bayan, City of San Jose del Monte, Bulacan (14.828343, 121.040905)",
        "hgabPesos": 50000000,
        "nepPage": "492",
        "hgabPage": "516",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Rehabilitation of Road with Drainage, Barangay Dulong Bayan, City of San Jose del Monte, Bulacan (121.026121, 14.822209)",
      "source_code": "2027DPWH-Proposal-10559",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 50000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Flood Control Structure, Barangay Dulong Bayan, San Jose Del Monte City, Bulacan",
      "prior_amount": 45000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 524299",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10559",
        "nepTitle": "Rehabilitation of Road with Drainage, Barangay Dulong Bayan, City of San Jose del Monte, Bulacan (121.026121, 14.822209)",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0516-007821",
        "hgabTitle": "Rehabilitation of Road with Drainage, Barangay Dulong Bayan, City of San Jose del Monte, Bulacan (14.828343, 121.040905)",
        "hgabPesos": 50000000,
        "nepPage": "492",
        "hgabPage": "516",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Rehabilitation of Road with drainage, Barangay Minuyan Proper, City of San Jose Del Monte, Bulacan (121.080917, 14.836105)",
      "source_code": "2027DPWH-Proposal-10579",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Flood Control Structure, Barangay Minuyan Proper, City of San Jose del Monte, Bulacan",
      "prior_amount": 100000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 584121",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10579",
        "nepTitle": "Rehabilitation of Road with drainage, Barangay Minuyan Proper, City of San Jose Del Monte, Bulacan (121.080917, 14.836105)",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0516-007822",
        "hgabTitle": "Rehabilitation of Road with drainage, Barangay Minuyan Proper, City of San Jose Del Monte, Bulacan (121.080917, 14.836105)",
        "hgabPesos": 50000000,
        "nepPage": "492",
        "hgabPage": "516",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Completion of Multi-Purpose Building (Covered Court), Barangay Mag-Aso, Jaro, Leyte (11.221369, 124.745542)",
      "source_code": "2027DPWH-Proposal-37907",
      "office": "Leyte 2nd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 6500000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Brgy. Mag-Aso, Jaro, Leyte",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104210853000 · PDF p. 892 · printed p. 2357",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 11.221369,
        "longitude": 124.745542,
        "raw": "11.221369, 124.745542",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mag-aso · jaro · leyte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37907",
        "nepTitle": "Completion of Multi-Purpose Building (Covered Court), Barangay Mag-Aso, Jaro, Leyte (11.221369, 124.745542)",
        "nepPesos": 6500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0856-014720",
        "hgabTitle": "Completion of Multi-Purpose Building (Covered Court), Barangay Mag-Aso, Jaro, Leyte (11.221369, 124.745542)",
        "hgabPesos": 6500000,
        "nepPage": "648",
        "hgabPage": "856",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Completion of Multi-Purpose Building, Barangay San Agustin, Malabon City (14.662042, 120.952531)",
      "source_code": "2027DPWH-Proposal-23169",
      "office": "Malabon Navotas District Engineering Office",
      "region": "NCR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Agustin, Malabon City",
      "prior_amount": 30000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543818",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.662042,
        "longitude": 120.952531,
        "raw": "14.662042, 120.952531",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "san agustin · malabon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23169",
        "nepTitle": "Completion of Multi-Purpose Building, Barangay San Agustin, Malabon City (14.662042, 120.952531)",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0656-010704",
        "hgabTitle": "Completion of Multi-Purpose Building, Barangay San Agustin, Malabon City (14.662042, 120.952531)",
        "hgabPesos": 5000000,
        "nepPage": "572",
        "hgabPage": "656",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Completion of Multi-Purpose Building, Barangay Santulan, Malabon City (14.685711, 120.958868)",
      "source_code": "2027DPWH-Proposal-23172",
      "office": "Malabon Navotas District Engineering Office",
      "region": "NCR",
      "amount_2027": 60000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. Santulan, Malabon City,  14.685767, 120.958842",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 31253",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 6.8,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.685711,
        "longitude": 120.958868,
        "raw": "14.685711, 120.958868",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.685767,
        "longitude": 120.958842,
        "raw": "14.685767, 120.958842",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "santulan · malabon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23172",
        "nepTitle": "Completion of Multi-Purpose Building, Barangay Santulan, Malabon City (14.685711, 120.958868)",
        "nepPesos": 60000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0630-010244",
        "hgabTitle": "Completion of Multi-Purpose Building, Barangay Santulan, Malabon City (14.685711, 120.958868)",
        "hgabPesos": 60000000,
        "nepPage": "560",
        "hgabPage": "630",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Carmen Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
      "source_code": "2027DPWH-Proposal-33710",
      "office": "Davao del Norte 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 50000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Ising, Carmen, Davao del Norte",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485482",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ising · carmen · davao del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33710",
        "nepTitle": "Construction (Completion) of Carmen Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0890-015365",
        "hgabTitle": "Construction (Completion) of Carmen Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
        "hgabPesos": 50000000,
        "nepPage": "665",
        "hgabPage": "890",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Carmen Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
      "source_code": "2027DPWH-Proposal-33710",
      "office": "Davao del Norte 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 50000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532895",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ising · carmen · davao del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33710",
        "nepTitle": "Construction (Completion) of Carmen Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0890-015365",
        "hgabTitle": "Construction (Completion) of Carmen Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
        "hgabPesos": 50000000,
        "nepPage": "665",
        "hgabPage": "890",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Carmen Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
      "source_code": "2027DPWH-Proposal-33710",
      "office": "Davao del Norte 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 50000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Ising, Carmen, Davao del Norte",
      "prior_amount": 3000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104204851000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ising · carmen · davao del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33710",
        "nepTitle": "Construction (Completion) of Carmen Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0890-015365",
        "hgabTitle": "Construction (Completion) of Carmen Multi-Purpose Building, Barangay Ising, Carmen, Davao del Norte",
        "hgabPesos": 50000000,
        "nepPage": "665",
        "hgabPage": "890",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi Purpose Building at Wangal, La Trinidad, Benguet",
      "source_code": "2027DPWH-Proposal-34725",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 150000000,
      "comparison_year": 2025,
      "prior_project": "Completion of Multi Purpose Building at Wangal, La Trinidad, Benguet",
      "prior_amount": 148000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595805",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Eric Yap"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34725",
        "nepTitle": "Construction (Completion) of Multi Purpose Building at Wangal, La Trinidad, Benguet",
        "nepPesos": 150000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0634-010327",
        "hgabTitle": "Construction (Completion) of Multi Purpose Building at Wangal, La Trinidad, Benguet",
        "hgabPesos": 150000000,
        "nepPage": "562",
        "hgabPage": "634",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Barangay Hall) at Barangay Mataas na Lupa, Taysan, Batangas",
      "source_code": "2027DPWH-Proposal-36285",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Barangay Hall) in Brgy. Mataas na Lupa, Taysan, Batangas",
      "prior_amount": 13000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599290",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36285",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Barangay Hall) at Barangay Mataas na Lupa, Taysan, Batangas",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0757-012747",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Barangay Hall) at Barangay Mataas na Lupa, Taysan, Batangas",
        "hgabPesos": 7000000,
        "nepPage": "611",
        "hgabPage": "757",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Barangay Hall) at Barangay Mataas na Lupa, Taysan, Batangas",
      "source_code": "2027DPWH-Proposal-36285",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-purpose Building (Barangay Hall) at Brgy. Mataas na Lupa, Taysan, Batangas",
      "prior_amount": 6000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35158",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36285",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Barangay Hall) at Barangay Mataas na Lupa, Taysan, Batangas",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0757-012747",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Barangay Hall) at Barangay Mataas na Lupa, Taysan, Batangas",
        "hgabPesos": 7000000,
        "nepPage": "611",
        "hgabPage": "757",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay Alalum, San Pascual, Batangas",
      "source_code": "2027DPWH-Proposal-09606",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 25000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Alalum, San Pascual, Batangas (13.823227,121.028655)",
      "prior_amount": 12000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34852",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 13.823227,
        "longitude": 121.028655,
        "raw": "13.823227,121.028655",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09606",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay Alalum, San Pascual, Batangas",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0751-012615",
        "hgabTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Alalum, San Pascual, Batangas (Phase 2)",
        "hgabPesos": 10000000,
        "nepPage": "608",
        "hgabPage": "751",
        "chainageStatus": "not stated",
        "trancheStatus": "one side stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay Camaman-an, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-39089",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Completion of Multi-Purpose Building (Barangay Hall), Brgy. Camaman-an, Cagayan de Oro City",
      "prior_amount": 1500000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010313138",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39089",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay Camaman-an, Cagayan de Oro City",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0874-015049",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay Camaman-an, Cagayan de Oro City",
        "hgabPesos": 10000000,
        "nepPage": "657",
        "hgabPage": "874",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court) Barangay Nueva, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-28896",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Nueva, City of San Pedro, Laguna",
      "prior_amount": 15000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545669",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nueva · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28896",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) Barangay Nueva, San Pedro City, Laguna",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0771-013027",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) Barangay Nueva, San Pedro City, Laguna",
        "hgabPesos": 5000000,
        "nepPage": "616",
        "hgabPage": "771",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court) Barangay Nueva, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-28896",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Nueva, San Pedro City, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599450",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nueva · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28896",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) Barangay Nueva, San Pedro City, Laguna",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0771-013027",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) Barangay Nueva, San Pedro City, Laguna",
        "hgabPesos": 5000000,
        "nepPage": "616",
        "hgabPage": "771",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Bagong Tubig, San Luis, Batangas",
      "source_code": "2027DPWH-Proposal-09554",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Bagong Tubig, San Luis, Batangas",
      "prior_amount": 6000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545317",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bagong tubig · san luis · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09554",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Bagong Tubig, San Luis, Batangas",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0751-012617",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Bagong Tubig, San Luis, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "608",
        "hgabPage": "751",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Gamao, Tingloy, Batangas",
      "source_code": "2027DPWH-Proposal-09563",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 12000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Gamao, Tingloy, Batangas",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545326",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gamao · tingloy · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09563",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Gamao, Tingloy, Batangas",
        "nepPesos": 12000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0752-012619",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Gamao, Tingloy, Batangas",
        "hgabPesos": 12000000,
        "nepPage": "608",
        "hgabPage": "752",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Palahanan I, San Juan, Batangas",
      "source_code": "2027DPWH-Proposal-36284",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Palahanan I, San Juan, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599236",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "palahanan i · san juan · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36284",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Palahanan I, San Juan, Batangas",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0758-012748",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Palahanan I, San Juan, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "611",
        "hgabPage": "758",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Sta. Cruz, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36282",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court) at Brgy. Sta. Cruz, Rosario, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35140",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sta. cruz · rosario · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36282",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Sta. Cruz, Rosario, Batangas",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0758-012750",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Barangay Sta. Cruz, Rosario, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "611",
        "hgabPage": "758",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Purok 1, Barangay Salvacion, Santo Tomas, Davao del Norte",
      "source_code": "2027DPWH-Proposal-38448",
      "office": "Davao del Norte 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Barangay Covered Court), Purok 1, Barangay Salvacion, Santo Tomas, Davao del Norte",
      "prior_amount": 8000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596613",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38448",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Purok 1, Barangay Salvacion, Santo Tomas, Davao del Norte",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0891-015377",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) at Purok 1, Barangay Salvacion, Santo Tomas, Davao del Norte",
        "hgabPesos": 5000000,
        "nepPage": "665",
        "hgabPage": "891",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Lingayao, Las Nieves, Agusan del Norte",
      "source_code": "2027DPWH-Proposal-38793",
      "office": "Agusan del Norte District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Lingayao, Las Nieves, Agusan del Norte",
      "prior_amount": 12000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602565",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lingayao · las nieves · agusan del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38793",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Lingayao, Las Nieves, Agusan del Norte",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0915-015824",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Lingayao, Las Nieves, Agusan del Norte",
        "hgabPesos": 7000000,
        "nepPage": "671",
        "hgabPage": "915",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Mahogany, Butuan City, Agusan del Norte",
      "source_code": "2027DPWH-Proposal-38794",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Mahogany, Butuan City, Agusan del Norte",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602638",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Aquino II"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mahogany · butuan · agusan del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38794",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Mahogany, Butuan City, Agusan del Norte",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0915-015835",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Mahogany, Butuan City, Agusan del Norte",
        "hgabPesos": 7000000,
        "nepPage": "672",
        "hgabPage": "915",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Miguel Macasarte, Banisilan, Cotabato",
      "source_code": "2027DPWH-Proposal-38605",
      "office": "Cotabato 3rd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Completion/Rehabilitation of Multi-Purpose Building (Covered Court) in Brgy. Miguel Macasarte, Banisilan, Cotabato",
      "prior_amount": 6000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602341",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Samantha Santos"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "miguel macasarte · banisilan · cotabato",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38605",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Miguel Macasarte, Banisilan, Cotabato",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0899-015522",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Miguel Macasarte, Banisilan, Cotabato",
        "hgabPesos": 5000000,
        "nepPage": "669",
        "hgabPage": "899",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Poblacion, Kawayan, Biliran (124.357710°, 11.677362°)",
      "source_code": "2027DPWH-Proposal-37891",
      "office": "Biliran District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Poblacion, Kawayan, Biliran",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420038",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 11.677362,
        "longitude": 124.35771,
        "raw": "124.357710°, 11.677362",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37891",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Poblacion, Kawayan, Biliran (124.357710°, 11.677362°)",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0853-014660",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Poblacion, Kawayan, Biliran (124.357710°, 11.677362°)",
        "hgabPesos": 5000000,
        "nepPage": "647",
        "hgabPage": "853",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Perfecto, San Juan City (121.022818, 14.602757)",
      "source_code": "2027DPWH-Proposal-22741",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay San Perfecto, San Juan City",
      "prior_amount": 67457000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595702",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.602757,
        "longitude": 121.022818,
        "raw": "121.022818, 14.602757",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22741",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Perfecto, San Juan City (121.022818, 14.602757)",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0656-010708",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Perfecto, San Juan City (121.022818, 14.602757)",
        "hgabPesos": 15000000,
        "nepPage": "572",
        "hgabPage": "656",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Teodoro, Bauan, Batangas",
      "source_code": "2027DPWH-Proposal-09594",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay San Teodoro, Bauan, Batangas",
      "prior_amount": 6000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545316",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san teodoro · bauan · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09594",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Teodoro, Bauan, Batangas",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0752-012623",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Teodoro, Bauan, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "608",
        "hgabPage": "752",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Sitio Bokbokon, Barangay Lawan-Lawan, Las Nieves, Agusan del Norte",
      "source_code": "2027DPWH-Proposal-38796",
      "office": "Agusan del Norte District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Sitio Bokbokon, Barangay Lawan-Lawan, Las Nieves, Agusan del Norte",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602563",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lawan-lawan · las nieves · agusan del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38796",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Sitio Bokbokon, Barangay Lawan-Lawan, Las Nieves, Agusan del Norte",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0915-015826",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court), Sitio Bokbokon, Barangay Lawan-Lawan, Las Nieves, Agusan del Norte",
        "hgabPesos": 7000000,
        "nepPage": "671",
        "hgabPage": "915",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Covered court), Acacia Street, Barangay Gordon Heights, Olongapo City, Zambales (14.855419, 120.290497)",
      "source_code": "2027DPWH-Proposal-11120",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 7000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court) Acacia Street, Barangay Gordon Heights, Olongapo City, Zambales",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545245",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jay Khonghun"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.855419,
        "longitude": 120.290497,
        "raw": "14.855419, 120.290497",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gordon heights · olongapo · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11120",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Covered court), Acacia Street, Barangay Gordon Heights, Olongapo City, Zambales (14.855419, 120.290497)",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (DPWH Building), Laoag City, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-05182",
      "office": "Ilocos Norte 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (DPWH Building), Laoag City, Ilocos Norte",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597149",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Sandro Marcos"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-05182",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (DPWH Building), Laoag City, Ilocos Norte",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0932-016149",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (DPWH Building), Laoag City, Ilocos Norte",
        "hgabPesos": 10000000,
        "nepPage": "682",
        "hgabPage": "932",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Evacuation Center), Barangay Nueva Era, San Manuel, Isabela",
      "source_code": "2027DPWH-Proposal-34879",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (Evacuation Center), Brgy. Nueva Era, San Manuel, Isabela",
      "prior_amount": 7000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 548760",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nueva era · san manuel · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34879",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Evacuation Center), Barangay Nueva Era, San Manuel, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0706-011690",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Evacuation Center), Barangay Nueva Era, San Manuel, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "588",
        "hgabPage": "706",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar (12.447525, 124.313751)",
      "source_code": "2027DPWH-Proposal-02651",
      "office": "Northern Samar 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 25000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar",
      "prior_amount": 9000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420161",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Niko Raul Daza"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 12.447525,
        "longitude": 124.313751,
        "raw": "12.447525, 124.313751",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02651",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar (12.447525, 124.313751)",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0860-014793",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar (12.447525, 124.313751)",
        "hgabPesos": 25000000,
        "nepPage": "650",
        "hgabPage": "860",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar (12.447525, 124.313751)",
      "source_code": "2027DPWH-Proposal-02651",
      "office": "Northern Samar 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 25000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar",
      "prior_amount": 15000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532332",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Niko Raul Daza"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 12.447525,
        "longitude": 124.313751,
        "raw": "12.447525, 124.313751",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02651",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar (12.447525, 124.313751)",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0860-014793",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (New Municipal Building), Victoria, Northern Samar (12.447525, 124.313751)",
        "hgabPesos": 25000000,
        "nepPage": "650",
        "hgabPage": "860",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Operations Center), Barangay Poblacion, Municipality of Catarman, Province of Camiguin",
      "source_code": "2027DPWH-Proposal-39119",
      "office": "Camiguin District Engineering Office",
      "region": "Region X",
      "amount_2027": 7000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Operations Center), Barangay Poblacion, Catarman, Camiguin, 124.67487933332, 9.1231116667",
      "prior_amount": 15000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40403",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 9.1231116667,
        "longitude": 124.67487933332,
        "raw": "124.67487933332, 9.1231116667",
        "orientation": "longitude, latitude",
        "decimalPlaces": 10,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39119",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Operations Center), Barangay Poblacion, Municipality of Catarman, Province of Camiguin",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0876-015089",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Municipality of Catarman, Province of Camiguin",
        "hgabPesos": 7000000,
        "nepPage": "657",
        "hgabPage": "876",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (San Pablo City Hall), Barangay V-A, San Pablo City, Laguna",
      "source_code": "2027DPWH-Proposal-36174",
      "office": "Laguna 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-Purpose Building (San Pablo City Hall), Barangay V-A, San Pablo City, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599519",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Amben Amante"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "v-a · san pablo · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36174",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (San Pablo City Hall), Barangay V-A, San Pablo City, Laguna",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0774-013084",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (San Pablo City Hall), Barangay V- A, San Pablo City, Laguna",
        "hgabPesos": 6000000,
        "nepPage": "618",
        "hgabPage": "774",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building (Senior Citizen's Building), Barangay Gregoria De Jesus, Gen. Mariano Alvarez, Cavite",
      "source_code": "2027DPWH-Proposal-36529",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Senior Citizen's Building), Brgy. Gregoria De Jesus, Gen. Mariano Alvarez, Cavite",
      "prior_amount": 1500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300103200934000 · PDF p. 474 · printed p. 1939",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gregoria de jesus · gen. mariano alvarez · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36529",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building (Senior Citizen's Building), Barangay Gregoria De Jesus, Gen. Mariano Alvarez, Cavite",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0769-012972",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Senior Citizen's Building), Barangay Gregoria De Jesus, Gen. Mariano Alvarez, Cavite",
        "hgabPesos": 5000000,
        "nepPage": "615",
        "hgabPage": "769",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building Barangay Namaltugan, Sudipen, La Union",
      "source_code": "2027DPWH-Proposal-33541",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 9200000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Namaltugan, Sudipen, La Union",
      "prior_amount": 8000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597342",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "namaltugan · sudipen · la union",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33541",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building Barangay Namaltugan, Sudipen, La Union",
        "nepPesos": 9200000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0677-011104",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building Barangay Namaltugan, Sudipen, La Union",
        "hgabPesos": 9200000,
        "nepPage": "577",
        "hgabPage": "677",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building Barangay Pandan, Bacnotan, La Union",
      "source_code": "2027DPWH-Proposal-33542",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5750000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pandan, Bacnotan, La Union",
      "prior_amount": 6000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597336",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pandan · bacnotan · la union",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33542",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building Barangay Pandan, Bacnotan, La Union",
        "nepPesos": 5750000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0678-011128",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building Barangay Pandan, Bacnotan, La Union",
        "hgabPesos": 5750000,
        "nepPage": "577",
        "hgabPage": "678",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
      "source_code": "2027DPWH-Proposal-33543",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Construction / Improvement of Multi-Purpose Building, Poblacion, Santol, La Union",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544181",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33543",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0678-011129",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
        "hgabPesos": 30000000,
        "nepPage": "577",
        "hgabPage": "678",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
      "source_code": "2027DPWH-Proposal-33543",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597351",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · santol · la union",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33543",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0678-011129",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
        "hgabPesos": 30000000,
        "nepPage": "577",
        "hgabPage": "678",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
      "source_code": "2027DPWH-Proposal-33543",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 30000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. Poblacion, Santol, La Union",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104200563000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · santol · la union",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33543",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0678-011129",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building Barangay Poblacion, Santol, La Union",
        "hgabPesos": 30000000,
        "nepPage": "577",
        "hgabPage": "678",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building Barangay Rimos 5, Luna, La Union",
      "source_code": "2027DPWH-Proposal-33544",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 14950000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Rimos 5, Luna, La Union",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597321",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "rimos 5 · luna · la union",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33544",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building Barangay Rimos 5, Luna, La Union",
        "nepPesos": 14950000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0678-011130",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building Barangay Rimos 5, Luna, La Union",
        "hgabPesos": 14950000,
        "nepPage": "577",
        "hgabPage": "678",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building Facility, Barangay Poblacion Ilaya, San Enrique, Iloilo",
      "source_code": "2027DPWH-Proposal-37327",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 15500000,
      "comparison_year": 2017,
      "prior_project": "Improvement of Multi Purpose Building, Brgy. Poblacion Ilaya, San Enrique, Iloilo",
      "prior_amount": 3000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010312137",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion ilaya · san enrique · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37327",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building Facility, Barangay Poblacion Ilaya, San Enrique, Iloilo",
        "nepPesos": 15500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0818-013963",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building Facility, Barangay Poblacion Ilaya, San Enrique, Iloilo",
        "hgabPesos": 15500000,
        "nepPage": "638",
        "hgabPage": "818",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building Facility, Barangay Poblacion Ilaya, San Enrique, Iloilo",
      "source_code": "2027DPWH-Proposal-37327",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 15500000,
      "comparison_year": 2019,
      "prior_project": "Construction (Completion) of Multi-purpose Building, Brgy. Poblacion Ilaya, San Enrique, Iloilo",
      "prior_amount": 6000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104209587000 · PDF p. 805 · printed p. 2270",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion ilaya · san enrique · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37327",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building Facility, Barangay Poblacion Ilaya, San Enrique, Iloilo",
        "nepPesos": 15500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0818-013963",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building Facility, Barangay Poblacion Ilaya, San Enrique, Iloilo",
        "hgabPesos": 15500000,
        "nepPage": "638",
        "hgabPage": "818",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36763",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Bagong Silang, San Pedro, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417471",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36763",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0771-013028",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
        "hgabPesos": 10000000,
        "nepPage": "617",
        "hgabPage": "771",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36763",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi Purpose Building, Brgy. Bagong Silang, San Pedro City, Laguna",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545679",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36763",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0771-013028",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
        "hgabPesos": 10000000,
        "nepPage": "617",
        "hgabPage": "771",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36763",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction/Completion of Multi-Purpose Building at Barangay Bagong Silang, San Pedro City, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599453",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36763",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0771-013028",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Bagong Silang, San Pedro City, Laguna",
        "hgabPesos": 10000000,
        "nepPage": "617",
        "hgabPage": "771",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Fugu, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35071",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Fugu, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597799",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "fugu · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35071",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Fugu, Gattaran, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0700-011569",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Fugu, Gattaran, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "585",
        "hgabPage": "700",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Ganzano, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35055",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building at Brgy. Ganzano, Gattaran, Cagayan",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544452",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ganzano · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35055",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Ganzano, Gattaran, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0700-011570",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Ganzano, Gattaran, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "585",
        "hgabPage": "700",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Maasin, Bulalacao Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37064",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Maasin, Bulalacao, Oriental Mindoro",
      "prior_amount": 4000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417962",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37064",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Maasin, Bulalacao Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0794-013480",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Maasin, Bulalacao Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "628",
        "hgabPage": "794",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Mahabang Lalim, General Nakar, Quezon",
      "source_code": "2027DPWH-Proposal-36345",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mahabang Lalim, General Nakar, Quezon",
      "prior_amount": 4000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413723",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mahabang lalim · general nakar · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36345",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Mahabang Lalim, General Nakar, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Manresa, Quezon City",
      "source_code": "2027DPWH-Proposal-34083",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 72000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Manresa, Quezon City",
      "prior_amount": 10000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466054",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "manresa · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34083",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Manresa, Quezon City",
        "nepPesos": 72000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0631-010258",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Manresa, Quezon City",
        "hgabPesos": 72000000,
        "nepPage": "560",
        "hgabPage": "631",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Manresa, Quezon City",
      "source_code": "2027DPWH-Proposal-34083",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 72000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Manresa, Quezon City",
      "prior_amount": 8300000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413047",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "manresa · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34083",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Manresa, Quezon City",
        "nepPesos": 72000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0631-010258",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Manresa, Quezon City",
        "hgabPesos": 72000000,
        "nepPage": "560",
        "hgabPage": "631",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Palaka, Municipality of Valladolid, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37438",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Palaka, Valladolid, Negros Occidental",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419085",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "palaka · valladolid · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37438",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Palaka, Municipality of Valladolid, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0835-014298",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Palaka, Municipality of Valladolid, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "643",
        "hgabPage": "835",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Palaka, Municipality of Valladolid, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37438",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Palaka, Valladolid, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600898",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "palaka · valladolid · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37438",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Palaka, Municipality of Valladolid, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0835-014298",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Palaka, Municipality of Valladolid, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "643",
        "hgabPage": "835",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion 1, Santa Maria, Isabela, 17.467914, 121.752852",
      "source_code": "2027DPWH-Proposal-35241",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion 1, Santa Maria, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544540",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Tonypet Albano"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 17.467914,
        "longitude": 121.752852,
        "raw": "17.467914, 121.752852",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion 1 · santa maria · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35241",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion 1, Santa Maria, Isabela, 17.467914, 121.752852",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0705-011671",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion 1, Santa Maria, Isabela, 17.467914, 121.752852",
        "hgabPesos": 10000000,
        "nepPage": "588",
        "hgabPage": "705",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37066",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Poblacion, Bulalacao, Oriental Mindoro",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483062",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37066",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0794-013481",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "628",
        "hgabPage": "794",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37066",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Improvement) of Multi-Purpose Building at Barangay Poblacion, Bulalacao, Oriental Mindoro",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417948",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37066",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0794-013481",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "628",
        "hgabPage": "794",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37066",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Poblacion, Bulalacao, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531248",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37066",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0794-013481",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bulalacao Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "628",
        "hgabPage": "794",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Laoac, Pangasinan",
      "source_code": "2027DPWH-Proposal-34292",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction / Improvement of Multi-Purpose Building, Barangay Poblacion, Laoac, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544285",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · laoac · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34292",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Laoac, Pangasinan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0632-010281",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Laoac, Pangasinan",
        "hgabPesos": 15000000,
        "nepPage": "561",
        "hgabPage": "632",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay San Gabriel, San Pablo City, Laguna",
      "source_code": "2027DPWH-Proposal-36625",
      "office": "Laguna 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San Gabriel, San Pablo City, Laguna",
      "prior_amount": 12000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482695",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Amben Amante"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san gabriel · san pablo · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36625",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay San Gabriel, San Pablo City, Laguna",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0775-013101",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay San Gabriel, San Pablo City, Laguna",
        "hgabPesos": 50000000,
        "nepPage": "618",
        "hgabPage": "775",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Tagumay, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35066",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tagumay, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529793",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tagumay · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35066",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Tagumay, Gattaran, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0700-011573",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Tagumay, Gattaran, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "585",
        "hgabPage": "700",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building in Barangay 1, Hinoba-an, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37602",
      "office": "Negros Occidental 3rd District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 1, Hinoba-an, Negros Occidental (9.60040,122.46686)",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37934",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mercedes Alvarez-Lansang"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 9.6004,
        "longitude": 122.46686,
        "raw": "9.60040,122.46686",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · hinoba-an · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37602",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building in Barangay 1, Hinoba-an, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building including Support Facilities, DPWH Davao del Norte 2nd DEO, Carmen, Davao del Norte",
      "source_code": "2027DPWH-Proposal-21359",
      "office": "Davao del Norte 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 150000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building including Support Facilities, DPWH Davao del Norte 2nd DEO, Carmen, Davao del Norte",
      "prior_amount": 150000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 520365",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21359",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building including Support Facilities, DPWH Davao del Norte 2nd DEO, Carmen, Davao del Norte",
        "nepPesos": 150000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0928-016051",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building including Support Facilities, DPWH Davao del Norte 2nd DEO, Carmen, Davao del Norte",
        "hgabPesos": 150000000,
        "nepPage": "678",
        "hgabPage": "928",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building of Barangay Santor, Reina Mercedes, Isabela",
      "source_code": "2027DPWH-Proposal-35401",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Santor, Reina Mercedes, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481534",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "santor · reina mercedes · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35401",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building of Barangay Santor, Reina Mercedes, Isabela",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0709-011751",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building of Barangay Santor, Reina Mercedes, Isabela",
        "hgabPesos": 6000000,
        "nepPage": "590",
        "hgabPage": "709",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, (Motorpool), Bulacan 2nd District Engineering Office, Santa Maria, Bulacan (120.99926, 14.885576)",
      "source_code": "2027DPWH-Proposal-10599",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 12000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, (Motorpool), Bulacan 2nd District Engineering Office, Santa Maria, Bulacan",
      "prior_amount": 35000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 520524",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.885576,
        "longitude": 120.99926,
        "raw": "120.99926, 14.885576",
        "orientation": "longitude, latitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10599",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, (Motorpool), Bulacan 2nd District Engineering Office, Santa Maria, Bulacan (120.99926, 14.885576)",
        "nepPesos": 12000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0934-016178",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, (Motorpool), Bulacan 2nd District Engineering Office, Santa Maria, Bulacan (120.999525, 14.886337)",
        "hgabPesos": 12000000,
        "nepPage": "683",
        "hgabPage": "934",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Hinoba-an, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37347",
      "office": "Negros Occidental 3rd District Engineering Office",
      "region": "NIR",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 1, Hinoba-an, Negros Occidental (9.60040,122.46686)",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37934",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mercedes Alvarez-Lansang"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 9.6004,
        "longitude": 122.46686,
        "raw": "9.60040,122.46686",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · hinoba-an · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37347",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Hinoba-an, Negros Occidental",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0834-014274",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Hinoba-an, Negros Occidental",
        "hgabPesos": 36000000,
        "nepPage": "643",
        "hgabPage": "834",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Ilog, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37349",
      "office": "Negros Occidental 3rd District Engineering Office",
      "region": "NIR",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 1, Ilog, Negros Occidental",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546797",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · ilog · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37349",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Ilog, Negros Occidental",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0834-014275",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Ilog, Negros Occidental",
        "hgabPesos": 30000000,
        "nepPage": "643",
        "hgabPage": "834",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Ilog, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37349",
      "office": "Negros Occidental 3rd District Engineering Office",
      "region": "NIR",
      "amount_2027": 30000000,
      "comparison_year": 2019,
      "prior_project": "Completion/Rehabilitation of Multi-Purpose Building, Brgy. 1, Ilog, Negros Occidental",
      "prior_amount": 500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104209983000 · PDF p. 833 · printed p. 2298",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · ilog · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37349",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Ilog, Negros Occidental",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0834-014275",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay 1, Ilog, Negros Occidental",
        "hgabPesos": 30000000,
        "nepPage": "643",
        "hgabPage": "834",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Abagao, Camalaniugan, Cagayan",
      "source_code": "2027DPWH-Proposal-35381",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Abagao, Camalaniugan, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597794",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "abagao · camalaniugan · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35381",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Abagao, Camalaniugan, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0700-011576",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Abagao, Camalaniugan, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "585",
        "hgabPage": "700",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Alibunan, Calinog, Iloilo",
      "source_code": "2027DPWH-Proposal-37121",
      "office": "Iloilo 6th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building of Barangay Alibunan, Calinog, Iloilo",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 418763",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alibunan · calinog · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37121",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Alibunan, Calinog, Iloilo",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0826-014123",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Alibunan, Calinog, Iloilo",
        "hgabPesos": 10000000,
        "nepPage": "640",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Aplaya, Bauan, Batangas",
      "source_code": "2027DPWH-Proposal-09601",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Aplaya, Bauan, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530436",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "aplaya · bauan · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09601",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Aplaya, Bauan, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0751-012608",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Kumintang Ibaba, Batangas City",
        "hgabPesos": 20000000,
        "nepPage": "609",
        "hgabPage": "751",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Asinga-Via, Baggao, Cagayan",
      "source_code": "2027DPWH-Proposal-35388",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Asinga Via, Baggao, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597778",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35388",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Asinga-Via, Baggao, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0700-011577",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Asinga-Via, Baggao, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "585",
        "hgabPage": "700",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Baculod, Alcala, Cagayan",
      "source_code": "2027DPWH-Proposal-35382",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Baculod, Alcala, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597783",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Ramon Nolasco"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baculod · alcala · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35382",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baculod, Alcala, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0700-011578",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baculod, Alcala, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "585",
        "hgabPage": "700",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Bagongon, Compostela, Davao de Oro",
      "source_code": "2027DPWH-Proposal-38494",
      "office": "Davao de Oro 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 7000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Bagongon, Compostela, Davao de Oro",
      "prior_amount": 2500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 421280",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maricar Zamora"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bagongon · compostela · davao de oro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38494",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bagongon, Compostela, Davao de Oro",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0889-015336",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bagongon, Compostela, Davao de Oro",
        "hgabPesos": 7000000,
        "nepPage": "664",
        "hgabPage": "889",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Baguio, Tayabas City, Quezon",
      "source_code": "2027DPWH-Proposal-36700",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 8000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Baguio, Tayabas City, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599581",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baguio · tayabas · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36700",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baguio, Tayabas City, Quezon",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0777-013138",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baguio, Tayabas City, Quezon",
        "hgabPesos": 8000000,
        "nepPage": "619",
        "hgabPage": "777",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
      "source_code": "2027DPWH-Proposal-34883",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415927",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ballesteros · aurora · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34883",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0706-011692",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
        "hgabPesos": 6000000,
        "nepPage": "589",
        "hgabPage": "706",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
      "source_code": "2027DPWH-Proposal-34883",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597934",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ballesteros · aurora · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34883",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0706-011692",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Ballesteros, Aurora, Isabela",
        "hgabPesos": 6000000,
        "nepPage": "589",
        "hgabPage": "706",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Bangatan, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35168",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Bangatan, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597797",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bangatan · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35168",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bangatan, Gattaran, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0700-011579",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bangatan, Gattaran, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "585",
        "hgabPage": "700",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "source_code": "2027DPWH-Proposal-33633",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 75000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City",
      "prior_amount": 20000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413658",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33633",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
        "nepPesos": 75000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010356",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
        "hgabPesos": 75000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "source_code": "2027DPWH-Proposal-33633",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 75000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "prior_amount": 30000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525464",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baras-baras · tarlac · tarlac",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33633",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
        "nepPesos": 75000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010356",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
        "hgabPesos": 75000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "source_code": "2027DPWH-Proposal-33633",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 75000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "prior_amount": 2500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545188",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baras-baras · tarlac · tarlac",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33633",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
        "nepPesos": 75000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010356",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
        "hgabPesos": 75000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "source_code": "2027DPWH-Proposal-33633",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 75000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Multi Purpose Building in Brgy. Baras Baras, Tarlac City",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 565695",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33633",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
        "nepPesos": 75000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010356",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
        "hgabPesos": 75000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "source_code": "2027DPWH-Proposal-33633",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 75000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595942",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baras-baras · tarlac · tarlac",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33633",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
        "nepPesos": 75000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010356",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
        "hgabPesos": 75000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
      "source_code": "2027DPWH-Proposal-33633",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 75000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Baras-Baras, City of Tarlac, Tarlac (15.518348, 120.565008)",
      "prior_amount": 7000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34213",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.518348,
        "longitude": 120.565008,
        "raw": "15.518348, 120.565008",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baras-baras · tarlac · tarlac",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33633",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
        "nepPesos": 75000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010356",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Baras-Baras, Tarlac City, Tarlac",
        "hgabPesos": 75000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Barbarit, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35150",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Barbarit, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597815",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "barbarit · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35150",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Barbarit, Gattaran, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0701-011580",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Barbarit, Gattaran, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "585",
        "hgabPage": "701",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Basac, Larena, Siquijor",
      "source_code": "2027DPWH-Proposal-37622",
      "office": "Siquijor District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Basac, Larena, Siquijor",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104203792000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "basac · larena · siquijor",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37622",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Basac, Larena, Siquijor",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0841-014395",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Basac, Larena, Siquijor",
        "hgabPesos": 5000000,
        "nepPage": "645",
        "hgabPage": "841",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Batangan, Gonzaga, Cagayan",
      "source_code": "2027DPWH-Proposal-35023",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Batangan, Gonzaga, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544467",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "batangan · gonzaga · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35023",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Batangan, Gonzaga, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0701-011581",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Batangan, Gonzaga, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "585",
        "hgabPage": "701",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Batong Dalig, Kawit, Cavite",
      "source_code": "2027DPWH-Proposal-36170",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Batong Dalig, Kawit, Cavite",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417306",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "batong dalig · kawit · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36170",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Batong Dalig, Kawit, Cavite",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0762-012839",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Batong Dalig, Kawit, Cavite",
        "hgabPesos": 20000000,
        "nepPage": "613",
        "hgabPage": "762",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Batong Dalig, Kawit, Cavite",
      "source_code": "2027DPWH-Proposal-36170",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building in Brgy. Batong Dalig, Kawit, Cavite",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35353",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "batong dalig · kawit · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36170",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Batong Dalig, Kawit, Cavite",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0762-012839",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Batong Dalig, Kawit, Cavite",
        "hgabPesos": 20000000,
        "nepPage": "613",
        "hgabPage": "762",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Bisag, Palanan, Isabela",
      "source_code": "2027DPWH-Proposal-34960",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5500000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Bisag, Palanan, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598027",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bisag · palanan · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34960",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bisag, Palanan, Isabela",
        "nepPesos": 5500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0711-011804",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bisag, Palanan, Isabela",
        "hgabPesos": 5500000,
        "nepPage": "590",
        "hgabPage": "711",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
      "source_code": "2027DPWH-Proposal-34963",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529904",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bitabian · san mariano · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34963",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0711-011805",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "590",
        "hgabPage": "711",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
      "source_code": "2027DPWH-Proposal-34963",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598008",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bitabian · san mariano · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34963",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0711-011805",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bitabian, San Mariano, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "590",
        "hgabPage": "711",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38598",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602496",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "biwang · bagumbayan · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38598",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0911-015761",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
        "hgabPesos": 5000000,
        "nepPage": "670",
        "hgabPage": "911",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Buasao, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35868",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Buasao, Sto. Domingo, Nueva Ecija",
      "prior_amount": 3500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544975",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35868",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Buasao, Sto. Domingo, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0737-012326",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Buasao, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "600",
        "hgabPage": "737",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Buenaflor Embarkadero, Dumangas, Iloilo, 10.819806, 122.712086",
      "source_code": "2027DPWH-Proposal-37262",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 11000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Buenaflor-Embarkadero, Dumangas, Iloilo",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600576",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 10.819806,
        "longitude": 122.712086,
        "raw": "10.819806, 122.712086",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37262",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Buenaflor Embarkadero, Dumangas, Iloilo, 10.819806, 122.712086",
        "nepPesos": 11000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0820-013987",
        "hgabTitle": "Construction (Completion) of 2 units Multi-Purpose Building, Barangay Buenaflor Embarkadero, Dumangas, Iloilo, 10.819806, 122.712086",
        "hgabPesos": 40000000,
        "nepPage": "638",
        "hgabPage": "820",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Buenaflor Embarkadero, Dumangas, Iloilo, 10.819806, 122.712086",
      "source_code": "2027DPWH-Proposal-37262",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 11000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation (Completion) of Multi-Purpose Building, Barangay Buenaflor Embarkadero, Dumangas, Iloilo, 10.819624, 122.711925",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37401",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 26.8,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 10.819806,
        "longitude": 122.712086,
        "raw": "10.819806, 122.712086",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 10.819624,
        "longitude": 122.711925,
        "raw": "10.819624, 122.711925",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buenaflor embarkadero · dumangas · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37262",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Buenaflor Embarkadero, Dumangas, Iloilo, 10.819806, 122.712086",
        "nepPesos": 11000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0820-013987",
        "hgabTitle": "Construction (Completion) of 2 units Multi-Purpose Building, Barangay Buenaflor Embarkadero, Dumangas, Iloilo, 10.819806, 122.712086",
        "hgabPesos": 40000000,
        "nepPage": "638",
        "hgabPage": "820",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Bulac, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36043",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Bulac, Talavera, Nueva Ecija",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481802",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36043",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bulac, Talavera, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0737-012327",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bulac, Talavera, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "600",
        "hgabPage": "737",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Cabal-asan, Maria, Siquijor",
      "source_code": "2027DPWH-Proposal-37620",
      "office": "Siquijor District Engineering Office",
      "region": "NIR",
      "amount_2027": 5500000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Cabal-asan, Maria, Siquijor",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484369",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cabal-asan · maria · siquijor",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37620",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Cabal-asan, Maria, Siquijor",
        "nepPesos": 5500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0841-014410",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Cabal-asan, Maria, Siquijor",
        "hgabPesos": 5500000,
        "nepPage": "645",
        "hgabPage": "841",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Cabugao, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36048",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi Purpose Building, Barangay Cabugao, Sto. Domingo, Nueva Ecija, 15.580838, 120.873065",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33915",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.580838,
        "longitude": 120.873065,
        "raw": "15.580838, 120.873065",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36048",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Cabugao, Sto. Domingo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0737-012328",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Cabugao, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "601",
        "hgabPage": "737",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Calatagan Proper, Virac, Catanduanes",
      "source_code": "2027DPWH-Proposal-39542",
      "office": "Catanduanes District Engineering Office",
      "region": "Region V",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Completion of Multi-Purpose Building, Barangay Calatagan Proper, Virac, Catanduanes",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596127",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Eulogio Rodriguez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "calatagan proper · virac · catanduanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39542",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Calatagan Proper, Virac, Catanduanes",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0804-013677",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Calatagan Proper, Virac, Catanduanes",
        "hgabPesos": 5000000,
        "nepPage": "633",
        "hgabPage": "804",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Capissayan Sur, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35018",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building at Brgy. Capissayan Sur, Gattaran, Cagayan",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544457",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "capissayan sur · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35018",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Capissayan Sur, Gattaran, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0701-011584",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Capissayan Sur, Gattaran, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "585",
        "hgabPage": "701",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Capuling, Dueñas, Iloilo ,11.059806 ,122.617673",
      "source_code": "2027DPWH-Proposal-37269",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Capuling, Dueñas, Iloilo",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600569",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 11.059806,
        "longitude": 122.617673,
        "raw": "11.059806 ,122.617673",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "capuling · duenas · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37269",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Capuling, Dueñas, Iloilo ,11.059806 ,122.617673",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0820-013989",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Capuling, Dueñas, Iloilo ,11.059806 ,122.617673",
        "hgabPesos": 10000000,
        "nepPage": "638",
        "hgabPage": "820",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Cardinal, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36038",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Cardinal, Guimba, Nueva Ecija, 15.603977, 120.782105",
      "prior_amount": 3500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33867",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.603977,
        "longitude": 120.782105,
        "raw": "15.603977, 120.782105",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cardinal · guimba · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36038",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Cardinal, Guimba, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Cardinal, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36038",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Cardinal, Guimba, Nueva Ecija",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104207401000 · PDF p. 652 · printed p. 2117",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cardinal · guimba · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36038",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Cardinal, Guimba, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Centro East (Poblacion), Palanan, Isabela",
      "source_code": "2027DPWH-Proposal-34962",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Centro East (Poblacion), Palanan, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598028",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "centro east · palanan · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34962",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Centro East (Poblacion), Palanan, Isabela",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0711-011808",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Centro East (Poblacion), Palanan, Isabela",
        "hgabPesos": 6000000,
        "nepPage": "590",
        "hgabPage": "711",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela",
      "source_code": "2027DPWH-Proposal-34874",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela",
      "prior_amount": 17000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597914",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cullalabo del sur · burgos · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34874",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0707-011713",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Building 1, Barangay Cullalabo del Sur, Burgos, Isabela",
        "hgabPesos": 20000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela",
      "source_code": "2027DPWH-Proposal-34874",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela, 17.099294, 121.698193 ",
      "prior_amount": 40000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32873",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 17.099294,
        "longitude": 121.698193,
        "raw": "17.099294, 121.698193",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cullalabo del sur · burgos · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34874",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0707-011713",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Building 1, Barangay Cullalabo del Sur, Burgos, Isabela",
        "hgabPesos": 20000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Dampol, Pulilan, Bulacan",
      "source_code": "2027DPWH-Proposal-33637",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 35000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Dampol, Pulilan, Bulacan",
      "prior_amount": 1500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201191000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33637",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Dampol, Pulilan, Bulacan",
        "nepPesos": 35000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38584",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
      "prior_amount": 2500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 422052",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "datu karon · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38584",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0912-015771",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
        "hgabPesos": 6000000,
        "nepPage": "671",
        "hgabPage": "912",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38584",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602528",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "datu karon · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38584",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0912-015771",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Datu Karon, Lebak, Sultan Kudarat",
        "hgabPesos": 6000000,
        "nepPage": "671",
        "hgabPage": "912",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Disulap, San Mariano, Isabela",
      "source_code": "2027DPWH-Proposal-34964",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Disulap, San Mariano, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104200941000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "disulap · san mariano · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34964",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Disulap, San Mariano, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0711-011810",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Disulap, San Mariano, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "590",
        "hgabPage": "711",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Eguia, Dasol, Pangasinan",
      "source_code": "2027DPWH-Proposal-34156",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Eguia, Dasol, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597403",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "eguia · dasol · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34156",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Eguia, Dasol, Pangasinan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0679-011162",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Eguia, Dasol, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "578",
        "hgabPage": "679",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Faigal, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35859",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Faigal, Guimba, Nueva Ecija",
      "prior_amount": 8000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530145",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "faigal · guimba · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35859",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Faigal, Guimba, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0737-012332",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Faigal, Guimba, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "601",
        "hgabPage": "737",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Germinal, Bolinao, Pangasinan",
      "source_code": "2027DPWH-Proposal-34177",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 50000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Germinal, Bolinao, Pangasinan (16.388052, 119.893274)",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32008",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.388052,
        "longitude": 119.893274,
        "raw": "16.388052, 119.893274",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "germinal · bolinao · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34177",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Germinal, Bolinao, Pangasinan",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0679-011163",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Germinal, Bolinao, Pangasinan",
        "hgabPesos": 50000000,
        "nepPage": "578",
        "hgabPage": "679",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Gonogon, Bontoc, Mountain Province",
      "source_code": "2027DPWH-Proposal-34759",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Gonogon, Bontoc, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597720",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maximo Dalog Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gonogon · bontoc · mountain province",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34759",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Gonogon, Bontoc, Mountain Province",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0695-011480",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Gonogon, Bontoc, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "583",
        "hgabPage": "695",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Jurisdiccion, Alcala, Cagayan",
      "source_code": "2027DPWH-Proposal-35046",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Jurisdiccion, Alcala, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597803",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Ramon Nolasco"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "jurisdiccion · alcala · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35046",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Jurisdiccion, Alcala, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0701-011587",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Jurisdiccion, Alcala, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "585",
        "hgabPage": "701",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Kalangay, Lucban, Quezon",
      "source_code": "2027DPWH-Proposal-36692",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 8000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Kalangay, Lucban, Quezon (14.156733°, 121.552353°)",
      "prior_amount": 3500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35735",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.156733,
        "longitude": 121.552353,
        "raw": "14.156733°, 121.552353",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kalangay · lucban · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36692",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Kalangay, Lucban, Quezon",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0777-013141",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Kalangay, Lucban, Quezon",
        "hgabPesos": 8000000,
        "nepPage": "619",
        "hgabPage": "777",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Keytodac, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38579",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Keytodac, Lebak, Sultan Kudarat",
      "prior_amount": 700000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485802",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "keytodac · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38579",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Keytodac, Lebak, Sultan Kudarat",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0912-015772",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Keytodac, Lebak, Sultan Kudarat",
        "hgabPesos": 7000000,
        "nepPage": "671",
        "hgabPage": "912",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Keytodac, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38579",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Keytodac, Lebak, Sultan Kudarat",
      "prior_amount": 1750000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104212959000 · PDF p. 1047 · printed p. 2512",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "keytodac · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38579",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Keytodac, Lebak, Sultan Kudarat",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0912-015772",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Keytodac, Lebak, Sultan Kudarat",
        "hgabPesos": 7000000,
        "nepPage": "671",
        "hgabPage": "912",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37790",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 70000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Labangon, Cebu City",
      "prior_amount": 50000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484292",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37790",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
        "nepPesos": 70000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0646-010510",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
        "hgabPesos": 70000000,
        "nepPage": "569",
        "hgabPage": "646",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37790",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 70000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Labangon, Cebu City",
      "prior_amount": 42500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 414646",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37790",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
        "nepPesos": 70000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0646-010510",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
        "hgabPesos": 70000000,
        "nepPage": "569",
        "hgabPage": "646",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37790",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 70000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 547105",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "labangon · cebu · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37790",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
        "nepPesos": 70000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0646-010510",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
        "hgabPesos": 70000000,
        "nepPage": "569",
        "hgabPage": "646",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37790",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 70000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 601187",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "labangon · cebu · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37790",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
        "nepPesos": 70000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0646-010510",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Labangon, Cebu City, Cebu",
        "hgabPesos": 70000000,
        "nepPage": "569",
        "hgabPage": "646",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Lipata, Panukulan, Quezon",
      "source_code": "2027DPWH-Proposal-36695",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 8000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Lipata, Panukulan, Quezon",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545735",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lipata · panukulan · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36695",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Lipata, Panukulan, Quezon",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0777-013142",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Lipata, Panukulan, Quezon",
        "hgabPesos": 8000000,
        "nepPage": "619",
        "hgabPage": "777",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "source_code": "2027DPWH-Proposal-34878",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415939",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "luna · quirino · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34878",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0707-011714",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "source_code": "2027DPWH-Proposal-34878",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Luna, Quirino, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597918",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "luna · quirino · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34878",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0707-011714",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Mabanguc, Aparri, Cagayan",
      "source_code": "2027DPWH-Proposal-35384",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mabanguc, Aparri, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597805",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mabanguc · aparri · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35384",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Mabanguc, Aparri, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0701-011589",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mabanguc, Aparri, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "585",
        "hgabPage": "701",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Mabini, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37489",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mabini, Cadiz City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600829",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mabini · cadiz · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37489",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Mabini, Cadiz City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0832-014232",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Mabini, Cadiz City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "642",
        "hgabPage": "832",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Macamias, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35845",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Macamias, Guimba, Nueva Ecija",
      "prior_amount": 4000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598607",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "macamias · guimba · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35845",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Macamias, Guimba, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0737-012333",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Macamias, Guimba, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "601",
        "hgabPage": "737",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Macamias, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35845",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi Purpose Building, Barangay Macamias, Guimba, Nueva Ecija, 15.62991, 120.705729",
      "prior_amount": 3500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33797",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.62991,
        "longitude": 120.705729,
        "raw": "15.62991, 120.705729",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "macamias · guimba · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35845",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Macamias, Guimba, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0737-012333",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Macamias, Guimba, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "601",
        "hgabPage": "737",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Maeling, Nampicuan, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35856",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Maeling, Nampicuan, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530168",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "maeling · nampicuan · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35856",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Maeling, Nampicuan, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0737-012334",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Maeling, Nampicuan, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "601",
        "hgabPage": "737",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna",
      "source_code": "2027DPWH-Proposal-09806",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna",
      "prior_amount": 17000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599430",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malaban · binan · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09806",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0772-013048",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna",
        "hgabPesos": 5000000,
        "nepPage": "617",
        "hgabPage": "772",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna",
      "source_code": "2027DPWH-Proposal-09806",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna (14.354068°, 121.086786°)",
      "prior_amount": 80000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30396",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.354068,
        "longitude": 121.086786,
        "raw": "14.354068°, 121.086786",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malaban · binan · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09806",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0772-013048",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Malaban, Biñan City, Laguna",
        "hgabPesos": 5000000,
        "nepPage": "617",
        "hgabPage": "772",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Mangandingay, Angadanan, Isabela",
      "source_code": "2027DPWH-Proposal-34922",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Mangandingay, Angadanan, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481540",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34922",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Mangandingay, Angadanan, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0712-011813",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Mangandingay, Angadanan, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "591",
        "hgabPage": "712",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Manggahan, Pasig City 14.597582,121.102681",
      "source_code": "2027DPWH-Proposal-31412",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 70000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Manggahan, Pasig City",
      "prior_amount": 15000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543884",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.597582,
        "longitude": 121.102681,
        "raw": "14.597582,121.102681",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31412",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Manggahan, Pasig City 14.597582,121.102681",
        "nepPesos": 70000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0631-010259",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Manggahan, Pasig City 14.597582,121.102681",
        "hgabPesos": 70000000,
        "nepPage": "560",
        "hgabPage": "631",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Marikit, Palanan, Isabela",
      "source_code": "2027DPWH-Proposal-34961",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Marikit, Palanan, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598024",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "marikit · palanan · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34961",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Marikit, Palanan, Isabela",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0712-011814",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Marikit, Palanan, Isabela",
        "hgabPesos": 6000000,
        "nepPage": "591",
        "hgabPage": "712",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Mat-I, Las Nieves, Agusan del Norte",
      "source_code": "2027DPWH-Proposal-38798",
      "office": "Agusan del Norte District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Brgy. Mat-I, Las Nieves, Agusan del Norte",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602599",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mat-i · las nieves · agusan del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38798",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Mat-I, Las Nieves, Agusan del Norte",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0915-015827",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Mat-I, Las Nieves, Agusan del Norte",
        "hgabPesos": 7000000,
        "nepPage": "671",
        "hgabPage": "915",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Maycaban, Cuyapo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35841",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Maycaban, Cuyapo, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530169",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "maycaban · cuyapo · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35841",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Maycaban, Cuyapo, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0737-012337",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Maycaban, Cuyapo, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "601",
        "hgabPage": "737",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Olango, Mallig, Isabela",
      "source_code": "2027DPWH-Proposal-35236",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction (Completion) of Multi-purpose Building, Brgy. Olango, Mallig, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481481",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "olango · mallig · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35236",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Olango, Mallig, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0707-011716",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Olango, Mallig, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35019",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529792",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "palagao sur · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35019",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0701-011592",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "586",
        "hgabPage": "701",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35019",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597813",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "palagao sur · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35019",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0701-011592",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Palagao Sur, Gattaran, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "586",
        "hgabPage": "701",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Piggatan, Alcala, Cagayan",
      "source_code": "2027DPWH-Proposal-35021",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Piggatan, Alcala, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597790",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Ramon Nolasco"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "piggatan · alcala · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35021",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Piggatan, Alcala, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0701-011593",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Piggatan, Alcala, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "586",
        "hgabPage": "701",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Licab, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35849",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Licab, Nueva Ecija",
      "prior_amount": 6000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33793",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion norte · licab · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35849",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Licab, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0738-012339",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Licab, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "601",
        "hgabPage": "738",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Licab, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35849",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion Norte, Licab, Nueva Ecija",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104207413000 · PDF p. 653 · printed p. 2118",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion norte · licab · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35849",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Licab, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0738-012339",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Licab, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "601",
        "hgabPage": "738",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Maria, Siquijor",
      "source_code": "2027DPWH-Proposal-37625",
      "office": "Siquijor District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion Norte, Maria, Siquijor",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419989",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion norte · maria · siquijor",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37625",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Maria, Siquijor",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0842-014415",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Maria, Siquijor",
        "hgabPesos": 5000000,
        "nepPage": "645",
        "hgabPage": "842",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Municipality of Mayantoc, Province of Tarlac",
      "source_code": "2027DPWH-Proposal-35560",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion Norte, Mayantoc, Tarlac (15.620404, 120.377428)",
      "prior_amount": 18000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34223",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.620404,
        "longitude": 120.377428,
        "raw": "15.620404, 120.377428",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35560",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Municipality of Mayantoc, Province of Tarlac",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0744-012477",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Norte, Municipality of Mayantoc, Province of Tarlac",
        "hgabPesos": 30000000,
        "nepPage": "604",
        "hgabPage": "744",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Agno, Pangasinan",
      "source_code": "2027DPWH-Proposal-34178",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-purpose Building, Barangay Poblacion, Agno, Pangasinan (16.116157, 119.799239)",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32010",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.116157,
        "longitude": 119.799239,
        "raw": "16.116157, 119.799239",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · agno · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34178",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Agno, Pangasinan",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0680-011177",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Agno, Pangasinan",
        "hgabPesos": 20000000,
        "nepPage": "578",
        "hgabPage": "680",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Agno, Pangasinan",
      "source_code": "2027DPWH-Proposal-34178",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Poblacion, Agno, Pangasinan",
      "prior_amount": 3500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104200622000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · agno · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34178",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Agno, Pangasinan",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0680-011177",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Agno, Pangasinan",
        "hgabPesos": 20000000,
        "nepPage": "578",
        "hgabPage": "680",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Anilao, Iloilo",
      "source_code": "2027DPWH-Proposal-37266",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 30000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Poblacion, Anilao, Iloilo",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483566",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · anilao · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37266",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Anilao, Iloilo",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0820-013990",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Anilao, Iloilo",
        "hgabPesos": 30000000,
        "nepPage": "638",
        "hgabPage": "820",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Banate, Iloilo, 11.002222,122.821944",
      "source_code": "2027DPWH-Proposal-37267",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy, Poblacion, Banate, Iloilo",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600581",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 11.002222,
        "longitude": 122.821944,
        "raw": "11.002222,122.821944",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37267",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Banate, Iloilo, 11.002222,122.821944",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0820-013991",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Banate, Iloilo, 11.002222,122.821944",
        "hgabPesos": 10000000,
        "nepPage": "638",
        "hgabPage": "820",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
      "source_code": "2027DPWH-Proposal-38495",
      "office": "Davao de Oro 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 8000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
      "prior_amount": 6000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532858",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maricar Zamora"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · compostela · davao de oro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38495",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0889-015337",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
        "hgabPesos": 8000000,
        "nepPage": "664",
        "hgabPage": "889",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
      "source_code": "2027DPWH-Proposal-38495",
      "office": "Davao de Oro 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 8000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40882",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maricar Zamora"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · compostela · davao de oro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38495",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0889-015337",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Compostela, Davao de Oro",
        "hgabPesos": 8000000,
        "nepPage": "664",
        "hgabPage": "889",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
      "source_code": "2027DPWH-Proposal-34176",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597404",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · dasol · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34176",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0680-011178",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
        "hgabPesos": 20000000,
        "nepPage": "578",
        "hgabPage": "680",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
      "source_code": "2027DPWH-Proposal-34176",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan (15.990590, 119.880249)",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.99059,
        "longitude": 119.880249,
        "raw": "15.990590, 119.880249",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · dasol · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34176",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0680-011178",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
        "hgabPesos": 20000000,
        "nepPage": "578",
        "hgabPage": "680",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
      "source_code": "2027DPWH-Proposal-34176",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Poblacion, Dasol, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104200624000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · dasol · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34176",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0680-011178",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
        "hgabPesos": 20000000,
        "nepPage": "578",
        "hgabPage": "680",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
      "source_code": "2027DPWH-Proposal-34176",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Poblacion, Dasol, Pangasinan",
      "prior_amount": 3500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104200624000 · PDF p. 522 · printed p. 1987",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · dasol · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34176",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0680-011178",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Dasol, Pangasinan",
        "hgabPesos": 20000000,
        "nepPage": "578",
        "hgabPage": "680",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan",
      "source_code": "2027DPWH-Proposal-34179",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597405",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arthur Celeste"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · mabini · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34179",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0680-011179",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan",
        "hgabPesos": 20000000,
        "nepPage": "578",
        "hgabPage": "680",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan",
      "source_code": "2027DPWH-Proposal-34179",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan (16.071635, 119.938395)",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32006",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arthur Celeste"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.071635,
        "longitude": 119.938395,
        "raw": "16.071635, 119.938395",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · mabini · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34179",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0680-011179",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Mabini, Pangasinan",
        "hgabPesos": 20000000,
        "nepPage": "578",
        "hgabPage": "680",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Monkayo, Davao de Oro",
      "source_code": "2027DPWH-Proposal-38492",
      "office": "Davao de Oro 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 50000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Monkayo, Davao de Oro",
      "prior_amount": 1500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 421290",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · monkayo · davao de oro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38492",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Monkayo, Davao de Oro",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0889-015338",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Monkayo, Davao de Oro",
        "hgabPesos": 50000000,
        "nepPage": "664",
        "hgabPage": "889",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Pulilan, Bulacan",
      "source_code": "2027DPWH-Proposal-33635",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 35000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598381",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · pulilan · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33635",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Pulilan, Bulacan",
        "nepPesos": 35000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0730-012176",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Pulilan, Bulacan",
        "hgabPesos": 35000000,
        "nepPage": "596",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Pulilan, Bulacan",
      "source_code": "2027DPWH-Proposal-33635",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 35000000,
      "comparison_year": 2019,
      "prior_project": "Construction/Improvement of Multi-Purpose Building, Brgy. Poblacion, Pulilan, Bulacan",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104207234000 · PDF p. 640 · printed p. 2105",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · pulilan · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33635",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Pulilan, Bulacan",
        "nepPesos": 35000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0730-012176",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Pulilan, Bulacan",
        "hgabPesos": 35000000,
        "nepPage": "596",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
      "source_code": "2027DPWH-Proposal-37732",
      "office": "Cebu 2nd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 547003",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · samboan · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37732",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0850-014587",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
        "hgabPesos": 30000000,
        "nepPage": "646",
        "hgabPage": "850",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
      "source_code": "2027DPWH-Proposal-37732",
      "office": "Cebu 2nd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596294",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · samboan · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37732",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0850-014587",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Samboan, Cebu",
        "hgabPesos": 30000000,
        "nepPage": "646",
        "hgabPage": "850",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Rang-ayan, Roxas, Isabela",
      "source_code": "2027DPWH-Proposal-34894",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Rang-ayan, Roxas, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544570",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "rang-ayan · roxas · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34894",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Rang-ayan, Roxas, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0707-011717",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Rang-ayan, Roxas, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal Poblacion, Lopez, Quezon",
      "source_code": "2027DPWH-Proposal-36499",
      "office": "Quezon 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Rizal Poblacion, Lopez, Quezon",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599706",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "rizal poblacion · lopez · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36499",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal Poblacion, Lopez, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0785-013311",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal Poblacion, Lopez, Quezon",
        "hgabPesos": 5000000,
        "nepPage": "623",
        "hgabPage": "785",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal, Quirino, Isabela",
      "source_code": "2027DPWH-Proposal-34904",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Rizal, Quirino, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597944",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "rizal · quirino · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34904",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal, Quirino, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0707-011719",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal, Quirino, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Sablang, General Nakar, Quezon",
      "source_code": "2027DPWH-Proposal-36690",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 8500000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Sablang, General Nakar, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530880",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sablang · general nakar · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36690",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sablang, General Nakar, Quezon",
        "nepPesos": 8500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0777-013145",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sablang, General Nakar, Quezon",
        "hgabPesos": 8500000,
        "nepPage": "619",
        "hgabPage": "777",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
      "source_code": "2027DPWH-Proposal-34875",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415949",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san bonifacio · burgos · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34875",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0707-011720",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
      "source_code": "2027DPWH-Proposal-34875",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544581",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san bonifacio · burgos · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34875",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0707-011720",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Bonifacio, Burgos, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Carlos, Aliaga, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36046",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Carlos, Aliaga, Nueva Ecija",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598587",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san carlos · aliaga · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36046",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Carlos, Aliaga, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0738-012341",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Carlos, Aliaga, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "601",
        "hgabPage": "738",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Francisco, San Manuel, Isabela",
      "source_code": "2027DPWH-Proposal-34880",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction (Completion) of Multi-purpose Building, Brgy. San Francisco, San Manuel, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481485",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san francisco · san manuel · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34880",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Francisco, San Manuel, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0707-011721",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Francisco, San Manuel, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Ward, Pototan, Iloilo",
      "source_code": "2027DPWH-Proposal-37123",
      "office": "Iloilo 6th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 62000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Ward, Pototan, Iloilo (10.943639, 122.635672)",
      "prior_amount": 75000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30517",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.943639,
        "longitude": 122.635672,
        "raw": "10.943639, 122.635672",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san jose ward · pototan · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37123",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Ward, Pototan, Iloilo",
        "nepPesos": 62000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0645-010494",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Ward, Pototan, Iloilo",
        "hgabPesos": 62000000,
        "nepPage": "569",
        "hgabPage": "645",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Botolan, Zambales",
      "source_code": "2027DPWH-Proposal-35698",
      "office": "Zambales 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 12000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Municipality of Botolan, Zambales",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530383",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san juan · botolan · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35698",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Botolan, Zambales",
        "nepPesos": 12000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0748-012560",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Botolan, Zambales",
        "hgabPesos": 12000000,
        "nepPage": "606",
        "hgabPage": "748",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Licab, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36047",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Juan, Licab, Nueva Ecija",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416484",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san juan · licab · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36047",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Licab, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0738-012342",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Licab, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "601",
        "hgabPage": "738",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Burgos, Isabela",
      "source_code": "2027DPWH-Proposal-34873",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Completion of Multi-purpose Building, Brgy. San Miguel, Burgos, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597917",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san miguel · burgos · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34873",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Burgos, Isabela",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0707-011723",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Burgos, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36040",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Guimba, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33823",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san miguel · guimba · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36040",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Guimba, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0738-012343",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Guimba, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "601",
        "hgabPage": "738",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Mahinog, Camiguin(124.783466,9.131037)",
      "source_code": "2027DPWH-Proposal-01288",
      "office": "Camiguin District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Rehabilitation (Completion) of Multi-Purpose Building, San Miguel, Mahinog, Camiguin",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 547638",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 9.131037,
        "longitude": 124.783466,
        "raw": "124.783466,9.131037",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-01288",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Mahinog, Camiguin(124.783466,9.131037)",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0876-015085",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Miguel, Mahinog, Camiguin(124.783466,9.131037)",
        "hgabPesos": 5000000,
        "nepPage": "658",
        "hgabPage": "876",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Ricardo, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35878",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, San Ricardo, Talavera, Nueva Ecija",
      "prior_amount": 3500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481845",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35878",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Ricardo, Talavera, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0738-012344",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Ricardo, Talavera, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "601",
        "hgabPage": "738",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Ricardo, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35878",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Ricardo, Talavera, Nueva Ecija",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598589",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san ricardo · talavera · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35878",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Ricardo, Talavera, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0738-012344",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Ricardo, Talavera, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "601",
        "hgabPage": "738",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Roque Ilaya, Calauag, Quezon",
      "source_code": "2027DPWH-Proposal-36493",
      "office": "Quezon 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 8000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Roque Ilaya Calauag, Quezon (13.946706°, 122.360431°)",
      "prior_amount": 8000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35906",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 13.946706,
        "longitude": 122.360431,
        "raw": "13.946706°, 122.360431",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36493",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Roque Ilaya, Calauag, Quezon",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0785-013312",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Roque Ilaya, Calauag, Quezon",
        "hgabPesos": 8000000,
        "nepPage": "623",
        "hgabPage": "785",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Sandiat Centro, San Manuel, Isabela",
      "source_code": "2027DPWH-Proposal-34898",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Sandiat Centro, San Manuel, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104206993000 · PDF p. 623 · printed p. 2088",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sandiat centro · san manuel · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34898",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sandiat Centro, San Manuel, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0707-011724",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sandiat Centro, San Manuel, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Sandugan, Larena, Siquijor",
      "source_code": "2027DPWH-Proposal-37623",
      "office": "Siquijor District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Sandugan, Larena, Siquijor",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104203807000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sandugan · larena · siquijor",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37623",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sandugan, Larena, Siquijor",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0842-014416",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sandugan, Larena, Siquijor",
        "hgabPesos": 5000000,
        "nepPage": "645",
        "hgabPage": "842",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Sisim, Peñablanca, Cagayan",
      "source_code": "2027DPWH-Proposal-34991",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. Sisim, Peñablanca, Cagayan",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481455",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Lara"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sisim · penablanca · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34991",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sisim, Peñablanca, Cagayan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0703-011648",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sisim, Peñablanca, Cagayan",
        "hgabPesos": 10000000,
        "nepPage": "587",
        "hgabPage": "703",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay South West Poblacion, Nampicuan, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35855",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay South West Poblacion, Nampicuan, Nueva Ecija",
      "prior_amount": 3500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544972",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "south west poblacion · nampicuan · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35855",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay South West Poblacion, Nampicuan, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Sto. Tomas, Naguilian, Isabela",
      "source_code": "2027DPWH-Proposal-34954",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Sto. Tomas, Naguilian, Isabela",
      "prior_amount": 2500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104200948000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sto. tomas · naguilian · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34954",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sto. Tomas, Naguilian, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0712-011818",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sto. Tomas, Naguilian, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "591",
        "hgabPage": "712",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Sunlife, Naguilian, Isabela",
      "source_code": "2027DPWH-Proposal-34952",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Sunlife, Naguilian, Isabela",
      "prior_amount": 2500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104200949000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sunlife · naguilian · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34952",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sunlife, Naguilian, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0712-011819",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sunlife, Naguilian, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "591",
        "hgabPage": "712",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Tabacao, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36045",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Tabacao, Talavera, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416492",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36045",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tabacao, Talavera, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0738-012350",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tabacao, Talavera, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "601",
        "hgabPage": "738",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Tabing Ilog, Samal, Bataan",
      "source_code": "2027DPWH-Proposal-35765",
      "office": "Bataan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tabing Ilog, Samal, Bataan (14.771199, 120.544899)",
      "prior_amount": 8000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33431",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Antonino Roman III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.771199,
        "longitude": 120.544899,
        "raw": "14.771199, 120.544899",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tabing ilog · samal · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35765",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tabing Ilog, Samal, Bataan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0725-012076",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tabing Ilog, Samal, Bataan",
        "hgabPesos": 10000000,
        "nepPage": "594",
        "hgabPage": "725",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Takiki, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35077",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Takiki, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597796",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "takiki · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35077",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Takiki, Gattaran, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0701-011596",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Takiki, Gattaran, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "586",
        "hgabPage": "701",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35017",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Improvement of Multi-Purpose Building, Brgy. Taligan, Gattaran, Cagayan",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481378",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taligan · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35017",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0701-011597",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "586",
        "hgabPage": "701",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35017",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544473",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taligan · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35017",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0701-011597",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "586",
        "hgabPage": "701",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35017",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597814",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taligan · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35017",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0701-011597",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Taligan, Gattaran, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "586",
        "hgabPage": "701",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Talisoy, Jomalig, Quezon",
      "source_code": "2027DPWH-Proposal-36696",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 8000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Talisoy, Jomalig, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413726",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "talisoy · jomalig · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36696",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Talisoy, Jomalig, Quezon",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0777-013146",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Talisoy, Jomalig, Quezon",
        "hgabPesos": 8000000,
        "nepPage": "619",
        "hgabPage": "777",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38578",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602543",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tran · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38578",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0912-015774",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
        "hgabPesos": 6000000,
        "nepPage": "671",
        "hgabPage": "912",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38578",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat(6.720811,124.049454)",
      "prior_amount": 3000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 41628",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 6.720811,
        "longitude": 124.049454,
        "raw": "6.720811,124.049454",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38578",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0912-015774",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
        "hgabPesos": 6000000,
        "nepPage": "671",
        "hgabPage": "912",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38578",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Tran, Lebak, Sultan Kudarat",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104212975000 · PDF p. 1048 · printed p. 2513",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tran · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38578",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0912-015774",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tran, Lebak, Sultan Kudarat",
        "hgabPesos": 6000000,
        "nepPage": "671",
        "hgabPage": "912",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Tubli, Caramoran, Catanduanes",
      "source_code": "2027DPWH-Proposal-39541",
      "office": "Catanduanes District Engineering Office",
      "region": "Region V",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Tubli, Caramoran, Catanduanes",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 418340",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39541",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tubli, Caramoran, Catanduanes",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0804-013679",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tubli, Caramoran, Catanduanes",
        "hgabPesos": 5000000,
        "nepPage": "633",
        "hgabPage": "804",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Tubli, Caramoran, Catanduanes",
      "source_code": "2027DPWH-Proposal-39541",
      "office": "Catanduanes District Engineering Office",
      "region": "Region V",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tubli, Caramoran, Catanduanes",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596126",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tubli · caramoran · catanduanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39541",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tubli, Caramoran, Catanduanes",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0804-013679",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tubli, Caramoran, Catanduanes",
        "hgabPesos": 5000000,
        "nepPage": "633",
        "hgabPage": "804",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Turod, Quezon, Isabela",
      "source_code": "2027DPWH-Proposal-34893",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Turod, Quezon, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597945",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "turod · quezon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34893",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Turod, Quezon, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0707-011726",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Turod, Quezon, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Victoria, Alicia, Isabela",
      "source_code": "2027DPWH-Proposal-34914",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Victoria, Alicia, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481535",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Ian Paul Dy"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "victoria · alicia · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34914",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Victoria, Alicia, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0712-011820",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Victoria, Alicia, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "591",
        "hgabPage": "712",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Villa Nuesa, Aurora, Isabela",
      "source_code": "2027DPWH-Proposal-34881",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Villa Nuesa, Aurora, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597940",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "villa nuesa · aurora · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34881",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Villa Nuesa, Aurora, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0707-011728",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Villa Nuesa, Aurora, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Vira, Roxas, Isabela",
      "source_code": "2027DPWH-Proposal-34884",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction/Completion of Multi-purpose Building, Brgy. Vira, Roxas, Isabela",
      "prior_amount": 4000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597929",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "vira · roxas · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34884",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Vira, Roxas, Isabela",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0707-011729",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Vira, Roxas, Isabela",
        "hgabPesos": 6000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangca, Baliwag, Bulacan (120.896441, 14.987998)",
      "source_code": "2027DPWH-Proposal-03564",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 12000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangca, Baliwag, Bulacan",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416336",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.987998,
        "longitude": 120.896441,
        "raw": "120.896441, 14.987998",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03564",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangca, Baliwag, Bulacan (120.896441, 14.987998)",
        "nepPesos": 12000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0730-012177",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangca, Baliwag, Bulacan (120.896441, 14.987998)",
        "hgabPesos": 12000000,
        "nepPage": "596",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, M. de Vera St., Barangay Sipac-Almacen, Navotas City (14.657236, 120.948131)",
      "source_code": "2027DPWH-Proposal-34054",
      "office": "Malabon Navotas District Engineering Office",
      "region": "NCR",
      "amount_2027": 84000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, M. de Vera St., Barangay Sipac-Almacen, Navotas City,  14.657167, 120.948126",
      "prior_amount": 100000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30194",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 7.7,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.657236,
        "longitude": 120.948131,
        "raw": "14.657236, 120.948131",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.657167,
        "longitude": 120.948126,
        "raw": "14.657167, 120.948126",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "sipac-almacen · navotas city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34054",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, M. de Vera St., Barangay Sipac-Almacen, Navotas City (14.657236, 120.948131)",
        "nepPesos": 84000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0631-010260",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, M. de Vera St., Barangay Sipac- Almacen, Navotas City (14.657236, 120.948131)",
        "hgabPesos": 84000000,
        "nepPage": "560",
        "hgabPage": "631",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Pitalo, San Fernando, Cebu",
      "source_code": "2027DPWH-Proposal-37778",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Pitalo, San Fernando, Cebu",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419526",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37778",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Pitalo, San Fernando, Cebu",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0846-014505",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Pitalo, San Fernando, Cebu",
        "hgabPesos": 10000000,
        "nepPage": "646",
        "hgabPage": "846",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, San Joaquin, Iloilo",
      "source_code": "2027DPWH-Proposal-37143",
      "office": "Iloilo 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 6500000,
      "comparison_year": 2022,
      "prior_project": "Construction of San Joaquin Multi-purpose Building, San Joaquin, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525685",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37143",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, San Joaquin, Iloilo",
        "nepPesos": 6500000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0817-013921",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tapikan, San Joaquin, Iloilo",
        "hgabPesos": 6500000,
        "nepPage": "637",
        "hgabPage": "817",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, San Joaquin, Iloilo",
      "source_code": "2027DPWH-Proposal-37143",
      "office": "Iloilo 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 6500000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Municipality of San Joaquin, Iloilo",
      "prior_amount": 5250000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546468",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37143",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, San Joaquin, Iloilo",
        "nepPesos": 6500000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0817-013921",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tapikan, San Joaquin, Iloilo",
        "hgabPesos": 6500000,
        "nepPage": "637",
        "hgabPage": "817",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, San Joaquin, Iloilo",
      "source_code": "2027DPWH-Proposal-37143",
      "office": "Iloilo 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 6500000,
      "comparison_year": 2018,
      "prior_project": "Construction of San Joaquin Multi-Purpose Building, San Joaquin, Iloilo",
      "prior_amount": 4000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104202989000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37143",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, San Joaquin, Iloilo",
        "nepPesos": 6500000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0817-013921",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Tapikan, San Joaquin, Iloilo",
        "hgabPesos": 6500000,
        "nepPage": "637",
        "hgabPage": "817",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Solana, Cagayan",
      "source_code": "2027DPWH-Proposal-34986",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Solana, Cagayan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597859",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34986",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Solana, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0704-011660",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Solana, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "587",
        "hgabPage": "704",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Tarlac City Convention Hall, Tarlac City, Tarlac",
      "source_code": "2027DPWH-Proposal-33631",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 75000000,
      "comparison_year": 2019,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Convention Hall), Tarlac City",
      "prior_amount": 100000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300103200634000 · PDF p. 453 · printed p. 1918",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33631",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Tarlac City Convention Hall, Tarlac City, Tarlac",
        "nepPesos": 75000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0636-010357",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Tarlac City Convention Hall, Tarlac City, Tarlac",
        "hgabPesos": 75000000,
        "nepPage": "563",
        "hgabPage": "636",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
      "source_code": "2027DPWH-Proposal-37779",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction/Repair/Rehabilitation/Completion of Multi-Purpose Building in Brgy. Tunghaan, Minglanilla, Cebu",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484116",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37779",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0846-014506",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "646",
        "hgabPage": "846",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
      "source_code": "2027DPWH-Proposal-37779",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546961",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37779",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0846-014506",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "646",
        "hgabPage": "846",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
      "source_code": "2027DPWH-Proposal-37779",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Tunghaan, Minglanilla, Cebu (10.250968°, 123.781574°)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 38422",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.250968,
        "longitude": 123.781574,
        "raw": "10.250968°, 123.781574",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37779",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0846-014506",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "646",
        "hgabPage": "846",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
      "source_code": "2027DPWH-Proposal-37779",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Completion of Multi-Purpose Building, Brgy. Tunghaan, Minglanilla, Cebu",
      "prior_amount": 500000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010312529",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37779",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0846-014506",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Tunghaan, Minglanilla, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "646",
        "hgabPage": "846",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, at Barangay Cullit, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35053",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Cullit, Gattaran, Cagayan",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415766",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cullit · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35053",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, at Barangay Cullit, Gattaran, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Talite Multi-purpose Building, Talite, Aguinaldo, Ifugao",
      "source_code": "2027DPWH-Proposal-34653",
      "office": "Ifugao 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Talite, Aguinaldo, Ifugao",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544415",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34653",
        "nepTitle": "Construction (Completion) of Talite Multi-purpose Building, Talite, Aguinaldo, Ifugao",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0693-011431",
        "hgabTitle": "Construction (Completion) of Talite Multi-purpose Building, Talite, Aguinaldo, Ifugao",
        "hgabPesos": 5000000,
        "nepPage": "582",
        "hgabPage": "693",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Talite Multi-purpose Building, Talite, Aguinaldo, Ifugao",
      "source_code": "2027DPWH-Proposal-34653",
      "office": "Ifugao 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Talite Multi-purpose Building, Talite, Aguinaldo, Ifugao",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597691",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34653",
        "nepTitle": "Construction (Completion) of Talite Multi-purpose Building, Talite, Aguinaldo, Ifugao",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0693-011431",
        "hgabTitle": "Construction (Completion) of Talite Multi-purpose Building, Talite, Aguinaldo, Ifugao",
        "hgabPesos": 5000000,
        "nepPage": "582",
        "hgabPage": "693",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Ubao Multi-Purpose Building, Ubao, Aguinaldo, Ifugao",
      "source_code": "2027DPWH-Proposal-34629",
      "office": "Ifugao 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Ubao, Aguinaldo, Ifugao",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481345",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34629",
        "nepTitle": "Construction (Completion) of Ubao Multi-Purpose Building, Ubao, Aguinaldo, Ifugao",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0693-011432",
        "hgabTitle": "Construction (Completion) of Ubao Multi-Purpose Building, Ubao, Aguinaldo, Ifugao",
        "hgabPesos": 5000000,
        "nepPage": "582",
        "hgabPage": "693",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Ubao Multi-Purpose Building, Ubao, Aguinaldo, Ifugao",
      "source_code": "2027DPWH-Proposal-34629",
      "office": "Ifugao 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Ubao, Aguinaldo, Ifugao",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597695",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34629",
        "nepTitle": "Construction (Completion) of Ubao Multi-Purpose Building, Ubao, Aguinaldo, Ifugao",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0693-011432",
        "hgabTitle": "Construction (Completion) of Ubao Multi-Purpose Building, Ubao, Aguinaldo, Ifugao",
        "hgabPesos": 5000000,
        "nepPage": "582",
        "hgabPage": "693",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35081",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. 1, Jones, Isabela",
      "prior_amount": 3500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481545",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35081",
        "nepTitle": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0713-011842",
        "hgabTitle": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "592",
        "hgabPage": "713",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35081",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529946",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35081",
        "nepTitle": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0713-011842",
        "hgabTitle": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "592",
        "hgabPage": "713",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35081",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Barangay 1, Jones, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598156",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35081",
        "nepTitle": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0713-011842",
        "hgabTitle": "Construction (Rehabilitation) of Multi-Purpose Building, Barangay 1, Jones, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "592",
        "hgabPage": "713",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction Multi-Purpose Building (Covered Court), Villa Angelica, Barangay 166, Caloocan City",
      "source_code": "2027DPWH-Proposal-33963",
      "office": "Metro Manila 3rd District Engineering Office",
      "region": "NCR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Villa Angelica, Barangay 166, Caloocan City",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597005",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "166 · caloocan city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33963",
        "nepTitle": "Construction Multi-Purpose Building (Covered Court), Villa Angelica, Barangay 166, Caloocan City",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0658-010751",
        "hgabTitle": "Construction (Completion) Multi-Purpose Building (Covered Court), Villa Angelica, Barangay 166, Caloocan City",
        "hgabPesos": 5000000,
        "nepPage": "573",
        "hgabPage": "658",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Bangued Multi-Purpose Building, Calaba, Bangued, Abra",
      "source_code": "2027DPWH-Proposal-34815",
      "office": "Abra District Engineering Office",
      "region": "CAR",
      "amount_2027": 50000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Calaba, Bangued, Abra",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481259",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Bernos"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34815",
        "nepTitle": "Construction of Bangued Multi-Purpose Building, Calaba, Bangued, Abra",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0690-011369",
        "hgabTitle": "Construction of Bangued Multi-Purpose Building, Calaba, Bangued, Abra",
        "hgabPesos": 50000000,
        "nepPage": "581",
        "hgabPage": "690",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Dangoy Multi-Purpose Building, Barangay Dangoy, Lubuagan, Kalinga",
      "source_code": "2027DPWH-Proposal-34811",
      "office": "Upper Kalinga District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Dangoy Multi-Purpose Building, Brgy. Dangoy, Lubuagan, Kalinga",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104206739000 · PDF p. 604 · printed p. 2069",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "dangoy · lubuagan · kalinga",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34811",
        "nepTitle": "Construction of Dangoy Multi-Purpose Building, Barangay Dangoy, Lubuagan, Kalinga",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0698-011523",
        "hgabTitle": "Construction of Dangoy Multi-Purpose Building, Barangay Dangoy, Lubuagan, Kalinga",
        "hgabPesos": 5000000,
        "nepPage": "584",
        "hgabPage": "698",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Hapao Multi-Purpose Building, Hapao, Hungduan, Ifugao",
      "source_code": "2027DPWH-Proposal-34647",
      "office": "Ifugao 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 7000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building at Hapao, Hungduan, Ifugao",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104200835000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34647",
        "nepTitle": "Construction of Hapao Multi-Purpose Building, Hapao, Hungduan, Ifugao",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0693-011427",
        "hgabTitle": "Construction of Hapao Multi-Purpose Building, Hapao, Hungduan, Ifugao",
        "hgabPesos": 7000000,
        "nepPage": "582",
        "hgabPage": "693",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37787",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 50000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Guadalupe, Cebu City",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484305",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37787",
        "nepTitle": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0646-010513",
        "hgabTitle": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
        "hgabPesos": 100000000,
        "nepPage": "647",
        "hgabPage": "646",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37787",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 50000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Guadalupe, Cebu City",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419759",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37787",
        "nepTitle": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0646-010513",
        "hgabTitle": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
        "hgabPesos": 100000000,
        "nepPage": "647",
        "hgabPage": "646",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37787",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 50000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532161",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "guadalupe · cebu · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37787",
        "nepTitle": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0646-010513",
        "hgabTitle": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
        "hgabPesos": 100000000,
        "nepPage": "647",
        "hgabPage": "646",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37787",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 50000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Guadalupe, Cebu City",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104203699000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37787",
        "nepTitle": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0646-010513",
        "hgabTitle": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
        "hgabPesos": 100000000,
        "nepPage": "647",
        "hgabPage": "646",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37787",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 50000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Guadalupe, Cebu City",
      "prior_amount": 4000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104203699000 · PDF p. 524 · printed p. 1989",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37787",
        "nepTitle": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0646-010513",
        "hgabTitle": "Construction of Multi- Purpose Building, Barangay Guadalupe, Cebu City, Cebu",
        "hgabPesos": 100000000,
        "nepPage": "647",
        "hgabPage": "646",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall) Barangay Camansa, Asuncion, Davao del Norte",
      "source_code": "2027DPWH-Proposal-38486",
      "office": "Davao del Norte District Engineering Office",
      "region": "Region XI",
      "amount_2027": 17000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building (Brgy. Hall), Barangay Camansa, Asuncion, Davao del Norte",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532912",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "De Carlo Uy"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38486",
        "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall) Barangay Camansa, Asuncion, Davao del Norte",
        "nepPesos": 17000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0894-015424",
        "hgabTitle": "Construction of Multi-Purpose Building (Barangay Hall) Barangay Camansa, Asuncion, Davao del Norte",
        "hgabPesos": 17000000,
        "nepPage": "667",
        "hgabPage": "894",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall) Poblacion, Talisay ,Camarines Norte",
      "source_code": "2027DPWH-Proposal-39430",
      "office": "Camarines Norte Sub District Engineering Office",
      "region": "Region V",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay Poblacion, Talisay, Camarines Norte",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596140",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Rosemarie Panotes"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39430",
        "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall) Poblacion, Talisay ,Camarines Norte",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0642-010449",
        "hgabTitle": "Construction of Multi-Purpose Building (Barangay Hall) Poblacion, Talisay ,Camarines Norte",
        "hgabPesos": 5000000,
        "nepPage": "568",
        "hgabPage": "642",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Asinan Proper, Subic, Zambales (14.88227, 120.22973)",
      "source_code": "2027DPWH-Proposal-11098",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, (Barangay Hall), Barangay Asinan Proper, Subic, Zambales (14.88227 ,120.22973)",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34389",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.88227,
        "longitude": 120.22973,
        "raw": "14.88227, 120.22973",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.88227,
        "longitude": 120.22973,
        "raw": "14.88227 ,120.22973",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11098",
        "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Asinan Proper, Subic, Zambales (14.88227, 120.22973)",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0750-012586",
        "hgabTitle": "Construction of Multi-Purpose Building Barangay Hall , Barangay Asinan Proper, Subic, Zambales (14.88227 ,120.22973)",
        "hgabPesos": 20000000,
        "nepPage": "606",
        "hgabPage": "750",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay East Bajac - Bajac, Olongapo City, Zambales (14.83624, 120.28795)",
      "source_code": "2027DPWH-Proposal-11106",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 25000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, (Barangay Hall), East Bajac - Bajac, Olongapo City, Zambales (14.83624 ,120.28795)",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34387",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jay Khonghun"
      ],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.83624,
        "longitude": 120.28795,
        "raw": "14.83624, 120.28795",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.83624,
        "longitude": 120.28795,
        "raw": "14.83624 ,120.28795",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11106",
        "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay East Bajac - Bajac, Olongapo City, Zambales (14.83624, 120.28795)",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0749-012571",
        "hgabTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay East Bajac - Bajac, Olongapo City, Zambales (14.83624, 120.28795)",
        "hgabPesos": 25000000,
        "nepPage": "606",
        "hgabPage": "749",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Magsaysay, Castillejos, Zambales (14.943376, 120.190068)",
      "source_code": "2027DPWH-Proposal-11088",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Magsaysay, Castillejos, Zambales (14.943376 ,120.190068)",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34369",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.943376,
        "longitude": 120.190068,
        "raw": "14.943376, 120.190068",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.943376,
        "longitude": 120.190068,
        "raw": "14.943376 ,120.190068",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11088",
        "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Magsaysay, Castillejos, Zambales (14.943376, 120.190068)",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0749-012568",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Magsaysay, Castillejos, Zambales (14.943376, 120.190068)",
        "hgabPesos": 30000000,
        "nepPage": "606",
        "hgabPage": "749",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay San Isidro, Subic, Zambales (14.86376864, 120.25706855)",
      "source_code": "2027DPWH-Proposal-11096",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, (Barangay Hall), Barangay San Isidro, Subic, Zambales (14.86376864 ,120.25706855)",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34375",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.86376864,
        "longitude": 120.25706855,
        "raw": "14.86376864, 120.25706855",
        "orientation": "latitude, longitude",
        "decimalPlaces": 8,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.86376864,
        "longitude": 120.25706855,
        "raw": "14.86376864 ,120.25706855",
        "orientation": "latitude, longitude",
        "decimalPlaces": 8,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11096",
        "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay San Isidro, Subic, Zambales (14.86376864, 120.25706855)",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0749-012576",
        "hgabTitle": "Construction of Multi-Purpose Building Barangay Hall , Barangay San Isidro, Subic, Zambales (14.86376864 ,120.25706855)",
        "hgabPesos": 20000000,
        "nepPage": "606",
        "hgabPage": "749",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Sta. Rita, Olongapo City (14.84897, 120.29113)",
      "source_code": "2027DPWH-Proposal-11109",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 25000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, (Barangay Hall) Barangay Sta. Rita, Olongapo City (14.84897 ,120.29113)",
      "prior_amount": 10500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34399",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.84897,
        "longitude": 120.29113,
        "raw": "14.84897, 120.29113",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.84897,
        "longitude": 120.29113,
        "raw": "14.84897 ,120.29113",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11109",
        "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Sta. Rita, Olongapo City (14.84897, 120.29113)",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0749-012577",
        "hgabTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Sta. Rita, Olongapo City (14.84897, 120.29113)",
        "hgabPesos": 50000000,
        "nepPage": "606",
        "hgabPage": "749",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Completion) at DPWH-Bacolod City DEO Compound, Bacolod City",
      "source_code": "2027DPWH-Proposal-37632",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 8000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building at DPWH-Bacolod City DEO Compound, Bacolod City (10.653285, 122.953680)",
      "prior_amount": 10928000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37767",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.653285,
        "longitude": 122.95368,
        "raw": "10.653285, 122.953680",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37632",
        "nepTitle": "Construction of Multi-Purpose Building (Completion) at DPWH-Bacolod City DEO Compound, Bacolod City",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0830-014181",
        "hgabTitle": "Construction of Multi-Purpose Building (Completion) at DPWH-Bacolod City DEO Compound, Bacolod City",
        "hgabPesos": 8000000,
        "nepPage": "640",
        "hgabPage": "830",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Natappian East, Solana, Cagayan",
      "source_code": "2027DPWH-Proposal-34988",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Natappian East, Solana, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597839",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "natappian east · solana · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34988",
        "nepTitle": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Natappian East, Solana, Cagayan",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0704-011663",
        "hgabTitle": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Natappian East, Solana, Cagayan",
        "hgabPesos": 7000000,
        "nepPage": "588",
        "hgabPage": "704",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court) at Barangay Mangan-Vaca, Subic, Zambales (14.889039, 120.237729)",
      "source_code": "2027DPWH-Proposal-11095",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 12000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court) at Barangay Mangan-Vaca, Subic, Zambales (14.889039 ,120.237729)",
      "prior_amount": 15000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34371",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.889039,
        "longitude": 120.237729,
        "raw": "14.889039, 120.237729",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.889039,
        "longitude": 120.237729,
        "raw": "14.889039 ,120.237729",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mangan-vaca · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11095",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court) at Barangay Mangan-Vaca, Subic, Zambales (14.889039, 120.237729)",
        "nepPesos": 12000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court) at Barangay San Agustin, Ibaan, Batangas",
      "source_code": "2027DPWH-Proposal-36287",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay San Agustin, Ibaan, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545493",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san agustin · ibaan · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36287",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court) at Barangay San Agustin, Ibaan, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0760-012797",
        "hgabTitle": "Construction of Multi-Purpose Building (Covered Court) at Barangay San Agustin, Ibaan, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "611",
        "hgabPage": "760",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court) at Sitio Nabalagbag, Barangay Jaybanga, Lobo, Batangas",
      "source_code": "2027DPWH-Proposal-09568",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 12000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court) at Sitio Nabalagbag, Barangay Jaybanga, Lobo, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599091",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "jaybanga · lobo · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09568",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court) at Sitio Nabalagbag, Barangay Jaybanga, Lobo, Batangas",
        "nepPesos": 12000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0752-012633",
        "hgabTitle": "Construction of Multi-Purpose Building (Covered Court) at Sitio Nabalagbag, Barangay Jaybanga, Lobo, Batangas",
        "hgabPesos": 12000000,
        "nepPage": "609",
        "hgabPage": "752",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court) in Barangay Gumaod, Claveria, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39015",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 6000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Brgy. Gumaod, Claveria, Misamis Oriental",
      "prior_amount": 2500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104211984000 · PDF p. 973 · printed p. 2438",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gumaod · claveria · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39015",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court) in Barangay Gumaod, Claveria, Misamis Oriental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0885-015250",
        "hgabTitle": "Construction of Multi-Purpose Building (Covered Court) in Barangay Gumaod, Claveria, Misamis Oriental",
        "hgabPesos": 6000000,
        "nepPage": "663",
        "hgabPage": "885",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay 178, Caloocan City 14.753695, 121.064569",
      "source_code": "2027DPWH-Proposal-22951",
      "office": "Metro Manila 3rd District Engineering Office",
      "region": "NCR",
      "amount_2027": 12000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building (Covered Court), Barangay 178, Caloocan City",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 480927",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.753695,
        "longitude": 121.064569,
        "raw": "14.753695, 121.064569",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22951",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay 178, Caloocan City 14.753695, 121.064569",
        "nepPesos": 12000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0658-010757",
        "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay 178, Caloocan City 14.753695, 121.064569",
        "hgabPesos": 12000000,
        "nepPage": "573",
        "hgabPage": "658",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Alcate, Victoria, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36924",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Alcate, Victoria, Oriental Mindoro",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417756",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alcate · victoria · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36924",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Alcate, Victoria, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0790-013397",
        "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Alcate, Victoria, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "625",
        "hgabPage": "790",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Aningway-Sacatihan, Subic, Zambales (14.913389, 120.228420)",
      "source_code": "2027DPWH-Proposal-11097",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Aningway-Sacatihan, Subic, Zambales (14.913389 ,120.228420)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34381",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.913389,
        "longitude": 120.22842,
        "raw": "14.913389, 120.228420",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.913389,
        "longitude": 120.22842,
        "raw": "14.913389 ,120.228420",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "aningway-sacatihan · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11097",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Aningway-Sacatihan, Subic, Zambales (14.913389, 120.228420)",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0749-012574",
        "hgabTitle": "Construction of Multi-Purpose Barangay Aningway-Sacatihan, Subic, Zambales (14.913277, 120.228128)",
        "hgabPesos": 30000000,
        "nepPage": "607",
        "hgabPage": "749",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Aroman, Carmen, Cotabato",
      "source_code": "2027DPWH-Proposal-38610",
      "office": "Cotabato 3rd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Completion/Rehabilitation of Multi-Purpose Building (Covered Court) in Brgy. Aroman, Carmen, Cotabato",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602349",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Samantha Santos"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "aroman · carmen · cotabato",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38610",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Aroman, Carmen, Cotabato",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0899-015533",
        "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Aroman, Carmen, Cotabato",
        "hgabPesos": 5000000,
        "nepPage": "670",
        "hgabPage": "899",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Bilwang, Kawayan, Biliran (124.398290°, 11.699000°)",
      "source_code": "2027DPWH-Proposal-37893",
      "office": "Biliran District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Brgy. Bilwang, Kawayan, Biliran",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 601315",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 11.699,
        "longitude": 124.39829,
        "raw": "124.398290°, 11.699000",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37893",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Bilwang, Kawayan, Biliran (124.398290°, 11.699000°)",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0854-014668",
        "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Bilwang, Kawayan, Biliran (124.398290°, 11.699000°)",
        "hgabPesos": 10000000,
        "nepPage": "648",
        "hgabPage": "854",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Corazon De Jesus, San Juan City (121.031630, 14.606733)",
      "source_code": "2027DPWH-Proposal-22740",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 30000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Brgy. Corazon De Jesus, San Juan City",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300103200127000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.606733,
        "longitude": 121.03163,
        "raw": "121.031630, 14.606733",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22740",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Corazon De Jesus, San Juan City (121.031630, 14.606733)",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0657-010737",
        "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Corazon De Jesus, San Juan City (121.031630, 14.606733)",
        "hgabPesos": 30000000,
        "nepPage": "572",
        "hgabPage": "657",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Gulod, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36906",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Gulod, Calapan City, Oriental Mindoro",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417745",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gulod · calapan · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36906",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Gulod, City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Magsaysay, Castillejos, Zambales (14.943196, 120.189947)",
      "source_code": "2027DPWH-Proposal-11089",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Magsaysay, Castillejos, Zambales (14.943196 ,120.189947)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34383",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.943196,
        "longitude": 120.189947,
        "raw": "14.943196, 120.189947",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.943196,
        "longitude": 120.189947,
        "raw": "14.943196 ,120.189947",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "magsaysay · castillejos · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11089",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Magsaysay, Castillejos, Zambales (14.943196, 120.189947)",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0749-012579",
        "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Magsaysay, Castillejos, Zambales (14.943196, 120.189947)",
        "hgabPesos": 10000000,
        "nepPage": "607",
        "hgabPage": "749",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Malakdang, Sabtang, Batanes",
      "source_code": "2027DPWH-Proposal-34940",
      "office": "Batanes District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Malakdang, Sabtang, Batanes (20.335943°, 121.871824°)",
      "prior_amount": 12000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32694",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 20.335943,
        "longitude": 121.871824,
        "raw": "20.335943°, 121.871824",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malakdang · sabtang · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34940",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Malakdang, Sabtang, Batanes",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0698-011534",
        "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Malakdang, Sabtang, Batanes",
        "hgabPesos": 6000000,
        "nepPage": "584",
        "hgabPage": "698",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Poblacion, Kapatagan, Lanao del Norte (123.76929°, 7.89914°)",
      "source_code": "2027DPWH-Proposal-01461",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5500000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Poblacion, Kapatagan, Lanao del Norte (123.76974°, 7.8991°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30780",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 49.8,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 7.89914,
        "longitude": 123.76929,
        "raw": "123.76929°, 7.89914",
        "orientation": "longitude, latitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 7.8991,
        "longitude": 123.76974,
        "raw": "123.76974°, 7.8991",
        "orientation": "longitude, latitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-01461",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Poblacion, Kapatagan, Lanao del Norte (123.76929°, 7.89914°)",
        "nepPesos": 5500000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Salapingao, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34215",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Salapingao, Dagupan City, Pangasinan",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597461",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "salapingao · dagupan · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34215",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Salapingao, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0683-011222",
        "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Salapingao, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "579",
        "hgabPage": "683",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay San Juan, San Pablo City, Laguna",
      "source_code": "2027DPWH-Proposal-36626",
      "office": "Laguna 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court) in Barangay San Juan, San Pablo City, Laguna",
      "prior_amount": 1500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417488",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Amben Amante"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san juan · san pablo · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36626",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay San Juan, San Pablo City, Laguna",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0775-013110",
        "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay San Juan, San Pablo City, Laguna",
        "hgabPesos": 7000000,
        "nepPage": "618",
        "hgabPage": "775",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Bug-ong, Mambajao, Camiguin (124.676971666, 9.250525)",
      "source_code": "2027DPWH-Proposal-01271",
      "office": "Camiguin District Engineering Office",
      "region": "Region X",
      "amount_2027": 7000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Bug-ong, Mambajao, Camiguin (124.677225666°,9.250853833°)",
      "prior_amount": 6000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40413",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 46.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 9.250525,
        "longitude": 124.676971666,
        "raw": "124.676971666, 9.250525",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 9.250853833,
        "longitude": 124.677225666,
        "raw": "124.677225666°,9.250853833",
        "orientation": "longitude, latitude",
        "decimalPlaces": 9,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-01271",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Bug-ong, Mambajao, Camiguin (124.676971666, 9.250525)",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0876-015094",
        "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Bug-ong, Mambajao, Camiguin (124.676971666, 9.250525)",
        "hgabPesos": 7000000,
        "nepPage": "658",
        "hgabPage": "876",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), PLC, Barangay 167, Caloocan City",
      "source_code": "2027DPWH-Proposal-33964",
      "office": "Metro Manila 3rd District Engineering Office",
      "region": "NCR",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), PLC, Barangay 167, Caloocan City, 14.730841, 121.020927",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 31494",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.730841,
        "longitude": 121.020927,
        "raw": "14.730841, 121.020927",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "167 · caloocan city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33964",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court), PLC, Barangay 167, Caloocan City",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0659-010769",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Covered Court) , PLC, Barangay 167, Caloocan City",
        "hgabPesos": 5000000,
        "nepPage": "574",
        "hgabPage": "659",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (DPWH 2nd Engineering District Office), Barangay Maparat, Compostela, Davao de Oro",
      "source_code": "2027DPWH-Proposal-21338",
      "office": "Davao de Oro 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 150000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (DPWH 2nd Engineering District Office), Barangay Maparat, Compostela, Davao de Oro",
      "prior_amount": 100000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 531879",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maricar Zamora"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "maparat · compostela · davao de oro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21338",
        "nepTitle": "Construction of Multi-Purpose Building (DPWH 2nd Engineering District Office), Barangay Maparat, Compostela, Davao de Oro",
        "nepPesos": 150000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0930-016105",
        "hgabTitle": "Construction of Multi-Purpose Building (DPWH 2nd Engineering District Office), Barangay Maparat, Compostela, Davao de Oro",
        "hgabPesos": 150000000,
        "nepPage": "680",
        "hgabPage": "930",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (DSWD SWAD- Zambales Office), Olongapo City, Zambales (14.827742, 120.285479)",
      "source_code": "2027DPWH-Proposal-11105",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 25000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (DSWD SWAD-Zambales Office), Olongapo City",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598940",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jay Khonghun"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.827742,
        "longitude": 120.285479,
        "raw": "14.827742, 120.285479",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11105",
        "nepTitle": "Construction of Multi-Purpose Building (DSWD SWAD- Zambales Office), Olongapo City, Zambales (14.827742, 120.285479)",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (DSWD SWAD- Zambales Office), Olongapo City, Zambales (14.827742, 120.285479)",
      "source_code": "2027DPWH-Proposal-11105",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 25000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (DSWD SWAD- Zambales Office), Olongapo City, Zambales (14.827742 ,120.285479)",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34385",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jay Khonghun"
      ],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.827742,
        "longitude": 120.285479,
        "raw": "14.827742, 120.285479",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.827742,
        "longitude": 120.285479,
        "raw": "14.827742 ,120.285479",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11105",
        "nepTitle": "Construction of Multi-Purpose Building (DSWD SWAD- Zambales Office), Olongapo City, Zambales (14.827742, 120.285479)",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Gymnasium), Tandu- Bato, Luuk, Sulu",
      "source_code": "2027DPWH-Proposal-38172",
      "office": "Sulu 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 60000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (Gymnasium), Tandu-Bato, Luuk, Sulu",
      "prior_amount": 40000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543633",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Abdulmunir Mundoc Arbison"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38172",
        "nepTitle": "Construction of Multi-Purpose Building (Gymnasium), Tandu- Bato, Luuk, Sulu",
        "nepPesos": 60000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0647-010542",
        "hgabTitle": "Construction of Multi-Purpose Building, Tandu- Bato, Luuk, Sulu",
        "hgabPesos": 60000000,
        "nepPage": "569",
        "hgabPage": "647",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (INSPIRE BUILDING), Laoag City, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-05152",
      "office": "Ilocos Norte 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 835000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (INSPIRE Building), Laoag City, Ilocos Norte",
      "prior_amount": 300000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543403",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Sandro Marcos"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-05152",
        "nepTitle": "Construction of Multi-Purpose Building (INSPIRE BUILDING), Laoag City, Ilocos Norte",
        "nepPesos": 835000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0633-010302",
        "hgabTitle": "Construction of Multi-Purpose Building (INSPIRE BUILDING), Laoag City, Ilocos Norte",
        "hgabPesos": 835000000,
        "nepPage": "561",
        "hgabPage": "633",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building - Minglanilla, Poblacion Ward I, Minglanilla, Cebu",
      "source_code": "2027DPWH-Proposal-37764",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 25000000,
      "comparison_year": 2020,
      "prior_project": "Construction/Repair/Rehabilitation/Completion of Multi-Purpose Building in Brgy. Poblacion Ward I, Minglanilla, Cebu",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484108",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37764",
        "nepTitle": "Construction of Multi-Purpose Building - Minglanilla, Poblacion Ward I, Minglanilla, Cebu",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0850-014586",
        "hgabTitle": "Construction of Multi-Purpose Building - Minglanilla, Poblacion Ward I, Minglanilla, Cebu",
        "hgabPesos": 25000000,
        "nepPage": "646",
        "hgabPage": "850",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building - Minglanilla, Poblacion Ward I, Minglanilla, Cebu",
      "source_code": "2027DPWH-Proposal-37764",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 25000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion Ward I, Minglanilla, Cebu (10.24459°, 123.797915°)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 38394",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.24459,
        "longitude": 123.797915,
        "raw": "10.24459°, 123.797915",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37764",
        "nepTitle": "Construction of Multi-Purpose Building - Minglanilla, Poblacion Ward I, Minglanilla, Cebu",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0850-014586",
        "hgabTitle": "Construction of Multi-Purpose Building - Minglanilla, Poblacion Ward I, Minglanilla, Cebu",
        "hgabPesos": 25000000,
        "nepPage": "646",
        "hgabPage": "850",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Bagumbayan, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33608",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building at Brgy. Bagumbayan, Bocaue, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530074",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33608",
        "nepTitle": "Construction of Multi-Purpose Building Bagumbayan, Bocaue, Bulacan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0730-012196",
        "hgabTitle": "Construction of Multi-Purpose Building Bagumbayan, Bocaue, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "597",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Bagumbayan, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33608",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building Barangay Bagumbayan, Bocaue, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598432",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33608",
        "nepTitle": "Construction of Multi-Purpose Building Bagumbayan, Bocaue, Bulacan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0730-012196",
        "hgabTitle": "Construction of Multi-Purpose Building Bagumbayan, Bocaue, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "597",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Bambang, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33607",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Bambang, Bocaue, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598398",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33607",
        "nepTitle": "Construction of Multi-Purpose Building Bambang, Bocaue, Bulacan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0730-012197",
        "hgabTitle": "Construction of Multi-Purpose Building Bambang, Bocaue, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "597",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Barangay Hall (Completion), Barangay San Lorenzo, San Nicolas, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-34125",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Barangay Hall), Barangay San Lorenzo, San Nicolas, Ilocos Norte",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597202",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Eugenio Angelo Barba"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34125",
        "nepTitle": "Construction of Multi-Purpose Building Barangay Hall (Completion), Barangay San Lorenzo, San Nicolas, Ilocos Norte",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0675-011073",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Ildefonso, San Nicolas, Ilocos Norte",
        "hgabPesos": 5000000,
        "nepPage": "576",
        "hgabPage": "675",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Evacuation Facility and Command Center, Subic, Zambales (14.878675, 120.229466)",
      "source_code": "2027DPWH-Proposal-11092",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building Evacuation Facility and Command Center, Subic, Zambales (14.878675  ,120.229466)",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30312",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.878675,
        "longitude": 120.229466,
        "raw": "14.878675, 120.229466",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.878675,
        "longitude": 120.229466,
        "raw": "14.878675  ,120.229466",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11092",
        "nepTitle": "Construction of Multi-Purpose Building Evacuation Facility and Command Center, Subic, Zambales (14.878675, 120.229466)",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0750-012585",
        "hgabTitle": "Construction of Multi-Purpose Building Evacuation Facility and Command Center, Subic, Zambales (14.878675, 120.229466)",
        "hgabPesos": 50000000,
        "nepPage": "607",
        "hgabPage": "750",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Facility, Barangay Cabalabaguan, Mina, Iloilo",
      "source_code": "2027DPWH-Proposal-37326",
      "office": "Iloilo 6th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 20500000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Cabalabaguan, Mina, Iloilo",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600622",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cabalabaguan · mina · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37326",
        "nepTitle": "Construction of Multi-Purpose Building Facility, Barangay Cabalabaguan, Mina, Iloilo",
        "nepPesos": 20500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0828-014157",
        "hgabTitle": "Construction of Multi-Purpose Building Facility, Barangay Cabalabaguan, Mina, Iloilo",
        "hgabPesos": 20500000,
        "nepPage": "640",
        "hgabPage": "828",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33600",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction/Improvement Multi-Purpose Building, Lolomboy, Bocaue, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481710",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33600",
        "nepTitle": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012199",
        "hgabTitle": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "597",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33600",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Lolomboy, Bocaue, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525408",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33600",
        "nepTitle": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012199",
        "hgabTitle": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "597",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33600",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Lolomboy, Bocaue, Bulacan (14.781112, 120.933370)",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33576",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.781112,
        "longitude": 120.93337,
        "raw": "14.781112, 120.933370",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33600",
        "nepTitle": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012199",
        "hgabTitle": "Construction of Multi-Purpose Building Lolomboy, Bocaue, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "597",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Tambubong, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33596",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Tambubong, Bocaue, Bulacan",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530054",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33596",
        "nepTitle": "Construction of Multi-Purpose Building Tambubong, Bocaue, Bulacan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012205",
        "hgabTitle": "Construction of Multi-Purpose Building Tambubong, Bocaue, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "597",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay 390 Zone 40 (Completion), Manila City (14.5984620, 120.9898245)",
      "source_code": "2027DPWH-Proposal-33921",
      "office": "North Manila District Engineering Office",
      "region": "NCR",
      "amount_2027": 70000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building at Barangay 390 Zone 40, Manila City",
      "prior_amount": 46500000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529319",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.598462,
        "longitude": 120.9898245,
        "raw": "14.5984620, 120.9898245",
        "orientation": "latitude, longitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "390 zone 40  · manila city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33921",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay 390 Zone 40 (Completion), Manila City (14.5984620, 120.9898245)",
        "nepPesos": 70000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0631-010266",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay 390 Zone 40 (Completion), Manila City (14.5984620, 120.9898245)",
        "hgabPesos": 70000000,
        "nepPage": "560",
        "hgabPage": "631",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Abiawin, Infanta, Quezon",
      "source_code": "2027DPWH-Proposal-36351",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Abiawin, Infanta, Quezon",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482726",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "abiawin · infanta · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36351",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Abiawin, Infanta, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0777-013149",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Abiawin, Infanta, Quezon",
        "hgabPesos": 5500000,
        "nepPage": "620",
        "hgabPage": "777",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Alalay Grande, Lupao, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36098",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building, Alalay Grande, Lupao, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201298000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36098",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Alalay Grande, Lupao, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0738-012352",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Alalay Grande, Lupao, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "602",
        "hgabPage": "738",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Alba, Baggao, Cagayan",
      "source_code": "2027DPWH-Proposal-35069",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Alba, Baggao, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544464",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alba · baggao · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35069",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Alba, Baggao, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0702-011602",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Alba, Baggao, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "586",
        "hgabPage": "702",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Alba, Baggao, Cagayan",
      "source_code": "2027DPWH-Proposal-35069",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Alba, Baggao, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597792",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alba · baggao · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35069",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Alba, Baggao, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0702-011602",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Alba, Baggao, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "586",
        "hgabPage": "702",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Alicia, Quezon City",
      "source_code": "2027DPWH-Proposal-33902",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 73000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi Purpose Building at Brgy. Alicia, Quezon City",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466083",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "alicia · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33902",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Alicia, Quezon City",
        "nepPesos": 73000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0631-010267",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Alicia, Quezon City",
        "hgabPesos": 73000000,
        "nepPage": "560",
        "hgabPage": "631",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Alicia, Quezon City",
      "source_code": "2027DPWH-Proposal-33902",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 73000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Alicia, Quezon City",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415125",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "alicia · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33902",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Alicia, Quezon City",
        "nepPesos": 73000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0631-010267",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Alicia, Quezon City",
        "hgabPesos": 73000000,
        "nepPage": "560",
        "hgabPage": "631",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Alupay, Sampaloc, Quezon",
      "source_code": "2027DPWH-Proposal-36342",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Alupay, Sampaloc, Quezon",
      "prior_amount": 3180000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482754",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alupay · sampaloc · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36342",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Alupay, Sampaloc, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0777-013151",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Alupay, Sampaloc, Quezon",
        "hgabPesos": 5000000,
        "nepPage": "620",
        "hgabPage": "777",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Amaga, Patnanungan, Quezon",
      "source_code": "2027DPWH-Proposal-36364",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Amaga, Patnanungan, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530856",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "amaga · patnanungan · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36364",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Amaga, Patnanungan, Quezon",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0777-013152",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Amaga, Patnanungan, Quezon",
        "hgabPesos": 6000000,
        "nepPage": "620",
        "hgabPage": "777",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Antipolo Del Sur, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28745",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2017,
      "prior_project": "Repair/Rehabilitation of Multi-purpose Building at Barangay Antipolo del Sur, Lipa City, Batangas",
      "prior_amount": 6000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010309961",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "antipolo del sur · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28745",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Antipolo Del Sur, Lipa City, Batangas",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0760-012803",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Antipolo Del Sur, Lipa City, Batangas",
        "hgabPesos": 20000000,
        "nepPage": "612",
        "hgabPage": "760",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon",
      "source_code": "2027DPWH-Proposal-36365",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599552",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "apad · jomalig · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36365",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0777-013154",
        "hgabTitle": "Construction/Completion of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon",
        "hgabPesos": 3000000,
        "nepPage": "620",
        "hgabPage": "777",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon",
      "source_code": "2027DPWH-Proposal-36365",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon (14.714683°, 122.420162°)",
      "prior_amount": 3000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35707",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.714683,
        "longitude": 122.420162,
        "raw": "14.714683°, 122.420162",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "apad · jomalig · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36365",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0777-013154",
        "hgabTitle": "Construction/Completion of Multi-Purpose Building at Barangay Apad, Jomalig, Quezon",
        "hgabPesos": 3000000,
        "nepPage": "620",
        "hgabPage": "777",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
      "source_code": "2027DPWH-Proposal-33905",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 54000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi Purpose Building at Brgy. Bagong Pag-asa, Quezon City",
      "prior_amount": 15000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466084",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "bagong pag-asa · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33905",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
        "nepPesos": 54000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0631-010268",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
        "hgabPesos": 54000000,
        "nepPage": "560",
        "hgabPage": "631",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
      "source_code": "2027DPWH-Proposal-33905",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 54000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi Purpose Building at Brgy. Bagong Pag-asa, Quezon City",
      "prior_amount": 4800000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413053",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "bagong pag-asa · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33905",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
        "nepPesos": 54000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0631-010268",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
        "hgabPesos": 54000000,
        "nepPage": "560",
        "hgabPage": "631",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
      "source_code": "2027DPWH-Proposal-33905",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 54000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Bagong Pag-asa, Quezon City, 14.66251, 121.03321",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 31726",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.66251,
        "longitude": 121.03321,
        "raw": "14.66251, 121.03321",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "bagong pag-asa · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33905",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
        "nepPesos": 54000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0631-010268",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
        "hgabPesos": 54000000,
        "nepPage": "560",
        "hgabPage": "631",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
      "source_code": "2027DPWH-Proposal-33905",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 54000000,
      "comparison_year": 2019,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Brgy. Bagong Pag-asa, Quezon City",
      "prior_amount": 20000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104206007000 · PDF p. 555 · printed p. 2020",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "bagong pag-asa · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33905",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
        "nepPesos": 54000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0631-010268",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Bagong Pag-asa, Quezon City",
        "hgabPesos": 54000000,
        "nepPage": "560",
        "hgabPage": "631",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Banay-Banay Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28763",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 9000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Banay-Banay, Lipa City, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599174",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28763",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Banay-Banay Lipa City, Batangas",
        "nepPesos": 9000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0760-012804",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Banay-Banay Lipa City, Batangas",
        "hgabPesos": 9000000,
        "nepPage": "612",
        "hgabPage": "760",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Banay-Banay Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28763",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 9000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation Of Multi-Purpose Building At Barangay Banay-Banay, Lipa City, Batangas (13.934282°, 121.112479°)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 25298",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 13.934282,
        "longitude": 121.112479,
        "raw": "13.934282°, 121.112479",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28763",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Banay-Banay Lipa City, Batangas",
        "nepPesos": 9000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0760-012804",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Banay-Banay Lipa City, Batangas",
        "hgabPesos": 9000000,
        "nepPage": "612",
        "hgabPage": "760",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Baraka, Norzagaray, Bulacan",
      "source_code": "2027DPWH-Proposal-33586",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Baraka, Norzagaray, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530118",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baraka · norzagaray · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33586",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Baraka, Norzagaray, Bulacan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0733-012251",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Baraka, Norzagaray, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "598",
        "hgabPage": "733",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Batuan, La Carlota City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37431",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Batuan, La Carlota City, Negros Occidental",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104203310000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "batuan · la carlota · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37431",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Batuan, La Carlota City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0835-014299",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Batuan, La Carlota City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "643",
        "hgabPage": "835",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Buenlag, Gerona, Tarlac (15.627114, 120.581505)",
      "source_code": "2027DPWH-Proposal-35475",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi Purpose Building at Barangay Buenlag, Gerona, Tarlac",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530342",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 15.627114,
        "longitude": 120.581505,
        "raw": "15.627114, 120.581505",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buenlag · gerona · tarlac",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35475",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Buenlag, Gerona, Tarlac (15.627114, 120.581505)",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0745-012498",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Buenlag, Gerona, Tarlac (15.627114, 120.581505)",
        "hgabPesos": 15000000,
        "nepPage": "605",
        "hgabPage": "745",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Buhay na Tubig, Imus, Cavite",
      "source_code": "2027DPWH-Proposal-36226",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. Buhay na Tubig, Imus City, Cavite",
      "prior_amount": 6000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482535",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "buhay na tubig · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36226",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Buhay na Tubig, Imus, Cavite",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0767-012928",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Buhay na Tubig, Imus, Cavite",
        "hgabPesos": 5000000,
        "nepPage": "613",
        "hgabPage": "767",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Buhay na Tubig, Imus, Cavite",
      "source_code": "2027DPWH-Proposal-36226",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building at Buhay na Tubig, Imus, Cavite",
      "prior_amount": 7000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417265",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36226",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Buhay na Tubig, Imus, Cavite",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0767-012928",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Buhay na Tubig, Imus, Cavite",
        "hgabPesos": 5000000,
        "nepPage": "613",
        "hgabPage": "767",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Buting, Pasig City 14.55329035, 121.0689975",
      "source_code": "2027DPWH-Proposal-31415",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 25000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building at Brgy. Buting, Pasig City",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466212",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.55329035,
        "longitude": 121.0689975,
        "raw": "14.55329035, 121.0689975",
        "orientation": "latitude, longitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31415",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Buting, Pasig City 14.55329035, 121.0689975",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0658-010739",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Buting, Pasig City 14.55329035, 121.0689975",
        "hgabPesos": 25000000,
        "nepPage": "573",
        "hgabPage": "658",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36761",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Calendola, San Pedro, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417472",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "calendola · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36761",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013058",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
        "hgabPesos": 10000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36761",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building in Barangay Calendola, San Pedro City, Laguna",
      "prior_amount": 2500000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530826",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "calendola · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36761",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013058",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
        "hgabPesos": 10000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36761",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Calendola, San Pedro City, Laguna",
      "prior_amount": 7500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599443",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "calendola · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36761",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013058",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
        "hgabPesos": 10000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36761",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Calendola, City of San Pedro, Laguna (14.343225°, 121.036087°)",
      "prior_amount": 12000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35545",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.343225,
        "longitude": 121.036087,
        "raw": "14.343225°, 121.036087",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "calendola · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36761",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013058",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
        "hgabPesos": 10000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36761",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Repair/Rehabilitation of Multi-Purpose Building, Calendola, San Pedro, Laguna",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010311481",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36761",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013058",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
        "hgabPesos": 10000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36761",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Repair/Rehabilitation of Multi-Purpose Building, Brgy. Calendola, San Pedro, Laguna",
      "prior_amount": 1500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104208282000 · PDF p. 714 · printed p. 2179",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "calendola · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36761",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013058",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Calendola, San Pedro City, Laguna",
        "hgabPesos": 10000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Canarvacanan, Alcala, Pangasinan",
      "source_code": "2027DPWH-Proposal-34483",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Canarvacanan, Alcala, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415484",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "canarvacanan · alcala · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34483",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Canarvacanan, Alcala, Pangasinan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0633-010308",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Canarvacanan, Alcala, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "561",
        "hgabPage": "633",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Canarvacanan, Binalonan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34271",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Canarvacanan, Binalonan, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544274",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "canarvacanan · binalonan · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34271",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Canarvacanan, Binalonan, Pangasinan",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0633-010309",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Canarvacanan, Binalonan, Pangasinan",
        "hgabPesos": 30000000,
        "nepPage": "561",
        "hgabPage": "633",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Candabong, Dumanjug, Cebu",
      "source_code": "2027DPWH-Proposal-37678",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Candabong, Dumanjug, Cebu",
      "prior_amount": 550000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419592",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "candabong · dumanjug · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37678",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Candabong, Dumanjug, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0852-014643",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Candabong, Dumanjug, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "647",
        "hgabPage": "852",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Candabong, Dumanjug, Cebu",
      "source_code": "2027DPWH-Proposal-37678",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Candabong, Dumanjug, Cebu",
      "prior_amount": 2500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104210414000 · PDF p. 862 · printed p. 2327",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "candabong · dumanjug · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37678",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Candabong, Dumanjug, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0852-014643",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Candabong, Dumanjug, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "647",
        "hgabPage": "852",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Canduman, Mandaue City, Cebu",
      "source_code": "2027DPWH-Proposal-37784",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 15000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Canduman, Mandaue City, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484280",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "canduman · mandaue · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37784",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Canduman, Mandaue City, Cebu",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0852-014632",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Canduman, Mandaue City, Cebu",
        "hgabPesos": 15000000,
        "nepPage": "647",
        "hgabPage": "852",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
      "source_code": "2027DPWH-Proposal-36366",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Casuguran, Jomalig, Quezon",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482731",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "casuguran · jomalig · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36366",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
      "source_code": "2027DPWH-Proposal-36366",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Casuguran, Jomalig, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530866",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "casuguran · jomalig · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36366",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
      "source_code": "2027DPWH-Proposal-36366",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599600",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "casuguran · jomalig · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36366",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
      "source_code": "2027DPWH-Proposal-36366",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon (14.714380°, 122.367384°)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35723",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.71438,
        "longitude": 122.367384,
        "raw": "14.714380°, 122.367384",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "casuguran · jomalig · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36366",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Casuguran, Jomalig, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36420",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Chrysanthemum, San Pedro, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417473",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "chrysanthemum · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36420",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013059",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
        "hgabPesos": 20000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36420",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530814",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "chrysanthemum · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36420",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013059",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
        "hgabPesos": 20000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36420",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Chrysanthemum, San Pedro City, Laguna",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599444",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "chrysanthemum · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36420",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013059",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
        "hgabPesos": 20000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36420",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Chrysanthemum, City of San Pedro, Laguna (14.340566°, 121.047357°)",
      "prior_amount": 7000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35547",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.340566,
        "longitude": 121.047357,
        "raw": "14.340566°, 121.047357",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "chrysanthemum · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36420",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013059",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Chrysanthemum, San Pedro City, Laguna",
        "hgabPesos": 20000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33866",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Improvement of Multi-Purpose Building at Brgy. Cumba, Lipa City, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466610",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cumba · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33866",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0760-012805",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "612",
        "hgabPage": "760",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33866",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Cumba, Lipa City, Batangas",
      "prior_amount": 5320000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417150",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cumba · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33866",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0760-012805",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "612",
        "hgabPage": "760",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33866",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
      "prior_amount": 55000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595995",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cumba · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33866",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0760-012805",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "612",
        "hgabPage": "760",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33866",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Multi-purpose Building at Barangay Cumba, Lipa City, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300103200366000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cumba · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33866",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0760-012805",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Cumba, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "612",
        "hgabPage": "760",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Dakila, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-35585",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Dakila, City of Malolos, Bulacan",
      "prior_amount": 7500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598340",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Danny Domingo"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "dakila · malolos · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35585",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Dakila, City of Malolos, Bulacan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0730-012188",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Dakila, City of Malolos, Bulacan",
        "hgabPesos": 5000000,
        "nepPage": "597",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Damar, Quezon City",
      "source_code": "2027DPWH-Proposal-33903",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 69500000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi Purpose Building at Brgy. Damar, Quezon City",
      "prior_amount": 10000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466086",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "damar · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33903",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Damar, Quezon City",
        "nepPesos": 69500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0631-010269",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Damar, Quezon City",
        "hgabPesos": 69500000,
        "nepPage": "560",
        "hgabPage": "631",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Damar, Quezon City",
      "source_code": "2027DPWH-Proposal-33903",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 69500000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Multi-Purpose Building at Brgy. Damar, Quezon City",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525104",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "damar · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33903",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Damar, Quezon City",
        "nepPesos": 69500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0631-010269",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Damar, Quezon City",
        "hgabPesos": 69500000,
        "nepPage": "560",
        "hgabPage": "631",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Del Carmen, Pagbilao, Quezon",
      "source_code": "2027DPWH-Proposal-36337",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Del Carmen, Pagbilao, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529084",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "del carmen · pagbilao · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36337",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Del Carmen, Pagbilao, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Dinahican, Infanta, Quezon",
      "source_code": "2027DPWH-Proposal-36355",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Dinahican, Infanta, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482732",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "dinahican · infanta · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36355",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Dinahican, Infanta, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0778-013164",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Dinahican, Infanta, Quezon",
        "hgabPesos": 7500000,
        "nepPage": "620",
        "hgabPage": "778",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Don Jorge L. Araneta, Bago City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37429",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Don Jorge L. Araneta Bago City, Negros Occidental",
      "prior_amount": 2800000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104210031000 · PDF p. 837 · printed p. 2302",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37429",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Don Jorge L. Araneta, Bago City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0835-014301",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Don Jorge L. Araneta, Bago City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "643",
        "hgabPage": "835",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Don Pedro, Mansalay, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37058",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Improvement) of Multi-Purpose Building at Barangay Don Pedro, Mansalay, Oriental Mindoro",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417945",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "don pedro · mansalay · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37058",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Don Pedro, Mansalay, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0794-013483",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Don Pedro, Mansalay, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "628",
        "hgabPage": "794",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Happy Valley, Roxas, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37057",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Happy Valley, Roxas, Oriental Mindoro",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483058",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfonso Umali Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37057",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Happy Valley, Roxas, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0794-013485",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Happy Valley, Roxas, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "628",
        "hgabPage": "794",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Inanama, Llanera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36096",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Inanama, Llanera, Nueva Ecija",
      "prior_amount": 6000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544993",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "inanama · llanera · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36096",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Inanama, Llanera, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0738-012353",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Inanama, Llanera, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "602",
        "hgabPage": "738",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Kalyaat, Lucban, Quezon",
      "source_code": "2027DPWH-Proposal-36339",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. Kalyaat, Lucban, Quezon",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482718",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kalyaat · lucban · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36339",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Kalyaat, Lucban, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0778-013165",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Kalyaat, Lucban, Quezon",
        "hgabPesos": 5000000,
        "nepPage": "620",
        "hgabPage": "778",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Kanluran Talaongan, Cavinti, Laguna",
      "source_code": "2027DPWH-Proposal-36769",
      "office": "Laguna 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 6500000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Kanluran Talaongan, Cavinti, Laguna",
      "prior_amount": 7700000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482587",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kanluran talaongan · cavinti · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36769",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Kanluran Talaongan, Cavinti, Laguna",
        "nepPesos": 6500000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Kanluran Talaongan, Cavinti, Laguna",
      "source_code": "2027DPWH-Proposal-36769",
      "office": "Laguna 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 6500000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Kanluran Talaongan, Cavinti, Laguna",
      "prior_amount": 2650000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104208236000 · PDF p. 711 · printed p. 2176",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kanluran talaongan · cavinti · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36769",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Kanluran Talaongan, Cavinti, Laguna",
        "nepPesos": 6500000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Langgam, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36762",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Langgam, San Pedro City, Laguna",
      "prior_amount": 7500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599445",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "langgam · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36762",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Langgam, San Pedro City, Laguna",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013060",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Langgam, San Pedro City, Laguna",
        "hgabPesos": 10000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Lewin, Lumban, Laguna",
      "source_code": "2027DPWH-Proposal-36243",
      "office": "Laguna 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Lewin, Lumban, Laguna",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482585",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lewin · lumban · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36243",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Lewin, Lumban, Laguna",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0771-013015",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Lewin, Lumban, Laguna",
        "hgabPesos": 50000000,
        "nepPage": "616",
        "hgabPage": "771",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Lumbac, Pulilan, Bulacan",
      "source_code": "2027DPWH-Proposal-35587",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-Purpose Building at Barangay Lumbac, Pulilan, Bulacan",
      "prior_amount": 8000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598350",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lumbac · pulilan · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35587",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Lumbac, Pulilan, Bulacan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0730-012189",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Lumbac, Pulilan, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "597",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Luna, Bongabong, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37051",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Completion of Multi-Purpose Building at Barangay Luna, Bongabong, Oriental Mindoro",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599911",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "luna · bongabong · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37051",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Luna, Bongabong, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0794-013486",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Luna, Bongabong, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "628",
        "hgabPage": "794",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Malingin, Bago City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37430",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Malingin, Bago City, Negros Occidental",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546815",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jeffrey Ferrer"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malingin · bago · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37430",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Malingin, Bago City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0836-014302",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Malingin, Bago City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "644",
        "hgabPage": "836",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Malingin, Bago City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37430",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Malingin, Bago City, Negros Occidental",
      "prior_amount": 3000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104203311000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malingin · bago · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37430",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Malingin, Bago City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0836-014302",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Malingin, Bago City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "644",
        "hgabPage": "836",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Malingin, Bago City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37430",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Malingin, Bago City, Negros Occidental",
      "prior_amount": 1500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104203311000 · PDF p. 523 · printed p. 1988",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malingin · bago · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37430",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Malingin, Bago City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0836-014302",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Malingin, Bago City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "644",
        "hgabPage": "836",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Pacita 1, San Pedro City Laguna",
      "source_code": "2027DPWH-Proposal-36779",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 80000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pacita 1, City of San Pedro, Laguna (14.345371°, 121.056255°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35571",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.345371,
        "longitude": 121.056255,
        "raw": "14.345371°, 121.056255",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36779",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Pacita 1, San Pedro City Laguna",
        "nepPesos": 80000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0641-010425",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Pacita 1, San Pedro City Laguna",
        "hgabPesos": 80000000,
        "nepPage": "567",
        "hgabPage": "641",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Pacita 2, San Pedro City Laguna",
      "source_code": "2027DPWH-Proposal-36760",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 70000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pacita 2, San Pedro City, Laguna",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599454",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36760",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Pacita 2, San Pedro City Laguna",
        "nepPesos": 70000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0641-010426",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Pacita 2, San Pedro City Laguna",
        "hgabPesos": 70000000,
        "nepPage": "567",
        "hgabPage": "641",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Pacita 2, San Pedro City Laguna",
      "source_code": "2027DPWH-Proposal-36760",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 70000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pacita 2, City of San Pedro, Laguna (14.350064°, 121.048682°)",
      "prior_amount": 15000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35573",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.350064,
        "longitude": 121.048682,
        "raw": "14.350064°, 121.048682",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36760",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Pacita 2, San Pedro City Laguna",
        "nepPesos": 70000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0641-010426",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Pacita 2, San Pedro City Laguna",
        "hgabPesos": 70000000,
        "nepPage": "567",
        "hgabPage": "641",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Pagolingin East, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28786",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 22000000,
      "comparison_year": 2020,
      "prior_project": "Improvement of Multi-Purpose Building, Brgy. Pagolingin East, Lipa City, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482369",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pagolingin east · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28786",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Pagolingin East, Lipa City, Batangas",
        "nepPesos": 22000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0760-012807",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Pagolingin East, Lipa City, Batangas",
        "hgabPesos": 22000000,
        "nepPage": "612",
        "hgabPage": "760",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Pagolingin East, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28786",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 22000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Multi-Purpose Building at Barangay Pagolingin East, Lipa City, Batangas",
      "prior_amount": 8000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300103200374000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pagolingin east · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28786",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Pagolingin East, Lipa City, Batangas",
        "nepPesos": 22000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0760-012807",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Pagolingin East, Lipa City, Batangas",
        "hgabPesos": 22000000,
        "nepPage": "612",
        "hgabPage": "760",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Panaytayan, Mansalay, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37059",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 7000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Improvement) of Multi-Purpose Building at Barangay Panaytayan, Mansalay, Oriental Mindoro",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417947",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "panaytayan · mansalay · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37059",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Panaytayan, Mansalay, Oriental Mindoro",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0794-013488",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Panaytayan, Mansalay, Oriental Mindoro",
        "hgabPesos": 7000000,
        "nepPage": "628",
        "hgabPage": "794",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Pangao, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28768",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 18000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building at Barangay Pangao, Lipa City, Batangas",
      "prior_amount": 2500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300103200283000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pangao · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28768",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Pangao, Lipa City, Batangas",
        "nepPesos": 18000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012808",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Pangao, Lipa City, Batangas",
        "hgabPesos": 18000000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
      "source_code": "2027DPWH-Proposal-33587",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Patubig, Marilao, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481792",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33587",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0733-012256",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
        "hgabPesos": 30000000,
        "nepPage": "599",
        "hgabPage": "733",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
      "source_code": "2027DPWH-Proposal-33587",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Patubig, Marilao, Bulacan",
      "prior_amount": 8300000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 414402",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33587",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0733-012256",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
        "hgabPesos": 30000000,
        "nepPage": "599",
        "hgabPage": "733",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
      "source_code": "2027DPWH-Proposal-33587",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Patubig, Marilao, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595934",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33587",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0733-012256",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Patubig Marilao, Bulacan",
        "hgabPesos": 30000000,
        "nepPage": "599",
        "hgabPage": "733",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan",
      "source_code": "2027DPWH-Proposal-35588",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan (14.927881, 120.841578)",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33580",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.927881,
        "longitude": 120.841578,
        "raw": "14.927881, 120.841578",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "penabatan · pulilan · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35588",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0730-012190",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "597",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Pindangan Centro, Alcala, Pangasinan",
      "source_code": "2027DPWH-Proposal-34481",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pindangan Centro, Alcala, Pangasinan",
      "prior_amount": 5500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415495",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pindangan centro · alcala · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34481",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Pindangan Centro, Alcala, Pangasinan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0633-010315",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Pindangan Centro, Alcala, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "562",
        "hgabPage": "633",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Poblacion, Bongabong, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37053",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Poblacion Multi-Purpose Building, at Brgy. Poblacion, Bongabong, Oriental Mindoro",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545999",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · bongabong · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37053",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Poblacion, Bongabong, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0794-013489",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Poblacion, Bongabong, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "628",
        "hgabPage": "794",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, Bulacan",
      "source_code": "2027DPWH-Proposal-35589",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598381",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · pulilan · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35589",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, Bulacan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0730-012191",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "597",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, Bulacan",
      "source_code": "2027DPWH-Proposal-35589",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2019,
      "prior_project": "Construction/Improvement of Multi-Purpose Building, Brgy. Poblacion, Pulilan, Bulacan",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104207234000 · PDF p. 640 · printed p. 2105",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · pulilan · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35589",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, Bulacan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0730-012191",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Poblacion, Pulilan, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "597",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Rosario, Pinamalayan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37040",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Rosario, Pinamalayan, Oriental Mindoro",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531232",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "rosario · pinamalayan · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37040",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Rosario, Pinamalayan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0794-013491",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Rosario, Pinamalayan, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "628",
        "hgabPage": "794",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Sabang, Pinamalayan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37041",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Sabang, Pinamalayan, Oriental Mindoro",
      "prior_amount": 4000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417967",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sabang · pinamalayan · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37041",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Sabang, Pinamalayan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0794-013492",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Sabang, Pinamalayan, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "628",
        "hgabPage": "794",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Sablang, General Nakar, Quezon",
      "source_code": "2027DPWH-Proposal-36349",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Sablang, General Nakar, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530880",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sablang · general nakar · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36349",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Sablang, General Nakar, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0782-013259",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sumilang, Municipality General Luna, Quezon",
        "hgabPesos": 10000000,
        "nepPage": "621",
        "hgabPage": "782",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Sagana, Bongabong, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37054",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sagana, Bongabong, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599951",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sagana · bongabong · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37054",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Sagana, Bongabong, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0794-013493",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Sagana, Bongabong, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "628",
        "hgabPage": "794",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Diego, Luisiana, Laguna",
      "source_code": "2027DPWH-Proposal-36773",
      "office": "Laguna 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 6500000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building at Barangay San Diego, Luisiana, Laguna",
      "prior_amount": 11100000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530794",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san diego · luisiana · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36773",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay San Diego, Luisiana, Laguna",
        "nepPesos": 6500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0771-013017",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Diego, Luisiana, Laguna",
        "hgabPesos": 6500000,
        "nepPage": "616",
        "hgabPage": "771",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Francisco, Legazpi City, Albay",
      "source_code": "2027DPWH-Proposal-39396",
      "office": "Albay 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Francisco, Legazpi City, Albay",
      "prior_amount": 5000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010311787",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san francisco · legazpi · albay",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39396",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay San Francisco, Legazpi City, Albay",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0796-013523",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Francisco, Legazpi City, Albay",
        "hgabPesos": 5000000,
        "nepPage": "629",
        "hgabPage": "796",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Isidro, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28753",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Multi-Purpose Building at Barangay San Isidro, Lipa City, Batangas",
      "prior_amount": 1500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201858000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san isidro · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28753",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay San Isidro, Lipa City, Batangas",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012809",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Isidro, Lipa City, Batangas",
        "hgabPesos": 20000000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Juan, Municipality of Pontevedra, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37433",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. San Juan, Pontevedra, Negros Occidental",
      "prior_amount": 3000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104203312000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san juan · pontevedra · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37433",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay San Juan, Municipality of Pontevedra, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0836-014303",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Juan, Municipality of Pontevedra, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "644",
        "hgabPage": "836",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Pedro, Tumauini, Isabela, 17.288839, 121.807212",
      "source_code": "2027DPWH-Proposal-35240",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Pedro, Tumauini, Isabela",
      "prior_amount": 16000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529852",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 17.288839,
        "longitude": 121.807212,
        "raw": "17.288839, 121.807212",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san pedro · tumauini · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35240",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay San Pedro, Tumauini, Isabela, 17.288839, 121.807212",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0705-011687",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Pedro, Tumauini, Isabela, 17.288839, 121.807212",
        "hgabPesos": 20000000,
        "nepPage": "588",
        "hgabPage": "705",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Pedro, Tumauini, Isabela, 17.288839, 121.807212",
      "source_code": "2027DPWH-Proposal-35240",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Pedro, Tumauini, Isabela",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597905",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 17.288839,
        "longitude": 121.807212,
        "raw": "17.288839, 121.807212",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san pedro · tumauini · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35240",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay San Pedro, Tumauini, Isabela, 17.288839, 121.807212",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0705-011687",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Pedro, Tumauini, Isabela, 17.288839, 121.807212",
        "hgabPesos": 20000000,
        "nepPage": "588",
        "hgabPage": "705",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Rafael, Burdeos, Quezon",
      "source_code": "2027DPWH-Proposal-36363",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San Rafael, Burdeos, Quezon",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482740",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san rafael · burdeos · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36363",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay San Rafael, Burdeos, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0779-013182",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Rafael, Burdeos, Quezon",
        "hgabPesos": 5000000,
        "nepPage": "621",
        "hgabPage": "779",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Rafael, Tarlac City, Tarlac",
      "source_code": "2027DPWH-Proposal-36148",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 39500000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building Barangay, San Rafael, Tarlac City, Tarlac",
      "prior_amount": 2500000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530298",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36148",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay San Rafael, Tarlac City, Tarlac",
        "nepPesos": 39500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0745-012504",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Rafael, Tarlac City, Tarlac",
        "hgabPesos": 39500000,
        "nepPage": "605",
        "hgabPage": "745",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Roque, Bulalacao, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37072",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Roque, Bulalacao, Oriental Mindoro",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531234",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfonso Umali Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san roque · bulalacao · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37072",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay San Roque, Bulalacao, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0794-013494",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Roque, Bulalacao, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "628",
        "hgabPage": "794",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
      "source_code": "2027DPWH-Proposal-35597",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544870",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35597",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0730-012192",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "597",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
      "source_code": "2027DPWH-Proposal-35597",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598423",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san roque · paombong · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35597",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0730-012192",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "597",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
      "source_code": "2027DPWH-Proposal-35597",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation of Multi-Purpose Building, San Roque, Paombong, Bulacan",
      "prior_amount": 1500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201195000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35597",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0730-012192",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Roque, Paombong, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "597",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Vicente, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-35600",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2018,
      "prior_project": "Construction/Improvement of Multi-Purpose Building, San Vicente, Malolos City, Bulacan",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201173000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35600",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay San Vicente, City of Malolos, Bulacan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0730-012193",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Vicente, City of Malolos, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "597",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay San Vicente, Santa Maria, Bulacan",
      "source_code": "2027DPWH-Proposal-33566",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 25000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Vicente, Santa Maria, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595929",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Salvador Pleyto"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san vicente · santa maria · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33566",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay San Vicente, Santa Maria, Bulacan",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0733-012258",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay San Vicente, Santa Maria, Bulacan",
        "hgabPesos": 25000000,
        "nepPage": "599",
        "hgabPage": "733",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Sta. Barbara, Llanera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36097",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sta. Barbara, Llanera, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530178",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sta. barbara · llanera · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36097",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Sta. Barbara, Llanera, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0738-012355",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Sta. Barbara, Llanera, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "602",
        "hgabPage": "738",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
      "source_code": "2027DPWH-Proposal-23015",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 15000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Sta. Lucia, Quezon City",
      "prior_amount": 25000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466060",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.70739,
        "longitude": 121.05327,
        "raw": "14.70739, 121.05327",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23015",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0661-010814",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
        "hgabPesos": 15000000,
        "nepPage": "575",
        "hgabPage": "661",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
      "source_code": "2027DPWH-Proposal-23015",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 15000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Sta. Lucia, Quezon City",
      "prior_amount": 20750000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413049",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.70739,
        "longitude": 121.05327,
        "raw": "14.70739, 121.05327",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23015",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0661-010814",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
        "hgabPesos": 15000000,
        "nepPage": "575",
        "hgabPage": "661",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
      "source_code": "2027DPWH-Proposal-23015",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Sta. Lucia, Quezon City",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525129",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.70739,
        "longitude": 121.05327,
        "raw": "14.70739, 121.05327",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23015",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0661-010814",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
        "hgabPesos": 15000000,
        "nepPage": "575",
        "hgabPage": "661",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
      "source_code": "2027DPWH-Proposal-23015",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 15000000,
      "comparison_year": 2019,
      "prior_project": "Construction/ Rehabilitation of Multi-Purpose Building, Brgy. Sta. Lucia, Quezon City",
      "prior_amount": 5000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104206003000 · PDF p. 554 · printed p. 2019",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.70739,
        "longitude": 121.05327,
        "raw": "14.70739, 121.05327",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23015",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0661-010814",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Sta. Lucia, Quezon City 14.70739, 121.05327",
        "hgabPesos": 15000000,
        "nepPage": "575",
        "hgabPage": "661",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Taal, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-35579",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Taal, City of Malolos, Bulacan (14.817809, 120.857842)",
      "prior_amount": 15000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33586",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Danny Domingo"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.817809,
        "longitude": 120.857842,
        "raw": "14.817809, 120.857842",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taal · malolos · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35579",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Taal, City of Malolos, Bulacan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0730-012194",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Taal, City of Malolos, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "597",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Tamaoyan, Legazpi City, Albay",
      "source_code": "2027DPWH-Proposal-39397",
      "office": "Albay 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 8500000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tamaoyan, Legazpi City, Albay",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546039",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tamaoyan · legazpi · albay",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39397",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Tamaoyan, Legazpi City, Albay",
        "nepPesos": 8500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0796-013525",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Tamaoyan, Legazpi City, Albay",
        "hgabPesos": 8500000,
        "nepPage": "629",
        "hgabPage": "796",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Taplacon, Camalig, Albay",
      "source_code": "2027DPWH-Proposal-39367",
      "office": "Albay 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 7500000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Taplacon, Camalig, Albay",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104202438000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taplacon · camalig · albay",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39367",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Taplacon, Camalig, Albay",
        "nepPesos": 7500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0796-013526",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Taplacon, Camalig, Albay",
        "hgabPesos": 7500000,
        "nepPage": "629",
        "hgabPage": "796",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Tibatib, Cavinti, Laguna",
      "source_code": "2027DPWH-Proposal-36770",
      "office": "Laguna 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 6500000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Tibatib, Cavinti, Laguna",
      "prior_amount": 2800000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482595",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tibatib · cavinti · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36770",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Tibatib, Cavinti, Laguna",
        "nepPesos": 6500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0771-013022",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Tibatib, Cavinti, Laguna",
        "hgabPesos": 6500000,
        "nepPage": "616",
        "hgabPage": "771",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Tibsoc, Municipality of San Enrique, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37435",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tibsoc, San Enrique, Negros Occidental",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419088",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jeffrey Ferrer"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tibsoc · san enrique · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37435",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Tibsoc, Municipality of San Enrique, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0836-014304",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Tibsoc, Municipality of San Enrique, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "644",
        "hgabPage": "836",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Tipacan, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28760",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Tipacan, Lipa City, Batangas",
      "prior_amount": 6000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466636",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tipacan · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28760",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Tipacan, Lipa City, Batangas",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012810",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Tipacan, Lipa City, Batangas",
        "hgabPesos": 15000000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Tipacan, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28760",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Multi-purpose Building, Barangay Tipacan, Lipa City, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300103200381000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tipacan · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28760",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Tipacan, Lipa City, Batangas",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012810",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Tipacan, Lipa City, Batangas",
        "hgabPesos": 15000000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Tongohin, Infanta, Quezon",
      "source_code": "2027DPWH-Proposal-36358",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tongohin, Infanta, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525536",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tongohin · infanta · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36358",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Tongohin, Infanta, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0780-013213",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Tongohin, Infanta, Quezon",
        "hgabPesos": 6000000,
        "nepPage": "621",
        "hgabPage": "780",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Waygan, Mansalay, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37063",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Waygan, Mansalay, Oriental Mindoro",
      "prior_amount": 4000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417977",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "waygan · mansalay · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37063",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Waygan, Mansalay, Oriental Mindoro",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0795-013498",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Waygan, Mansalay, Oriental Mindoro",
        "hgabPesos": 10000000,
        "nepPage": "629",
        "hgabPage": "795",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Zamora, Municipality of Pontevedra, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37434",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Zamora, Pontevedra, Negros Occidental",
      "prior_amount": 3000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104210036000 · PDF p. 837 · printed p. 2302",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "zamora · pontevedra · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37434",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Zamora, Municipality of Pontevedra, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0836-014306",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Zamora, Municipality of Pontevedra, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "644",
        "hgabPage": "836",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Brgy. Abaga (Covered Court), Lala, Lanao del Norte",
      "source_code": "2027DPWH-Proposal-39168",
      "office": "Lanao del Norte 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 8000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Abaga, Lala, Lanao del Norte",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 547671",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "abaga · lala · lanao del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39168",
        "nepTitle": "Construction of Multi-Purpose Building at Brgy. Abaga (Covered Court), Lala, Lanao del Norte",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0880-015171",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Abaga (Covered Court), Lala, Lanao del Norte",
        "hgabPesos": 8000000,
        "nepPage": "662",
        "hgabPage": "880",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Lingayen, Pangasinan",
      "source_code": "2027DPWH-Proposal-34195",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 13000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Multi Purpose Building, Barangay Lingayen, Lingayen, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 567253",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34195",
        "nepTitle": "Construction of Multi-Purpose Building at Lingayen, Pangasinan",
        "nepPesos": 13000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0683-011226",
        "hgabTitle": "Construction of Multi-Purpose Building at Lingayen, Pangasinan",
        "hgabPesos": 13000000,
        "nepPage": "579",
        "hgabPage": "683",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Molino 4, Bacoor City, Cavite",
      "source_code": "2027DPWH-Proposal-36428",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Molino 4, City of Bacoor, Cavite",
      "prior_amount": 9000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417367",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36428",
        "nepTitle": "Construction of Multi-Purpose Building at Molino 4, Bacoor City, Cavite",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0769-012984",
        "hgabTitle": "Construction of Multi-Purpose Building at Molino 4, Bacoor City, Cavite",
        "hgabPesos": 10000000,
        "nepPage": "615",
        "hgabPage": "769",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Molino 4, Bacoor City, Cavite",
      "source_code": "2027DPWH-Proposal-36428",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Molino 4, Bacoor City, Cavite",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599396",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36428",
        "nepTitle": "Construction of Multi-Purpose Building at Molino 4, Bacoor City, Cavite",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0769-012984",
        "hgabTitle": "Construction of Multi-Purpose Building at Molino 4, Bacoor City, Cavite",
        "hgabPesos": 10000000,
        "nepPage": "615",
        "hgabPage": "769",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Municipality of Gerona, Tarlac",
      "source_code": "2027DPWH-Proposal-36149",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 40000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Gerona, Gerona, Tarlac",
      "prior_amount": 3100000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482105",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36149",
        "nepTitle": "Construction of Multi-Purpose Building at Municipality of Gerona, Tarlac",
        "nepPesos": 40000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0745-012505",
        "hgabTitle": "Construction of Multi-Purpose Building at Municipality of Gerona, Tarlac",
        "hgabPesos": 40000000,
        "nepPage": "605",
        "hgabPage": "745",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Tongko, Tayabas City, Quezon",
      "source_code": "2027DPWH-Proposal-36329",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Tongko, Tayabas, Quezon",
      "prior_amount": 7000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545713",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36329",
        "nepTitle": "Construction of Multi-Purpose Building at Tongko, Tayabas City, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0777-013148",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Tamlong, Tayabas City, Quezon",
        "hgabPesos": 5000000,
        "nepPage": "621",
        "hgabPage": "777",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37566",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay 12, Bacolod City, Negros Occidental",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483403",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "12 · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37566",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0830-014200",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "830",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37566",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 12, Bacolod City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546370",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "12 · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37566",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0830-014200",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "830",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37566",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay 12, Bacolod City, Negros Occidental (10.6717, 122.9465)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37761",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.6717,
        "longitude": 122.9465,
        "raw": "10.6717, 122.9465",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "12 · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37566",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0830-014200",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay 12, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "830",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay 4, Isabela, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37596",
      "office": "Negros Occidental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 4, Isabela, Negros Occidental",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419017",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Dino Yulo"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "4 · isabela · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37596",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay 4, Isabela, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0834-014263",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay 4, Isabela, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "643",
        "hgabPage": "834",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Alangilan, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37567",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Alangilan, Bacolod City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531610",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alangilan · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37567",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Alangilan, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Alangilan, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37567",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Alangilan, Bacolod City, Negros Occidental (10.662042, 123.097617)",
      "prior_amount": 7500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37773",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.662042,
        "longitude": 123.097617,
        "raw": "10.662042, 123.097617",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alangilan · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37567",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Alangilan, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37568",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose building, Brgy. Banago, Bacolod City, Negros Occidental",
      "prior_amount": 15000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466839",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "banago · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37568",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014202",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37568",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-purpose building, Brgy. Banago, Bacolod City, Negros Occidental",
      "prior_amount": 12450000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413249",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "banago · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37568",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014202",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37568",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Banago, Bacolod City, Negros Occidental (10.708524, 122.950133)",
      "prior_amount": 15000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37787",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.708524,
        "longitude": 122.950133,
        "raw": "10.708524, 122.950133",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "banago · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37568",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014202",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Banago, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37569",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-purpose Building, Barangay Cabug, Bacolod City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531621",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cabug · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37569",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014203",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37569",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Cabug, Bacolod City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600512",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cabug · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37569",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014203",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37569",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Cabug, Bacolod City, Negros Occidental (10.59859, 122.94763)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37777",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.59859,
        "longitude": 122.94763,
        "raw": "10.59859, 122.94763",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cabug · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37569",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014203",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Cabug, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Estefania, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37570",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Estefania, Bacolod City, Negros Occidental",
      "prior_amount": 8000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600489",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "estefania · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37570",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Estefania, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014204",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Estefania, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Galicia, Ilog, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37606",
      "office": "Negros Occidental 3rd District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Galicia, Ilog, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531923",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "galicia · ilog · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37606",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Galicia, Ilog, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0835-014294",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Galicia, Ilog, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "643",
        "hgabPage": "835",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Handumanan, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37572",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Handumanan, Bacolod City, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531594",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "handumanan · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37572",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Handumanan, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014205",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Handumanan, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Handumanan, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37572",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Handumanan, Bacolod City, Negros Occidental",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546375",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "handumanan · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37572",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Handumanan, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014205",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Handumanan, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay III, Hinigaran, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37599",
      "office": "Negros Occidental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building in Barangay III, Hinigaran, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531899",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "iii · hinigaran · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37599",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay III, Hinigaran, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0834-014270",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay III, Hinigaran, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "643",
        "hgabPage": "834",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Kigay, Malangas, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38185",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 40000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi Purpose Building, Kigay, Malangas, Zamboanga Sibugay",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 601702",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38185",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Kigay, Malangas, Zamboanga Sibugay",
        "nepPesos": 40000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0869-014963",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Kigay, Malangas, Zamboanga Sibugay",
        "hgabPesos": 40000000,
        "nepPage": "654",
        "hgabPage": "869",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Luna, Cadiz, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37581",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Luna, Cadiz City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600828",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "luna · cadiz · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37581",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Luna, Cadiz, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0833-014248",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Luna, Cadiz, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "642",
        "hgabPage": "833",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Maganay, Buug, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38177",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 6000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building for Barangay Maganay, Buug, Zamboanga Sibugay",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300103200535000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "maganay · buug · zamboanga sibugay",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38177",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Maganay, Buug, Zamboanga Sibugay",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0870-014973",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Maganay, Buug, Zamboanga Sibugay",
        "hgabPesos": 6000000,
        "nepPage": "654",
        "hgabPage": "870",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Minapasuk, Calatrava, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37579",
      "office": "Negros Occidental 5th District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Minapasuk, Calatrava, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529112",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jules Ledesma"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "minapasuk · calatrava · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37579",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Minapasuk, Calatrava, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0836-014314",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Minapasuk, Calatrava, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "644",
        "hgabPage": "836",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Poblacion East, Candoni, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37601",
      "office": "Negros Occidental 3rd District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-purpose Building, Candoni, Brgy. East Poblacion, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104210009000 · PDF p. 835 · printed p. 2300",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37601",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Poblacion East, Candoni, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0835-014295",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Poblacion East, Candoni, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "643",
        "hgabPage": "835",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37591",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, San Enrique, Negros Occidental",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419087",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jeffrey Ferrer"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san enrique · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37591",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0836-014309",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "644",
        "hgabPage": "836",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37591",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Enrique, Negros Occidental",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600911",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jeffrey Ferrer"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san enrique · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37591",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0836-014309",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "644",
        "hgabPage": "836",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37591",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation of Multi-purpose Building, Brgy. Poblacion, San Enrique, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104203318000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san enrique · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37591",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0836-014309",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "644",
        "hgabPage": "836",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37591",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, San Enrique, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104210027000 · PDF p. 836 · printed p. 2301",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san enrique · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37591",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0836-014309",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Poblacion, San Enrique, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "644",
        "hgabPage": "836",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Poblacion, Valladolid, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37593",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Valladolid, Negros Occidental (10.4613787°, 122.8229880°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37991",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.4613787,
        "longitude": 122.822988,
        "raw": "10.4613787°, 122.8229880",
        "orientation": "latitude, longitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · valladolid · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37593",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Poblacion, Valladolid, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0836-014310",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Poblacion, Valladolid, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "644",
        "hgabPage": "836",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Robles, La Castellana, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37595",
      "office": "Negros Occidental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Robles, La Castellana, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531904",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "robles · la castellana · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37595",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Robles, La Castellana, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0834-014271",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Robles, La Castellana, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "643",
        "hgabPage": "834",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay San Pedro, Binalbagan, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37594",
      "office": "Negros Occidental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2019,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, San Pedro, Binalbagan, Negros Occidental",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104209911000 · PDF p. 828 · printed p. 2293",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37594",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay San Pedro, Binalbagan, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0834-014272",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay San Pedro, Binalbagan, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "643",
        "hgabPage": "834",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Sta. Maria, Iriga City, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39526",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sta.Maria, Iriga City, Camarines Sur",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546153",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Miguel Luis Villafuerte"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39526",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Sta. Maria, Iriga City, Camarines Sur",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0803-013653",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Sta. Maria, Iriga City, Camarines Sur",
        "hgabPesos": 5000000,
        "nepPage": "632",
        "hgabPage": "803",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37575",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Tangub, Bacolod City, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483411",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37575",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014207",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37575",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. Tangub, Bacolod City, Negros Occidental",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 418534",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tangub · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37575",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014207",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37575",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tangub, Bacolod City, Negros Occidental",
      "prior_amount": 15000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546373",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tangub · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37575",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014207",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Tangub, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Villamonte, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37576",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Villamonte, Bacolod City, Negros Occidental",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531615",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "villamonte · bacolod · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37576",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Villamonte, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014208",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Villamonte, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Brgy. Kapatagan, Alicia, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38341",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Kapatagan, Alicia, Zamboanga Sibugay",
      "prior_amount": 2500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420578",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Marlo Bancoro"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kapatagan · alicia · zamboanga sibugay",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38341",
        "nepTitle": "Construction of Multi-Purpose Building in Brgy. Kapatagan, Alicia, Zamboanga Sibugay",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0870-014974",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Kapatagan, Alicia, Zamboanga Sibugay",
        "hgabPesos": 10000000,
        "nepPage": "654",
        "hgabPage": "870",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Brgy. Kapatagan, Alicia, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38341",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Kapatagan, Alicia, Zamboanga Sibugay (7.563494, 122.958533)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 39953",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Marlo Bancoro"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 7.563494,
        "longitude": 122.958533,
        "raw": "7.563494, 122.958533",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kapatagan · alicia · zamboanga sibugay",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38341",
        "nepTitle": "Construction of Multi-Purpose Building in Brgy. Kapatagan, Alicia, Zamboanga Sibugay",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0870-014974",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Kapatagan, Alicia, Zamboanga Sibugay",
        "hgabPesos": 10000000,
        "nepPage": "654",
        "hgabPage": "870",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Brgy. Lapirawan, Alicia, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38334",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 50000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Lapirawan, Alicia, Zamboanga Sibugay (7.529492, 123.00937)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 39965",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Marlo Bancoro"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 7.529492,
        "longitude": 123.00937,
        "raw": "7.529492, 123.00937",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lapirawan · alicia · zamboanga sibugay",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38334",
        "nepTitle": "Construction of Multi-Purpose Building in Brgy. Lapirawan, Alicia, Zamboanga Sibugay",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0870-014975",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Lapirawan, Alicia, Zamboanga Sibugay",
        "hgabPesos": 50000000,
        "nepPage": "654",
        "hgabPage": "870",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Brgy. Nanan, Payao, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38340",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Completion of Multi Purpose Building, Nanan, Payao, Zamboanga Sibugay",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 601719",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38340",
        "nepTitle": "Construction of Multi-Purpose Building in Brgy. Nanan, Payao, Zamboanga Sibugay",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Brgy. Nanan, Payao, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38340",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Nanan, Payao, Zamboanga Sibugay",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104211355000 · PDF p. 929 · printed p. 2394",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nanan · payao · zamboanga sibugay",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38340",
        "nepTitle": "Construction of Multi-Purpose Building in Brgy. Nanan, Payao, Zamboanga Sibugay",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Brgy. Pulo Mabao, Olutanga, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38338",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Pulo Mabao, Olutanga, Zamboanga Sibugay (7.283705, 122.822725)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 39979",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 7.283705,
        "longitude": 122.822725,
        "raw": "7.283705, 122.822725",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pulo mabao · olutanga · zamboanga sibugay",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38338",
        "nepTitle": "Construction of Multi-Purpose Building in Brgy. Pulo Mabao, Olutanga, Zamboanga Sibugay",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0870-014979",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Pulo Mabao, Olutanga, Zamboanga Sibugay",
        "hgabPesos": 5000000,
        "nepPage": "655",
        "hgabPage": "870",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
      "source_code": "2027DPWH-Proposal-36645",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 47520000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Padre Garcia, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417083",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36645",
        "nepTitle": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
        "nepPesos": 47520000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012811",
        "hgabTitle": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
        "hgabPesos": 47520000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
      "source_code": "2027DPWH-Proposal-36645",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 47520000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545401",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36645",
        "nepTitle": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
        "nepPesos": 47520000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012811",
        "hgabTitle": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
        "hgabPesos": 47520000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
      "source_code": "2027DPWH-Proposal-36645",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 47520000,
      "comparison_year": 2019,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Padre Garcia, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104207983000 · PDF p. 693 · printed p. 2158",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36645",
        "nepTitle": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
        "nepPesos": 47520000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012811",
        "hgabTitle": "Construction of Multi-Purpose Building in Padre Garcia, Batangas",
        "hgabPesos": 47520000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building of Barangay Poblacion, San Pablo, Isabela, 17.44767, 121.79493",
      "source_code": "2027DPWH-Proposal-35276",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 30000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Poblacion, San Pablo, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529844",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Tonypet Albano"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 17.44767,
        "longitude": 121.79493,
        "raw": "17.44767, 121.79493",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san pablo · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35276",
        "nepTitle": "Construction of Multi-Purpose Building of Barangay Poblacion, San Pablo, Isabela, 17.44767, 121.79493",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0705-011688",
        "hgabTitle": "Construction of Multi-Purpose Building of Barangay Poblacion, San Pablo, Isabela, 17.44767, 121.79493",
        "hgabPesos": 30000000,
        "nepPage": "588",
        "hgabPage": "705",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building of Barangay Poblacion, San Pablo, Isabela, 17.44767, 121.79493",
      "source_code": "2027DPWH-Proposal-35276",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, San Pablo, Isabela",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597911",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Tonypet Albano"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 17.44767,
        "longitude": 121.79493,
        "raw": "17.44767, 121.79493",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san pablo · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35276",
        "nepTitle": "Construction of Multi-Purpose Building of Barangay Poblacion, San Pablo, Isabela, 17.44767, 121.79493",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0705-011688",
        "hgabTitle": "Construction of Multi-Purpose Building of Barangay Poblacion, San Pablo, Isabela, 17.44767, 121.79493",
        "hgabPesos": 30000000,
        "nepPage": "588",
        "hgabPage": "705",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building of Barangay San Jose, Baliwag City, Bulacan",
      "source_code": "2027DPWH-Proposal-33621",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2019,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, San Jose, Baliwag, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104207194000 · PDF p. 637 · printed p. 2102",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33621",
        "nepTitle": "Construction of Multi-Purpose Building of Barangay San Jose, Baliwag City, Bulacan",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012202",
        "hgabTitle": "Construction of Multi-Purpose Building of Barangay San Jose, Baliwag City, Bulacan",
        "hgabPesos": 30000000,
        "nepPage": "597",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, (Covered Court), Barangay Asinan Proper, Subic, Zambales (14.88227, 120.22969)",
      "source_code": "2027DPWH-Proposal-11100",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, (Covered Court), Barangay Asinan Proper, Subic, Zambales (14.88227 ,120.22969)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34397",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.88227,
        "longitude": 120.22969,
        "raw": "14.88227, 120.22969",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.88227,
        "longitude": 120.22969,
        "raw": "14.88227 ,120.22969",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "asinan proper · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11100",
        "nepTitle": "Construction of Multi-Purpose Building, (Covered Court), Barangay Asinan Proper, Subic, Zambales (14.88227, 120.22969)",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0637-010388",
        "hgabTitle": "Construction of Multi-Purpose Building Barangay Asinan-Proper, Subic, Zambales (14.892332, 120.226488)",
        "hgabPesos": 100000000,
        "nepPage": "607",
        "hgabPage": "637",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Ampusongan, Bakun, Benguet",
      "source_code": "2027DPWH-Proposal-34770",
      "office": "Benguet 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Ampusongan, Bakun, Benguet",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415663",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34770",
        "nepTitle": "Construction of Multi-Purpose Building, Ampusongan, Bakun, Benguet",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0691-011401",
        "hgabTitle": "Construction of Multi-Purpose Building, Ampusongan, Bakun, Benguet",
        "hgabPesos": 5000000,
        "nepPage": "582",
        "hgabPage": "691",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Apa Mimbalay, Masiu, Lanao del Sur",
      "source_code": "2027DPWH-Proposal-26620",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 30000000,
      "comparison_year": 2019,
      "prior_project": "Construction of multi purpose building, Barangay Apa Mimbalay, Municipality of Masiu, Lanao del sur",
      "prior_amount": 1500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104211543000 · PDF p. 942 · printed p. 2407",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-26620",
        "nepTitle": "Construction of Multi-Purpose Building, Apa Mimbalay, Masiu, Lanao del Sur",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0651-010617",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Apa Mimbalay, Masiu, Lanao del Sur",
        "hgabPesos": 30000000,
        "nepPage": "570",
        "hgabPage": "651",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35084",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. 1, Jones, Isabela",
      "prior_amount": 3500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481545",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35084",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay 1, Jones, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0635-010340",
        "hgabTitle": "Construction of 2-units Multi-Purpose Building, Barangay 1, Jones, Isabela",
        "hgabPesos": 55000000,
        "nepPage": "592",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35084",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529946",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35084",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay 1, Jones, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0635-010340",
        "hgabTitle": "Construction of 2-units Multi-Purpose Building, Barangay 1, Jones, Isabela",
        "hgabPesos": 55000000,
        "nepPage": "592",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 1, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35084",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Barangay 1, Jones, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598156",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35084",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay 1, Jones, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0635-010340",
        "hgabTitle": "Construction of 2-units Multi-Purpose Building, Barangay 1, Jones, Isabela",
        "hgabPesos": 55000000,
        "nepPage": "592",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 1, San Miguel, Iloilo",
      "source_code": "2027DPWH-Proposal-37182",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. 1, San Miguel, Iloilo",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104203095000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "1 · san miguel · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37182",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay 1, San Miguel, Iloilo",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0824-014066",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay 1, San Miguel, Iloilo",
        "hgabPesos": 5000000,
        "nepPage": "639",
        "hgabPage": "824",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 3, Calamba City, Laguna",
      "source_code": "2027DPWH-Proposal-36752",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building Brgy. Brgy. 3, Calamba City, Laguna",
      "prior_amount": 12000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599432",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Cha Hernandez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36752",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay 3, Calamba City, Laguna",
        "nepPesos": 100000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0641-010431",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay 3, Calamba City, Laguna",
        "hgabPesos": 100000000,
        "nepPage": "567",
        "hgabPage": "641",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 37A, Cavite City, Cavite",
      "source_code": "2027DPWH-Proposal-36450",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 37A, Cavite City",
      "prior_amount": 4000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417222",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36450",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay 37A, Cavite City, Cavite",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0767-012944",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay 37A, Cavite City, Cavite",
        "hgabPesos": 10000000,
        "nepPage": "614",
        "hgabPage": "767",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 40, Bacolod City",
      "source_code": "2027DPWH-Proposal-37385",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 20000000,
      "comparison_year": 2019,
      "prior_project": "Rehabilitation/Improvement of Multi-purpose Building, Barangay 40, Bacolod City",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104209434000 · PDF p. 794 · printed p. 2259",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "40 · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37385",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay 40, Bacolod City",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014211",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay 40, Bacolod City",
        "hgabPesos": 20000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City, Cavite",
      "source_code": "2027DPWH-Proposal-36451",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City",
      "prior_amount": 4000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417223",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36451",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City, Cavite",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0767-012945",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City, Cavite",
        "hgabPesos": 10000000,
        "nepPage": "614",
        "hgabPage": "767",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City, Cavite",
      "source_code": "2027DPWH-Proposal-36451",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City, Cavite",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599337",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "48a · cavite · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36451",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City, Cavite",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0767-012945",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay 48A, Cavite City, Cavite",
        "hgabPesos": 10000000,
        "nepPage": "614",
        "hgabPage": "767",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 5, Lucena City, Quezon",
      "source_code": "2027DPWH-Proposal-36478",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay 5, Lucena City, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596058",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "David Suarez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "5 · lucena · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36478",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay 5, Lucena City, Quezon",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0780-013220",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay 5, Lucena City, Quezon",
        "hgabPesos": 6000000,
        "nepPage": "621",
        "hgabPage": "780",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 8, Cavite City, Cavite",
      "source_code": "2027DPWH-Proposal-36454",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building Barangay 8, Cavite City, Cavite",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545508",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "8 · cavite · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36454",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay 8, Cavite City, Cavite",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0767-012946",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay 8, Cavite City, Cavite",
        "hgabPesos": 10000000,
        "nepPage": "614",
        "hgabPage": "767",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay 8, Kabankalan, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37348",
      "office": "Negros Occidental 3rd District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay 8, Kabankalan, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419052",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mercedes Alvarez-Lansang"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "8 · kabankalan · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37348",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay 8, Kabankalan, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0835-014297",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay 8, Kabankalan, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "643",
        "hgabPage": "835",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Abatan, Bauko, Mountain Province",
      "source_code": "2027DPWH-Proposal-34682",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Abatan, Bauko, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597723",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "abatan · bauko · mountain province",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34682",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Abatan, Bauko, Mountain Province",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0695-011483",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Abatan, Bauko, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "583",
        "hgabPage": "695",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Aberawan, El Nido, Palawan",
      "source_code": "2027DPWH-Proposal-36964",
      "office": "Palawan 1st District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Aberawan, El Nido, Palawan",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417805",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Rose Salvame"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "aberawan · el nido · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36964",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Aberawan, El Nido, Palawan",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0791-013415",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Aberawan, El Nido, Palawan",
        "hgabPesos": 6000000,
        "nepPage": "626",
        "hgabPage": "791",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Acacia, Silang, Cavite",
      "source_code": "2027DPWH-Proposal-36551",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Acacia, Silang Cavite",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599398",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36551",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Acacia, Silang, Cavite",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0769-012986",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Acacia, Silang, Cavite",
        "hgabPesos": 10000000,
        "nepPage": "615",
        "hgabPage": "769",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Aganan, Dao, Capiz",
      "source_code": "2027DPWH-Proposal-37096",
      "office": "Capiz 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Aganan, Dao, Capiz",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483461",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37096",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Aganan, Dao, Capiz",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0816-013906",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Aganan, Dao, Capiz",
        "hgabPesos": 5000000,
        "nepPage": "636",
        "hgabPage": "816",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Agawa, Besao, Mountain Province",
      "source_code": "2027DPWH-Proposal-34687",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building at Barangay Agawa, Municipality of Besao, Mountain Province",
      "prior_amount": 3000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104200855000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "agawa · besao · mountain province",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34687",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Agawa, Besao, Mountain Province",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0695-011484",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Agawa, Besao, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "583",
        "hgabPage": "695",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Aguiguican, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35166",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Aguiguican, Gattaran, Cagayan",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481372",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "aguiguican · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35166",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Aguiguican, Gattaran, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0702-011608",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Aguiguican, Gattaran, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "586",
        "hgabPage": "702",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Aguiguican, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35166",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Aguiguican, Gattaran, Cagayan",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544470",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "aguiguican · gattaran · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35166",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Aguiguican, Gattaran, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0702-011608",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Aguiguican, Gattaran, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "586",
        "hgabPage": "702",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Alacaygan, EB Magalona, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37659",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Alacaygan, EB Magalona, Negros Occidental",
      "prior_amount": 3100000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104209837000 · PDF p. 822 · printed p. 2287",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37659",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Alacaygan, EB Magalona, Negros Occidental",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0833-014250",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Alacaygan, EB Magalona, Negros Occidental",
        "hgabPesos": 10000000,
        "nepPage": "642",
        "hgabPage": "833",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Alibadabad, San Mariano, Isabela",
      "source_code": "2027DPWH-Proposal-35242",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. Alibadabad, San Mariano, Isabela",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104206979000 · PDF p. 622 · printed p. 2087",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "alibadabad · san mariano · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35242",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Alibadabad, San Mariano, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0712-011830",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Alibadabad, San Mariano, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "591",
        "hgabPage": "712",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Alijis, Bacolod City",
      "source_code": "2027DPWH-Proposal-37387",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Alijis, Bacolod City",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 418521",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "alijis · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37387",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Alijis, Bacolod City",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014212",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Alijis, Bacolod City",
        "hgabPesos": 10000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Alijis, Bacolod City",
      "source_code": "2027DPWH-Proposal-37387",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Alijis, Bacolod City,",
      "prior_amount": 2500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104202896000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37387",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Alijis, Bacolod City",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014212",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Alijis, Bacolod City",
        "hgabPesos": 10000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Alijis, Bacolod City",
      "source_code": "2027DPWH-Proposal-37387",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Rehabilitation/Improvement of Multi-purpose Building, Barangay Alijis, Bacolod City",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104209445000 · PDF p. 795 · printed p. 2260",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "alijis · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37387",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Alijis, Bacolod City",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014212",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Alijis, Bacolod City",
        "hgabPesos": 10000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Ambalangan Dalin, San Fabian, Pangasinan",
      "source_code": "2027DPWH-Proposal-34224",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5500000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Ambalangan Dalin, San Fabian, Pangasinan\n\n16.1475, 120.473905",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32105",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.1475,
        "longitude": 120.473905,
        "raw": "16.1475, 120.473905",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34224",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Ambalangan Dalin, San Fabian, Pangasinan",
        "nepPesos": 5500000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0683-011228",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Ambalangan Dalin, San Fabian, Pangasinan",
        "hgabPesos": 2500000,
        "nepPage": "579",
        "hgabPage": "683",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Apasan, Sampaloc, Quezon",
      "source_code": "2027DPWH-Proposal-36687",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Apasan, Sampaloc, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530858",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "apasan · sampaloc · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36687",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Apasan, Sampaloc, Quezon",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0780-013215",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Apasan, Sampaloc, Quezon",
        "hgabPesos": 10000000,
        "nepPage": "621",
        "hgabPage": "780",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bagumbayan, Magpet, North Cotabato",
      "source_code": "2027DPWH-Proposal-38682",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Bagumbayan, Magpet, North Cotabato",
      "prior_amount": 3500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104212515000 · PDF p. 1014 · printed p. 2479",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bagumbayan · magpet · north cotabato",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38682",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Bagumbayan, Magpet, North Cotabato",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0896-015468",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Bagumbayan, Magpet, North Cotabato",
        "hgabPesos": 6000000,
        "nepPage": "668",
        "hgabPage": "896",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Balibago, Rosario Batangas",
      "source_code": "2027DPWH-Proposal-36717",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Balibago, Rosario, Batangas",
      "prior_amount": 4000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104207997000 · PDF p. 694 · printed p. 2159",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36717",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Balibago, Rosario Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012814",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Balibago, Rosario Batangas",
        "hgabPesos": 10000000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Balite, Magpet, North Cotabato",
      "source_code": "2027DPWH-Proposal-38696",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Balite, Magpet, North Cotabato",
      "prior_amount": 3500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104212516000 · PDF p. 1014 · printed p. 2479",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "balite · magpet · north cotabato",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38696",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Balite, Magpet, North Cotabato",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0896-015469",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Balite, Magpet, North Cotabato",
        "hgabPesos": 6000000,
        "nepPage": "668",
        "hgabPage": "896",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Banawang, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35639",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Banawang, Bagac, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595830",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "banawang · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35639",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Banawang, Bagac, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012135",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Banawang, Bagac, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "595",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Banawang, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35639",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Banawang, Bagac, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201109000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "banawang · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35639",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Banawang, Bagac, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012135",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Banawang, Bagac, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "595",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
      "source_code": "2027DPWH-Proposal-37002",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 7500000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation/Improvement of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483026",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gil Acosta Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bancao-bancao · puerto princesa · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37002",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
        "nepPesos": 7500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0792-013443",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
        "hgabPesos": 7500000,
        "nepPage": "627",
        "hgabPage": "792",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
      "source_code": "2027DPWH-Proposal-37002",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 7500000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-purpose Building at Barangay Bancao-Bancao, City of Puerto Princesa, Palawan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531196",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gil Acosta Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bancao-bancao · puerto princesa · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37002",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
        "nepPesos": 7500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0792-013443",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
        "hgabPesos": 7500000,
        "nepPage": "627",
        "hgabPage": "792",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
      "source_code": "2027DPWH-Proposal-37002",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 7500000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Bancao-bancao, Puerto Princesa City, Palawan",
      "prior_amount": 5500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545951",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gil Acosta Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bancao-bancao · puerto princesa · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37002",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
        "nepPesos": 7500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0792-013443",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Bancao-Bancao, Puerto Princesa City, Palawan",
        "hgabPesos": 7500000,
        "nepPage": "627",
        "hgabPage": "792",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales (14.877165, 120.234107)",
      "source_code": "2027DPWH-Proposal-11099",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 20000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545256",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.877165,
        "longitude": 120.234107,
        "raw": "14.877165, 120.234107",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baraca-camachile · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11099",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales (14.877165, 120.234107)",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales (14.877165, 120.234107)",
      "source_code": "2027DPWH-Proposal-11099",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. Baraca-Camachile, Subic, Zambales",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598962",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.877165,
        "longitude": 120.234107,
        "raw": "14.877165, 120.234107",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baraca-camachile · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11099",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales (14.877165, 120.234107)",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales (14.877165, 120.234107)",
      "source_code": "2027DPWH-Proposal-11099",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales (14.87718582  ,120.23410665)",
      "prior_amount": 30000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34395",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 2.3,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.877165,
        "longitude": 120.234107,
        "raw": "14.877165, 120.234107",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.87718582,
        "longitude": 120.23410665,
        "raw": "14.87718582  ,120.23410665",
        "orientation": "latitude, longitude",
        "decimalPlaces": 8,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baraca-camachile · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11099",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Baraca-Camachile, Subic, Zambales (14.877165, 120.234107)",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Barake, Aborlan, Palawan",
      "source_code": "2027DPWH-Proposal-37000",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 7500000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Barake, Aborlan, Palawan",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483010",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "barake · aborlan · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37000",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Barake, Aborlan, Palawan",
        "nepPesos": 7500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0792-013449",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Barake, Aborlan, Palawan",
        "hgabPesos": 7500000,
        "nepPage": "627",
        "hgabPage": "792",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Baranayan, Palimbang, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38589",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Baranayan, Palimbang, Sultan Kudarat",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485794",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baranayan · palimbang · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38589",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Baranayan, Palimbang, Sultan Kudarat",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0914-015813",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Baranayan, Palimbang, Sultan Kudarat",
        "hgabPesos": 30000000,
        "nepPage": "671",
        "hgabPage": "914",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Baresbes, Dingras, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-34149",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 15000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Baresbes, Dingras, Ilocos Norte",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481038",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baresbes · dingras · ilocos norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34149",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Baresbes, Dingras, Ilocos Norte",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0676-011098",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Baresbes, Dingras, Ilocos Norte",
        "hgabPesos": 15000000,
        "nepPage": "577",
        "hgabPage": "676",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Baresbes, Dingras, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-34149",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Baresbes, Dingras, Ilocos Norte",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544116",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "baresbes · dingras · ilocos norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34149",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Baresbes, Dingras, Ilocos Norte",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0676-011098",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Baresbes, Dingras, Ilocos Norte",
        "hgabPesos": 15000000,
        "nepPage": "577",
        "hgabPage": "676",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Barotuan, El Nido, Palawan",
      "source_code": "2027DPWH-Proposal-36966",
      "office": "Palawan 1st District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Barotuan, El Nido, Palawan",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482972",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Rose Salvame"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "barotuan · el nido · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36966",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Barotuan, El Nido, Palawan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0791-013416",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Barotuan, El Nido, Palawan",
        "hgabPesos": 10000000,
        "nepPage": "626",
        "hgabPage": "791",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Barotuan, El Nido, Palawan",
      "source_code": "2027DPWH-Proposal-36966",
      "office": "Palawan 1st District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Barotuan, El Nido, Palawan",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104202286000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "barotuan · el nido · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36966",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Barotuan, El Nido, Palawan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0791-013416",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Barotuan, El Nido, Palawan",
        "hgabPesos": 10000000,
        "nepPage": "626",
        "hgabPage": "791",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Barurao I, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38581",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. Barurao I, Lebak, Sultan Kudarat",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485779",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "barurao i · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38581",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Barurao I, Lebak, Sultan Kudarat",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0912-015777",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Barurao I, Lebak, Sultan Kudarat",
        "hgabPesos": 5500000,
        "nepPage": "671",
        "hgabPage": "912",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Barurao I, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38581",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Barurao I, Lebak, Sultan Kudarat",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 548151",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "barurao i · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38581",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Barurao I, Lebak, Sultan Kudarat",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0912-015777",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Barurao I, Lebak, Sultan Kudarat",
        "hgabPesos": 5500000,
        "nepPage": "671",
        "hgabPage": "912",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Basak, Compostela, Cebu",
      "source_code": "2027DPWH-Proposal-37710",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Basak, Compostela, Cebu",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484235",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Duke Frasco"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "basak · compostela · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37710",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Basak, Compostela, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0851-014614",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Basak, Compostela, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "646",
        "hgabPage": "851",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Basak, Compostela, Cebu",
      "source_code": "2027DPWH-Proposal-37710",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Basak, Compostela, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419658",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Duke Frasco"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "basak · compostela · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37710",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Basak, Compostela, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0851-014614",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Basak, Compostela, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "646",
        "hgabPage": "851",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Basak, Magpet, North Cotabato",
      "source_code": "2027DPWH-Proposal-38692",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Basak, Magpet, North Cotabato",
      "prior_amount": 2500000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010313680",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "basak · magpet · north cotabato",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38692",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Basak, Magpet, North Cotabato",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0896-015470",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Basak, Magpet, North Cotabato",
        "hgabPesos": 6000000,
        "nepPage": "668",
        "hgabPage": "896",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bautista, San Agustin, Isabela",
      "source_code": "2027DPWH-Proposal-35095",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 11000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Bautista, San Agustin, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598160",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bautista · san agustin · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35095",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Bautista, San Agustin, Isabela",
        "nepPesos": 11000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0718-011934",
        "hgabTitle": "Construction of Multi-Purpose Building (Building 1), Barangay Bautista, San Agustin, Isabela",
        "hgabPesos": 6000000,
        "nepPage": "592",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bila, Bauko, Mountain Province",
      "source_code": "2027DPWH-Proposal-34684",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Bila, Bauko, Mountain Province",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481353",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bila · bauko · mountain province",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34684",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Bila, Bauko, Mountain Province",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0696-011497",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bila, Bauko, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "583",
        "hgabPage": "696",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Binagbag, Municipality of Agdangan, Quezon",
      "source_code": "2027DPWH-Proposal-36247",
      "office": "Quezon 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay, Binagbag, Agdangan, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104208391000 · PDF p. 721 · printed p. 2186",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36247",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Binagbag, Municipality of Agdangan, Quezon",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0783-013263",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Binagbag, Municipality of Agdangan, Quezon",
        "hgabPesos": 10000000,
        "nepPage": "622",
        "hgabPage": "783",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Binaritan, Morong, Bataan",
      "source_code": "2027DPWH-Proposal-35678",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Binaritan, Morong, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595834",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maria Angela Garcia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "binaritan · morong · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35678",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Binaritan, Morong, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012137",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Binaritan, Morong, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "595",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Binaritan, Morong, Bataan",
      "source_code": "2027DPWH-Proposal-35678",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi Purpose Building, Brgy. Binaritan, Morong, Bataan (14.680013, 120.271425)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33491",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maria Angela Garcia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.680013,
        "longitude": 120.271425,
        "raw": "14.680013, 120.271425",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "binaritan · morong · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35678",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Binaritan, Morong, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012137",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Binaritan, Morong, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "595",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38571",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602496",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "biwang · bagumbayan · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38571",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0912-015778",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Biwang, Bagumbayan, Sultan Kudarat",
        "hgabPesos": 7000000,
        "nepPage": "671",
        "hgabPage": "912",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Borac, Coron, Palawan",
      "source_code": "2027DPWH-Proposal-36953",
      "office": "Palawan 1st District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building in Brgy. Borac, Coron, Palawan",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482945",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "borac · coron · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36953",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Borac, Coron, Palawan",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0791-013417",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Borac, Coron, Palawan",
        "hgabPesos": 6000000,
        "nepPage": "626",
        "hgabPage": "791",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bulilan Sur, Pila, Laguna",
      "source_code": "2027DPWH-Proposal-36739",
      "office": "Laguna 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Bulilan Sur, Pila, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530791",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bulilan sur · pila · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36739",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Bulilan Sur, Pila, Laguna",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0771-013023",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Bulilan Sur, Pila, Laguna",
        "hgabPesos": 5000000,
        "nepPage": "616",
        "hgabPage": "771",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bungoy, Dolores, Quezon",
      "source_code": "2027DPWH-Proposal-36476",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7500000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Bungoy, Dolores, Quezon",
      "prior_amount": 2500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417560",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "David Suarez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bungoy · dolores · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36476",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Bungoy, Dolores, Quezon",
        "nepPesos": 7500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0781-013237",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Bungoy, Dolores, Quezon",
        "hgabPesos": 7500000,
        "nepPage": "621",
        "hgabPage": "781",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bustamante, Luna, Isabela",
      "source_code": "2027DPWH-Proposal-34908",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction/Completion of Multi-purpose Building, Brgy. Bustamante, Luna, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597927",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bustamante · luna · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34908",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Bustamante, Luna, Isabela",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0708-011734",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Bustamante, Luna, Isabela",
        "hgabPesos": 6000000,
        "nepPage": "589",
        "hgabPage": "708",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Cabaritan, San Manuel, Pangasinan",
      "source_code": "2027DPWH-Proposal-34330",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction/Improvement of Multi-Purpose Building, Brgy. Cabaritan, San Manuel, Pangasinan",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104200713000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cabaritan · san manuel · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34330",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Cabaritan, San Manuel, Pangasinan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0688-011335",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Cabaritan, San Manuel, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "580",
        "hgabPage": "688",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Cabcaben, Mariveles, Bataan",
      "source_code": "2027DPWH-Proposal-35634",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Cabcaben, Mariveles, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543414",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cabcaben · mariveles · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35634",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Cabcaben, Mariveles, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012138",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Cabcaben, Mariveles, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "595",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Cabugao Sur, Santa Barbara, Iloilo",
      "source_code": "2027DPWH-Proposal-37164",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 7000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Cabugao Sur, Santa Barbara, Iloilo, 10.798691, 122.530600",
      "prior_amount": 3000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37577",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.798691,
        "longitude": 122.5306,
        "raw": "10.798691, 122.530600",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cabugao sur · santa barbara · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37164",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Cabugao Sur, Santa Barbara, Iloilo",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0826-014101",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Cabugao Sur, Santa Barbara, Iloilo",
        "hgabPesos": 7000000,
        "nepPage": "639",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caduha-an, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37477",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Caduha-an, Cadiz City, Negros Occidental (10.9501149, 123.181421)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37812",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.9501149,
        "longitude": 123.181421,
        "raw": "10.9501149, 123.181421",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "caduha-an · cadiz · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37477",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Caduha-an, Cadiz City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0833-014253",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Caduha-an, Cadiz City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "642",
        "hgabPage": "833",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Cagamutan Norte, Leganes, Iloilo",
      "source_code": "2027DPWH-Proposal-37162",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 15000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Cagamutan Norte, Leganes, Iloilo",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483673",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cagamutan norte · leganes · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37162",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Cagamutan Norte, Leganes, Iloilo",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0826-014102",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Cagamutan Norte, Leganes, Iloilo",
        "hgabPesos": 15000000,
        "nepPage": "639",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caingin, City of Santa Rosa. Laguna",
      "source_code": "2027DPWH-Proposal-36751",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Caingin, Santa Rosa City, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545656",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36751",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Caingin, City of Santa Rosa. Laguna",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013061",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Caingin, City of Santa Rosa. Laguna",
        "hgabPesos": 50000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caingin, City of Santa Rosa. Laguna",
      "source_code": "2027DPWH-Proposal-36751",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Caingin, City of Santa Rosa, Laguna (14.304787°, 121.124811°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35543",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.304787,
        "longitude": 121.124811,
        "raw": "14.304787°, 121.124811",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36751",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Caingin, City of Santa Rosa. Laguna",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013061",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Caingin, City of Santa Rosa. Laguna",
        "hgabPesos": 50000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caluttit, Bontoc, Mountain Province",
      "source_code": "2027DPWH-Proposal-34689",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Completion of Multi-Purpose Building, Barangay Caluttit, Bontoc, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415741",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maximo Dalog Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "caluttit · bontoc · mountain province",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34689",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Caluttit, Bontoc, Mountain Province",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0696-011499",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Caluttit, Bontoc, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "583",
        "hgabPage": "696",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Camaley, Binmaley, Pangasinan",
      "source_code": "2027DPWH-Proposal-34186",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 8000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Multi Purpose Building, Barangay Camaley, Binmaley, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 567251",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "camaley · binmaley · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34186",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Camaley, Binmaley, Pangasinan",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0683-011231",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Camaley, Binmaley, Pangasinan",
        "hgabPesos": 8000000,
        "nepPage": "579",
        "hgabPage": "683",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "source_code": "2027DPWH-Proposal-35094",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 7000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Improvement (Completion) of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416075",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "caquilingan · cordon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35094",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011935",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
        "hgabPesos": 7000000,
        "nepPage": "592",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "source_code": "2027DPWH-Proposal-35094",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 7000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544676",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "caquilingan · cordon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35094",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011935",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
        "hgabPesos": 7000000,
        "nepPage": "592",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "source_code": "2027DPWH-Proposal-35094",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598114",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "caquilingan · cordon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35094",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011935",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Caquilingan, Cordon, Isabela",
        "hgabPesos": 7000000,
        "nepPage": "592",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caticlan, Malay, Aklan",
      "source_code": "2027DPWH-Proposal-37295",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation of Multi-purpose Building, Brgy. Caticlan, Malay, Aklan",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104202844000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "caticlan · malay · aklan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37295",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Caticlan, Malay, Aklan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0813-013848",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Caticlan, Malay, Aklan",
        "hgabPesos": 5000000,
        "nepPage": "635",
        "hgabPage": "813",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Centro 1, Claveria, Cagayan",
      "source_code": "2027DPWH-Proposal-35100",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Centro 1, Claveria, Cagayan",
      "prior_amount": 1250000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104206856000 · PDF p. 613 · printed p. 2078",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "centro 1 · claveria · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35100",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Centro 1, Claveria, Cagayan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0703-011644",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Centro 1, Claveria, Cagayan",
        "hgabPesos": 10000000,
        "nepPage": "587",
        "hgabPage": "703",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Centro II, Orani, Bataan",
      "source_code": "2027DPWH-Proposal-35788",
      "office": "Bataan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Centro II Multi-Purpose Building, Orani, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530024",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35788",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Centro II, Orani, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0725-012091",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Centro II, Orani, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "594",
        "hgabPage": "725",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Concepcion, Calintaan, Occidental Mindoro",
      "source_code": "2027DPWH-Proposal-36856",
      "office": "Mindoro Occidental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Concepcion, Calintaan, Occidental Mindoro",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482893",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "concepcion · calintaan · occidental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36856",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Concepcion, Calintaan, Occidental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0787-013351",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Concepcion, Calintaan, Occidental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "624",
        "hgabPage": "787",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Culalabat, Cauayan City, Isabela",
      "source_code": "2027DPWH-Proposal-35253",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Culalabat, Cauayan, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598038",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "culalabat · cauayan · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35253",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Culalabat, Cauayan City, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011937",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Culalabat, Cauayan City, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "592",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Cullalabo Del Sur, Burgos, Isabela",
      "source_code": "2027DPWH-Proposal-35329",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela",
      "prior_amount": 17000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597914",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cullalabo del sur · burgos · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35329",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Cullalabo Del Sur, Burgos, Isabela",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0708-011736",
        "hgabTitle": "Construction of Multi-Purpose Building, Building 2, Barangay Cullalabo Del Sur, Burgos, Isabela",
        "hgabPesos": 50000000,
        "nepPage": "590",
        "hgabPage": "708",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Cullalabo Del Sur, Burgos, Isabela",
      "source_code": "2027DPWH-Proposal-35329",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Cullalabo del Sur, Burgos, Isabela, 17.099294, 121.698193 ",
      "prior_amount": 40000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32873",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 17.099294,
        "longitude": 121.698193,
        "raw": "17.099294, 121.698193",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cullalabo del sur · burgos · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35329",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Cullalabo Del Sur, Burgos, Isabela",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0708-011736",
        "hgabTitle": "Construction of Multi-Purpose Building, Building 2, Barangay Cullalabo Del Sur, Burgos, Isabela",
        "hgabPesos": 50000000,
        "nepPage": "590",
        "hgabPage": "708",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Cullit, Camalaniugan, Cagayan",
      "source_code": "2027DPWH-Proposal-35036",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Cullit, Camalaniugan, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544469",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cullit · camalaniugan · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35036",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Cullit, Camalaniugan, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0702-011614",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Cullit, Camalaniugan, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "586",
        "hgabPage": "702",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Daragutan East, San Mariano, Isabela",
      "source_code": "2027DPWH-Proposal-35244",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Daragutan East, San Mariano, Isabela",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104200938000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "daragutan east · san mariano · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35244",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Daragutan East, San Mariano, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0713-011833",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Daragutan East, San Mariano, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "591",
        "hgabPage": "713",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Daungan, Guiguinto, Bulacan",
      "source_code": "2027DPWH-Proposal-35572",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 20000000,
      "comparison_year": 2018,
      "prior_project": "Completion of Multi-Purpose Building, Daungan, Guiguinto, Bulacan",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201129000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35572",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Daungan, Guiguinto, Bulacan",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012206",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Daungan, Guiguinto, Bulacan",
        "hgabPesos": 20000000,
        "nepPage": "597",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
      "source_code": "2027DPWH-Proposal-35324",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Improvement (Completion) of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416080",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "digumased · dinapigue · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35324",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011939",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
        "hgabPesos": 50000000,
        "nepPage": "592",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
      "source_code": "2027DPWH-Proposal-35324",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544686",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "digumased · dinapigue · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35324",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011939",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Digumased, Dinapigue, Isabela",
        "hgabPesos": 50000000,
        "nepPage": "592",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Disimpit, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35086",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Disimpit, Jones, Isabela, 16.533582, 121.719681",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33095",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.533582,
        "longitude": 121.719681,
        "raw": "16.533582, 121.719681",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "disimpit · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35086",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Disimpit, Jones, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011941",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Disimpit, Jones, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "592",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay District 3, San Manuel, Isabela",
      "source_code": "2027DPWH-Proposal-35336",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 41500000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay District 3, San Manuel, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529860",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "district 3 · san manuel · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35336",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay District 3, San Manuel, Isabela",
        "nepPesos": 41500000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0635-010344",
        "hgabTitle": "Construction of 2-units Multi-Purpose Building, Barangay District 3, San Manuel, Isabela",
        "hgabPesos": 62350000,
        "nepPage": "590",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay District 3, San Manuel, Isabela",
      "source_code": "2027DPWH-Proposal-35336",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 41500000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay District 3, San Manuel, Isabela, 17.0282, 121.6301",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32875",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 17.0282,
        "longitude": 121.6301,
        "raw": "17.0282, 121.6301",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "district 3 · san manuel · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35336",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay District 3, San Manuel, Isabela",
        "nepPesos": 41500000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0635-010344",
        "hgabTitle": "Construction of 2-units Multi-Purpose Building, Barangay District 3, San Manuel, Isabela",
        "hgabPesos": 62350000,
        "nepPage": "590",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Dorongan Linmansangan, Mangatarem, Pangasinan",
      "source_code": "2027DPWH-Proposal-34565",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 11000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Multi-Purpose Building Brgy. Dorongan Linmansangan, Mangatarem, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010310534",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "dorongan linmansangan · mangatarem · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34565",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Dorongan Linmansangan, Mangatarem, Pangasinan",
        "nepPesos": 11000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0683-011232",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Dorongan Linmansangan, Mangatarem, Pangasinan",
        "hgabPesos": 11000000,
        "nepPage": "579",
        "hgabPage": "683",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Dulangan, Puerto Galera, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36916",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building at Dulangan, Puerto Galera, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545910",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36916",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Dulangan, Puerto Galera, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "source_code": "2027DPWH-Proposal-37722",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419674",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "esperanza · poro · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37722",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0851-014615",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "646",
        "hgabPage": "851",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "source_code": "2027DPWH-Proposal-37722",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Esperanza, Poro, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532110",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "esperanza · poro · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37722",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0851-014615",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "646",
        "hgabPage": "851",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "source_code": "2027DPWH-Proposal-37722",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 601083",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "esperanza · poro · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37722",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0851-014615",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "646",
        "hgabPage": "851",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "source_code": "2027DPWH-Proposal-37722",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of (Completion) Multi-Purpose Building, Barangay Esperanza, Poro, Cebu (10.702302, 124.414909)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 38722",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.702302,
        "longitude": 124.414909,
        "raw": "10.702302, 124.414909",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "esperanza · poro · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37722",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0851-014615",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "646",
        "hgabPage": "851",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
      "source_code": "2027DPWH-Proposal-37722",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction/Completion of Multi-Purpose Building, Brgy. Esperanza, Poro, Cebu",
      "prior_amount": 1500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104210463000 · PDF p. 865 · printed p. 2330",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "esperanza · poro · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37722",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0851-014615",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Esperanza, Poro, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "646",
        "hgabPage": "851",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
      "source_code": "2027DPWH-Proposal-34896",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415936",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "estrada · quezon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34896",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0708-011738",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
        "hgabPesos": 6000000,
        "nepPage": "590",
        "hgabPage": "708",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
      "source_code": "2027DPWH-Proposal-34896",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
      "prior_amount": 3500000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529874",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "estrada · quezon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34896",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0708-011738",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Estrada, Quezon, Isabela",
        "hgabPesos": 6000000,
        "nepPage": "590",
        "hgabPage": "708",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Gabawan, Odiongan, Romblon",
      "source_code": "2027DPWH-Proposal-06346",
      "office": "Romblon District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Gabawan, Odiongan, Romblon",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413849",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gabawan · odiongan · romblon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-06346",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Gabawan, Odiongan, Romblon",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0793-013477",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Gabawan, Odiongan, Romblon",
        "hgabPesos": 6000000,
        "nepPage": "628",
        "hgabPage": "793",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Gabawan, Odiongan, Romblon",
      "source_code": "2027DPWH-Proposal-06346",
      "office": "Romblon District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Gabawan, Odiongan, Romblon",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596115",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gabawan · odiongan · romblon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-06346",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Gabawan, Odiongan, Romblon",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0793-013477",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Gabawan, Odiongan, Romblon",
        "hgabPesos": 6000000,
        "nepPage": "628",
        "hgabPage": "793",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Gomez, Llanera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36135",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Gomez, Llanera, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481824",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36135",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Gomez, Llanera, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0739-012360",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Gomez, Llanera, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "602",
        "hgabPage": "739",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Gomez, Llanera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36135",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building, Gomez, Llanera, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201305000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36135",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Gomez, Llanera, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0739-012360",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Gomez, Llanera, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "602",
        "hgabPage": "739",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Guiddam, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35200",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Guiddam, Abulug, Cagayan",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415829",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "guiddam · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35200",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Guiddam, Abulug, Cagayan",
        "nepPesos": 100000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010350",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Guiddam, Abulug, Cagayan",
        "hgabPesos": 100000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Guiddam, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35200",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Guiddam, Abulug, Cagayan",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597824",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "guiddam · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35200",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Guiddam, Abulug, Cagayan",
        "nepPesos": 100000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010350",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Guiddam, Abulug, Cagayan",
        "hgabPesos": 100000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Guina-ang, Bontoc, Mountain Province",
      "source_code": "2027DPWH-Proposal-34690",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Guina-ang, Bontoc, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544439",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maximo Dalog Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34690",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Guina-ang, Bontoc, Mountain Province",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0696-011502",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Guina-ang, Bontoc, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "583",
        "hgabPage": "696",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Handumanan, Bacolod City",
      "source_code": "2027DPWH-Proposal-37365",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Handumanan, Bacolod City",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600490",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "handumanan · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37365",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Handumanan, Bacolod City",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014213",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Handumanan, Bacolod City",
        "hgabPesos": 30000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Iba, Meycauayan City, Bulacan",
      "source_code": "2027DPWH-Proposal-35899",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 8000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Iba, Meycauayan City, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481774",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35899",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Iba, Meycauayan City, Bulacan",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0734-012264",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Iba, Meycauayan City, Bulacan",
        "hgabPesos": 8000000,
        "nepPage": "599",
        "hgabPage": "734",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Ibaba, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35673",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Ibaba, Bagac, Bataan",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201111000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ibaba · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35673",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Ibaba, Bagac, Bataan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012139",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Ibaba, Bagac, Bataan",
        "hgabPesos": 10000000,
        "nepPage": "595",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Ibis, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35677",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Ibis, Bagac, Bataan",
      "prior_amount": 7500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543408",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ibis · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35677",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Ibis, Bagac, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012140",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Ibis, Bagac, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "595",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Igualdad, Naga City, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39346",
      "office": "Camarines Sur 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Igualdad, Naga City, Camarines Sur",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531398",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Nelson Legacion"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "igualdad · naga · camarines sur",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39346",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Igualdad, Naga City, Camarines Sur",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0801-013613",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Igualdad, Naga City, Camarines Sur",
        "hgabPesos": 5000000,
        "nepPage": "631",
        "hgabPage": "801",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Kanluran, City of Santa Rosa, Laguna",
      "source_code": "2027DPWH-Proposal-36397",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Kanluran, Santa Rosa City, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545660",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Roy Gonzales"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kanluran · santa rosa · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36397",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Kanluran, City of Santa Rosa, Laguna",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013062",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Kanluran, City of Santa Rosa, Laguna",
        "hgabPesos": 50000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Kaybagal South, Tagaytay City, Cavite",
      "source_code": "2027DPWH-Proposal-36519",
      "office": "Cavite 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 80000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Kaybagal South, Tagaytay City, Cavite",
      "prior_amount": 60000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596068",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Aniela Tolentino"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kaybagal south · tagaytay · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36519",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Kaybagal South, Tagaytay City, Cavite",
        "nepPesos": 80000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0641-010422",
        "hgabTitle": "Construction of Multi Purpose Facility, Kaybagal South, Tagaytay City, Cavite",
        "hgabPesos": 40000000,
        "nepPage": "568",
        "hgabPage": "641",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Kiadsam, Sen. Ninoy Aquino, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38580",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 7000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Kiadsam, Sen. Ninoy Aquino, Sultan Kudarat (6.445332,124.311223)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30884",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 6.445332,
        "longitude": 124.311223,
        "raw": "6.445332,124.311223",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kiadsam · sen. ninoy aquino · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38580",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Kiadsam, Sen. Ninoy Aquino, Sultan Kudarat",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Kinabuhayan, Dolores, Quezon",
      "source_code": "2027DPWH-Proposal-36477",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 12000000,
      "comparison_year": 2025,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Kinabuhayan, Dolores, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596052",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "David Suarez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kinabuhayan · dolores · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36477",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Kinabuhayan, Dolores, Quezon",
        "nepPesos": 12000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0781-013238",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Kinabuhayan, Dolores, Quezon",
        "hgabPesos": 12000000,
        "nepPage": "621",
        "hgabPage": "781",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Kraan, Palimbang, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38582",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Kraan, Palimbang, Sultan Kudarat (6.119145,124.344441)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 41688",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 6.119145,
        "longitude": 124.344441,
        "raw": "6.119145,124.344441",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "kraan · palimbang · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38582",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Kraan, Palimbang, Sultan Kudarat",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Kulaman, Sen. Ninoy Aquino, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38573",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 13000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Kulaman, Sen. Ninoy Aquino, Sultan Kudarat(6.459404,124.330895)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 41710",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 6.459404,
        "longitude": 124.330895,
        "raw": "6.459404,124.330895",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38573",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Kulaman, Sen. Ninoy Aquino, Sultan Kudarat",
        "nepPesos": 13000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0912-015780",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Kulaman, Sen. Ninoy Aquino, Sultan Kudarat",
        "hgabPesos": 13000000,
        "nepPage": "671",
        "hgabPage": "912",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Laguinbanua, Ibajay, Aklan",
      "source_code": "2027DPWH-Proposal-37281",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Laguinbanua, Ibajay, Aklan - 11.808637, 122.156701",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37191",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 11.808637,
        "longitude": 122.156701,
        "raw": "11.808637, 122.156701",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37281",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Laguinbanua, Ibajay, Aklan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0813-013850",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Laguinbanua, Ibajay, Aklan",
        "hgabPesos": 15000000,
        "nepPage": "636",
        "hgabPage": "813",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
      "source_code": "2027DPWH-Proposal-38717",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602329",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lanao · kidapawan · north cotabato",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38717",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0897-015482",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
        "hgabPesos": 6000000,
        "nepPage": "669",
        "hgabPage": "897",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
      "source_code": "2027DPWH-Proposal-38717",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Lanao, City of Kidapawan, North Cotabato (125.07945, 7.024908)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 41226",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 7.024908,
        "longitude": 125.07945,
        "raw": "125.07945, 7.024908",
        "orientation": "longitude, latitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38717",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0897-015482",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
        "hgabPesos": 6000000,
        "nepPage": "669",
        "hgabPage": "897",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
      "source_code": "2027DPWH-Proposal-38717",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2017,
      "prior_project": "Completion of Multi-Purpose Building, Brgy. Lanao, Kidapawan City, North Cotabato",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010313691",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lanao · kidapawan · north cotabato",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38717",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0897-015482",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Lanao, Kidapawan City, North Cotabato",
        "hgabPesos": 6000000,
        "nepPage": "669",
        "hgabPage": "897",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Laoag, Aguilar, Pangasinan",
      "source_code": "2027DPWH-Proposal-34563",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 11000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Laoag, Aguilar, Pangasinan",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481172",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "laoag · aguilar · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34563",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Laoag, Aguilar, Pangasinan",
        "nepPesos": 11000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Laois, Labrador, Pangasinan",
      "source_code": "2027DPWH-Proposal-34188",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Laois, Labrador, Pangasinan",
      "prior_amount": 2500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415457",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "laois · labrador · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34188",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Laois, Labrador, Pangasinan",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0683-011236",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Laois, Labrador, Pangasinan",
        "hgabPesos": 20000000,
        "nepPage": "579",
        "hgabPage": "683",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Laois, Labrador, Pangasinan",
      "source_code": "2027DPWH-Proposal-34188",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy Laois, Labrador, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595789",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "laois · labrador · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34188",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Laois, Labrador, Pangasinan",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0683-011236",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Laois, Labrador, Pangasinan",
        "hgabPesos": 20000000,
        "nepPage": "579",
        "hgabPage": "683",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Laurel, Cordon, Isabela",
      "source_code": "2027DPWH-Proposal-35078",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Laurel, Cordon, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598175",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "laurel · cordon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35078",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Laurel, Cordon, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011943",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Laurel, Cordon, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "592",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Layac, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35650",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Layac, Dinalupihan, Bataan",
      "prior_amount": 6000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104207153000 · PDF p. 634 · printed p. 2099",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "layac · dinalupihan · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35650",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Layac, Dinalupihan, Bataan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012141",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Layac, Dinalupihan, Bataan",
        "hgabPesos": 10000000,
        "nepPage": "595",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Libas, Buenavista, Marinduque",
      "source_code": "2027DPWH-Proposal-36824",
      "office": "Marinduque District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 14000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building Barangay Libas, Buenavista, Marinduque",
      "prior_amount": 14000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599748",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Reynaldo Salvacion"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "libas · buenavista · marinduque",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36824",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Libas, Buenavista, Marinduque",
        "nepPesos": 14000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0787-013339",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Libas, Buenavista, Marinduque",
        "hgabPesos": 14000000,
        "nepPage": "624",
        "hgabPage": "787",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35105",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building at Brgy. Libertad, Abulug, Cagayan",
      "prior_amount": 3500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481401",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "libertad · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35105",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
        "nepPesos": 100000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010351",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
        "hgabPesos": 150000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35105",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Libertad, Abulug, Cagayan",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415780",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "libertad · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35105",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
        "nepPesos": 100000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010351",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
        "hgabPesos": 150000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35105",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Libertad, Abulug, Cagayan",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597817",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "libertad · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35105",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
        "nepPesos": 100000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010351",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
        "hgabPesos": 150000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35105",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Libertad, Abulug, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104200883000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "libertad · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35105",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
        "nepPesos": 100000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010351",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Libertad, Abulug, Cagayan",
        "hgabPesos": 150000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Libsong West, Lingayen, Pangasinan",
      "source_code": "2027DPWH-Proposal-34187",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 25000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Libsong West, Lingayen, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597426",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mark Cojuangco"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "libsong west · lingayen · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34187",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Libsong West, Lingayen, Pangasinan",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0683-011237",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Libsong West, Lingayen, Pangasinan",
        "hgabPesos": 25000000,
        "nepPage": "579",
        "hgabPage": "683",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Ligaya, Sablayan, Occidental Mindoro",
      "source_code": "2027DPWH-Proposal-36841",
      "office": "Mindoro Occidental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Ligaya, Sablayan, Occidental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545897",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ligaya · sablayan · occidental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36841",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Ligaya, Sablayan, Occidental Mindoro",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0787-013354",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Ligaya, Sablayan, Occidental Mindoro",
        "hgabPesos": 10000000,
        "nepPage": "624",
        "hgabPage": "787",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Loma de Gato, Marilao, Bulacan",
      "source_code": "2027DPWH-Proposal-36144",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Loma de Gato, Marilao, Bulacan",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481775",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36144",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Loma de Gato, Marilao, Bulacan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0734-012265",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Loma de Gato, Marilao, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "599",
        "hgabPage": "734",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Loma de Gato, Marilao, Bulacan",
      "source_code": "2027DPWH-Proposal-36144",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Loma De Gato, Marilao, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598451",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "loma de gato · marilao · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36144",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Loma de Gato, Marilao, Bulacan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0734-012265",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Loma de Gato, Marilao, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "599",
        "hgabPage": "734",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Longos Central, San Fabian, Pangasinan",
      "source_code": "2027DPWH-Proposal-34242",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Longos Central, San Fabian, Pangasinan",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597440",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "longos central · san fabian · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34242",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Longos Central, San Fabian, Pangasinan",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0683-011239",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Longos Central, San Fabian, Pangasinan",
        "hgabPesos": 7000000,
        "nepPage": "579",
        "hgabPage": "683",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Lopez Jaena, Sagay City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37458",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Lopez Jaena, Sagay City, Negros Occidental",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483739",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lopez jaena · sagay · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37458",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Lopez Jaena, Sagay City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0833-014255",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Lopez Jaena, Sagay City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "642",
        "hgabPage": "833",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Lourdes, City of San Fernando, Pampanga",
      "source_code": "2027DPWH-Proposal-35679",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 57000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building, Lourdes, City of San Fernando, Pampanga",
      "prior_amount": 4500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201390000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35679",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Lourdes, City of San Fernando, Pampanga",
        "nepPesos": 57000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0637-010392",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Lourdes, City of San Fernando, Pampanga",
        "hgabPesos": 57000000,
        "nepPage": "565",
        "hgabPage": "637",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Lucanin, Mariveles, Bataan",
      "source_code": "2027DPWH-Proposal-35633",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Lucanin, Mariveles, Bataan",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543415",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lucanin · mariveles · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35633",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Lucanin, Mariveles, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012142",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Lucanin, Mariveles, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "595",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "source_code": "2027DPWH-Proposal-35335",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415939",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "luna · quirino · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35335",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0708-011740",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
        "hgabPesos": 50000000,
        "nepPage": "590",
        "hgabPage": "708",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
      "source_code": "2027DPWH-Proposal-35335",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Luna, Quirino, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597918",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "luna · quirino · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35335",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0708-011740",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Luna, Quirino, Isabela",
        "hgabPesos": 50000000,
        "nepPage": "590",
        "hgabPage": "708",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mabini, El Nido, Palawan",
      "source_code": "2027DPWH-Proposal-36965",
      "office": "Palawan 1st District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building in Brgy. Mabini, El Nido, Palawan",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482952",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Rose Salvame"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mabini · el nido · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36965",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Mabini, El Nido, Palawan",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0791-013422",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mabini, El Nido, Palawan",
        "hgabPesos": 6000000,
        "nepPage": "626",
        "hgabPage": "791",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Macaas, Catmon, Cebu",
      "source_code": "2027DPWH-Proposal-37714",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Macaas, Catmon, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419684",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "macaas · catmon · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37714",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Macaas, Catmon, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0851-014616",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Macaas, Catmon, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "646",
        "hgabPage": "851",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Macaleeng, Anda, Pangasinan",
      "source_code": "2027DPWH-Proposal-34153",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Macaleeng, Anda, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544199",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arthur Celeste"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "macaleeng · anda · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34153",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Macaleeng, Anda, Pangasinan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0680-011180",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Macaleeng, Anda, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "578",
        "hgabPage": "680",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Macalong, La Paz, Tarlac",
      "source_code": "2027DPWH-Proposal-35745",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 8000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Macalong, La Paz, Tarlac",
      "prior_amount": 2500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416796",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bong Rivera"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35745",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Macalong, La Paz, Tarlac",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0742-012446",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Macalong, La Paz, Tarlac",
        "hgabPesos": 8000000,
        "nepPage": "604",
        "hgabPage": "742",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Maharlika San Pedro Laguna",
      "source_code": "2027DPWH-Proposal-28905",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Maharlika, San Pedro, Laguna",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482647",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28905",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Maharlika San Pedro Laguna",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013063",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Maharlika San Pedro Laguna",
        "hgabPesos": 10000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Maharlika San Pedro Laguna",
      "source_code": "2027DPWH-Proposal-28905",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building. Barangay Maharlika, San Pedro, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530833",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28905",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Maharlika San Pedro Laguna",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013063",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Maharlika San Pedro Laguna",
        "hgabPesos": 10000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Malalatan, Alcala, Cagayan",
      "source_code": "2027DPWH-Proposal-35047",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Malalatan, Alcala, Cagayan",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544480",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Ramon Nolasco"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malalatan · alcala · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35047",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Malalatan, Alcala, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0702-011621",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Malalatan, Alcala, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "587",
        "hgabPage": "702",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Maligaya, Lubang, Occidental Mindoro",
      "source_code": "2027DPWH-Proposal-36864",
      "office": "Mindoro Occidental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5500000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Maligaya, Lubang, Occidental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531078",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "maligaya · lubang · occidental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36864",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Maligaya, Lubang, Occidental Mindoro",
        "nepPesos": 5500000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Malongcay Dacu, Dauin, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37411",
      "office": "Negros Oriental 3rd District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Malongcay Dacu, Dauin, Negros Oriental",
      "prior_amount": 6000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532215",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malongcay dacu · dauin · negros oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37411",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Malongcay Dacu, Dauin, Negros Oriental",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0840-014393",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Malongcay Dacu, Dauin, Negros Oriental",
        "hgabPesos": 10000000,
        "nepPage": "645",
        "hgabPage": "840",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Manato Central, Tagkawayan, Quezon",
      "source_code": "2027DPWH-Proposal-36501",
      "office": "Quezon 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7500000,
      "comparison_year": 2019,
      "prior_project": "Repair/Rehabilitation of Multi-Purpose Building, Brgy. Manato Central, Tagkawayan, Quezon",
      "prior_amount": 600000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104208425000 · PDF p. 724 · printed p. 2189",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "manato central · tagkawayan · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36501",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Manato Central, Tagkawayan, Quezon",
        "nepPesos": 7500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0786-013318",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Manato Central, Tagkawayan, Quezon",
        "hgabPesos": 7500000,
        "nepPage": "623",
        "hgabPage": "786",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Manggahan, General Trias City Cavite",
      "source_code": "2027DPWH-Proposal-36385",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Manggahan, General Trias, Cavite",
      "prior_amount": 20000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482483",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36385",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Manggahan, General Trias City Cavite",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0768-012951",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Manggahan, General Trias City Cavite",
        "hgabPesos": 5000000,
        "nepPage": "614",
        "hgabPage": "768",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Manggahan, General Trias City Cavite",
      "source_code": "2027DPWH-Proposal-36385",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Manggahan, General Trias, Cavite",
      "prior_amount": 16600000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 414509",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36385",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Manggahan, General Trias City Cavite",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0768-012951",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Manggahan, General Trias City Cavite",
        "hgabPesos": 5000000,
        "nepPage": "614",
        "hgabPage": "768",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mantapoli, Marantao, Lanao del Sur",
      "source_code": "2027DPWH-Proposal-26599",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Mantapoli, Marantao, Lanao del Sur (124.260010°, 7.974511°)",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30764",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 7.974511,
        "longitude": 124.26001,
        "raw": "124.260010°, 7.974511",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-26599",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Mantapoli, Marantao, Lanao del Sur",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0651-010620",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mantapoli, Marantao, Lanao del Sur",
        "hgabPesos": 10000000,
        "nepPage": "570",
        "hgabPage": "651",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37460",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546725",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "maquiling · sagay · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37460",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0833-014256",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "642",
        "hgabPage": "833",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37460",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600823",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "maquiling · sagay · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37460",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0833-014256",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Maquiling, Sagay City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "642",
        "hgabPage": "833",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
      "source_code": "2027DPWH-Proposal-35234",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415942",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mararigue · san manuel · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35234",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0708-011741",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
        "hgabPesos": 6000000,
        "nepPage": "590",
        "hgabPage": "708",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
      "source_code": "2027DPWH-Proposal-35234",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544590",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mararigue · san manuel · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35234",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0708-011741",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mararigue, San Manuel, Isabela",
        "hgabPesos": 6000000,
        "nepPage": "590",
        "hgabPage": "708",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Market Area, City of Santa Rosa, Laguna",
      "source_code": "2027DPWH-Proposal-36396",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Market Area, Santa Rosa City, Laguna",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545661",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Roy Gonzales"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "market area · santa rosa · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36396",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Market Area, City of Santa Rosa, Laguna",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013064",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Market Area, City of Santa Rosa, Laguna",
        "hgabPesos": 50000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Market Area, City of Santa Rosa, Laguna",
      "source_code": "2027DPWH-Proposal-36396",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Market Area, City of Santa Rosa, Laguna (14.318805°, 121.112146°)",
      "prior_amount": 35761000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35569",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Roy Gonzales"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.318805,
        "longitude": 121.112146,
        "raw": "14.318805°, 121.112146",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "market area · santa rosa · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36396",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Market Area, City of Santa Rosa, Laguna",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013064",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Market Area, City of Santa Rosa, Laguna",
        "hgabPesos": 50000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Masiit, Calauan, Laguna",
      "source_code": "2027DPWH-Proposal-36609",
      "office": "Laguna 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 40000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Masiit, Calauan, Laguna",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596046",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "masiit · calauan · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36609",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Masiit, Calauan, Laguna",
        "nepPesos": 40000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0776-013119",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Masiit, Calauan, Laguna",
        "hgabPesos": 40000000,
        "nepPage": "619",
        "hgabPage": "776",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon",
      "source_code": "2027DPWH-Proposal-36480",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon",
      "prior_amount": 2500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596053",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "David Suarez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mayao castillo · lucena · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36480",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0781-013240",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon",
        "hgabPesos": 10000000,
        "nepPage": "621",
        "hgabPage": "781",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon",
      "source_code": "2027DPWH-Proposal-36480",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon (13.932840°, 121.661626°)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35844",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "David Suarez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 13.93284,
        "longitude": 121.661626,
        "raw": "13.932840°, 121.661626",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mayao castillo · lucena · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36480",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0781-013240",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mayao Castillo, Lucena City, Quezon",
        "hgabPesos": 10000000,
        "nepPage": "621",
        "hgabPage": "781",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Milagrosa, Municipality of Catanauan, Quezon",
      "source_code": "2027DPWH-Proposal-36252",
      "office": "Quezon 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Milagrosa, Catanauan, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545788",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "milagrosa · catanauan · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36252",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Milagrosa, Municipality of Catanauan, Quezon",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0783-013271",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Milagrosa, Municipality of Catanauan, Quezon",
        "hgabPesos": 10000000,
        "nepPage": "622",
        "hgabPage": "783",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Milbuk, Palimbang, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38590",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Milbuk, Palimbang, Sultan Kudarat",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485806",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "milbuk · palimbang · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38590",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Milbuk, Palimbang, Sultan Kudarat",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Milbuk, Palimbang, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38590",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Milbuk, Palimbang, Sultan Kudarat",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 548171",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "milbuk · palimbang · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38590",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Milbuk, Palimbang, Sultan Kudarat",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Minagbag, Quezon, Isabela",
      "source_code": "2027DPWH-Proposal-35334",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2020,
      "prior_project": "Construction/Improvement of Multi-Purpose Building, Brgy. Minagbag, Quezon, Isabela",
      "prior_amount": 1800000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481493",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "minagbag · quezon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35334",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Minagbag, Quezon, Isabela",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0708-011742",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Minagbag, Quezon, Isabela",
        "hgabPesos": 20000000,
        "nepPage": "590",
        "hgabPage": "708",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Minagbag, Quezon, Isabela",
      "source_code": "2027DPWH-Proposal-35334",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Minagbag, Quezon, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544576",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "minagbag · quezon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35334",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Minagbag, Quezon, Isabela",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0708-011742",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Minagbag, Quezon, Isabela",
        "hgabPesos": 20000000,
        "nepPage": "590",
        "hgabPage": "708",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Minanga, San Mariano, Isabela",
      "source_code": "2027DPWH-Proposal-35245",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Minanga, San Mariano, Isabela",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544641",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "minanga · san mariano · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35245",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Minanga, San Mariano, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0713-011834",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Minanga, San Mariano, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "591",
        "hgabPage": "713",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
      "source_code": "2027DPWH-Proposal-37188",
      "office": "Capiz 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 7000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
      "prior_amount": 2500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 418579",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Howard Guintu"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mongpong · roxas · capiz",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37188",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0815-013895",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
        "hgabPesos": 7000000,
        "nepPage": "636",
        "hgabPage": "815",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
      "source_code": "2027DPWH-Proposal-37188",
      "office": "Capiz 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 7000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531645",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Howard Guintu"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mongpong · roxas · capiz",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37188",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0815-013895",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mongpong, Roxas City, Capiz",
        "hgabPesos": 7000000,
        "nepPage": "636",
        "hgabPage": "815",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Motag, Malay, Aklan",
      "source_code": "2027DPWH-Proposal-37297",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction/Completion of Multi-Purpose Building, Barangay Motag, Malay, Aklan",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600387",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Florencio Miraflores"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "motag · malay · aklan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37297",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Motag, Malay, Aklan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0813-013851",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Motag, Malay, Aklan",
        "hgabPesos": 5000000,
        "nepPage": "636",
        "hgabPage": "813",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mt. View, Mariveles, Bataan",
      "source_code": "2027DPWH-Proposal-35627",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Mt. View, Mariveles, Bataan",
      "prior_amount": 8000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595825",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mt. view · mariveles · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35627",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Mt. View, Mariveles, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012143",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mt. View, Mariveles, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "595",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mulawin, Naujan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36919",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Mulawin, Naujan, Oriental Mindoro",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482930",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mulawin · naujan · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36919",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Mulawin, Naujan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Nalsian, Manaoag, Pangasinan",
      "source_code": "2027DPWH-Proposal-34205",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5500000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Nalsian, Manaoag, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597449",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nalsian · manaoag · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34205",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Nalsian, Manaoag, Pangasinan",
        "nepPesos": 5500000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0683-011244",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Nalsian, Manaoag, Pangasinan",
        "hgabPesos": 3500000,
        "nepPage": "579",
        "hgabPage": "683",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Nalsian, Manaoag, Pangasinan",
      "source_code": "2027DPWH-Proposal-34205",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5500000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Nalsian, Manaoag, Pangasinan",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104200677000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nalsian · manaoag · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34205",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Nalsian, Manaoag, Pangasinan",
        "nepPesos": 5500000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0683-011244",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Nalsian, Manaoag, Pangasinan",
        "hgabPesos": 3500000,
        "nepPage": "579",
        "hgabPage": "683",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Nampalcan, Umingan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34338",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Nampalcan, Umingan, Pangasinan(15.91154,120.83354)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32280",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.91154,
        "longitude": 120.83354,
        "raw": "15.91154,120.83354",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34338",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Nampalcan, Umingan, Pangasinan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0689-011346",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Nampalcan, Umingan, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "580",
        "hgabPage": "689",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Nangalasauan, Amulung, Cagayan",
      "source_code": "2027DPWH-Proposal-34990",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. Nangalasauan, Amulung, Cagayan",
      "prior_amount": 900000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481449",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nangalasauan · amulung · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34990",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Nangalasauan, Amulung, Cagayan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0704-011665",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Nangalasauan, Amulung, Cagayan",
        "hgabPesos": 10000000,
        "nepPage": "588",
        "hgabPage": "704",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Nangalasauan, Amulung, Cagayan",
      "source_code": "2027DPWH-Proposal-34990",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Nangalasauan, Amulung, Cagayan",
      "prior_amount": 600000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415889",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34990",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Nangalasauan, Amulung, Cagayan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0704-011665",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Nangalasauan, Amulung, Cagayan",
        "hgabPesos": 10000000,
        "nepPage": "588",
        "hgabPage": "704",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Nemmatan, San Agustin, Isabela",
      "source_code": "2027DPWH-Proposal-35096",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Nemmatan, San Agustin, Isabela, 16.525883, 121.734987",
      "prior_amount": 3500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33111",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.525883,
        "longitude": 121.734987,
        "raw": "16.525883, 121.734987",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nemmatan · san agustin · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35096",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Nemmatan, San Agustin, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011944",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Nemmatan, San Agustin, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "592",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay New Israel, Makilala, North Cotabato",
      "source_code": "2027DPWH-Proposal-38700",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2017,
      "prior_project": "Completion of Multi-Purpose Building, Brgy. New Israel, Makilala, North Cotabato",
      "prior_amount": 1000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010313654",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "new israel · makilala · north cotabato",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38700",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay New Israel, Makilala, North Cotabato",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0897-015484",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay New Israel, Makilala, North Cotabato",
        "hgabPesos": 6000000,
        "nepPage": "669",
        "hgabPage": "897",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
      "source_code": "2027DPWH-Proposal-37719",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419690",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "northern poblacion · san francisco · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37719",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0851-014617",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "646",
        "hgabPage": "851",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
      "source_code": "2027DPWH-Proposal-37719",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 601078",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "northern poblacion · san francisco · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37719",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0851-014617",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Northern Poblacion, San Francisco, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "646",
        "hgabPage": "851",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Obogon, Tanjay City, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37508",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Obogon, Tanjay City, Negros Oriental",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419883",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maisa Sagarbarria"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "obogon · tanjay · negros oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37508",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Obogon, Tanjay City, Negros Oriental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0840-014385",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Obogon, Tanjay City, Negros Oriental",
        "hgabPesos": 5000000,
        "nepPage": "645",
        "hgabPage": "840",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Osiem, Mangaldan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34219",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5500000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Osiem, Mangaldan, Pangasinan\n\n16.060098, 120.422508",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32165",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.060098,
        "longitude": 120.422508,
        "raw": "16.060098, 120.422508",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34219",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Osiem, Mangaldan, Pangasinan",
        "nepPesos": 5500000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0684-011245",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Osiem, Mangaldan, Pangasinan",
        "hgabPesos": 3000000,
        "nepPage": "579",
        "hgabPage": "684",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pag-asa, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35676",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Pag-asa, Bagac, Bataan",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530034",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pag-asa · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35676",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Pag-asa, Bagac, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012145",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pag-asa, Bagac, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "595",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pag-asa, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35676",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Pag-Asa, Bagac, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201113000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pag-asa · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35676",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Pag-asa, Bagac, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012145",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pag-asa, Bagac, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "595",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pao, Manaoag, Pangasinan",
      "source_code": "2027DPWH-Proposal-34206",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5500000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Pao, Manaoag, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529604",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pao · manaoag · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34206",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Pao, Manaoag, Pangasinan",
        "nepPesos": 5500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0684-011247",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pao, Manaoag, Pangasinan",
        "hgabPesos": 5500000,
        "nepPage": "579",
        "hgabPage": "684",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pao, Manaoag, Pangasinan",
      "source_code": "2027DPWH-Proposal-34206",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5500000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Pao, Manaoag, Pangasinan\n\n16.050053, 120.50562",
      "prior_amount": 3000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32167",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.050053,
        "longitude": 120.50562,
        "raw": "16.050053, 120.50562",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34206",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Pao, Manaoag, Pangasinan",
        "nepPesos": 5500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0684-011247",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pao, Manaoag, Pangasinan",
        "hgabPesos": 5500000,
        "nepPage": "579",
        "hgabPage": "684",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Papallasen, Umingan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34506",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Papallasen, Umingan, Pangasinan(15.922268,120.745122)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32282",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.922268,
        "longitude": 120.745122,
        "raw": "15.922268,120.745122",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34506",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Papallasen, Umingan, Pangasinan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0689-011347",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Papallasen, Umingan, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "580",
        "hgabPage": "689",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-36379",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building Barangay Pasong Camachile II, General Trias City, Cavite",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417283",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pasong camachile ii · general trias · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36379",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0768-012953",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
        "hgabPesos": 10000000,
        "nepPage": "614",
        "hgabPage": "768",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-36379",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530666",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pasong camachile ii · general trias · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36379",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0768-012953",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
        "hgabPesos": 10000000,
        "nepPage": "614",
        "hgabPage": "768",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Payompon, Mamburao, Occidental Mindoro",
      "source_code": "2027DPWH-Proposal-32304",
      "office": "Mindoro Occidental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 55000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Payompon, Mamburao, Occidental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545896",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Odie Tarriela"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "payompon · mamburao · occidental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32304",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Payompon, Mamburao, Occidental Mindoro",
        "nepPesos": 55000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pemienta, Umingan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34507",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Pemienta, Umingan, Pangasinan(15.92422,120.82562)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32284",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.92422,
        "longitude": 120.82562,
        "raw": "15.92422,120.82562",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34507",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Pemienta, Umingan, Pangasinan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0689-011348",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pemienta, Umingan, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "580",
        "hgabPage": "689",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35106",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Pinili, Abulug, Cagayan",
      "prior_amount": 15000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481386",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pinili · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35106",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
        "nepPesos": 100000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010352",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
        "hgabPesos": 100000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35106",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Pinili, Abulug, Cagayan",
      "prior_amount": 12450000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 414333",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pinili · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35106",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
        "nepPesos": 100000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010352",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
        "hgabPesos": 100000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35106",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi Purpose Building at Brgy. Pinili, Abulug, Cagayan(18.373843°,121.397486°)",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32766",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 18.373843,
        "longitude": 121.397486,
        "raw": "18.373843°,121.397486",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35106",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
        "nepPesos": 100000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010352",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pinili, Abulug, Cagayan",
        "hgabPesos": 100000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35648",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Pita, Dinalupihan, Bataan",
      "prior_amount": 6000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416258",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35648",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012146",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
        "hgabPesos": 10000000,
        "nepPage": "595",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35648",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
      "prior_amount": 7000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543412",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pita · dinalupihan · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35648",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012146",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
        "hgabPesos": 10000000,
        "nepPage": "595",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35648",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan (14.892437, 120.440146)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33513",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.892437,
        "longitude": 120.440146,
        "raw": "14.892437, 120.440146",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pita · dinalupihan · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35648",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012146",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
        "hgabPesos": 10000000,
        "nepPage": "595",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35648",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
      "prior_amount": 2500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104207159000 · PDF p. 635 · printed p. 2100",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pita · dinalupihan · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35648",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012146",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pita, Dinalupihan, Bataan",
        "hgabPesos": 10000000,
        "nepPage": "595",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion East, Pantabangan, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35829",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay East Poblacion, Pantabangan, Nueva Ecija",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416480",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35829",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion East, Pantabangan, Nueva Ecija",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0739-012363",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion East, Pantabangan, Nueva Ecija",
        "hgabPesos": 30000000,
        "nepPage": "602",
        "hgabPage": "739",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion East, Pantabangan, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35829",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay East Poblacion, Pantabangan, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530160",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35829",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion East, Pantabangan, Nueva Ecija",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0739-012363",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion East, Pantabangan, Nueva Ecija",
        "hgabPesos": 30000000,
        "nepPage": "602",
        "hgabPage": "739",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion II, Sagay City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37465",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Poblacion II, Sagay City, Negros Occidental",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483744",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion ii · sagay · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37465",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion II, Sagay City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0833-014257",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion II, Sagay City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "643",
        "hgabPage": "833",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion Ilaya, San Enrique,Iloilo",
      "source_code": "2027DPWH-Proposal-37274",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 15000000,
      "comparison_year": 2017,
      "prior_project": "Improvement of Multi Purpose Building, Brgy. Poblacion Ilaya, San Enrique, Iloilo",
      "prior_amount": 3000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010312137",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion ilaya · san enrique · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37274",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion Ilaya, San Enrique,Iloilo",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0820-013994",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion Ilaya, San Enrique,Iloilo",
        "hgabPesos": 15000000,
        "nepPage": "638",
        "hgabPage": "820",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion Ilaya, San Enrique,Iloilo",
      "source_code": "2027DPWH-Proposal-37274",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 15000000,
      "comparison_year": 2019,
      "prior_project": "Construction (Completion) of Multi-purpose Building, Brgy. Poblacion Ilaya, San Enrique, Iloilo",
      "prior_amount": 6000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104209587000 · PDF p. 805 · printed p. 2270",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion ilaya · san enrique · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37274",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion Ilaya, San Enrique,Iloilo",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0820-013994",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion Ilaya, San Enrique,Iloilo",
        "hgabPesos": 15000000,
        "nepPage": "638",
        "hgabPage": "820",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion South, Solano, Nueva Vizcaya",
      "source_code": "2027DPWH-Proposal-34871",
      "office": "Nueva Vizcaya District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion South, Solano, Nueva Vizcaya (16.51830, 121.17951)",
      "prior_amount": 15000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33229",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.5183,
        "longitude": 121.17951,
        "raw": "16.51830, 121.17951",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion south · solano · nueva vizcaya",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34871",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion South, Solano, Nueva Vizcaya",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0720-011985",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion South, Solano, Nueva Vizcaya",
        "hgabPesos": 20000000,
        "nepPage": "593",
        "hgabPage": "720",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion Sur, Licab, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36036",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi Purpose Building, Barangay Poblacion Sur, Licab, Nueva Ecija, 15.543029, 120.761179",
      "prior_amount": 3500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33811",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.543029,
        "longitude": 120.761179,
        "raw": "15.543029, 120.761179",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion sur · licab · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36036",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion Sur, Licab, Nueva Ecija",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0739-012364",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion Sur, Licab, Nueva Ecija",
        "hgabPesos": 15000000,
        "nepPage": "602",
        "hgabPage": "739",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion West, Pantabangan, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36133",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay West Poblacion, Pantabangan, Nueva Ecija",
      "prior_amount": 2500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545002",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36133",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion West, Pantabangan, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0739-012365",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion West, Pantabangan, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "602",
        "hgabPage": "739",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Abra de Ilog, Occidental Mindoro",
      "source_code": "2027DPWH-Proposal-36849",
      "office": "Mindoro Occidental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Poblacion, Abra de Ilog, Occidental Mindoro",
      "prior_amount": 4000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300103201161000 · PDF p. 491 · printed p. 1956",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · abra de ilog · occidental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36849",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Abra de Ilog, Occidental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0788-013366",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Abra de Ilog, Occidental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "625",
        "hgabPage": "788",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Alimodian, Iloilo",
      "source_code": "2027DPWH-Proposal-37184",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Alimodian, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531850",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · alimodian · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37184",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Alimodian, Iloilo",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0826-014110",
        "hgabTitle": "Construction of 2-units Multi-Purpose Building, Barangay Poblacion, Alimodian, Iloilo",
        "hgabPesos": 40500000,
        "nepPage": "639",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Alimodian, Iloilo",
      "source_code": "2027DPWH-Proposal-37184",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 20000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Poblacion Alimodian, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300103200477000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37184",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Alimodian, Iloilo",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0826-014110",
        "hgabTitle": "Construction of 2-units Multi-Purpose Building, Barangay Poblacion, Alimodian, Iloilo",
        "hgabPesos": 40500000,
        "nepPage": "639",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Alimodian, Iloilo",
      "source_code": "2027DPWH-Proposal-37184",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 20000000,
      "comparison_year": 2019,
      "prior_project": "Completion of Multi-Purpose Building, Brgy. Poblacion, Alimodian, Iloilo",
      "prior_amount": 2500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104209692000 · PDF p. 812 · printed p. 2277",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · alimodian · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37184",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Alimodian, Iloilo",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0826-014110",
        "hgabTitle": "Construction of 2-units Multi-Purpose Building, Barangay Poblacion, Alimodian, Iloilo",
        "hgabPesos": 40500000,
        "nepPage": "639",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Banate, Iloilo",
      "source_code": "2027DPWH-Proposal-37321",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 25500000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy, Poblacion, Banate, Iloilo",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600581",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37321",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Banate, Iloilo",
        "nepPesos": 25500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0820-013995",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Banate, Iloilo",
        "hgabPesos": 25500000,
        "nepPage": "638",
        "hgabPage": "820",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Bansud, Oriental Mindoro (121.457500°,12.863888°)",
      "source_code": "2027DPWH-Proposal-06373",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 20000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, Bansud, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545996",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 12.863888,
        "longitude": 121.4575,
        "raw": "121.457500°,12.863888",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-06373",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Bansud, Oriental Mindoro (121.457500°,12.863888°)",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0795-013499",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Bansud, Oriental Mindoro (121.457500°,12.863888°)",
        "hgabPesos": 20000000,
        "nepPage": "629",
        "hgabPage": "795",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Boljoon, Cebu",
      "source_code": "2027DPWH-Proposal-37731",
      "office": "Cebu 2nd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 30000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Poblacion, Boljoon, Cebu",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419633",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37731",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Boljoon, Cebu",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0851-014608",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Boljoon, Cebu",
        "hgabPesos": 30000000,
        "nepPage": "646",
        "hgabPage": "851",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Boljoon, Cebu",
      "source_code": "2027DPWH-Proposal-37731",
      "office": "Cebu 2nd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Boljoon, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 547000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · boljoon · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37731",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Boljoon, Cebu",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0851-014608",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Boljoon, Cebu",
        "hgabPesos": 30000000,
        "nepPage": "646",
        "hgabPage": "851",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Bontoc, Mountain Province",
      "source_code": "2027DPWH-Proposal-34691",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Poblacion, Bontoc, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597721",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maximo Dalog Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · bontoc · mountain province",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34691",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Bontoc, Mountain Province",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0697-011504",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Bontoc, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "583",
        "hgabPage": "697",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Bugallon, Pangasinan",
      "source_code": "2027DPWH-Proposal-34443",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Poblacion, Bugallon, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104206399000 · PDF p. 582 · printed p. 2047",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · bugallon · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34443",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Bugallon, Pangasinan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0684-011248",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Bugallon, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "579",
        "hgabPage": "684",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Buluan, Maguindanao del Sur",
      "source_code": "2027DPWH-Proposal-38745",
      "office": "Regional Office XII BARMM",
      "region": "Region XII",
      "amount_2027": 7500000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Buluan, Maguindanao del Sur (124.689345,7.170586)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30862",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 7.170586,
        "longitude": 124.689345,
        "raw": "124.689345,7.170586",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38745",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Buluan, Maguindanao del Sur",
        "nepPesos": 7500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0654-010675",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Buluan, Maguindanao del Sur",
        "hgabPesos": 7500000,
        "nepPage": "571",
        "hgabPage": "654",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Anggal Midtimbang, Maguindanao del Sur",
      "source_code": "2027DPWH-Proposal-38742",
      "office": "Regional Office XII BARMM",
      "region": "Region XII",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Anggal Midtimbang, Maguindanao Del Sur 124.342114,6.992682",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 31030",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 6.992682,
        "longitude": 124.342114,
        "raw": "124.342114,6.992682",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38742",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Anggal Midtimbang, Maguindanao del Sur",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0654-010676",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Anggal Midtimbang, Maguindanao del Sur",
        "hgabPesos": 20000000,
        "nepPage": "571",
        "hgabPage": "654",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Paglas, Maguindanao del Sur",
      "source_code": "2027DPWH-Proposal-38748",
      "office": "Regional Office XII BARMM",
      "region": "Region XII",
      "amount_2027": 7500000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Paglas, Maguindanao del Sur",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596678",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · datu paglas · maguindanao del sur",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38748",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Paglas, Maguindanao del Sur",
        "nepPesos": 7500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0654-010677",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Datu Paglas, Maguindanao del Sur",
        "hgabPesos": 7500000,
        "nepPage": "571",
        "hgabPage": "654",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Labrador, Pangasinan",
      "source_code": "2027DPWH-Proposal-34191",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Poblacion, Labrador, Pangasinan",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481187",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · labrador · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34191",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Labrador, Pangasinan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0684-011249",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Labrador, Pangasinan",
        "hgabPesos": 10000000,
        "nepPage": "579",
        "hgabPage": "684",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Labrador, Pangasinan",
      "source_code": "2027DPWH-Proposal-34191",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Labrador, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544233",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · labrador · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34191",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Labrador, Pangasinan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0684-011249",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Labrador, Pangasinan",
        "hgabPesos": 10000000,
        "nepPage": "579",
        "hgabPage": "684",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Leon, Iloilo",
      "source_code": "2027DPWH-Proposal-37181",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 30000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Poblacion, Leon, Iloilo",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483679",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37181",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Leon, Iloilo",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0826-014111",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Leon, Iloilo",
        "hgabPesos": 30000000,
        "nepPage": "639",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Leon, Iloilo",
      "source_code": "2027DPWH-Proposal-37181",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Leon, Iloilo",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600754",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · leon · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37181",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Leon, Iloilo",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0826-014111",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Leon, Iloilo",
        "hgabPesos": 30000000,
        "nepPage": "639",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Morong, Bataan",
      "source_code": "2027DPWH-Proposal-35644",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Poblacion, Morong, Bataan",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416259",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maria Angela Garcia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35644",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Morong, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012147",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Morong, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Morong, Bataan",
      "source_code": "2027DPWH-Proposal-35644",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Morong, Bataan",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543420",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maria Angela Garcia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · morong · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35644",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Morong, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012147",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Morong, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, San Miguel, Iloilo",
      "source_code": "2027DPWH-Proposal-37324",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 20500000,
      "comparison_year": 2018,
      "prior_project": "Completion of Multi-purpose Building, Brgy. Poblacion, San Miguel, Iloilo",
      "prior_amount": 10000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104203088000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san miguel · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37324",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, San Miguel, Iloilo",
        "nepPesos": 20500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0826-014112",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, San Miguel, Iloilo",
        "hgabPesos": 20500000,
        "nepPage": "639",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Santa Barbara, Iloilo",
      "source_code": "2027DPWH-Proposal-37183",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. Poblacion, Santa Barbara, Iloilo",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531855",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · santa barbara · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37183",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Santa Barbara, Iloilo",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0826-014113",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Santa Barbara, Iloilo",
        "hgabPesos": 15000000,
        "nepPage": "639",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Santa Barbara, Iloilo",
      "source_code": "2027DPWH-Proposal-37183",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, Santa Barbara, Iloilo",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600753",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · santa barbara · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37183",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Santa Barbara, Iloilo",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0826-014113",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Santa Barbara, Iloilo",
        "hgabPesos": 15000000,
        "nepPage": "639",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Tantangan, South Cotabato",
      "source_code": "2027DPWH-Proposal-38737",
      "office": "South Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 25000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation (Completion) of Multi-Purpose Building, Barangay Poblacion, Tantangan, South Cotabato (6.612297, 124.747975)",
      "prior_amount": 2000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 41534",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 6.612297,
        "longitude": 124.747975,
        "raw": "6.612297, 124.747975",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · tantangan · south cotabato",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38737",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Tantangan, South Cotabato",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0900-015547",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Tantangan, South Cotabato",
        "hgabPesos": 25000000,
        "nepPage": "670",
        "hgabPage": "900",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo",
      "source_code": "2027DPWH-Proposal-37185",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600761",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · zarraga · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37185",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0826-014114",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo",
        "hgabPesos": 15000000,
        "nepPage": "639",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo",
      "source_code": "2027DPWH-Proposal-37185",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 15000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Poblacion Zarraga, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300103200478000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37185",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0826-014114",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo",
        "hgabPesos": 15000000,
        "nepPage": "639",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo (10.823217, 122.609097)",
      "source_code": "2027DPWH-Proposal-03053",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600761",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 10.823217,
        "longitude": 122.609097,
        "raw": "10.823217, 122.609097",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · zarraga · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03053",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo (10.823217, 122.609097)",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo (10.823217, 122.609097)",
      "source_code": "2027DPWH-Proposal-03053",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Poblacion Zarraga, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300103200478000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 10.823217,
        "longitude": 122.609097,
        "raw": "10.823217, 122.609097",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03053",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Zarraga, Iloilo (10.823217, 122.609097)",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Popol, Buluan, Maguindanao del Sur",
      "source_code": "2027DPWH-Proposal-38738",
      "office": "Regional Office XII BARMM",
      "region": "Region XII",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building , Barangay Popol, Buluan, Maguindanao del Sur (124.689345,7.170586)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30856",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 7.170586,
        "longitude": 124.689345,
        "raw": "124.689345,7.170586",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38738",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Popol, Buluan, Maguindanao del Sur",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0654-010681",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Popol, Buluan, Maguindanao del Sur",
        "hgabPesos": 10000000,
        "nepPage": "571",
        "hgabPage": "654",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Puertobello, Tudela, Cebu",
      "source_code": "2027DPWH-Proposal-37723",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Puertobello, Tudela, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 419694",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "puertobello · tudela · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37723",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Puertobello, Tudela, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Puertobello, Tudela, Cebu",
      "source_code": "2027DPWH-Proposal-37723",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction / Completion of Multi Purpose Building, Brgy. Puertobello, Tudela, Cebu",
      "prior_amount": 3000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 570728",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "puertobello · tudela · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37723",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Puertobello, Tudela, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Punta TayTay, Bacolod City",
      "source_code": "2027DPWH-Proposal-37629",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 30000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Punta, Taytay, Bacolod City",
      "prior_amount": 2500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104209404000 · PDF p. 792 · printed p. 2257",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37629",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Punta TayTay, Bacolod City",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014214",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Punta TayTay, Bacolod City",
        "hgabPesos": 30000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pusil, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33864",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation/Improvement of Multi-Purpose Building at Brgy. Pusil, Lipa City, Batangas",
      "prior_amount": 4500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482459",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pusil · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33864",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Pusil, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012819",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pusil, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Quilib, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36678",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Quilib, Rosario, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417117",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "quilib · rosario · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36678",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Quilib, Rosario, Batangas",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012820",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Quilib, Rosario, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Quilib, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36678",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Quilib, Rosario, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35150",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "quilib · rosario · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36678",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Quilib, Rosario, Batangas",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012820",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Quilib, Rosario, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Quilo- Quilo North, Padre Garcia, Batangas",
      "source_code": "2027DPWH-Proposal-36677",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Quilo-Quilo North, Padre Garcia, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530522",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36677",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Quilo- Quilo North, Padre Garcia, Batangas",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012821",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Quilo- Quilo North, Padre Garcia, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Quinaoayanan, Bani, Pangasinan",
      "source_code": "2027DPWH-Proposal-34164",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Quinaoayanan, Bani, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529584",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "quinaoayanan · bani · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34164",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Quinaoayanan, Bani, Pangasinan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0680-011181",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Quinaoayanan, Bani, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "578",
        "hgabPage": "680",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
      "source_code": "2027DPWH-Proposal-34935",
      "office": "Batanes District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529775",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "radiwan · ivana · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34935",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0699-011553",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
        "hgabPesos": 5000000,
        "nepPage": "584",
        "hgabPage": "699",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
      "source_code": "2027DPWH-Proposal-34935",
      "office": "Batanes District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597752",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "radiwan · ivana · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34935",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0699-011553",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Radiwan, Ivana, Batanes",
        "hgabPesos": 5000000,
        "nepPage": "584",
        "hgabPage": "699",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Resurreccion, Umingan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34508",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Barangay Resurreccion, Umingan, Pangasinan(15.894052,120.726567)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32258",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.894052,
        "longitude": 120.726567,
        "raw": "15.894052,120.726567",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34508",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Resurreccion, Umingan, Pangasinan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0689-011350",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Resurreccion, Umingan, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "580",
        "hgabPage": "689",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Rizal, Cauayan City, Isabela",
      "source_code": "2027DPWH-Proposal-35258",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Rizal, Cauayan City, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544695",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "rizal · cauayan · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35258",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Rizal, Cauayan City, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011945",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Rizal, Cauayan City, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "593",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
      "source_code": "2027DPWH-Proposal-35409",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
      "prior_amount": 25000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466424",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Tan"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "rosario · santiago · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35409",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011946",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "593",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
      "source_code": "2027DPWH-Proposal-35409",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
      "prior_amount": 20750000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413159",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Tan"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "rosario · santiago · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35409",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011946",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Rosario, Santiago City, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "593",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Saclit, Sadanga, Mountain Province",
      "source_code": "2027DPWH-Proposal-34694",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Saclit, Sadanga, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597730",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "saclit · sadanga · mountain province",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34694",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Saclit, Sadanga, Mountain Province",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0697-011505",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Saclit, Sadanga, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "583",
        "hgabPage": "697",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sacrifice Valley, Hermosa, Bataan",
      "source_code": "2027DPWH-Proposal-35779",
      "office": "Bataan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Sacrifice Valley, Hermosa Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481692",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35779",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sacrifice Valley, Hermosa, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0726-012096",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sacrifice Valley, Hermosa, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "594",
        "hgabPage": "726",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sacrifice Valley, Hermosa, Bataan",
      "source_code": "2027DPWH-Proposal-35779",
      "office": "Bataan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-purpose Building in Brgy. Sacrifice Valley, Hermosa, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33443",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sacrifice valley · hermosa · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35779",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sacrifice Valley, Hermosa, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0726-012096",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sacrifice Valley, Hermosa, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "594",
        "hgabPage": "726",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sagasa, Esperanza, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38577",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. Sagasa, Esperanza, Sultan Kudarat",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485789",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bella Suansing"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sagasa · esperanza · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38577",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sagasa, Esperanza, Sultan Kudarat",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0912-015782",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sagasa, Esperanza, Sultan Kudarat",
        "hgabPesos": 7000000,
        "nepPage": "671",
        "hgabPage": "912",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sagasa, Esperanza, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38577",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Sagasa, Esperanza, Sultan Kudarat",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 548164",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bella Suansing"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sagasa · esperanza · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38577",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sagasa, Esperanza, Sultan Kudarat",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0912-015782",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sagasa, Esperanza, Sultan Kudarat",
        "hgabPesos": 7000000,
        "nepPage": "671",
        "hgabPage": "912",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sagpangan, Aborlan, Palawan",
      "source_code": "2027DPWH-Proposal-37005",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 7500000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sagpangan, Aborlan, Palawan",
      "prior_amount": 5500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545955",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sagpangan · aborlan · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37005",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sagpangan, Aborlan, Palawan",
        "nepPesos": 7500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0792-013454",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sagpangan, Aborlan, Palawan",
        "hgabPesos": 7500000,
        "nepPage": "627",
        "hgabPage": "792",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Salay, San Agustin, Isabela",
      "source_code": "2027DPWH-Proposal-35097",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Improvement (Completion) of Multi-Purpose Building, Barangay Salay, San Agustin, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416083",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "salay · san agustin · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35097",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Salay, San Agustin, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011947",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Salay, San Agustin, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "593",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Salcedo II, Noveleta, Cavite",
      "source_code": "2027DPWH-Proposal-36169",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Salcedo II, Noveleta, Cavite",
      "prior_amount": 3000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104208192000 · PDF p. 708 · printed p. 2173",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "salcedo ii · noveleta · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36169",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Salcedo II, Noveleta, Cavite",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0768-012954",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Salcedo II, Noveleta, Cavite",
        "hgabPesos": 10000000,
        "nepPage": "614",
        "hgabPage": "768",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Saluysoy, Meycauayan City, Bulacan",
      "source_code": "2027DPWH-Proposal-35900",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 8000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Saluysoy, Meycauayan City, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413618",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "saluysoy · meycauayan · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35900",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Saluysoy, Meycauayan City, Bulacan",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0734-012269",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Saluysoy, Meycauayan City, Bulacan",
        "hgabPesos": 8000000,
        "nepPage": "599",
        "hgabPage": "734",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Saluysoy, Meycauayan City, Bulacan",
      "source_code": "2027DPWH-Proposal-35900",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 8000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Saluysoy, Meycauayan City, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010310984",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "saluysoy · meycauayan · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35900",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Saluysoy, Meycauayan City, Bulacan",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0734-012269",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Saluysoy, Meycauayan City, Bulacan",
        "hgabPesos": 8000000,
        "nepPage": "599",
        "hgabPage": "734",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35415",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San Agustin, Abulug, Cagayan",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415834",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san agustin · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35415",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
        "nepPesos": 100000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0703-011633",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
        "hgabPesos": 20000000,
        "nepPage": "563",
        "hgabPage": "703",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35415",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San Agustin, Abulug, Cagayan",
      "prior_amount": 18000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597818",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san agustin · abulug · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35415",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
        "nepPesos": 100000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0703-011633",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
        "hgabPesos": 20000000,
        "nepPage": "563",
        "hgabPage": "703",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35415",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan(18.353437°,121.475170°)",
      "prior_amount": 14800000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32788",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 18.353437,
        "longitude": 121.47517,
        "raw": "18.353437°,121.475170",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35415",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
        "nepPesos": 100000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0703-011633",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Agustin, Abulug, Cagayan",
        "hgabPesos": 20000000,
        "nepPage": "563",
        "hgabPage": "703",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes",
      "source_code": "2027DPWH-Proposal-35407",
      "office": "Batanes District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544445",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "—"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · basco · batanes",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35407",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0699-011554",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes",
        "hgabPesos": 10000000,
        "nepPage": "584",
        "hgabPage": "699",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Antonio, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-26354",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San Antonio, San Pedro, Laguna",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482656",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san antonio · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-26354",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Antonio, San Pedro City, Laguna",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013065",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Antonio, San Pedro City, Laguna",
        "hgabPesos": 10000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Antonio, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-26354",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San, Antonio, San Pedro, Laguna",
      "prior_amount": 13000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104208263000 · PDF p. 713 · printed p. 2178",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-26354",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Antonio, San Pedro City, Laguna",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0773-013065",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Antonio, San Pedro City, Laguna",
        "hgabPesos": 10000000,
        "nepPage": "617",
        "hgabPage": "773",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35346",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 75000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Brgy. San Fabian, Echague, Isabela",
      "prior_amount": 3500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481567",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san fabian · echague · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35346",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
        "nepPesos": 75000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010353",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
        "hgabPesos": 75000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35346",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 75000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529940",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san fabian · echague · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35346",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
        "nepPesos": 75000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010353",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
        "hgabPesos": 75000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35346",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 75000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-purpose Building, Brgy. San Fabian, Echague, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598059",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san fabian · echague · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35346",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
        "nepPesos": 75000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010353",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
        "hgabPesos": 75000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35346",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 75000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela, 16.715905, 121.683631",
      "prior_amount": 12500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33025",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.715905,
        "longitude": 121.683631,
        "raw": "16.715905, 121.683631",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san fabian · echague · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35346",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
        "nepPesos": 75000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010353",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela",
        "hgabPesos": 75000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-36393",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San Francisco, General Trias, Cavite",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417234",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san francisco · general trias · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36393",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0768-012955",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
        "hgabPesos": 5000000,
        "nepPage": "614",
        "hgabPage": "768",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-36393",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San Francisco, General Trias City, Cavite",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530749",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san francisco · general trias · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36393",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0768-012955",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
        "hgabPesos": 5000000,
        "nepPage": "614",
        "hgabPage": "768",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-36393",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545518",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san francisco · general trias · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36393",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0768-012955",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Francisco, General Trias City, Cavite",
        "hgabPesos": 5000000,
        "nepPage": "614",
        "hgabPage": "768",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Isidro, Iguig, Cagayan",
      "source_code": "2027DPWH-Proposal-34995",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Isidro, Iguig, Cagayan",
      "prior_amount": 2500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104206913000 · PDF p. 617 · printed p. 2082",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san isidro · iguig · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34995",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Isidro, Iguig, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0704-011667",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Isidro, Iguig, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "588",
        "hgabPage": "704",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Isidro, Santiago City, Isabela",
      "source_code": "2027DPWH-Proposal-35092",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Isidro, Santiago City, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529930",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Tan"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san isidro · santiago · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35092",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Isidro, Santiago City, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011948",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Isidro, Santiago City, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "593",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Jose, Balanga City, Bataan (14.671365, 120.535013)",
      "source_code": "2027DPWH-Proposal-35614",
      "office": "Bataan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 25000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Bataan Multi-Purpose Building, San Jose, Balanga, Bataan",
      "prior_amount": 50000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481709",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albert Garcia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.671365,
        "longitude": 120.535013,
        "raw": "14.671365, 120.535013",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35614",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Jose, Balanga City, Bataan (14.671365, 120.535013)",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0727-012123",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Jose, Balanga City, Bataan (14.671365, 120.535013)",
        "hgabPesos": 25000000,
        "nepPage": "595",
        "hgabPage": "727",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Jose, Balanga City, Bataan (14.671365, 120.535013)",
      "source_code": "2027DPWH-Proposal-35614",
      "office": "Bataan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 25000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building Barangay San Jose, City of Balanga, Bataan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598332",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albert Garcia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.671365,
        "longitude": 120.535013,
        "raw": "14.671365, 120.535013",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san jose · balanga · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35614",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Jose, Balanga City, Bataan (14.671365, 120.535013)",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0727-012123",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Jose, Balanga City, Bataan (14.671365, 120.535013)",
        "hgabPesos": 25000000,
        "nepPage": "595",
        "hgabPage": "727",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Jose, Coron, Palawan",
      "source_code": "2027DPWH-Proposal-36954",
      "office": "Palawan 1st District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building in Brgy. San Jose, Coron, Palawan",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482961",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san jose · coron · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36954",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Jose, Coron, Palawan",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0791-013427",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Jose, Coron, Palawan",
        "hgabPesos": 6000000,
        "nepPage": "626",
        "hgabPage": "791",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Jose, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35087",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-purpose Building, Brgy. San Jose, Jones, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529950",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san jose · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35087",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Jose, Jones, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011949",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Jose, Jones, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "593",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Jose, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35087",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose, Jones, Isabela",
      "prior_amount": 3500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598171",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san jose · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35087",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Jose, Jones, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011949",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Jose, Jones, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "593",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Jose, San Miguel, Iloilo",
      "source_code": "2027DPWH-Proposal-37160",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Improvement of Multi-Purpose Building, San Jose, San Miguel, Iloilo",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 418853",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37160",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Jose, San Miguel, Iloilo",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0826-014117",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Jose, San Miguel, Iloilo",
        "hgabPesos": 10000000,
        "nepPage": "639",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Jose, San Miguel, Iloilo",
      "source_code": "2027DPWH-Proposal-37160",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Jose, San Miguel, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546650",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san jose · san miguel · iloilo",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37160",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Jose, San Miguel, Iloilo",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0826-014117",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Jose, San Miguel, Iloilo",
        "hgabPesos": 10000000,
        "nepPage": "639",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Juan, Dumaran, Palawan",
      "source_code": "2027DPWH-Proposal-36960",
      "office": "Palawan 1st District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Juan, Dumaran, Palawan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531138",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san juan · dumaran · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36960",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Juan, Dumaran, Palawan",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0791-013428",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Juan, Dumaran, Palawan",
        "hgabPesos": 6000000,
        "nepPage": "626",
        "hgabPage": "791",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Juan, San Narciso, Zambales 15.003452, 120.095337",
      "source_code": "2027DPWH-Proposal-36110",
      "office": "Zambales 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Juan, Municipality of San Narciso, Zambales",
      "prior_amount": 4000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530384",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 15.003452,
        "longitude": 120.095337,
        "raw": "15.003452, 120.095337",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36110",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Juan, San Narciso, Zambales 15.003452, 120.095337",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0636-010366",
        "hgabTitle": "Construction of Multi-Purpose Building (Main Building), Barangay San Juan, San Narciso, Zambales 15.003452, 120.095337",
        "hgabPesos": 100000000,
        "nepPage": "606",
        "hgabPage": "636",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Luis, Cauayan City, Isabela",
      "source_code": "2027DPWH-Proposal-35263",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 535000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building of Barangay San Luis, Cauayan City, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416053",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san luis · cauayan · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35263",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Luis, Cauayan City, Isabela",
        "nepPesos": 535000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010354",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Luis, Cauayan City, Isabela",
        "hgabPesos": 535000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Luis, Cauayan City, Isabela",
      "source_code": "2027DPWH-Proposal-35263",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 535000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Luis, City of Cauayan, Isabela, 16.95551,121.82675",
      "prior_amount": 215000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30285",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.95551,
        "longitude": 121.82675,
        "raw": "16.95551,121.82675",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san luis · cauayan · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35263",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Luis, Cauayan City, Isabela",
        "nepPesos": 535000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010354",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Luis, Cauayan City, Isabela",
        "hgabPesos": 535000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Miguel, Alaminos, Laguna (14.051387, 121.258098)",
      "source_code": "2027DPWH-Proposal-23541",
      "office": "Laguna 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay San Miguel, Alaminos, Laguna",
      "prior_amount": 5016000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599494",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.051387,
        "longitude": 121.258098,
        "raw": "14.051387, 121.258098",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san miguel · alaminos · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23541",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Alaminos, Laguna (14.051387, 121.258098)",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0776-013120",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Alaminos, Laguna (14.051387, 121.258098)",
        "hgabPesos": 7000000,
        "nepPage": "619",
        "hgabPage": "776",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Miguel, Arakan, North Cotabato",
      "source_code": "2027DPWH-Proposal-38718",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2019,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. San Miguel, Arakan, North Cotabato",
      "prior_amount": 1500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104212489000 · PDF p. 1012 · printed p. 2477",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san miguel · arakan · north cotabato",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38718",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Arakan, North Cotabato",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0897-015487",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Arakan, North Cotabato",
        "hgabPesos": 6000000,
        "nepPage": "669",
        "hgabPage": "897",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Miguel, Balungao, Pangasinan",
      "source_code": "2027DPWH-Proposal-34326",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay San Miguel, Balungao, Pangasinan",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525216",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san miguel · balungao · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34326",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Balungao, Pangasinan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0689-011352",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Balungao, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "581",
        "hgabPage": "689",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Miguel, Puerto Princesa City, Palawan",
      "source_code": "2027DPWH-Proposal-36991",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 9000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Miguel, City of Puerto Princesa, Palawan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531197",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gil Acosta Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san miguel · puerto princesa · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36991",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Puerto Princesa City, Palawan",
        "nepPesos": 9000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0792-013457",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Puerto Princesa City, Palawan",
        "hgabPesos": 9000000,
        "nepPage": "627",
        "hgabPage": "792",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Miguel, Puerto Princesa City, Palawan",
      "source_code": "2027DPWH-Proposal-36991",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 9000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Miguel, Puerto Princesa City, Palawan",
      "prior_amount": 5500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545946",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gil Acosta Jr."
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san miguel · puerto princesa · palawan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36991",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Puerto Princesa City, Palawan",
        "nepPesos": 9000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0792-013457",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Miguel, Puerto Princesa City, Palawan",
        "hgabPesos": 9000000,
        "nepPage": "627",
        "hgabPage": "792",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Pedro, Pilar, Capiz",
      "source_code": "2027DPWH-Proposal-37199",
      "office": "Capiz 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 7000000,
      "comparison_year": 2019,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. San Pedro, Pilar, Capiz",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104209471000 · PDF p. 797 · printed p. 2262",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san pedro · pilar · capiz",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37199",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Pedro, Pilar, Capiz",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0816-013897",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Pedro, Pilar, Capiz",
        "hgabPesos": 7000000,
        "nepPage": "636",
        "hgabPage": "816",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Roque, Palimbang, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38583",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 8000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Roque, Palimbang, Sultan Kudarat",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 533239",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san roque · palimbang · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38583",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Roque, Palimbang, Sultan Kudarat",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0914-015819",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Roque, Palimbang, Sultan Kudarat",
        "hgabPesos": 7000000,
        "nepPage": "671",
        "hgabPage": "914",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36644",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2020,
      "prior_project": "Improvement of Multi-Purpose Building, Brgy. San Roque, Rosario, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482382",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san roque · rosario · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36644",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012823",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
        "hgabPesos": 30000000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36644",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. San Roque, Rosario, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545402",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san roque · rosario · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36644",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012823",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
        "hgabPesos": 30000000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36644",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, at Barangay San Roque, Rosario, Batangas (13.854494, 121.196690)",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35014",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 13.854494,
        "longitude": 121.19669,
        "raw": "13.854494, 121.196690",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san roque · rosario · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36644",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012823",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
        "hgabPesos": 30000000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36644",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation of Multi-purpose Building, Brgy. San Roque, Rosario, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201846000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san roque · rosario · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36644",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012823",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Roque, Rosario, Batangas",
        "hgabPesos": 30000000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Vicente East, Asingan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34324",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-purpose Building, Brgy. San Vicente East, Asingan, Pangasinan",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104206465000 · PDF p. 586 · printed p. 2051",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san vicente east · asingan · pangasinan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34324",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Vicente East, Asingan, Pangasinan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0689-011355",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Vicente East, Asingan, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "581",
        "hgabPage": "689",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Vicente, Iguig, Cagayan",
      "source_code": "2027DPWH-Proposal-34996",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, San Vicente, Iguig, Cagayan",
      "prior_amount": 2200000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415863",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34996",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Vicente, Iguig, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0704-011668",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Vicente, Iguig, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "588",
        "hgabPage": "704",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay San Vicente, Iguig, Cagayan",
      "source_code": "2027DPWH-Proposal-34996",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Vicente, Iguig, Cagayan",
      "prior_amount": 2500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597897",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san vicente · iguig · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34996",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay San Vicente, Iguig, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0704-011668",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay San Vicente, Iguig, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "588",
        "hgabPage": "704",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Saysain, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35670",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. Saysain, Bagac, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595832",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "saysain · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35670",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Saysain, Bagac, Bataan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012148",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Saysain, Bagac, Bataan",
        "hgabPesos": 10000000,
        "nepPage": "596",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Saysain, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35670",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Saysain, Bagac, Bataan (14.570308, 120.394029)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33519",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.570308,
        "longitude": 120.394029,
        "raw": "14.570308, 120.394029",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "saysain · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35670",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Saysain, Bagac, Bataan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012148",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Saysain, Bagac, Bataan",
        "hgabPesos": 10000000,
        "nepPage": "596",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Singcang-Airport, Bacolod City",
      "source_code": "2027DPWH-Proposal-37369",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 25000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Barangay Singcang Airport, Bacolod City",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104202893000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37369",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Singcang-Airport, Bacolod City",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0830-014193",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Singcang-Airport, Bacolod City",
        "hgabPesos": 5000000,
        "nepPage": "641",
        "hgabPage": "830",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sinunuc, Zamboanga City",
      "source_code": "2027DPWH-Proposal-38244",
      "office": "Zamboanga City 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sinunuc, Zamboanga City (6.931821°, 122.005694°) ",
      "prior_amount": 60000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30695",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 6.931821,
        "longitude": 122.005694,
        "raw": "6.931821°, 122.005694",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "sinunuc · zamboanga city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38244",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sinunuc, Zamboanga City",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0864-014871",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sinunuc, Zamboanga City",
        "hgabPesos": 30000000,
        "nepPage": "653",
        "hgabPage": "864",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36907",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Calapan City, Oriental Mindoro",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482912",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sta. isabel · calapan · oriental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36907",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35618",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Sta. Isabel, Dinalupihan, Bataan",
      "prior_amount": 7000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481690",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35618",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Dinalupihan, Bataan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012149",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Dinalupihan, Bataan",
        "hgabPesos": 10000000,
        "nepPage": "596",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35618",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Repair/Rehabilitation of Multi-Purpose Building, Barangay Sta. Isabel, Dinalupihan, Bataan",
      "prior_amount": 2500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201103000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sta. isabel · dinalupihan · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35618",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Dinalupihan, Bataan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012149",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Dinalupihan, Bataan",
        "hgabPesos": 10000000,
        "nepPage": "596",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Natonin, Mountain Province",
      "source_code": "2027DPWH-Proposal-34711",
      "office": "Mountain Province 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Sta. Isabel, Natonin, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597734",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sta. isabel · natonin · mountain province",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34711",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Natonin, Mountain Province",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0697-011521",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sta. Isabel, Natonin, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "584",
        "hgabPage": "697",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sta. Monica, Floridablanca, Pampanga",
      "source_code": "2027DPWH-Proposal-33562",
      "office": "Pampanga 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Sta. Monica, Floridablanca, Pampanga",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598806",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33562",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sta. Monica, Floridablanca, Pampanga",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0742-012438",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sta. Monica, Floridablanca, Pampanga",
        "hgabPesos": 50000000,
        "nepPage": "604",
        "hgabPage": "742",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sto. Nino, Kidapawan City, North Cotabato",
      "source_code": "2027DPWH-Proposal-38698",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Sto Niño, Kidapawan City, North Cotabato",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485595",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "santo nino · kidapawan · north cotabato",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38698",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sto. Nino, Kidapawan City, North Cotabato",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0897-015488",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sto. Nino, Kidapawan City, North Cotabato",
        "hgabPesos": 6000000,
        "nepPage": "669",
        "hgabPage": "897",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
      "source_code": "2027DPWH-Proposal-33924",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "region": "NCR",
      "amount_2027": 25000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 480908",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "sucat · muntinlupa city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33924",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0656-010702",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
        "hgabPesos": 25000000,
        "nepPage": "572",
        "hgabPage": "656",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
      "source_code": "2027DPWH-Proposal-33924",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "region": "NCR",
      "amount_2027": 25000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
      "prior_amount": 32000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596751",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "sucat · muntinlupa city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33924",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0656-010702",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sucat, Muntinlupa City",
        "hgabPesos": 25000000,
        "nepPage": "572",
        "hgabPage": "656",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Taba-ao, Sagay City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37471",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Taba-ao,Sagay City, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104209862000 · PDF p. 824 · printed p. 2289",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taba-ao · sagay · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37471",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Taba-ao, Sagay City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0833-014258",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Taba-ao, Sagay City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "643",
        "hgabPage": "833",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Taclobo, Dumaguete City, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37496",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Construction/ Rehabilitation of Multi-purpose Building in Barangay Taclobo, Dumaguete City, Negros Oriental",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413987",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maisa Sagarbarria"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taclobo · dumaguete · negros oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37496",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Taclobo, Dumaguete City, Negros Oriental",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0840-014386",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Taclobo, Dumaguete City, Negros Oriental",
        "hgabPesos": 20000000,
        "nepPage": "645",
        "hgabPage": "840",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Taclobo, Dumaguete City, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37496",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation (Completion) of Multi-Purpose Building, Barangay Taclobo, Dumaguete City, Negros Oriental (9.314167, 123.28944)",
      "prior_amount": 4000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 38078",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maisa Sagarbarria"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 9.314167,
        "longitude": 123.28944,
        "raw": "9.314167, 123.28944",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taclobo · dumaguete · negros oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37496",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Taclobo, Dumaguete City, Negros Oriental",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0840-014386",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Taclobo, Dumaguete City, Negros Oriental",
        "hgabPesos": 20000000,
        "nepPage": "645",
        "hgabPage": "840",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Talaibon, Ibaan, Batangas",
      "source_code": "2027DPWH-Proposal-36715",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Talaibon, Ibaan, Batangas",
      "prior_amount": 15000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530516",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "talaibon · ibaan · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36715",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Talaibon, Ibaan, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012825",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Talaibon, Ibaan, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Talaibon, Ibaan, Batangas",
      "source_code": "2027DPWH-Proposal-36715",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Talaibon, Ibaan, Batangas",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599293",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "talaibon · ibaan · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36715",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Talaibon, Ibaan, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012825",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Talaibon, Ibaan, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "612",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38587",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 548156",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tibpuan · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38587",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0914-015821",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
        "hgabPesos": 5500000,
        "nepPage": "671",
        "hgabPage": "914",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38587",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602541",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tibpuan · lebak · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38587",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0914-015821",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Tibpuan, Lebak, Sultan Kudarat",
        "hgabPesos": 5500000,
        "nepPage": "671",
        "hgabPage": "914",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Tomongtong, EB Magalona, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37403",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tomongtong, EB Magalona, Negros Occidental",
      "prior_amount": 3700000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 418961",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37403",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Tomongtong, EB Magalona, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0833-014259",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Tomongtong, EB Magalona, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "643",
        "hgabPage": "833",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Tuban, Sablayan, Occidental Mindoro",
      "source_code": "2027DPWH-Proposal-36845",
      "office": "Mindoro Occidental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Tuban, Sablayan, Occidental Mindoro",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482906",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tuban · sablayan · occidental mindoro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36845",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Tuban, Sablayan, Occidental Mindoro",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0788-013370",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Tuban, Sablayan, Occidental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "625",
        "hgabPage": "788",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Tucop, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35658",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tucop, Dinalupihan, Bataan",
      "prior_amount": 6000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104207163000 · PDF p. 635 · printed p. 2100",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tucop · dinalupihan · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35658",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Tucop, Dinalupihan, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012151",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Tucop, Dinalupihan, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Tupax, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35088",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-purpose Building, Barangay Tupax, Jones, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598074",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tupax · jones · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35088",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Tupax, Jones, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011951",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Tupax, Jones, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "593",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Turod Sur, Cordon, Isabela",
      "source_code": "2027DPWH-Proposal-35079",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Turod Sur, Cordon, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544681",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "turod sur · cordon · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35079",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Turod Sur, Cordon, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011952",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Turod Sur, Cordon, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "593",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Ubaub, Argao, Cebu",
      "source_code": "2027DPWH-Proposal-37751",
      "office": "Cebu 2nd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Ubaub, Argao, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532084",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ubaub · argao · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37751",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Ubaub, Argao, Cebu",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0851-014610",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Ubaub, Argao, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "646",
        "hgabPage": "851",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Victoria, Llanera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35830",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Victoria, Llanera, Nueva Ecija",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481812",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "victoria · llanera · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35830",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Victoria, Llanera, Nueva Ecija",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0739-012367",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Victoria, Llanera, Nueva Ecija",
        "hgabPesos": 30000000,
        "nepPage": "602",
        "hgabPage": "739",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Victoria, Llanera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35830",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Victoria, Llanera, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598561",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "victoria · llanera · nueva ecija",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35830",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Victoria, Llanera, Nueva Ecija",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0739-012367",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Victoria, Llanera, Nueva Ecija",
        "hgabPesos": 30000000,
        "nepPage": "602",
        "hgabPage": "739",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Villa Luna, Cauayan City, Isabela",
      "source_code": "2027DPWH-Proposal-35261",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building of Barangay Villa Luna, Cauayan City, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416055",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "villa luna · cauayan · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35261",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Villa Luna, Cauayan City, Isabela",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0718-011953",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Villa Luna, Cauayan City, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "593",
        "hgabPage": "718",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Villamonte, Bacolod City",
      "source_code": "2027DPWH-Proposal-37370",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation of Multi-purpose Building, Barangay Villamonte, Bacolod City",
      "prior_amount": 500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104202905000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "villamonte · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37370",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Villamonte, Bacolod City",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014215",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Villamonte, Bacolod City",
        "hgabPesos": 5000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Wari Wari, New Lucena, Iloilo",
      "source_code": "2027DPWH-Proposal-37161",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Wari-Wari, New Lucena, Iloilo",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 483692",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37161",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Wari Wari, New Lucena, Iloilo",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0826-014119",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Wari Wari, New Lucena, Iloilo",
        "hgabPesos": 10000000,
        "nepPage": "639",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Wari Wari, New Lucena, Iloilo",
      "source_code": "2027DPWH-Proposal-37161",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Wari-Wari, New Lucena, Iloilo",
      "prior_amount": 5050000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600788",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37161",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Wari Wari, New Lucena, Iloilo",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0826-014119",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Wari Wari, New Lucena, Iloilo",
        "hgabPesos": 10000000,
        "nepPage": "639",
        "hgabPage": "826",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay West Calaguiman, Samal, Bataan",
      "source_code": "2027DPWH-Proposal-35766",
      "office": "Bataan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. West Calaguiman, Samal, Bataan",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416250",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Antonino Roman III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "west calaguiman · samal · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35766",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay West Calaguiman, Samal, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0726-012097",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay West Calaguiman, Samal, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "594",
        "hgabPage": "726",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay West Calaguiman, Samal, Bataan",
      "source_code": "2027DPWH-Proposal-35766",
      "office": "Bataan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay West Calaguiman, Samal, Bataan",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530027",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Antonino Roman III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "west calaguiman · samal · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35766",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay West Calaguiman, Samal, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0726-012097",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay West Calaguiman, Samal, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "594",
        "hgabPage": "726",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Ziminila, Camalaniugan, Cagayan",
      "source_code": "2027DPWH-Proposal-35037",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building at Brgy. Ziminila, Camalaniugan, Cagayan",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104200871000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "ziminila · camalaniugan · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35037",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Ziminila, Camalaniugan, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0703-011631",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Ziminila, Camalaniugan, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "587",
        "hgabPage": "703",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Zone 6, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37484",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Zone 6, Cadiz City, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546738",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "zone 6 · cadiz · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37484",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Zone 6, Cadiz City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0833-014260",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Zone 6, Cadiz City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "643",
        "hgabPage": "833",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
      "source_code": "2027DPWH-Proposal-37973",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 25000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Baybay City, Leyte",
      "prior_amount": 6000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532308",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 10.67525,
        "longitude": 124.796548,
        "raw": "10.675250, 124.796548",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37973",
        "nepTitle": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0860-014785",
        "hgabTitle": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
        "hgabPesos": 25000000,
        "nepPage": "650",
        "hgabPage": "860",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
      "source_code": "2027DPWH-Proposal-37973",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 25000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Multi-Purpose Building, Baybay City, Leyte",
      "prior_amount": 3000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010312738",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 10.67525,
        "longitude": 124.796548,
        "raw": "10.675250, 124.796548",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37973",
        "nepTitle": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0860-014785",
        "hgabTitle": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
        "hgabPesos": 25000000,
        "nepPage": "650",
        "hgabPage": "860",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
      "source_code": "2027DPWH-Proposal-37973",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 25000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building, Baybay City, Leyte",
      "prior_amount": 7500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104203903000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 10.67525,
        "longitude": 124.796548,
        "raw": "10.675250, 124.796548",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37973",
        "nepTitle": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0860-014785",
        "hgabTitle": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
        "hgabPesos": 25000000,
        "nepPage": "650",
        "hgabPage": "860",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
      "source_code": "2027DPWH-Proposal-37973",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 25000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Baybay City, Leyte",
      "prior_amount": 12000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104203903000 · PDF p. 524 · printed p. 1989",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 10.67525,
        "longitude": 124.796548,
        "raw": "10.675250, 124.796548",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37973",
        "nepTitle": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0860-014785",
        "hgabTitle": "Construction of Multi-Purpose Building, Baybay City, Leyte (10.675250, 124.796548)",
        "hgabPesos": 25000000,
        "nepPage": "650",
        "hgabPage": "860",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy Abaga, Municipality of Madalum, Lanao del Sur",
      "source_code": "2027DPWH-Proposal-38951",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Abaga, Madalum, Lanao del Sur",
      "prior_amount": 3000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104204264000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "abaga · madalum · lanao del sur",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38951",
        "nepTitle": "Construction of Multi-Purpose Building, Brgy Abaga, Municipality of Madalum, Lanao del Sur",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0652-010628",
        "hgabTitle": "Construction of Multi-Purpose Building, Abaga, Municipality of Madalum, Lanao del Sur",
        "hgabPesos": 10000000,
        "nepPage": "570",
        "hgabPage": "652",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy Daguan, Municipality of Kapatagan, Lanao del Sur",
      "source_code": "2027DPWH-Proposal-38949",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 30000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Daguan, Kapatagan, Lanao del Sur",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420707",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Yasser Balindong"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "daguan · kapatagan · lanao del sur",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38949",
        "nepTitle": "Construction of Multi-Purpose Building, Brgy Daguan, Municipality of Kapatagan, Lanao del Sur",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0652-010629",
        "hgabTitle": "Construction of Multi-Purpose Building, Daguan, Municipality of Kapatagan, Lanao del Sur",
        "hgabPesos": 30000000,
        "nepPage": "570",
        "hgabPage": "652",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy Daguan, Municipality of Kapatagan, Lanao del Sur",
      "source_code": "2027DPWH-Proposal-38949",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Daguan, Kapatagan, Lanao del Sur (124.214436°, 7.542336°)",
      "prior_amount": 7500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30754",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Yasser Balindong"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 7.542336,
        "longitude": 124.214436,
        "raw": "124.214436°, 7.542336",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38949",
        "nepTitle": "Construction of Multi-Purpose Building, Brgy Daguan, Municipality of Kapatagan, Lanao del Sur",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0652-010629",
        "hgabTitle": "Construction of Multi-Purpose Building, Daguan, Municipality of Kapatagan, Lanao del Sur",
        "hgabPesos": 30000000,
        "nepPage": "570",
        "hgabPage": "652",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy Tongantongan, Municipality of Madalum, Lanao del Sur",
      "source_code": "2027DPWH-Proposal-38953",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tongantongan, Madalum, Lanao del Sur",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420738",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tongantongan · madalum · lanao del sur",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38953",
        "nepTitle": "Construction of Multi-Purpose Building, Brgy Tongantongan, Municipality of Madalum, Lanao del Sur",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0652-010632",
        "hgabTitle": "Construction of Multi-Purpose Building, Tongantongan, Municipality of Madalum, Lanao del Sur",
        "hgabPesos": 10000000,
        "nepPage": "570",
        "hgabPage": "652",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy. Likud Tabawan, South Ubian, Tawi-Tawi",
      "source_code": "2027DPWH-Proposal-38248",
      "office": "Regional Office IX BARMM",
      "region": "Region IX",
      "amount_2027": 16000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Likud Tabawan, South Ubian, Tawi-Tawi",
      "prior_amount": 20000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484698",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38248",
        "nepTitle": "Construction of Multi-Purpose Building, Brgy. Likud Tabawan, South Ubian, Tawi-Tawi",
        "nepPesos": 16000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0647-010543",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Likud Tabawan, South Ubian, Tawi- Tawi",
        "hgabPesos": 16000000,
        "nepPage": "569",
        "hgabPage": "647",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy. Little Margos, Tungawan, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38213",
      "office": "Zamboanga Sibugay 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 7000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Little Margos, Tungawan, Zamboanga Sibugay",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484919",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38213",
        "nepTitle": "Construction of Multi-Purpose Building, Brgy. Little Margos, Tungawan, Zamboanga Sibugay",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0871-014998",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Little Margos, Tungawan, Zamboanga Sibugay",
        "hgabPesos": 7000000,
        "nepPage": "655",
        "hgabPage": "871",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy. Little Margos, Tungawan, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-38213",
      "office": "Zamboanga Sibugay 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 7000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Little Margos, Tungawan, Zamboanga Sibugay",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532477",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "little margos · tungawan · zamboanga sibugay",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38213",
        "nepTitle": "Construction of Multi-Purpose Building, Brgy. Little Margos, Tungawan, Zamboanga Sibugay",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0871-014998",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Little Margos, Tungawan, Zamboanga Sibugay",
        "hgabPesos": 7000000,
        "nepPage": "655",
        "hgabPage": "871",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy. Poblacion, Lugait, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39027",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Lugait, Misamis Oriental",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602008",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · lugait · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39027",
        "nepTitle": "Construction of Multi-Purpose Building, Brgy. Poblacion, Lugait, Misamis Oriental",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0648-010554",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Balingoan, Misamis Oriental (124.847967°, 9.002995°)",
        "hgabPesos": 90000000,
        "nepPage": "664",
        "hgabPage": "648",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy. Poblacion, Lugait, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39027",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Lugait, Misamis Oriental (124.259861°, 8.342981°)",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40692",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 8.342981,
        "longitude": 124.259861,
        "raw": "124.259861°, 8.342981",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39027",
        "nepTitle": "Construction of Multi-Purpose Building, Brgy. Poblacion, Lugait, Misamis Oriental",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0648-010554",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Balingoan, Misamis Oriental (124.847967°, 9.002995°)",
        "hgabPesos": 90000000,
        "nepPage": "664",
        "hgabPage": "648",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Brgy. Poblacion, Sibutad, Zamboanga del Norte",
      "source_code": "2027DPWH-Proposal-38254",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 15000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Sibutad, Zamboanga del Norte",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420462",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · sibutad · zamboanga del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38254",
        "nepTitle": "Construction of Multi-Purpose Building, Brgy. Poblacion, Sibutad, Zamboanga del Norte",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0865-014886",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion, Sibutad, Zamboanga del Norte",
        "hgabPesos": 15000000,
        "nepPage": "653",
        "hgabPage": "865",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Buas, Candaba, Pampanga",
      "source_code": "2027DPWH-Proposal-35514",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Buas, Candaba, Pampanga",
      "prior_amount": 700000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481945",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35514",
        "nepTitle": "Construction of Multi-Purpose Building, Buas, Candaba, Pampanga",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0741-012424",
        "hgabTitle": "Construction of Multi-Purpose Building, Mandili, Candaba, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "603",
        "hgabPage": "741",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Buas, Candaba, Pampanga",
      "source_code": "2027DPWH-Proposal-35514",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation (Completion) of Multi-Purpose Building, Barangay Buas, Candaba, Pampanga",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525450",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35514",
        "nepTitle": "Construction of Multi-Purpose Building, Buas, Candaba, Pampanga",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0741-012424",
        "hgabTitle": "Construction of Multi-Purpose Building, Mandili, Candaba, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "603",
        "hgabPage": "741",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Bubong, Lanao del Sur",
      "source_code": "2027DPWH-Proposal-26642",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Bubong, Lanao del Sur",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543659",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-26642",
        "nepTitle": "Construction of Multi-Purpose Building, Bubong, Lanao del Sur",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0652-010633",
        "hgabTitle": "Construction of Multi-Purpose Building, Bubong, Lanao del Sur",
        "hgabPesos": 50000000,
        "nepPage": "570",
        "hgabPage": "652",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Bulac, Minalin, Pampanga",
      "source_code": "2027DPWH-Proposal-35478",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 7000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Bulac Multi-Purpose Building, Bulac, Minalin, Pampanga",
      "prior_amount": 1500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201369000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35478",
        "nepTitle": "Construction of Multi-Purpose Building, Bulac, Minalin, Pampanga",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0741-012408",
        "hgabTitle": "Construction of Multi-Purpose Building, Bulac, Minalin, Pampanga",
        "hgabPesos": 7000000,
        "nepPage": "603",
        "hgabPage": "741",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, CSU Solana, Solana, Cagayan",
      "source_code": "2027DPWH-Proposal-34987",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, CSU Solana, Solana, Cagayan",
      "prior_amount": 13203000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 605793",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34987",
        "nepTitle": "Construction of Multi-Purpose Building, CSU Solana, Solana, Cagayan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0704-011670",
        "hgabTitle": "Construction of Multi-Purpose Building, CSU Solana, Solana, Cagayan",
        "hgabPesos": 15000000,
        "nepPage": "588",
        "hgabPage": "704",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Cabusao, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39301",
      "office": "Camarines Sur 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 20000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building at Cabusao, Camarines Sur",
      "prior_amount": 7500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546080",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39301",
        "nepTitle": "Construction of Multi-Purpose Building, Cabusao, Camarines Sur",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0798-013572",
        "hgabTitle": "Construction of Multi-Purpose Building, Cabusao, Camarines Sur",
        "hgabPesos": 20000000,
        "nepPage": "630",
        "hgabPage": "798",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Calabanga, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39347",
      "office": "Camarines Sur 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 50000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building , Calabanga, Camarines Sur",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104202642000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39347",
        "nepTitle": "Construction of Multi-Purpose Building, Calabanga, Camarines Sur",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0801-013615",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Sibobo, Calabanga, CamarinesSur",
        "hgabPesos": 50000000,
        "nepPage": "631",
        "hgabPage": "801",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Camdas, Baguio City",
      "source_code": "2027DPWH-Proposal-34776",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-purpose Building, Camdas, Baguio City",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481327",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34776",
        "nepTitle": "Construction of Multi-Purpose Building, Camdas, Baguio City",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0691-011398",
        "hgabTitle": "Construction of Multi-Purpose Building, Camdas, Baguio City",
        "hgabPesos": 10000000,
        "nepPage": "582",
        "hgabPage": "691",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Camdas, Baguio City",
      "source_code": "2027DPWH-Proposal-34776",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Camdas, Baguio City",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010310617",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34776",
        "nepTitle": "Construction of Multi-Purpose Building, Camdas, Baguio City",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0691-011398",
        "hgabTitle": "Construction of Multi-Purpose Building, Camdas, Baguio City",
        "hgabPesos": 10000000,
        "nepPage": "582",
        "hgabPage": "691",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Capitol Complex, Barangay Cadlan, Pili, Camarines Sur",
      "source_code": "2027DPWH-Proposal-27338",
      "office": "Camarines Sur 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Capitol Complex, Barangay Cadlan, Pili, Camarines Sur",
      "prior_amount": 150000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 531847",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cadlan · pili · camarines sur",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-27338",
        "nepTitle": "Construction of Multi-Purpose Building, Capitol Complex, Barangay Cadlan, Pili, Camarines Sur",
        "nepPesos": 75000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Capitol Grounds, San Miguel, Jordan, Guimaras",
      "source_code": "2027DPWH-Proposal-37306",
      "office": "Guimaras District Engineering Office",
      "region": "Region VI",
      "amount_2027": 25000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-purpose Building, Capitol Grounds, Barangay San Miguel, Jordan, Guimaras",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546425",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "JC Rahman Nava"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37306",
        "nepTitle": "Construction of Multi-Purpose Building, Capitol Grounds, San Miguel, Jordan, Guimaras",
        "nepPesos": 25000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0816-013914",
        "hgabTitle": "Construction of Multi-Purpose Building, Capitol Grounds, San Miguel, Jordan, Guimaras",
        "hgabPesos": 25000000,
        "nepPage": "637",
        "hgabPage": "816",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Covered Court, Barangay San Isidro, La Paz, Tarlac",
      "source_code": "2027DPWH-Proposal-35742",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 8000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), San Isidro, La Paz, Tarlac",
      "prior_amount": 3500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104207669000 · PDF p. 670 · printed p. 2135",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35742",
        "nepTitle": "Construction of Multi-Purpose Building, Covered Court, Barangay San Isidro, La Paz, Tarlac",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0742-012447",
        "hgabTitle": "Construction of Multi-Purpose Building, Covered Court, Barangay San Isidro, La Paz, Tarlac",
        "hgabPesos": 8000000,
        "nepPage": "604",
        "hgabPage": "742",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Dela Paz, San Simon, Pampanga",
      "source_code": "2027DPWH-Proposal-35486",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Completion (Rehabilitation) of Dela Paz Multi-purpose Building, Brgy. Dela Paz, San Simon, Pampanga",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530259",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35486",
        "nepTitle": "Construction of Multi-Purpose Building, Dela Paz, San Simon, Pampanga",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0741-012410",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Dela Paz, San Simon, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "603",
        "hgabPage": "741",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Department of Agriculture, Barangay Marawoy, Lipa City, Batangas (13.962243, 121.173008)",
      "source_code": "2027DPWH-Proposal-09637",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Department of Agriculture), Barangay Marawoy, Lipa City, Batangas",
      "prior_amount": 150000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 605753",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 13.962243,
        "longitude": 121.173008,
        "raw": "13.962243, 121.173008",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "marawoy · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09637",
        "nepTitle": "Construction of Multi-Purpose Building, Department of Agriculture, Barangay Marawoy, Lipa City, Batangas (13.962243, 121.173008)",
        "nepPesos": 100000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0642-010438",
        "hgabTitle": "Construction of Multi-Purpose Building, Department of Agriculture, Barangay Marawoy, Lipa City, Batangas (13.962243, 121.173008)",
        "hgabPesos": 100000000,
        "nepPage": "568",
        "hgabPage": "642",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Frances, Calumpit, Bulacan (120.762592, 14.919208)",
      "source_code": "2027DPWH-Proposal-03492",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Frances, Calumpit, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544859",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.919208,
        "longitude": 120.762592,
        "raw": "120.762592, 14.919208",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03492",
        "nepTitle": "Construction of Multi-Purpose Building, Frances, Calumpit, Bulacan (120.762592, 14.919208)",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012208",
        "hgabTitle": "Construction of Multi-Purpose Building, Frances, Calumpit, Bulacan (120.762592, 14.919208)",
        "hgabPesos": 15000000,
        "nepPage": "598",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Frances, Calumpit, Bulacan (120.762592, 14.919208)",
      "source_code": "2027DPWH-Proposal-03492",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Brgy. Frances, Calumpit, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598341",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.919208,
        "longitude": 120.762592,
        "raw": "120.762592, 14.919208",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03492",
        "nepTitle": "Construction of Multi-Purpose Building, Frances, Calumpit, Bulacan (120.762592, 14.919208)",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012208",
        "hgabTitle": "Construction of Multi-Purpose Building, Frances, Calumpit, Bulacan (120.762592, 14.919208)",
        "hgabPesos": 15000000,
        "nepPage": "598",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Lanang, Candaba, Pampanga",
      "source_code": "2027DPWH-Proposal-35515",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 7000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation (Completion) of Lanang Multi-Purpose Building, Barangay Lanang, Candaba, Pampanga",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525445",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35515",
        "nepTitle": "Construction of Multi-Purpose Building, Lanang, Candaba, Pampanga",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0741-012411",
        "hgabTitle": "Construction of Multi-Purpose Building, Lanang, Candaba, Pampanga",
        "hgabPesos": 7000000,
        "nepPage": "603",
        "hgabPage": "741",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Municipality of Del Carmen, Siargao Island, Surigao del Norte",
      "source_code": "2027DPWH-Proposal-38855",
      "office": "Surigao del Norte 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Multi-Purpose Building, Siargao Island, Del Carmen, Surigao del Norte",
      "prior_amount": 3000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010313969",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38855",
        "nepTitle": "Construction of Multi-Purpose Building, Municipality of Del Carmen, Siargao Island, Surigao del Norte",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0922-015956",
        "hgabTitle": "Construction of Multi-Purpose Building, Municipality of Del Carmen, Siargao Island, Surigao del Norte",
        "hgabPesos": 5000000,
        "nepPage": "674",
        "hgabPage": "922",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
      "source_code": "2027DPWH-Proposal-34441",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Poblacion, Basista, Pangasinan",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481186",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34441",
        "nepTitle": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0684-011264",
        "hgabTitle": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
        "hgabPesos": 10000000,
        "nepPage": "580",
        "hgabPage": "684",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
      "source_code": "2027DPWH-Proposal-34441",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, Basista, Pangasinan",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529614",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34441",
        "nepTitle": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0684-011264",
        "hgabTitle": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
        "hgabPesos": 10000000,
        "nepPage": "580",
        "hgabPage": "684",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
      "source_code": "2027DPWH-Proposal-34441",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy Poblacion, Basista, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595786",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34441",
        "nepTitle": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0684-011264",
        "hgabTitle": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
        "hgabPesos": 10000000,
        "nepPage": "580",
        "hgabPage": "684",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
      "source_code": "2027DPWH-Proposal-34441",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion Basista, Pangasinan\n\n15.84947, 120.40228",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32193",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.84947,
        "longitude": 120.40228,
        "raw": "15.84947, 120.40228",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34441",
        "nepTitle": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0684-011264",
        "hgabTitle": "Construction of Multi-Purpose Building, Poblacion, Basista Pangasinan",
        "hgabPesos": 10000000,
        "nepPage": "580",
        "hgabPage": "684",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Purok 4 Fatima, Barangay Napnapan, Pantukan, Davao de Oro",
      "source_code": "2027DPWH-Proposal-38433",
      "office": "Davao de Oro 1st District Engineering Office",
      "region": "Region XI",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Purok 4 Fatima, Barangay Napnapan, Pantukan, Davao de Oro",
      "prior_amount": 8000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602091",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jhong Ceniza"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "napnapan · pantukan · davao de oro",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38433",
        "nepTitle": "Construction of Multi-Purpose Building, Purok 4 Fatima, Barangay Napnapan, Pantukan, Davao de Oro",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0889-015334",
        "hgabTitle": "Construction of Multi-Purpose Building, Purok 4 Fatima, Barangay Napnapan, Pantukan, Davao de Oro",
        "hgabPesos": 10000000,
        "nepPage": "664",
        "hgabPage": "889",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, San Enrique, Iloilo",
      "source_code": "2027DPWH-Proposal-37273",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of San Enrique Multi-purpose Building, San Enrique, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525687",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37273",
        "nepTitle": "Construction of Multi-Purpose Building, San Enrique, Iloilo",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0820-013996",
        "hgabTitle": "Construction of Multi-Purpose Building, San Enrique, Iloilo",
        "hgabPesos": 10000000,
        "nepPage": "638",
        "hgabPage": "820",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, San Enrique, Iloilo",
      "source_code": "2027DPWH-Proposal-37273",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, San Enrique, Iloilo",
      "prior_amount": 15000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546533",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37273",
        "nepTitle": "Construction of Multi-Purpose Building, San Enrique, Iloilo",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0820-013996",
        "hgabTitle": "Construction of Multi-Purpose Building, San Enrique, Iloilo",
        "hgabPesos": 10000000,
        "nepPage": "638",
        "hgabPage": "820",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, San Matias, Sto. Tomas, Pampanga",
      "source_code": "2027DPWH-Proposal-35508",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Matias, Sto. Tomas,Pampanga",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525439",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Anna York Bondoc"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35508",
        "nepTitle": "Construction of Multi-Purpose Building, San Matias, Sto. Tomas, Pampanga",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0741-012414",
        "hgabTitle": "Construction of Multi-Purpose Building, San Matias, Sto. Tomas, Pampanga",
        "hgabPesos": 7000000,
        "nepPage": "603",
        "hgabPage": "741",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, San Rafael, Macabebe Pampanga",
      "source_code": "2027DPWH-Proposal-35525",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay San Rafael, Macabebe, Pampanga",
      "prior_amount": 700000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481956",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35525",
        "nepTitle": "Construction of Multi-Purpose Building, San Rafael, Macabebe Pampanga",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0742-012431",
        "hgabTitle": "Construction of Multi-Purpose Building, San Rafael, Macabebe Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "603",
        "hgabPage": "742",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, San Rafael, Macabebe Pampanga",
      "source_code": "2027DPWH-Proposal-35525",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Completion (Rehabilitation) of San Rafael Multi-Purpose Building, Brgy. San Rafael, Macabebe, Pampanga",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530266",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35525",
        "nepTitle": "Construction of Multi-Purpose Building, San Rafael, Macabebe Pampanga",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0742-012431",
        "hgabTitle": "Construction of Multi-Purpose Building, San Rafael, Macabebe Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "603",
        "hgabPage": "742",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
      "source_code": "2027DPWH-Proposal-35492",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building at Barangay San Vicente, Apalit, Pampanga",
      "prior_amount": 5500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416596",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35492",
        "nepTitle": "Construction of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0742-012432",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "604",
        "hgabPage": "742",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
      "source_code": "2027DPWH-Proposal-35492",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay San Vicente, Apalit, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525441",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35492",
        "nepTitle": "Construction of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0742-012432",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "604",
        "hgabPage": "742",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
      "source_code": "2027DPWH-Proposal-35492",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Rehabilitation (Completion) of San Vicente Multi-Purpose Building, Barangay San Vicente, Apalit, Pampanga",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545108",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35492",
        "nepTitle": "Construction of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0742-012432",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, San Vicente, Apalit, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "604",
        "hgabPage": "742",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Saniboy St., Barangay Hulo, Mandaluyong City",
      "source_code": "2027DPWH-Proposal-22726",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 40000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Saniboy St., Barangay Hulo, Mandaluyong City",
      "prior_amount": 70000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595669",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "hulo · mandaluyong city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22726",
        "nepTitle": "Construction of Multi-Purpose Building, Saniboy St., Barangay Hulo, Mandaluyong City",
        "nepPesos": 40000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0658-010741",
        "hgabTitle": "Construction of Multi-Purpose Building, Saniboy St., Barangay Hulo, Mandaluyong City",
        "hgabPesos": 40000000,
        "nepPage": "573",
        "hgabPage": "658",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Subic Fishing Port, Subic Zambales (14.8762, 120.2324)",
      "source_code": "2027DPWH-Proposal-11091",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Subic Fishing Port, Zambales (14.8762 ,120.2324)",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30310",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.8762,
        "longitude": 120.2324,
        "raw": "14.8762, 120.2324",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.8762,
        "longitude": 120.2324,
        "raw": "14.8762 ,120.2324",
        "orientation": "latitude, longitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11091",
        "nepTitle": "Construction of Multi-Purpose Building, Subic Fishing Port, Subic Zambales (14.8762, 120.2324)",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Turo, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33595",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Turo, Bocaue, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525406",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33595",
        "nepTitle": "Construction of Multi-Purpose Building, Turo, Bocaue, Bulacan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012209",
        "hgabTitle": "Construction of Multi-Purpose Building, Turo, Bocaue, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "598",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Turo, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33595",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Turo, Bocaue, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544848",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33595",
        "nepTitle": "Construction of Multi-Purpose Building, Turo, Bocaue, Bulacan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012209",
        "hgabTitle": "Construction of Multi-Purpose Building, Turo, Bocaue, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "598",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, United Hillcrest, Barangay 173, Caloocan City",
      "source_code": "2027DPWH-Proposal-33980",
      "office": "Metro Manila 3rd District Engineering Office",
      "region": "NCR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, United Hillcrest, Barangay 173, Caloocan City",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596977",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "173 · caloocan city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33980",
        "nepTitle": "Construction of Multi-Purpose Building, United Hillcrest, Barangay 173, Caloocan City",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0660-010780",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building United Hillcrest, Barangay 173, Caloocan City",
        "hgabPesos": 5000000,
        "nepPage": "574",
        "hgabPage": "660",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Zarraga, Iloilo (10.823044, 122.609778)",
      "source_code": "2027DPWH-Proposal-03052",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5500000,
      "comparison_year": 2023,
      "prior_project": "Construction/Improvement of Multi-Purpose Building, Zarraga, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546659",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 10.823044,
        "longitude": 122.609778,
        "raw": "10.823044, 122.609778",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03052",
        "nepTitle": "Construction of Multi-Purpose Building, Zarraga, Iloilo (10.823044, 122.609778)",
        "nepPesos": 5500000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Zarraga, Iloilo (10.823044, 122.609778)",
      "source_code": "2027DPWH-Proposal-03052",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5500000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Zarraga, Iloilo",
      "prior_amount": 5050000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 600786",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 10.823044,
        "longitude": 122.609778,
        "raw": "10.823044, 122.609778",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03052",
        "nepTitle": "Construction of Multi-Purpose Building, Zarraga, Iloilo (10.823044, 122.609778)",
        "nepPesos": 5500000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose building in Liloy, Zamboanga del Norte",
      "source_code": "2027DPWH-Proposal-38298",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 12000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Liloy, Zamboanga del Norte",
      "prior_amount": 9000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484837",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38298",
        "nepTitle": "Construction of Multi-Purpose building in Liloy, Zamboanga del Norte",
        "nepPesos": 12000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0868-014933",
        "hgabTitle": "Construction of Multi-Purpose building in Liloy, Zamboanga del Norte",
        "hgabPesos": 12000000,
        "nepPage": "654",
        "hgabPage": "868",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose building in Liloy, Zamboanga del Norte",
      "source_code": "2027DPWH-Proposal-38298",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 12000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Liloy, Zamboanga del Norte",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 601644",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38298",
        "nepTitle": "Construction of Multi-Purpose building in Liloy, Zamboanga del Norte",
        "nepPesos": 12000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0868-014933",
        "hgabTitle": "Construction of Multi-Purpose building in Liloy, Zamboanga del Norte",
        "hgabPesos": 12000000,
        "nepPage": "654",
        "hgabPage": "868",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "source_code": "2027DPWH-Proposal-05312",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 200000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "prior_amount": 35000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413389",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Paolo Ortega"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-05312",
        "nepTitle": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
        "nepPesos": 200000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0634-010323",
        "hgabTitle": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
        "hgabPesos": 200000000,
        "nepPage": "562",
        "hgabPage": "634",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "source_code": "2027DPWH-Proposal-05312",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 200000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "prior_amount": 90000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 524868",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Paolo Ortega"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-05312",
        "nepTitle": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
        "nepPesos": 200000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0634-010323",
        "hgabTitle": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
        "hgabPesos": 200000000,
        "nepPage": "562",
        "hgabPage": "634",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "source_code": "2027DPWH-Proposal-05312",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 200000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
      "prior_amount": 61500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 605745",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Paolo Ortega"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-05312",
        "nepTitle": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
        "nepPesos": 200000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0634-010323",
        "hgabTitle": "Construction of Multi-Storey Multi-Purpose Building, City of San Fernando, La Union",
        "hgabPesos": 200000000,
        "nepPage": "562",
        "hgabPage": "634",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-purpose Building , Barangay Dagang, Paracale, Camarines Norte",
      "source_code": "2027DPWH-Proposal-39491",
      "office": "Camarines Norte District Engineering Office",
      "region": "Region V",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Multi-Purpose Building in Brgy. Dagang, Paracale, Camarines Norte",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010311842",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "dagang · paracale · camarines norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39491",
        "nepTitle": "Construction of Multi-purpose Building , Barangay Dagang, Paracale, Camarines Norte",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0797-013554",
        "hgabTitle": "Construction of Multi-purpose Building , Barangay Dagang, Paracale, Camarines Norte",
        "hgabPesos": 5000000,
        "nepPage": "630",
        "hgabPage": "797",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-purpose building, Barangay Tue, Tadian, Mountain Province",
      "source_code": "2027DPWH-Proposal-34799",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tue, Tadian, Mountain Province",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104206728000 · PDF p. 604 · printed p. 2069",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tue · tadian · mountain province",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34799",
        "nepTitle": "Construction of Multi-purpose building, Barangay Tue, Tadian, Mountain Province",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0697-011509",
        "hgabTitle": "Construction of Multi-purpose building, Barangay Tue, Tadian, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "583",
        "hgabPage": "697",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multipurpose Building in Barangay Tumpagon, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39139",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Multipurpose Building, Tumpagon, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010313129",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39139",
        "nepTitle": "Construction of Multipurpose Building in Barangay Tumpagon, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0873-015043",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Tumpagon, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 10000000,
        "nepPage": "656",
        "hgabPage": "873",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Western Uma Multi-Purpose Building, Barangay Western Uma, Lubuagan, Kalinga",
      "source_code": "2027DPWH-Proposal-34812",
      "office": "Upper Kalinga District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction (Completion) of Western Uma Multi-purpose Building, Western Uma, Lubuagan, Kalinga",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481348",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34812",
        "nepTitle": "Construction of Western Uma Multi-Purpose Building, Barangay Western Uma, Lubuagan, Kalinga",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0698-011531",
        "hgabTitle": "Construction of Western Uma Multi-Purpose Building, Barangay Western Uma, Lubuagan, Kalinga",
        "hgabPesos": 5000000,
        "nepPage": "584",
        "hgabPage": "698",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Western Uma Multi-Purpose Building, Barangay Western Uma, Lubuagan, Kalinga",
      "source_code": "2027DPWH-Proposal-34812",
      "office": "Upper Kalinga District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Western Uma Multi-Purpose Building, Brgy. Western Uma, Lubuagan, Kalinga",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104206748000 · PDF p. 605 · printed p. 2070",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "western uma · lubuagan · kalinga",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34812",
        "nepTitle": "Construction of Western Uma Multi-Purpose Building, Barangay Western Uma, Lubuagan, Kalinga",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0698-011531",
        "hgabTitle": "Construction of Western Uma Multi-Purpose Building, Barangay Western Uma, Lubuagan, Kalinga",
        "hgabPesos": 5000000,
        "nepPage": "584",
        "hgabPage": "698",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of of Multi-Purpose Building, Barangay San Placido, Roxas, Isabela",
      "source_code": "2027DPWH-Proposal-35231",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-purpose Building, Barangay San Placido, Roxas, Isabela, 17.14644,121.582101",
      "prior_amount": 6000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32903",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 17.14644,
        "longitude": 121.582101,
        "raw": "17.14644,121.582101",
        "orientation": "latitude, longitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san placido · roxas · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35231",
        "nepTitle": "Construction of of Multi-Purpose Building, Barangay San Placido, Roxas, Isabela",
        "nepPesos": 100000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010355",
        "hgabTitle": "Construction of of Multi-Purpose Building, Barangay San Placido, Roxas, Isabela",
        "hgabPesos": 100000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction(Completion) of Multi-Purpose Building, Barangay Gangalan, San Mariano, Isabela",
      "source_code": "2027DPWH-Proposal-35141",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 7000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building at Barangay San Gangalan, San Mariano, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544640",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35141",
        "nepTitle": "Construction(Completion) of Multi-Purpose Building, Barangay Gangalan, San Mariano, Isabela",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0713-011840",
        "hgabTitle": "Construction(Completion) of Multi-Purpose Building, Barangay Gangalan, San Mariano, Isabela",
        "hgabPesos": 7000000,
        "nepPage": "592",
        "hgabPage": "713",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction(Completion) of Multi-Purpose Building, Barangay Gangalan, San Mariano, Isabela",
      "source_code": "2027DPWH-Proposal-35141",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 7000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Gangalan, San Mariano, Isabela (16.897832, 122.062504)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32946",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 16.897832,
        "longitude": 122.062504,
        "raw": "16.897832, 122.062504",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gangalan · san mariano · isabela",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35141",
        "nepTitle": "Construction(Completion) of Multi-Purpose Building, Barangay Gangalan, San Mariano, Isabela",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0713-011840",
        "hgabTitle": "Construction(Completion) of Multi-Purpose Building, Barangay Gangalan, San Mariano, Isabela",
        "hgabPesos": 7000000,
        "nepPage": "592",
        "hgabPage": "713",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction/Completion of Multi-Purpose Building, Barangay Maybunga, Pasig City",
      "source_code": "2027DPWH-Proposal-22738",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Maybunga, Pasig City",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529217",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "maybunga · pasig city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22738",
        "nepTitle": "Construction/Completion of Multi-Purpose Building, Barangay Maybunga, Pasig City",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0658-010743",
        "hgabTitle": "Construction/Completion of Multi-Purpose Building, Barangay Maybunga, Pasig City",
        "hgabPesos": 15000000,
        "nepPage": "573",
        "hgabPage": "658",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction/Completion of Multi-Purpose Building, Barangay Maybunga, Pasig City",
      "source_code": "2027DPWH-Proposal-22738",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Maybunga, Pasig City",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 596850",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "maybunga · pasig city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22738",
        "nepTitle": "Construction/Completion of Multi-Purpose Building, Barangay Maybunga, Pasig City",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0658-010743",
        "hgabTitle": "Construction/Completion of Multi-Purpose Building, Barangay Maybunga, Pasig City",
        "hgabPesos": 15000000,
        "nepPage": "573",
        "hgabPage": "658",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction/Completion of Multi-Purpose Building, Barangay Maybunga, Pasig City",
      "source_code": "2027DPWH-Proposal-22738",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 15000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Maybunga, Pasig City",
      "prior_amount": 4000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104205794000 · PDF p. 539 · printed p. 2004",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "maybunga · pasig city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22738",
        "nepTitle": "Construction/Completion of Multi-Purpose Building, Barangay Maybunga, Pasig City",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0658-010743",
        "hgabTitle": "Construction/Completion of Multi-Purpose Building, Barangay Maybunga, Pasig City",
        "hgabPesos": 15000000,
        "nepPage": "573",
        "hgabPage": "658",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Improvement of Moalboal Multi-Purpose Building at Barangay Poblacion West, Moalboal, Cebu",
      "source_code": "2027DPWH-Proposal-37666",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion West, Moalboal, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532135",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion west · moalboal · cebu",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37666",
        "nepTitle": "Improvement of Moalboal Multi-Purpose Building at Barangay Poblacion West, Moalboal, Cebu",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0853-014650",
        "hgabTitle": "Improvement of Moalboal Multi-Purpose Building at Barangay Poblacion West, Moalboal, Cebu",
        "hgabPesos": 20000000,
        "nepPage": "647",
        "hgabPage": "853",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation (Completion) of Multi-Purpose Building at Barangay Bagong Silang, Imus, Cavite",
      "source_code": "2027DPWH-Proposal-36222",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Bagong Silang, Imus City, Cavite",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104208097000 · PDF p. 701 · printed p. 2166",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bagong silang · imus · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36222",
        "nepTitle": "Rehabilitation (Completion) of Multi-Purpose Building at Barangay Bagong Silang, Imus, Cavite",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0768-012961",
        "hgabTitle": "Rehabilitation (Completion) of Multi-Purpose Building at Barangay Bagong Silang, Imus, Cavite",
        "hgabPesos": 5000000,
        "nepPage": "615",
        "hgabPage": "768",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation (Completion) of Multi-Purpose Building at Barangay Dulao, Bago City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37437",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Dulao, Bago City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546806",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jeffrey Ferrer"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "dulao · bago · negros occidental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37437",
        "nepTitle": "Rehabilitation (Completion) of Multi-Purpose Building at Barangay Dulao, Bago City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0836-014311",
        "hgabTitle": "Rehabilitation (Completion) of Multi-Purpose Building at Barangay Dulao, Bago City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "644",
        "hgabPage": "836",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Agusan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39170",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Agusan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420981",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "agusan · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39170",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Agusan, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015074",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Agusan, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5000000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Agusan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39170",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Agusan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532665",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "agusan · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39170",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Agusan, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015074",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Agusan, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5000000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Agusan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39170",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. Agusan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 3000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104211748000 · PDF p. 956 · printed p. 2421",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "agusan · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39170",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Agusan, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015074",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Agusan, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5000000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bugo, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39171",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Bugo, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 6000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485163",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bugo · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39171",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bugo, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015075",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Bugo, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 6000000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bugo, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39171",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Bugo, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420983",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bugo · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39171",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bugo, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015075",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Bugo, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 6000000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bulua, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39172",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Bulua, Cagayan de Oro City, Misamis Oriental, Misamis Oriental",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420963",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39172",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bulua, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0874-015044",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Bulua, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5000000,
        "nepPage": "656",
        "hgabPage": "874",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bulua, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39172",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Bulua, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 547610",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bulua · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39172",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bulua, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0874-015044",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Bulua, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5000000,
        "nepPage": "656",
        "hgabPage": "874",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bulua, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39172",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Bulua, Cagayan de Oro City, Misamis Oriental (124.61333°, 8.48111°)",
      "prior_amount": 6000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40307",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 8.48111,
        "longitude": 124.61333,
        "raw": "124.61333°, 8.48111",
        "orientation": "longitude, latitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39172",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Bulua, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0874-015044",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Bulua, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5000000,
        "nepPage": "656",
        "hgabPage": "874",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Camaman-an, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39173",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Camaman-an, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420978",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "camaman-an · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39173",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Camaman-an, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015076",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Camaman-an, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5000000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Camaman-an, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39173",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Camaman-an, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 3000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104211754000 · PDF p. 957 · printed p. 2422",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "camaman-an · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39173",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Camaman-an, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015076",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Camaman-an, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5000000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39175",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 6000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485155",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "carmen · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39175",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0874-015046",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Carmen, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 10000000,
        "nepPage": "656",
        "hgabPage": "874",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39175",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. Carmen, Cagayan De Oro City, Misamis Oriental",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420973",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "carmen · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39175",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0874-015046",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Carmen, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 10000000,
        "nepPage": "656",
        "hgabPage": "874",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39175",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Carmen, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 20000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532657",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "carmen · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39175",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0874-015046",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Carmen, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 10000000,
        "nepPage": "656",
        "hgabPage": "874",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39175",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Carmen, Cagayan de Oro City, Misamis Oriental (124.6088°, 8.4594°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40309",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 8.4594,
        "longitude": 124.6088,
        "raw": "124.6088°, 8.4594",
        "orientation": "longitude, latitude",
        "decimalPlaces": 4,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39175",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0874-015046",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Carmen, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 10000000,
        "nepPage": "656",
        "hgabPage": "874",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39175",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 2500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104211737000 · PDF p. 956 · printed p. 2421",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "carmen · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39175",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Carmen, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0874-015046",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Carmen, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 10000000,
        "nepPage": "656",
        "hgabPage": "874",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Consolacion, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39176",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5500000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Consolacion, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485164",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "consolacion · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39176",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Consolacion, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015077",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Consolacion, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5500000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Consolacion, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39176",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5500000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Consolacion, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532666",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "consolacion · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39176",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Consolacion, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5500000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015077",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Consolacion, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5500000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Cugman, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39177",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Cugman, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420984",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "cugman · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39177",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Cugman, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015078",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Cugman, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5000000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Cugman, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39177",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Cugman, Cagayan de Oro City, Misamis Oriental (124.70591° , 8.470591°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40372",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 8.470591,
        "longitude": 124.70591,
        "raw": "124.70591° , 8.470591",
        "orientation": "longitude, latitude",
        "decimalPlaces": 5,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39177",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Cugman, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015078",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Cugman, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5000000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Dansolihon, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39178",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Dansolihon, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532658",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "dansolihon · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39178",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Dansolihon, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0874-015047",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Dansolihon, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5000000,
        "nepPage": "656",
        "hgabPage": "874",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39179",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 6000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 479037",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lapasan · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39179",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015079",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Lapasan, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 6000000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39179",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Lapasan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 7000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420988",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lapasan · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39179",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015079",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Lapasan, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 6000000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39179",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Lapasan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 2000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532664",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lapasan · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39179",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015079",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Lapasan, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 6000000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39179",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 6000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 4000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104211755000 · PDF p. 957 · printed p. 2422",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lapasan · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39179",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015079",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Lapasan, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 6000000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Macabalan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39180",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Macabalan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 8000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420989",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "macabalan · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39180",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Macabalan, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015080",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Macabalan, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5000000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Macabalan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39180",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Macabalan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 532668",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "macabalan · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39180",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Macabalan, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0875-015080",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Macabalan, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5000000,
        "nepPage": "657",
        "hgabPage": "875",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Mambuaya Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39181",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 6000000,
      "comparison_year": 2019,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. Mambuaya, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 3000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104211732000 · PDF p. 955 · printed p. 2420",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39181",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Mambuaya Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0874-015048",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Mambuaya Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 6000000,
        "nepPage": "656",
        "hgabPage": "874",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Tablon, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39182",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy. Tablon, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 485162",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tablon · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39182",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Tablon, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0876-015081",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Tablon, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5000000,
        "nepPage": "657",
        "hgabPage": "876",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Tablon, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39182",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Tablon, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420992",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "tablon · cagayan de oro · misamis oriental",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39182",
        "nepTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Brgy. Tablon, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0876-015081",
        "hgabTitle": "Rehabilitation and Improvement of Multi-Purpose Building at Barangay Tablon, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 5000000,
        "nepPage": "657",
        "hgabPage": "876",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of La Colina Subdivision Multi-Purpose Building, Barangay Fortune, Marikina City",
      "source_code": "2027DPWH-Proposal-31397",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 7000000,
      "comparison_year": 2022,
      "prior_project": "Construction of La Colina Subdivision Multi-Purpose Building, Barangay Fortune, Marikina City",
      "prior_amount": 18000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 524987",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31397",
        "nepTitle": "Rehabilitation of La Colina Subdivision Multi-Purpose Building, Barangay Fortune, Marikina City",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Barangay Gym), Barangay San Vicente, Panabo City, Davao del Norte",
      "source_code": "2027DPWH-Proposal-38440",
      "office": "Davao del Norte 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building (Gym), Barangay San Vicente, Panabo City, Davao del Norte",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 421537",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Manuel Lagdameo"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38440",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Barangay Gym), Barangay San Vicente, Panabo City, Davao del Norte",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0893-015406",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building (Barangay Gym), Barangay San Vicente, Panabo City, Davao del Norte",
        "hgabPesos": 5000000,
        "nepPage": "666",
        "hgabPage": "893",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court) at Barangay Bacao, Taysan, Batangas",
      "source_code": "2027DPWH-Proposal-36270",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-purpose Building (Covered Court), Brgy. Bacao, Taysan, Batangas",
      "prior_amount": 6000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300103200995000 · PDF p. 479 · printed p. 1944",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bacao · taysan · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36270",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court) at Barangay Bacao, Taysan, Batangas",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012828",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court) at Barangay Bacao, Taysan, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "613",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court) at Barangay Sico 1, San Juan, Batangas",
      "source_code": "2027DPWH-Proposal-36271",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction/Completion of Multi-Purpose Building (Covered Court) in Brgy. Sico 1, San Juan, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545394",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sico 1 · san juan · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36271",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court) at Barangay Sico 1, San Juan, Batangas",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012829",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court) at Barangay Sico 1, San Juan, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "613",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Batiawan, Subic, Zambales (14.931047, 120.411425)",
      "source_code": "2027DPWH-Proposal-23280",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Multi-Purpose Building, Batiawan (Covered Court), Subic Zambales",
      "prior_amount": 3500000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010311213",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.931047,
        "longitude": 120.411425,
        "raw": "14.931047, 120.411425",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23280",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Batiawan, Subic, Zambales (14.931047, 120.411425)",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Diniog, Dilasag, Aurora",
      "source_code": "2027DPWH-Proposal-35446",
      "office": "Aurora District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Multi-Purpose Building-(Covered Court), Brgy. Diniog, Dilasag, Aurora Province",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010310848",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35446",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Diniog, Dilasag, Aurora",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0725-012075",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Diniog, Dilasag, Aurora",
        "hgabPesos": 5000000,
        "nepPage": "594",
        "hgabPage": "725",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Diniog, Dilasag, Aurora",
      "source_code": "2027DPWH-Proposal-35446",
      "office": "Aurora District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Brgy. Diniog, Dilasag, Aurora Province",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201080000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35446",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Diniog, Dilasag, Aurora",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0725-012075",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Diniog, Dilasag, Aurora",
        "hgabPesos": 5000000,
        "nepPage": "594",
        "hgabPage": "725",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Mahay, Butuan City, Agusan del Norte",
      "source_code": "2027DPWH-Proposal-38894",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Brgy. Mahay, Butuan City, Agusan del Norte",
      "prior_amount": 1500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104213081000 · PDF p. 1056 · printed p. 2521",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mahay · butuan · agusan del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38894",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Mahay, Butuan City, Agusan del Norte",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0918-015886",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Mahay, Butuan City, Agusan del Norte",
        "hgabPesos": 10000000,
        "nepPage": "672",
        "hgabPage": "918",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Maon, Butuan City, Agusan del Norte",
      "source_code": "2027DPWH-Proposal-38896",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Maon, Butuan City, Agusan del Norte",
      "prior_amount": 1500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104213079000 · PDF p. 1056 · printed p. 2521",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "maon · butuan · agusan del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38896",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Maon, Butuan City, Agusan del Norte",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0918-015888",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Maon, Butuan City, Agusan del Norte",
        "hgabPesos": 10000000,
        "nepPage": "673",
        "hgabPage": "918",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Pamatawan, Subic, Zambales (14.92417645, 120.22210897)",
      "source_code": "2027DPWH-Proposal-11101",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Pamatawan, Subic, Zambales (14.92417645 ,120.22210897)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34403",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.92417645,
        "longitude": 120.22210897,
        "raw": "14.92417645, 120.22210897",
        "orientation": "latitude, longitude",
        "decimalPlaces": 8,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.92417645,
        "longitude": 120.22210897,
        "raw": "14.92417645 ,120.22210897",
        "orientation": "latitude, longitude",
        "decimalPlaces": 8,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pamatawan · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11101",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Pamatawan, Subic, Zambales (14.92417645, 120.22210897)",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Pooc I, Silang, Cavite",
      "source_code": "2027DPWH-Proposal-36534",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation of Multi-purpose Building (Covered Court), Brgy. Pooc I, Silang, Cavite",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201633000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pooc i · silang · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36534",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Pooc I, Silang, Cavite",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0770-012994",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Pooc I, Silang, Cavite",
        "hgabPesos": 10000000,
        "nepPage": "616",
        "hgabPage": "770",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Radiwan, Ivana Batanes",
      "source_code": "2027DPWH-Proposal-34936",
      "office": "Batanes District Engineering Office",
      "region": "Region II",
      "amount_2027": 9000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Radiwan, Ivana, Batanes (20.368555°, 121.913798°)",
      "prior_amount": 9000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32704",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 20.368555,
        "longitude": 121.913798,
        "raw": "20.368555°, 121.913798",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34936",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Radiwan, Ivana Batanes",
        "nepPesos": 9000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0699-011555",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Radiwan, Ivana Batanes",
        "hgabPesos": 9000000,
        "nepPage": "584",
        "hgabPage": "699",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay San Isidro, Subic, Zambales (14.86388044, 120.25723454)",
      "source_code": "2027DPWH-Proposal-11102",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay San Isidro, Subic, Zambales (14.86388044 ,120.25723454)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 34405",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.86388044,
        "longitude": 120.25723454,
        "raw": "14.86388044, 120.25723454",
        "orientation": "latitude, longitude",
        "decimalPlaces": 8,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.86388044,
        "longitude": 120.25723454,
        "raw": "14.86388044 ,120.25723454",
        "orientation": "latitude, longitude",
        "decimalPlaces": 8,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san isidro · subic · zambales",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-11102",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay San Isidro, Subic, Zambales (14.86388044, 120.25723454)",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Sto. Niño, Municipality of Catarman, Province of Camiguin",
      "source_code": "2027DPWH-Proposal-39132",
      "office": "Camiguin District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Brgy. Sto. Niño, Catarman, Camiguin",
      "prior_amount": 4000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104211775000 · PDF p. 958 · printed p. 2423",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39132",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Sto. Niño, Municipality of Catarman, Province of Camiguin",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Taligaman, Butuan City, Agusan del Norte",
      "source_code": "2027DPWH-Proposal-38904",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Taligaman, Butuan City, Agusan del Norte",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602630",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Aquino II"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "taligaman · butuan · agusan del norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38904",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Taligaman, Butuan City, Agusan del Norte",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0918-015896",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Taligaman, Butuan City, Agusan del Norte",
        "hgabPesos": 10000000,
        "nepPage": "673",
        "hgabPage": "918",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Yumbing, Municipality of Mambajao, Province of Camiguin",
      "source_code": "2027DPWH-Proposal-39133",
      "office": "Camiguin District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Yumbing, Mambajao, Camiguin(124.663196°,9.242903166°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40431",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jurdin Jesus Romualdo"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 9.242903166,
        "longitude": 124.663196,
        "raw": "124.663196°,9.242903166",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39133",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Yumbing, Municipality of Mambajao, Province of Camiguin",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0876-015087",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, Municipality of Mambajao, Province of Camiguin",
        "hgabPesos": 26000000,
        "nepPage": "658",
        "hgabPage": "876",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Sto. Niño, Catarman, Camiguin (124.6731227, 9.1492746)",
      "source_code": "2027DPWH-Proposal-01273",
      "office": "Camiguin District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Brgy. Sto. Niño, Catarman, Camiguin",
      "prior_amount": 4000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104211775000 · PDF p. 958 · printed p. 2423",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 9.1492746,
        "longitude": 124.6731227,
        "raw": "124.6731227, 9.1492746",
        "orientation": "longitude, latitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-01273",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Sto. Niño, Catarman, Camiguin (124.6731227, 9.1492746)",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0877-015102",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Sto. Niño, Catarman, Camiguin (124.6731227, 9.1492746)",
        "hgabPesos": 5000000,
        "nepPage": "658",
        "hgabPage": "877",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Yumbing, Mambajao, Camiguin (124.6636647, 9.2429296)",
      "source_code": "2027DPWH-Proposal-01274",
      "office": "Camiguin District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay Yumbing, Mambajao, Camiguin(124.663196°,9.242903166°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 40431",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": 51.5,
      "distanceBand": "50–<100 meters",
      "leftCoordinates": {
        "latitude": 9.2429296,
        "longitude": 124.6636647,
        "raw": "124.6636647, 9.2429296",
        "orientation": "longitude, latitude",
        "decimalPlaces": 7,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 9.242903166,
        "longitude": 124.663196,
        "raw": "124.663196°,9.242903166",
        "orientation": "longitude, latitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Nearby printed locations · site identity unresolved",
      "proximityReview": "Verify building identities and funded scopes · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-01274",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Yumbing, Mambajao, Camiguin (124.6636647, 9.2429296)",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0877-015103",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Yumbing, Mambajao, Camiguin (124.6636647, 9.2429296)",
        "hgabPesos": 5000000,
        "nepPage": "658",
        "hgabPage": "877",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Gymnasium), Barangay Bai Saripinang, Bagumbayan, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38570",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction (Completion) of Multi-Purpose Building (Gymnasium), Barangay Bai Saripinang, Bagumbayan, Sultan Kudarat",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 421992",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "bai saripinang · bagumbayan · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38570",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Gymnasium), Barangay Bai Saripinang, Bagumbayan, Sultan Kudarat",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0914-015822",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building (Gymnasium), Barangay Bai Saripinang, Bagumbayan, Sultan Kudarat",
        "hgabPesos": 5000000,
        "nepPage": "671",
        "hgabPage": "914",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building Biñang 1st, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33605",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Improvement of Multi-Purpose Building, Brgy. Biñang 1st, Bocaue, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104207239000 · PDF p. 640 · printed p. 2105",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33605",
        "nepTitle": "Rehabilitation of Multi-Purpose Building Biñang 1st, Bocaue, Bulacan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012216",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building Biñang 1st, Bocaue, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "598",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33602",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Caingin, Bocaue, Bulacan",
      "prior_amount": 1500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481738",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33602",
        "nepTitle": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012217",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "598",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33602",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Caingin, Bocaue, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530050",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33602",
        "nepTitle": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012217",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "598",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33602",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Caingin, Bocaue, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598400",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33602",
        "nepTitle": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012217",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building Caingin, Bocaue, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "598",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building Taal, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33597",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Taal, Bocaue, Bulacan (14.812748, 120.932681)",
      "prior_amount": 15000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33594",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.812748,
        "longitude": 120.932681,
        "raw": "14.812748, 120.932681",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33597",
        "nepTitle": "Rehabilitation of Multi-Purpose Building Taal, Bocaue, Bulacan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012218",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building Taal, Bocaue, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "598",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building Wakas, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33594",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Improvement of Multi-Purpose Building, Barangay Wakas, Bocaue, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544818",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33594",
        "nepTitle": "Rehabilitation of Multi-Purpose Building Wakas, Bocaue, Bulacan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012219",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building Wakas, Bocaue, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "598",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay 7, Lipa City Batangas",
      "source_code": "2027DPWH-Proposal-28819",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay 7, Lipa City, Batangas",
      "prior_amount": 25000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599173",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28819",
        "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay 7, Lipa City Batangas",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012831",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay 7, Lipa City Batangas",
        "hgabPesos": 30000000,
        "nepPage": "613",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay 7, Lipa City Batangas",
      "source_code": "2027DPWH-Proposal-28819",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Multi-purpose Building at Barangay 7, Lipa City, Batangas",
      "prior_amount": 8000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300103200363000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28819",
        "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay 7, Lipa City Batangas",
        "nepPesos": 30000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0761-012831",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay 7, Lipa City Batangas",
        "hgabPesos": 30000000,
        "nepPage": "613",
        "hgabPage": "761",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33867",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Balintawak, Lipa City, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 475286",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "balintawak · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33867",
        "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0762-012832",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "613",
        "hgabPage": "762",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33867",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417155",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "balintawak · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33867",
        "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0762-012832",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "613",
        "hgabPage": "762",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33867",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Rehabilitation/Improvement of Multi-purpose Building at Brgy. Balintawak, Lipa City, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010309956",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "balintawak · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33867",
        "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0762-012832",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "613",
        "hgabPage": "762",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33867",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
      "prior_amount": 6000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300103200281000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "balintawak · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33867",
        "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0762-012832",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "613",
        "hgabPage": "762",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33867",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Balintawak, Lipa City, Batangas",
      "prior_amount": 6000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104208004000 · PDF p. 694 · printed p. 2159",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "balintawak · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33867",
        "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0762-012832",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay Balintawak, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "613",
        "hgabPage": "762",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay Narra, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-36422",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Narra, San Pedro City, Laguna",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599446",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "narra · san pedro · laguna",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36422",
        "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay Narra, San Pedro City, Laguna",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0774-013082",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay Narra, San Pedro City, Laguna",
        "hgabPesos": 7000000,
        "nepPage": "618",
        "hgabPage": "774",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay San Celestino, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28748",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Rehabilitation/Improvement of Multi-purpose Building at Brgy. San Celestino, Lipa City, Batangas",
      "prior_amount": 1000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010309958",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "san celestino · lipa · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28748",
        "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay San Celestino, Lipa City, Batangas",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0762-012833",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay San Celestino, Lipa City, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "613",
        "hgabPage": "762",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay Siena, Quezon City",
      "source_code": "2027DPWH-Proposal-33904",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 18000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Multi-Purpose Building at Brgy. Siena, Quezon City",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525106",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "siena · quezon city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33904",
        "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay Siena, Quezon City",
        "nepPesos": 18000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0662-010822",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay Siena, Quezon City",
        "hgabPesos": 18000000,
        "nepPage": "575",
        "hgabPage": "662",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building at Barangay Sto. Niño, Calumpit, Bulacan",
      "source_code": "2027DPWH-Proposal-35595",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 13000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Sto. Nino, Calumpit, Bulacan",
      "prior_amount": 4000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481747",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "santo nino · calumpit · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35595",
        "nepTitle": "Rehabilitation of Multi-Purpose Building at Barangay Sto. Niño, Calumpit, Bulacan",
        "nepPesos": 13000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012215",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building at Barangay Sto. Niño, Calumpit, Bulacan",
        "hgabPesos": 13000000,
        "nepPage": "598",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay 1, Bacolod, City",
      "source_code": "2027DPWH-Proposal-37626",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 15000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation of Multi-purpose Building, Brgy. 1, Bacolod City",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104202907000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37626",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay 1, Bacolod, City",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014218",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay 1, Bacolod, City",
        "hgabPesos": 15000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay 1, Bacolod, City",
      "source_code": "2027DPWH-Proposal-37626",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 15000000,
      "comparison_year": 2019,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. 1, Bacolod City",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104202907000 · PDF p. 523 · printed p. 1988",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37626",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay 1, Bacolod, City",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014218",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay 1, Bacolod, City",
        "hgabPesos": 15000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay 14, Bacolod City",
      "source_code": "2027DPWH-Proposal-37627",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. 14, Bacolod City",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104209415000 · PDF p. 792 · printed p. 2257",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "14 · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37627",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay 14, Bacolod City",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014219",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay 14, Bacolod City",
        "hgabPesos": 5000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay 3, Bacolod City",
      "source_code": "2027DPWH-Proposal-37375",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation of Multi-purpose Building, Brgy. 3, Bacolod City",
      "prior_amount": 500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104202910000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "3 · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37375",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay 3, Bacolod City",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014222",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay 3, Bacolod City",
        "hgabPesos": 5000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay 35, Bacolod City",
      "source_code": "2027DPWH-Proposal-37383",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation of Multi-purpose Building, Brgy. 35, Bacolod City",
      "prior_amount": 2500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104202912000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "35 · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37383",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay 35, Bacolod City",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0832-014223",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay 35, Bacolod City",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "832",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay 35, Bacolod City",
      "source_code": "2027DPWH-Proposal-37383",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2019,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. 35, Bacolod City",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104202912000 · PDF p. 523 · printed p. 1988",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "35 · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37383",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay 35, Bacolod City",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0832-014223",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay 35, Bacolod City",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "832",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay 39, Bacolod City",
      "source_code": "2027DPWH-Proposal-37384",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Rehabilitation/Improvement of Multi-Purpose Building, Barangay 39, Bacolod City",
      "prior_amount": 1500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104209433000 · PDF p. 794 · printed p. 2259",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "39 · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37384",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay 39, Bacolod City",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Alangilan, Bacolod City",
      "source_code": "2027DPWH-Proposal-37386",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction (Completion) of Multi-purpose Building, Barangay Alangilan, Bacolod City",
      "prior_amount": 500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104202886000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "alangilan · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37386",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Alangilan, Bacolod City",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0832-014225",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Alangilan, Bacolod City",
        "hgabPesos": 5000000,
        "nepPage": "642",
        "hgabPage": "832",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Atilano Ricardo, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35675",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Atilano Ricardo, Bagac, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 466473",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "atilano ricardo · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35675",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Atilano Ricardo, Bagac, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012152",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Atilano Ricardo, Bagac, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Atilano Ricardo, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35675",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Atilano Ricardo, Bagac, Bataan",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413603",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "atilano ricardo · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35675",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Atilano Ricardo, Bagac, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0728-012152",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Atilano Ricardo, Bagac, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "728",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Balete, San Nicolas, Batangas",
      "source_code": "2027DPWH-Proposal-36721",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction(Completion) of Multi-Purpose Building at Barangay Balete, San Nicolas, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599134",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "balete · san nicolas · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36721",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Balete, San Nicolas, Batangas",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0757-012737",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Balete, San Nicolas, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "611",
        "hgabPage": "757",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Batangas II, Mariveles, Bataan",
      "source_code": "2027DPWH-Proposal-35667",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Batangas II, Mariveles, Bataan",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530033",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "batangas ii · mariveles · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35667",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Batangas II, Mariveles, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0729-012154",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Batangas II, Mariveles, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "729",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Batangas II, Mariveles, Bataan",
      "source_code": "2027DPWH-Proposal-35667",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building, Batangas II, Mariveles, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201108000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35667",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Batangas II, Mariveles, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0729-012154",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Batangas II, Mariveles, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "729",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Calantipayan, Lopez, Quezon",
      "source_code": "2027DPWH-Proposal-36495",
      "office": "Quezon 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Calantipayan, Lopez, Quezon",
      "prior_amount": 8000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530959",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "calantipayan · lopez · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36495",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Calantipayan, Lopez, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0786-013321",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Calantipayan, Lopez, Quezon",
        "hgabPesos": 5000000,
        "nepPage": "623",
        "hgabPage": "786",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Camaya, Mariveles, Bataan",
      "source_code": "2027DPWH-Proposal-35665",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Camaya, Mariveles, Bataan",
      "prior_amount": 6000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416282",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35665",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Camaya, Mariveles, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0729-012156",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Camaya, Mariveles, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "729",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Camaya, Mariveles, Bataan",
      "source_code": "2027DPWH-Proposal-35665",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction/Repair/Rehabilitation of Multi-purpose Building Barangay Camaya, Mariveles, Bataan",
      "prior_amount": 3000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201121000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "camaya · mariveles · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35665",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Camaya, Mariveles, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0729-012156",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Camaya, Mariveles, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "729",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "source_code": "2027DPWH-Proposal-35204",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Centro 1, Lasam, Cagayan",
      "prior_amount": 40000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 474140",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "centro 1 · lasam · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35204",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0703-011646",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "587",
        "hgabPage": "703",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "source_code": "2027DPWH-Proposal-35204",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Centro 1, Lasam, Cagayan",
      "prior_amount": 34000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 414188",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "centro 1 · lasam · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35204",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0703-011646",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "587",
        "hgabPage": "703",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "source_code": "2027DPWH-Proposal-35204",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529802",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "centro 1 · lasam · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35204",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0703-011646",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "587",
        "hgabPage": "703",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "source_code": "2027DPWH-Proposal-35204",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan(18.067248°,121.602502°)",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32774",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 18.067248,
        "longitude": 121.602502,
        "raw": "18.067248°,121.602502",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35204",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0703-011646",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "587",
        "hgabPage": "703",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "source_code": "2027DPWH-Proposal-35204",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Centro 1, Lasam, Cagayan",
      "prior_amount": 2500000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010310678",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "centro 1 · lasam · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35204",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0703-011646",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "587",
        "hgabPage": "703",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
      "source_code": "2027DPWH-Proposal-35204",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Centro 1, Lasam, Cagayan",
      "prior_amount": 3000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104206858000 · PDF p. 613 · printed p. 2078",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "centro 1 · lasam · cagayan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35204",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0703-011646",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Centro 1, Lasam, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "587",
        "hgabPage": "703",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Gomez, Lopez, Quezon",
      "source_code": "2027DPWH-Proposal-36811",
      "office": "Quezon 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Gomez, Lopez, Quezon (13.883742°, 122.255920°)",
      "prior_amount": 8000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 35942",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 13.883742,
        "longitude": 122.25592,
        "raw": "13.883742°, 122.255920",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "gomez · lopez · quezon",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36811",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Gomez, Lopez, Quezon",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0786-013322",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Gomez, Lopez, Quezon",
        "hgabPesos": 50000000,
        "nepPage": "623",
        "hgabPage": "786",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Granada, Bacolod City",
      "source_code": "2027DPWH-Proposal-37372",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 20000000,
      "comparison_year": 2018,
      "prior_project": "Construction (Completion) of Multi-purpose Building, Barangay Granada, Bacolod City",
      "prior_amount": 500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104202888000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "granada · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37372",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Granada, Bacolod City",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0832-014226",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Granada, Bacolod City",
        "hgabPesos": 20000000,
        "nepPage": "642",
        "hgabPage": "832",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Granada, Bacolod City",
      "source_code": "2027DPWH-Proposal-37372",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 20000000,
      "comparison_year": 2019,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Granada, Bacolod City",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104209417000 · PDF p. 793 · printed p. 2258",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37372",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Granada, Bacolod City",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0832-014226",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Granada, Bacolod City",
        "hgabPesos": 20000000,
        "nepPage": "642",
        "hgabPage": "832",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Lalawigan, Samal, Bataan",
      "source_code": "2027DPWH-Proposal-35759",
      "office": "Bataan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Lalawigan, Samal, Bataan",
      "prior_amount": 6000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104207152000 · PDF p. 634 · printed p. 2099",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "lalawigan · samal · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35759",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Lalawigan, Samal, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0726-012099",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Lalawigan, Samal, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "594",
        "hgabPage": "726",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Luacan, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35653",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Luacan, Dinalupihan, Bataan",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 416254",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35653",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Luacan, Dinalupihan, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0729-012157",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Luacan, Dinalupihan, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "729",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Luacan, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35653",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Luacan, Dinalupihan, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 595837",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "luacan · dinalupihan · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35653",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Luacan, Dinalupihan, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0729-012157",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Luacan, Dinalupihan, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "729",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Luacan, Dinalupihan, Bataan",
      "source_code": "2027DPWH-Proposal-35653",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Luacan, Dinalupihan, Bataan",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104207154000 · PDF p. 634 · printed p. 2099",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "luacan · dinalupihan · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35653",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Luacan, Dinalupihan, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0729-012157",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Luacan, Dinalupihan, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "729",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Mabayo, Morong, Bataan",
      "source_code": "2027DPWH-Proposal-35642",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mabayo, Morong, Bataan",
      "prior_amount": 3000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104207155000 · PDF p. 634 · printed p. 2099",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mabayo · morong · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35642",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Mabayo, Morong, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0729-012158",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Mabayo, Morong, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "729",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Malaya, Mariveles, Bataan",
      "source_code": "2027DPWH-Proposal-35663",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Malaya, Mariveles, Bataan",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543416",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "malaya · mariveles · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35663",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Malaya, Mariveles, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0729-012159",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Malaya, Mariveles, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "729",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Mambalite, Daet, Camarines Norte",
      "source_code": "2027DPWH-Proposal-39551",
      "office": "Camarines Norte Sub District Engineering Office",
      "region": "Region V",
      "amount_2027": 5100000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Mambalite, Daet, Camarines Norte",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104208911000 · PDF p. 758 · printed p. 2223",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "mambalite · daet · camarines norte",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39551",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Mambalite, Daet, Camarines Norte",
        "nepPesos": 5100000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0645-010493",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Mambalite, Daet, Camarines Norte",
        "hgabPesos": 5100000,
        "nepPage": "569",
        "hgabPage": "645",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Mandalagan, Bacolod City",
      "source_code": "2027DPWH-Proposal-37366",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Mandalagan, Bacolod City",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531607",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "mandalagan · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37366",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Mandalagan, Bacolod City",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0832-014227",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Mandalagan, Bacolod City",
        "hgabPesos": 10000000,
        "nepPage": "642",
        "hgabPage": "832",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Mandalagan, Bacolod City",
      "source_code": "2027DPWH-Proposal-37366",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Rehabilitation/Improvement of Multi-Purpose Building, Barangay Mandalagan, Bacolod City",
      "prior_amount": 1500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104209435000 · PDF p. 794 · printed p. 2259",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "mandalagan · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37366",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Mandalagan, Bacolod City",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0832-014227",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Mandalagan, Bacolod City",
        "hgabPesos": 10000000,
        "nepPage": "642",
        "hgabPage": "832",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Nagbalayong, Morong, Bataan",
      "source_code": "2027DPWH-Proposal-35641",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Nagbalayong, Morong, Bataan",
      "prior_amount": 4000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543419",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maria Angela Garcia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "nagbalayong · morong · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35641",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Nagbalayong, Morong, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0729-012160",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Nagbalayong, Morong, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "729",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38572",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
      "prior_amount": 2500000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 533222",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bella Suansing"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "new panay · esperanza · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38572",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0914-015823",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
        "hgabPesos": 5000000,
        "nepPage": "671",
        "hgabPage": "914",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-38572",
      "office": "Sultan Kudarat 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 602510",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bella Suansing"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "new panay · esperanza · sultan kudarat",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38572",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0914-015823",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay New Panay, Esperanza, Sultan Kudarat",
        "hgabPesos": 5000000,
        "nepPage": "671",
        "hgabPage": "914",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Paysawan, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35671",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Multi Purpose Building, Brgy. Paysawan, Bagac, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 565669",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "paysawan · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35671",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Paysawan, Bagac, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0729-012161",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Paysawan, Bagac, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "729",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Paysawan, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35671",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Paysawan, Bagac, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104201119000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "paysawan · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35671",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Paysawan, Bagac, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0729-012161",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Paysawan, Bagac, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "729",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "source_code": "2027DPWH-Proposal-36723",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Poblacion, San Nicolas, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 482357",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san nicolas · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36723",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0757-012741",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "611",
        "hgabPage": "757",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "source_code": "2027DPWH-Proposal-36723",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Improvement of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "prior_amount": 13000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413688",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san nicolas · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36723",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0757-012741",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "611",
        "hgabPage": "757",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "source_code": "2027DPWH-Proposal-36723",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas City",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530444",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36723",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0757-012741",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "611",
        "hgabPage": "757",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "source_code": "2027DPWH-Proposal-36723",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building at Barangay Poblacion, San Nicolas, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599133",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · san nicolas · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36723",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0757-012741",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "611",
        "hgabPage": "757",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
      "source_code": "2027DPWH-Proposal-36723",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building at Poblacion, San Nicolas, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300103200959000 · PDF p. 476 · printed p. 1941",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36723",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0757-012741",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Nicolas, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "611",
        "hgabPage": "757",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35638",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building in Brgy. Quinawan, Bagac, Bataan",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 481708",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "quinawan · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35638",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0729-012162",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "729",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35638",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Quinawan, Bagac, Bataan",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 413606",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "quinawan · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35638",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0729-012162",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "729",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
      "source_code": "2027DPWH-Proposal-35638",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543417",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "quinawan · bagac · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35638",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0729-012162",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Quinawan, Bagac, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "729",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Sabang, Morong, Bataan",
      "source_code": "2027DPWH-Proposal-35643",
      "office": "Bataan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sabang, Morong, Bataan",
      "prior_amount": 7500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543410",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maria Angela Garcia"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "sabang · morong · bataan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35643",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Sabang, Morong, Bataan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0729-012163",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Sabang, Morong, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "596",
        "hgabPage": "729",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay Villamonte, Bacolod City",
      "source_code": "2027DPWH-Proposal-37373",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 15000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation of Multi-purpose Building, Barangay Villamonte, Bacolod City",
      "prior_amount": 500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300104202905000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": true,
      "barangay": "villamonte · bacolod city",
      "barangayEvidence": "Same explicit barangay/city wording only · administrative identity unverified",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37373",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay Villamonte, Bacolod City",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0832-014228",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay Villamonte, Bacolod City",
        "hgabPesos": 15000000,
        "nepPage": "642",
        "hgabPage": "832",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Poblacion, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33599",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion, Bocaue, Bulacan",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530053",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33599",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Poblacion, Bocaue, Bulacan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0732-012221",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Poblacion, Bocaue, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "598",
        "hgabPage": "732",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation/Improvement of Multi-Purpose Building at Barangay Pinagbakahan, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-35582",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Pinagbakahan, City of Malolos, Bulacan",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598417",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Danny Domingo"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "pinagbakahan · malolos · bulacan",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35582",
        "nepTitle": "Rehabilitation/Improvement of Multi-Purpose Building at Barangay Pinagbakahan, City of Malolos, Bulacan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0732-012222",
        "hgabTitle": "Rehabilitation/Improvement of Multi-Purpose Building at Barangay Pinagbakahan, City of Malolos, Bulacan",
        "hgabPesos": 5000000,
        "nepPage": "598",
        "hgabPage": "732",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation/Improvement of Multi-Purpose Building at Barangay Pinagbakahan, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-35582",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2016,
      "prior_project": "Construction of Multi Purpose Building at Pinagbakahan, City of Malolos, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 103004010306758",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35582",
        "nepTitle": "Rehabilitation/Improvement of Multi-Purpose Building at Barangay Pinagbakahan, City of Malolos, Bulacan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0732-012222",
        "hgabTitle": "Rehabilitation/Improvement of Multi-Purpose Building at Barangay Pinagbakahan, City of Malolos, Bulacan",
        "hgabPesos": 5000000,
        "nepPage": "598",
        "hgabPage": "732",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation/Improvement of Multi-Purpose Building at Barangay Pinagbakahan, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-35582",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Multi Purpose Building at Pinagbakahan, City of Malolos, Bulacan",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010306758",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35582",
        "nepTitle": "Rehabilitation/Improvement of Multi-Purpose Building at Barangay Pinagbakahan, City of Malolos, Bulacan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0732-012222",
        "hgabTitle": "Rehabilitation/Improvement of Multi-Purpose Building at Barangay Pinagbakahan, City of Malolos, Bulacan",
        "hgabPesos": 5000000,
        "nepPage": "598",
        "hgabPage": "732",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation/Improvement of Multi-Purpose Building, Barangay Balete, San Nicolas, Batangas",
      "source_code": "2027DPWH-Proposal-36559",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction(Completion) of Multi-Purpose Building at Barangay Balete, San Nicolas, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599134",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "balete · san nicolas · batangas",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36559",
        "nepTitle": "Rehabilitation/Improvement of Multi-Purpose Building, Barangay Balete, San Nicolas, Batangas",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0757-012746",
        "hgabTitle": "Rehabilitation/Improvement of Multi-Purpose Building, Barangay Balete, San Nicolas, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "611",
        "hgabPage": "757",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
      "source_code": "2027DPWH-Proposal-20272",
      "office": "Abra District Engineering Office",
      "region": "CAR",
      "amount_2027": 25284000,
      "comparison_year": 2020,
      "prior_project": "Abra - Cervantes Road, Abra",
      "prior_amount": 105000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512725",
      "similarity_pct": 100,
      "current_chainage": "17+340.00–18+200.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20272",
        "nepTitle": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
        "nepPesos": 25284000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0241-002393",
        "hgabTitle": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
        "hgabPesos": 25284000,
        "nepPage": "301",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
      "source_code": "2027DPWH-Proposal-20272",
      "office": "Abra District Engineering Office",
      "region": "CAR",
      "amount_2027": 25284000,
      "comparison_year": 2021,
      "prior_project": "Abra-Cervantes Road, Abra",
      "prior_amount": 31753000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437142",
      "similarity_pct": 100,
      "current_chainage": "17+340.00–18+200.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20272",
        "nepTitle": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
        "nepPesos": 25284000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0241-002393",
        "hgabTitle": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
        "hgabPesos": 25284000,
        "nepPage": "301",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
      "source_code": "2027DPWH-Proposal-20272",
      "office": "Abra District Engineering Office",
      "region": "CAR",
      "amount_2027": 25284000,
      "comparison_year": 2022,
      "prior_project": "Abra - Cervantes Road, Abra",
      "prior_amount": 20000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548634",
      "similarity_pct": 100,
      "current_chainage": "17+340.00–18+200.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20272",
        "nepTitle": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
        "nepPesos": 25284000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0241-002393",
        "hgabTitle": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
        "hgabPesos": 25284000,
        "nepPage": "301",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
      "source_code": "2027DPWH-Proposal-20272",
      "office": "Abra District Engineering Office",
      "region": "CAR",
      "amount_2027": 25284000,
      "comparison_year": 2018,
      "prior_project": "Abra - Cervantes Road, Abra",
      "prior_amount": 100000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310205100001000",
      "similarity_pct": 100,
      "current_chainage": "17+340.00–18+200.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20272",
        "nepTitle": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
        "nepPesos": 25284000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0241-002393",
        "hgabTitle": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
        "hgabPesos": 25284000,
        "nepPage": "301",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
      "source_code": "2027DPWH-Proposal-20272",
      "office": "Abra District Engineering Office",
      "region": "CAR",
      "amount_2027": 25284000,
      "comparison_year": 2019,
      "prior_project": "Abra - Cervantes Road, Abra",
      "prior_amount": 50000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310205100001000 · PDF p. 203 · printed p. 1668",
      "similarity_pct": 100,
      "current_chainage": "17+340.00–18+200.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20272",
        "nepTitle": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
        "nepPesos": 25284000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0241-002393",
        "hgabTitle": "Abra Cervantes Road - Sta. 17+340 -Sta. 18+200, Abra",
        "hgabPesos": 25284000,
        "nepPage": "301",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
      "source_code": "2027DPWH-Proposal-20282",
      "office": "Upper Kalinga District Engineering Office",
      "region": "CAR",
      "amount_2027": 150000000,
      "comparison_year": 2020,
      "prior_project": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Kalinga",
      "prior_amount": 70000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 513090",
      "similarity_pct": 100,
      "current_chainage": "17+951.00–19+451.00 · 21+775.00–23+600.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20282",
        "nepTitle": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002261",
        "hgabTitle": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
        "hgabPesos": 150000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
      "source_code": "2027DPWH-Proposal-20282",
      "office": "Upper Kalinga District Engineering Office",
      "region": "CAR",
      "amount_2027": 150000000,
      "comparison_year": 2021,
      "prior_project": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Kalinga",
      "prior_amount": 29400000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437083",
      "similarity_pct": 100,
      "current_chainage": "17+951.00–19+451.00 · 21+775.00–23+600.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20282",
        "nepTitle": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002261",
        "hgabTitle": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
        "hgabPesos": 150000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
      "source_code": "2027DPWH-Proposal-20282",
      "office": "Upper Kalinga District Engineering Office",
      "region": "CAR",
      "amount_2027": 150000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section), Kalinga",
      "prior_amount": 60000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 521061",
      "similarity_pct": 100,
      "current_chainage": "17+951.00–19+451.00 · 21+775.00–23+600.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20282",
        "nepTitle": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002261",
        "hgabTitle": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
        "hgabPesos": 150000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
      "source_code": "2027DPWH-Proposal-20282",
      "office": "Upper Kalinga District Engineering Office",
      "region": "CAR",
      "amount_2027": 150000000,
      "comparison_year": 2024,
      "prior_project": "Abra - Kalinga - Apayao Road along Aciga ( Pinukpuk ) - Tawang - Buaya - Mabaca ( Balbalan Section, Kalinga ) , Kalinga",
      "prior_amount": 101728000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597107",
      "similarity_pct": 100,
      "current_chainage": "17+951.00–19+451.00 · 21+775.00–23+600.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20282",
        "nepTitle": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002261",
        "hgabTitle": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
        "hgabPesos": 150000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
      "source_code": "2027DPWH-Proposal-20282",
      "office": "Upper Kalinga District Engineering Office",
      "region": "CAR",
      "amount_2027": 150000000,
      "comparison_year": 2025,
      "prior_project": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Kalinga",
      "prior_amount": 125000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633571",
      "similarity_pct": 100,
      "current_chainage": "17+951.00–19+451.00 · 21+775.00–23+600.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20282",
        "nepTitle": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002261",
        "hgabTitle": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
        "hgabPesos": 150000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
      "source_code": "2027DPWH-Proposal-20282",
      "office": "Upper Kalinga District Engineering Office",
      "region": "CAR",
      "amount_2027": 150000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section), Kalinga",
      "prior_amount": 50000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200511000",
      "similarity_pct": 100,
      "current_chainage": "17+951.00–19+451.00 · 21+775.00–23+600.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20282",
        "nepTitle": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002261",
        "hgabTitle": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
        "hgabPesos": 150000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Alcala Bypass Road, Sta. 5+460 - Sta. 5+510, Cagayan",
      "source_code": "2027DPWH-Proposal-32770",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 120000000,
      "comparison_year": 2020,
      "prior_project": "Alcala Bypass Road, Cagayan",
      "prior_amount": 19200000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512655",
      "similarity_pct": 100,
      "current_chainage": "5+460.00–5+510.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32770",
        "nepTitle": "Alcala Bypass Road, Sta. 5+460 - Sta. 5+510, Cagayan",
        "nepPesos": 120000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001899",
        "hgabTitle": "Alcala Bypass Road, Sta. 5+460 - Sta. 5+510, Cagayan",
        "hgabPesos": 120000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Alcala Bypass Road, Sta. 5+460 - Sta. 5+510, Cagayan",
      "source_code": "2027DPWH-Proposal-32770",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 120000000,
      "comparison_year": 2023,
      "prior_project": "Alcala Bypass Road, Cagayan",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566997",
      "similarity_pct": 100,
      "current_chainage": "5+460.00–5+510.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32770",
        "nepTitle": "Alcala Bypass Road, Sta. 5+460 - Sta. 5+510, Cagayan",
        "nepPesos": 120000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001899",
        "hgabTitle": "Alcala Bypass Road, Sta. 5+460 - Sta. 5+510, Cagayan",
        "hgabPesos": 120000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Alilem-Sugpon (Ilocos Sur)-Bakun (Benguet) Road, Sta. 0+000 - Sta. 12+000",
      "source_code": "2027DPWH-Proposal-20309",
      "office": "Ilocos Sur 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2021,
      "prior_project": "Alilem-Sugpon (Ilocos Sur) - Bakun (Benguet) Road, Ilocos Sur",
      "prior_amount": 20000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437128",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–12+000.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20309",
        "nepTitle": "Alilem-Sugpon (Ilocos Sur)-Bakun (Benguet) Road, Sta. 0+000 - Sta. 12+000",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Alilem-Sugpon (Ilocos Sur)-Bakun (Benguet) Road, Sta. 0+000 - Sta. 12+000",
      "source_code": "2027DPWH-Proposal-20309",
      "office": "Ilocos Sur 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2022,
      "prior_project": "Alilem - Sugpon (Ilocos Sur) - Bakun (Benguet) Road, Ilocos Sur",
      "prior_amount": 30000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548265",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–12+000.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20309",
        "nepTitle": "Alilem-Sugpon (Ilocos Sur)-Bakun (Benguet) Road, Sta. 0+000 - Sta. 12+000",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Alilem-Sugpon (Ilocos Sur)-Bakun (Benguet) Road, Sta. 0+000 - Sta. 12+000",
      "source_code": "2027DPWH-Proposal-20309",
      "office": "Ilocos Sur 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Alilem-Sugpon (Ilocos Sur) - Bakun (Benguet) Road, Ilocos Sur",
      "prior_amount": 40000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568078",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–12+000.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20309",
        "nepTitle": "Alilem-Sugpon (Ilocos Sur)-Bakun (Benguet) Road, Sta. 0+000 - Sta. 12+000",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22+183 - Sta. 24+733), Eastern Samar",
      "source_code": "2027DPWH-Proposal-20406",
      "office": "Eastern Samar District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 59349000,
      "comparison_year": 2020,
      "prior_project": "Arteche, Brgy. Catumsan-Jipapad-Las Navas-Catubig-Rawis Road, Eastern Samar",
      "prior_amount": 100000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 513144",
      "similarity_pct": 100,
      "current_chainage": "22+183.00–24+733.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20406",
        "nepTitle": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22+183 - Sta. 24+733), Eastern Samar",
        "nepPesos": 59349000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0239-002352",
        "hgabTitle": "Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22 + 783 - Sta. 24 + 733), Eastern Samar",
        "hgabPesos": 265000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22+183 - Sta. 24+733), Eastern Samar",
      "source_code": "2027DPWH-Proposal-20406",
      "office": "Eastern Samar District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 59349000,
      "comparison_year": 2021,
      "prior_project": "Arteche, Brgy. Catumsan-Jipapad-Las Navas-Catubig-Rawis Road, Eastern Samar",
      "prior_amount": 42000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437094",
      "similarity_pct": 100,
      "current_chainage": "22+183.00–24+733.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20406",
        "nepTitle": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22+183 - Sta. 24+733), Eastern Samar",
        "nepPesos": 59349000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0239-002352",
        "hgabTitle": "Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22 + 783 - Sta. 24 + 733), Eastern Samar",
        "hgabPesos": 265000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22+183 - Sta. 24+733), Eastern Samar",
      "source_code": "2027DPWH-Proposal-20406",
      "office": "Eastern Samar District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 59349000,
      "comparison_year": 2022,
      "prior_project": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig, Rawis Road, Eastern Samar",
      "prior_amount": 35000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548441",
      "similarity_pct": 100,
      "current_chainage": "22+183.00–24+733.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20406",
        "nepTitle": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22+183 - Sta. 24+733), Eastern Samar",
        "nepPesos": 59349000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0239-002352",
        "hgabTitle": "Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22 + 783 - Sta. 24 + 733), Eastern Samar",
        "hgabPesos": 265000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22+183 - Sta. 24+733), Eastern Samar",
      "source_code": "2027DPWH-Proposal-20406",
      "office": "Eastern Samar District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 59349000,
      "comparison_year": 2023,
      "prior_project": "Arteche, Brgy. Catumsan-Jipapad-Las Navas-Catubig, Rawis Road, Eastern Samar",
      "prior_amount": 100000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568155",
      "similarity_pct": 100,
      "current_chainage": "22+183.00–24+733.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20406",
        "nepTitle": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22+183 - Sta. 24+733), Eastern Samar",
        "nepPesos": 59349000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0239-002352",
        "hgabTitle": "Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22 + 783 - Sta. 24 + 733), Eastern Samar",
        "hgabPesos": 265000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22+183 - Sta. 24+733), Eastern Samar",
      "source_code": "2027DPWH-Proposal-20406",
      "office": "Eastern Samar District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 59349000,
      "comparison_year": 2024,
      "prior_project": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig, Rawis Road, Eastern Samar",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 596974",
      "similarity_pct": 100,
      "current_chainage": "22+183.00–24+733.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20406",
        "nepTitle": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22+183 - Sta. 24+733), Eastern Samar",
        "nepPesos": 59349000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0239-002352",
        "hgabTitle": "Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22 + 783 - Sta. 24 + 733), Eastern Samar",
        "hgabPesos": 265000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22+183 - Sta. 24+733), Eastern Samar",
      "source_code": "2027DPWH-Proposal-20406",
      "office": "Eastern Samar District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 59349000,
      "comparison_year": 2025,
      "prior_project": "Arteche, Brgy. Catumsan-Jipapad-Las Navas-Catubig, Rawis Road, Eastern Samar",
      "prior_amount": 130100000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633639",
      "similarity_pct": 100,
      "current_chainage": "22+183.00–24+733.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20406",
        "nepTitle": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22+183 - Sta. 24+733), Eastern Samar",
        "nepPesos": 59349000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0239-002352",
        "hgabTitle": "Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22 + 783 - Sta. 24 + 733), Eastern Samar",
        "hgabPesos": 265000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Balagtas Diversion Road, Sta.0+335.80 - Sta.0+383.80, Balagtas, Bulacan",
      "source_code": "2027DPWH-Proposal-20580",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 100000000,
      "comparison_year": 2022,
      "prior_project": "Balagtas Diversion Road, Bulacan",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522275",
      "similarity_pct": 100,
      "current_chainage": "0+335.80–0+383.80",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20580",
        "nepTitle": "Balagtas Diversion Road, Sta.0+335.80 - Sta.0+383.80, Balagtas, Bulacan",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0216-001935",
        "hgabTitle": "Balagtas Diversion Road, Sta.0+335.80 - Sta.0+383.80, Balagtas, Bulacan",
        "hgabPesos": 100000000,
        "nepPage": "279",
        "hgabPage": "216",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Balagtas Diversion Road, Sta.0+335.80 - Sta.0+383.80, Balagtas, Bulacan",
      "source_code": "2027DPWH-Proposal-20580",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 100000000,
      "comparison_year": 2024,
      "prior_project": "Balagtas Diversion Road, Bulacan",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595502",
      "similarity_pct": 100,
      "current_chainage": "0+335.80–0+383.80",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20580",
        "nepTitle": "Balagtas Diversion Road, Sta.0+335.80 - Sta.0+383.80, Balagtas, Bulacan",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0216-001935",
        "hgabTitle": "Balagtas Diversion Road, Sta.0+335.80 - Sta.0+383.80, Balagtas, Bulacan",
        "hgabPesos": 100000000,
        "nepPage": "279",
        "hgabPage": "216",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Balagtas Diversion Road, Sta.0+335.80 - Sta.0+383.80, Balagtas, Bulacan",
      "source_code": "2027DPWH-Proposal-20580",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Balagtas Diversion Road, Balagtas, Bulacan",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631792",
      "similarity_pct": 100,
      "current_chainage": "0+335.80–0+383.80",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20580",
        "nepTitle": "Balagtas Diversion Road, Sta.0+335.80 - Sta.0+383.80, Balagtas, Bulacan",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0216-001935",
        "hgabTitle": "Balagtas Diversion Road, Sta.0+335.80 - Sta.0+383.80, Balagtas, Bulacan",
        "hgabPesos": 100000000,
        "nepPage": "279",
        "hgabPage": "216",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Balete Bypass Road, Sta. 1+080.00 - Sta. 1+140.00, Aklan",
      "source_code": "2027DPWH-Proposal-23894",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 100000000,
      "comparison_year": 2022,
      "prior_project": "Balete Bypass Road, Aklan",
      "prior_amount": 100000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547367",
      "similarity_pct": 100,
      "current_chainage": "1+080.00–1+140.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23894",
        "nepTitle": "Balete Bypass Road, Sta. 1+080.00 - Sta. 1+140.00, Aklan",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0222-002045",
        "hgabTitle": "Balete Bypass Road, Sta. 1+080.00 - Sta. 1+140.00, Aklan",
        "hgabPesos": 100000000,
        "nepPage": "282",
        "hgabPage": "222",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Balete Bypass Road, Sta. 1+080.00 - Sta. 1+140.00, Aklan",
      "source_code": "2027DPWH-Proposal-23894",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Balete Bypass Road, Aklan",
      "prior_amount": 100000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566245",
      "similarity_pct": 100,
      "current_chainage": "1+080.00–1+140.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23894",
        "nepTitle": "Balete Bypass Road, Sta. 1+080.00 - Sta. 1+140.00, Aklan",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0222-002045",
        "hgabTitle": "Balete Bypass Road, Sta. 1+080.00 - Sta. 1+140.00, Aklan",
        "hgabPesos": 100000000,
        "nepPage": "282",
        "hgabPage": "222",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Balete Bypass Road, Sta. 1+080.00 - Sta. 1+140.00, Aklan",
      "source_code": "2027DPWH-Proposal-23894",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Balete Bypass Road, Balete, Aklan",
      "prior_amount": 60619000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631907",
      "similarity_pct": 100,
      "current_chainage": "1+080.00–1+140.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23894",
        "nepTitle": "Balete Bypass Road, Sta. 1+080.00 - Sta. 1+140.00, Aklan",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0222-002045",
        "hgabTitle": "Balete Bypass Road, Sta. 1+080.00 - Sta. 1+140.00, Aklan",
        "hgabPesos": 100000000,
        "nepPage": "282",
        "hgabPage": "222",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25+569 - Sta. 25+942, Sta. 25+987 - Sta. 27+317, South Cotabato",
      "source_code": "2027DPWH-Proposal-33041",
      "office": "South Cotabato 1st District Engineering Office",
      "region": "Region XII",
      "amount_2027": 122000000,
      "comparison_year": 2022,
      "prior_project": "Banga-Tupi-Malungon Road(Banga-Tupi Section), South Cotabato",
      "prior_amount": 73000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547713",
      "similarity_pct": 100,
      "current_chainage": "25+569.00–25+942.00 · 25+987.00–27+317.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33041",
        "nepTitle": "Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25+569 - Sta. 25+942, Sta. 25+987 - Sta. 27+317, South Cotabato",
        "nepPesos": 122000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0228-002161",
        "hgabTitle": "Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25+569 - Sta. 25+942, Sta. 25+987 - Sta. 27+317, South Cotabato",
        "hgabPesos": 122000000,
        "nepPage": "289",
        "hgabPage": "228",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25+569 - Sta. 25+942, Sta. 25+987 - Sta. 27+317, South Cotabato",
      "source_code": "2027DPWH-Proposal-33041",
      "office": "South Cotabato 1st District Engineering Office",
      "region": "Region XII",
      "amount_2027": 122000000,
      "comparison_year": 2025,
      "prior_project": "Banga-Tupi-Malungon Road (Banga-Tupi Section), South Cotabato",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 632091",
      "similarity_pct": 100,
      "current_chainage": "25+569.00–25+942.00 · 25+987.00–27+317.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33041",
        "nepTitle": "Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25+569 - Sta. 25+942, Sta. 25+987 - Sta. 27+317, South Cotabato",
        "nepPesos": 122000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0228-002161",
        "hgabTitle": "Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25+569 - Sta. 25+942, Sta. 25+987 - Sta. 27+317, South Cotabato",
        "hgabPesos": 122000000,
        "nepPage": "289",
        "hgabPage": "228",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25+942 - 25+987, South Cotabato",
      "source_code": "2027DPWH-Proposal-33042",
      "office": "South Cotabato 1st District Engineering Office",
      "region": "Region XII",
      "amount_2027": 72000000,
      "comparison_year": 2022,
      "prior_project": "Banga-Tupi-Malungon Road(Banga-Tupi Section), South Cotabato",
      "prior_amount": 73000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547713",
      "similarity_pct": 100,
      "current_chainage": "25+942.00–25+987.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33042",
        "nepTitle": "Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25+942 - 25+987, South Cotabato",
        "nepPesos": 72000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25+942 - 25+987, South Cotabato",
      "source_code": "2027DPWH-Proposal-33042",
      "office": "South Cotabato 1st District Engineering Office",
      "region": "Region XII",
      "amount_2027": 72000000,
      "comparison_year": 2025,
      "prior_project": "Banga-Tupi-Malungon Road (Banga-Tupi Section), South Cotabato",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 632091",
      "similarity_pct": 100,
      "current_chainage": "25+942.00–25+987.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33042",
        "nepTitle": "Banga-Tupi-Malungon Road ( Tupi-Malungon Section) Sta. 25+942 - 25+987, South Cotabato",
        "nepPesos": 72000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Banga-Tupi-Malungon Road (Banga-Tupi Section) - Sta. 17+285 - Sta. 17+316.5, South Cotabato",
      "source_code": "2027DPWH-Proposal-33047",
      "office": "South Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 11970000,
      "comparison_year": 2022,
      "prior_project": "Banga-Tupi-Malungon Road(Banga-Tupi Section), South Cotabato",
      "prior_amount": 73000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547713",
      "similarity_pct": 100,
      "current_chainage": "17+285.00–17+316.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33047",
        "nepTitle": "Banga-Tupi-Malungon Road (Banga-Tupi Section) - Sta. 17+285 - Sta. 17+316.5, South Cotabato",
        "nepPesos": 11970000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002245",
        "hgabTitle": "Banga-Tupi-Malungon Road (Banga-Tupi Section) - Sta. 17+285 - Sta. 17+316.5, South Cotabato",
        "hgabPesos": 11970000,
        "nepPage": "293",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Banga-Tupi-Malungon Road (Banga-Tupi Section) - Sta. 17+285 - Sta. 17+316.5, South Cotabato",
      "source_code": "2027DPWH-Proposal-33047",
      "office": "South Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 11970000,
      "comparison_year": 2025,
      "prior_project": "Banga-Tupi-Malungon Road (Banga-Tupi Section), South Cotabato",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 632091",
      "similarity_pct": 100,
      "current_chainage": "17+285.00–17+316.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33047",
        "nepTitle": "Banga-Tupi-Malungon Road (Banga-Tupi Section) - Sta. 17+285 - Sta. 17+316.5, South Cotabato",
        "nepPesos": 11970000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002245",
        "hgabTitle": "Banga-Tupi-Malungon Road (Banga-Tupi Section) - Sta. 17+285 - Sta. 17+316.5, South Cotabato",
        "hgabPesos": 11970000,
        "nepPage": "293",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Banga-Tupi-Malungon Road (Malungon-Tupi Section), Sta. 77+170 - Sta. 77+183 , Sarangani",
      "source_code": "2027DPWH-Proposal-20769",
      "office": "Sarangani District Engineering Office",
      "region": "Region XII",
      "amount_2027": 1500000,
      "comparison_year": 2024,
      "prior_project": "Banga - Tupi - Malungon Road ( Malungon - Tupi Section ) , Sarangani",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595918",
      "similarity_pct": 100,
      "current_chainage": "77+170.00–77+183.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20769",
        "nepTitle": "Banga-Tupi-Malungon Road (Malungon-Tupi Section), Sta. 77+170 - Sta. 77+183 , Sarangani",
        "nepPesos": 1500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002244",
        "hgabTitle": "Banga-Tupi-Malungon Road (Malungon-Tupi Section), Sta. 77+170 - Sta. 77+183 , Sarangani",
        "hgabPesos": 1500000,
        "nepPage": "292",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bantay-San Ildefonso Bypass Road, Ilocos Sur",
      "source_code": "2027DPWH-Proposal-20644",
      "office": "Ilocos Sur 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2022,
      "prior_project": "Bantay-San Ildefonso Bypass Road, Ilocos Sur",
      "prior_amount": 60000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547269",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20644",
        "nepTitle": "Bantay-San Ildefonso Bypass Road, Ilocos Sur",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bantay-San Ildefonso Bypass Road, Ilocos Sur",
      "source_code": "2027DPWH-Proposal-20644",
      "office": "Ilocos Sur 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Bantay - San Ildefonso Bypass Road, Ilocos Sur",
      "prior_amount": 85000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566147",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20644",
        "nepTitle": "Bantay-San Ildefonso Bypass Road, Ilocos Sur",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bantay-San Ildefonso Bypass Road, Ilocos Sur",
      "source_code": "2027DPWH-Proposal-20644",
      "office": "Ilocos Sur 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Bantay-San Ildefonso Bypass Road, Ilocos Sur",
      "prior_amount": 39406000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631731",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20644",
        "nepTitle": "Bantay-San Ildefonso Bypass Road, Ilocos Sur",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Basey-Maydolong Road (Sta. 21+676 - Sta. 22+066, Sta. 28+276 - Sta. 30+960.13), Eastern Samar",
      "source_code": "2027DPWH-Proposal-32893",
      "office": "Eastern Samar District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 300000000,
      "comparison_year": 2022,
      "prior_project": "Basey-Maydolong Road, Eastern Samar",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547591",
      "similarity_pct": 100,
      "current_chainage": "21+676.00–22+066.00 · 28+276.00–30+960.13",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32893",
        "nepTitle": "Basey-Maydolong Road (Sta. 21+676 - Sta. 22+066, Sta. 28+276 - Sta. 30+960.13), Eastern Samar",
        "nepPesos": 300000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0223-002077",
        "hgabTitle": "Basey-Maydolong Road (Sta. 21+676 - Sta. 22+066, Sta. 28+276 - Sta. 30+960.13), Eastern Samar",
        "hgabPesos": 300000000,
        "nepPage": "284",
        "hgabPage": "223",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Basey-Maydolong Road (Sta. 21+676 - Sta. 22+066, Sta. 28+276 - Sta. 30+960.13), Eastern Samar",
      "source_code": "2027DPWH-Proposal-32893",
      "office": "Eastern Samar District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 300000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Maydolong - Basey Road, Eastern Samar",
      "prior_amount": 58000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 527397",
      "similarity_pct": 100,
      "current_chainage": "21+676.00–22+066.00 · 28+276.00–30+960.13",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32893",
        "nepTitle": "Basey-Maydolong Road (Sta. 21+676 - Sta. 22+066, Sta. 28+276 - Sta. 30+960.13), Eastern Samar",
        "nepPesos": 300000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0223-002077",
        "hgabTitle": "Basey-Maydolong Road (Sta. 21+676 - Sta. 22+066, Sta. 28+276 - Sta. 30+960.13), Eastern Samar",
        "hgabPesos": 300000000,
        "nepPage": "284",
        "hgabPage": "223",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Basey-Maydolong Road (Sta. 21+676 - Sta. 22+066, Sta. 28+276 - Sta. 30+960.13), Eastern Samar",
      "source_code": "2027DPWH-Proposal-32893",
      "office": "Eastern Samar District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 300000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Maydolong - Basey Road, Eastern Samar",
      "prior_amount": 164000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 559452",
      "similarity_pct": 100,
      "current_chainage": "21+676.00–22+066.00 · 28+276.00–30+960.13",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32893",
        "nepTitle": "Basey-Maydolong Road (Sta. 21+676 - Sta. 22+066, Sta. 28+276 - Sta. 30+960.13), Eastern Samar",
        "nepPesos": 300000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0223-002077",
        "hgabTitle": "Basey-Maydolong Road (Sta. 21+676 - Sta. 22+066, Sta. 28+276 - Sta. 30+960.13), Eastern Samar",
        "hgabPesos": 300000000,
        "nepPage": "284",
        "hgabPage": "223",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Basey-Maydolong Road, Barangay Del Pilar, Maydolong, Eastern Samar",
      "source_code": "2027DPWH-Proposal-37905",
      "office": "Eastern Samar District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 100000000,
      "comparison_year": 2026,
      "prior_project": "Basey-Maydolong Road, Barangay Del Pilar, Maydolong, Eastern Samar (Sta. 22+993 - Sta. 24+073)",
      "prior_amount": 130731000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12310",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "22+993.00–24+073.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37905",
        "nepTitle": "Basey-Maydolong Road, Barangay Del Pilar, Maydolong, Eastern Samar",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0223-002078",
        "hgabTitle": "Basey-Maydolong Road, Barangay Del Pilar, Maydolong, Eastern Samar",
        "hgabPesos": 100000000,
        "nepPage": "284",
        "hgabPage": "223",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bato By-Pass Road, Sta. 2+501 - 3+059.01, Barangay Tabunok, Bato, Leyte",
      "source_code": "2027DPWH-Proposal-32888",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 62070000,
      "comparison_year": 2026,
      "prior_project": "Bato By-Pass Road, Sta. 2+233 - 2+513, Barangay Tabunok, Leyte",
      "prior_amount": 33768000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12675",
      "similarity_pct": 100,
      "current_chainage": "2+501.00–3+059.01",
      "prior_chainage": "2+233.00–2+513.00",
      "chainage_overlap": "2+501.00–2+513.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32888",
        "nepTitle": "Bato By-Pass Road, Sta. 2+501 - 3+059.01, Barangay Tabunok, Bato, Leyte",
        "nepPesos": 62070000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0223-002079",
        "hgabTitle": "Bato By-Pass Road, Sta. 2+501 - 3+059.01, Barangay Tabunok, Bato, Leyte",
        "hgabPesos": 62070000,
        "nepPage": "284",
        "hgabPage": "223",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union",
      "source_code": "2027DPWH-Proposal-31734",
      "office": "La Union 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 119874000,
      "comparison_year": 2020,
      "prior_project": "Bauang-San Fernando-San Juan Bypass Road, (Bauang Section), La Union",
      "prior_amount": 150000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512116",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–3+003.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31734",
        "nepTitle": "Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union",
        "nepPesos": 119874000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0213-001876",
        "hgabTitle": "Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union",
        "hgabPesos": 119874000,
        "nepPage": "277",
        "hgabPage": "213",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union",
      "source_code": "2027DPWH-Proposal-31734",
      "office": "La Union 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 119874000,
      "comparison_year": 2021,
      "prior_project": "Bauang-San Fernando-San Juan Bypass Road, (Bauang Section), La Union",
      "prior_amount": 79915000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436454",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–3+003.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31734",
        "nepTitle": "Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union",
        "nepPesos": 119874000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0213-001876",
        "hgabTitle": "Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union",
        "hgabPesos": 119874000,
        "nepPage": "277",
        "hgabPage": "213",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union",
      "source_code": "2027DPWH-Proposal-31734",
      "office": "La Union 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 119874000,
      "comparison_year": 2024,
      "prior_project": "Bauang - San Fernando - San Juan Bypass Road, ( San Fernando - San Juan Section ) , La Union",
      "prior_amount": 130000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595464",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–3+003.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31734",
        "nepTitle": "Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union",
        "nepPesos": 119874000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0213-001876",
        "hgabTitle": "Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union",
        "hgabPesos": 119874000,
        "nepPage": "277",
        "hgabPage": "213",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union",
      "source_code": "2027DPWH-Proposal-31734",
      "office": "La Union 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 119874000,
      "comparison_year": 2019,
      "prior_project": "Bauang-San Fernando-San Juan Bypass Road, (Bauang Section), La Union",
      "prior_amount": 150000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100388000 · PDF p. 187 · printed p. 1652",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–3+003.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31734",
        "nepTitle": "Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union",
        "nepPesos": 119874000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0213-001876",
        "hgabTitle": "Bauang-San Fernando-San Juan Bypass Road (Bauang Section), Sta 0+000 - Sta 3+003, La Union",
        "hgabPesos": 119874000,
        "nepPage": "277",
        "hgabPage": "213",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Besao-Tubo (via Tamboan) Road, Sta. 11+387 - Sta. 13+587, Besao, Mountain Province",
      "source_code": "2027DPWH-Proposal-20280",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 119100000,
      "comparison_year": 2021,
      "prior_project": "Besao-Tubo-(via Tamboan) Road, Mountain Province",
      "prior_amount": 20000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437281",
      "similarity_pct": 100,
      "current_chainage": "11+387.00–13+587.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20280",
        "nepTitle": "Besao-Tubo (via Tamboan) Road, Sta. 11+387 - Sta. 13+587, Besao, Mountain Province",
        "nepPesos": 119100000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0241-002397",
        "hgabTitle": "Besao-Tubo (via Tamboan) Road, Sta.11+387 - Sta.11+567, Besao, Mountain Province",
        "hgabPesos": 8600000,
        "nepPage": "295",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Besao-Tubo (via Tamboan) Road, Sta. 11+387 - Sta. 13+587, Besao, Mountain Province",
      "source_code": "2027DPWH-Proposal-20280",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 119100000,
      "comparison_year": 2022,
      "prior_project": "Besao- Tubo (via Tamboan) Road, Mountain Province",
      "prior_amount": 25000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548641",
      "similarity_pct": 100,
      "current_chainage": "11+387.00–13+587.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20280",
        "nepTitle": "Besao-Tubo (via Tamboan) Road, Sta. 11+387 - Sta. 13+587, Besao, Mountain Province",
        "nepPesos": 119100000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0241-002397",
        "hgabTitle": "Besao-Tubo (via Tamboan) Road, Sta.11+387 - Sta.11+567, Besao, Mountain Province",
        "hgabPesos": 8600000,
        "nepPage": "295",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Besao-Tubo (via Tamboan) Road, Sta. 11+387 - Sta. 13+587, Besao, Mountain Province",
      "source_code": "2027DPWH-Proposal-20280",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 119100000,
      "comparison_year": 2024,
      "prior_project": "Besao - Tubo - ( via Tamboan ) Road, Mountain Province",
      "prior_amount": 20000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597240",
      "similarity_pct": 100,
      "current_chainage": "11+387.00–13+587.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20280",
        "nepTitle": "Besao-Tubo (via Tamboan) Road, Sta. 11+387 - Sta. 13+587, Besao, Mountain Province",
        "nepPesos": 119100000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0241-002397",
        "hgabTitle": "Besao-Tubo (via Tamboan) Road, Sta.11+387 - Sta.11+567, Besao, Mountain Province",
        "hgabPesos": 8600000,
        "nepPage": "295",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Besao-Tubo (via Tamboan) Road, Sta. 11+387 - Sta. 13+587, Besao, Mountain Province",
      "source_code": "2027DPWH-Proposal-20280",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 119100000,
      "comparison_year": 2025,
      "prior_project": "Besao-Tubo (via Tamboan) Road, Mountain Province",
      "prior_amount": 22520000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633710",
      "similarity_pct": 100,
      "current_chainage": "11+387.00–13+587.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20280",
        "nepTitle": "Besao-Tubo (via Tamboan) Road, Sta. 11+387 - Sta. 13+587, Besao, Mountain Province",
        "nepPesos": 119100000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0241-002397",
        "hgabTitle": "Besao-Tubo (via Tamboan) Road, Sta.11+387 - Sta.11+567, Besao, Mountain Province",
        "hgabPesos": 8600000,
        "nepPage": "295",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
      "source_code": "2027DPWH-Proposal-32767",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 480000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
      "prior_amount": 300000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 425206",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32767",
        "nepTitle": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
        "nepPesos": 480000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001879",
        "hgabTitle": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
        "hgabPesos": 480000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
      "source_code": "2027DPWH-Proposal-32767",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 480000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
      "prior_amount": 300000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547268",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32767",
        "nepTitle": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
        "nepPesos": 480000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001879",
        "hgabTitle": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
        "hgabPesos": 480000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
      "source_code": "2027DPWH-Proposal-32767",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 480000000,
      "comparison_year": 2023,
      "prior_project": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
      "prior_amount": 80000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566615",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32767",
        "nepTitle": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
        "nepPesos": 480000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001879",
        "hgabTitle": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
        "hgabPesos": 480000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
      "source_code": "2027DPWH-Proposal-32767",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 480000000,
      "comparison_year": 2024,
      "prior_project": "Binalonan - Laoac - Villasis ( BLV ) Bypass Road, Pangasinan",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 594974",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32767",
        "nepTitle": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
        "nepPesos": 480000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001879",
        "hgabTitle": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
        "hgabPesos": 480000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
      "source_code": "2027DPWH-Proposal-32767",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 480000000,
      "comparison_year": 2025,
      "prior_project": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
      "prior_amount": 70000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631747",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32767",
        "nepTitle": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
        "nepPesos": 480000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001879",
        "hgabTitle": "Binalonan-Laoac-Villasis (BLV) Bypass Road, Pangasinan",
        "hgabPesos": 480000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bocaue-Balagtas Diversion Road, Sta. 3+900 - Sta. 3+976.43, Bulacan",
      "source_code": "2027DPWH-Proposal-31745",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 50956000,
      "comparison_year": 2021,
      "prior_project": "Bocaue-Balagtas Diversion Road, Bulacan",
      "prior_amount": 50000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436901",
      "similarity_pct": 100,
      "current_chainage": "3+900.00–3+976.43",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31745",
        "nepTitle": "Bocaue-Balagtas Diversion Road, Sta. 3+900 - Sta. 3+976.43, Bulacan",
        "nepPesos": 50956000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0217-001949",
        "hgabTitle": "Bocaue-Balagtas Diversion Road, Sta. 3+900 - Sta. 3+976.43, Bulacan",
        "hgabPesos": 50956000,
        "nepPage": "279",
        "hgabPage": "217",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bocaue-Balagtas Diversion Road, Sta. 3+900 - Sta. 3+976.43, Bulacan",
      "source_code": "2027DPWH-Proposal-31745",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 50956000,
      "comparison_year": 2022,
      "prior_project": "Bocaue - Balagtas Diversion Road, Bulacan",
      "prior_amount": 30000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547116",
      "similarity_pct": 100,
      "current_chainage": "3+900.00–3+976.43",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31745",
        "nepTitle": "Bocaue-Balagtas Diversion Road, Sta. 3+900 - Sta. 3+976.43, Bulacan",
        "nepPesos": 50956000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0217-001949",
        "hgabTitle": "Bocaue-Balagtas Diversion Road, Sta. 3+900 - Sta. 3+976.43, Bulacan",
        "hgabPesos": 50956000,
        "nepPage": "279",
        "hgabPage": "217",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
      "source_code": "2027DPWH-Proposal-31625",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2020,
      "prior_project": "Construction/Rehabilitation of Bolinao - Dasol Coastal Road, Pangasinan",
      "prior_amount": 100000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 498482",
      "similarity_pct": 100,
      "current_chainage": "42+760.00–44+620.00 · 60+482.00–66+157.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31625",
        "nepTitle": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002250",
        "hgabTitle": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
        "hgabPesos": 100000000,
        "nepPage": "294",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
      "source_code": "2027DPWH-Proposal-31625",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Bolinao - Dasol Coastal Road, Pangasinan",
      "prior_amount": 85000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 426378",
      "similarity_pct": 100,
      "current_chainage": "42+760.00–44+620.00 · 60+482.00–66+157.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31625",
        "nepTitle": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002250",
        "hgabTitle": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
        "hgabPesos": 100000000,
        "nepPage": "294",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
      "source_code": "2027DPWH-Proposal-31625",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2022,
      "prior_project": "Bolinao-Dasol Coastal Road, Pangasinan",
      "prior_amount": 105000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548491",
      "similarity_pct": 100,
      "current_chainage": "42+760.00–44+620.00 · 60+482.00–66+157.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31625",
        "nepTitle": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002250",
        "hgabTitle": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
        "hgabPesos": 100000000,
        "nepPage": "294",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
      "source_code": "2027DPWH-Proposal-31625",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Bolinao - Dasol Coastal Road, Pangasinan",
      "prior_amount": 105000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 567859",
      "similarity_pct": 100,
      "current_chainage": "42+760.00–44+620.00 · 60+482.00–66+157.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31625",
        "nepTitle": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002250",
        "hgabTitle": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
        "hgabPesos": 100000000,
        "nepPage": "294",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
      "source_code": "2027DPWH-Proposal-31625",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2024,
      "prior_project": "Bolinao - Dasol Coastal Road, Pangasinan",
      "prior_amount": 70000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597085",
      "similarity_pct": 100,
      "current_chainage": "42+760.00–44+620.00 · 60+482.00–66+157.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31625",
        "nepTitle": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002250",
        "hgabTitle": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
        "hgabPesos": 100000000,
        "nepPage": "294",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
      "source_code": "2027DPWH-Proposal-31625",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Bolinao-Dasol Coastal Road, Pangasinan",
      "prior_amount": 200000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633561",
      "similarity_pct": 100,
      "current_chainage": "42+760.00–44+620.00 · 60+482.00–66+157.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31625",
        "nepTitle": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002250",
        "hgabTitle": "Bolinao-Dasol Coastal Road Sta. 42+760- Sta. 44+620, Sta. 60+482 -Sta. 66+157, Pangasinan",
        "hgabPesos": 100000000,
        "nepPage": "294",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
      "source_code": "2027DPWH-Proposal-20313",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 107687000,
      "comparison_year": 2020,
      "prior_project": "Construction/Rehabilitation of Bolinao - Dasol Coastal Road, Pangasinan",
      "prior_amount": 100000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 498482",
      "similarity_pct": 100,
      "current_chainage": "53+200.00–60+482.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20313",
        "nepTitle": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
        "nepPesos": 107687000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002251",
        "hgabTitle": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
        "hgabPesos": 107687000,
        "nepPage": "294",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
      "source_code": "2027DPWH-Proposal-20313",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 107687000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Bolinao - Dasol Coastal Road, Pangasinan",
      "prior_amount": 85000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 426378",
      "similarity_pct": 100,
      "current_chainage": "53+200.00–60+482.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20313",
        "nepTitle": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
        "nepPesos": 107687000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002251",
        "hgabTitle": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
        "hgabPesos": 107687000,
        "nepPage": "294",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
      "source_code": "2027DPWH-Proposal-20313",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 107687000,
      "comparison_year": 2022,
      "prior_project": "Bolinao-Dasol Coastal Road, Pangasinan",
      "prior_amount": 105000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548491",
      "similarity_pct": 100,
      "current_chainage": "53+200.00–60+482.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20313",
        "nepTitle": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
        "nepPesos": 107687000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002251",
        "hgabTitle": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
        "hgabPesos": 107687000,
        "nepPage": "294",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
      "source_code": "2027DPWH-Proposal-20313",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 107687000,
      "comparison_year": 2023,
      "prior_project": "Bolinao - Dasol Coastal Road, Pangasinan",
      "prior_amount": 105000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 567859",
      "similarity_pct": 100,
      "current_chainage": "53+200.00–60+482.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20313",
        "nepTitle": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
        "nepPesos": 107687000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002251",
        "hgabTitle": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
        "hgabPesos": 107687000,
        "nepPage": "294",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
      "source_code": "2027DPWH-Proposal-20313",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 107687000,
      "comparison_year": 2024,
      "prior_project": "Bolinao - Dasol Coastal Road, Pangasinan",
      "prior_amount": 70000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597085",
      "similarity_pct": 100,
      "current_chainage": "53+200.00–60+482.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20313",
        "nepTitle": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
        "nepPesos": 107687000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002251",
        "hgabTitle": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
        "hgabPesos": 107687000,
        "nepPage": "294",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
      "source_code": "2027DPWH-Proposal-20313",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 107687000,
      "comparison_year": 2025,
      "prior_project": "Bolinao-Dasol Coastal Road, Pangasinan",
      "prior_amount": 200000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633561",
      "similarity_pct": 100,
      "current_chainage": "53+200.00–60+482.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20313",
        "nepTitle": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
        "nepPesos": 107687000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002251",
        "hgabTitle": "Bolinao-Dasol Coastal Road, Sta. 53+200 - Sta. 60+482, Pangasinan",
        "hgabPesos": 107687000,
        "nepPage": "294",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
      "source_code": "2027DPWH-Proposal-20699",
      "office": "Southern Leyte 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 88100000,
      "comparison_year": 2021,
      "prior_project": "Bontoc Bypass Road (Sogod to Buenavista), Southern Leyte",
      "prior_amount": 15000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436964",
      "similarity_pct": 100,
      "current_chainage": "5+820.00–5+910.00 · 7+178.00–8+088.56",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20699",
        "nepTitle": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
        "nepPesos": 88100000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0223-002080",
        "hgabTitle": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
        "hgabPesos": 88100000,
        "nepPage": "284",
        "hgabPage": "223",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
      "source_code": "2027DPWH-Proposal-20699",
      "office": "Southern Leyte 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 88100000,
      "comparison_year": 2022,
      "prior_project": "Sogod to Buenavista, Bontoc Bypass Road, Southern Leyte",
      "prior_amount": 100000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547387",
      "similarity_pct": 100,
      "current_chainage": "5+820.00–5+910.00 · 7+178.00–8+088.56",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20699",
        "nepTitle": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
        "nepPesos": 88100000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0223-002080",
        "hgabTitle": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
        "hgabPesos": 88100000,
        "nepPage": "284",
        "hgabPage": "223",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
      "source_code": "2027DPWH-Proposal-20699",
      "office": "Southern Leyte 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 88100000,
      "comparison_year": 2023,
      "prior_project": "Bontoc Bypass Road (Sogod to Buenavista), Southern Leyte",
      "prior_amount": 45000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 567066",
      "similarity_pct": 100,
      "current_chainage": "5+820.00–5+910.00 · 7+178.00–8+088.56",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20699",
        "nepTitle": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
        "nepPesos": 88100000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0223-002080",
        "hgabTitle": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
        "hgabPesos": 88100000,
        "nepPage": "284",
        "hgabPage": "223",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
      "source_code": "2027DPWH-Proposal-20699",
      "office": "Southern Leyte 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 88100000,
      "comparison_year": 2024,
      "prior_project": "Sogod to Buenavista, Bontoc Bypass Road, Sogod, Southern Leyte",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595665",
      "similarity_pct": 100,
      "current_chainage": "5+820.00–5+910.00 · 7+178.00–8+088.56",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20699",
        "nepTitle": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
        "nepPesos": 88100000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0223-002080",
        "hgabTitle": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
        "hgabPesos": 88100000,
        "nepPage": "284",
        "hgabPage": "223",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
      "source_code": "2027DPWH-Proposal-20699",
      "office": "Southern Leyte 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 88100000,
      "comparison_year": 2025,
      "prior_project": "Sogod to Buenavista, Bontoc Bypass Road, Southern Leyte",
      "prior_amount": 79200000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631468",
      "similarity_pct": 100,
      "current_chainage": "5+820.00–5+910.00 · 7+178.00–8+088.56",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20699",
        "nepTitle": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
        "nepPesos": 88100000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0223-002080",
        "hgabTitle": "Bontoc Bypass Road (Sogod to Buenavista), Sta. 5+820 - Sta. 5+910, Sta. 7+178 - Sta. 8+088.56, Southern Leyte",
        "hgabPesos": 88100000,
        "nepPage": "284",
        "hgabPage": "223",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bukidnon-Compostela Valley Road, Namnam, San Fernando, Bukidnon-Laak, Compostela Valley, Sta. 1556+708 - Sta. 1560+120.05",
      "source_code": "2027DPWH-Proposal-20460",
      "office": "Davao del Norte District Engineering Office",
      "region": "Region XI",
      "amount_2027": 220000000,
      "comparison_year": 2021,
      "prior_project": "Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak Compostela Valley), Bukidnon",
      "prior_amount": 137825000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437228",
      "similarity_pct": 100,
      "current_chainage": "1556+708.00–1560+120.05",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20460",
        "nepTitle": "Bukidnon-Compostela Valley Road, Namnam, San Fernando, Bukidnon-Laak, Compostela Valley, Sta. 1556+708 - Sta. 1560+120.05",
        "nepPesos": 220000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
      "source_code": "2027DPWH-Proposal-33051",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 20000000,
      "comparison_year": 2020,
      "prior_project": "Butuan City Bypass Road, (Lemon-NRJ-Antongalon-Pianing Section), Butuan City",
      "prior_amount": 50000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512707",
      "similarity_pct": 100,
      "current_chainage": "4+749.50–5+128.60",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Aquino II"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33051",
        "nepTitle": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002247",
        "hgabTitle": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
        "hgabPesos": 20000000,
        "nepPage": "293",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
      "source_code": "2027DPWH-Proposal-33051",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section), Butuan City",
      "prior_amount": 103000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436866",
      "similarity_pct": 100,
      "current_chainage": "4+749.50–5+128.60",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Aquino II"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33051",
        "nepTitle": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002247",
        "hgabTitle": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
        "hgabPesos": 20000000,
        "nepPage": "293",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
      "source_code": "2027DPWH-Proposal-33051",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Butuan City Bypass Road, (Lemon-NRJ-Antongalon-Pianing Section), Butuan City",
      "prior_amount": 30000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547640",
      "similarity_pct": 100,
      "current_chainage": "4+749.50–5+128.60",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Aquino II"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33051",
        "nepTitle": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002247",
        "hgabTitle": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
        "hgabPesos": 20000000,
        "nepPage": "293",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
      "source_code": "2027DPWH-Proposal-33051",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 20000000,
      "comparison_year": 2023,
      "prior_project": "Butuan City Bypass Road, ( Lemon - NRJ - Antongalon - Pianing Section ), Butuan City",
      "prior_amount": 105000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566518",
      "similarity_pct": 100,
      "current_chainage": "4+749.50–5+128.60",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Aquino II"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33051",
        "nepTitle": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002247",
        "hgabTitle": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
        "hgabPesos": 20000000,
        "nepPage": "293",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
      "source_code": "2027DPWH-Proposal-33051",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 20000000,
      "comparison_year": 2024,
      "prior_project": "Butuan City Bypass Road, ( Lemon - NRJ - Antongalon - Pianing Section ) , Butuan City",
      "prior_amount": 90000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595821",
      "similarity_pct": 100,
      "current_chainage": "4+749.50–5+128.60",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Aquino II"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33051",
        "nepTitle": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002247",
        "hgabTitle": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
        "hgabPesos": 20000000,
        "nepPage": "293",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
      "source_code": "2027DPWH-Proposal-33051",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Butuan City Bypass Road, (Lemon-NRJ-Antongalon-Pianing Section), Butuan City",
      "prior_amount": 40000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 632190",
      "similarity_pct": 100,
      "current_chainage": "4+749.50–5+128.60",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Aquino II"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33051",
        "nepTitle": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002247",
        "hgabTitle": "Butuan City Bypass Road (Lemon-NRJ-Antongalon-Pianing Section) (Sta. 4+749.5 - Sta. 5+128.60), Butuan City",
        "hgabPesos": 20000000,
        "nepPage": "293",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Butuan City West Diversion Road, Butuan City",
      "source_code": "2027DPWH-Proposal-38928",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 300000000,
      "comparison_year": 2020,
      "prior_project": "Butuan City West Diversion Road, Butuan City",
      "prior_amount": 130000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512632",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Aquino II"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38928",
        "nepTitle": "Butuan City West Diversion Road, Butuan City",
        "nepPesos": 300000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0228-002168",
        "hgabTitle": "Butuan City West Diversion Road, Butuan City",
        "hgabPesos": 300000000,
        "nepPage": "289",
        "hgabPage": "228",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Butuan City West Diversion Road, Butuan City",
      "source_code": "2027DPWH-Proposal-38928",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 300000000,
      "comparison_year": 2019,
      "prior_project": "Butuan City West Diversion Road, Butuan City",
      "prior_amount": 150000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100596000 · PDF p. 199 · printed p. 1664",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38928",
        "nepTitle": "Butuan City West Diversion Road, Butuan City",
        "nepPesos": 300000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0228-002168",
        "hgabTitle": "Butuan City West Diversion Road, Butuan City",
        "hgabPesos": 300000000,
        "nepPage": "289",
        "hgabPage": "228",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "CDO-New Western Diversion Road (Kauswagan-Bonbon Section), Barangay Bonbon-Barangay Bayabas, Sta. 0+000 - Sta. 0+160, Sta. 0+224 - Sta. 0+271, Sta. 0+400 - Sta. 1+110, Sta. 1+540 - Sta. 1+970, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-20869",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 60000000,
      "comparison_year": 2026,
      "prior_project": "CDO-New Western Diversion Road (Kauswagan-Bonbon Section), Barangay Bonbon-Barangay Bayabas, Sta. 0+000 - Sta. 0+160, Sta. 0+224 - Sta. 0+271, Sta. 0+400 - Sta. 1+110, Sta. 1+540 - Sta. 1+970, Cagayan de Oro City",
      "prior_amount": 77105000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12382",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+160.00 · 0+224.00–0+271.00 · 0+400.00–1+110.00 · 1+540.00–1+970.00",
      "prior_chainage": "0+000.00–0+160.00 · 0+224.00–0+271.00 · 0+400.00–1+110.00 · 1+540.00–1+970.00",
      "chainage_overlap": "0+000.00–0+160.00 · 0+224.00–0+271.00 · 0+400.00–1+110.00 · 1+540.00–1+970.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20869",
        "nepTitle": "CDO-New Western Diversion Road (Kauswagan-Bonbon Section), Barangay Bonbon-Barangay Bayabas, Sta. 0+000 - Sta. 0+160, Sta. 0+224 - Sta. 0+271, Sta. 0+400 - Sta. 1+110, Sta. 1+540 - Sta. 1+970, Cagayan de Oro City",
        "nepPesos": 60000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0225-002112",
        "hgabTitle": "CDO-New Western Diversion Road (Kauswagan-Bonbon Section), Barangay Bonbon- Barangay Bayabas, Sta. 0+000 - Sta. 0+160, Sta. 0+224 - Sta. 0+271, Sta. 0+400 - Sta. 1+110, Sta. 1+540 - Sta. 1+970, Cagayan de Oro City",
        "hgabPesos": 60000000,
        "nepPage": "285",
        "hgabPage": "225",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cadapaan Br. (B02112MN) along Marawi-Malabang Road",
      "source_code": "2027DPWH-Proposal-18726",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 25000000,
      "comparison_year": 2026,
      "prior_project": "Cadapaan Br. (B02112MN) along Marawi-Malabang Road",
      "prior_amount": 10596000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 13732",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-18726",
        "nepTitle": "Cadapaan Br. (B02112MN) along Marawi-Malabang Road",
        "nepPesos": 25000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0260-002681",
        "hgabTitle": "Cadapaan Br. (B02112MN) along Marawi-Malabang Road",
        "hgabPesos": 25000000,
        "nepPage": "314",
        "hgabPage": "260",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cagaluan Bypass Road, Sta. 0+500 - Sta. 2+500, Kalinga",
      "source_code": "2027DPWH-Proposal-32755",
      "office": "Upper Kalinga District Engineering Office",
      "region": "CAR",
      "amount_2027": 100000000,
      "comparison_year": 2024,
      "prior_project": "Cagaluan Bypass Road, Kalinga",
      "prior_amount": 8000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595846",
      "similarity_pct": 100,
      "current_chainage": "0+500.00–2+500.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32755",
        "nepTitle": "Cagaluan Bypass Road, Sta. 0+500 - Sta. 2+500, Kalinga",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cagaluan Bypass Road, Sta. 3+360 - Sta. 4+060, Kalinga",
      "source_code": "2027DPWH-Proposal-31729",
      "office": "Upper Kalinga District Engineering Office",
      "region": "CAR",
      "amount_2027": 35000000,
      "comparison_year": 2024,
      "prior_project": "Cagaluan Bypass Road, Kalinga",
      "prior_amount": 8000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595846",
      "similarity_pct": 100,
      "current_chainage": "3+360.00–4+060.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31729",
        "nepTitle": "Cagaluan Bypass Road, Sta. 3+360 - Sta. 4+060, Kalinga",
        "nepPesos": 35000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0230-002191",
        "hgabTitle": "Cagaluan Bypass Road, Sta. 3+360 - Sta. 4+060, Kalinga",
        "hgabPesos": 35000000,
        "nepPage": "290",
        "hgabPage": "230",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Caiguit-Cabungaan Diversion Road, (Sta.0+423 - Sta.0+507, Sta.0+816 - Sta.0+921, Sta.1+073 - Sta.1+203), Villaba, Leyte",
      "source_code": "2027DPWH-Proposal-20691",
      "office": "Leyte 3rd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Caiguit to Cabungaan Diversion Road, Villaba, Leyte",
      "prior_amount": 45000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 500283",
      "similarity_pct": 100,
      "current_chainage": "0+423.00–0+507.00 · 0+816.00–0+921.00 · 1+073.00–1+203.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20691",
        "nepTitle": "Caiguit-Cabungaan Diversion Road, (Sta.0+423 - Sta.0+507, Sta.0+816 - Sta.0+921, Sta.1+073 - Sta.1+203), Villaba, Leyte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002222",
        "hgabTitle": "Caiguit-Cabungaan Diversion Road, (Sta.0+423 - Sta.0+507, Sta.0+816 - Sta.0+921, Sta.1+073 - Sta.1+203), Villaba, Leyte",
        "hgabPesos": 5000000,
        "nepPage": "291",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Caiguit-Cabungaan Diversion Road, (Sta.0+423 - Sta.0+507, Sta.0+816 - Sta.0+921, Sta.1+073 - Sta.1+203), Villaba, Leyte",
      "source_code": "2027DPWH-Proposal-20691",
      "office": "Leyte 3rd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Caiguit to Cabungaan Diversion Road, Villaba, Leyte",
      "prior_amount": 36552000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 426951",
      "similarity_pct": 100,
      "current_chainage": "0+423.00–0+507.00 · 0+816.00–0+921.00 · 1+073.00–1+203.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20691",
        "nepTitle": "Caiguit-Cabungaan Diversion Road, (Sta.0+423 - Sta.0+507, Sta.0+816 - Sta.0+921, Sta.1+073 - Sta.1+203), Villaba, Leyte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002222",
        "hgabTitle": "Caiguit-Cabungaan Diversion Road, (Sta.0+423 - Sta.0+507, Sta.0+816 - Sta.0+921, Sta.1+073 - Sta.1+203), Villaba, Leyte",
        "hgabPesos": 5000000,
        "nepPage": "291",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Caiguit-Cabungaan Diversion Road, (Sta.0+423 - Sta.0+507, Sta.0+816 - Sta.0+921, Sta.1+073 - Sta.1+203), Villaba, Leyte",
      "source_code": "2027DPWH-Proposal-20691",
      "office": "Leyte 3rd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Caiguit to Cabungaan Diversion Road, Villaba, Leyte",
      "prior_amount": 25000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522953",
      "similarity_pct": 100,
      "current_chainage": "0+423.00–0+507.00 · 0+816.00–0+921.00 · 1+073.00–1+203.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20691",
        "nepTitle": "Caiguit-Cabungaan Diversion Road, (Sta.0+423 - Sta.0+507, Sta.0+816 - Sta.0+921, Sta.1+073 - Sta.1+203), Villaba, Leyte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002222",
        "hgabTitle": "Caiguit-Cabungaan Diversion Road, (Sta.0+423 - Sta.0+507, Sta.0+816 - Sta.0+921, Sta.1+073 - Sta.1+203), Villaba, Leyte",
        "hgabPesos": 5000000,
        "nepPage": "291",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cantao-an-Cogon Road leading to Naga Valley (NAVA) Industrial Park, Naga City, Cebu",
      "source_code": "2027DPWH-Proposal-33472",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Cantao-an-Cogon Road leading to Naga Valley (NAVA) Industrial Park, Sta. 0+000 - Sta. 1+420, Naga City, Cebu",
      "prior_amount": 43605000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 16962",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–1+420.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33472",
        "nepTitle": "Cantao-an-Cogon Road leading to Naga Valley (NAVA) Industrial Park, Naga City, Cebu",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0434-006141",
        "hgabTitle": "Cantao-an-Cogon Road leading to Naga Valley (NAVA) Industrial Park, Naga City, Cebu",
        "hgabPesos": 30000000,
        "nepPage": "447",
        "hgabPage": "434",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20766",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 71400000,
      "comparison_year": 2020,
      "prior_project": "Cantilan-Madrid Bypass Road (SDCR Alternate Route), Surigao del Sur",
      "prior_amount": 105000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512325",
      "similarity_pct": 100,
      "current_chainage": "3+390.50–4+671.85",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20766",
        "nepTitle": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
        "nepPesos": 71400000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0228-002169",
        "hgabTitle": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
        "hgabPesos": 71400000,
        "nepPage": "289",
        "hgabPage": "228",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20766",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 71400000,
      "comparison_year": 2021,
      "prior_project": "Cantilan-Madrid Bypass Road (SDCR Alternate Route), Surigao Del Sur",
      "prior_amount": 105000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436869",
      "similarity_pct": 100,
      "current_chainage": "3+390.50–4+671.85",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20766",
        "nepTitle": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
        "nepPesos": 71400000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0228-002169",
        "hgabTitle": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
        "hgabPesos": 71400000,
        "nepPage": "289",
        "hgabPage": "228",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20766",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 71400000,
      "comparison_year": 2022,
      "prior_project": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Surigao Del Sur",
      "prior_amount": 105000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547084",
      "similarity_pct": 100,
      "current_chainage": "3+390.50–4+671.85",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20766",
        "nepTitle": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
        "nepPesos": 71400000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0228-002169",
        "hgabTitle": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
        "hgabPesos": 71400000,
        "nepPage": "289",
        "hgabPage": "228",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20766",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 71400000,
      "comparison_year": 2023,
      "prior_project": "Cantilan-Madrid Bypass Road (SDCR Alternate Route), Surigao del Sur",
      "prior_amount": 101000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566980",
      "similarity_pct": 100,
      "current_chainage": "3+390.50–4+671.85",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20766",
        "nepTitle": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
        "nepPesos": 71400000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0228-002169",
        "hgabTitle": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
        "hgabPesos": 71400000,
        "nepPage": "289",
        "hgabPage": "228",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20766",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 71400000,
      "comparison_year": 2024,
      "prior_project": "Cantilan - Madrid Bypass Road ( SDCR Alternate Route ) , Surigao del Sur",
      "prior_amount": 35000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595339",
      "similarity_pct": 100,
      "current_chainage": "3+390.50–4+671.85",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20766",
        "nepTitle": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
        "nepPesos": 71400000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0228-002169",
        "hgabTitle": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
        "hgabPesos": 71400000,
        "nepPage": "289",
        "hgabPage": "228",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20766",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 71400000,
      "comparison_year": 2019,
      "prior_project": "Cantilan-Madrid Bypass Road (SDCR Alternate Route), Surigao del Sur",
      "prior_amount": 105000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100597000 · PDF p. 199 · printed p. 1664",
      "similarity_pct": 100,
      "current_chainage": "3+390.50–4+671.85",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20766",
        "nepTitle": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
        "nepPesos": 71400000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0228-002169",
        "hgabTitle": "Cantilan - Madrid Bypass Road (SDCR Alternate Route), Sta. 3+390.5 - Sta. 4+671.85, Surigao del Sur",
        "hgabPesos": 71400000,
        "nepPage": "289",
        "hgabPage": "228",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac",
      "source_code": "2027DPWH-Proposal-32465",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 400000000,
      "comparison_year": 2021,
      "prior_project": "Capas-Botolan Road, Tarlac",
      "prior_amount": 12000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437291",
      "similarity_pct": 100,
      "current_chainage": "8+320.00–9+845.00 · 9+845.00–11+495.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32465",
        "nepTitle": "Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac",
        "nepPesos": 400000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0235-002279",
        "hgabTitle": "Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac",
        "hgabPesos": 400000000,
        "nepPage": "295",
        "hgabPage": "235",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac",
      "source_code": "2027DPWH-Proposal-32465",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 400000000,
      "comparison_year": 2022,
      "prior_project": "Capas - Botolan Road, Tarlac",
      "prior_amount": 80000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548428",
      "similarity_pct": 100,
      "current_chainage": "8+320.00–9+845.00 · 9+845.00–11+495.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32465",
        "nepTitle": "Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac",
        "nepPesos": 400000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0235-002279",
        "hgabTitle": "Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac",
        "hgabPesos": 400000000,
        "nepPage": "295",
        "hgabPage": "235",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac",
      "source_code": "2027DPWH-Proposal-32465",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 400000000,
      "comparison_year": 2025,
      "prior_project": "Capas-Botolan Road, Tarlac",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633594",
      "similarity_pct": 100,
      "current_chainage": "8+320.00–9+845.00 · 9+845.00–11+495.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32465",
        "nepTitle": "Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac",
        "nepPesos": 400000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0235-002279",
        "hgabTitle": "Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac",
        "hgabPesos": 400000000,
        "nepPage": "295",
        "hgabPage": "235",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac",
      "source_code": "2027DPWH-Proposal-32465",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 400000000,
      "comparison_year": 2019,
      "prior_project": "Capas-Botolan Road, Tarlac",
      "prior_amount": 150000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310205100231000 · PDF p. 205 · printed p. 1670",
      "similarity_pct": 100,
      "current_chainage": "8+320.00–9+845.00 · 9+845.00–11+495.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32465",
        "nepTitle": "Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac",
        "nepPesos": 400000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0235-002279",
        "hgabTitle": "Capas-Botolan Road (Sta. 008+320 - Sta. 009+845, Sta. 009+845 - Sta. 011+495), Tarlac",
        "hgabPesos": 400000000,
        "nepPage": "295",
        "hgabPage": "235",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Capulong Br. (B01790LZ) along C-2 Road",
      "source_code": "2027DPWH-Proposal-18753",
      "office": "North Manila District Engineering Office",
      "region": "NCR",
      "amount_2027": 1000000,
      "comparison_year": 2022,
      "prior_project": "Capulong Br. (B01790LZ) along C-2 Road",
      "prior_amount": 25000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 551797",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-18753",
        "nepTitle": "Capulong Br. (B01790LZ) along C-2 Road",
        "nepPesos": 1000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0273-002961",
        "hgabTitle": "Capulong Br. (B01790LZ) along C-2 Road",
        "hgabPesos": 1000000,
        "nepPage": "327",
        "hgabPage": "273",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Capulong Br. (B01790LZ) along C-2 Road",
      "source_code": "2027DPWH-Proposal-18753",
      "office": "North Manila District Engineering Office",
      "region": "NCR",
      "amount_2027": 1000000,
      "comparison_year": 2025,
      "prior_project": "Capulong Br. (B01790LZ) along C-2 Road",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 640230",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-18753",
        "nepTitle": "Capulong Br. (B01790LZ) along C-2 Road",
        "nepPesos": 1000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0273-002961",
        "hgabTitle": "Capulong Br. (B01790LZ) along C-2 Road",
        "hgabPesos": 1000000,
        "nepPage": "327",
        "hgabPage": "273",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Capulong Br. (B01790LZ) along C-2 Road",
      "source_code": "2027DPWH-Proposal-18753",
      "office": "North Manila District Engineering Office",
      "region": "NCR",
      "amount_2027": 1000000,
      "comparison_year": 2017,
      "prior_project": "Capulong Br. (B01790LZ) along C-2 Road",
      "prior_amount": 10980000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016200534",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-18753",
        "nepTitle": "Capulong Br. (B01790LZ) along C-2 Road",
        "nepPesos": 1000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0273-002961",
        "hgabTitle": "Capulong Br. (B01790LZ) along C-2 Road",
        "hgabPesos": 1000000,
        "nepPage": "327",
        "hgabPage": "273",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela",
      "source_code": "2027DPWH-Proposal-20945",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 138682000,
      "comparison_year": 2020,
      "prior_project": "Cauayan City-Cabatuan Diversion Road, Isabela",
      "prior_amount": 40000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512346",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+027.00 · 5+800.00–7+262.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20945",
        "nepTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela",
        "nepPesos": 138682000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001908",
        "hgabTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela",
        "hgabPesos": 138682000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela",
      "source_code": "2027DPWH-Proposal-20945",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 138682000,
      "comparison_year": 2021,
      "prior_project": "Cauayan City-Cabatuan Diversion Road, Cabatuan, Isabela",
      "prior_amount": 1293000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436565",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+027.00 · 5+800.00–7+262.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20945",
        "nepTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela",
        "nepPesos": 138682000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001908",
        "hgabTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela",
        "hgabPesos": 138682000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela",
      "source_code": "2027DPWH-Proposal-20945",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 138682000,
      "comparison_year": 2025,
      "prior_project": "Cauayan City-Cabatuan Diversion Road, Isabela",
      "prior_amount": 81000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631761",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+027.00 · 5+800.00–7+262.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20945",
        "nepTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela",
        "nepPesos": 138682000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001908",
        "hgabTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela",
        "hgabPesos": 138682000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela",
      "source_code": "2027DPWH-Proposal-20945",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 138682000,
      "comparison_year": 2019,
      "prior_project": "Cauayan City-Cabatuan Diversion Road, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100618000 · PDF p. 200 · printed p. 1665",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+027.00 · 5+800.00–7+262.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20945",
        "nepTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela",
        "nepPesos": 138682000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001908",
        "hgabTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 0+000 - Sta. 0+027, Sta. 5+800 - Sta. 7+262, Isabela",
        "hgabPesos": 138682000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City - Cabatuan Diversion Road, Sta. 165 - Sta. 1+407, Sta. 1+669 - Sta. 2+154. Sta. 2+841 - Sta. 3+634, Isabela",
      "source_code": "2027DPWH-Proposal-31827",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2020,
      "prior_project": "Cauayan City-Cabatuan Diversion Road, Isabela",
      "prior_amount": 40000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512346",
      "similarity_pct": 100,
      "current_chainage": "1+669.00–2+154.00 · 2+841.00–3+634.00 · 1+407.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31827",
        "nepTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 165 - Sta. 1+407, Sta. 1+669 - Sta. 2+154. Sta. 2+841 - Sta. 3+634, Isabela",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City - Cabatuan Diversion Road, Sta. 165 - Sta. 1+407, Sta. 1+669 - Sta. 2+154. Sta. 2+841 - Sta. 3+634, Isabela",
      "source_code": "2027DPWH-Proposal-31827",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2021,
      "prior_project": "Cauayan City-Cabatuan Diversion Road, Cabatuan, Isabela",
      "prior_amount": 1293000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436565",
      "similarity_pct": 100,
      "current_chainage": "1+669.00–2+154.00 · 2+841.00–3+634.00 · 1+407.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31827",
        "nepTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 165 - Sta. 1+407, Sta. 1+669 - Sta. 2+154. Sta. 2+841 - Sta. 3+634, Isabela",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City - Cabatuan Diversion Road, Sta. 165 - Sta. 1+407, Sta. 1+669 - Sta. 2+154. Sta. 2+841 - Sta. 3+634, Isabela",
      "source_code": "2027DPWH-Proposal-31827",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Cauayan City-Cabatuan Diversion Road, Isabela",
      "prior_amount": 81000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631761",
      "similarity_pct": 100,
      "current_chainage": "1+669.00–2+154.00 · 2+841.00–3+634.00 · 1+407.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31827",
        "nepTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 165 - Sta. 1+407, Sta. 1+669 - Sta. 2+154. Sta. 2+841 - Sta. 3+634, Isabela",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City - Cabatuan Diversion Road, Sta. 165 - Sta. 1+407, Sta. 1+669 - Sta. 2+154. Sta. 2+841 - Sta. 3+634, Isabela",
      "source_code": "2027DPWH-Proposal-31827",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 100000000,
      "comparison_year": 2019,
      "prior_project": "Cauayan City-Cabatuan Diversion Road, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100618000 · PDF p. 200 · printed p. 1665",
      "similarity_pct": 100,
      "current_chainage": "1+669.00–2+154.00 · 2+841.00–3+634.00 · 1+407.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31827",
        "nepTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 165 - Sta. 1+407, Sta. 1+669 - Sta. 2+154. Sta. 2+841 - Sta. 3+634, Isabela",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela",
      "source_code": "2027DPWH-Proposal-20576",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 131318000,
      "comparison_year": 2020,
      "prior_project": "Cauayan City-Cabatuan Diversion Road, Isabela",
      "prior_amount": 40000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512346",
      "similarity_pct": 100,
      "current_chainage": "3+634.00–5+800.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20576",
        "nepTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela",
        "nepPesos": 131318000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001909",
        "hgabTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela",
        "hgabPesos": 131318000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela",
      "source_code": "2027DPWH-Proposal-20576",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 131318000,
      "comparison_year": 2021,
      "prior_project": "Cauayan City-Cabatuan Diversion Road, Cabatuan, Isabela",
      "prior_amount": 1293000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436565",
      "similarity_pct": 100,
      "current_chainage": "3+634.00–5+800.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20576",
        "nepTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela",
        "nepPesos": 131318000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001909",
        "hgabTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela",
        "hgabPesos": 131318000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela",
      "source_code": "2027DPWH-Proposal-20576",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 131318000,
      "comparison_year": 2025,
      "prior_project": "Cauayan City-Cabatuan Diversion Road, Isabela",
      "prior_amount": 81000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631761",
      "similarity_pct": 100,
      "current_chainage": "3+634.00–5+800.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20576",
        "nepTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela",
        "nepPesos": 131318000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001909",
        "hgabTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela",
        "hgabPesos": 131318000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela",
      "source_code": "2027DPWH-Proposal-20576",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 131318000,
      "comparison_year": 2019,
      "prior_project": "Cauayan City-Cabatuan Diversion Road, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100618000 · PDF p. 200 · printed p. 1665",
      "similarity_pct": 100,
      "current_chainage": "3+634.00–5+800.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20576",
        "nepTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela",
        "nepPesos": 131318000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001909",
        "hgabTitle": "Cauayan City - Cabatuan Diversion Road, Sta. 3+634 - Sta. 5+800, Isabela",
        "hgabPesos": 131318000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
      "source_code": "2027DPWH-Proposal-20606",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 144726000,
      "comparison_year": 2021,
      "prior_project": "Cauayan City Bypass Road, Isabela",
      "prior_amount": 88800000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436618",
      "similarity_pct": 100,
      "current_chainage": "2+344.00–3+820.68",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20606",
        "nepTitle": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
        "nepPesos": 144726000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001915",
        "hgabTitle": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
        "hgabPesos": 144726000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
      "source_code": "2027DPWH-Proposal-20606",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 144726000,
      "comparison_year": 2023,
      "prior_project": "Cauayan City Bypass Road, Isabela",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566635",
      "similarity_pct": 100,
      "current_chainage": "2+344.00–3+820.68",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20606",
        "nepTitle": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
        "nepPesos": 144726000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001915",
        "hgabTitle": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
        "hgabPesos": 144726000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
      "source_code": "2027DPWH-Proposal-20606",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 144726000,
      "comparison_year": 2024,
      "prior_project": "Cauayan City Bypass Road, Isabela",
      "prior_amount": 155000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 594994",
      "similarity_pct": 100,
      "current_chainage": "2+344.00–3+820.68",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20606",
        "nepTitle": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
        "nepPesos": 144726000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001915",
        "hgabTitle": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
        "hgabPesos": 144726000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
      "source_code": "2027DPWH-Proposal-20606",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 144726000,
      "comparison_year": 2025,
      "prior_project": "Cauayan City Bypass Road, Isabela",
      "prior_amount": 77500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 630796",
      "similarity_pct": 100,
      "current_chainage": "2+344.00–3+820.68",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20606",
        "nepTitle": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
        "nepPesos": 144726000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001915",
        "hgabTitle": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
        "hgabPesos": 144726000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
      "source_code": "2027DPWH-Proposal-20606",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 144726000,
      "comparison_year": 2019,
      "prior_project": "Cauayan City Bypass Road, Isabela",
      "prior_amount": 114000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100402000 · PDF p. 187 · printed p. 1652",
      "similarity_pct": 100,
      "current_chainage": "2+344.00–3+820.68",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20606",
        "nepTitle": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
        "nepPesos": 144726000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001915",
        "hgabTitle": "Cauayan City Bypass Road (Sta. 2+344 - Sta. 3+820.68), Isabela",
        "hgabPesos": 144726000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
      "source_code": "2027DPWH-Proposal-20613",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 143906000,
      "comparison_year": 2021,
      "prior_project": "Cauayan City Bypass Road, Isabela",
      "prior_amount": 88800000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436618",
      "similarity_pct": 100,
      "current_chainage": "4+069.00–4+600.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20613",
        "nepTitle": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
        "nepPesos": 143906000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001916",
        "hgabTitle": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
        "hgabPesos": 143906000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
      "source_code": "2027DPWH-Proposal-20613",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 143906000,
      "comparison_year": 2023,
      "prior_project": "Cauayan City Bypass Road, Isabela",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566635",
      "similarity_pct": 100,
      "current_chainage": "4+069.00–4+600.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20613",
        "nepTitle": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
        "nepPesos": 143906000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001916",
        "hgabTitle": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
        "hgabPesos": 143906000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
      "source_code": "2027DPWH-Proposal-20613",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 143906000,
      "comparison_year": 2024,
      "prior_project": "Cauayan City Bypass Road, Isabela",
      "prior_amount": 155000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 594994",
      "similarity_pct": 100,
      "current_chainage": "4+069.00–4+600.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20613",
        "nepTitle": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
        "nepPesos": 143906000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001916",
        "hgabTitle": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
        "hgabPesos": 143906000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
      "source_code": "2027DPWH-Proposal-20613",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 143906000,
      "comparison_year": 2025,
      "prior_project": "Cauayan City Bypass Road, Isabela",
      "prior_amount": 77500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 630796",
      "similarity_pct": 100,
      "current_chainage": "4+069.00–4+600.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20613",
        "nepTitle": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
        "nepPesos": 143906000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001916",
        "hgabTitle": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
        "hgabPesos": 143906000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
      "source_code": "2027DPWH-Proposal-20613",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 143906000,
      "comparison_year": 2019,
      "prior_project": "Cauayan City Bypass Road, Isabela",
      "prior_amount": 114000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100402000 · PDF p. 187 · printed p. 1652",
      "similarity_pct": 100,
      "current_chainage": "4+069.00–4+600.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20613",
        "nepTitle": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
        "nepPesos": 143906000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0215-001916",
        "hgabTitle": "Cauayan City Bypass Road (Sta. 4+069 - Sta. 4+600), Isabela",
        "hgabPesos": 143906000,
        "nepPage": "278",
        "hgabPage": "215",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cawag-Philseco Bypass Road, Sta. 1+925 - Sta. 3+415.75, Zambales",
      "source_code": "2027DPWH-Proposal-23832",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 44500000,
      "comparison_year": 2020,
      "prior_project": "Cawag-Philseco Bypass Road, Zambales",
      "prior_amount": 100000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512138",
      "similarity_pct": 100,
      "current_chainage": "1+925.00–3+415.75",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23832",
        "nepTitle": "Cawag-Philseco Bypass Road, Sta. 1+925 - Sta. 3+415.75, Zambales",
        "nepPesos": 44500000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0217-001943",
        "hgabTitle": "Cawag-Philseco Bypass Road, Sta. 1+925 - Sta. 3+600, Zambales",
        "hgabPesos": 80000000,
        "nepPage": "290",
        "hgabPage": "217",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cawag-Philseco Bypass Road, Sta. 1+925 - Sta. 3+415.75, Zambales",
      "source_code": "2027DPWH-Proposal-23832",
      "office": "Zambales 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 44500000,
      "comparison_year": 2021,
      "prior_project": "Cawag-Philseco Bypass Road, Zambales",
      "prior_amount": 85000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436628",
      "similarity_pct": 100,
      "current_chainage": "1+925.00–3+415.75",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23832",
        "nepTitle": "Cawag-Philseco Bypass Road, Sta. 1+925 - Sta. 3+415.75, Zambales",
        "nepPesos": 44500000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0217-001943",
        "hgabTitle": "Cawag-Philseco Bypass Road, Sta. 1+925 - Sta. 3+600, Zambales",
        "hgabPesos": 80000000,
        "nepPage": "290",
        "hgabPage": "217",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Columbio - Lutayan - Koronadal Road, Sta.12+501 - Sta.12+687, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-20466",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "region": "Region XII",
      "amount_2027": 161820000,
      "comparison_year": 2020,
      "prior_project": "Columbio - Lutayan - Koronadal Road, Sultan Kudarat",
      "prior_amount": 77750000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 513186",
      "similarity_pct": 100,
      "current_chainage": "12+501.00–12+687.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20466",
        "nepTitle": "Columbio - Lutayan - Koronadal Road, Sta.12+501 - Sta.12+687, Sultan Kudarat",
        "nepPesos": 161820000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0240-002380",
        "hgabTitle": "Columbio - Lutayan - Koronadal Road, Sta.12+501 - Sta.12+687, Sultan Kudarat",
        "hgabPesos": 161820000,
        "nepPage": "300",
        "hgabPage": "240",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Columbio - Lutayan - Koronadal Road, Sta.12+501 - Sta.12+687, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-20466",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "region": "Region XII",
      "amount_2027": 161820000,
      "comparison_year": 2021,
      "prior_project": "Columbio - Lutayan - Koronadal Road, Sultan Kudarat",
      "prior_amount": 32655000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437106",
      "similarity_pct": 100,
      "current_chainage": "12+501.00–12+687.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20466",
        "nepTitle": "Columbio - Lutayan - Koronadal Road, Sta.12+501 - Sta.12+687, Sultan Kudarat",
        "nepPesos": 161820000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0240-002380",
        "hgabTitle": "Columbio - Lutayan - Koronadal Road, Sta.12+501 - Sta.12+687, Sultan Kudarat",
        "hgabPesos": 161820000,
        "nepPage": "300",
        "hgabPage": "240",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Columbio - Lutayan - Koronadal Road, Sta.13+369 - Sta.13+663, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-20467",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "region": "Region XII",
      "amount_2027": 255780000,
      "comparison_year": 2020,
      "prior_project": "Columbio - Lutayan - Koronadal Road, Sultan Kudarat",
      "prior_amount": 77750000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 513186",
      "similarity_pct": 100,
      "current_chainage": "13+369.00–13+663.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20467",
        "nepTitle": "Columbio - Lutayan - Koronadal Road, Sta.13+369 - Sta.13+663, Sultan Kudarat",
        "nepPesos": 255780000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0240-002381",
        "hgabTitle": "Columbio - Lutayan - Koronadal Road, Sta.13+369 - Sta.13+663, Sultan Kudarat",
        "hgabPesos": 255780000,
        "nepPage": "300",
        "hgabPage": "240",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Columbio - Lutayan - Koronadal Road, Sta.13+369 - Sta.13+663, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-20467",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "region": "Region XII",
      "amount_2027": 255780000,
      "comparison_year": 2021,
      "prior_project": "Columbio - Lutayan - Koronadal Road, Sultan Kudarat",
      "prior_amount": 32655000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437106",
      "similarity_pct": 100,
      "current_chainage": "13+369.00–13+663.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20467",
        "nepTitle": "Columbio - Lutayan - Koronadal Road, Sta.13+369 - Sta.13+663, Sultan Kudarat",
        "nepPesos": 255780000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0240-002381",
        "hgabTitle": "Columbio - Lutayan - Koronadal Road, Sta.13+369 - Sta.13+663, Sultan Kudarat",
        "hgabPesos": 255780000,
        "nepPage": "300",
        "hgabPage": "240",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Columbio - Lutayan - Koronadal Road, Sta.20+310 - Sta.29+869, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-20475",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "region": "Region XII",
      "amount_2027": 240000000,
      "comparison_year": 2020,
      "prior_project": "Columbio - Lutayan - Koronadal Road, Sultan Kudarat",
      "prior_amount": 77750000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 513186",
      "similarity_pct": 100,
      "current_chainage": "20+310.00–29+869.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20475",
        "nepTitle": "Columbio - Lutayan - Koronadal Road, Sta.20+310 - Sta.29+869, Sultan Kudarat",
        "nepPesos": 240000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0240-002382",
        "hgabTitle": "Columbio - Lutayan - Koronadal Road, Sta.20+310 - Sta.29+869, Sultan Kudarat",
        "hgabPesos": 240000000,
        "nepPage": "300",
        "hgabPage": "240",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Columbio - Lutayan - Koronadal Road, Sta.20+310 - Sta.29+869, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-20475",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "region": "Region XII",
      "amount_2027": 240000000,
      "comparison_year": 2021,
      "prior_project": "Columbio - Lutayan - Koronadal Road, Sultan Kudarat",
      "prior_amount": 32655000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437106",
      "similarity_pct": 100,
      "current_chainage": "20+310.00–29+869.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20475",
        "nepTitle": "Columbio - Lutayan - Koronadal Road, Sta.20+310 - Sta.29+869, Sultan Kudarat",
        "nepPesos": 240000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0240-002382",
        "hgabTitle": "Columbio - Lutayan - Koronadal Road, Sta.20+310 - Sta.29+869, Sultan Kudarat",
        "hgabPesos": 240000000,
        "nepPage": "300",
        "hgabPage": "240",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Barangay Road at Sitio Agnaoan, Barangay Mabuno, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35074",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Sitio Agnaoan, Barangay Mabuno, Gattaran, Cagayan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574696",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35074",
        "nepTitle": "Concreting of Barangay Road at Sitio Agnaoan, Barangay Mabuno, Gattaran, Cagayan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0484-007153",
        "hgabTitle": "Concreting of Barangay Road at Sitio Agnaoan, Barangay Mabuno, Gattaran, Cagayan",
        "hgabPesos": 10000000,
        "nepPage": "475",
        "hgabPage": "484",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Barangay Road at Sitio Rissik, Barangay Mabuno, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35075",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Sitio Rissik, Barangay Mabuno, Gattaran, Cagayan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574695",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35075",
        "nepTitle": "Concreting of Barangay Road at Sitio Rissik, Barangay Mabuno, Gattaran, Cagayan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0484-007154",
        "hgabTitle": "Concreting of Barangay Road at Sitio Rissik, Barangay Mabuno, Gattaran, Cagayan",
        "hgabPesos": 10000000,
        "nepPage": "475",
        "hgabPage": "484",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Barangay Road, Barangay Nabaccayan, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35151",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Concreting of Barangay Road at Brgy. Nabaccayan, Gattaran, Cagayan",
      "prior_amount": 15000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535216",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35151",
        "nepTitle": "Concreting of Barangay Road, Barangay Nabaccayan, Gattaran, Cagayan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0484-007164",
        "hgabTitle": "Concreting of Barangay Road, Barangay Nabaccayan, Gattaran, Cagayan",
        "hgabPesos": 10000000,
        "nepPage": "475",
        "hgabPage": "484",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Barangay Road, Barangay Nassiping, Gattaran, Cagayan",
      "source_code": "2027DPWH-Proposal-35149",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Nassiping, Gattaran, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574701",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35149",
        "nepTitle": "Concreting of Barangay Road, Barangay Nassiping, Gattaran, Cagayan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0484-007165",
        "hgabTitle": "Concreting of Barangay Road, Barangay Nassiping, Gattaran, Cagayan",
        "hgabPesos": 10000000,
        "nepPage": "475",
        "hgabPage": "484",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Barangay Road, Barangay San Isidro, Daet, Camarines Norte",
      "source_code": "2027DPWH-Proposal-39556",
      "office": "Camarines Norte Sub District Engineering Office",
      "region": "Region V",
      "amount_2027": 7500000,
      "comparison_year": 2021,
      "prior_project": "Construction of Barangay Road, Barangay San Isidro, Daet, Camarines Norte",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428707",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Rosemarie Panotes"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39556",
        "nepTitle": "Concreting of Barangay Road, Barangay San Isidro, Daet, Camarines Norte",
        "nepPesos": 7500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0429-006051",
        "hgabTitle": "Concreting of Barangay Road, Barangay San Isidro, Daet, Camarines Norte",
        "hgabPesos": 7500000,
        "nepPage": "444",
        "hgabPage": "429",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Barangay Road, Barangay San Isidro, Daet, Camarines Norte",
      "source_code": "2027DPWH-Proposal-39556",
      "office": "Camarines Norte Sub District Engineering Office",
      "region": "Region V",
      "amount_2027": 7500000,
      "comparison_year": 2017,
      "prior_project": "Construction of Road, Brgy. San Isidro, Daet, Camarines Norte",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307826",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39556",
        "nepTitle": "Concreting of Barangay Road, Barangay San Isidro, Daet, Camarines Norte",
        "nepPesos": 7500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0429-006051",
        "hgabTitle": "Concreting of Barangay Road, Barangay San Isidro, Daet, Camarines Norte",
        "hgabPesos": 7500000,
        "nepPage": "444",
        "hgabPage": "429",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Barangay Road, Barangay San Vicente, Buguey, Cagayan",
      "source_code": "2027DPWH-Proposal-35034",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, San Vicente, Buguey, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551504",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35034",
        "nepTitle": "Concreting of Barangay Road, Barangay San Vicente, Buguey, Cagayan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0485-007168",
        "hgabTitle": "Concreting of Barangay Road, Barangay San Vicente, Buguey, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "475",
        "hgabPage": "485",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Quezon Road, Quezon, San Isidro, Isabela",
      "source_code": "2027DPWH-Proposal-35299",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Brgy. Quezon, San Isidro, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574812",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35299",
        "nepTitle": "Concreting of Quezon Road, Quezon, San Isidro, Isabela",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0497-007433",
        "hgabTitle": "Concreting of Quezon Road, Quezon, San Isidro, Isabela",
        "hgabPesos": 20000000,
        "nepPage": "481",
        "hgabPage": "497",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Quezon Road, Quezon, San Isidro, Isabela",
      "source_code": "2027DPWH-Proposal-35299",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 0+000 - Sta. 0+323, Barangay Quezon, San Isidro, Isabela",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21042",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+323.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35299",
        "nepTitle": "Concreting of Quezon Road, Quezon, San Isidro, Isabela",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0497-007433",
        "hgabTitle": "Concreting of Quezon Road, Quezon, San Isidro, Isabela",
        "hgabPesos": 20000000,
        "nepPage": "481",
        "hgabPage": "497",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road along Barangay Libertad, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35099",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2020,
      "prior_project": "Concreting Barangay Libertad Road, Abulug, Cagayan",
      "prior_amount": 15000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 492454",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35099",
        "nepTitle": "Concreting of Road along Barangay Libertad, Abulug, Cagayan",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0485-007179",
        "hgabTitle": "Concreting of Road along Barangay Libertad, Abulug, Cagayan",
        "hgabPesos": 20000000,
        "nepPage": "476",
        "hgabPage": "485",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road along Barangay Libertad, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-35099",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Concreting Barangay Libertad Road, Abulug, Cagayan",
      "prior_amount": 11550000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 424741",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35099",
        "nepTitle": "Concreting of Road along Barangay Libertad, Abulug, Cagayan",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0485-007179",
        "hgabTitle": "Concreting of Road along Barangay Libertad, Abulug, Cagayan",
        "hgabPesos": 20000000,
        "nepPage": "476",
        "hgabPage": "485",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road in Barangay Santa Cruz, Angat, Bulacan",
      "source_code": "2027DPWH-Proposal-36052",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Santa Cruz, Sta. 00+027 – Sta.00+208; Sta.00+000 – Sta.00+119, Angat, Bulacan",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27098",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+027.00–0+208.00 · 0+000.00–0+119.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36052",
        "nepTitle": "Concreting of Road in Barangay Santa Cruz, Angat, Bulacan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0512-007746",
        "hgabTitle": "Concreting of Road in Barangay Santa Cruz, Angat, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "489",
        "hgabPage": "512",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road of Brgy. Guilingan to Brgy. Tappa, Brgy. Tappa, San Mariano, Isabela",
      "source_code": "2027DPWH-Proposal-00478",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 9603000,
      "comparison_year": 2025,
      "prior_project": "Concreting of Road of Brgy. Guilingan to Brgy. Tappa, Brgy. Tappa, San Mariano, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574770",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-00478",
        "nepTitle": "Concreting of Road of Brgy. Guilingan to Brgy. Tappa, Brgy. Tappa, San Mariano, Isabela",
        "nepPesos": 9603000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0494-007362",
        "hgabTitle": "Concreting of Road of Barangay Guilingan to Barangay Tappa, Barangay Tappa, San Mariano, Isabela",
        "hgabPesos": 9603000,
        "nepPage": "479",
        "hgabPage": "494",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Antipolo, Baao, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39520",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Improvement of Road, Barangay Antipolo, Baao, Camarines Sur",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527224",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39520",
        "nepTitle": "Concreting of Road, Barangay Antipolo, Baao, Camarines Sur",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0563-008862",
        "hgabTitle": "Concreting of Road, Barangay Antipolo, Baao, Camarines Sur",
        "hgabPesos": 15000000,
        "nepPage": "521",
        "hgabPage": "563",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Bimonton, Mallig, Isabela",
      "source_code": "2027DPWH-Proposal-34900",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Bimonton, Mallig, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551555",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34900",
        "nepTitle": "Concreting of Road, Barangay Bimonton, Mallig, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0492-007307",
        "hgabTitle": "Concreting of Road, Barangay Bimonton, Mallig, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "478",
        "hgabPage": "492",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Bojo, Aloguinsan, Cebu",
      "source_code": "2027DPWH-Proposal-37831",
      "office": "Cebu 3rd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Road Concreting, Bojo, Aloguinsan, Cebu",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 492814",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37831",
        "nepTitle": "Concreting of Road, Barangay Bojo, Aloguinsan, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0585-009344",
        "hgabTitle": "Concreting of Road, Barangay Bojo, Aloguinsan, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "535",
        "hgabPage": "585",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Bojo, Aloguinsan, Cebu",
      "source_code": "2027DPWH-Proposal-37831",
      "office": "Cebu 3rd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road in Barangay Bojo, Aloguinsan, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 536443",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37831",
        "nepTitle": "Concreting of Road, Barangay Bojo, Aloguinsan, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0585-009344",
        "hgabTitle": "Concreting of Road, Barangay Bojo, Aloguinsan, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "535",
        "hgabPage": "585",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Bojo, Aloguinsan, Cebu",
      "source_code": "2027DPWH-Proposal-37831",
      "office": "Cebu 3rd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road in Barangay Bojo, Aloguinsan, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 550209",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37831",
        "nepTitle": "Concreting of Road, Barangay Bojo, Aloguinsan, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0585-009344",
        "hgabTitle": "Concreting of Road, Barangay Bojo, Aloguinsan, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "535",
        "hgabPage": "585",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Bojo, Aloguinsan, Cebu",
      "source_code": "2027DPWH-Proposal-37831",
      "office": "Cebu 3rd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Brgy. Bojo, Aloguinsan, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117204523000 · PDF p. 1345 · printed p. 2810",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37831",
        "nepTitle": "Concreting of Road, Barangay Bojo, Aloguinsan, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0585-009344",
        "hgabTitle": "Concreting of Road, Barangay Bojo, Aloguinsan, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "535",
        "hgabPage": "585",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Cabadiangan, Alcantara, Cebu",
      "source_code": "2027DPWH-Proposal-37817",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Road Concreting at Brgy. Cabadiangan, Alcantara, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 500147",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Patricia Calderon"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37817",
        "nepTitle": "Concreting of Road, Barangay Cabadiangan, Alcantara, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0588-009413",
        "hgabTitle": "Concreting of Road, Barangay Cabadiangan, Alcantara, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "537",
        "hgabPage": "588",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Cabadiangan, Alcantara, Cebu",
      "source_code": "2027DPWH-Proposal-37817",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2016,
      "prior_project": "Concreting of Roads, Cabadiangan Road, Barangay Cabadiangan, Alcantara, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050305619",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37817",
        "nepTitle": "Concreting of Road, Barangay Cabadiangan, Alcantara, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0588-009413",
        "hgabTitle": "Concreting of Road, Barangay Cabadiangan, Alcantara, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "537",
        "hgabPage": "588",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Cabadiangan, Alcantara, Cebu",
      "source_code": "2027DPWH-Proposal-37817",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Roads, Cabadiangan Road, Barangay Cabadiangan, Alcantara, Cebu",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050305619",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37817",
        "nepTitle": "Concreting of Road, Barangay Cabadiangan, Alcantara, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0588-009413",
        "hgabTitle": "Concreting of Road, Barangay Cabadiangan, Alcantara, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "537",
        "hgabPage": "588",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Capitan Claudio, Toledo City, Cebu",
      "source_code": "2027DPWH-Proposal-37834",
      "office": "Cebu 3rd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road in Barangay Capitan Claudio, Toledo City, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552690",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Karen Flores-Garcia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37834",
        "nepTitle": "Concreting of Road, Barangay Capitan Claudio, Toledo City, Cebu",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0585-009346",
        "hgabTitle": "Concreting of Road, Barangay Capitan Claudio, Toledo City, Cebu",
        "hgabPesos": 10000000,
        "nepPage": "535",
        "hgabPage": "585",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Curva, Medellin, Cebu",
      "source_code": "2027DPWH-Proposal-37839",
      "office": "Cebu 4th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Curva, Medellin, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 528191",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37839",
        "nepTitle": "Concreting of Road, Barangay Curva, Medellin, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0586-009352",
        "hgabTitle": "Concreting of Road, Barangay Curva, Medellin, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "535",
        "hgabPage": "586",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay De La Fe and Barangay Salvacion, Buhi, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39514",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 50000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay De La Fe - Barangay Salvacion, Buhi, Camarines Sur, Sta. 1+449.00 - Sta. 2+734.00",
      "prior_amount": 48812000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27929",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "1+449.00–2+734.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39514",
        "nepTitle": "Concreting of Road, Barangay De La Fe and Barangay Salvacion, Buhi, Camarines Sur",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0563-008863",
        "hgabTitle": "Concreting of Road, Barangay De La Fe and Barangay Salvacion, Buhi, Camarines Sur",
        "hgabPesos": 50000000,
        "nepPage": "521",
        "hgabPage": "563",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Ipil, Carmen, Cebu",
      "source_code": "2027DPWH-Proposal-37849",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Ipil, Carmen, Cebu",
      "prior_amount": 10000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552726",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37849",
        "nepTitle": "Concreting of Road, Barangay Ipil, Carmen, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0586-009364",
        "hgabTitle": "Concreting of Road, Barangay Ipil, Carmen, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "536",
        "hgabPage": "586",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Kaluangan, Asturias, Cebu",
      "source_code": "2027DPWH-Proposal-37832",
      "office": "Cebu 3rd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Road Concreting at Brgy Kaluangan, Asturias, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050308165",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37832",
        "nepTitle": "Concreting of Road, Barangay Kaluangan, Asturias, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0585-009347",
        "hgabTitle": "Concreting of Road, Barangay Kaluangan, Asturias, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "535",
        "hgabPage": "585",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Kawasan, Aloguinsan, Cebu",
      "source_code": "2027DPWH-Proposal-37806",
      "office": "Cebu 3rd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road in Barangay Kawasan, Aloguinsan, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 536444",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37806",
        "nepTitle": "Concreting of Road, Barangay Kawasan, Aloguinsan, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0585-009348",
        "hgabTitle": "Concreting of Road, Barangay Kawasan, Aloguinsan, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "535",
        "hgabPage": "585",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Kawasan, Aloguinsan, Cebu",
      "source_code": "2027DPWH-Proposal-37806",
      "office": "Cebu 3rd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road in Barangay Kawasan, Aloguinsan, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 550210",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37806",
        "nepTitle": "Concreting of Road, Barangay Kawasan, Aloguinsan, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0585-009348",
        "hgabTitle": "Concreting of Road, Barangay Kawasan, Aloguinsan, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "535",
        "hgabPage": "585",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Kawasan, Aloguinsan, Cebu",
      "source_code": "2027DPWH-Proposal-37806",
      "office": "Cebu 3rd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Kawasan, Aloguinsan, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575676",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37806",
        "nepTitle": "Concreting of Road, Barangay Kawasan, Aloguinsan, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0585-009348",
        "hgabTitle": "Concreting of Road, Barangay Kawasan, Aloguinsan, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "535",
        "hgabPage": "585",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Kawasan, Aloguinsan, Cebu",
      "source_code": "2027DPWH-Proposal-37806",
      "office": "Cebu 3rd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Kawasan (Sta. 0+000 - 0+300), Aloguinsan, Cebu\t\n",
      "prior_amount": 4845000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 28394",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+300.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37806",
        "nepTitle": "Concreting of Road, Barangay Kawasan, Aloguinsan, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0585-009348",
        "hgabTitle": "Concreting of Road, Barangay Kawasan, Aloguinsan, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "535",
        "hgabPage": "585",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Lupa, Compostela, Cebu",
      "source_code": "2027DPWH-Proposal-37816",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Lupa, Compostela, Cebu",
      "prior_amount": 20000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540723",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Duke Frasco"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37816",
        "nepTitle": "Concreting of Road, Barangay Lupa, Compostela, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0586-009365",
        "hgabTitle": "Concreting of Road, Barangay Lupa, Compostela, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "536",
        "hgabPage": "586",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Manga, Alcantara, Cebu",
      "source_code": "2027DPWH-Proposal-37850",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2016,
      "prior_project": "Construction of Barangay Road along Barangay Manga, Alcantara, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050305615",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37850",
        "nepTitle": "Concreting of Road, Barangay Manga, Alcantara, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0588-009415",
        "hgabTitle": "Concreting of Road, Barangay Manga, Alcantara, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "537",
        "hgabPage": "588",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Manga, Alcantara, Cebu",
      "source_code": "2027DPWH-Proposal-37850",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Barangay Road along Barangay Manga, Alcantara, Cebu",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050305615",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37850",
        "nepTitle": "Concreting of Road, Barangay Manga, Alcantara, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0588-009415",
        "hgabTitle": "Concreting of Road, Barangay Manga, Alcantara, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "537",
        "hgabPage": "588",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Manga, Alcantara, Cebu",
      "source_code": "2027DPWH-Proposal-37850",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation of Road, Brgy. Manga, Alcantara, Cebu",
      "prior_amount": 2500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201763000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37850",
        "nepTitle": "Concreting of Road, Barangay Manga, Alcantara, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0588-009415",
        "hgabTitle": "Concreting of Road, Barangay Manga, Alcantara, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "537",
        "hgabPage": "588",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Maya, Daanbantayan, Cebu",
      "source_code": "2027DPWH-Proposal-37837",
      "office": "Cebu 4th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Maya, Daanbantayan, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 536420",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37837",
        "nepTitle": "Concreting of Road, Barangay Maya, Daanbantayan, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0586-009355",
        "hgabTitle": "Concreting of Road, Barangay Maya, Daanbantayan, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "535",
        "hgabPage": "586",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Minagbag, Quezon, Isabela",
      "source_code": "2027DPWH-Proposal-34905",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Minagbag, Quezon, Isabela",
      "prior_amount": 6000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540327",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34905",
        "nepTitle": "Concreting of Road, Barangay Minagbag, Quezon, Isabela",
        "nepPesos": 6000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0492-007320",
        "hgabTitle": "Concreting of Road, Barangay Minagbag, Quezon, Isabela",
        "hgabPesos": 6000000,
        "nepPage": "478",
        "hgabPage": "492",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Poblacion, Tabuelan, Cebu",
      "source_code": "2027DPWH-Proposal-37840",
      "office": "Cebu 4th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Poblacion, Sta. 000+000 - Sta. 000+175, Tabuelan, Cebu",
      "prior_amount": 4849000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 28445",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+175.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37840",
        "nepTitle": "Concreting of Road, Barangay Poblacion, Tabuelan, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0586-009357",
        "hgabTitle": "Concreting of Road, Barangay Poblacion, Tabuelan, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "535",
        "hgabPage": "586",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Puertobello, Tudela, Cebu",
      "source_code": "2027DPWH-Proposal-37848",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Puertobello, Tudela, Cebu",
      "prior_amount": 20000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540724",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37848",
        "nepTitle": "Concreting of Road, Barangay Puertobello, Tudela, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0586-009367",
        "hgabTitle": "Concreting of Road, Barangay Puertobello, Tudela, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "536",
        "hgabPage": "586",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay San Antonio, Roxas, Isabela",
      "source_code": "2027DPWH-Proposal-35371",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 30000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. San Antonio, Roxas, Isabela",
      "prior_amount": 20000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 498968",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35371",
        "nepTitle": "Concreting of Road, Barangay San Antonio, Roxas, Isabela",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0492-007322",
        "hgabTitle": "Concreting of Road, Barangay San Antonio, Roxas, Isabela",
        "hgabPesos": 30000000,
        "nepPage": "478",
        "hgabPage": "492",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay San Antonio, Roxas, Isabela",
      "source_code": "2027DPWH-Proposal-35371",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 30000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Brgy. San Antonio, Roxas, Isabela",
      "prior_amount": 15400000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 426516",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35371",
        "nepTitle": "Concreting of Road, Barangay San Antonio, Roxas, Isabela",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0492-007322",
        "hgabTitle": "Concreting of Road, Barangay San Antonio, Roxas, Isabela",
        "hgabPesos": 30000000,
        "nepPage": "478",
        "hgabPage": "492",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay San Francisco - Barangay Sta. Eulalia, Baao, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39515",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 80000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Sta. Eulalia to Barangay San Francisco, Baao, Camarines Sur",
      "prior_amount": 80000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 527358",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39515",
        "nepTitle": "Concreting of Road, Barangay San Francisco - Barangay Sta. Eulalia, Baao, Camarines Sur",
        "nepPesos": 80000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0430-006063",
        "hgabTitle": "Concreting of Road, Barangay San Francisco - Barangay Sta. Eulalia, Baao, Camarines Sur",
        "hgabPesos": 80000000,
        "nepPage": "444",
        "hgabPage": "430",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay San Francisco - Barangay Sta. Eulalia, Baao, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39515",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 80000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Sta. Eulalia - Barangay San Francisco, Baao, Camarines Sur",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551038",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39515",
        "nepTitle": "Concreting of Road, Barangay San Francisco - Barangay Sta. Eulalia, Baao, Camarines Sur",
        "nepPesos": 80000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0430-006063",
        "hgabTitle": "Concreting of Road, Barangay San Francisco - Barangay Sta. Eulalia, Baao, Camarines Sur",
        "hgabPesos": 80000000,
        "nepPage": "444",
        "hgabPage": "430",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay San Jose, Quirino, Isabela",
      "source_code": "2027DPWH-Proposal-34913",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay San Jose, Quirino, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574759",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34913",
        "nepTitle": "Concreting of Road, Barangay San Jose, Quirino, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0492-007325",
        "hgabTitle": "Concreting of Road, Barangay San Jose, Quirino, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "478",
        "hgabPage": "492",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay San Miguel, Luna, Isabela",
      "source_code": "2027DPWH-Proposal-34891",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Barangay San Miguel, Luna, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 425684",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34891",
        "nepTitle": "Concreting of Road, Barangay San Miguel, Luna, Isabela",
        "nepPesos": 6000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay San Vicente, Quirino, Isabela",
      "source_code": "2027DPWH-Proposal-34912",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay San Vicente, Quirino, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551553",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34912",
        "nepTitle": "Concreting of Road, Barangay San Vicente, Quirino, Isabela",
        "nepPesos": 6000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0492-007327",
        "hgabTitle": "Concreting of Road, Barangay San Vicente, Quirino, Isabela",
        "hgabPesos": 6000000,
        "nepPage": "478",
        "hgabPage": "492",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Barangay Tulang, Argao, Cebu",
      "source_code": "2027DPWH-Proposal-37827",
      "office": "Cebu 2nd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Tulang, Argao, Cebu, Sta 0+000 - Sta 0+318\t\n",
      "prior_amount": 4845000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 28365",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+318.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37827",
        "nepTitle": "Concreting of Road, Barangay Tulang, Argao, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0584-009315",
        "hgabTitle": "Concreting of Road, Barangay Tulang, Argao, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "534",
        "hgabPage": "584",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, North Poblacion, San Fernando, Cebu",
      "source_code": "2027DPWH-Proposal-37765",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Concreting of Road, North Poblacion, San Fernando, Cebu",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 536425",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37765",
        "nepTitle": "Concreting of Road, North Poblacion, San Fernando, Cebu",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0583-009301",
        "hgabTitle": "Concreting of Road, North Poblacion, San Fernando, Cebu",
        "hgabPesos": 10000000,
        "nepPage": "534",
        "hgabPage": "583",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, North Poblacion, San Fernando, Cebu",
      "source_code": "2027DPWH-Proposal-37765",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay North Poblacion, San Fernando, Cebu",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574274",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37765",
        "nepTitle": "Concreting of Road, North Poblacion, San Fernando, Cebu",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0583-009301",
        "hgabTitle": "Concreting of Road, North Poblacion, San Fernando, Cebu",
        "hgabPesos": 10000000,
        "nepPage": "534",
        "hgabPage": "583",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Road, Padada, Davao del Sur",
      "source_code": "2027DPWH-Proposal-38527",
      "office": "Davao del Sur District Engineering Office",
      "region": "Region XI",
      "amount_2027": 40000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Padada, Davao del Sur",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 553179",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38527",
        "nepTitle": "Concreting of Road, Padada, Davao del Sur",
        "nepPesos": 40000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Tomonoy-Agbalanga Road at Barangay Tomonoy and Agbalanga, Moalboal, Cebu",
      "source_code": "2027DPWH-Proposal-37686",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 7000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Tomonoy-Agbalanga Road, Brgy. Tomonoy & Agbalanga, Moalboal, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 492836",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37686",
        "nepTitle": "Concreting of Tomonoy-Agbalanga Road at Barangay Tomonoy and Agbalanga, Moalboal, Cebu",
        "nepPesos": 7000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0589-009424",
        "hgabTitle": "Concreting of Tomonoy-Agbalanga Road at Barangay Tomonoy and Agbalanga, Moalboal, Cebu",
        "hgabPesos": 7000000,
        "nepPage": "538",
        "hgabPage": "589",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Tomonoy-Agbalanga Road at Barangay Tomonoy and Agbalanga, Moalboal, Cebu",
      "source_code": "2027DPWH-Proposal-37686",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 7000000,
      "comparison_year": 2024,
      "prior_project": "Improvement of Tomonoy - Agbalanga Road at Barangay Tomonoy, Moalboal, Cebu",
      "prior_amount": 7500000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552778",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37686",
        "nepTitle": "Concreting of Tomonoy-Agbalanga Road at Barangay Tomonoy and Agbalanga, Moalboal, Cebu",
        "nepPesos": 7000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0589-009424",
        "hgabTitle": "Concreting of Tomonoy-Agbalanga Road at Barangay Tomonoy and Agbalanga, Moalboal, Cebu",
        "hgabPesos": 7000000,
        "nepPage": "538",
        "hgabPage": "589",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Villaflor Road, Villaflor, San Isidro, Isabela",
      "source_code": "2027DPWH-Proposal-35300",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 15000000,
      "comparison_year": 2021,
      "prior_project": "Road Concreting, Barangay Villaflor, San Isidro, Isabela",
      "prior_amount": 15000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427810",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35300",
        "nepTitle": "Concreting of Villaflor Road, Villaflor, San Isidro, Isabela",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0497-007435",
        "hgabTitle": "Concreting of Villaflor Road, Villaflor, San Isidro, Isabela",
        "hgabPesos": 15000000,
        "nepPage": "481",
        "hgabPage": "497",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Villaflor Road, Villaflor, San Isidro, Isabela",
      "source_code": "2027DPWH-Proposal-35300",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 15000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Villaflor, San Isidro, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551608",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35300",
        "nepTitle": "Concreting of Villaflor Road, Villaflor, San Isidro, Isabela",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0497-007435",
        "hgabTitle": "Concreting of Villaflor Road, Villaflor, San Isidro, Isabela",
        "hgabPesos": 15000000,
        "nepPage": "481",
        "hgabPage": "497",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Villaflor Road, Villaflor, San Isidro, Isabela",
      "source_code": "2027DPWH-Proposal-35300",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 0+000 - Sta. 0+646, Barangay Villaflor, San Isidro, Isabela",
      "prior_amount": 9800000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21036",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+646.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35300",
        "nepTitle": "Concreting of Villaflor Road, Villaflor, San Isidro, Isabela",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0497-007435",
        "hgabTitle": "Concreting of Villaflor Road, Villaflor, San Isidro, Isabela",
        "hgabPesos": 15000000,
        "nepPage": "481",
        "hgabPage": "497",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Access Road leading to Sitio of Pines, Tubaday, Santol, La Union",
      "source_code": "2027DPWH-Proposal-33546",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 75000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Access Road leading to Sitio of Pines, Tubaday, Santol, La Union",
      "prior_amount": 20000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 529704",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33546",
        "nepTitle": "Construction of Access Road leading to Sitio of Pines, Tubaday, Santol, La Union",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0414-005727",
        "hgabTitle": "Construction of Access Road leading to Sitio of Pines, Tubaday, Santol, La Union",
        "hgabPesos": 75000000,
        "nepPage": "434",
        "hgabPage": "414",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Access Road leading to Sitio of Pines, Tubaday, Santol, La Union",
      "source_code": "2027DPWH-Proposal-33546",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 75000000,
      "comparison_year": 2025,
      "prior_project": "Access Road leading to Sitio of Pines, Tubaday, Santol, La Union",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 546117",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33546",
        "nepTitle": "Construction of Access Road leading to Sitio of Pines, Tubaday, Santol, La Union",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0414-005727",
        "hgabTitle": "Construction of Access Road leading to Sitio of Pines, Tubaday, Santol, La Union",
        "hgabPesos": 75000000,
        "nepPage": "434",
        "hgabPage": "414",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Access Road leading to Sitio of Pines, Tubaday, Santol, La Union",
      "source_code": "2027DPWH-Proposal-33546",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 75000000,
      "comparison_year": 2026,
      "prior_project": "Access Road leading to Sitio of Pines, Tubaday, Santol, La Union, Sta. 0+100 - Sta 0+225",
      "prior_amount": 4350000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 16161",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+100.00–0+225.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33546",
        "nepTitle": "Construction of Access Road leading to Sitio of Pines, Tubaday, Santol, La Union",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0414-005727",
        "hgabTitle": "Construction of Access Road leading to Sitio of Pines, Tubaday, Santol, La Union",
        "hgabPesos": 75000000,
        "nepPage": "434",
        "hgabPage": "414",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Andabuen-Ara-Capuseran Road, Barangay Andabuen-Ara-Capuseran, Benito Soliven, Isabela",
      "source_code": "2027DPWH-Proposal-35376",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Barangay Andabuen Road, Barangay Ara to Brgy. Capuseran, Benito Soliven, Isabela",
      "prior_amount": 20000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 498994",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35376",
        "nepTitle": "Construction of Andabuen-Ara-Capuseran Road, Barangay Andabuen-Ara-Capuseran, Benito Soliven, Isabela",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0496-007397",
        "hgabTitle": "Construction of Andabuen-Ara-Capuseran Road, Barangay Andabuen-Ara-Capuseran, Benito Soliven, Isabela",
        "hgabPesos": 50000000,
        "nepPage": "480",
        "hgabPage": "496",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Andabuen-Ara-Capuseran Road, Barangay Andabuen-Ara-Capuseran, Benito Soliven, Isabela",
      "source_code": "2027DPWH-Proposal-35376",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Barangay Andabuen Road, Barangay Ara to Brgy. Capuseran, Benito Soliven, Isabela",
      "prior_amount": 15400000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 426528",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35376",
        "nepTitle": "Construction of Andabuen-Ara-Capuseran Road, Barangay Andabuen-Ara-Capuseran, Benito Soliven, Isabela",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0496-007397",
        "hgabTitle": "Construction of Andabuen-Ara-Capuseran Road, Barangay Andabuen-Ara-Capuseran, Benito Soliven, Isabela",
        "hgabPesos": 50000000,
        "nepPage": "480",
        "hgabPage": "496",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Apao, Tineg - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub, Abra",
      "source_code": "2027DPWH-Proposal-34778",
      "office": "Abra District Engineering Office",
      "region": "CAR",
      "amount_2027": 144039000,
      "comparison_year": 2022,
      "prior_project": "Construction of Apao - Lan - ag Road, Tineg/Lacub, Abra",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 521978",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–5+000.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34778",
        "nepTitle": "Construction of Apao, Tineg - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub, Abra",
        "nepPesos": 144039000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0416-005778",
        "hgabTitle": "Construction of Apao, Tineg - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub, Abra",
        "hgabPesos": 144039000,
        "nepPage": "435",
        "hgabPage": "416",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Bacag - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub Abra",
      "source_code": "2027DPWH-Proposal-34779",
      "office": "Abra District Engineering Office",
      "region": "CAR",
      "amount_2027": 142837000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Bacag-Lan-ag Road, Lacub, Abra",
      "prior_amount": 85000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 527137",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–5+000.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34779",
        "nepTitle": "Construction of Bacag - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub Abra",
        "nepPesos": 142837000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0416-005779",
        "hgabTitle": "Construction of Bacag - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub Abra",
        "hgabPesos": 142837000,
        "nepPage": "435",
        "hgabPage": "416",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Bacawan-Buhay na Tubig-Calima Road, Pola, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-05775",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 120000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Bacawan - Buhay na Tubig - Calima Road, Pola, Oriental Mindoro",
      "prior_amount": 300000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 539621",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-05775",
        "nepTitle": "Construction of Bacawan-Buhay na Tubig-Calima Road, Pola, Oriental Mindoro",
        "nepPesos": 120000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0428-006013",
        "hgabTitle": "Construction of Bacawan-Buhay na Tubig-Calima Road, Pola, Oriental Mindoro",
        "hgabPesos": 120000000,
        "nepPage": "442",
        "hgabPage": "428",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Bagong Buhay Road, Naujan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-23281",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Concreting of Road,  Sta.0+000 - Sta.0+346.5, Brgy. Bagong Buhay, Naujan, Oriental Mindoro",
      "prior_amount": 4811000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 22301",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+346.50",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23281",
        "nepTitle": "Construction of Bagong Buhay Road, Naujan, Oriental Mindoro",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0552-008616",
        "hgabTitle": "Construction of Bagong Buhay Road, Naujan, Oriental Mindoro",
        "hgabPesos": 30000000,
        "nepPage": "514",
        "hgabPage": "552",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Barangay Mongol to Barangay Talboc Access Road, Mongol, Mayoyao, Ifugao",
      "source_code": "2027DPWH-Proposal-34634",
      "office": "Ifugao 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 40000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Mongol to Talboc Access Road, Mongol, Mayoyao, Ifugao",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 537441",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34634",
        "nepTitle": "Construction of Barangay Mongol to Barangay Talboc Access Road, Mongol, Mayoyao, Ifugao",
        "nepPesos": 40000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0479-007031",
        "hgabTitle": "Construction of Barangay Mongol to Barangay Talboc Access Road, Mongol, Mayoyao, Ifugao",
        "hgabPesos": 40000000,
        "nepPage": "471",
        "hgabPage": "479",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Barangay Mongol to Barangay Talboc Access Road, Mongol, Mayoyao, Ifugao",
      "source_code": "2027DPWH-Proposal-34634",
      "office": "Ifugao 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 40000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Mongol - Talboc Access Road, Barangay Mongol, Mayoyao, Ifugao",
      "prior_amount": 10000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 553536",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34634",
        "nepTitle": "Construction of Barangay Mongol to Barangay Talboc Access Road, Mongol, Mayoyao, Ifugao",
        "nepPesos": 40000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0479-007031",
        "hgabTitle": "Construction of Barangay Mongol to Barangay Talboc Access Road, Mongol, Mayoyao, Ifugao",
        "hgabPesos": 40000000,
        "nepPage": "471",
        "hgabPage": "479",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Barangay Nalbu Access Road, Nalbu, Mayoyao, Ifugao",
      "source_code": "2027DPWH-Proposal-34633",
      "office": "Ifugao 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Nalbu Access Road, Nalbu, Mayoyao, Ifugao",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574647",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34633",
        "nepTitle": "Construction of Barangay Nalbu Access Road, Nalbu, Mayoyao, Ifugao",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0479-007033",
        "hgabTitle": "Construction of Barangay Nalbu Access Road, Nalbu, Mayoyao, Ifugao",
        "hgabPesos": 5000000,
        "nepPage": "471",
        "hgabPage": "479",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Barangay Road at Barangay Marawoy, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33853",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Road Rehabilitation and Improvement - Marawoy, Lipa City, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428417",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33853",
        "nepTitle": "Construction of Barangay Road at Barangay Marawoy, Lipa City, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0540-008355",
        "hgabTitle": "Construction of Barangay Road at Barangay Marawoy, Lipa City, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "507",
        "hgabPage": "540",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Barangay Road at Barangay Marawoy, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33853",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Construction/Repair/Rehabilitation of Road, Brgy. Marawoy, Lipa City, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306522",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33853",
        "nepTitle": "Construction of Barangay Road at Barangay Marawoy, Lipa City, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0540-008355",
        "hgabTitle": "Construction of Barangay Road at Barangay Marawoy, Lipa City, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "507",
        "hgabPage": "540",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Barangay Road at Barangay Marawoy, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33853",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Road, Barangay Marawoy, Lipa City, Batangas",
      "prior_amount": 20000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200795000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33853",
        "nepTitle": "Construction of Barangay Road at Barangay Marawoy, Lipa City, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0540-008355",
        "hgabTitle": "Construction of Barangay Road at Barangay Marawoy, Lipa City, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "507",
        "hgabPage": "540",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Barangay Road, Barangay Estrella, San Mateo, Isabela",
      "source_code": "2027DPWH-Proposal-35318",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Concreting of Road, Barangay Estrella, San Mateo, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 20889",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35318",
        "nepTitle": "Construction of Barangay Road, Barangay Estrella, San Mateo, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0496-007401",
        "hgabTitle": "Construction of Barangay Road, Barangay Estrella, San Mateo, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "480",
        "hgabPage": "496",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Barangay Road, Barangay Lugui, Labo, Camarines Norte",
      "source_code": "2027DPWH-Proposal-39504",
      "office": "Camarines Norte District Engineering Office",
      "region": "Region V",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Lugui, Labo, Camarines Norte",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 536086",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Josefina Tallado"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39504",
        "nepTitle": "Construction of Barangay Road, Barangay Lugui, Labo, Camarines Norte",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0559-008781",
        "hgabTitle": "Construction of Barangay Road, Barangay Lugui, Labo, Camarines Norte",
        "hgabPesos": 30000000,
        "nepPage": "519",
        "hgabPage": "559",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Barangay Road, Barangay Minallo, Naguilian, Isabela",
      "source_code": "2027DPWH-Proposal-35311",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Barangay Minallo, Naguilian, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427769",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35311",
        "nepTitle": "Construction of Barangay Road, Barangay Minallo, Naguilian, Isabela",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0496-007402",
        "hgabTitle": "Construction of Barangay Road, Barangay Minallo, Naguilian, Isabela",
        "hgabPesos": 20000000,
        "nepPage": "480",
        "hgabPage": "496",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Barangay Road, Barangay Minallo, Naguilian, Isabela",
      "source_code": "2027DPWH-Proposal-35311",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road of Brgy. Minallo, Naguilian, Isabela",
      "prior_amount": 8000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574771",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35311",
        "nepTitle": "Construction of Barangay Road, Barangay Minallo, Naguilian, Isabela",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0496-007402",
        "hgabTitle": "Construction of Barangay Road, Barangay Minallo, Naguilian, Isabela",
        "hgabPesos": 20000000,
        "nepPage": "480",
        "hgabPage": "496",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Barangay Road, Barangay Rang-ayan, Naguilian, Isabela",
      "source_code": "2027DPWH-Proposal-35312",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Brgy. Rang-ayan, Naguilian, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117202986000 · PDF p. 1253 · printed p. 2718",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35312",
        "nepTitle": "Construction of Barangay Road, Barangay Rang-ayan, Naguilian, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0496-007403",
        "hgabTitle": "Construction of Barangay Road, Barangay Rang-ayan, Naguilian, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "480",
        "hgabPage": "496",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Barangay Road, Barangay Villa Belen, Capalonga, Camarines Norte",
      "source_code": "2027DPWH-Proposal-39502",
      "office": "Camarines Norte District Engineering Office",
      "region": "Region V",
      "amount_2027": 30000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. Villa Belen, Capalonga, Camarines Norte",
      "prior_amount": 10000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499769",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39502",
        "nepTitle": "Construction of Barangay Road, Barangay Villa Belen, Capalonga, Camarines Norte",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0559-008784",
        "hgabTitle": "Construction of Barangay Road, Barangay Villa Belen, Capalonga, Camarines Norte",
        "hgabPesos": 30000000,
        "nepPage": "519",
        "hgabPage": "559",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Barangay Road, Barangay Villa Cruz, San Mateo, Isabela",
      "source_code": "2027DPWH-Proposal-35315",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Villa Cruz, San Mateo, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535316",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35315",
        "nepTitle": "Construction of Barangay Road, Barangay Villa Cruz, San Mateo, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0496-007406",
        "hgabTitle": "Construction of Barangay Road, Barangay Villa Cruz, San Mateo, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "480",
        "hgabPage": "496",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Barangay Road, Guilingan to Tappa, Barangay Guilingan, Benito Soliven, Isabela",
      "source_code": "2027DPWH-Proposal-00473",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 9795000,
      "comparison_year": 2025,
      "prior_project": "Construction of Barangay Road, Guilingan to Tappa, Barangay Guilingan, Benito Soliven, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560342",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-00473",
        "nepTitle": "Construction of Barangay Road, Guilingan to Tappa, Barangay Guilingan, Benito Soliven, Isabela",
        "nepPesos": 9795000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0496-007409",
        "hgabTitle": "Construction of Barangay Road, Guilingan to Tappa, Barangay Guilingan, Benito Soliven, Isabela",
        "hgabPesos": 9795000,
        "nepPage": "480",
        "hgabPage": "496",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Barangay Road, Tulay na Lupa, Labo, Camarines Norte",
      "source_code": "2027DPWH-Proposal-39499",
      "office": "Camarines Norte District Engineering Office",
      "region": "Region V",
      "amount_2027": 40000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road at Barangay Tulay na Lupa, Labo, Camarines Norte",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575384",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Josefina Tallado"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39499",
        "nepTitle": "Construction of Barangay Road, Tulay na Lupa, Labo, Camarines Norte",
        "nepPesos": 40000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0559-008786",
        "hgabTitle": "Construction of Barangay Road, Tulay na Lupa, Labo, Camarines Norte",
        "hgabPesos": 40000000,
        "nepPage": "519",
        "hgabPage": "559",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Cag-abaca - Cularima - General Malvar Road, Sta. 002+584.50 - Sta. 002+972, Catarman, Northern Samar",
      "source_code": "2027DPWH-Proposal-02647",
      "office": "Northern Samar 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 60000000,
      "comparison_year": 2021,
      "prior_project": "Construction/ Improvement Of Cag-Abaca - Cularima Road - General Malvar Road, Catarman Northern Samar",
      "prior_amount": 50000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 432867",
      "similarity_pct": 100,
      "current_chainage": "2+584.50–2+972.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Niko Raul Daza"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02647",
        "nepTitle": "Construction of Cag-abaca - Cularima - General Malvar Road, Sta. 002+584.50 - Sta. 002+972, Catarman, Northern Samar",
        "nepPesos": 60000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0435-006162",
        "hgabTitle": "Construction of Cag-abaca - Cularima - General Malvar Road, Sta. 002+584.50 - Sta. 002+972, Catarman, Northern Samar",
        "hgabPesos": 60000000,
        "nepPage": "448",
        "hgabPage": "435",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Cag-abaca - Cularima - General Malvar Road, Sta. 002+584.50 - Sta. 002+972, Catarman, Northern Samar",
      "source_code": "2027DPWH-Proposal-02647",
      "office": "Northern Samar 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 60000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Cag-abaca - Cularima - General Malvar Road, Catarman, Northern Samar",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574334",
      "similarity_pct": 100,
      "current_chainage": "2+584.50–2+972.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Niko Raul Daza"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02647",
        "nepTitle": "Construction of Cag-abaca - Cularima - General Malvar Road, Sta. 002+584.50 - Sta. 002+972, Catarman, Northern Samar",
        "nepPesos": 60000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0435-006162",
        "hgabTitle": "Construction of Cag-abaca - Cularima - General Malvar Road, Sta. 002+584.50 - Sta. 002+972, Catarman, Northern Samar",
        "hgabPesos": 60000000,
        "nepPage": "448",
        "hgabPage": "435",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Camiling - Bayambang Diversion Road (Segment 2), Camiling, Tarlac",
      "source_code": "2027DPWH-Proposal-00630",
      "office": "Tarlac District Engineering Office",
      "region": "Region III",
      "amount_2027": 13500000,
      "comparison_year": 2025,
      "prior_project": "Construction of Camiling - Bayambang Diversion Road (Segment 2), Camiling, Tarlac",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 558856",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "same tranche",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-00630",
        "nepTitle": "Construction of Camiling - Bayambang Diversion Road (Segment 2), Camiling, Tarlac",
        "nepPesos": 13500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0534-008214",
        "hgabTitle": "Construction of Camiling - Bayambang Diversion Road (Segment 2), Camiling, Tarlac",
        "hgabPesos": 13500000,
        "nepPage": "502",
        "hgabPage": "534",
        "chainageStatus": "not stated",
        "trancheStatus": "same tranche",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Canubing I - Balingayan Road, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-33527",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Concreting of Balingayan - Canubing I Road, Calapan City, Oriental Mindoro",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 527967",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33527",
        "nepTitle": "Construction of Canubing I - Balingayan Road, City of Calapan, Oriental Mindoro",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0552-008617",
        "hgabTitle": "Construction of Canubing I - Balingayan Road, City of Calapan, Oriental Mindoro",
        "hgabPesos": 30000000,
        "nepPage": "514",
        "hgabPage": "552",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Clark - Mabalacat Access Road, Mabalacat City, Pampanga (Sta. 0+000 to Sta. 1+100)",
      "source_code": "2027DPWH-Proposal-10834",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Clark-Mabalacat Access Road, Mabalacat City, Pampanga",
      "prior_amount": 35000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 527864",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+100.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10834",
        "nepTitle": "Construction of Clark - Mabalacat Access Road, Mabalacat City, Pampanga (Sta. 0+000 to Sta. 1+100)",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0420-005862",
        "hgabTitle": "Construction of Clark - Mabalacat Access Road, Mabalacat City, Pampanga (Sta. 0+000 to Sta. 1+100)",
        "hgabPesos": 100000000,
        "nepPage": "437",
        "hgabPage": "420",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Cogorin Ilaya to Binahian B. Barangay Road, Lopez, Quezon",
      "source_code": "2027DPWH-Proposal-36486",
      "office": "Quezon 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Cogorin Ilaya to Binahian B. Barangay Road, Lopez, Quezon",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575259",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36486",
        "nepTitle": "Construction of Cogorin Ilaya to Binahian B. Barangay Road, Lopez, Quezon",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0549-008557",
        "hgabTitle": "Construction of Cogorin Ilaya to Binahian B. Barangay Road, Sta. 0+400 - Sta. 1+000, Lopez, Quezon",
        "hgabPesos": 20000000,
        "nepPage": "512",
        "hgabPage": "549",
        "chainageStatus": "incomplete",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Diversion Road, Brgy. Alvenda, Mutia - Pob. Sergio Osmeña Sr. Road, Zamboanga del Norte - Sta. 7+872 - Sta. 8+308, Sta. 9+540 - Sta. 9+660.84",
      "source_code": "2027DPWH-Proposal-32897",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 131900000,
      "comparison_year": 2024,
      "prior_project": "Brgy. Alvenda, Mutia - Pob. Sergio Osmeña Sr. Road Diversion Road, Zamboanga del Norte",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595902",
      "similarity_pct": 100,
      "current_chainage": "7+872.00–8+308.00 · 9+540.00–9+660.84",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32897",
        "nepTitle": "Construction of Diversion Road, Brgy. Alvenda, Mutia - Pob. Sergio Osmeña Sr. Road, Zamboanga del Norte - Sta. 7+872 - Sta. 8+308, Sta. 9+540 - Sta. 9+660.84",
        "nepPesos": 131900000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0224-002094",
        "hgabTitle": "Construction of Diversion Road, Barangay Alvenda, Mutia - Pob. Sergio Osmeña Sr. Road, Zamboanga del Norte - Sta. 7+872 - Sta. 8+308, Sta. 9+540 - Sta. 9+660.84",
        "hgabPesos": 131900000,
        "nepPage": "284",
        "hgabPage": "224",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Diversion Road, Brgy. Banonong, Dapitan City - Pob. Sibutad Road, Zamboanga del Norte - Sta. 0+000 - Sta. 0+285, Sta. 2+897.10 - Sta. 3+187, Sta. 12+823 - Sta. 12+853",
      "source_code": "2027DPWH-Proposal-32896",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 28108000,
      "comparison_year": 2022,
      "prior_project": "Brgy. Banonong, Dapitan City - Pob. Sibutad Diversion Road, Zamboanga del Norte",
      "prior_amount": 47182000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547604",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+285.00 · 2+897.10–3+187.00 · 12+823.00–12+853.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32896",
        "nepTitle": "Construction of Diversion Road, Brgy. Banonong, Dapitan City - Pob. Sibutad Road, Zamboanga del Norte - Sta. 0+000 - Sta. 0+285, Sta. 2+897.10 - Sta. 3+187, Sta. 12+823 - Sta. 12+853",
        "nepPesos": 28108000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002226",
        "hgabTitle": "Construction of Diversion Road, Barangay Banonong, Dapitan City - Pob. Sibutad Road, Zamboanga del Norte - Sta. 0+000 - Sta. 0+285, Sta. 2+897.10 - Sta. 3+187, Sta. 12+823 - Sta. 12+853",
        "hgabPesos": 28108000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Diversion Road, Brgy. Banonong, Dapitan City - Pob. Sibutad Road, Zamboanga del Norte - Sta. 0+000 - Sta. 0+285, Sta. 2+897.10 - Sta. 3+187, Sta. 12+823 - Sta. 12+853",
      "source_code": "2027DPWH-Proposal-32896",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 28108000,
      "comparison_year": 2023,
      "prior_project": "Brgy. Banonong, Dapitan City - Pob. Sibutad Diversion Road, Zamboanga del Norte",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566482",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+285.00 · 2+897.10–3+187.00 · 12+823.00–12+853.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32896",
        "nepTitle": "Construction of Diversion Road, Brgy. Banonong, Dapitan City - Pob. Sibutad Road, Zamboanga del Norte - Sta. 0+000 - Sta. 0+285, Sta. 2+897.10 - Sta. 3+187, Sta. 12+823 - Sta. 12+853",
        "nepPesos": 28108000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002226",
        "hgabTitle": "Construction of Diversion Road, Barangay Banonong, Dapitan City - Pob. Sibutad Road, Zamboanga del Norte - Sta. 0+000 - Sta. 0+285, Sta. 2+897.10 - Sta. 3+187, Sta. 12+823 - Sta. 12+853",
        "hgabPesos": 28108000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Diversion Road, Brgy. Banonong, Dapitan City - Pob. Sibutad Road, Zamboanga del Norte - Sta. 0+000 - Sta. 0+285, Sta. 2+897.10 - Sta. 3+187, Sta. 12+823 - Sta. 12+853",
      "source_code": "2027DPWH-Proposal-32896",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 28108000,
      "comparison_year": 2024,
      "prior_project": "Brgy. Banonong, Dapitan City - Pob. Sibutad Diversion Road, Zamboanga del Norte",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 594841",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+285.00 · 2+897.10–3+187.00 · 12+823.00–12+853.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32896",
        "nepTitle": "Construction of Diversion Road, Brgy. Banonong, Dapitan City - Pob. Sibutad Road, Zamboanga del Norte - Sta. 0+000 - Sta. 0+285, Sta. 2+897.10 - Sta. 3+187, Sta. 12+823 - Sta. 12+853",
        "nepPesos": 28108000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002226",
        "hgabTitle": "Construction of Diversion Road, Barangay Banonong, Dapitan City - Pob. Sibutad Road, Zamboanga del Norte - Sta. 0+000 - Sta. 0+285, Sta. 2+897.10 - Sta. 3+187, Sta. 12+823 - Sta. 12+853",
        "hgabPesos": 28108000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Guinzadan Central Road, Barangay Guinzadan Central, Bauko, Mountain Province",
      "source_code": "2027DPWH-Proposal-34774",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 13000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Guinzadan Central Road Sta. 0+111 - Sta. 0+211, Bauko, Mountain Province",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 24115",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+111.00–0+211.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34774",
        "nepTitle": "Construction of Guinzadan Central Road, Barangay Guinzadan Central, Bauko, Mountain Province",
        "nepPesos": 13000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0480-007066",
        "hgabTitle": "Construction of Guinzadan Central Road, Barangay Guinzadan Central, Bauko, Mountain Province",
        "hgabPesos": 13000000,
        "nepPage": "472",
        "hgabPage": "480",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Local Road, Barangay Bongato East, Bayambang, Pangasinan",
      "source_code": "2027DPWH-Proposal-34485",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Local Roads, Brgy. Bongato East, Bayambang, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307058",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34485",
        "nepTitle": "Construction of Local Road, Barangay Bongato East, Bayambang, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0475-006951",
        "hgabTitle": "Construction of Local Road, Barangay Bongato East, Bayambang, Pangasinan",
        "hgabPesos": 10000000,
        "nepPage": "468",
        "hgabPage": "475",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Local Road, Barangay Taloyan, Malasiqui, Pangasinan",
      "source_code": "2027DPWH-Proposal-34469",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Local Road, Brgy. Taloyan, Malasiqui, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307055",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34469",
        "nepTitle": "Construction of Local Road, Barangay Taloyan, Malasiqui, Pangasinan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0475-006952",
        "hgabTitle": "Construction of Local Road, Barangay Taloyan, Malasiqui, Pangasinan",
        "hgabPesos": 10000000,
        "nepPage": "468",
        "hgabPage": "475",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Local Road, Barangay Telbang, Bayambang, Pangasinan",
      "source_code": "2027DPWH-Proposal-34417",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Local Roads, Brgy. Telbang, Bayambang, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307060",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34417",
        "nepTitle": "Construction of Local Road, Barangay Telbang, Bayambang, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0475-006953",
        "hgabTitle": "Construction of Local Road, Barangay Telbang, Bayambang, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "469",
        "hgabPage": "475",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Local Roads at Barangay Indahag, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-39101",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Local Road, Barangay Indahag, Cagayan de Oro City",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050308418",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39101",
        "nepTitle": "Construction of Local Roads at Barangay Indahag, Cagayan de Oro City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0608-009824",
        "hgabTitle": "Construction of Local Roads at Barangay Indahag, Cagayan de Oro City",
        "hgabPesos": 10000000,
        "nepPage": "549",
        "hgabPage": "608",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Looban - Upper Dapawan Access Road, Odiongan, Romblon",
      "source_code": "2027DPWH-Proposal-37029",
      "office": "Romblon District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Looban-Upper Dapawan Access Road, Odiongan, Romblon",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522635",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37029",
        "nepTitle": "Construction of Looban - Upper Dapawan Access Road, Odiongan, Romblon",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0556-008714",
        "hgabTitle": "Construction of Looban - Upper Dapawan Access Road, Odiongan, Romblon",
        "hgabPesos": 20000000,
        "nepPage": "517",
        "hgabPage": "556",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Mabini-Bauan-San Luis-Lemery Road, Batangas",
      "source_code": "2027DPWH-Proposal-33807",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Mabini-Bauan-San Luis-Lemery Road, Batangas",
      "prior_amount": 105000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568116",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33807",
        "nepTitle": "Construction of Mabini-Bauan-San Luis-Lemery Road, Batangas",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0426-005974",
        "hgabTitle": "Construction of Mabini-Bauan-San Luis-Lemery Road, Batangas",
        "hgabPesos": 100000000,
        "nepPage": "441",
        "hgabPage": "426",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Magpet (Pangao-An - Don Panaca) to Davao City Via Salaysay (Indawhong-Ballah-Masawang) to Lumondao (Junction Bukidnon to Davao) Road, Cotabato",
      "source_code": "2027DPWH-Proposal-09265",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 36000000,
      "comparison_year": 2022,
      "prior_project": "Concreting of Magpet (Pangao-an - Don Panaca) to Davao City via Salaysay (Indawhong-Ballah-Masawang) to Lumondao (Junction Bukidnon to Davao) Road, Cotabato",
      "prior_amount": 100000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 521542",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09265",
        "nepTitle": "Construction of Magpet (Pangao-An - Don Panaca) to Davao City Via Salaysay (Indawhong-Ballah-Masawang) to Lumondao (Junction Bukidnon to Davao) Road, Cotabato",
        "nepPesos": 36000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0620-010060",
        "hgabTitle": "Construction of Magpet (Pangao-An - Don Panaca) to Davao City Via Salaysay (Indawhong-Ballah-Masawang) to Lumondao (Junction Bukidnon to Davao) Road, Cotabato",
        "hgabPesos": 36000000,
        "nepPage": "554",
        "hgabPage": "620",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Magpet (Pangao-An - Don Panaca) to Davao City Via Salaysay (Indawhong-Ballah-Masawang) to Lumondao (Junction Bukidnon to Davao) Road, Cotabato",
      "source_code": "2027DPWH-Proposal-09265",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 36000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Magpet (Pangao-an - Don Panaca) to Davao City via Salaysay (Indawhong-Ballah-Masawang) to Lumondao (Junction Bukidnon to Davao) Road, Cotabato",
      "prior_amount": 147752000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 527504",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09265",
        "nepTitle": "Construction of Magpet (Pangao-An - Don Panaca) to Davao City Via Salaysay (Indawhong-Ballah-Masawang) to Lumondao (Junction Bukidnon to Davao) Road, Cotabato",
        "nepPesos": 36000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0620-010060",
        "hgabTitle": "Construction of Magpet (Pangao-An - Don Panaca) to Davao City Via Salaysay (Indawhong-Ballah-Masawang) to Lumondao (Junction Bukidnon to Davao) Road, Cotabato",
        "hgabPesos": 36000000,
        "nepPage": "554",
        "hgabPage": "620",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Makilo-Aselap Road, Barangay Calaccad, Tabuk City, Kalinga",
      "source_code": "2027DPWH-Proposal-34606",
      "office": "Lower Kalinga District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Makilo-Aselap Road, Brgy. Calaccad, Tabuk City, Kalinga",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574654",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Caroline Agyao"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34606",
        "nepTitle": "Construction of Makilo-Aselap Road, Barangay Calaccad, Tabuk City, Kalinga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0480-007055",
        "hgabTitle": "Construction of Makilo-Aselap Road, Barangay Calaccad, Tabuk City, Kalinga",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "480",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Najalin Relocation Site Road, Barangay Nagasi, La Carlota City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37426",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 0+000 - Sta. 0+296, Najalin Relocation Site, Barangay Nagasi, La Carlota City, Negros Occidental",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 28198",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+296.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jeffrey Ferrer"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37426",
        "nepTitle": "Construction of Najalin Relocation Site Road, Barangay Nagasi, La Carlota City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0578-009173",
        "hgabTitle": "Construction of Najalin Relocation Site Road, Barangay Nagasi, La Carlota City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "531",
        "hgabPage": "578",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Nanas-Batuan Road, Barangay Bagonawa and Barangay Batuan, Municipality of San Enrique, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37423",
      "office": "Negros Occidental 4th District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Nanas – Batuan, Sta. 0+000 - Sta. 0+260, Barangay Bagonawa and Barangay Batuan, San Enrique, Negros Occidental",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 28200",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+260.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jeffrey Ferrer"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37423",
        "nepTitle": "Construction of Nanas-Batuan Road, Barangay Bagonawa and Barangay Batuan, Municipality of San Enrique, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0578-009175",
        "hgabTitle": "Construction of Nanas-Batuan Road, Barangay Bagonawa and Barangay Batuan, Municipality of San Enrique, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "531",
        "hgabPage": "578",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Pantao - Moroponros Road, Oas, Albay",
      "source_code": "2027DPWH-Proposal-39485",
      "office": "Albay 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 70000000,
      "comparison_year": 2019,
      "prior_project": "Construction/Rehabilitation/ Improvement of Pantao- Moroponros Road, Oas, Albay",
      "prior_amount": 50000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117202286000 · PDF p. 1212 · printed p. 2677",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39485",
        "nepTitle": "Construction of Pantao - Moroponros Road, Oas, Albay",
        "nepPesos": 70000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0431-006073",
        "hgabTitle": "Construction of Pantao - Moroponros Road, Oas, Albay",
        "hgabPesos": 70000000,
        "nepPage": "444",
        "hgabPage": "431",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Patong-Basak Road at Barangay Patong, Badian, Cebu",
      "source_code": "2027DPWH-Proposal-37671",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 32000000,
      "comparison_year": 2026,
      "prior_project": "Road Construction of Patong-Basak Road,  Sta. 0+786 - Sta. 0+930, at Brgy. Basak and Patong, Badian, Cebu",
      "prior_amount": 29093000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 23055",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+786.00–0+930.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37671",
        "nepTitle": "Construction of Patong-Basak Road at Barangay Patong, Badian, Cebu",
        "nepPesos": 32000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0589-009429",
        "hgabTitle": "Construction of Patong-Basak Road at Barangay Patong, Badian, Cebu",
        "hgabPesos": 15000000,
        "nepPage": "538",
        "hgabPage": "589",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Poblacion Bypass Road, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-09655",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Poblacion Bypass Road, General Trias City, Cavite",
      "prior_amount": 11000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575171",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09655",
        "nepTitle": "Construction of Poblacion Bypass Road, General Trias City, Cavite",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0426-005977",
        "hgabTitle": "Construction of Poblacion Bypass Road, General Trias City, Cavite",
        "hgabPesos": 100000000,
        "nepPage": "441",
        "hgabPage": "426",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Poblacion, Pidigan Road, Barangay Poblacion, Pidigan, Abra",
      "source_code": "2027DPWH-Proposal-34736",
      "office": "Abra District Engineering Office",
      "region": "CAR",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Poblacion, Pidigan Road, Pidigan, Abra",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560257",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34736",
        "nepTitle": "Construction of Poblacion, Pidigan Road, Barangay Poblacion, Pidigan, Abra",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0417-005799",
        "hgabTitle": "Rehabilitation of Poblacion, Pidigan Road, Barangay Poblacion, Pidigan, Abra",
        "hgabPesos": 100000000,
        "nepPage": "435",
        "hgabPage": "417",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Quezon to Magsaysay Road (Sta. 1+200 - Sta. 3+450), Mapanas, Northern Samar",
      "source_code": "2027DPWH-Proposal-02679",
      "office": "Northern Samar 2nd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 100000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Quezon - Magsaysay Road, Mapanas, Northern Samar",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 429442",
      "similarity_pct": 100,
      "current_chainage": "1+200.00–3+450.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02679",
        "nepTitle": "Construction of Quezon to Magsaysay Road (Sta. 1+200 - Sta. 3+450), Mapanas, Northern Samar",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0436-006186",
        "hgabTitle": "Construction of Quezon to Magsaysay Road (Sta. 2+250 - Sta. 4+500), Mapanas, Northern Samar",
        "hgabPesos": 100000000,
        "nepPage": "448",
        "hgabPage": "436",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Quezon to Magsaysay Road (Sta. 1+200 - Sta. 3+450), Mapanas, Northern Samar",
      "source_code": "2027DPWH-Proposal-02679",
      "office": "Northern Samar 2nd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Quezon to Magsaysay Road, Mapanas, Northern Samar",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575829",
      "similarity_pct": 100,
      "current_chainage": "1+200.00–3+450.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02679",
        "nepTitle": "Construction of Quezon to Magsaysay Road (Sta. 1+200 - Sta. 3+450), Mapanas, Northern Samar",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0436-006186",
        "hgabTitle": "Construction of Quezon to Magsaysay Road (Sta. 2+250 - Sta. 4+500), Mapanas, Northern Samar",
        "hgabPesos": 100000000,
        "nepPage": "448",
        "hgabPage": "436",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road (Sta. 0- Sta. 580, Sta. 3+470 - Sta. 4+738) Jct. Ruins to Banoceh, Talisay, Negros Occidental (10.7150581, 122.9615514)",
      "source_code": "2027DPWH-Proposal-37656",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 50000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road Jct. Ruins to Banoceh, Talisay City, Negros Occidental",
      "prior_amount": 25000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540702",
      "similarity_pct": 100,
      "current_chainage": "3+470.00–4+738.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Javi Benitez"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37656",
        "nepTitle": "Construction of Road (Sta. 0- Sta. 580, Sta. 3+470 - Sta. 4+738) Jct. Ruins to Banoceh, Talisay, Negros Occidental (10.7150581, 122.9615514)",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0575-009110",
        "hgabTitle": "Construction of Road (Sta. 0- Sta. 580, Sta. 3+470 - Sta. 4+738) Jct. Ruins to Banoceh, Talisay, Negros Occidental (10.7150581, 122.9615514)",
        "hgabPesos": 50000000,
        "nepPage": "528",
        "hgabPage": "575",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road (Sta. 1+210 - Sta. 1+775) in Barangay Inamlan, Laoang, Northern Samar",
      "source_code": "2027DPWH-Proposal-38061",
      "office": "Northern Samar 2nd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 30000000,
      "comparison_year": 2024,
      "prior_project": "Concreting of Road in Barangay Inamlan, Brgy. Inamlan, Laoang, Northern Samar",
      "prior_amount": 20000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552910",
      "similarity_pct": 100,
      "current_chainage": "1+210.00–1+775.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38061",
        "nepTitle": "Construction of Road (Sta. 1+210 - Sta. 1+775) in Barangay Inamlan, Laoang, Northern Samar",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0597-009593",
        "hgabTitle": "Construction of Road (Sta. 1+404 - Sta. 1+969) in Barangay Inamlan, Laoang, Northern Samar",
        "hgabPesos": 30000000,
        "nepPage": "542",
        "hgabPage": "597",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Along Barangay Balite, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36930",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Balite, Calapan City, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527100",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36930",
        "nepTitle": "Construction of Road Along Barangay Balite, City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0553-008635",
        "hgabTitle": "Construction of Road Along Barangay Balite, City of Calapan, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "515",
        "hgabPage": "553",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Along Barangay Caagutayan, San Teodoro, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36937",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Brgy. Caagutayan, San Teodoro, Oriental Mindoro",
      "prior_amount": 50000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 425863",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36937",
        "nepTitle": "Construction of Road Along Barangay Caagutayan, San Teodoro, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0553-008637",
        "hgabTitle": "Construction of Road Along Barangay Caagutayan, San Teodoro, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "515",
        "hgabPage": "553",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Along Barangay Canubing 2, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36934",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Brgy. Canubing 2, Calapan City, Oriental Mindoro",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 425866",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36934",
        "nepTitle": "Construction of Road Along Barangay Canubing 2, City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0553-008638",
        "hgabTitle": "Construction of Road Along Barangay Canubing 2, City of Calapan, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "515",
        "hgabPage": "553",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Along Barangay Canubing 2, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36934",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Canubing 2, Calapan City, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560789",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36934",
        "nepTitle": "Construction of Road Along Barangay Canubing 2, City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0553-008638",
        "hgabTitle": "Construction of Road Along Barangay Canubing 2, City of Calapan, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "515",
        "hgabPage": "553",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Along Barangay Managpi, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36936",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Concreting of Road, Barangay Managpi, Calapan City, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527098",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36936",
        "nepTitle": "Construction of Road Along Barangay Managpi, City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0553-008640",
        "hgabTitle": "Construction of Road Along Barangay Managpi, City of Calapan, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "515",
        "hgabPage": "553",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Along Barangay Pachoca, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36931",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Pachoca, Calapan City, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527104",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36931",
        "nepTitle": "Construction of Road Along Barangay Pachoca, City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0553-008642",
        "hgabTitle": "Construction of Road Along Barangay Pachoca, City of Calapan, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "515",
        "hgabPage": "553",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Along Barangay Pachoca, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36931",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Road at Brgy. Pachoca, Calapan, Oriental Mindoro",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300116201814000 · PDF p. 1187 · printed p. 2652",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36931",
        "nepTitle": "Construction of Road Along Barangay Pachoca, City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0553-008642",
        "hgabTitle": "Construction of Road Along Barangay Pachoca, City of Calapan, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "515",
        "hgabPage": "553",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Along Barangay Parang, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36933",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Brgy Parang, Calapan City, Oriental Mindoro",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 425859",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36933",
        "nepTitle": "Construction of Road Along Barangay Parang, City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0553-008643",
        "hgabTitle": "Construction of Road Along Barangay Parang, City of Calapan, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "515",
        "hgabPage": "553",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Along Barangay Sta. Rita, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36928",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. Sta. Rita, Calapan City, Oriental Mindoro",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499660",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36928",
        "nepTitle": "Construction of Road Along Barangay Sta. Rita, City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0553-008645",
        "hgabTitle": "Construction of Road Along Barangay Sta. Rita, City of Calapan, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "515",
        "hgabPage": "553",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Along Barangay Sta. Rita, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36928",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Rehabilitation of Road, Sta. Rita, Calapan City, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552278",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36928",
        "nepTitle": "Construction of Road Along Barangay Sta. Rita, City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0553-008645",
        "hgabTitle": "Construction of Road Along Barangay Sta. Rita, City of Calapan, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "515",
        "hgabPage": "553",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Barangay Balbalino, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35887",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Balbalino, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+437.40",
      "prior_amount": 6115000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27140",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+437.40",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35887",
        "nepTitle": "Construction of Road Barangay Balbalino, Guimba, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0518-007859",
        "hgabTitle": "Construction of Road Barangay Balbalino, Guimba, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "494",
        "hgabPage": "518",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Barangay Batitang, Zaragoza, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35888",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Roads, Batitang, Zaragoza, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499199",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35888",
        "nepTitle": "Construction of Road Barangay Batitang, Zaragoza, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0519-007890",
        "hgabTitle": "Construction of Road Barangay Batitang, Zaragoza, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "494",
        "hgabPage": "519",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Barangay San Jose to Barangay Casala, San Mariano, Isabela",
      "source_code": "2027DPWH-Proposal-00474",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 14844000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road Barangay San Jose to Barangay Casala, San Mariano, Isabela",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574777",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-00474",
        "nepTitle": "Construction of Road Barangay San Jose to Barangay Casala, San Mariano, Isabela",
        "nepPesos": 14844000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0496-007412",
        "hgabTitle": "Construction of Road Barangay San Jose to Barangay Casala, San Mariano, Isabela",
        "hgabPesos": 14844000,
        "nepPage": "480",
        "hgabPage": "496",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Concreting at Sitio Lingunan, Barangay Partida, Norzagaray, Bulacan",
      "source_code": "2027DPWH-Proposal-35732",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sitio Lingunan, Sta. 00+204 – Sta. 00+804, Barangay Partida, Norzagaray, Bulacan",
      "prior_amount": 9414000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27108",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+204.00–0+804.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35732",
        "nepTitle": "Construction of Road Concreting at Sitio Lingunan, Barangay Partida, Norzagaray, Bulacan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0513-007766",
        "hgabTitle": "Construction of Road Concreting at Sitio Lingunan, Barangay Partida, Norzagaray, Bulacan",
        "hgabPesos": 5000000,
        "nepPage": "490",
        "hgabPage": "513",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Slope Protection Structure, Barangay Buot, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37792",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 40000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road with Slope Protection Structure, Sta. 6+700.00 - Sta. 7+420.00 Barangay Buot, Cebu City, Cebu\t\n",
      "prior_amount": 38760000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 23082",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "6+700.00–7+420.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37792",
        "nepTitle": "Construction of Road Slope Protection Structure, Barangay Buot, Cebu City, Cebu",
        "nepPesos": 40000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0590-009445",
        "hgabTitle": "Construction of Road Slope Protection Structure, Barangay Buot, Cebu City, Cebu",
        "hgabPesos": 40000000,
        "nepPage": "539",
        "hgabPage": "590",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Slope Protection Structure, Barangay Sudlon I, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37788",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 40000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road with Slope Protection Structure, Sta. 6+400.00 - Sta. 6+795.00 Barangay Sudlon I, Cebu City, Cebu",
      "prior_amount": 77520000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 19600",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "6+400.00–6+795.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37788",
        "nepTitle": "Construction of Road Slope Protection Structure, Barangay Sudlon I, Cebu City, Cebu",
        "nepPesos": 40000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0590-009457",
        "hgabTitle": "Construction of Road Slope Protection Structure, Barangay Sudlon I, Cebu City, Cebu",
        "hgabPesos": 40000000,
        "nepPage": "539",
        "hgabPage": "590",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Slope Protection Structure, Sta. 2+800 - Sta. 2+850.00 Barangay Bonbon, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-08083",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road Slope Protection Structure, Barangay Bonbon, Cebu City",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 561050",
      "similarity_pct": 100,
      "current_chainage": "2+800.00–2+850.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08083",
        "nepTitle": "Construction of Road Slope Protection Structure, Sta. 2+800 - Sta. 2+850.00 Barangay Bonbon, Cebu City, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Anilao Labac, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28790",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction/Rehabilitation of Road at Barangay Anilao Labac, Lipa City, Batangas",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526842",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28790",
        "nepTitle": "Construction of Road at Barangay Anilao Labac, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008360",
        "hgabTitle": "Construction of Road at Barangay Anilao Labac, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "507",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Anilao Labac, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28790",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Improvement of Road at Barangay Anilao Labac, Sta. 0+000 - Sta. 0+388, Sta. 0+000 - Sta. 0+120, Sta. 0+000 - Sta. 0+084, Sta. 0+000 - Sta. 0+202, Sta. 0+000 - Sta. 0+064, Sta. 0+000 - Sta. 0+078, Sta. 0+000 - Sta. 0+047, Sta. 0+000 - Sta. 0+086, Sta. 0+000 - Sta. 0+022, Lipa City Batangas",
      "prior_amount": 12028000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21974",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+388.00 · 0+000.00–0+120.00 · 0+000.00–0+084.00 · 0+000.00–0+202.00 · 0+000.00–0+064.00 · 0+000.00–0+078.00 · 0+000.00–0+047.00 · 0+000.00–0+086.00 · 0+000.00–0+022.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28790",
        "nepTitle": "Construction of Road at Barangay Anilao Labac, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008360",
        "hgabTitle": "Construction of Road at Barangay Anilao Labac, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "507",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Anilao Labac, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28790",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Construction/Repair/Rehabilitation/Improvement of Road, Brgy. Anilao Labac, Lipa City, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306556",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28790",
        "nepTitle": "Construction of Road at Barangay Anilao Labac, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008360",
        "hgabTitle": "Construction of Road at Barangay Anilao Labac, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "507",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Anilao, Bongabong, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37048",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Barangay Anilao Road, Bongabong, Oriental Mindoro",
      "prior_amount": 10500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428662",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37048",
        "nepTitle": "Construction of Road at Barangay Anilao, Bongabong, Oriental Mindoro",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0557-008724",
        "hgabTitle": "Construction of Road at Barangay Anilao, Bongabong, Oriental Mindoro",
        "hgabPesos": 10000000,
        "nepPage": "517",
        "hgabPage": "557",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Bagong Bayan II, Bongabong, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37049",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Road at Barangay Bagong Bayan II, Bongabong, Oriental Mindoro",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560826",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37049",
        "nepTitle": "Construction of Road at Barangay Bagong Bayan II, Bongabong, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0557-008725",
        "hgabTitle": "Construction of Road at Barangay Bagong Bayan II, Bongabong, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "517",
        "hgabPage": "557",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Balasig, Cabagan, Isabela",
      "source_code": "2027DPWH-Proposal-35271",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Rehabilitation of Road, Barangay Balasig, Cabagan, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551539",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35271",
        "nepTitle": "Construction of Road at Barangay Balasig, Cabagan, Isabela",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0490-007283",
        "hgabTitle": "Construction of Road at Barangay Balasig, Cabagan, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "477",
        "hgabPage": "490",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Balatasan, Bulalacao, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37070",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Balatasan, Bulalacao, Oriental Mindoro",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527145",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfonso Umali Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37070",
        "nepTitle": "Construction of Road at Barangay Balatasan, Bulalacao, Oriental Mindoro",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0557-008727",
        "hgabTitle": "Construction of Road at Barangay Balatasan, Bulalacao, Oriental Mindoro",
        "hgabPesos": 20000000,
        "nepPage": "517",
        "hgabPage": "557",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Balatasan, Bulalacao, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37070",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 20000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road at Brgy. Balatasan, Bulalacao, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 536044",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfonso Umali Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37070",
        "nepTitle": "Construction of Road at Barangay Balatasan, Bulalacao, Oriental Mindoro",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0557-008727",
        "hgabTitle": "Construction of Road at Barangay Balatasan, Bulalacao, Oriental Mindoro",
        "hgabPesos": 20000000,
        "nepPage": "517",
        "hgabPage": "557",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Caliguian, Burgos, Isabela",
      "source_code": "2027DPWH-Proposal-35198",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Caliguian, Burgos, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526435",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35198",
        "nepTitle": "Construction of Road at Barangay Caliguian, Burgos, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0493-007333",
        "hgabTitle": "Construction of Road at Barangay Caliguian, Burgos, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "479",
        "hgabPage": "493",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Caliguian, Burgos, Isabela",
      "source_code": "2027DPWH-Proposal-35198",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Caliguian, Burgos, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540325",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35198",
        "nepTitle": "Construction of Road at Barangay Caliguian, Burgos, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0493-007333",
        "hgabTitle": "Construction of Road at Barangay Caliguian, Burgos, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "479",
        "hgabPage": "493",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Cawayan, Bongabong, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37050",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Concreting of Brgy. Cawayan Road, Bongabong, Oriental Mindoro",
      "prior_amount": 2500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201306000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37050",
        "nepTitle": "Construction of Road at Barangay Cawayan, Bongabong, Oriental Mindoro",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0557-008728",
        "hgabTitle": "Construction of Road at Barangay Cawayan, Bongabong, Oriental Mindoro",
        "hgabPesos": 10000000,
        "nepPage": "517",
        "hgabPage": "557",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Cawayan, Bongabong, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-37050",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Brgy. Cawayan Road, Bongabong, Oriental Mindoro",
      "prior_amount": 2800000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117201306000 · PDF p. 1209 · printed p. 2674",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37050",
        "nepTitle": "Construction of Road at Barangay Cawayan, Bongabong, Oriental Mindoro",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0557-008728",
        "hgabTitle": "Construction of Road at Barangay Cawayan, Bongabong, Oriental Mindoro",
        "hgabPesos": 10000000,
        "nepPage": "517",
        "hgabPage": "557",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Lumbang, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33846",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Road, Barangay Lumbang, Lipa City, Batangas",
      "prior_amount": 8000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526900",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33846",
        "nepTitle": "Construction of Road at Barangay Lumbang, Lipa City, Batangas",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0426-005987",
        "hgabTitle": "Construction of Road at Barangay Lumbang, Lipa City, Batangas",
        "hgabPesos": 100000000,
        "nepPage": "441",
        "hgabPage": "426",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Lumbang, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33846",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Lumbang, Lipa City, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535778",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33846",
        "nepTitle": "Construction of Road at Barangay Lumbang, Lipa City, Batangas",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0426-005987",
        "hgabTitle": "Construction of Road at Barangay Lumbang, Lipa City, Batangas",
        "hgabPesos": 100000000,
        "nepPage": "441",
        "hgabPage": "426",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Paltao, Pulilan, Bulacan",
      "source_code": "2027DPWH-Proposal-35590",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 13000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road at Barangay Paltao, Pulilan, Bulacan",
      "prior_amount": 8000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560398",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35590",
        "nepTitle": "Construction of Road at Barangay Paltao, Pulilan, Bulacan",
        "nepPesos": 13000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0508-007664",
        "hgabTitle": "Construction of Road and Drainage Canal at Barangay Paltao, Pulilan, Bulacan",
        "hgabPesos": 13000000,
        "nepPage": "486",
        "hgabPage": "508",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Poblacion 5, Amadeo, Cavite",
      "source_code": "2027DPWH-Proposal-09687",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 6300000,
      "comparison_year": 2019,
      "prior_project": "Road Concreting, Brgy. Poblacion 5, Amadeo, Cavite",
      "prior_amount": 1500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203591000 · PDF p. 1289 · printed p. 2754",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09687",
        "nepTitle": "Construction of Road at Barangay Poblacion 5, Amadeo, Cavite",
        "nepPesos": 6300000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0544-008432",
        "hgabTitle": "Construction of Road at Barangay Poblacion 5, Amadeo, Cavite",
        "hgabPesos": 6300000,
        "nepPage": "509",
        "hgabPage": "544",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Pulong Yantok, Angat, Bulacan",
      "source_code": "2027DPWH-Proposal-33622",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 20000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road Barangay Pulong at Barangay Yantok, Angat, Bulacan",
      "prior_amount": 25000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 534748",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33622",
        "nepTitle": "Construction of Road at Barangay Pulong Yantok, Angat, Bulacan",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0513-007764",
        "hgabTitle": "Construction of Road at Barangay Pulong Yantok, Angat, Bulacan",
        "hgabPesos": 20000000,
        "nepPage": "490",
        "hgabPage": "513",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Pulong Yantok, Angat, Bulacan",
      "source_code": "2027DPWH-Proposal-33622",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 20000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Road, Pulong Yantok, Angat, Bulacan",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200807000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33622",
        "nepTitle": "Construction of Road at Barangay Pulong Yantok, Angat, Bulacan",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0513-007764",
        "hgabTitle": "Construction of Road at Barangay Pulong Yantok, Angat, Bulacan",
        "hgabPesos": 20000000,
        "nepPage": "490",
        "hgabPage": "513",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay San Guillermo, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28814",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 12000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Road, Barangay San Guillermo, Lipa City, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200805000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28814",
        "nepTitle": "Construction of Road at Barangay San Guillermo, Lipa City, Batangas",
        "nepPesos": 12000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008366",
        "hgabTitle": "Construction of Road at Barangay San Guillermo, Lipa City, Batangas",
        "hgabPesos": 12000000,
        "nepPage": "507",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Tamacan, Amadeo, Cavite",
      "source_code": "2027DPWH-Proposal-09692",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2019,
      "prior_project": "Road Concreting, Brgy. Tamacan, Amadeo, Cavite",
      "prior_amount": 1500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203594000 · PDF p. 1289 · printed p. 2754",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09692",
        "nepTitle": "Construction of Road at Barangay Tamacan, Amadeo, Cavite",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0544-008433",
        "hgabTitle": "Construction of Road at Barangay Tamacan, Amadeo, Cavite",
        "hgabPesos": 15000000,
        "nepPage": "509",
        "hgabPage": "544",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Barangay Union, Cabagan, Isabela",
      "source_code": "2027DPWH-Proposal-35272",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Union, Cabagan, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535271",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35272",
        "nepTitle": "Construction of Road at Barangay Union, Cabagan, Isabela",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0490-007284",
        "hgabTitle": "Construction of Road at Barangay Union, Cabagan, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "477",
        "hgabPage": "490",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Cabetican, Bacolor, Pampanga",
      "source_code": "2027DPWH-Proposal-36071",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Cabetican, Bacolor, Pampanga",
      "prior_amount": 7500000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540423",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36071",
        "nepTitle": "Construction of Road at Cabetican, Bacolor, Pampanga",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0526-008036",
        "hgabTitle": "Construction of Road at Cabetican, Bacolor, Pampanga",
        "hgabPesos": 10000000,
        "nepPage": "498",
        "hgabPage": "526",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Nagbukel, Nagbukel, San Isidro, Isabela",
      "source_code": "2027DPWH-Proposal-35294",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 0+000 - Sta. 0+487, Barangay Nagbukel, San Isidro, Isabela",
      "prior_amount": 9088000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 26851",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+487.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35294",
        "nepTitle": "Construction of Road at Nagbukel, Nagbukel, San Isidro, Isabela",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0500-007494",
        "hgabTitle": "Construction of Road at Nagbukel, Nagbukel, San Isidro, Isabela",
        "hgabPesos": 15000000,
        "nepPage": "482",
        "hgabPage": "500",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Purok 8, Upper Puerto, Barangay Puerto, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-39105",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Roads (Purok 8) Upper Puerto - Sta. 0+000 to Sta. 0+150, Barangay Puerto, Cagayan de Oro City",
      "prior_amount": 8000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 23603",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+150.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39105",
        "nepTitle": "Construction of Road at Purok 8, Upper Puerto, Barangay Puerto, Cagayan de Oro City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0608-009828",
        "hgabTitle": "Construction of Road at Upper Puerto, Barangay Puerto, Cagayan de Oro City",
        "hgabPesos": 10000000,
        "nepPage": "549",
        "hgabPage": "608",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Rizal West, San Isidro, Isabela",
      "source_code": "2027DPWH-Proposal-35302",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 0+000 - Sta. 0+323, Barangay Rizal West, San Isidro, Isabela",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21026",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+323.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35302",
        "nepTitle": "Construction of Road at Rizal West, San Isidro, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0500-007495",
        "hgabTitle": "Construction of Road at Rizal West, San Isidro, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "482",
        "hgabPage": "500",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Victoria, San Isidro, Isabela",
      "source_code": "2027DPWH-Proposal-35303",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Victoria, San Isidro, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551609",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35303",
        "nepTitle": "Construction of Road at Victoria, San Isidro, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0500-007496",
        "hgabTitle": "Construction of Road at Victoria, San Isidro, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "482",
        "hgabPage": "500",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road at Victoria, San Isidro, Isabela",
      "source_code": "2027DPWH-Proposal-35303",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 0+000 - Sta. 0+323, Barangay Victoria, San Isidro, Isabela",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21032",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+323.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35303",
        "nepTitle": "Construction of Road at Victoria, San Isidro, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0500-007496",
        "hgabTitle": "Construction of Road at Victoria, San Isidro, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "482",
        "hgabPage": "500",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road in Awayan, Sipocot, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39529",
      "office": "Camarines Sur 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 10000000,
      "comparison_year": 2016,
      "prior_project": "Concreting of Barangay Road, Barangay Awayan, Sipocot, Camarines Sur",
      "prior_amount": 2000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050305341",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39529",
        "nepTitle": "Construction of Road in Awayan, Sipocot, Camarines Sur",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0559-008787",
        "hgabTitle": "Construction of Road in Awayan, Sipocot, Camarines Sur",
        "hgabPesos": 10000000,
        "nepPage": "519",
        "hgabPage": "559",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road in Awayan, Sipocot, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39529",
      "office": "Camarines Sur 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Barangay Road, Barangay Awayan, Sipocot, Camarines Sur",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050305341",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39529",
        "nepTitle": "Construction of Road in Awayan, Sipocot, Camarines Sur",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0559-008787",
        "hgabTitle": "Construction of Road in Awayan, Sipocot, Camarines Sur",
        "hgabPesos": 10000000,
        "nepPage": "519",
        "hgabPage": "559",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road in Awayan, Sipocot, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39529",
      "office": "Camarines Sur 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Barangay Road, Brgy. Awayan, Sipocot, Camarines Sur",
      "prior_amount": 10000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203924000 · PDF p. 1309 · printed p. 2774",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39529",
        "nepTitle": "Construction of Road in Awayan, Sipocot, Camarines Sur",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0559-008787",
        "hgabTitle": "Construction of Road in Awayan, Sipocot, Camarines Sur",
        "hgabPesos": 10000000,
        "nepPage": "519",
        "hgabPage": "559",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road in Barangay Dalaon, Molave, Zamboanga del Sur",
      "source_code": "2027DPWH-Proposal-38299",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Dalaon, Municipality of Molave, Zamboanga del Sur",
      "prior_amount": 15000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527747",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38299",
        "nepTitle": "Construction of Road in Barangay Dalaon, Molave, Zamboanga del Sur",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0603-009723",
        "hgabTitle": "Construction of Road in Barangay Dalaon, Molave, Zamboanga del Sur",
        "hgabPesos": 15000000,
        "nepPage": "546",
        "hgabPage": "603",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road in Barangay Dao, Pagadian City, Zamboanga del Sur",
      "source_code": "2027DPWH-Proposal-38279",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Dao, Pagadian City, Zamboanga Del Sur",
      "prior_amount": 40000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 523018",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Yu"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38279",
        "nepTitle": "Construction of Road in Barangay Dao, Pagadian City, Zamboanga del Sur",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0604-009724",
        "hgabTitle": "Construction of Road in Barangay Dao, Pagadian City, Zamboanga del Sur",
        "hgabPesos": 20000000,
        "nepPage": "546",
        "hgabPage": "604",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road in Barangay Dao, Pagadian City, Zamboanga del Sur",
      "source_code": "2027DPWH-Proposal-38279",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Dao, Pagadian City, Zamboanga del Sur",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 576486",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Yu"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38279",
        "nepTitle": "Construction of Road in Barangay Dao, Pagadian City, Zamboanga del Sur",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0604-009724",
        "hgabTitle": "Construction of Road in Barangay Dao, Pagadian City, Zamboanga del Sur",
        "hgabPesos": 20000000,
        "nepPage": "546",
        "hgabPage": "604",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road in Barangay Ping-As, Alitagtag, Batangas",
      "source_code": "2027DPWH-Proposal-36594",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Rehabilitation of Roads, Barangay Ping-as, Alitagtag, Batangas",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203505000 · PDF p. 1284 · printed p. 2749",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36594",
        "nepTitle": "Construction of Road in Barangay Ping-As, Alitagtag, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0539-008315",
        "hgabTitle": "Construction of Road in Barangay Ping-As, Alitagtag, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "506",
        "hgabPage": "539",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road in Lipilip, Sipocot, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39528",
      "office": "Camarines Sur 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 10000000,
      "comparison_year": 2016,
      "prior_project": "Concreting of Barangay Road,  Brgy. Lipilip, Sipocot, Camarines Sur",
      "prior_amount": 2000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050305367",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39528",
        "nepTitle": "Construction of Road in Lipilip, Sipocot, Camarines Sur",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0560-008789",
        "hgabTitle": "Construction of Road in Lipilip, Sipocot, Camarines Sur",
        "hgabPesos": 10000000,
        "nepPage": "519",
        "hgabPage": "560",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road in Lipilip, Sipocot, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39528",
      "office": "Camarines Sur 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Barangay Road,  Brgy. Lipilip, Sipocot, Camarines Sur",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050305367",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39528",
        "nepTitle": "Construction of Road in Lipilip, Sipocot, Camarines Sur",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0560-008789",
        "hgabTitle": "Construction of Road in Lipilip, Sipocot, Camarines Sur",
        "hgabPesos": 10000000,
        "nepPage": "519",
        "hgabPage": "560",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road of Barangay Roxas, Naguilian, Isabela",
      "source_code": "2027DPWH-Proposal-35396",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Roxas, Naguilian, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535322",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35396",
        "nepTitle": "Construction of Road of Barangay Roxas, Naguilian, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0496-007413",
        "hgabTitle": "Construction of Road of Barangay Roxas, Naguilian, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "480",
        "hgabPage": "496",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road of Barangay Songsong, Gamu to Barangay Tomines, Naguilian, Isabela",
      "source_code": "2027DPWH-Proposal-00450",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 9896000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road of Barangay Songsong, Gamu to Barangay Tomines, Naguilian, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574774",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-00450",
        "nepTitle": "Construction of Road of Barangay Songsong, Gamu to Barangay Tomines, Naguilian, Isabela",
        "nepPesos": 9896000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0496-007414",
        "hgabTitle": "Construction of Road of Barangay Songsong, Gamu to Barangay Tomines, Naguilian, Isabela",
        "hgabPesos": 9896000,
        "nepPage": "480",
        "hgabPage": "496",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Aliaga IS, Barangay Macabucod, Aliaga, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35984",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road Aliaga IS Barangay Macabucod, Aliaga, Nueva Ecija, Sta. 0+000 - Sta. 1+120",
      "prior_amount": 14700000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21552",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–1+120.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35984",
        "nepTitle": "Construction of Road, Aliaga IS, Barangay Macabucod, Aliaga, Nueva Ecija",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0519-007891",
        "hgabTitle": "Construction of Road, Aliaga IS, Barangay Macabucod, Aliaga, Nueva Ecija",
        "hgabPesos": 10000000,
        "nepPage": "494",
        "hgabPage": "519",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Andres Bonifacio, Diffun, Quirino",
      "source_code": "2027DPWH-Proposal-35132",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. Andres Bonifacio, Diffun, Quirino",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499050",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35132",
        "nepTitle": "Construction of Road, Andres Bonifacio, Diffun, Quirino",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007593",
        "hgabTitle": "Construction of Road, Andres Bonifacio, Diffun, Quirino",
        "hgabPesos": 10000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Andres Bonifacio, Diffun, Quirino",
      "source_code": "2027DPWH-Proposal-35132",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Andres Bonifacio Road, Barangay Andres Bonifacio, Diffun, Quirino - Sta. 0+380 - Sta. 0+730",
      "prior_amount": 4544000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21217",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+380.00–0+730.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35132",
        "nepTitle": "Construction of Road, Andres Bonifacio, Diffun, Quirino",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007593",
        "hgabTitle": "Construction of Road, Andres Bonifacio, Diffun, Quirino",
        "hgabPesos": 10000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Aurora West, Diffun, Quirino",
      "source_code": "2027DPWH-Proposal-35134",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. Aurora West, Diffun, Quirino",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499051",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35134",
        "nepTitle": "Construction of Road, Aurora West, Diffun, Quirino",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007594",
        "hgabTitle": "Construction of Road, Aurora West, Diffun, Quirino",
        "hgabPesos": 10000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Aurora West, Diffun, Quirino",
      "source_code": "2027DPWH-Proposal-35134",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction/Improvement of Road, Aurora West, Diffun, Quirino",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535378",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35134",
        "nepTitle": "Construction of Road, Aurora West, Diffun, Quirino",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007594",
        "hgabTitle": "Construction of Road, Aurora West, Diffun, Quirino",
        "hgabPesos": 10000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Bahay Pare, Candaba, Pampanga",
      "source_code": "2027DPWH-Proposal-35516",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Bahay Pare Road, Barangay Bahay Pare, Candaba, Pampanga",
      "prior_amount": 8000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522316",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35516",
        "nepTitle": "Construction of Road, Bahay Pare, Candaba, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0526-008037",
        "hgabTitle": "Construction of Road, Bahay Pare, Candaba, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "498",
        "hgabPage": "526",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Bahay Pare, Candaba, Pampanga",
      "source_code": "2027DPWH-Proposal-35516",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Bahay Pare Road, Barangay Bahay Pare, Candaba, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 526011",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35516",
        "nepTitle": "Construction of Road, Bahay Pare, Candaba, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0526-008037",
        "hgabTitle": "Construction of Road, Bahay Pare, Candaba, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "498",
        "hgabPage": "526",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Bahay Pare, Candaba, Pampanga",
      "source_code": "2027DPWH-Proposal-35516",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Road, Barangay Bahay Pare, Candaba, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307445",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35516",
        "nepTitle": "Construction of Road, Bahay Pare, Candaba, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0526-008037",
        "hgabTitle": "Construction of Road, Bahay Pare, Candaba, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "498",
        "hgabPage": "526",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Balili-Alab, Bontoc, Mountain Province",
      "source_code": "2027DPWH-Proposal-34666",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Alab-Barangay Balili Road Sta. 0+720 - Sta. 0+800, Bontoc, Mountain Province",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 29364",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+720.00–0+800.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maximo Dalog Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34666",
        "nepTitle": "Construction of Road, Balili-Alab, Bontoc, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0480-007067",
        "hgabTitle": "Construction of Road, Balili-Alab, Bontoc, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "480",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay 8, Bacolod City",
      "source_code": "2027DPWH-Proposal-37378",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Barangay Road, Barangay 8, Bacolod City",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117204229000 · PDF p. 1327 · printed p. 2792",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37378",
        "nepTitle": "Construction of Road, Barangay 8, Bacolod City",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0573-009079",
        "hgabTitle": "Construction of Road, Barangay 8, Bacolod City",
        "hgabPesos": 5000000,
        "nepPage": "528",
        "hgabPage": "573",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay 9, Isabela, Negros Occidental",
      "source_code": "2027DPWH-Proposal-28995",
      "office": "Negros Occidental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay 9 , Isabela, Negros Occidental",
      "prior_amount": 9500000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575615",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Dino Yulo"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28995",
        "nepTitle": "Construction of Road, Barangay 9, Isabela, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0577-009149",
        "hgabTitle": "Construction of Road, Barangay 9, Isabela, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "530",
        "hgabPage": "577",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Alunogan, Natonin, Mountain Province",
      "source_code": "2027DPWH-Proposal-34700",
      "office": "Mountain Province 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Alunogan, Sta. 0+108 - Sta. 0+200, Natonin, Mountain Province",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 29385",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+108.00–0+200.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34700",
        "nepTitle": "Construction of Road, Barangay Alunogan, Natonin, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0482-007117",
        "hgabTitle": "Construction of Road, Barangay Alunogan, Natonin, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "474",
        "hgabPage": "482",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Amagos, Sta. 0+000 - 0+376, Bato, Leyte",
      "source_code": "2027DPWH-Proposal-37969",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Amagos, Bato, Leyte",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552881",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+376.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37969",
        "nepTitle": "Construction of Road, Barangay Amagos, Sta. 0+000 - 0+376, Bato, Leyte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0595-009555",
        "hgabTitle": "Construction of Road, Barangay Amagos, Sta. 0+000 - 0+376, Bato, Leyte",
        "hgabPesos": 5000000,
        "nepPage": "541",
        "hgabPage": "595",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Ambabaay, Bani, Pangasinan",
      "source_code": "2027DPWH-Proposal-34158",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road in Barangay Ambabaay, Bani, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526172",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34158",
        "nepTitle": "Construction of Road, Barangay Ambabaay, Bani, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0467-006789",
        "hgabTitle": "Construction of Road, Barangay Ambabaay, Bani, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "467",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Ambalite, Pugo, La Union",
      "source_code": "2027DPWH-Proposal-34253",
      "office": "La Union 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 12500000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road in Barangay Ambalite, Pugo, La Union, Sta.0+000-Sta0+400",
      "prior_amount": 11601000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 26474",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+400.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34253",
        "nepTitle": "Construction of Road, Barangay Ambalite, Pugo, La Union",
        "nepPesos": 12500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0466-006749",
        "hgabTitle": "Construction of Road, Barangay Ambalite, Pugo, La Union",
        "hgabPesos": 12500000,
        "nepPage": "464",
        "hgabPage": "466",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Ambasing, Sagada, Mountain Province",
      "source_code": "2027DPWH-Proposal-34792",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Improvement of Road, Ambasing, Sagada, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 537223",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34792",
        "nepTitle": "Construction of Road, Barangay Ambasing, Sagada, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0480-007069",
        "hgabTitle": "Construction of Road, Barangay Ambasing, Sagada, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "480",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Ambolong, Batan, Aklan",
      "source_code": "2027DPWH-Proposal-37237",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Brgy. Ambolong, Batan, Aklan",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117204165000 · PDF p. 1324 · printed p. 2789",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37237",
        "nepTitle": "Construction of Road, Barangay Ambolong, Batan, Aklan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0566-008931",
        "hgabTitle": "Construction of Road, Barangay Ambolong, Batan, Aklan",
        "hgabPesos": 5000000,
        "nepPage": "523",
        "hgabPage": "566",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Amiroy to Barangay Badiangan, Mina, Iloilo",
      "source_code": "2027DPWH-Proposal-37110",
      "office": "Iloilo 6th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Badiangan to Barangay Amiroy, Mina, Iloilo - Station 0+000 - Station 0+670",
      "prior_amount": 9569000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 22750",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+670.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37110",
        "nepTitle": "Construction of Road, Barangay Amiroy to Barangay Badiangan, Mina, Iloilo",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0572-009058",
        "hgabTitle": "Construction of Road, Barangay Amiroy to Barangay Badiangan, Mina, Iloilo",
        "hgabPesos": 10000000,
        "nepPage": "527",
        "hgabPage": "572",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Angoluan, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35352",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Brgy. Angoluan, Echague, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 569775",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35352",
        "nepTitle": "Construction of Road, Barangay Angoluan, Echague, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0501-007501",
        "hgabTitle": "Construction of Road, Barangay Angoluan, Echague, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "482",
        "hgabPage": "501",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Anolid, Mangaldan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34528",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 1+225 - Sta. 1+374, Barangay Anolid, Mangaldan, Pangasinan",
      "prior_amount": 4834000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 26504",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "1+225.00–1+374.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34528",
        "nepTitle": "Construction of Road, Barangay Anolid, Mangaldan, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006854",
        "hgabTitle": "Construction of Road, Barangay Anolid, Mangaldan, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Anonat, Paracelis, Mountain Province",
      "source_code": "2027DPWH-Proposal-34703",
      "office": "Mountain Province 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Improvement of Road, Anonat, Paracelis, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 537208",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34703",
        "nepTitle": "Construction of Road, Barangay Anonat, Paracelis, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0482-007118",
        "hgabTitle": "Construction of Road, Barangay Anonat, Paracelis, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "474",
        "hgabPage": "482",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Anonat, Paracelis, Mountain Province",
      "source_code": "2027DPWH-Proposal-34703",
      "office": "Mountain Province 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Anonat, Paracelis, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 576464",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34703",
        "nepTitle": "Construction of Road, Barangay Anonat, Paracelis, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0482-007118",
        "hgabTitle": "Construction of Road, Barangay Anonat, Paracelis, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "474",
        "hgabPage": "482",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Apale, Ragay, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39289",
      "office": "Camarines Sur 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Barangay Road, Apale, Ragay, Camarines Sur",
      "prior_amount": 1500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428730",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39289",
        "nepTitle": "Construction of Road, Barangay Apale, Ragay, Camarines Sur",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0560-008790",
        "hgabTitle": "Construction of Road, Barangay Apale, Ragay, Camarines Sur",
        "hgabPesos": 10000000,
        "nepPage": "519",
        "hgabPage": "560",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Arebasore, Mabinay, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37517",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Arebasore, Mabinay, Negros Oriental",
      "prior_amount": 25000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527536",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37517",
        "nepTitle": "Construction of Road, Barangay Arebasore, Mabinay, Negros Oriental",
        "nepPesos": 6000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0579-009210",
        "hgabTitle": "Construction of Road, Barangay Arebasore, Mabinay, Negros Oriental",
        "hgabPesos": 6000000,
        "nepPage": "532",
        "hgabPage": "579",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Arebasore, Mabinay, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37517",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Barangay Arebasore, Mabinay, Negros Oriental",
      "prior_amount": 3000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117204658000 · PDF p. 1353 · printed p. 2818",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37517",
        "nepTitle": "Construction of Road, Barangay Arebasore, Mabinay, Negros Oriental",
        "nepPesos": 6000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0579-009210",
        "hgabTitle": "Construction of Road, Barangay Arebasore, Mabinay, Negros Oriental",
        "hgabPesos": 6000000,
        "nepPage": "532",
        "hgabPage": "579",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Atabay, Sta. 0+000 - 0+371, Hilongos, Leyte",
      "source_code": "2027DPWH-Proposal-37966",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Rehabilitation of Road, Barangay Atabay, Hilongos, Leyte",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552901",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+371.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37966",
        "nepTitle": "Construction of Road, Barangay Atabay, Sta. 0+000 - 0+371, Hilongos, Leyte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0595-009556",
        "hgabTitle": "Construction of Road, Barangay Atabay, Sta. 0+000 - 0+371, Hilongos, Leyte",
        "hgabPesos": 5000000,
        "nepPage": "541",
        "hgabPage": "595",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Baay, Bagulin, La Union",
      "source_code": "2027DPWH-Proposal-34513",
      "office": "La Union 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Barangay Road, Brgy. Baay, Bagulin, La Union",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200267000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34513",
        "nepTitle": "Construction of Road, Barangay Baay, Bagulin, La Union",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0466-006751",
        "hgabTitle": "Construction of Road, Barangay Baay, Bagulin, La Union",
        "hgabPesos": 5000000,
        "nepPage": "465",
        "hgabPage": "466",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Babaran, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35353",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Concreting of Road, Brgy Babaran, Echague, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574823",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35353",
        "nepTitle": "Construction of Road, Barangay Babaran, Echague, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0501-007503",
        "hgabTitle": "Construction of Road, Barangay Babaran, Echague, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "482",
        "hgabPage": "501",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bacayao Sur, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34457",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Bacayao Sur, Dagupan City, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574552",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34457",
        "nepTitle": "Construction of Road, Barangay Bacayao Sur, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006856",
        "hgabTitle": "Construction of Road, Barangay Bacayao Sur, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bacayao Sur, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34457",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Road, Brgy. Bacayao Sur, Dagupan City, Pangasinan",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200340000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34457",
        "nepTitle": "Construction of Road, Barangay Bacayao Sur, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006856",
        "hgabTitle": "Construction of Road, Barangay Bacayao Sur, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Baclayan, Puerto Galera, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36895",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Baclayan, Puerto Galera, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552287",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36895",
        "nepTitle": "Construction of Road, Barangay Baclayan, Puerto Galera, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0553-008647",
        "hgabTitle": "Construction of Road, Barangay Baclayan, Puerto Galera, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "515",
        "hgabPage": "553",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Baco, Leyte Leyte (Station 0+000 - 0+200)",
      "source_code": "2027DPWH-Proposal-37999",
      "office": "Leyte 3rd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Baco, Leyte, Leyte",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527587",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+200.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37999",
        "nepTitle": "Construction of Road, Barangay Baco, Leyte Leyte (Station 0+000 - 0+200)",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0593-009517",
        "hgabTitle": "Construction of Road, Barangay Baco, Leyte Leyte (Station 0+000 - 0+200)",
        "hgabPesos": 5000000,
        "nepPage": "540",
        "hgabPage": "593",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Badiang, Cataingan to Barangay Guindawahan, Pio V. Corpuz, Masbate, Sta. 5+330 - Sta. 6+163",
      "source_code": "2027DPWH-Proposal-39329",
      "office": "Masbate 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 25000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Guindawahan-Badiang Road, Pio V. Corpuz and Cataingan, Masbate",
      "prior_amount": 20000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300116201866000 · PDF p. 1191 · printed p. 2656",
      "similarity_pct": 100,
      "current_chainage": "5+330.00–6+163.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39329",
        "nepTitle": "Construction of Road, Barangay Badiang, Cataingan to Barangay Guindawahan, Pio V. Corpuz, Masbate, Sta. 5+330 - Sta. 6+163",
        "nepPesos": 25000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0565-008894",
        "hgabTitle": "Construction of Road, Barangay Badiang, Cataingan to Barangay Guindawahan, Pio V. Corpuz, Masbate, Sta. 5+330 - Sta. 6+163",
        "hgabPesos": 25000000,
        "nepPage": "522",
        "hgabPage": "565",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bagnen Proper, Bauko, Mountain Province",
      "source_code": "2027DPWH-Proposal-34654",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Improvement of Road, Bagnen Proper, Bauko, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 537226",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34654",
        "nepTitle": "Construction of Road, Barangay Bagnen Proper, Bauko, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007071",
        "hgabTitle": "Construction of Road, Barangay Bagnen Proper, Bauko, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bagnen Proper, Bauko, Mountain Province",
      "source_code": "2027DPWH-Proposal-34654",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Bagnen Proper, Bauko, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 576452",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34654",
        "nepTitle": "Construction of Road, Barangay Bagnen Proper, Bauko, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007071",
        "hgabTitle": "Construction of Road, Barangay Bagnen Proper, Bauko, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bagong Barrio, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35930",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Bagong Barrio , San Ildefonso, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535512",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35930",
        "nepTitle": "Construction of Road, Barangay Bagong Barrio, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0516-007835",
        "hgabTitle": "Construction of Road, Barangay Bagong Barrio, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "516",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bagong Barrio, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35930",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Bagong Barrio, San Ildefonso, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 559041",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35930",
        "nepTitle": "Construction of Road, Barangay Bagong Barrio, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0516-007835",
        "hgabTitle": "Construction of Road, Barangay Bagong Barrio, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "516",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bagong Barrio, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35930",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Road, Brgy. Bagong Barrio, San Ildefonso, Bulacan",
      "prior_amount": 1500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200783000",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35930",
        "nepTitle": "Construction of Road, Barangay Bagong Barrio, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0516-007835",
        "hgabTitle": "Construction of Road, Barangay Bagong Barrio, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "516",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Baguinay, Manaoag, Pangasinan",
      "source_code": "2027DPWH-Proposal-34208",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road at Barangay Baguinay, Manaoag, Pangasinan",
      "prior_amount": 1500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427499",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34208",
        "nepTitle": "Construction of Road, Barangay Baguinay, Manaoag, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006857",
        "hgabTitle": "Construction of Road, Barangay Baguinay, Manaoag, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Balanoy, La Paz, Tarlac",
      "source_code": "2027DPWH-Proposal-35743",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Balanoy, La Paz, Tarlac",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575011",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bong Rivera"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35743",
        "nepTitle": "Construction of Road, Barangay Balanoy, La Paz, Tarlac",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0534-008202",
        "hgabTitle": "Construction of Road, Barangay Balanoy, La Paz, Tarlac",
        "hgabPesos": 5000000,
        "nepPage": "502",
        "hgabPage": "534",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Balintaugan, Bauko, Mountain Province",
      "source_code": "2027DPWH-Proposal-34655",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Balintaugan, Bauko, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540269",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34655",
        "nepTitle": "Construction of Road, Barangay Balintaugan, Bauko, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007072",
        "hgabTitle": "Construction of Road, Barangay Balintaugan, Bauko, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36018",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526599",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36018",
        "nepTitle": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007898",
        "hgabTitle": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "494",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36018",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2016,
      "prior_project": "Construction of Barangay Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050304770",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36018",
        "nepTitle": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007898",
        "hgabTitle": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "494",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36018",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Barangay Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050304770",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36018",
        "nepTitle": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007898",
        "hgabTitle": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "494",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36018",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Road, Brgy. Baloc, Sto. Domingo, Nueva Ecija",
      "prior_amount": 5840000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300116201667000 · PDF p. 1178 · printed p. 2643",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36018",
        "nepTitle": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007898",
        "hgabTitle": "Construction of Road, Barangay Baloc, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "494",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Baluga, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35889",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Baluga, Talavera, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 539552",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35889",
        "nepTitle": "Construction of Road, Barangay Baluga, Talavera, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Baluga, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35889",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Baluga, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+567.78",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21536",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+567.78",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35889",
        "nepTitle": "Construction of Road, Barangay Baluga, Talavera, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Baluga, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35889",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Barangay Baluga, Talavera, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203216000 · PDF p. 1267 · printed p. 2732",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35889",
        "nepTitle": "Construction of Road, Barangay Baluga, Talavera, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bana-ao, Tadian, Mountain Province",
      "source_code": "2027DPWH-Proposal-34793",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Bana-ao, Tadian, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 576462",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34793",
        "nepTitle": "Construction of Road, Barangay Bana-ao, Tadian, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007073",
        "hgabTitle": "Construction of Road, Barangay Bana-ao, Tadian, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Banaba Kanluran, Batangas City",
      "source_code": "2027DPWH-Proposal-36155",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction/Rehabilitation of Road, Brgy. Banaba Kanluran, Batangas City, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499369",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36155",
        "nepTitle": "Construction of Road, Barangay Banaba Kanluran, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0537-008275",
        "hgabTitle": "Construction of Road, Barangay Banaba Kanluran, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "505",
        "hgabPage": "537",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Banao, Bauko, Mountain Province",
      "source_code": "2027DPWH-Proposal-34656",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Improvement of Road, Banao, Bauko, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 537216",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34656",
        "nepTitle": "Construction of Road, Barangay Banao, Bauko, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007074",
        "hgabTitle": "Construction of Road, Barangay Banao, Bauko, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Banao, Bauko, Mountain Province",
      "source_code": "2027DPWH-Proposal-34656",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Banao, Bauko, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 553548",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34656",
        "nepTitle": "Construction of Road, Barangay Banao, Bauko, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007074",
        "hgabTitle": "Construction of Road, Barangay Banao, Bauko, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Banao, Bauko, Mountain Province",
      "source_code": "2027DPWH-Proposal-34656",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Banao, Bauko, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 576380",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34656",
        "nepTitle": "Construction of Road, Barangay Banao, Bauko, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007074",
        "hgabTitle": "Construction of Road, Barangay Banao, Bauko, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Banawang - Barangay Astorga, Tunga, Leyte",
      "source_code": "2027DPWH-Proposal-37924",
      "office": "Leyte 2nd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Banawang - Astorga, Tunga, Leyte",
      "prior_amount": 10000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552859",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37924",
        "nepTitle": "Construction of Road, Barangay Banawang - Barangay Astorga, Tunga, Leyte",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0592-009497",
        "hgabTitle": "Construction of Road, Barangay Banawang - Barangay Astorga, Tunga, Leyte",
        "hgabPesos": 10000000,
        "nepPage": "539",
        "hgabPage": "592",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bangin, San Nicolas, Batangas",
      "source_code": "2027DPWH-Proposal-36576",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Bangin, San Nicolas, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 550930",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36576",
        "nepTitle": "Construction of Road, Barangay Bangin, San Nicolas, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0539-008323",
        "hgabTitle": "Construction of Road, Barangay Bangin, San Nicolas, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "506",
        "hgabPage": "539",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Banog Norte, Bani, Pangasinan",
      "source_code": "2027DPWH-Proposal-34159",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Banog Norte, Bani, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526198",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34159",
        "nepTitle": "Construction of Road, Barangay Banog Norte, Bani, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0469-006827",
        "hgabTitle": "Construction of Road, Barangay Banog Norte, Bani, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "469",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bantayan, Mangaldan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34237",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Concreting of Barangay Road, Brgy. Bantayan, Mangaldan, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200323000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34237",
        "nepTitle": "Construction of Road, Barangay Bantayan, Mangaldan, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006858",
        "hgabTitle": "Construction of Road, Barangay Bantayan, Mangaldan, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Banyaga, Agoncillo, Batangas",
      "source_code": "2027DPWH-Proposal-36571",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Roads at Barangay Banyaga, Agoncillo, Batangas",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575107",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36571",
        "nepTitle": "Construction of Road, Barangay Banyaga, Agoncillo, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0539-008324",
        "hgabTitle": "Construction of Road, Barangay Banyaga, Agoncillo, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "506",
        "hgabPage": "539",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Banyaga, Agoncillo, Batangas",
      "source_code": "2027DPWH-Proposal-36571",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Concreting of Road, Brgy. Banyaga, Agoncillo, Batangas",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201035000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36571",
        "nepTitle": "Construction of Road, Barangay Banyaga, Agoncillo, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0539-008324",
        "hgabTitle": "Construction of Road, Barangay Banyaga, Agoncillo, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "506",
        "hgabPage": "539",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Barangobong, Villasis, Pangasinan",
      "source_code": "2027DPWH-Proposal-34474",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Barangobong, Villasis, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560247",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34474",
        "nepTitle": "Construction of Road, Barangay Barangobong, Villasis, Pangasinan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0415-005765",
        "hgabTitle": "Construction of Road, Barangay Barangobong, Villasis, Pangasinan",
        "hgabPesos": 10000000,
        "nepPage": "434",
        "hgabPage": "415",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Baruan, Agno, Pangasinan",
      "source_code": "2027DPWH-Proposal-34170",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Baruan, Agno, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551391",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34170",
        "nepTitle": "Construction of Road, Barangay Baruan, Agno, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0469-006828",
        "hgabTitle": "Construction of Road, Barangay Baruan, Agno, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "469",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Baruan, Agno, Pangasinan",
      "source_code": "2027DPWH-Proposal-34170",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Road Concreting, Brgy. Baruan, Agno, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117202568000 · PDF p. 1229 · printed p. 2694",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34170",
        "nepTitle": "Construction of Road, Barangay Baruan, Agno, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0469-006828",
        "hgabTitle": "Construction of Road, Barangay Baruan, Agno, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "469",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Basang Hamog, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36001",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6380000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Basang Hamog, Talavera, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560443",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36001",
        "nepTitle": "Construction of Road, Barangay Basang Hamog, Talavera, Nueva Ecija",
        "nepPesos": 6380000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007900",
        "hgabTitle": "Construction of Road, Barangay Basang Hamog, Talavera, Nueva Ecija",
        "hgabPesos": 6380000,
        "nepPage": "494",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Basang Hamog, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36001",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6380000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Basang Hamog, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+511",
      "prior_amount": 7448000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27152",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+511.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36001",
        "nepTitle": "Construction of Road, Barangay Basang Hamog, Talavera, Nueva Ecija",
        "nepPesos": 6380000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007900",
        "hgabTitle": "Construction of Road, Barangay Basang Hamog, Talavera, Nueva Ecija",
        "hgabPesos": 6380000,
        "nepPage": "494",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Baviera, Sagay City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37454",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road in Brgy. Baviera, City of Sagay, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 536343",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37454",
        "nepTitle": "Construction of Road, Barangay Baviera, Sagay City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0576-009126",
        "hgabTitle": "Construction of Road, Barangay Baviera, Sagay City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "529",
        "hgabPage": "576",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Belwang, Lupi, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39285",
      "office": "Camarines Sur 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 15000000,
      "comparison_year": 2016,
      "prior_project": "Concreting of Barangay Road, Brgy. Belwang, Lupi, Camarines Sur",
      "prior_amount": 2000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050305365",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39285",
        "nepTitle": "Construction of Road, Barangay Belwang, Lupi, Camarines Sur",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0560-008791",
        "hgabTitle": "Construction of Road, Barangay Belwang, Lupi, Camarines Sur",
        "hgabPesos": 15000000,
        "nepPage": "519",
        "hgabPage": "560",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Belwang, Lupi, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39285",
      "office": "Camarines Sur 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 15000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Barangay Road, Brgy. Belwang, Lupi, Camarines Sur",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050305365",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39285",
        "nepTitle": "Construction of Road, Barangay Belwang, Lupi, Camarines Sur",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0560-008791",
        "hgabTitle": "Construction of Road, Barangay Belwang, Lupi, Camarines Sur",
        "hgabPesos": 15000000,
        "nepPage": "519",
        "hgabPage": "560",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Belwang, Lupi, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39285",
      "office": "Camarines Sur 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 15000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Barangay Road, Brgy. Belwang, Lupi, Camarines Sur",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203927000 · PDF p. 1310 · printed p. 2775",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39285",
        "nepTitle": "Construction of Road, Barangay Belwang, Lupi, Camarines Sur",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0560-008791",
        "hgabTitle": "Construction of Road, Barangay Belwang, Lupi, Camarines Sur",
        "hgabPesos": 15000000,
        "nepPage": "519",
        "hgabPage": "560",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bertese, Quezon, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35862",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Road, Brgy. Bertese, Quezon, Nueva Ecija",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522294",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mika Suansing"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35862",
        "nepTitle": "Construction of Road, Barangay Bertese, Quezon, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007902",
        "hgabTitle": "Construction of Road, Barangay Bertese, Quezon, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "494",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bertese, Quezon, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35862",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Road, Brgy. Bertese, Quezon, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307356",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35862",
        "nepTitle": "Construction of Road, Barangay Bertese, Quezon, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007902",
        "hgabTitle": "Construction of Road, Barangay Bertese, Quezon, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "494",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Betwagan, Sadanga, Mountain Province",
      "source_code": "2027DPWH-Proposal-34789",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Betwagan, Sadanga, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 537214",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34789",
        "nepTitle": "Construction of Road, Barangay Betwagan, Sadanga, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007076",
        "hgabTitle": "Construction of Road, Barangay Betwagan, Sadanga, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Betwagan, Sadanga, Mountain Province",
      "source_code": "2027DPWH-Proposal-34789",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Betwagan Road Sta. 1+740 - Sta 1+820, Sadanga, Mountain Province",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 24113",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "1+740.00–1+820.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34789",
        "nepTitle": "Construction of Road, Barangay Betwagan, Sadanga, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007076",
        "hgabTitle": "Construction of Road, Barangay Betwagan, Sadanga, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bibiclat, Aliaga, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35833",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. Bibiclat, Aliaga, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 492503",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35833",
        "nepTitle": "Construction of Road, Barangay Bibiclat, Aliaga, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007903",
        "hgabTitle": "Construction of Road, Barangay Bibiclat, Aliaga, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bibiclat, Aliaga, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35833",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Barangay Bibiclat Road, Aliaga, Nueva Ecija",
      "prior_amount": 20000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526595",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35833",
        "nepTitle": "Construction of Road, Barangay Bibiclat, Aliaga, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007903",
        "hgabTitle": "Construction of Road, Barangay Bibiclat, Aliaga, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bibiclat, Aliaga, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35833",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Bibiclat, Aliaga, Nueva Ecija",
      "prior_amount": 17000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 527839",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35833",
        "nepTitle": "Construction of Road, Barangay Bibiclat, Aliaga, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007903",
        "hgabTitle": "Construction of Road, Barangay Bibiclat, Aliaga, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bibiclat, Cuyapo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35837",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Bibiclat, Cuyapo, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560503",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35837",
        "nepTitle": "Construction of Road, Barangay Bibiclat, Cuyapo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007904",
        "hgabTitle": "Construction of Road, Barangay Bibiclat, Cuyapo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bibiclat, Cuyapo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35837",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Bibiclat, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+390",
      "prior_amount": 5390000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27190",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+390.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35837",
        "nepTitle": "Construction of Road, Barangay Bibiclat, Cuyapo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007904",
        "hgabTitle": "Construction of Road, Barangay Bibiclat, Cuyapo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
      "source_code": "2027DPWH-Proposal-35949",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road at Brgy. Biclat, San Miguel, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499182",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35949",
        "nepTitle": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007836",
        "hgabTitle": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "517",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
      "source_code": "2027DPWH-Proposal-35949",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574088",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35949",
        "nepTitle": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007836",
        "hgabTitle": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "517",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
      "source_code": "2027DPWH-Proposal-35949",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Road, Brgy. Biclat, San Miguel, Bulacan",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200786000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35949",
        "nepTitle": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007836",
        "hgabTitle": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "517",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
      "source_code": "2027DPWH-Proposal-35949",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Road, Brgy. Biclat, San Miguel, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203188000 · PDF p. 1265 · printed p. 2730",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35949",
        "nepTitle": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007836",
        "hgabTitle": "Construction of Road, Barangay Biclat, San Miguel, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "517",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bio-os, Amlan, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37500",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 0+000 - Sta. 0+298.5, Barangay Bio-os, Amlan, Negros Oriental",
      "prior_amount": 9800000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 22884",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+298.50",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maisa Sagarbarria"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37500",
        "nepTitle": "Construction of Road, Barangay Bio-os, Amlan, Negros Oriental",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0580-009212",
        "hgabTitle": "Construction of Road, Barangay Bio-os, Amlan, Negros Oriental",
        "hgabPesos": 10000000,
        "nepPage": "532",
        "hgabPage": "580",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bonuan Binloc, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34458",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Concreting of Road, Brgy. Bonuan Binloc, Dagupan City, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200332000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34458",
        "nepTitle": "Construction of Road, Barangay Bonuan Binloc, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006859",
        "hgabTitle": "Construction of Road, Barangay Bonuan Binloc, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bonuan Boquig, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34459",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Brgy. Bonuan Boquig, Dagupan City, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117202623000 · PDF p. 1232 · printed p. 2697",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34459",
        "nepTitle": "Construction of Road, Barangay Bonuan Boquig, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006860",
        "hgabTitle": "Construction of Road, Barangay Bonuan Boquig, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bubulong Malaki, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35931",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Road, Brgy. Bubulong Malaki, San Ildefonso, Bulacan",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200787000",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35931",
        "nepTitle": "Construction of Road, Barangay Bubulong Malaki, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007837",
        "hgabTitle": "Construction of Road, Barangay Bubulong Malaki, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Buenasuerte to Barangay Libertad, Uson, Masbate",
      "source_code": "2027DPWH-Proposal-39335",
      "office": "Masbate 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 15000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Libertad - Buenasuerte Road, Uson, Masbate",
      "prior_amount": 10000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552448",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39335",
        "nepTitle": "Construction of Road, Barangay Buenasuerte to Barangay Libertad, Uson, Masbate",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bugtong na Buli, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35873",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Bugtong na Buli, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+332",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27154",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+332.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35873",
        "nepTitle": "Construction of Road, Barangay Bugtong na Buli, Talavera, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007906",
        "hgabTitle": "Construction of Road, Barangay Bugtong na Buli, Talavera, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bukal, Tiaong, Quezon",
      "source_code": "2027DPWH-Proposal-36667",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Brgy. Bukal, Tiaong, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535899",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36667",
        "nepTitle": "Construction of Road, Barangay Bukal, Tiaong, Quezon",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0548-008519",
        "hgabTitle": "Construction of Road, Barangay Bukal, Tiaong, Quezon",
        "hgabPesos": 15000000,
        "nepPage": "512",
        "hgabPage": "548",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bukal, Tiaong, Quezon",
      "source_code": "2027DPWH-Proposal-36667",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Brgy. Bukal, Tiaong, Quezon",
      "prior_amount": 6000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 549665",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36667",
        "nepTitle": "Construction of Road, Barangay Bukal, Tiaong, Quezon",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0548-008519",
        "hgabTitle": "Construction of Road, Barangay Bukal, Tiaong, Quezon",
        "hgabPesos": 15000000,
        "nepPage": "512",
        "hgabPage": "548",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bulihan, San Antonio, Quezon",
      "source_code": "2027DPWH-Proposal-36465",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 11000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road at Barangay Bulihan, San Antonio, Quezon",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526997",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "David Suarez"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36465",
        "nepTitle": "Construction of Road, Barangay Bulihan, San Antonio, Quezon",
        "nepPesos": 11000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0548-008534",
        "hgabTitle": "Construction of Road, Barangay Bulihan, San Antonio, Quezon",
        "hgabPesos": 11000000,
        "nepPage": "512",
        "hgabPage": "548",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bulwang, Numancia, Aklan",
      "source_code": "2027DPWH-Proposal-37291",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Barangay Road, Barangay Bulwang, Numancia, Aklan",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428882",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37291",
        "nepTitle": "Construction of Road, Barangay Bulwang, Numancia, Aklan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0566-008932",
        "hgabTitle": "Construction of Road, Barangay Bulwang, Numancia, Aklan",
        "hgabPesos": 5000000,
        "nepPage": "523",
        "hgabPage": "566",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bun-ayan, Sabangan, Mountain Province",
      "source_code": "2027DPWH-Proposal-34755",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Bun - ayan, Sabangan, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 553554",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34755",
        "nepTitle": "Construction of Road, Barangay Bun-ayan, Sabangan, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007077",
        "hgabTitle": "Construction of Road, Barangay Bun-ayan, Sabangan, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bunol, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36000",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6875000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Bunol, Guimba, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560471",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36000",
        "nepTitle": "Construction of Road, Barangay Bunol, Guimba, Nueva Ecija",
        "nepPesos": 6875000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007907",
        "hgabTitle": "Construction of Road, Barangay Bunol, Guimba, Nueva Ecija",
        "hgabPesos": 6875000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bunol, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36000",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6875000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Bunol, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+466",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27158",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+466.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36000",
        "nepTitle": "Construction of Road, Barangay Bunol, Guimba, Nueva Ecija",
        "nepPesos": 6875000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007907",
        "hgabTitle": "Construction of Road, Barangay Bunol, Guimba, Nueva Ecija",
        "hgabPesos": 6875000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Buringal, Paracelis, Mountain Province",
      "source_code": "2027DPWH-Proposal-34706",
      "office": "Mountain Province 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Improvement of Road, Buringal, Paracelis, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 537209",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34706",
        "nepTitle": "Construction of Road, Barangay Buringal, Paracelis, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0483-007120",
        "hgabTitle": "Construction of Road, Barangay Buringal, Paracelis, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "474",
        "hgabPage": "483",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Busilelao, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35355",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Brgy. Busilelao, Echague, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551635",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35355",
        "nepTitle": "Construction of Road, Barangay Busilelao, Echague, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0501-007508",
        "hgabTitle": "Construction of Road, Barangay Busilelao, Echague, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "482",
        "hgabPage": "501",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Busilelao, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35355",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road Barangay Busilelao, Echague, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560360",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35355",
        "nepTitle": "Construction of Road, Barangay Busilelao, Echague, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0501-007508",
        "hgabTitle": "Construction of Road, Barangay Busilelao, Echague, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "482",
        "hgabPage": "501",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Butigue, Paracelis, Mountain Province",
      "source_code": "2027DPWH-Proposal-34803",
      "office": "Mountain Province 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Improvement of Road, Butigue, Paracelis, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 537211",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34803",
        "nepTitle": "Construction of Road, Barangay Butigue, Paracelis, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0483-007121",
        "hgabTitle": "Construction of Road, Barangay Butigue, Paracelis, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "474",
        "hgabPage": "483",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Butigue, Paracelis, Mountain Province",
      "source_code": "2027DPWH-Proposal-34803",
      "office": "Mountain Province 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Butigue, Paracelis, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 576466",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34803",
        "nepTitle": "Construction of Road, Barangay Butigue, Paracelis, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0483-007121",
        "hgabTitle": "Construction of Road, Barangay Butigue, Paracelis, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "474",
        "hgabPage": "483",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Buyasan to Barangay Cadsalan, San Mariano, Isabela",
      "source_code": "2027DPWH-Proposal-00460",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 9797000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Buyasan to Barangay Cadsalan, San Mariano, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560343",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-00460",
        "nepTitle": "Construction of Road, Barangay Buyasan to Barangay Cadsalan, San Mariano, Isabela",
        "nepPesos": 9797000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0497-007418",
        "hgabTitle": "Construction of Road, Barangay Buyasan to Barangay Cadsalan, San Mariano, Isabela",
        "hgabPesos": 9797000,
        "nepPage": "480",
        "hgabPage": "497",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Caaninaplahan, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36028",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Caaninaplahan, Talavera, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560462",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36028",
        "nepTitle": "Construction of Road, Barangay Caaninaplahan, Talavera, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007908",
        "hgabTitle": "Construction of Road, Barangay Caaninaplahan, Talavera, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Cababto-an (Sta. 0+214.50 - Sta. 0+274.50), Pambujan, Northern Samar",
      "source_code": "2027DPWH-Proposal-38058",
      "office": "Northern Samar 2nd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Road Concreting, Barangay Cababto-an, Pambujan, Northern Samar",
      "prior_amount": 7500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 429449",
      "similarity_pct": 100,
      "current_chainage": "0+214.50–0+274.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38058",
        "nepTitle": "Construction of Road, Barangay Cababto-an (Sta. 0+214.50 - Sta. 0+274.50), Pambujan, Northern Samar",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0597-009596",
        "hgabTitle": "Construction of Road, Barangay Cababto-an (Sta. 0+214.50 - Sta. 0+274.50), Pambujan, Northern Samar",
        "hgabPesos": 5000000,
        "nepPage": "542",
        "hgabPage": "597",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Cabarasan - Barangay Dao (Sta. 4+760 - Sta. 4+964), Gamay, Northern Samar",
      "source_code": "2027DPWH-Proposal-02675",
      "office": "Northern Samar 2nd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 8000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Cabarasan - Barangay Dao, Gamay, Northern Samar",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 561229",
      "similarity_pct": 100,
      "current_chainage": "4+760.00–4+964.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02675",
        "nepTitle": "Construction of Road, Barangay Cabarasan - Barangay Dao (Sta. 4+760 - Sta. 4+964), Gamay, Northern Samar",
        "nepPesos": 8000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0597-009597",
        "hgabTitle": "Construction of Road, Barangay Cabarasan - Barangay Dao (Sta. 4+760 - Sta. 4+900), Gamay, Northern Samar",
        "hgabPesos": 8000000,
        "nepPage": "542",
        "hgabPage": "597",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Cabarasan - Barangay Dao (Sta. 4+760 - Sta. 4+964), Gamay, Northern Samar",
      "source_code": "2027DPWH-Proposal-02675",
      "office": "Northern Samar 2nd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 8000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Brgy. Cabarasan-Dao Road, Gamay, Northern Samar",
      "prior_amount": 10000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050308329",
      "similarity_pct": 100,
      "current_chainage": "4+760.00–4+964.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02675",
        "nepTitle": "Construction of Road, Barangay Cabarasan - Barangay Dao (Sta. 4+760 - Sta. 4+964), Gamay, Northern Samar",
        "nepPesos": 8000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0597-009597",
        "hgabTitle": "Construction of Road, Barangay Cabarasan - Barangay Dao (Sta. 4+760 - Sta. 4+900), Gamay, Northern Samar",
        "hgabPesos": 8000000,
        "nepPage": "542",
        "hgabPage": "597",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Cabileo, Cuyapo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35838",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 7700000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Cabileo, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+",
      "prior_amount": 5178000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21540",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35838",
        "nepTitle": "Construction of Road, Barangay Cabileo, Cuyapo, Nueva Ecija",
        "nepPesos": 7700000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007910",
        "hgabTitle": "Construction of Road, Barangay Cabileo, Cuyapo, Nueva Ecija",
        "hgabPesos": 7700000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Cabulay, Santiago City, Isabela",
      "source_code": "2027DPWH-Proposal-35410",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Brgy. Cabulay, Santiago City, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427787",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Tan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35410",
        "nepTitle": "Construction of Road, Barangay Cabulay, Santiago City, Isabela",
        "nepPesos": 6000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0501-007509",
        "hgabTitle": "Construction of Road, Barangay Cabulay, Santiago City, Isabela",
        "hgabPesos": 6000000,
        "nepPage": "482",
        "hgabPage": "501",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Cag-an, Anilao, Iloilo",
      "source_code": "2027DPWH-Proposal-37264",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of road at Barangay Cag-an, Anilao, Iloilo",
      "prior_amount": 3000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201620000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37264",
        "nepTitle": "Construction of Road, Barangay Cag-an, Anilao, Iloilo",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0572-009039",
        "hgabTitle": "Construction of Road, Barangay Cag-an, Anilao, Iloilo",
        "hgabPesos": 5000000,
        "nepPage": "527",
        "hgabPage": "572",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Calabeng, Bani, Pangasinan",
      "source_code": "2027DPWH-Proposal-34162",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Calabeng, Bani, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574532",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34162",
        "nepTitle": "Construction of Road, Barangay Calabeng, Bani, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0470-006829",
        "hgabTitle": "Construction of Road, Barangay Calabeng, Bani, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "470",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Calawitan, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35932",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Brgy. Road at Brgy. Calawitan, San Ildefonso, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200766000",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35932",
        "nepTitle": "Construction of Road, Barangay Calawitan, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0517-007839",
        "hgabTitle": "Rehabilitation of Road, Barangay Calawitan, San Ildefonso, Bulacan, Sta. 00+000 - 00+200",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Camaligan, Batan, Aklan",
      "source_code": "2027DPWH-Proposal-37240",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Brgy. Camaligan, Batan, Aklan",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117204167000 · PDF p. 1324 · printed p. 2789",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37240",
        "nepTitle": "Construction of Road, Barangay Camaligan, Batan, Aklan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0567-008934",
        "hgabTitle": "Construction of Road, Barangay Camaligan, Batan, Aklan",
        "hgabPesos": 5000000,
        "nepPage": "523",
        "hgabPage": "567",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Camansihan , City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36873",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Concreting of Road, Barangay Camansihan, Calapan City, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527097",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36873",
        "nepTitle": "Construction of Road, Barangay Camansihan , City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0554-008654",
        "hgabTitle": "Construction of Road, Barangay Camansihan , City of Calapan, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "515",
        "hgabPage": "554",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Camil-Bucutan, San Fermin, Caba, La Union",
      "source_code": "2027DPWH-Proposal-34247",
      "office": "La Union 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 22500000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road (Camil-Bucutan) in Barangay San Fermin, Caba, La Union, Sta. 10+910-Sta.11+320",
      "prior_amount": 18851000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 26468",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "10+910.00–11+320.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Dante Garcia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34247",
        "nepTitle": "Construction of Road, Barangay Camil-Bucutan, San Fermin, Caba, La Union",
        "nepPesos": 22500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0466-006754",
        "hgabTitle": "Construction of Road, Barangay Camil-Bucutan, San Fermin, Caba, La Union",
        "hgabPesos": 22500000,
        "nepPage": "465",
        "hgabPage": "466",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Can-eo, Bontoc, Mountain Province",
      "source_code": "2027DPWH-Proposal-34667",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Can-eo Road, Bontoc, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526365",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maximo Dalog Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34667",
        "nepTitle": "Construction of Road, Barangay Can-eo, Bontoc, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007078",
        "hgabTitle": "Construction of Road, Barangay Can-eo, Bontoc, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Canluto, Bindoy, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37560",
      "office": "Negros Oriental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Road, Brgy. Canluto, Bindoy, Negros Oriental",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201812000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37560",
        "nepTitle": "Construction of Road, Barangay Canluto, Bindoy, Negros Oriental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0579-009190",
        "hgabTitle": "Construction of Road, Barangay Canluto, Bindoy, Negros Oriental",
        "hgabPesos": 5000000,
        "nepPage": "531",
        "hgabPage": "579",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Cantukong, Carmen, Cebu",
      "source_code": "2027DPWH-Proposal-37712",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Road, Barangay Cantukong, Carmen, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 429189",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37712",
        "nepTitle": "Construction of Road, Barangay Cantukong, Carmen, Cebu",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0586-009375",
        "hgabTitle": "Construction of Road, Barangay Cantukong, Carmen, Cebu",
        "hgabPesos": 10000000,
        "nepPage": "536",
        "hgabPage": "586",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Capaoay, San Jacinto, Pangasinan",
      "source_code": "2027DPWH-Proposal-34225",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road at Barangay Capaoay, San Jacinto, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560222",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34225",
        "nepTitle": "Construction of Road, Barangay Capaoay, San Jacinto, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006865",
        "hgabTitle": "Construction of Road, Barangay Capaoay, San Jacinto, Pangasinan",
        "hgabPesos": 10000000,
        "nepPage": "467",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Capilla, Pastrana, Leyte",
      "source_code": "2027DPWH-Proposal-37922",
      "office": "Leyte 2nd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 7000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of road in Barangay Capilla, Pastrana, Leyte",
      "prior_amount": 3000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117204742000 · PDF p. 1357 · printed p. 2822",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37922",
        "nepTitle": "Construction of Road, Barangay Capilla, Pastrana, Leyte",
        "nepPesos": 7000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0593-009505",
        "hgabTitle": "Construction of Road, Barangay Capilla, Pastrana, Leyte",
        "hgabPesos": 7000000,
        "nepPage": "539",
        "hgabPage": "593",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Caranglaan, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34211",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. Caranglaan, Dagupan City, Pangasinan",
      "prior_amount": 1500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 498712",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34211",
        "nepTitle": "Construction of Road, Barangay Caranglaan, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006868",
        "hgabTitle": "Construction of Road, Barangay Caranglaan, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Caranglaan, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34211",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road at Barangay Caranglaan, Dagupan City, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540212",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34211",
        "nepTitle": "Construction of Road, Barangay Caranglaan, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006868",
        "hgabTitle": "Construction of Road, Barangay Caranglaan, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Carig Sur, Tuguegarao City, Cagayan",
      "source_code": "2027DPWH-Proposal-34982",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road , Brgy. Carig Sur, Tuguegarao City, Cagayan",
      "prior_amount": 10000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540309",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Lara"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34982",
        "nepTitle": "Construction of Road, Barangay Carig Sur, Tuguegarao City, Cagayan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0486-007200",
        "hgabTitle": "Construction of Road, Barangay Carig Sur, Tuguegarao City, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "476",
        "hgabPage": "486",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Carig Sur, Tuguegarao City, Cagayan",
      "source_code": "2027DPWH-Proposal-34982",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Carig Sur, Tuguegarao City, Cagayan",
      "prior_amount": 5060000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560314",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Lara"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34982",
        "nepTitle": "Construction of Road, Barangay Carig Sur, Tuguegarao City, Cagayan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0486-007200",
        "hgabTitle": "Construction of Road, Barangay Carig Sur, Tuguegarao City, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "476",
        "hgabPage": "486",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Carmen, Zaragoza Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35982",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 11000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Carmen, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 0+415",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21544",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+415.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35982",
        "nepTitle": "Construction of Road, Barangay Carmen, Zaragoza Nueva Ecija",
        "nepPesos": 11000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007912",
        "hgabTitle": "Construction of Road, Barangay Carmen, Zaragoza Nueva Ecija",
        "hgabPesos": 11000000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Catarman, Liloan, Cebu",
      "source_code": "2027DPWH-Proposal-37709",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Improvement of Road, Barangay Catarman, Liloan, Cebu - Sta. 0+000.00 - Sta. 0+150.00\n",
      "prior_amount": 4849000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 23003",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+150.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37709",
        "nepTitle": "Construction of Road, Barangay Catarman, Liloan, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0586-009376",
        "hgabTitle": "Construction of Road, Barangay Catarman, Liloan, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "536",
        "hgabPage": "586",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Catarman, Liloan, Cebu",
      "source_code": "2027DPWH-Proposal-37709",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Road at Brgy. Catarman, Liloan, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300116201963000 · PDF p. 1196 · printed p. 2661",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37709",
        "nepTitle": "Construction of Road, Barangay Catarman, Liloan, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0586-009376",
        "hgabTitle": "Construction of Road, Barangay Catarman, Liloan, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "536",
        "hgabPage": "586",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Cayanga, San Fabian, Pangasinan",
      "source_code": "2027DPWH-Proposal-34222",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Brgy. Cayanga, San Fabian, Pangasinan",
      "prior_amount": 1500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117202625000 · PDF p. 1232 · printed p. 2697",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34222",
        "nepTitle": "Construction of Road, Barangay Cayanga, San Fabian, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006869",
        "hgabTitle": "Construction of Road, Barangay Cayanga, San Fabian, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Collado, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35876",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Collado, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+772.40",
      "prior_amount": 8624000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27164",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+772.40",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35876",
        "nepTitle": "Construction of Road, Barangay Collado, Talavera, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007915",
        "hgabTitle": "Construction of Road, Barangay Collado, Talavera, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Collado, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35876",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Roads, Collado, Talavera, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200823000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35876",
        "nepTitle": "Construction of Road, Barangay Collado, Talavera, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007915",
        "hgabTitle": "Construction of Road, Barangay Collado, Talavera, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Comitang, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36019",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Roads, Comitang, Sto. Domingo, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200824000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36019",
        "nepTitle": "Construction of Road, Barangay Comitang, Sto. Domingo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007917",
        "hgabTitle": "Construction of Road, Barangay Comitang, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Comunal , City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36878",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Comunal, Calapan City, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 550995",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36878",
        "nepTitle": "Construction of Road, Barangay Comunal , City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0554-008656",
        "hgabTitle": "Construction of Road, Barangay Comunal , City of Calapan, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "515",
        "hgabPage": "554",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Concepcion, Zaragoza, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35884",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road in Barangay Concepcion, Zaragoza, Nueva Ecija",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427988",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35884",
        "nepTitle": "Construction of Road, Barangay Concepcion, Zaragoza, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007918",
        "hgabTitle": "Construction of Road, Barangay Concepcion, Zaragoza, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Concepcion, Zaragoza, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35884",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road in Barangay Concepcion, Zaragoza, Nueva Ecija",
      "prior_amount": 29000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522298",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35884",
        "nepTitle": "Construction of Road, Barangay Concepcion, Zaragoza, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007918",
        "hgabTitle": "Construction of Road, Barangay Concepcion, Zaragoza, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Concepcion, Zaragoza, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35884",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Concepcion, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 0+440",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21546",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+440.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35884",
        "nepTitle": "Construction of Road, Barangay Concepcion, Zaragoza, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007918",
        "hgabTitle": "Construction of Road, Barangay Concepcion, Zaragoza, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Culong, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36010",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Culong, Guimba, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 539559",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36010",
        "nepTitle": "Construction of Road, Barangay Culong, Guimba, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007919",
        "hgabTitle": "Construction of Road, Barangay Culong, Guimba, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Culong, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36010",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Barangay Culong, Guimba, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203218000 · PDF p. 1267 · printed p. 2732",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36010",
        "nepTitle": "Construction of Road, Barangay Culong, Guimba, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007919",
        "hgabTitle": "Construction of Road, Barangay Culong, Guimba, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Dacudac, Tadian, Mountain Province",
      "source_code": "2027DPWH-Proposal-34794",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Improvement of Dacudac Road, Tadian, Mountain Province",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427669",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34794",
        "nepTitle": "Construction of Road, Barangay Dacudac, Tadian, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007079",
        "hgabTitle": "Construction of Road, Barangay Dacudac, Tadian, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Daganas, Sta. 000+000 - Sta. 000+260, Catarman, Northern Samar",
      "source_code": "2027DPWH-Proposal-02655",
      "office": "Northern Samar 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 6168000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Brgy. Daganas, Catarman, Northern Samar",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 536652",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+260.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Niko Raul Daza"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02655",
        "nepTitle": "Construction of Road, Barangay Daganas, Sta. 000+000 - Sta. 000+260, Catarman, Northern Samar",
        "nepPesos": 6168000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0596-009579",
        "hgabTitle": "Construction of Road, Barangay Daganas, Sta. 000+000 - Sta. 000+260, Catarman, Northern Samar",
        "hgabPesos": 6168000,
        "nepPage": "541",
        "hgabPage": "596",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Daganas, Sta. 000+000 - Sta. 000+260, Catarman, Northern Samar",
      "source_code": "2027DPWH-Proposal-02655",
      "office": "Northern Samar 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 6168000,
      "comparison_year": 2018,
      "prior_project": "Road Concreting, Brgy. Daganas, Catarman, Northern Samar",
      "prior_amount": 2500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201927000",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+260.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02655",
        "nepTitle": "Construction of Road, Barangay Daganas, Sta. 000+000 - Sta. 000+260, Catarman, Northern Samar",
        "nepPesos": 6168000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0596-009579",
        "hgabTitle": "Construction of Road, Barangay Daganas, Sta. 000+000 - Sta. 000+260, Catarman, Northern Samar",
        "hgabPesos": 6168000,
        "nepPage": "541",
        "hgabPage": "596",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Dicamay 2, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35108",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 26000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 0+000 - Sta. 0+517, Brgy. Dicamay 2, Jones, Isabela",
      "prior_amount": 7840000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21056",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+517.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35108",
        "nepTitle": "Construction of Road, Barangay Dicamay 2, Jones, Isabela",
        "nepPesos": 26000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0501-007511",
        "hgabTitle": "Construction of Road, Sta. 0+000 - Sta. 0+750, Barangay Dicamay 2, Jones, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "482",
        "hgabPage": "501",
        "chainageStatus": "incomplete",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Dimasalang Sur, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35890",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Dimasalang Sur, Talavera, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535548",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35890",
        "nepTitle": "Construction of Road, Barangay Dimasalang Sur, Talavera, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007921",
        "hgabTitle": "Construction of Road, Barangay Dimasalang Sur, Talavera, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Dimasalang Sur, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35890",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Dimasalang Sur, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+470",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21550",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+470.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35890",
        "nepTitle": "Construction of Road, Barangay Dimasalang Sur, Talavera, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007921",
        "hgabTitle": "Construction of Road, Barangay Dimasalang Sur, Talavera, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay District 2, San Manuel, Isabela",
      "source_code": "2027DPWH-Proposal-35339",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 59680000,
      "comparison_year": 2023,
      "prior_project": "Construction of District 2 Barangay Road, San Manuel, Isabela",
      "prior_amount": 13127000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535290",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35339",
        "nepTitle": "Construction of Road, Barangay District 2, San Manuel, Isabela",
        "nepPesos": 59680000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0418-005827",
        "hgabTitle": "Construction of Road, Barangay District 2, San Manuel, Isabela",
        "hgabPesos": 59680000,
        "nepPage": "436",
        "hgabPage": "418",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay District V, Cuyapo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36009",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Road, District V, Cuyapo, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428008",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36009",
        "nepTitle": "Construction of Road, Barangay District V, Cuyapo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007922",
        "hgabTitle": "Construction of Road, Barangay District V, Cuyapo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay District V, Cuyapo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36009",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay District V, Cuyapo, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560469",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36009",
        "nepTitle": "Construction of Road, Barangay District V, Cuyapo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007922",
        "hgabTitle": "Construction of Road, Barangay District V, Cuyapo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay District V, Cuyapo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36009",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay District V, Cuyapo, Nueva Ecija Sta. 0+000 - Sta. 0+385",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21512",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+385.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36009",
        "nepTitle": "Construction of Road, Barangay District V, Cuyapo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007922",
        "hgabTitle": "Construction of Road, Barangay District V, Cuyapo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Dulong Bayan, Quezon, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35863",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Barangay Dulong Bayan Road, Quezon, Nueva Ecija",
      "prior_amount": 10000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499220",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mika Suansing"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35863",
        "nepTitle": "Construction of Road, Barangay Dulong Bayan, Quezon, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007923",
        "hgabTitle": "Construction of Road, Barangay Dulong Bayan, Quezon, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Dulong Bayan, Quezon, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35863",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Dulong Bayan, Quezon, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 539561",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mika Suansing"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35863",
        "nepTitle": "Construction of Road, Barangay Dulong Bayan, Quezon, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007923",
        "hgabTitle": "Construction of Road, Barangay Dulong Bayan, Quezon, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Esguerra, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36030",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Esguerra, Talavera, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560466",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36030",
        "nepTitle": "Construction of Road, Barangay Esguerra, Talavera, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007924",
        "hgabTitle": "Construction of Road, Barangay Esguerra, Talavera, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Esperanza, San Francisco, Cebu",
      "source_code": "2027DPWH-Proposal-37720",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Esperanza, San Francisco, Cebu",
      "prior_amount": 10000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540722",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37720",
        "nepTitle": "Construction of Road, Barangay Esperanza, San Francisco, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0586-009377",
        "hgabTitle": "Construction of Road, Barangay Esperanza, San Francisco, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "536",
        "hgabPage": "586",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Estacion, Nampicuan, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36014",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Estacion, Nampicuan, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 539563",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36014",
        "nepTitle": "Construction of Road, Barangay Estacion, Nampicuan, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007925",
        "hgabTitle": "Construction of Road, Barangay Estacion, Nampicuan, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Estrella, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-26344",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2016,
      "prior_project": "Road Concreting, Estrella, San Pedro City, Laguna",
      "prior_amount": 1000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303572",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-26344",
        "nepTitle": "Construction of Road, Barangay Estrella, San Pedro City, Laguna",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0546-008484",
        "hgabTitle": "Construction of Road, Barangay Estrella, San Pedro City, Laguna",
        "hgabPesos": 30000000,
        "nepPage": "510",
        "hgabPage": "546",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Estrella, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-26344",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2017,
      "prior_project": "Road Concreting, Estrella, San Pedro City, Laguna",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050303572",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-26344",
        "nepTitle": "Construction of Road, Barangay Estrella, San Pedro City, Laguna",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0546-008484",
        "hgabTitle": "Construction of Road, Barangay Estrella, San Pedro City, Laguna",
        "hgabPesos": 30000000,
        "nepPage": "510",
        "hgabPage": "546",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Fidelisan, Sagada, Mountain Province",
      "source_code": "2027DPWH-Proposal-34677",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Fidelisan Road Sta. 4+738 - Sta. 4+812, Sagada, Mountain Province",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 29372",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "4+738.00–4+812.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34677",
        "nepTitle": "Construction of Road, Barangay Fidelisan, Sagada, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007080",
        "hgabTitle": "Construction of Road, Barangay Fidelisan, Sagada, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Gacat, Sta. 0+000 - 0+380, Baybay City, Leyte",
      "source_code": "2027DPWH-Proposal-37964",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Gacat, Baybay City, Leyte",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527616",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+380.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37964",
        "nepTitle": "Construction of Road, Barangay Gacat, Sta. 0+000 - 0+380, Baybay City, Leyte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0595-009560",
        "hgabTitle": "Construction of Road, Barangay Gacat, Sta. 0+000 - 0+380, Baybay City, Leyte",
        "hgabPesos": 5000000,
        "nepPage": "541",
        "hgabPage": "595",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Gais-Guipe, Dasol, Pangasinan",
      "source_code": "2027DPWH-Proposal-34165",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road in Barangay Gais-Guipe, Dasol, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526183",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34165",
        "nepTitle": "Construction of Road, Barangay Gais-Guipe, Dasol, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0470-006831",
        "hgabTitle": "Construction of Road, Barangay Gais-Guipe, Dasol, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "470",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Gayang, Sabangan, Mountain Province",
      "source_code": "2027DPWH-Proposal-34672",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Gayang, Sabangan, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 553555",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34672",
        "nepTitle": "Construction of Road, Barangay Gayang, Sabangan, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007081",
        "hgabTitle": "Construction of Road, Barangay Gayang, Sabangan, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Gen. Luna, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+900",
      "source_code": "2027DPWH-Proposal-10624",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2024,
      "prior_project": "Concreting of Road, Barangay Gen. Luna, Rizal, Nueva Ecija",
      "prior_amount": 15000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551845",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+900.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Kokoy Salvador"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10624",
        "nepTitle": "Construction of Road, Barangay Gen. Luna, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+900",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007928",
        "hgabTitle": "Construction of Road, Barangay Gen. Luna, Rizal, Nueva Ecija Sta. 0+000 - Sta. 0+900",
        "hgabPesos": 10000000,
        "nepPage": "495",
        "hgabPage": "521",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay General, Tudela, Cebu",
      "source_code": "2027DPWH-Proposal-37724",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay General, Tudela, Cebu - Sta. 0+000.00 - Sta. 0+150.00\t\n",
      "prior_amount": 4845000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 28486",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+150.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37724",
        "nepTitle": "Construction of Road, Barangay General, Tudela, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0587-009379",
        "hgabTitle": "Construction of Road, Barangay General, Tudela, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "536",
        "hgabPage": "587",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Gogognan, Aborlan, Palawan",
      "source_code": "2027DPWH-Proposal-37019",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 30000000,
      "comparison_year": 2022,
      "prior_project": "Road Construction at Barangay Gogognan, Municipality of Aborlan, Palawan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527117",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37019",
        "nepTitle": "Construction of Road, Barangay Gogognan, Aborlan, Palawan",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0556-008701",
        "hgabTitle": "Construction of Road, Barangay Gogognan, Aborlan, Palawan",
        "hgabPesos": 30000000,
        "nepPage": "516",
        "hgabPage": "556",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Gogognan, Aborlan, Palawan",
      "source_code": "2027DPWH-Proposal-37019",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 00+000 - Sta. 00+696, Barangay Gogognan, Aborlan, Palawan",
      "prior_amount": 18265000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 22398",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+696.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37019",
        "nepTitle": "Construction of Road, Barangay Gogognan, Aborlan, Palawan",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0556-008701",
        "hgabTitle": "Construction of Road, Barangay Gogognan, Aborlan, Palawan",
        "hgabPesos": 30000000,
        "nepPage": "516",
        "hgabPage": "556",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Goma, Digos City-Sitio Bagong Silang, Managa, Sta. 8+841.896 - Sta. 9+841.896, Bansalan, Davao del Sur",
      "source_code": "2027DPWH-Proposal-21286",
      "office": "Davao del Sur District Engineering Office",
      "region": "Region XI",
      "amount_2027": 50000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Brgy. Goma, Digos City-Sitio Bagong Silang Road, Managa, Bansalan, Davao del Sur",
      "prior_amount": 70000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 521487",
      "similarity_pct": 100,
      "current_chainage": "8+841.90–9+841.90",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21286",
        "nepTitle": "Construction of Road, Barangay Goma, Digos City-Sitio Bagong Silang, Managa, Sta. 8+841.896 - Sta. 9+841.896, Bansalan, Davao del Sur",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0619-010038",
        "hgabTitle": "Construction of Road, Barangay Goma, Digos City-Sitio Bagong Silang, Managa, Sta. 8+841.896 - Sta. 9+841.896, Bansalan, Davao del Sur",
        "hgabPesos": 50000000,
        "nepPage": "554",
        "hgabPage": "619",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Goma, Digos City-Sitio Bagong Silang, Managa, Sta. 8+841.896 - Sta. 9+841.896, Bansalan, Davao del Sur",
      "source_code": "2027DPWH-Proposal-21286",
      "office": "Davao del Sur District Engineering Office",
      "region": "Region XI",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "﻿Construction of Road, Brgy. Goma, Digos City-Sitio Bagong Silang, Barangay Managa, Bansalan, Davao del Sur",
      "prior_amount": 115000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 559633",
      "similarity_pct": 100,
      "current_chainage": "8+841.90–9+841.90",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21286",
        "nepTitle": "Construction of Road, Barangay Goma, Digos City-Sitio Bagong Silang, Managa, Sta. 8+841.896 - Sta. 9+841.896, Bansalan, Davao del Sur",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0619-010038",
        "hgabTitle": "Construction of Road, Barangay Goma, Digos City-Sitio Bagong Silang, Managa, Sta. 8+841.896 - Sta. 9+841.896, Bansalan, Davao del Sur",
        "hgabPesos": 50000000,
        "nepPage": "554",
        "hgabPage": "619",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Gucab, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35351",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Gucab, Echague, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535337",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35351",
        "nepTitle": "Construction of Road, Barangay Gucab, Echague, Isabela",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0501-007519",
        "hgabTitle": "Construction of Road, Barangay Gucab, Echague, Isabela",
        "hgabPesos": 15000000,
        "nepPage": "482",
        "hgabPage": "501",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Gueday, Besao, Mountain Province",
      "source_code": "2027DPWH-Proposal-34665",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Improvement of Road, Gueday, Besao, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 537215",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34665",
        "nepTitle": "Construction of Road, Barangay Gueday, Besao, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007082",
        "hgabTitle": "Construction of Road, Barangay Gueday, Besao, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Guibang, Gamu, Isabela",
      "source_code": "2027DPWH-Proposal-35375",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2022,
      "prior_project": "Road Concreting, Barangay Guibang, Gamu, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526459",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35375",
        "nepTitle": "Construction of Road, Barangay Guibang, Gamu, Isabela",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0497-007420",
        "hgabTitle": "Construction of Road, Barangay Guibang, Gamu, Isabela",
        "hgabPesos": 50000000,
        "nepPage": "481",
        "hgabPage": "497",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Guibang, Gamu, Isabela",
      "source_code": "2027DPWH-Proposal-35375",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Guibang, Gamu, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551586",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35375",
        "nepTitle": "Construction of Road, Barangay Guibang, Gamu, Isabela",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0497-007420",
        "hgabTitle": "Construction of Road, Barangay Guibang, Gamu, Isabela",
        "hgabPesos": 50000000,
        "nepPage": "481",
        "hgabPage": "497",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Guinzadan Central, Bauko, Mountain Province",
      "source_code": "2027DPWH-Proposal-34657",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Guinzadan Central Road Sta. 0+111 - Sta. 0+211, Bauko, Mountain Province",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 24115",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+111.00–0+211.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34657",
        "nepTitle": "Construction of Road, Barangay Guinzadan Central, Bauko, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007083",
        "hgabTitle": "Construction of Road, Barangay Guinzadan Central, Bauko, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "472",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Hinabuyan, Villaba, Leyte (Station 0+340 - 0+690)",
      "source_code": "2027DPWH-Proposal-37998",
      "office": "Leyte 3rd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 15000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Road, Brgy. Hinabuyan, Villaba, Leyte",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117204758000 · PDF p. 1358 · printed p. 2823",
      "similarity_pct": 100,
      "current_chainage": "0+340.00–0+690.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37998",
        "nepTitle": "Construction of Road, Barangay Hinabuyan, Villaba, Leyte (Station 0+340 - 0+690)",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0594-009535",
        "hgabTitle": "Construction of Road, Barangay Hinabuyan, Villaba, Leyte (Station 0+340 - 0+690)",
        "hgabPesos": 15000000,
        "nepPage": "540",
        "hgabPage": "594",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Hulo, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36020",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Hulo, Sto. Domingo, Nueva Ecija, Sta. 0+000 - Sta. 0+191",
      "prior_amount": 5649000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21594",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+191.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36020",
        "nepTitle": "Construction of Road, Barangay Hulo, Sto. Domingo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007939",
        "hgabTitle": "Construction of Road, Barangay Hulo, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Ilog Baliwag, Quezon, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35864",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Ilog Baliwag, Quezon, Nueva Ecija, Sta. 0+000 - Sta. 0+401",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27172",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+401.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mika Suansing"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35864",
        "nepTitle": "Construction of Road, Barangay Ilog Baliwag, Quezon, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007940",
        "hgabTitle": "Construction of Road, Barangay Ilog Baliwag, Quezon, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Ilog Baliwag, Quezon, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35864",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Roads, Ilog Baliwag, Quezon, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307368",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35864",
        "nepTitle": "Construction of Road, Barangay Ilog Baliwag, Quezon, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007940",
        "hgabTitle": "Construction of Road, Barangay Ilog Baliwag, Quezon, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Iraga, Solana, Cagayan",
      "source_code": "2027DPWH-Proposal-34983",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road , Brgy. Iraga, Solana, Cagayan",
      "prior_amount": 30000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540317",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34983",
        "nepTitle": "Construction of Road, Barangay Iraga, Solana, Cagayan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0486-007202",
        "hgabTitle": "Construction of Road, Barangay Iraga, Solana, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "476",
        "hgabPage": "486",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Isaub, Aborlan, Palawan",
      "source_code": "2027DPWH-Proposal-37013",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Road construction at Barangay Isaub, Municipality of Aborlan, Palawan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527126",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37013",
        "nepTitle": "Construction of Road, Barangay Isaub, Aborlan, Palawan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0556-008702",
        "hgabTitle": "Construction of Road, Barangay Isaub, Aborlan, Palawan",
        "hgabPesos": 10000000,
        "nepPage": "517",
        "hgabPage": "556",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Isaub, Aborlan, Palawan",
      "source_code": "2027DPWH-Proposal-37013",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Isaub, Aborlan, Palawan",
      "prior_amount": 5500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 536035",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37013",
        "nepTitle": "Construction of Road, Barangay Isaub, Aborlan, Palawan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0556-008702",
        "hgabTitle": "Construction of Road, Barangay Isaub, Aborlan, Palawan",
        "hgabPesos": 10000000,
        "nepPage": "517",
        "hgabPage": "556",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Isaub, Aborlan, Palawan",
      "source_code": "2027DPWH-Proposal-37013",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Road Concreting of Barangay Isaub, Municipality of Aborlan, Palawan",
      "prior_amount": 4000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203803000 · PDF p. 1302 · printed p. 2767",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37013",
        "nepTitle": "Construction of Road, Barangay Isaub, Aborlan, Palawan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0556-008702",
        "hgabTitle": "Construction of Road, Barangay Isaub, Aborlan, Palawan",
        "hgabPesos": 10000000,
        "nepPage": "517",
        "hgabPage": "556",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Iton, Bayambang, Pangasinan",
      "source_code": "2027DPWH-Proposal-34428",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Road, Barangay Iton, Bayambang, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117202697000 · PDF p. 1236 · printed p. 2701",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34428",
        "nepTitle": "Construction of Road, Barangay Iton, Bayambang, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0475-006964",
        "hgabTitle": "Construction of Road, Barangay Iton, Bayambang, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "469",
        "hgabPage": "475",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37486",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 536335",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37486",
        "nepTitle": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0576-009129",
        "hgabTitle": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "529",
        "hgabPage": "576",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37486",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 576799",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37486",
        "nepTitle": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0576-009129",
        "hgabTitle": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "529",
        "hgabPage": "576",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37486",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road (Sta. 0+609 - Sta. 0+859), Barangay Jerusalem, Cadiz City, Negros Occidental",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 28127",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+609.00–0+859.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37486",
        "nepTitle": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0576-009129",
        "hgabTitle": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "529",
        "hgabPage": "576",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37486",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Concreting of Road, Brgy. Jerusalem, Cadiz City, Negros Occidental",
      "prior_amount": 3500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201658000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37486",
        "nepTitle": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0576-009129",
        "hgabTitle": "Construction of Road, Barangay Jerusalem, Cadiz City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "529",
        "hgabPage": "576",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Jubay, Calubian, Leyte (Station 21+349.3 - 22+169.3)",
      "source_code": "2027DPWH-Proposal-38014",
      "office": "Leyte 3rd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Concreting of Calubian-Jubay Road, Calubian, Leyte",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 528087",
      "similarity_pct": 100,
      "current_chainage": "21+349.30–22+169.30",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38014",
        "nepTitle": "Construction of Road, Barangay Jubay, Calubian, Leyte (Station 21+349.3 - 22+169.3)",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0594-009536",
        "hgabTitle": "Construction of Road, Barangay Jubay, Calubian, Leyte (Station 21+349.3 - 22+169.3)",
        "hgabPesos": 30000000,
        "nepPage": "540",
        "hgabPage": "594",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Kaleo, Barlig, Mountain Province",
      "source_code": "2027DPWH-Proposal-34699",
      "office": "Mountain Province 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Improvement of Road, Kaleo, Barlig, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 537210",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34699",
        "nepTitle": "Construction of Road, Barangay Kaleo, Barlig, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0483-007122",
        "hgabTitle": "Construction of Road, Barangay Kaleo, Barlig, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "474",
        "hgabPage": "483",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Kaleo, Barlig, Mountain Province",
      "source_code": "2027DPWH-Proposal-34699",
      "office": "Mountain Province 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Kaleo, Barlig, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 553565",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34699",
        "nepTitle": "Construction of Road, Barangay Kaleo, Barlig, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0483-007122",
        "hgabTitle": "Construction of Road, Barangay Kaleo, Barlig, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "474",
        "hgabPage": "483",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Kinalanguyan, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36031",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Kinalanguyan, Talavera, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560498",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36031",
        "nepTitle": "Construction of Road, Barangay Kinalanguyan, Talavera, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007942",
        "hgabTitle": "Construction of Road, Barangay Kinalanguyan, Talavera, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "495",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Landas, Mangaldan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34218",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road at Barangay Landas, Mangaldan, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560226",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34218",
        "nepTitle": "Construction of Road, Barangay Landas, Mangaldan, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006871",
        "hgabTitle": "Construction of Road, Barangay Landas, Mangaldan, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Langka , Municipality of Lupon - Barangay Poblacion, Municipality of Banaybanay, Davao Oriental - (Sta. 0+500.000 – Sta. 2+882.000)",
      "source_code": "2027DPWH-Proposal-21301",
      "office": "Davao Oriental 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 70000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Langka , Municipality of Lupon - Barangay Poblacion, Municipality of Banaybanay, Davao Oriental",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 539934",
      "similarity_pct": 100,
      "current_chainage": "0+500.00–2+882.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21301",
        "nepTitle": "Construction of Road, Barangay Langka , Municipality of Lupon - Barangay Poblacion, Municipality of Banaybanay, Davao Oriental - (Sta. 0+500.000 – Sta. 2+882.000)",
        "nepPesos": 70000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Lanise, Claveria, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39025",
      "office": "Misamis Oriental 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road at Barangay Lanise, Sta. 0+000 - Sta. 0+265, Claveria, Misamis Oriental",
      "prior_amount": 4819000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 23727",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+265.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39025",
        "nepTitle": "Construction of Road, Barangay Lanise, Claveria, Misamis Oriental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0616-009977",
        "hgabTitle": "Construction of Road, Barangay Lanise, Claveria, Misamis Oriental",
        "hgabPesos": 5000000,
        "nepPage": "552",
        "hgabPage": "616",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Laoag, San Agustin, Isabela",
      "source_code": "2027DPWH-Proposal-35174",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 13100000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Laoag, San Agustin, Isabela",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551629",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35174",
        "nepTitle": "Construction of Road, Barangay Laoag, San Agustin, Isabela",
        "nepPesos": 13100000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0501-007520",
        "hgabTitle": "Construction of Road, Sta. 0+000 - Sta. 0+635, Barangay Laoag, San Agustin, Isabela",
        "hgabPesos": 8500000,
        "nepPage": "482",
        "hgabPage": "501",
        "chainageStatus": "incomplete",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Latap, Cuyapo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35840",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. Latap, Cuyapo, Nueva Ecija",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499189",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35840",
        "nepTitle": "Construction of Road, Barangay Latap, Cuyapo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007943",
        "hgabTitle": "Construction of Road, Barangay Latap, Cuyapo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "496",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Latap, Cuyapo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35840",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Latap, Cuyapo, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560484",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35840",
        "nepTitle": "Construction of Road, Barangay Latap, Cuyapo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007943",
        "hgabTitle": "Construction of Road, Barangay Latap, Cuyapo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "496",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Latap, Cuyapo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35840",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Latap, Cuyapo, Nueva Ecija, Sta. 0+000 - Sta. 0+575",
      "prior_amount": 7546000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27174",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+575.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35840",
        "nepTitle": "Construction of Road, Barangay Latap, Cuyapo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007943",
        "hgabTitle": "Construction of Road, Barangay Latap, Cuyapo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "496",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Legaspi, Tayug, Pangasinan",
      "source_code": "2027DPWH-Proposal-34579",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road , Brgy. Legaspi, Tayug, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117202668000 · PDF p. 1235 · printed p. 2700",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34579",
        "nepTitle": "Construction of Road, Barangay Legaspi, Tayug, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0473-006907",
        "hgabTitle": "Construction of Road, Barangay Legaspi, Tayug, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "468",
        "hgabPage": "473",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Lenga, Tadian, Mountain Province",
      "source_code": "2027DPWH-Proposal-34756",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Improvement of Road, Lenga, Tadian, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 537218",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34756",
        "nepTitle": "Construction of Road, Barangay Lenga, Tadian, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007086",
        "hgabTitle": "Construction of Road, Barangay Lenga, Tadian, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "473",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Leseb, Bauko, Mountain Province",
      "source_code": "2027DPWH-Proposal-34659",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Leseb, Bauko, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540271",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34659",
        "nepTitle": "Construction of Road, Barangay Leseb, Bauko, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007087",
        "hgabTitle": "Construction of Road, Barangay Leseb, Bauko, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "473",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Libas, Banga, Aklan",
      "source_code": "2027DPWH-Proposal-37228",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Libas, Banga, Aklan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 576780",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jess Marquez"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37228",
        "nepTitle": "Construction of Road, Barangay Libas, Banga, Aklan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0567-008936",
        "hgabTitle": "Construction of Road, Barangay Libas, Banga, Aklan",
        "hgabPesos": 5000000,
        "nepPage": "524",
        "hgabPage": "567",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Libas, Banga, Aklan",
      "source_code": "2027DPWH-Proposal-37228",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Road Brgy. Libas, Banga, Aklan",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307969",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37228",
        "nepTitle": "Construction of Road, Barangay Libas, Banga, Aklan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0567-008936",
        "hgabTitle": "Construction of Road, Barangay Libas, Banga, Aklan",
        "hgabPesos": 5000000,
        "nepPage": "524",
        "hgabPage": "567",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Libas, Banga, Aklan",
      "source_code": "2027DPWH-Proposal-37228",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Road, Brgy. Libas, Banga, Aklan",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201514000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37228",
        "nepTitle": "Construction of Road, Barangay Libas, Banga, Aklan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0567-008936",
        "hgabTitle": "Construction of Road, Barangay Libas, Banga, Aklan",
        "hgabPesos": 5000000,
        "nepPage": "524",
        "hgabPage": "567",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Libertad , Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35360",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Improvement of Road, Brgy. Libertad, Echague, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526501",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35360",
        "nepTitle": "Construction of Road, Barangay Libertad , Echague, Isabela",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0501-007521",
        "hgabTitle": "Construction of Road, Barangay Libertad , Echague, Isabela",
        "hgabPesos": 15000000,
        "nepPage": "482",
        "hgabPage": "501",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Linao leading to Barangay Talisay Road, Sta. 1+800 - Sta. 3+000, Calatrava, Romblon",
      "source_code": "2027DPWH-Proposal-06091",
      "office": "Romblon District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 52800000,
      "comparison_year": 2025,
      "prior_project": "Construction of Barangay Linao leading to Barangay Talisay Road, Calatrava, Romblon",
      "prior_amount": 150000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 559178",
      "similarity_pct": 100,
      "current_chainage": "1+800.00–3+000.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-06091",
        "nepTitle": "Construction of Road, Barangay Linao leading to Barangay Talisay Road, Sta. 1+800 - Sta. 3+000, Calatrava, Romblon",
        "nepPesos": 52800000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0429-006031",
        "hgabTitle": "Construction of Road, Barangay Linao leading to Barangay Talisay Road, Sta. 1+800 - Sta. 3+000, Calatrava, Romblon",
        "hgabPesos": 52800000,
        "nepPage": "443",
        "hgabPage": "429",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Lingoy, Barlig, Mountain Province",
      "source_code": "2027DPWH-Proposal-34760",
      "office": "Mountain Province 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Lingoy, Barlig, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540276",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34760",
        "nepTitle": "Construction of Road, Barangay Lingoy, Barlig, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0483-007123",
        "hgabTitle": "Construction of Road, Barangay Lingoy, Barlig, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "474",
        "hgabPage": "483",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Lomboy, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35893",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Lomboy, Talavera, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 539566",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35893",
        "nepTitle": "Construction of Road, Barangay Lomboy, Talavera, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007944",
        "hgabTitle": "Construction of Road, Barangay Lomboy, Talavera, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "496",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Lower Tambaking, Maimbung, Sulu Sta. 00+000 to Sta. 01+500",
      "source_code": "2027DPWH-Proposal-38315",
      "office": "Sulu 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 50000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road at Barangay Lower Tambaking, Maimbung, Sulu",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 429515",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+500.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Samier Tan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38315",
        "nepTitle": "Construction of Road, Barangay Lower Tambaking, Maimbung, Sulu Sta. 00+000 to Sta. 01+500",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0600-009650",
        "hgabTitle": "Construction of Road, Barangay Lower Tambaking, Maimbung, Sulu Sta. 00+000 to Sta. 01+500",
        "hgabPesos": 50000000,
        "nepPage": "544",
        "hgabPage": "600",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Lower Tambaking, Maimbung, Sulu Sta. 00+000 to Sta. 01+500",
      "source_code": "2027DPWH-Proposal-38315",
      "office": "Sulu 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Concreting of Road at Barangay Lower Tambaking, Maimbung. Sulu",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 537195",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+500.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Samier Tan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38315",
        "nepTitle": "Construction of Road, Barangay Lower Tambaking, Maimbung, Sulu Sta. 00+000 to Sta. 01+500",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0600-009650",
        "hgabTitle": "Construction of Road, Barangay Lower Tambaking, Maimbung, Sulu Sta. 00+000 to Sta. 01+500",
        "hgabPesos": 50000000,
        "nepPage": "544",
        "hgabPage": "600",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Lucao, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34228",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road at Barangay Lucao, Dagupan City, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535113",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34228",
        "nepTitle": "Construction of Road, Barangay Lucao, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006873",
        "hgabTitle": "Construction of Road, Barangay Lucao, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Lucao, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34228",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Brgy. Lucao, Dagupan City, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551396",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34228",
        "nepTitle": "Construction of Road, Barangay Lucao, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006873",
        "hgabTitle": "Construction of Road, Barangay Lucao, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Lucao, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34228",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 0+000 - Sta. 0+198, Barangay Lucao, Dagupan City, Pangasinan",
      "prior_amount": 4834000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 26518",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+198.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34228",
        "nepTitle": "Construction of Road, Barangay Lucao, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006873",
        "hgabTitle": "Construction of Road, Barangay Lucao, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Lucao, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34228",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Barangay Lucao, Dagupan City, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117202618000 · PDF p. 1232 · printed p. 2697",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34228",
        "nepTitle": "Construction of Road, Barangay Lucao, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006873",
        "hgabTitle": "Construction of Road, Barangay Lucao, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Maasin, Mangaldan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34235",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 3+039 - Sta. 3+158, Barangay Maasin, Mangaldan, Pangasinan",
      "prior_amount": 4834000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 26520",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "3+039.00–3+158.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34235",
        "nepTitle": "Construction of Road, Barangay Maasin, Mangaldan, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006874",
        "hgabTitle": "Construction of Road, Barangay Maasin, Mangaldan, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Maasin, Mangaldan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34235",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road Brgy. Maasin, Mangaldan, Pangasinan",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117202616000 · PDF p. 1232 · printed p. 2697",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34235",
        "nepTitle": "Construction of Road, Barangay Maasin, Mangaldan, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006874",
        "hgabTitle": "Construction of Road, Barangay Maasin, Mangaldan, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mabunga, Sta. 0+000 - 0+355, Mahaplag, Leyte",
      "source_code": "2027DPWH-Proposal-37959",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Mabunga, Sta. 0+250 - 0+650, Mahaplag, Leyte",
      "prior_amount": 4824000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 28685",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+355.00",
      "prior_chainage": "0+250.00–0+650.00",
      "chainage_overlap": "0+250.00–0+355.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37959",
        "nepTitle": "Construction of Road, Barangay Mabunga, Sta. 0+000 - 0+355, Mahaplag, Leyte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0595-009563",
        "hgabTitle": "Construction of Road, Barangay Mabunga, Sta. 0+000 - 0+355, Mahaplag, Leyte",
        "hgabPesos": 5000000,
        "nepPage": "541",
        "hgabPage": "595",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36008",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5500000,
      "comparison_year": 2021,
      "prior_project": "Construction of Road, Macarse, Zaragoza, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428010",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36008",
        "nepTitle": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
        "nepPesos": 5500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007945",
        "hgabTitle": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
        "hgabPesos": 5500000,
        "nepPage": "496",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36008",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5500000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540389",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36008",
        "nepTitle": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
        "nepPesos": 5500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007945",
        "hgabTitle": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
        "hgabPesos": 5500000,
        "nepPage": "496",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36008",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5500000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija, Sta. 0+000 - Sta. 0+379.70",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21598",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+379.70",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36008",
        "nepTitle": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
        "nepPesos": 5500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007945",
        "hgabTitle": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
        "hgabPesos": 5500000,
        "nepPage": "496",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36008",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5500000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203219000 · PDF p. 1267 · printed p. 2732",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36008",
        "nepTitle": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
        "nepPesos": 5500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0521-007945",
        "hgabTitle": "Construction of Road, Barangay Macarse, Zaragoza, Nueva Ecija",
        "hgabPesos": 5500000,
        "nepPage": "496",
        "hgabPage": "521",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Madadamian , Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35363",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Concreting of Road, Sta. 0+000 - Sta. 0+646, Brgy. Madadamian, Echague, Isabela",
      "prior_amount": 9800000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 26841",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+646.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35363",
        "nepTitle": "Construction of Road, Barangay Madadamian , Echague, Isabela",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0501-007522",
        "hgabTitle": "Construction of Road, Barangay Madadamian , Echague, Isabela",
        "hgabPesos": 20000000,
        "nepPage": "482",
        "hgabPage": "501",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mag-abo, Amlan, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37501",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Mag-abo, Amlan, Negros Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527530",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maisa Sagarbarria"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37501",
        "nepTitle": "Construction of Road, Barangay Mag-abo, Amlan, Negros Oriental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0580-009217",
        "hgabTitle": "Construction of Road, Barangay Mag-abo, Amlan, Negros Oriental",
        "hgabPesos": 5000000,
        "nepPage": "532",
        "hgabPage": "580",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Magsaysay, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37488",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Magsaysay, Cadiz City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527395",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37488",
        "nepTitle": "Construction of Road, Barangay Magsaysay, Cadiz City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0576-009131",
        "hgabTitle": "Construction of Road, Barangay Magsaysay, Cadiz City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "529",
        "hgabPage": "576",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mahacot Silangan, Batangas City",
      "source_code": "2027DPWH-Proposal-36191",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2020,
      "prior_project": "Construction/Rehabilitation of Road, Brgy. Mahacot Silangan, Batangas City, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499376",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36191",
        "nepTitle": "Construction of Road, Barangay Mahacot Silangan, Batangas City",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mahacot Silangan, Batangas City",
      "source_code": "2027DPWH-Proposal-36191",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2024,
      "prior_project": "Rehabilitation of Road, Barangay Mahacot Silangan, Batangas City, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 550929",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36191",
        "nepTitle": "Construction of Road, Barangay Mahacot Silangan, Batangas City",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mahacot Silangan, Batangas City",
      "source_code": "2027DPWH-Proposal-36191",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2018,
      "prior_project": "Construction/Rehabilitation of Road, Brgy. Mahacot Silangan, Batangas City",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201010000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36191",
        "nepTitle": "Construction of Road, Barangay Mahacot Silangan, Batangas City",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Malaya, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36670",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. Malaya, Rosario, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499439",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36670",
        "nepTitle": "Construction of Road, Barangay Malaya, Rosario, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008371",
        "hgabTitle": "Construction of Road, Barangay Malaya, Rosario, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Malaya, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36670",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Improvement of Road at Barangay Malaya, Rosario, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526877",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36670",
        "nepTitle": "Construction of Road, Barangay Malaya, Rosario, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008371",
        "hgabTitle": "Construction of Road, Barangay Malaya, Rosario, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Malaya, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36670",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Barangay Road, of Barangay Malaya in Rosario, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535811",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36670",
        "nepTitle": "Construction of Road, Barangay Malaya, Rosario, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008371",
        "hgabTitle": "Construction of Road, Barangay Malaya, Rosario, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Malaya, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36021",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Roads, Malaya, Sto Domingo, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499206",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36021",
        "nepTitle": "Construction of Road, Barangay Malaya, Sto. Domingo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007948",
        "hgabTitle": "Construction of Road, Barangay Malaya, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Maligcong, Bontoc, Mountain Province",
      "source_code": "2027DPWH-Proposal-34668",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Maligcong, Bontoc, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540272",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maximo Dalog Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34668",
        "nepTitle": "Construction of Road, Barangay Maligcong, Bontoc, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007089",
        "hgabTitle": "Construction of Road, Barangay Maligcong, Bontoc, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "473",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Maligcong, Bontoc, Mountain Province",
      "source_code": "2027DPWH-Proposal-34668",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Maligcong, Bontoc, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 576456",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maximo Dalog Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34668",
        "nepTitle": "Construction of Road, Barangay Maligcong, Bontoc, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007089",
        "hgabTitle": "Construction of Road, Barangay Maligcong, Bontoc, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "473",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Maligcong, Bontoc, Mountain Province",
      "source_code": "2027DPWH-Proposal-34668",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Improvement of Road, Barangay Maligcong, Bontoc, Mountain Province",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 29382",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maximo Dalog Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34668",
        "nepTitle": "Construction of Road, Barangay Maligcong, Bontoc, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007089",
        "hgabTitle": "Construction of Road, Barangay Maligcong, Bontoc, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "473",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Malitao, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35361",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of barangay road, Brgy. Malitao, Echague, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535357",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35361",
        "nepTitle": "Construction of Road, Barangay Malitao, Echague, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0501-007523",
        "hgabTitle": "Construction of Road, Barangay Malitao, Echague, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "482",
        "hgabPage": "501",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Malitao, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35361",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Concreting of Road, Sta. 0+000 - Sta. 0+323, Brgy. Malitao, Echague, Isabela",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 26843",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+323.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35361",
        "nepTitle": "Construction of Road, Barangay Malitao, Echague, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0501-007523",
        "hgabTitle": "Construction of Road, Barangay Malitao, Echague, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "482",
        "hgabPage": "501",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mambarao, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36023",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Mambarao, Sto. Domingo, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540399",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36023",
        "nepTitle": "Construction of Road, Barangay Mambarao, Sto. Domingo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007951",
        "hgabTitle": "Construction of Road, Barangay Mambarao, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mampaitan, Mogpog, Marinduque",
      "source_code": "2027DPWH-Proposal-36825",
      "office": "Marinduque District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 16000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Mampaitan, Mogpog, Marinduque",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527085",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36825",
        "nepTitle": "Construction of Road, Barangay Mampaitan, Mogpog, Marinduque",
        "nepPesos": 16000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0552-008603",
        "hgabTitle": "Construction of Road, Barangay Mampaitan, Mogpog, Marinduque",
        "hgabPesos": 16000000,
        "nepPage": "514",
        "hgabPage": "552",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Managpi, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36874",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Concreting of Road, Barangay Managpi, Calapan City, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527098",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36874",
        "nepTitle": "Construction of Road, Barangay Managpi, City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0554-008661",
        "hgabTitle": "Rehabilitation of Road, Barangay Managpi, City of Calapan, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "516",
        "hgabPage": "554",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Manalo, Puerto Princesa City, Palawan",
      "source_code": "2027DPWH-Proposal-37009",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 00+000 - Sta. 00+910, Barangay Manalo, Puerto Princesa City, Palawan",
      "prior_amount": 18680000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 22402",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+910.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gil Acosta Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37009",
        "nepTitle": "Construction of Road, Barangay Manalo, Puerto Princesa City, Palawan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0556-008703",
        "hgabTitle": "Construction of Road, Barangay Manalo, Puerto Princesa City, Palawan",
        "hgabPesos": 10000000,
        "nepPage": "517",
        "hgabPage": "556",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mandalagan, Bacolod City",
      "source_code": "2027DPWH-Proposal-37367",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Road, Brgy. Mandalagan, Bacolod City",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201566000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37367",
        "nepTitle": "Construction of Road, Barangay Mandalagan, Bacolod City",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0573-009080",
        "hgabTitle": "Construction of Road, Barangay Mandalagan, Bacolod City",
        "hgabPesos": 5000000,
        "nepPage": "528",
        "hgabPage": "573",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mandalagan, Bacolod City",
      "source_code": "2027DPWH-Proposal-37367",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction/Rehabilitation of Road, Mandalagan, Bacolod City",
      "prior_amount": 3000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117204239000 · PDF p. 1328 · printed p. 2793",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37367",
        "nepTitle": "Construction of Road, Barangay Mandalagan, Bacolod City",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0573-009080",
        "hgabTitle": "Construction of Road, Barangay Mandalagan, Bacolod City",
        "hgabPesos": 5000000,
        "nepPage": "528",
        "hgabPage": "573",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Manganese, Anilao, Iloilo",
      "source_code": "2027DPWH-Proposal-37265",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Road, Barangay Manganese, Anilao, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050308075",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37265",
        "nepTitle": "Construction of Road, Barangay Manganese, Anilao, Iloilo",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0572-009041",
        "hgabTitle": "Construction of Road, Barangay Manganese, Anilao, Iloilo",
        "hgabPesos": 5000000,
        "nepPage": "527",
        "hgabPage": "572",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mangangan II, Baco, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36889",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. Mangangan II, Baco, Oriental Mindoro",
      "prior_amount": 1500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499659",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36889",
        "nepTitle": "Construction of Road, Barangay Mangangan II, Baco, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0554-008662",
        "hgabTitle": "Construction of Road, Barangay Mangangan II, Baco, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "516",
        "hgabPage": "554",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mangayao, Bayambang, Pangasinan",
      "source_code": "2027DPWH-Proposal-34427",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Mangayao, Bayambang, Pangasinan, Sta. 0+811 - Sta. 1+130",
      "prior_amount": 4834000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 26616",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+811.00–1+130.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34427",
        "nepTitle": "Construction of Road, Barangay Mangayao, Bayambang, Pangasinan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0475-006965",
        "hgabTitle": "Construction of Road, Barangay Mangayao, Bayambang, Pangasinan",
        "hgabPesos": 10000000,
        "nepPage": "469",
        "hgabPage": "475",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mangin, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34212",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Concreting of Road, Brgy. Mangin, Dagupan City, Pangasinan",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200334000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34212",
        "nepTitle": "Construction of Road, Barangay Mangin, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006875",
        "hgabTitle": "Construction of Road, Barangay Mangin, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mansilingan, Bacolod City",
      "source_code": "2027DPWH-Proposal-37368",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 15000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Mansilingan, Bacolod City",
      "prior_amount": 15000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540662",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37368",
        "nepTitle": "Construction of Road, Barangay Mansilingan, Bacolod City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0573-009081",
        "hgabTitle": "Construction of Road, Barangay Mansilingan, Bacolod City",
        "hgabPesos": 15000000,
        "nepPage": "528",
        "hgabPage": "573",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mansilingan, Bacolod City",
      "source_code": "2027DPWH-Proposal-37368",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 15000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Barangay Road, Brgy. Mansilingan, Bacolod City",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050308008",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37368",
        "nepTitle": "Construction of Road, Barangay Mansilingan, Bacolod City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0573-009081",
        "hgabTitle": "Construction of Road, Barangay Mansilingan, Bacolod City",
        "hgabPesos": 15000000,
        "nepPage": "528",
        "hgabPage": "573",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mansilingan, Bacolod City",
      "source_code": "2027DPWH-Proposal-37368",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 15000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Road, Brgy. Mansilingan, Bacolod City",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201567000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37368",
        "nepTitle": "Construction of Road, Barangay Mansilingan, Bacolod City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0573-009081",
        "hgabTitle": "Construction of Road, Barangay Mansilingan, Bacolod City",
        "hgabPesos": 15000000,
        "nepPage": "528",
        "hgabPage": "573",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Marilag, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36671",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy Marilag, Rosario, Batangas",
      "prior_amount": 15000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 492581",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36671",
        "nepTitle": "Construction of Road, Barangay Marilag, Rosario, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008372",
        "hgabTitle": "Construction of Road, Barangay Marilag, Rosario, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Marilag, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36671",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Brgy Marilag, Rosario, Batangas",
      "prior_amount": 11550000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 424786",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36671",
        "nepTitle": "Construction of Road, Barangay Marilag, Rosario, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008372",
        "hgabTitle": "Construction of Road, Barangay Marilag, Rosario, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Marilag, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36671",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Improvement of Road at Barangay Marilag, Rosario, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526878",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36671",
        "nepTitle": "Construction of Road, Barangay Marilag, Rosario, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008372",
        "hgabTitle": "Construction of Road, Barangay Marilag, Rosario, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Marilag, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36671",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Road, Barangay Marilag, Rosario, Batangas",
      "prior_amount": 15000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306496",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36671",
        "nepTitle": "Construction of Road, Barangay Marilag, Rosario, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008372",
        "hgabTitle": "Construction of Road, Barangay Marilag, Rosario, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Marilag, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36671",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Brgy. Marilag, Rosario, Batangas",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203551000 · PDF p. 1286 · printed p. 2751",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36671",
        "nepTitle": "Construction of Road, Barangay Marilag, Rosario, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008372",
        "hgabTitle": "Construction of Road, Barangay Marilag, Rosario, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Masipit, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36880",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Barangay Masipit, Calapan City, Oriental Mindoro",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428610",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36880",
        "nepTitle": "Construction of Road, Barangay Masipit, City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Matictic Bayan to Barangay Matictic Coral (Junction), Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.066754, 14.915913)",
      "source_code": "2027DPWH-Proposal-10535",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Matictic Bayan to Barangay Matictic Coral (Junction), Norzagaray, Bulacan",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560434",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–4+860.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10535",
        "nepTitle": "Construction of Road, Barangay Matictic Bayan to Barangay Matictic Coral (Junction), Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.066754, 14.915913)",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0514-007794",
        "hgabTitle": "Construction of Road, Barangay Matictic Bayan to Barangay Matictic Coral (Junction), Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.066754, 14.915913)",
        "hgabPesos": 30000000,
        "nepPage": "491",
        "hgabPage": "514",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Matictic Coral (Junction) to Barangay Baraka, Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.096979, 14.910598)",
      "source_code": "2027DPWH-Proposal-10534",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Matictic Coral (Junction) to Barangay Baraka, Norzagaray, Bulacan",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560435",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–4+860.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10534",
        "nepTitle": "Construction of Road, Barangay Matictic Coral (Junction) to Barangay Baraka, Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.096979, 14.910598)",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0514-007795",
        "hgabTitle": "Construction of Road, Barangay Matictic Coral (Junction) to Barangay Baraka, Norzagaray, Bulacan, Sta. 00+000 - Sta. 04+860 (121.096979, 14.910598)",
        "hgabPesos": 30000000,
        "nepPage": "491",
        "hgabPage": "514",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Matingkis, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36002",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6220500,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Matingkis, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+295.90",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21604",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+295.90",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36002",
        "nepTitle": "Construction of Road, Barangay Matingkis, Talavera, Nueva Ecija",
        "nepPesos": 6220500,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007953",
        "hgabTitle": "Construction of Road, Barangay Matingkis, Talavera, Nueva Ecija",
        "hgabPesos": 6220500,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mayabig , Baco, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36890",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Concreting of Road at Mayabig, Baco, Oriental Mindoro",
      "prior_amount": 5750000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 536004",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36890",
        "nepTitle": "Construction of Road, Barangay Mayabig , Baco, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0554-008664",
        "hgabTitle": "Construction of Road, Barangay Mayabig , Baco, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "516",
        "hgabPage": "554",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mayabig , Baco, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36890",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Mayabig, Baco, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560787",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36890",
        "nepTitle": "Construction of Road, Barangay Mayabig , Baco, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0554-008664",
        "hgabTitle": "Construction of Road, Barangay Mayabig , Baco, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "516",
        "hgabPage": "554",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mayag, Bauko, Mountain Province",
      "source_code": "2027DPWH-Proposal-34660",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Mayag, Bauko, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540273",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34660",
        "nepTitle": "Construction of Road, Barangay Mayag, Bauko, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007091",
        "hgabTitle": "Construction of Road, Barangay Mayag, Bauko, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "473",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mayaposi, Mabinay, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37522",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Mayaposi, Mabinay, Negros Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527531",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37522",
        "nepTitle": "Construction of Road, Barangay Mayaposi, Mabinay, Negros Oriental",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0580-009219",
        "hgabTitle": "Construction of Road, Barangay Mayaposi, Mabinay, Negros Oriental",
        "hgabPesos": 10000000,
        "nepPage": "532",
        "hgabPage": "580",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Mestizo Norte, San Carlos City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34098",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. Mestizo Norte, San Carlos City, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 498771",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maria Rachel Arenas"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34098",
        "nepTitle": "Construction of Road, Barangay Mestizo Norte, San Carlos City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0475-006966",
        "hgabTitle": "Construction of Road, Barangay Mestizo Norte, San Carlos City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "469",
        "hgabPage": "475",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Minabuyoc, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35996",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 7800000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Minabuyoc, Talavera, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551849",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35996",
        "nepTitle": "Construction of Road, Barangay Minabuyoc, Talavera, Nueva Ecija",
        "nepPesos": 7800000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007954",
        "hgabTitle": "Construction of Road, Barangay Minabuyoc, Talavera, Nueva Ecija",
        "hgabPesos": 7800000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Montserrat - Barangay Biasong, Pilar, Cebu",
      "source_code": "2027DPWH-Proposal-37726",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Road Improvement Brgy. Biasong to Brgy. Montserrat, Pilar, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552721",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37726",
        "nepTitle": "Construction of Road, Barangay Montserrat - Barangay Biasong, Pilar, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0587-009382",
        "hgabTitle": "Construction of Road, Barangay Montserrat - Barangay Biasong, Pilar, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "536",
        "hgabPage": "587",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Nabaong Garlang, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35941",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Nabaong Garlang, San Ildefonso, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 550904",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35941",
        "nepTitle": "Construction of Road, Barangay Nabaong Garlang, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007841",
        "hgabTitle": "Construction of Road, Barangay Nabaong Garlang, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Nabaong Garlang, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35941",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Barangay Nabaong Garlang, San Ildefonso, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203164000 · PDF p. 1264 · printed p. 2729",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35941",
        "nepTitle": "Construction of Road, Barangay Nabaong Garlang, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007841",
        "hgabTitle": "Construction of Road, Barangay Nabaong Garlang, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Naga-Naga, Alicia, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-21576",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 29500000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Naga-Naga, Alicia, Zamboanga Sibugay, Sta.00+000-Sta.01+090",
      "prior_amount": 24118000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 28860",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–1+090.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Marlo Bancoro"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21576",
        "nepTitle": "Construction of Road, Barangay Naga-Naga, Alicia, Zamboanga Sibugay",
        "nepPesos": 29500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0606-009772",
        "hgabTitle": "Construction of Road, Barangay Naga-Naga, Alicia, Zamboanga Sibugay",
        "hgabPesos": 29500000,
        "nepPage": "548",
        "hgabPage": "606",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Napsan, Puerto Princesa City, Palawan",
      "source_code": "2027DPWH-Proposal-37010",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Road construction at Barangay Napsan, City of Puerto Princesa, Palawan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527125",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gil Acosta Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37010",
        "nepTitle": "Construction of Road, Barangay Napsan, Puerto Princesa City, Palawan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0556-008705",
        "hgabTitle": "Construction of Road, Barangay Napsan, Puerto Princesa City, Palawan",
        "hgabPesos": 10000000,
        "nepPage": "517",
        "hgabPage": "556",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Narvacan II, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36032",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Narvacan II, Guimba, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551850",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36032",
        "nepTitle": "Construction of Road, Barangay Narvacan II, Guimba, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007956",
        "hgabTitle": "Construction of Road, Barangay Narvacan II, Guimba, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Narvacan II, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36032",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Narvacan II, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+310",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21608",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+310.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36032",
        "nepTitle": "Construction of Road, Barangay Narvacan II, Guimba, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007956",
        "hgabTitle": "Construction of Road, Barangay Narvacan II, Guimba, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Navarro, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-26332",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 48628000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Navarro, General Trias City, Cavite",
      "prior_amount": 7000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575170",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-26332",
        "nepTitle": "Construction of Road, Barangay Navarro, General Trias City, Cavite",
        "nepPesos": 48628000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0544-008442",
        "hgabTitle": "Construction of Road, Barangay Navarro, General Trias City, Cavite",
        "hgabPesos": 48628000,
        "nepPage": "509",
        "hgabPage": "544",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Navarro, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-26332",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 48628000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Navarro, Sta. 0+000 - Sta. 0+214.3, General Trias City, Cavite",
      "prior_amount": 8018000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 22066",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+214.30",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-26332",
        "nepTitle": "Construction of Road, Barangay Navarro, General Trias City, Cavite",
        "nepPesos": 48628000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0544-008442",
        "hgabTitle": "Construction of Road, Barangay Navarro, General Trias City, Cavite",
        "hgabPesos": 48628000,
        "nepPage": "509",
        "hgabPage": "544",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Navitas, Malinao, Aklan",
      "source_code": "2027DPWH-Proposal-37287",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Barangay Road, Barangay Navitas, Malinao, Aklan",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428889",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Florencio Miraflores"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37287",
        "nepTitle": "Construction of Road, Barangay Navitas, Malinao, Aklan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0567-008940",
        "hgabTitle": "Construction of Road, Barangay Navitas, Malinao, Aklan",
        "hgabPesos": 5000000,
        "nepPage": "524",
        "hgabPage": "567",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay New Magsaysay to Barangay Sinipit, Benito Soliven, Isabela",
      "source_code": "2027DPWH-Proposal-00459",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 15661000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay New Magsaysay to Barangay Sinipit, Benito Soliven, Isabela",
      "prior_amount": 15987000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560348",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-00459",
        "nepTitle": "Construction of Road, Barangay New Magsaysay to Barangay Sinipit, Benito Soliven, Isabela",
        "nepPesos": 15661000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0497-007423",
        "hgabTitle": "Construction of Road, Barangay New Magsaysay to Barangay Sinipit, Benito Soliven, Isabela",
        "hgabPesos": 15661000,
        "nepPage": "481",
        "hgabPage": "497",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay New Rizal, M'lang, Cotabato",
      "source_code": "2027DPWH-Proposal-38607",
      "office": "Cotabato 3rd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 30000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road in Barangay New Rizal, M'lang, Province of Cotabato",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 528012",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Samantha Santos"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38607",
        "nepTitle": "Construction of Road, Barangay New Rizal, M'lang, Cotabato",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0620-010069",
        "hgabTitle": "Construction of Road, Barangay New Rizal, M'lang, Cotabato",
        "hgabPesos": 30000000,
        "nepPage": "555",
        "hgabPage": "620",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay North Poblacion, Nampicuan, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35857",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5510000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Barangay North Poblacion, Nampicuan, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203223000 · PDF p. 1267 · printed p. 2732",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35857",
        "nepTitle": "Construction of Road, Barangay North Poblacion, Nampicuan, Nueva Ecija",
        "nepPesos": 5510000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007957",
        "hgabTitle": "Construction of Road, Barangay North Poblacion, Nampicuan, Nueva Ecija",
        "hgabPesos": 5510000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Northwest Poblacion, Nampicuan, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35858",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Road, Northwest Poblacion, Nampicuan, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428011",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35858",
        "nepTitle": "Construction of Road, Barangay Northwest Poblacion, Nampicuan, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007958",
        "hgabTitle": "Construction of Road, Barangay Northwest Poblacion, Nampicuan, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Northwest Poblacion, Nampicuan, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35858",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Northwest Poblacion, Nampicuan, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574941",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35858",
        "nepTitle": "Construction of Road, Barangay Northwest Poblacion, Nampicuan, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007958",
        "hgabTitle": "Construction of Road, Barangay Northwest Poblacion, Nampicuan, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Oraan East, Manaoag, Pangasinan",
      "source_code": "2027DPWH-Proposal-34232",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 0+020 - Sta. 0+358, Barangay Oraan East, Manaoag, Pangasinan",
      "prior_amount": 4834000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 26524",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+020.00–0+358.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34232",
        "nepTitle": "Construction of Road, Barangay Oraan East, Manaoag, Pangasinan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0471-006878",
        "hgabTitle": "Construction of Road, Barangay Oraan East, Manaoag, Pangasinan",
        "hgabPesos": 10000000,
        "nepPage": "467",
        "hgabPage": "471",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Otucan Sur, Bauko, Mountain Province",
      "source_code": "2027DPWH-Proposal-34753",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Otucan Sur, Bauko, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 576454",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34753",
        "nepTitle": "Construction of Road, Barangay Otucan Sur, Bauko, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007093",
        "hgabTitle": "Construction of Road, Barangay Otucan Sur, Bauko, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "473",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pacalag, San Miguel. Bulacan Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35951",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Barangay Pacalag, San Miguel, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203165000 · PDF p. 1264 · printed p. 2729",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35951",
        "nepTitle": "Construction of Road, Barangay Pacalag, San Miguel. Bulacan Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007842",
        "hgabTitle": "Construction of Road, Barangay Pacalag, San Miguel. Bulacan Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Palamis, Alaminos City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34182",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Palamis, Alaminos City, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535069",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arthur Celeste"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34182",
        "nepTitle": "Construction of Road, Barangay Palamis, Alaminos City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0470-006833",
        "hgabTitle": "Construction of Road, Barangay Palamis, Alaminos City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "470",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Palintucang, Bauang, La Union",
      "source_code": "2027DPWH-Proposal-34416",
      "office": "La Union 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Barangay Road, Brgy. Palintucang, Bauang, La Union",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306977",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34416",
        "nepTitle": "Construction of Road, Barangay Palintucang, Bauang, La Union",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0467-006766",
        "hgabTitle": "Construction of Road, Barangay Palintucang, Bauang, La Union",
        "hgabPesos": 10000000,
        "nepPage": "465",
        "hgabPage": "467",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Palitod, Paracelis, Mountain Province",
      "source_code": "2027DPWH-Proposal-34707",
      "office": "Mountain Province 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Palitod, Paracelis, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 553561",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34707",
        "nepTitle": "Construction of Road, Barangay Palitod, Paracelis, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0483-007124",
        "hgabTitle": "Construction of Road, Barangay Palitod, Paracelis, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "474",
        "hgabPage": "483",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pangabat, Jamindan, Capiz",
      "source_code": "2027DPWH-Proposal-37099",
      "office": "Capiz 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 20000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Pangabat, Jamindan, Capiz",
      "prior_amount": 10000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552530",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37099",
        "nepTitle": "Construction of Road, Barangay Pangabat, Jamindan, Capiz",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0569-008982",
        "hgabTitle": "Construction of Road, Barangay Pangabat, Jamindan, Capiz",
        "hgabPesos": 20000000,
        "nepPage": "525",
        "hgabPage": "569",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Panisijan, Uson, Masbate",
      "source_code": "2027DPWH-Proposal-39340",
      "office": "Masbate 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Panisijan, Uson, Masbate",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575429",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39340",
        "nepTitle": "Construction of Road, Barangay Panisijan, Uson, Masbate",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0565-008900",
        "hgabTitle": "Construction of Road, Barangay Panisijan, Uson, Masbate",
        "hgabPesos": 5000000,
        "nepPage": "523",
        "hgabPage": "565",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Partida II, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35846",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6226000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Partida II, Guimba, Nueva Ecija",
      "prior_amount": 5900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27182",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35846",
        "nepTitle": "Construction of Road, Barangay Partida II, Guimba, Nueva Ecija",
        "nepPesos": 6226000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007960",
        "hgabTitle": "Construction of Road, Barangay Partida II, Guimba, Nueva Ecija",
        "hgabPesos": 6226000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pasong Inchic, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36011",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Pasong Inchic, Guimba, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560501",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36011",
        "nepTitle": "Construction of Road, Barangay Pasong Inchic, Guimba, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007961",
        "hgabTitle": "Construction of Road, Barangay Pasong Inchic, Guimba, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Payahan, Sta. 0+000 - Sta. 0+247, Calbayog City, Samar",
      "source_code": "2027DPWH-Proposal-38086",
      "office": "Samar 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Road, Brgy. Payahan, Calbayog City, Samar",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 500335",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+247.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Stephen James Tan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38086",
        "nepTitle": "Construction of Road, Barangay Payahan, Sta. 0+000 - Sta. 0+247, Calbayog City, Samar",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0598-009615",
        "hgabTitle": "Construction of Road, Barangay Payahan, Sta. 0+000 - Sta. 0+247, Calbayog City, Samar",
        "hgabPesos": 5000000,
        "nepPage": "543",
        "hgabPage": "598",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Piglisan, Cuyapo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35842",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5500000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Piglisan, Cuyapo, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540400",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35842",
        "nepTitle": "Construction of Road, Barangay Piglisan, Cuyapo, Nueva Ecija",
        "nepPesos": 5500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007962",
        "hgabTitle": "Construction of Road, Barangay Piglisan, Cuyapo, Nueva Ecija",
        "hgabPesos": 5500000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pinagpanaan, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35990",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Pinagpanaan, Talavera, Nueva Ecija",
      "prior_amount": 6063000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560502",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35990",
        "nepTitle": "Construction of Road, Barangay Pinagpanaan, Talavera, Nueva Ecija",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007963",
        "hgabTitle": "Construction of Road, Barangay Pinagpanaan, Talavera, Nueva Ecija",
        "hgabPesos": 10000000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pinagpanaan, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35990",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Pinagpanaan, Talavera, Nueva Ecija, Sta. 0+000 - Sta. 0+355",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27184",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+355.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35990",
        "nepTitle": "Construction of Road, Barangay Pinagpanaan, Talavera, Nueva Ecija",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007963",
        "hgabTitle": "Construction of Road, Barangay Pinagpanaan, Talavera, Nueva Ecija",
        "hgabPesos": 10000000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pinagpanaan, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35990",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Roads, Pinagpanaan, Talavera, Nueva Ecija",
      "prior_amount": 2500000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307367",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35990",
        "nepTitle": "Construction of Road, Barangay Pinagpanaan, Talavera, Nueva Ecija",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007963",
        "hgabTitle": "Construction of Road, Barangay Pinagpanaan, Talavera, Nueva Ecija",
        "hgabPesos": 10000000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pinambaran, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35952",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Pinambaran, San Miguel, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 550905",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35952",
        "nepTitle": "Construction of Road, Barangay Pinambaran, San Miguel, Bulacan Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007843",
        "hgabTitle": "Construction of Road, Barangay Pinambaran, San Miguel, Bulacan Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pinambaran, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35952",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Road, Brgy. Pinambaran, San Miguel, Bulacan",
      "prior_amount": 3000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203194000 · PDF p. 1266 · printed p. 2731",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35952",
        "nepTitle": "Construction of Road, Barangay Pinambaran, San Miguel, Bulacan Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007843",
        "hgabTitle": "Construction of Road, Barangay Pinambaran, San Miguel, Bulacan Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte",
      "source_code": "2027DPWH-Proposal-37950",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Roads, Barangay Pinocawan, Javier, Leyte",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 429404",
      "similarity_pct": 100,
      "current_chainage": "1+390.00–1+750.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37950",
        "nepTitle": "Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0595-009566",
        "hgabTitle": "Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte",
        "hgabPesos": 5000000,
        "nepPage": "541",
        "hgabPage": "595",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte",
      "source_code": "2027DPWH-Proposal-37950",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Pinocawan, Javier, Leyte",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552888",
      "similarity_pct": 100,
      "current_chainage": "1+390.00–1+750.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37950",
        "nepTitle": "Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0595-009566",
        "hgabTitle": "Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte",
        "hgabPesos": 5000000,
        "nepPage": "541",
        "hgabPage": "595",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte",
      "source_code": "2027DPWH-Proposal-37950",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Pinocawan, Javier, Leyte",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 573580",
      "similarity_pct": 100,
      "current_chainage": "1+390.00–1+750.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37950",
        "nepTitle": "Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0595-009566",
        "hgabTitle": "Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte",
        "hgabPesos": 5000000,
        "nepPage": "541",
        "hgabPage": "595",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte",
      "source_code": "2027DPWH-Proposal-37950",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Pinocawan, Sta. 1+133 - 1+523, Javier, Leyte",
      "prior_amount": 4824000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 28687",
      "similarity_pct": 100,
      "current_chainage": "1+390.00–1+750.00",
      "prior_chainage": "1+133.00–1+523.00",
      "chainage_overlap": "1+390.00–1+523.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37950",
        "nepTitle": "Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0595-009566",
        "hgabTitle": "Construction of Road, Barangay Pinocawan, Sta. 1+390 - 1+750, Javier, Leyte",
        "hgabPesos": 5000000,
        "nepPage": "541",
        "hgabPage": "595",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Piut, Carranglan, Nueva Ecija Sta. 0+000 - Sta. 0+620",
      "source_code": "2027DPWH-Proposal-10604",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 7000000,
      "comparison_year": 2022,
      "prior_project": "Concreting of road, Piut, Carranglan, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526625",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+620.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10604",
        "nepTitle": "Construction of Road, Barangay Piut, Carranglan, Nueva Ecija Sta. 0+000 - Sta. 0+620",
        "nepPesos": 7000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007964",
        "hgabTitle": "Construction of Road, Barangay Piut, Carranglan, Nueva Ecija Sta. 0+000 - Sta. 0+620",
        "hgabPesos": 7000000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Piut, Carranglan, Nueva Ecija Sta. 0+000 - Sta. 0+620",
      "source_code": "2027DPWH-Proposal-10604",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 7000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Piut, Carranglan, Nueva Ecija",
      "prior_amount": 9500000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 539493",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+620.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10604",
        "nepTitle": "Construction of Road, Barangay Piut, Carranglan, Nueva Ecija Sta. 0+000 - Sta. 0+620",
        "nepPesos": 7000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007964",
        "hgabTitle": "Construction of Road, Barangay Piut, Carranglan, Nueva Ecija Sta. 0+000 - Sta. 0+620",
        "hgabPesos": 7000000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Plaridel, Sagay City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37466",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Plaridel, Sagay City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 536331",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37466",
        "nepTitle": "Construction of Road, Barangay Plaridel, Sagay City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0576-009134",
        "hgabTitle": "Construction of Road, Barangay Plaridel, Sagay City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "529",
        "hgabPage": "576",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Plaridel, Sagay City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37466",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Plaridel, Sagay City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 576795",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37466",
        "nepTitle": "Construction of Road, Barangay Plaridel, Sagay City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0576-009134",
        "hgabTitle": "Construction of Road, Barangay Plaridel, Sagay City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "529",
        "hgabPage": "576",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Poblacion, Binalonan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34298",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Poblacion, Binalonan, Pangasinan",
      "prior_amount": 12000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526304",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34298",
        "nepTitle": "Construction of Road, Barangay Poblacion, Binalonan, Pangasinan",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0415-005768",
        "hgabTitle": "Construction of Road, Barangay Poblacion, Binalonan, Pangasinan",
        "hgabPesos": 20000000,
        "nepPage": "435",
        "hgabPage": "415",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Poblacion, Binalonan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34298",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Poblacion, Binalonan, Pangasinan",
      "prior_amount": 8000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535148",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34298",
        "nepTitle": "Construction of Road, Barangay Poblacion, Binalonan, Pangasinan",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0415-005768",
        "hgabTitle": "Construction of Road, Barangay Poblacion, Binalonan, Pangasinan",
        "hgabPesos": 20000000,
        "nepPage": "435",
        "hgabPage": "415",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Poblacion, Binalonan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34298",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 20000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Roads, Barangay Poblacion, Binalonan, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551441",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34298",
        "nepTitle": "Construction of Road, Barangay Poblacion, Binalonan, Pangasinan",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0415-005768",
        "hgabTitle": "Construction of Road, Barangay Poblacion, Binalonan, Pangasinan",
        "hgabPesos": 20000000,
        "nepPage": "435",
        "hgabPage": "415",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Poblacion, Sagada, Mountain Province",
      "source_code": "2027DPWH-Proposal-34678",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Poblacion, Sagada, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540274",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34678",
        "nepTitle": "Construction of Road, Barangay Poblacion, Sagada, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Polo, Tanjay City, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37511",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Concreting of Road, Brgy. Polo, Tanjay City, Negros Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552825",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maisa Sagarbarria"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37511",
        "nepTitle": "Construction of Road, Barangay Polo, Tanjay City, Negros Oriental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0580-009221",
        "hgabTitle": "Construction of Road, Barangay Polo, Tanjay City, Negros Oriental",
        "hgabPesos": 5000000,
        "nepPage": "532",
        "hgabPage": "580",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Polocate, Banga, Aklan",
      "source_code": "2027DPWH-Proposal-37234",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Barangay Polocate, Banga, Aklan",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428896",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jess Marquez"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37234",
        "nepTitle": "Construction of Road, Barangay Polocate, Banga, Aklan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0567-008942",
        "hgabTitle": "Construction of Road, Barangay Polocate, Banga, Aklan",
        "hgabPesos": 5000000,
        "nepPage": "524",
        "hgabPage": "567",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Polocate, Banga, Aklan",
      "source_code": "2027DPWH-Proposal-37234",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Brgy. Polocate, Banga, Aklan",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522804",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jess Marquez"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37234",
        "nepTitle": "Construction of Road, Barangay Polocate, Banga, Aklan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0567-008942",
        "hgabTitle": "Construction of Road, Barangay Polocate, Banga, Aklan",
        "hgabPesos": 5000000,
        "nepPage": "524",
        "hgabPage": "567",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Polocate, Banga, Aklan",
      "source_code": "2027DPWH-Proposal-37234",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Road Brgy. Polocate, Banga, Aklan",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307975",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37234",
        "nepTitle": "Construction of Road, Barangay Polocate, Banga, Aklan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0567-008942",
        "hgabTitle": "Construction of Road, Barangay Polocate, Banga, Aklan",
        "hgabPesos": 5000000,
        "nepPage": "524",
        "hgabPage": "567",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pomponan, Sta. 0+000 - 0+372, Baybay City, Leyte",
      "source_code": "2027DPWH-Proposal-37961",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Pomponan, City of Baybay, Leyte",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552883",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+372.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37961",
        "nepTitle": "Construction of Road, Barangay Pomponan, Sta. 0+000 - 0+372, Baybay City, Leyte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0595-009567",
        "hgabTitle": "Construction of Road, Barangay Pomponan, Sta. 0+000 - 0+372, Baybay City, Leyte",
        "hgabPesos": 5000000,
        "nepPage": "541",
        "hgabPage": "595",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pugaro, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34462",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Pugaro, Dagupan City, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526260",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34462",
        "nepTitle": "Construction of Road, Barangay Pugaro, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0472-006881",
        "hgabTitle": "Construction of Road, Barangay Pugaro, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "472",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pugaro, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34462",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Brgy. Pugaro, Dagupan City, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117202633000 · PDF p. 1233 · printed p. 2698",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34462",
        "nepTitle": "Construction of Road, Barangay Pugaro, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0472-006881",
        "hgabTitle": "Construction of Road, Barangay Pugaro, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "472",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pulong Bahay, Quezon, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35865",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Barangay Pulong Bahay, Quezon, Nueva Ecija",
      "prior_amount": 6289000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427987",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mika Suansing"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35865",
        "nepTitle": "Construction of Road, Barangay Pulong Bahay, Quezon, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007967",
        "hgabTitle": "Construction of Road, Barangay Pulong Bahay, Quezon, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pulong Bahay, Quezon, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35865",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Pulong Bahay, Quezon, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560480",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mika Suansing"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35865",
        "nepTitle": "Construction of Road, Barangay Pulong Bahay, Quezon, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0522-007967",
        "hgabTitle": "Construction of Road, Barangay Pulong Bahay, Quezon, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "496",
        "hgabPage": "522",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pulong Bayabas, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35954",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Pulong Bayabas, San Miguel, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427951",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35954",
        "nepTitle": "Construction of Road, Barangay Pulong Bayabas, San Miguel, Bulacan Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007845",
        "hgabTitle": "Construction of Road, Barangay Pulong Bayabas, San Miguel, Bulacan Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pulong Bayabas, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35954",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Road, Brgy. Pulong Bayabas, San Miguel, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200797000",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35954",
        "nepTitle": "Construction of Road, Barangay Pulong Bayabas, San Miguel, Bulacan Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007845",
        "hgabTitle": "Construction of Road, Barangay Pulong Bayabas, San Miguel, Bulacan Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Pulong Duhat, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35958",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Pulong Duhat, San Miguel, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574067",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35958",
        "nepTitle": "Construction of Road, Barangay Pulong Duhat, San Miguel, Bulacan Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0517-007846",
        "hgabTitle": "Rehabilitation of Road, Barangay Pulong Duhat, San Miguel, Bulacan Sta. 00+000 - 00+230",
        "hgabPesos": 10000000,
        "nepPage": "493",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Rivilla, Sta. 0+800 - 1+156, Bato, Leyte",
      "source_code": "2027DPWH-Proposal-37968",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Roads, Barangay Rivilla, Bato, Leyte",
      "prior_amount": 1000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 429405",
      "similarity_pct": 100,
      "current_chainage": "0+800.00–1+156.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37968",
        "nepTitle": "Construction of Road, Barangay Rivilla, Sta. 0+800 - 1+156, Bato, Leyte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0596-009569",
        "hgabTitle": "Construction of Road, Barangay Rivilla, Sta. 0+800 - 1+156, Bato, Leyte",
        "hgabPesos": 5000000,
        "nepPage": "541",
        "hgabPage": "596",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Road, Barangay Anajao, Argao, Cebu",
      "source_code": "2027DPWH-Proposal-37753",
      "office": "Cebu 2nd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Road Improvement of Anajao Road at Brgy Anajao, Argao, Cebu",
      "prior_amount": 3000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050308192",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37753",
        "nepTitle": "Construction of Road, Barangay Road, Barangay Anajao, Argao, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0584-009314",
        "hgabTitle": "Construction of Road, Barangay Balaas, Argao, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "534",
        "hgabPage": "584",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Road, Barangay Colawin, Argao, Cebu",
      "source_code": "2027DPWH-Proposal-37750",
      "office": "Cebu 2nd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. Colawin, Argao, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 500131",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37750",
        "nepTitle": "Construction of Road, Barangay Road, Barangay Colawin, Argao, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0584-009323",
        "hgabTitle": "Construction of Road, Barangay Road, Barangay Colawin, Argao, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "534",
        "hgabPage": "584",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Road, Barangay Sumaguan, Argao, Cebu",
      "source_code": "2027DPWH-Proposal-37754",
      "office": "Cebu 2nd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Sumaguan, Argao, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574304",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37754",
        "nepTitle": "Construction of Road, Barangay Road, Barangay Sumaguan, Argao, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0585-009328",
        "hgabTitle": "Construction of Road, Barangay Road, Barangay Sumaguan, Argao, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "534",
        "hgabPage": "585",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Rosacara, Bansud, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-05849",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 69000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Road, Brgy. Rosacara, Bansud, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575356",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-05849",
        "nepTitle": "Construction of Road, Barangay Rosacara, Bansud, Oriental Mindoro",
        "nepPesos": 69000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0429-006038",
        "hgabTitle": "Construction of Road, Barangay Rosacara, Bansud, Oriental Mindoro",
        "hgabPesos": 69000000,
        "nepPage": "443",
        "hgabPage": "429",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Rosario, Santiago City, Isabela",
      "source_code": "2027DPWH-Proposal-35180",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 10800000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 0+000 - Sta. 0+517, Brgy. Rosario, Santiago City, Isabela",
      "prior_amount": 7840000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21054",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+517.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Tan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35180",
        "nepTitle": "Construction of Road, Barangay Rosario, Santiago City, Isabela",
        "nepPesos": 10800000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Rumbang, Rizal, Occidental Mindoro",
      "source_code": "2027DPWH-Proposal-36853",
      "office": "Mindoro Occidental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 15000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Barangay Rumbang, Rizal, Occidental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428596",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Odie Tarriela"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36853",
        "nepTitle": "Construction of Road, Barangay Rumbang, Rizal, Occidental Mindoro",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0552-008614",
        "hgabTitle": "Construction of Road, Barangay Rumbang, Rizal, Occidental Mindoro",
        "hgabPesos": 15000000,
        "nepPage": "514",
        "hgabPage": "552",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Rumbang, Rizal, Occidental Mindoro",
      "source_code": "2027DPWH-Proposal-36853",
      "office": "Mindoro Occidental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 15000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road along Barangay Rumbang, Rizal, Occidental Mindoro",
      "prior_amount": 30000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552274",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Odie Tarriela"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36853",
        "nepTitle": "Construction of Road, Barangay Rumbang, Rizal, Occidental Mindoro",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0552-008614",
        "hgabTitle": "Construction of Road, Barangay Rumbang, Rizal, Occidental Mindoro",
        "hgabPesos": 15000000,
        "nepPage": "514",
        "hgabPage": "552",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay S. Cabral, Siocon, Zamboanga del Norte",
      "source_code": "2027DPWH-Proposal-21502",
      "office": "Zamboanga del Norte 4th District Engineering Office",
      "region": "Region IX",
      "amount_2027": 30000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of barangay road - S. Cabral, Siocon, Zamboanga del Norte",
      "prior_amount": 6000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117204948000 · PDF p. 1369 · printed p. 2834",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21502",
        "nepTitle": "Construction of Road, Barangay S. Cabral, Siocon, Zamboanga del Norte",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0603-009710",
        "hgabTitle": "Construction of Road, Barangay S. Cabral, Siocon, Zamboanga del Norte",
        "hgabPesos": 30000000,
        "nepPage": "546",
        "hgabPage": "603",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sab-ahan, Bais City, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37515",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Road, Barangay Sab-Ahan, Bais City, Negros Oriental",
      "prior_amount": 50000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 426080",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maisa Sagarbarria"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37515",
        "nepTitle": "Construction of Road, Barangay Sab-ahan, Bais City, Negros Oriental",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0580-009222",
        "hgabTitle": "Construction of Road, Barangay Sab-ahan, Bais City, Negros Oriental",
        "hgabPesos": 10000000,
        "nepPage": "532",
        "hgabPage": "580",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sab-ahan, Bais City, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37515",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road in Barangay Sab-ahan, Bais City, Negros Oriental",
      "prior_amount": 18000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522933",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maisa Sagarbarria"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37515",
        "nepTitle": "Construction of Road, Barangay Sab-ahan, Bais City, Negros Oriental",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0580-009222",
        "hgabTitle": "Construction of Road, Barangay Sab-ahan, Bais City, Negros Oriental",
        "hgabPesos": 10000000,
        "nepPage": "532",
        "hgabPage": "580",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sab-ahan, Bais City, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37515",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 0+000 - Sta. 0+307.5, Barangay Sab-ahan, Bais City, Negros Oriental",
      "prior_amount": 8820000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 28269",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+307.50",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maisa Sagarbarria"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37515",
        "nepTitle": "Construction of Road, Barangay Sab-ahan, Bais City, Negros Oriental",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0580-009222",
        "hgabTitle": "Construction of Road, Barangay Sab-ahan, Bais City, Negros Oriental",
        "hgabPesos": 10000000,
        "nepPage": "532",
        "hgabPage": "580",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Saclit, Sadanga, Mountain Province",
      "source_code": "2027DPWH-Proposal-34791",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Improvement of Road, Saclit, Sadanga, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 537213",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34791",
        "nepTitle": "Construction of Road, Barangay Saclit, Sadanga, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007095",
        "hgabTitle": "Construction of Road, Barangay Saclit, Sadanga, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "473",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Saclit, Sadanga, Mountain Province",
      "source_code": "2027DPWH-Proposal-34791",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Saclit, Sadanga, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 553560",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34791",
        "nepTitle": "Construction of Road, Barangay Saclit, Sadanga, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0481-007095",
        "hgabTitle": "Construction of Road, Barangay Saclit, Sadanga, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "473",
        "hgabPage": "481",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Saguing, Makilala, North Cotabato",
      "source_code": "2027DPWH-Proposal-38713",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Saguing, Makilala, North Cotabato",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 500579",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38713",
        "nepTitle": "Construction of Road, Barangay Saguing, Makilala, North Cotabato",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0620-010062",
        "hgabTitle": "Construction of Road, Barangay Saguing, Makilala, North Cotabato",
        "hgabPesos": 10000000,
        "nepPage": "554",
        "hgabPage": "620",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Salaan, Mangaldan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34525",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. Salaan, Mangaldan, Pangasinan",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 498725",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34525",
        "nepTitle": "Construction of Road, Barangay Salaan, Mangaldan, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0472-006882",
        "hgabTitle": "Construction of Road, Barangay Salaan, Mangaldan, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "472",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Salaan, Mangaldan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34525",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road at Barangay Salaan, Mangaldan, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535104",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34525",
        "nepTitle": "Construction of Road, Barangay Salaan, Mangaldan, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0472-006882",
        "hgabTitle": "Construction of Road, Barangay Salaan, Mangaldan, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "472",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Salaan, Mangaldan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34525",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road at Barangay Salaan, Mangaldan, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560224",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34525",
        "nepTitle": "Construction of Road, Barangay Salaan, Mangaldan, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0472-006882",
        "hgabTitle": "Construction of Road, Barangay Salaan, Mangaldan, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "472",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Salay, Mangaldan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34524",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Concreting of Road, Brgy. Salay, Mangaldan, Pangasinan",
      "prior_amount": 1500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200336000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34524",
        "nepTitle": "Construction of Road, Barangay Salay, Mangaldan, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0472-006883",
        "hgabTitle": "Construction of Road, Barangay Salay, Mangaldan, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "472",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Salvacion, Puerto Princesa City, Palawan",
      "source_code": "2027DPWH-Proposal-37012",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Salvacion, Puerto Princesa City, Palawan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 536031",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gil Acosta Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37012",
        "nepTitle": "Construction of Road, Barangay Salvacion, Puerto Princesa City, Palawan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0556-008706",
        "hgabTitle": "Construction of Road, Barangay Salvacion, Puerto Princesa City, Palawan",
        "hgabPesos": 10000000,
        "nepPage": "517",
        "hgabPage": "556",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Samay, Ragay, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39288",
      "office": "Camarines Sur 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 15000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Barangay Road, Barangay Samay, Ragay, Camarines Sur",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307900",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39288",
        "nepTitle": "Construction of Road, Barangay Samay, Ragay, Camarines Sur",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0560-008800",
        "hgabTitle": "Construction of Road, Barangay Samay, Ragay, Camarines Sur",
        "hgabPesos": 15000000,
        "nepPage": "520",
        "hgabPage": "560",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Samay, Ragay, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39288",
      "office": "Camarines Sur 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 15000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Barangay Road, Brgy. Samay, Ragay, Camarines Sur",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300116201848000 · PDF p. 1189 · printed p. 2654",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39288",
        "nepTitle": "Construction of Road, Barangay Samay, Ragay, Camarines Sur",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0560-008800",
        "hgabTitle": "Construction of Road, Barangay Samay, Ragay, Camarines Sur",
        "hgabPesos": 15000000,
        "nepPage": "520",
        "hgabPage": "560",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Andres, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36012",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay San Andres, Guimba, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540391",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36012",
        "nepTitle": "Construction of Road, Barangay San Andres, Guimba, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007972",
        "hgabTitle": "Construction of Road, Barangay San Andres, Guimba, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "496",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Andres, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36012",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay San Andres, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+401",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27212",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+401.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36012",
        "nepTitle": "Construction of Road, Barangay San Andres, Guimba, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007972",
        "hgabTitle": "Construction of Road, Barangay San Andres, Guimba, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "496",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Andres, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36012",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Roads, San Andres, Guimba, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200827000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36012",
        "nepTitle": "Construction of Road, Barangay San Andres, Guimba, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007972",
        "hgabTitle": "Construction of Road, Barangay San Andres, Guimba, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "496",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Eustacio, Aliaga, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35834",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5730000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay San Eustacio, Aliaga, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551844",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35834",
        "nepTitle": "Construction of Road, Barangay San Eustacio, Aliaga, Nueva Ecija",
        "nepPesos": 5730000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007977",
        "hgabTitle": "Construction of Road, Barangay San Eustacio, Aliaga, Nueva Ecija",
        "hgabPesos": 5730000,
        "nepPage": "497",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Eustacio, Aliaga, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35834",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5730000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay San Eustacio, Aliaga, Nueva Ecija, Sta. 0+000 - Sta. 0+337",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21622",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+337.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35834",
        "nepTitle": "Construction of Road, Barangay San Eustacio, Aliaga, Nueva Ecija",
        "nepPesos": 5730000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007977",
        "hgabTitle": "Construction of Road, Barangay San Eustacio, Aliaga, Nueva Ecija",
        "hgabPesos": 5730000,
        "nepPage": "497",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Fabian, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36025",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Road, San Fabian, Sto. Domingo, Nueva Ecija",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428015",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36025",
        "nepTitle": "Construction of Road, Barangay San Fabian, Sto. Domingo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007978",
        "hgabTitle": "Construction of Road, Barangay San Fabian, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "497",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Fabian, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36025",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Barangay San Fabian, Sto. Domingo, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203226000 · PDF p. 1267 · printed p. 2732",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36025",
        "nepTitle": "Construction of Road, Barangay San Fabian, Sto. Domingo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007978",
        "hgabTitle": "Construction of Road, Barangay San Fabian, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "497",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Fermin, Caba, La Union",
      "source_code": "2027DPWH-Proposal-34406",
      "office": "La Union 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay San Fermin, Caba, La Union",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535062",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Dante Garcia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34406",
        "nepTitle": "Construction of Road, Barangay San Fermin, Caba, La Union",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0467-006771",
        "hgabTitle": "Construction of Road, Barangay San Fermin, Caba, La Union",
        "hgabPesos": 15000000,
        "nepPage": "465",
        "hgabPage": "467",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Fermin-San Jose, Caba, La Union",
      "source_code": "2027DPWH-Proposal-34248",
      "office": "La Union 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 12500000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road (San Fermin-San Jose) in Barangay San Fermin and San Jose, Caba, La Union, Sta. 9+130-Sta9+530",
      "prior_amount": 10151000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 26472",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "9+130.00–9+530.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Dante Garcia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34248",
        "nepTitle": "Construction of Road, Barangay San Fermin-San Jose, Caba, La Union",
        "nepPesos": 12500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0467-006772",
        "hgabTitle": "Construction of Road, Barangay San Fermin-San Jose, Caba, La Union",
        "hgabPesos": 12500000,
        "nepPage": "465",
        "hgabPage": "467",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Francisco, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36026",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Road, San Francisco, Sto. Domingo, Nueva Ecija",
      "prior_amount": 3500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428016",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36026",
        "nepTitle": "Construction of Road, Barangay San Francisco, Sto. Domingo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007979",
        "hgabTitle": "Construction of Road, Barangay San Francisco, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "497",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Francisco, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36026",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay San Francisco, Sto. Domingo, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535553",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36026",
        "nepTitle": "Construction of Road, Barangay San Francisco, Sto. Domingo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007979",
        "hgabTitle": "Construction of Road, Barangay San Francisco, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "497",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Francisco, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36026",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Roads, San Francisco, Sto. Domingo, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200828000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36026",
        "nepTitle": "Construction of Road, Barangay San Francisco, Sto. Domingo, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007979",
        "hgabTitle": "Construction of Road, Barangay San Francisco, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "497",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Isidro to Barangay MAHABA, Marihatag, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-38802",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 40000000,
      "comparison_year": 2026,
      "prior_project": "Concreting of San Isidro Mahaba Road (Sta. 0+000 - Sta. 2+026.50), Marihatag, Surigao del Sur",
      "prior_amount": 49000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 20062",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–2+026.50",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38802",
        "nepTitle": "Construction of Road, Barangay San Isidro to Barangay MAHABA, Marihatag, Surigao del Sur",
        "nepPesos": 40000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0628-010218",
        "hgabTitle": "Construction of Road, Barangay San Isidro to Barangay MAHABA, Marihatag, Surigao del Sur",
        "hgabPesos": 40000000,
        "nepPage": "557",
        "hgabPage": "628",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Isidro, Pamplona, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37505",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Barangay San Isidro, Pamplona, Negros Oriental",
      "prior_amount": 1500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 429266",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maisa Sagarbarria"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37505",
        "nepTitle": "Construction of Road, Barangay San Isidro, Pamplona, Negros Oriental",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0580-009223",
        "hgabTitle": "Construction of Road, Barangay San Isidro, Pamplona, Negros Oriental",
        "hgabPesos": 10000000,
        "nepPage": "532",
        "hgabPage": "580",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Isidro, Pamplona, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37505",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 0+000 - Sta. 0+393, Barangay San Isidro, Pamplona, Negros Oriental",
      "prior_amount": 9800000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 28271",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+393.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maisa Sagarbarria"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37505",
        "nepTitle": "Construction of Road, Barangay San Isidro, Pamplona, Negros Oriental",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0580-009223",
        "hgabTitle": "Construction of Road, Barangay San Isidro, Pamplona, Negros Oriental",
        "hgabPesos": 10000000,
        "nepPage": "532",
        "hgabPage": "580",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Isidro, Pamplona, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37505",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Barangay San Isidro, Pamplona, Negros Oriental",
      "prior_amount": 3000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117204662000 · PDF p. 1353 · printed p. 2818",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37505",
        "nepTitle": "Construction of Road, Barangay San Isidro, Pamplona, Negros Oriental",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0580-009223",
        "hgabTitle": "Construction of Road, Barangay San Isidro, Pamplona, Negros Oriental",
        "hgabPesos": 10000000,
        "nepPage": "532",
        "hgabPage": "580",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Jose to Barangay Madao, Uson, Masbate",
      "source_code": "2027DPWH-Proposal-39338",
      "office": "Masbate 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 20000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Madao - San Jose Road, Uson, Masbate",
      "prior_amount": 10000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552449",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39338",
        "nepTitle": "Construction of Road, Barangay San Jose to Barangay Madao, Uson, Masbate",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0565-008901",
        "hgabTitle": "Construction of Road, Barangay San Jose to Barangay Madao, Uson, Masbate",
        "hgabPesos": 20000000,
        "nepPage": "523",
        "hgabPage": "565",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Jose, Licab, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35851",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5500000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay San Jose, Licab, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560453",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35851",
        "nepTitle": "Construction of Road, Barangay San Jose, Licab, Nueva Ecija",
        "nepPesos": 5500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007982",
        "hgabTitle": "Construction of Road, Barangay San Jose, Licab, Nueva Ecija",
        "hgabPesos": 5500000,
        "nepPage": "497",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Jose, San Pablo City, Laguna",
      "source_code": "2027DPWH-Proposal-36663",
      "office": "Laguna 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Improvement of Road, Barangay San Jose, San Pablo City, Laguna",
      "prior_amount": 20000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 550960",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Amben Amante"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36663",
        "nepTitle": "Construction of Road, Barangay San Jose, San Pablo City, Laguna",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0547-008497",
        "hgabTitle": "Construction of Road, Barangay San Jose, San Pablo City, Laguna",
        "hgabPesos": 5000000,
        "nepPage": "511",
        "hgabPage": "547",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Juan, Aborlan, Palawan",
      "source_code": "2027DPWH-Proposal-37021",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 25000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of San Juan Road, Aborlan, Palawan",
      "prior_amount": 15000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 425905",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37021",
        "nepTitle": "Construction of Road, Barangay San Juan, Aborlan, Palawan",
        "nepPesos": 25000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0556-008707",
        "hgabTitle": "Construction of Road, Barangay San Juan, Aborlan, Palawan",
        "hgabPesos": 25000000,
        "nepPage": "517",
        "hgabPage": "556",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Juan, Aliaga, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35998",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay San Juan, Aliaga, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560464",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35998",
        "nepTitle": "Construction of Road, Barangay San Juan, Aliaga, Nueva Ecija",
        "nepPesos": 7000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007983",
        "hgabTitle": "Construction of Road, Barangay San Juan, Aliaga, Nueva Ecija",
        "hgabPesos": 7000000,
        "nepPage": "497",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Juan, Canaman, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39350",
      "office": "Camarines Sur 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, San Juan, Canaman, Camarines Sur - Sta. 0+000 - Sta. 0+450",
      "prior_amount": 5857000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 22491",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+450.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39350",
        "nepTitle": "Construction of Road, Barangay San Juan, Canaman, Camarines Sur",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0561-008818",
        "hgabTitle": "Construction of Road, Barangay San Juan, Canaman, Camarines Sur",
        "hgabPesos": 20000000,
        "nepPage": "520",
        "hgabPage": "561",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Manuel, Quezon, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35866",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay San Manuel, Quezon, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540405",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mika Suansing"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35866",
        "nepTitle": "Construction of Road, Barangay San Manuel, Quezon, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007985",
        "hgabTitle": "Construction of Road, Barangay San Manuel, Quezon, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "497",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Miguel, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35248",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Road, San Miguel, Echague, Isabela",
      "prior_amount": 40000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522170",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35248",
        "nepTitle": "Construction of Road, Barangay San Miguel, Echague, Isabela",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0502-007538",
        "hgabTitle": "Construction of Road, Barangay San Miguel, Echague, Isabela",
        "hgabPesos": 50000000,
        "nepPage": "483",
        "hgabPage": "502",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Miguel, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35248",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay San Miguel,Sta. 0+000 - Sta. 0+646, Echague, Isabela",
      "prior_amount": 9800000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+646.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35248",
        "nepTitle": "Construction of Road, Barangay San Miguel, Echague, Isabela",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0502-007538",
        "hgabTitle": "Construction of Road, Barangay San Miguel, Echague, Isabela",
        "hgabPesos": 50000000,
        "nepPage": "483",
        "hgabPage": "502",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Miguel, Luna, Isabela",
      "source_code": "2027DPWH-Proposal-35330",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 30000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Barangay San Miguel, Luna, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 425684",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35330",
        "nepTitle": "Construction of Road, Barangay San Miguel, Luna, Isabela",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0493-007343",
        "hgabTitle": "Construction of Road, Barangay San Miguel, Luna, Isabela",
        "hgabPesos": 36000000,
        "nepPage": "479",
        "hgabPage": "493",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Pascual, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36007",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5500000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay San Pascual, Sto Domingo, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540406",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36007",
        "nepTitle": "Construction of Road, Barangay San Pascual, Sto. Domingo, Nueva Ecija",
        "nepPesos": 5500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007986",
        "hgabTitle": "Construction of Road, Barangay San Pascual, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 5500000,
        "nepPage": "497",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Rafael, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35847",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 7130750,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay San Rafael, Guimba, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540392",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35847",
        "nepTitle": "Construction of Road, Barangay San Rafael, Guimba, Nueva Ecija",
        "nepPesos": 7130750,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007987",
        "hgabTitle": "Construction of Road, Barangay San Rafael, Guimba, Nueva Ecija",
        "hgabPesos": 7130750,
        "nepPage": "497",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Rafael, Guimba, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35847",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 7130750,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay San Rafael, Guimba, Nueva Ecija, Sta. 0+000 - Sta. 0+388.40",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21624",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+388.40",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35847",
        "nepTitle": "Construction of Road, Barangay San Rafael, Guimba, Nueva Ecija",
        "nepPesos": 7130750,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007987",
        "hgabTitle": "Construction of Road, Barangay San Rafael, Guimba, Nueva Ecija",
        "hgabPesos": 7130750,
        "nepPage": "497",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Ramon, Manaoag, Pangasinan",
      "source_code": "2027DPWH-Proposal-34210",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road at Barangay San Ramon, Manaoag, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560230",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34210",
        "nepTitle": "Construction of Road, Barangay San Ramon, Manaoag, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0472-006885",
        "hgabTitle": "Construction of Road, Barangay San Ramon, Manaoag, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "472",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Roque, La Paz, Tarlac.",
      "source_code": "2027DPWH-Proposal-35746",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Road at Barangay San Roque, La Paz, Tarlac",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560592",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bong Rivera"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35746",
        "nepTitle": "Construction of Road, Barangay San Roque, La Paz, Tarlac.",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0534-008203",
        "hgabTitle": "Construction of Road, Barangay San Roque, La Paz, Tarlac.",
        "hgabPesos": 5000000,
        "nepPage": "502",
        "hgabPage": "534",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Roque, Liloan, Cebu",
      "source_code": "2027DPWH-Proposal-37708",
      "office": "Cebu 5th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Brgy. San Roque, Liloan, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117204613000 · PDF p. 1350 · printed p. 2815",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37708",
        "nepTitle": "Construction of Road, Barangay San Roque, Liloan, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0587-009385",
        "hgabTitle": "Construction of Road, Barangay San Roque, Liloan, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "536",
        "hgabPage": "587",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay San Vicente, Burgos, Pangasinan",
      "source_code": "2027DPWH-Proposal-34166",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay San Vicente, Burgos, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 550866",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arthur Celeste"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34166",
        "nepTitle": "Construction of Road, Barangay San Vicente, Burgos, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0470-006837",
        "hgabTitle": "Construction of Road, Barangay San Vicente, Burgos, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "470",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Santo Domingo, Batangas City",
      "source_code": "2027DPWH-Proposal-36314",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road in Brgy. Santo Domingo, Batangas City, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27424",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36314",
        "nepTitle": "Construction of Road, Barangay Santo Domingo, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sapang Dayap, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35943",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road at Brgy. Sapang Dayap, San Ildefonso, Bulacan",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574114",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35943",
        "nepTitle": "Construction of Road, Barangay Sapang Dayap, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007848",
        "hgabTitle": "Construction of Road, Barangay Sapang Dayap, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "494",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sapang Pahalang, San Rafael, Bulacan Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35947",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Concreting of Road at Sapang Pahalang, Brgy. Sapang Pahalang, San Rafael, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535534",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35947",
        "nepTitle": "Construction of Road, Barangay Sapang Pahalang, San Rafael, Bulacan Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007849",
        "hgabTitle": "Construction of Road, Barangay Sapang Pahalang, San Rafael, Bulacan Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "494",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sapang Pahalang, San Rafael, Bulacan Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35947",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Road, Brgy. Sapang Pahalang, San Rafael, Bulacan",
      "prior_amount": 1500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200801000",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35947",
        "nepTitle": "Construction of Road, Barangay Sapang Pahalang, San Rafael, Bulacan Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007849",
        "hgabTitle": "Construction of Road, Barangay Sapang Pahalang, San Rafael, Bulacan Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "494",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sapang Putik, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35939",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Sapang Putik, San Ildefonso, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 539458",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35939",
        "nepTitle": "Construction of Road, Barangay Sapang Putik, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0517-007850",
        "hgabTitle": "Construction of Road, Barangay Sapang Putik, San Ildefonso, Bulacan, Sta. 00+000 - 00+420",
        "hgabPesos": 10000000,
        "nepPage": "494",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sapang Putik, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35939",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road at Barangay Sapang Putik, Sapang Putik, San Ildefonso, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 558851",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35939",
        "nepTitle": "Construction of Road, Barangay Sapang Putik, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0517-007850",
        "hgabTitle": "Construction of Road, Barangay Sapang Putik, San Ildefonso, Bulacan, Sta. 00+000 - 00+420",
        "hgabPesos": 10000000,
        "nepPage": "494",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sapang Putik, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35939",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation of Road, Barangay Sapang Putik, San Ildefonso, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200618000",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35939",
        "nepTitle": "Construction of Road, Barangay Sapang Putik, San Ildefonso, Bulacan, Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0517-007850",
        "hgabTitle": "Construction of Road, Barangay Sapang Putik, San Ildefonso, Bulacan, Sta. 00+000 - 00+420",
        "hgabPesos": 10000000,
        "nepPage": "494",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sapang, Manaoag, Pangasinan",
      "source_code": "2027DPWH-Proposal-34233",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Concreting of Road, Brgy. Sapang, Manaoag, Pangasinan",
      "prior_amount": 1500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200337000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34233",
        "nepTitle": "Construction of Road, Barangay Sapang, Manaoag, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0472-006886",
        "hgabTitle": "Construction of Road, Barangay Sapang, Manaoag, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "472",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sicsican, Matanda, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35992",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Sicsican Matanda, Talavera, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560477",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35992",
        "nepTitle": "Construction of Road, Barangay Sicsican, Matanda, Talavera, Nueva Ecija",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007989",
        "hgabTitle": "Construction of Road, Barangay Sicsican, Matanda, Talavera, Nueva Ecija",
        "hgabPesos": 10000000,
        "nepPage": "497",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sicsican, Matanda, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35992",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Sicsican Matanda, Talavera, Nueva Ecija Sta. 0+000 - Sta. 0+425",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21516",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+425.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35992",
        "nepTitle": "Construction of Road, Barangay Sicsican, Matanda, Talavera, Nueva Ecija",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0523-007989",
        "hgabTitle": "Construction of Road, Barangay Sicsican, Matanda, Talavera, Nueva Ecija",
        "hgabPesos": 10000000,
        "nepPage": "497",
        "hgabPage": "523",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sinturisan, San Nicolas, Batangas",
      "source_code": "2027DPWH-Proposal-36581",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Roads in Barangay Sinturisan, San Nicolas, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428293",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36581",
        "nepTitle": "Construction of Road, Barangay Sinturisan, San Nicolas, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0539-008328",
        "hgabTitle": "Construction of Road, Barangay Sinturisan, San Nicolas, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "506",
        "hgabPage": "539",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sta. Catalina, Quirino, Isabela",
      "source_code": "2027DPWH-Proposal-35235",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of road, Barangay Sta. Catalina, Quirino, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427754",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35235",
        "nepTitle": "Construction of Road, Barangay Sta. Catalina, Quirino, Isabela",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0493-007345",
        "hgabTitle": "Construction of Road, Barangay Sta. Catalina, Quirino, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "479",
        "hgabPage": "493",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sta. Cruz, Cuyapo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36006",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5500000,
      "comparison_year": 2018,
      "prior_project": "Construction of Roads, Sta. Cruz, Cuyapo, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200830000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36006",
        "nepTitle": "Construction of Road, Barangay Sta. Cruz, Cuyapo, Nueva Ecija",
        "nepPesos": 5500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0524-007992",
        "hgabTitle": "Construction of Road, Barangay Sta. Cruz, Cuyapo, Nueva Ecija",
        "hgabPesos": 5500000,
        "nepPage": "497",
        "hgabPage": "524",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sta. Isabel, Jones, Isabela",
      "source_code": "2027DPWH-Proposal-35107",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 24000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. 0+000 - Sta. 0+581, Brgy. Sta. Isabel, Jones, Isabela",
      "prior_amount": 8820000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21058",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+581.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35107",
        "nepTitle": "Construction of Road, Barangay Sta. Isabel, Jones, Isabela",
        "nepPesos": 24000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0502-007539",
        "hgabTitle": "Construction of Road, Sta. 0+000 - Sta. 0+375, Barangay Sta. Isabel, Jones, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "483",
        "hgabPage": "502",
        "chainageStatus": "incomplete",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sta. Maria, Sto. Tomas City, Batangas",
      "source_code": "2027DPWH-Proposal-36596",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Road, Barangay Sta Maria, City of Sto Tomas, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21935",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36596",
        "nepTitle": "Construction of Road, Barangay Sta. Maria, Sto. Tomas City, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0539-008329",
        "hgabTitle": "Construction of Road, Barangay Sta. Maria, Sto. Tomas City, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "507",
        "hgabPage": "539",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sta. Monica, Puerto Princesa City, Palawan",
      "source_code": "2027DPWH-Proposal-37020",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 25000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Sta. Monica, Puerto Princesa City, Palawan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552314",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gil Acosta Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37020",
        "nepTitle": "Construction of Road, Barangay Sta. Monica, Puerto Princesa City, Palawan",
        "nepPesos": 25000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0556-008708",
        "hgabTitle": "Construction of Road, Barangay Sta. Monica, Puerto Princesa City, Palawan",
        "hgabPesos": 25000000,
        "nepPage": "517",
        "hgabPage": "556",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sta. Putican Cabulo, Baco, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36887",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Concreting of Road, Brgy. Putican-Cabulo, Baco, Oriental Mindoro",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522577",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36887",
        "nepTitle": "Construction of Road, Barangay Sta. Putican Cabulo, Baco, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sta. Rita Matanda, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35955",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Road, Brgy. Sta. Rita Matanda, San Miguel, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307347",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35955",
        "nepTitle": "Construction of Road, Barangay Sta. Rita Matanda, San Miguel, Bulacan Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007851",
        "hgabTitle": "Construction of Road, Barangay Sta. Rita Matanda, San Miguel, Bulacan Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "494",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sta. Rita, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36877",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. Sta. Rita, Calapan City, Oriental Mindoro",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499660",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36877",
        "nepTitle": "Construction of Road, Barangay Sta. Rita, City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sta. Rita, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36877",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Rehabilitation of Road, Sta. Rita, Calapan City, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552278",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36877",
        "nepTitle": "Construction of Road, Barangay Sta. Rita, City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sta. Rita, Quezon, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35867",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Road, Brgy. Sta. Rita, Quezon, Nueva Ecija",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522295",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mika Suansing"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35867",
        "nepTitle": "Construction of Road, Barangay Sta. Rita, Quezon, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0524-007994",
        "hgabTitle": "Construction of Road, Barangay Sta. Rita, Quezon, Nueva Ecija",
        "hgabPesos": 5000000,
        "nepPage": "497",
        "hgabPage": "524",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sta. Rita, Sto. Domingo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35870",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5670000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Sta. Rita, Sto. Domingo, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540409",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35870",
        "nepTitle": "Construction of Road, Barangay Sta. Rita, Sto. Domingo, Nueva Ecija",
        "nepPesos": 5670000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0524-007995",
        "hgabTitle": "Construction of Road, Barangay Sta. Rita, Sto. Domingo, Nueva Ecija",
        "hgabPesos": 5670000,
        "nepPage": "497",
        "hgabPage": "524",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sta. Rosa, Sta. Maria, Pangasinan",
      "source_code": "2027DPWH-Proposal-34396",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Barangay Road in Barangay Sta. Rosa, Sta. Maria, Pangasinan",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117202643000 · PDF p. 1233 · printed p. 2698",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34396",
        "nepTitle": "Construction of Road, Barangay Sta. Rosa, Sta. Maria, Pangasinan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0473-006908",
        "hgabTitle": "Construction of Road, Barangay Sta. Rosa, Sta. Maria, Pangasinan",
        "hgabPesos": 10000000,
        "nepPage": "468",
        "hgabPage": "473",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sto. Tomas, Aliaga, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35983",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 11754500,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Sto. Tomas, Aliaga, Nueva Ecija, Sta. 0+000 - Sta. 0+",
      "prior_amount": 9414000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21628",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35983",
        "nepTitle": "Construction of Road, Barangay Sto. Tomas, Aliaga, Nueva Ecija",
        "nepPesos": 11754500,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0524-007999",
        "hgabTitle": "Construction of Road, Barangay Sto. Tomas, Aliaga, Nueva Ecija",
        "hgabPesos": 11754500,
        "nepPage": "497",
        "hgabPage": "524",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sumadel, Tadian, Mountain Province",
      "source_code": "2027DPWH-Proposal-34795",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Sumadel, Tadian, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 553559",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34795",
        "nepTitle": "Construction of Road, Barangay Sumadel, Tadian, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0482-007097",
        "hgabTitle": "Construction of Road, Barangay Sumadel, Tadian, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "473",
        "hgabPage": "482",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tacbuyan, Estancia, Iloilo",
      "source_code": "2027DPWH-Proposal-37317",
      "office": "Iloilo 3rd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of road at Barangay Tacbuyan, Estancia, Iloilo",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201637000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37317",
        "nepTitle": "Construction of Road, Barangay Tacbuyan, Estancia, Iloilo",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0572-009048",
        "hgabTitle": "Construction of Road, Barangay Tacbuyan, Estancia, Iloilo",
        "hgabPesos": 10000000,
        "nepPage": "527",
        "hgabPage": "572",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tagaytay, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35879",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6500000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Tagaytay, Talavera, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560492",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35879",
        "nepTitle": "Construction of Road, Barangay Tagaytay, Talavera, Nueva Ecija",
        "nepPesos": 6500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0524-008000",
        "hgabTitle": "Construction of Road, Barangay Tagaytay, Talavera, Nueva Ecija",
        "hgabPesos": 6500000,
        "nepPage": "498",
        "hgabPage": "524",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tagaytay, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35879",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6500000,
      "comparison_year": 2018,
      "prior_project": "Construction of Roads, Tagaytay, Talavera, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200831000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35879",
        "nepTitle": "Construction of Road, Barangay Tagaytay, Talavera, Nueva Ecija",
        "nepPesos": 6500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0524-008000",
        "hgabTitle": "Construction of Road, Barangay Tagaytay, Talavera, Nueva Ecija",
        "hgabPesos": 6500000,
        "nepPage": "498",
        "hgabPage": "524",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tagbakin, Tiaong, Quezon",
      "source_code": "2027DPWH-Proposal-36469",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 16000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Tagbakin, Tiaong, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527006",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36469",
        "nepTitle": "Construction of Road, Barangay Tagbakin, Tiaong, Quezon",
        "nepPesos": 16000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0549-008543",
        "hgabTitle": "Construction of Road, Barangay Tagbakin, Tiaong, Quezon",
        "hgabPesos": 16000000,
        "nepPage": "512",
        "hgabPage": "549",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tagbakin, Tiaong, Quezon",
      "source_code": "2027DPWH-Proposal-36469",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 16000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Brgy. Tagbakin, Tiaong, Quezon",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 527929",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36469",
        "nepTitle": "Construction of Road, Barangay Tagbakin, Tiaong, Quezon",
        "nepPesos": 16000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0549-008543",
        "hgabTitle": "Construction of Road, Barangay Tagbakin, Tiaong, Quezon",
        "hgabPesos": 16000000,
        "nepPage": "512",
        "hgabPage": "549",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tagpo, Bais City, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37516",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Barangay Tagpo, Bais City, Negros Oriental",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 429269",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maisa Sagarbarria"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37516",
        "nepTitle": "Construction of Road, Barangay Tagpo, Bais City, Negros Oriental",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0580-009226",
        "hgabTitle": "Construction of Road, Barangay Tagpo, Bais City, Negros Oriental",
        "hgabPesos": 10000000,
        "nepPage": "532",
        "hgabPage": "580",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tagpo, Bais City, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37516",
      "office": "Negros Oriental 2nd District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Barangay Tagpo, Bais City, Negros Oriental",
      "prior_amount": 2500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117204665000 · PDF p. 1353 · printed p. 2818",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37516",
        "nepTitle": "Construction of Road, Barangay Tagpo, Bais City, Negros Oriental",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0580-009226",
        "hgabTitle": "Construction of Road, Barangay Tagpo, Bais City, Negros Oriental",
        "hgabPesos": 10000000,
        "nepPage": "532",
        "hgabPage": "580",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Talisay, Tiaong, Quezon",
      "source_code": "2027DPWH-Proposal-36470",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Talisay, Tiaong, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574169",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36470",
        "nepTitle": "Construction of Road, Barangay Talisay, Tiaong, Quezon",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0549-008544",
        "hgabTitle": "Construction of Road, Barangay Talisay, Tiaong, Quezon",
        "hgabPesos": 15000000,
        "nepPage": "512",
        "hgabPage": "549",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Talisay, Tiaong, Quezon",
      "source_code": "2027DPWH-Proposal-36470",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Brgy Road, Brgy. Talisay, Tiaong, Quezon",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203644000 · PDF p. 1292 · printed p. 2757",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36470",
        "nepTitle": "Construction of Road, Barangay Talisay, Tiaong, Quezon",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0549-008544",
        "hgabTitle": "Construction of Road, Barangay Talisay, Tiaong, Quezon",
        "hgabPesos": 15000000,
        "nepPage": "512",
        "hgabPage": "549",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Talubin, Bontoc, Mountain Province",
      "source_code": "2027DPWH-Proposal-34669",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Talubin Road Sta. 0+936 - Sta. 1+036, Bontoc, Mountain Province",
      "prior_amount": 9800000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 24119",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+936.00–1+036.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maximo Dalog Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34669",
        "nepTitle": "Construction of Road, Barangay Talubin, Bontoc, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0482-007099",
        "hgabTitle": "Construction of Road, Barangay Talubin, Bontoc, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "473",
        "hgabPage": "482",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tanulong, Sagada, Mountain Province",
      "source_code": "2027DPWH-Proposal-34679",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Tanulong, Sagada, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540275",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34679",
        "nepTitle": "Construction of Road, Barangay Tanulong, Sagada, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0482-007101",
        "hgabTitle": "Construction of Road, Barangay Tanulong, Sagada, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "473",
        "hgabPage": "482",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tapapan, Bauko, Mountain Province",
      "source_code": "2027DPWH-Proposal-34664",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Improvement of Road, Tapapan, Bauko, Mountain Province",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 537220",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34664",
        "nepTitle": "Construction of Road, Barangay Tapapan, Bauko, Mountain Province",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0482-007102",
        "hgabTitle": "Construction of Road, Barangay Tapapan, Bauko, Mountain Province",
        "hgabPesos": 5000000,
        "nepPage": "473",
        "hgabPage": "482",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34217",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Road at Barangay Tapuac, Dagupan City, Pangasinan",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427158",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34217",
        "nepTitle": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0472-006889",
        "hgabTitle": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "472",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34217",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road at Brgy. Tapuac, Dagupan City, Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 521950",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34217",
        "nepTitle": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0472-006889",
        "hgabTitle": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "472",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34217",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 576442",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34217",
        "nepTitle": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0472-006889",
        "hgabTitle": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "472",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-34217",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Road, Brgy. Tapuac, Dagupan City, Pangasinan",
      "prior_amount": 3000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200345000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34217",
        "nepTitle": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0472-006889",
        "hgabTitle": "Construction of Road, Barangay Tapuac, Dagupan City, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "472",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tibagan, San Miguel, Bulacan Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35956",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Barangay Tibagan, San Miguel, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203174000 · PDF p. 1264 · printed p. 2729",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35956",
        "nepTitle": "Construction of Road, Barangay Tibagan, San Miguel, Bulacan Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007852",
        "hgabTitle": "Construction of Road, Barangay Tibagan, San Miguel, Bulacan Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "494",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tiglawigan, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37491",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Tiglawigan, Cadiz City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 576800",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37491",
        "nepTitle": "Construction of Road, Barangay Tiglawigan, Cadiz City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0576-009136",
        "hgabTitle": "Construction of Road, Barangay Tiglawigan, Cadiz City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "529",
        "hgabPage": "576",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tiglawigan, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37491",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road (Sta. 0+000 - Sta. 0+300), Barangay Tiglawigan, Cadiz City, Negros Occidental",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 28137",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+300.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37491",
        "nepTitle": "Construction of Road, Barangay Tiglawigan, Cadiz City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0576-009136",
        "hgabTitle": "Construction of Road, Barangay Tiglawigan, Cadiz City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "529",
        "hgabPage": "576",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Timbao, Bacong, Negros Oriental",
      "source_code": "2027DPWH-Proposal-37422",
      "office": "Negros Oriental 3rd District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Brgy. Timbao, Bacong, Negros Oriental",
      "prior_amount": 20000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 426084",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37422",
        "nepTitle": "Construction of Road, Barangay Timbao, Bacong, Negros Oriental",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0581-009248",
        "hgabTitle": "Construction of Road, Barangay Timbao, Bacong, Negros Oriental",
        "hgabPesos": 10000000,
        "nepPage": "533",
        "hgabPage": "581",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tipor, Bani, Pangasinan",
      "source_code": "2027DPWH-Proposal-34163",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road in Barangay Tipor, Bani, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526191",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34163",
        "nepTitle": "Construction of Road, Barangay Tipor, Bani, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0470-006838",
        "hgabTitle": "Construction of Road, Barangay Tipor, Bani, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "470",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tipor, Bani, Pangasinan",
      "source_code": "2027DPWH-Proposal-34163",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Brgy. Tipor, Bani, Pangasinan",
      "prior_amount": 3000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117202604000 · PDF p. 1231 · printed p. 2696",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34163",
        "nepTitle": "Construction of Road, Barangay Tipor, Bani, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0470-006838",
        "hgabTitle": "Construction of Road, Barangay Tipor, Bani, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "470",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tocok, San Fabian, Pangasinan",
      "source_code": "2027DPWH-Proposal-34221",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road at Barangay Tocok, San Fabian, Pangasinan",
      "prior_amount": 1500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427506",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34221",
        "nepTitle": "Construction of Road, Barangay Tocok, San Fabian, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0472-006892",
        "hgabTitle": "Construction of Road, Barangay Tocok, San Fabian, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "472",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tocok, San Fabian, Pangasinan",
      "source_code": "2027DPWH-Proposal-34221",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Brgy. Tocok, San Fabian, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526239",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34221",
        "nepTitle": "Construction of Road, Barangay Tocok, San Fabian, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0472-006892",
        "hgabTitle": "Construction of Road, Barangay Tocok, San Fabian, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "467",
        "hgabPage": "472",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Tuy-a, Sta. 0+600 - 0+968, Abuyog, Leyte",
      "source_code": "2027DPWH-Proposal-37957",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Tuy - A, Abuyog, Leyte",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552896",
      "similarity_pct": 100,
      "current_chainage": "0+600.00–0+968.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37957",
        "nepTitle": "Construction of Road, Barangay Tuy-a, Sta. 0+600 - 0+968, Abuyog, Leyte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0596-009575",
        "hgabTitle": "Construction of Road, Barangay Tuy-a, Sta. 0+600 - 0+968, Abuyog, Leyte",
        "hgabPesos": 5000000,
        "nepPage": "541",
        "hgabPage": "596",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Umpucan, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35945",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Umpucan, San Ildefonso, Bulacan",
      "prior_amount": 25000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535530",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35945",
        "nepTitle": "Construction of Road, Barangay Umpucan, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007853",
        "hgabTitle": "Construction of Road, Barangay Umpucan, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "494",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Umpucan, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35945",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Barangay Umpucan, San Ildefonso, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203176000 · PDF p. 1265 · printed p. 2730",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35945",
        "nepTitle": "Construction of Road, Barangay Umpucan, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0517-007853",
        "hgabTitle": "Construction of Road, Barangay Umpucan, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
        "hgabPesos": 10000000,
        "nepPage": "494",
        "hgabPage": "517",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Upper Tambaking, Maimbung, Sulu Sta. 00+500 to Sta. 02+000",
      "source_code": "2027DPWH-Proposal-38313",
      "office": "Sulu 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 50000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road at Barangay Upper Tambaking, Maimbung, Sulu",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 429521",
      "similarity_pct": 100,
      "current_chainage": "0+500.00–2+000.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Samier Tan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38313",
        "nepTitle": "Construction of Road, Barangay Upper Tambaking, Maimbung, Sulu Sta. 00+500 to Sta. 02+000",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0600-009651",
        "hgabTitle": "Construction of Road, Barangay Upper Tambaking, Maimbung, Sulu Sta. 00+500 to Sta. 02+000",
        "hgabPesos": 50000000,
        "nepPage": "544",
        "hgabPage": "600",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Viga, Agno, Pangasinan",
      "source_code": "2027DPWH-Proposal-34183",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road in Barangay Viga, Agno, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526193",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34183",
        "nepTitle": "Construction of Road, Barangay Viga, Agno, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0470-006839",
        "hgabTitle": "Construction of Road, Barangay Viga, Agno, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "470",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Viga, Agno, Pangasinan",
      "source_code": "2027DPWH-Proposal-34183",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Viga, Agno, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 550867",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34183",
        "nepTitle": "Construction of Road, Barangay Viga, Agno, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0470-006839",
        "hgabTitle": "Construction of Road, Barangay Viga, Agno, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "470",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Viga, Agno, Pangasinan",
      "source_code": "2027DPWH-Proposal-34183",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Brgy. Viga, Agno, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117202542000 · PDF p. 1228 · printed p. 2693",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34183",
        "nepTitle": "Construction of Road, Barangay Viga, Agno, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0470-006839",
        "hgabTitle": "Construction of Road, Barangay Viga, Agno, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "470",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Villa Mag-aso, Sta. 0+000 - 0+370, Baybay City, Leyte",
      "source_code": "2027DPWH-Proposal-37963",
      "office": "Leyte 5th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Roads, Barangay Villa Mag-aso, Baybay City, Leyte",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 429408",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+370.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37963",
        "nepTitle": "Construction of Road, Barangay Villa Mag-aso, Sta. 0+000 - 0+370, Baybay City, Leyte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0596-009576",
        "hgabTitle": "Construction of Road, Barangay Villa Mag-aso, Sta. 0+000 - 0+370, Baybay City, Leyte",
        "hgabPesos": 5000000,
        "nepPage": "541",
        "hgabPage": "596",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Villa Pag-asa, Bansud, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-05847",
      "office": "Southern Mindoro District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Villa Pag-asa, Bansud, Oriental Mindoro",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527149",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-05847",
        "nepTitle": "Construction of Road, Barangay Villa Pag-asa, Bansud, Oriental Mindoro",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0557-008737",
        "hgabTitle": "Construction of Road, Barangay Villa Pag-asa, Bansud, Oriental Mindoro",
        "hgabPesos": 15000000,
        "nepPage": "518",
        "hgabPage": "557",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Villaflores, Cuyapo, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36033",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Villaflores, Cuyapo, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560465",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36033",
        "nepTitle": "Construction of Road, Barangay Villaflores, Cuyapo, Nueva Ecija",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0524-008004",
        "hgabTitle": "Construction of Road, Barangay Villaflores, Cuyapo, Nueva Ecija",
        "hgabPesos": 10000000,
        "nepPage": "498",
        "hgabPage": "524",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay of San Cornelio-Bautista, Caba, La Union",
      "source_code": "2027DPWH-Proposal-34249",
      "office": "La Union 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 18750000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road (San Cornelio-Bautista) in Brgy. San Cornelio, Caba, La Union, Sta. 3+33-Sta.4+180",
      "prior_amount": 17401000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 26470",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "3+033.00–4+180.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Dante Garcia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34249",
        "nepTitle": "Construction of Road, Barangay of San Cornelio-Bautista, Caba, La Union",
        "nepPesos": 18750000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0466-006764",
        "hgabTitle": "Construction of Road, Barangay of San Cornelio-Bautista, Caba, La Union",
        "hgabPesos": 18750000,
        "nepPage": "465",
        "hgabPage": "466",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Batong Buhay, Sablayan, Occidental Mindoro",
      "source_code": "2027DPWH-Proposal-36838",
      "office": "Mindoro Occidental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 8000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Batong Buhay, Sablayan, Occidental Mindoro",
      "prior_amount": 15000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552272",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36838",
        "nepTitle": "Construction of Road, Batong Buhay, Sablayan, Occidental Mindoro",
        "nepPesos": 8000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0552-008615",
        "hgabTitle": "Construction of Road, Batong Buhay, Sablayan, Occidental Mindoro",
        "hgabPesos": 8000000,
        "nepPage": "514",
        "hgabPage": "552",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Baucawe, Lianga, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-38803",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road Barangay Baucawe, Lianga, Surigao Del Sur",
      "prior_amount": 25000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 561501",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38803",
        "nepTitle": "Construction of Road, Baucawe, Lianga, Surigao del Sur",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0628-010223",
        "hgabTitle": "Construction of Road, Baucawe, Lianga, Surigao del Sur",
        "hgabPesos": 30000000,
        "nepPage": "558",
        "hgabPage": "628",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Brgy. Princesa to Brgy. Andil, Baroy Lanao Del Norte",
      "source_code": "2027DPWH-Proposal-39203",
      "office": "Lanao del Norte 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 40000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Princesa to Barangay andil, Baroy, Lanao del Norte",
      "prior_amount": 6000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 536832",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39203",
        "nepTitle": "Construction of Road, Brgy. Princesa to Brgy. Andil, Baroy Lanao Del Norte",
        "nepPesos": 40000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0611-009879",
        "hgabTitle": "Construction of Road, Barangay Princesa to Barangay Andil, Baroy Lanao Del Norte",
        "hgabPesos": 40000000,
        "nepPage": "551",
        "hgabPage": "611",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Brgy. Sanao, Katipunan, Zamboanga del Norte",
      "source_code": "2027DPWH-Proposal-38224",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Sanao, Katipunan, Zamboanga Del Norte",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 536710",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38224",
        "nepTitle": "Construction of Road, Brgy. Sanao, Katipunan, Zamboanga del Norte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0601-009676",
        "hgabTitle": "Construction of Road, Barangay Sanao, Katipunan, Zamboanga del Norte",
        "hgabPesos": 5000000,
        "nepPage": "544",
        "hgabPage": "601",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Brgy. Tulapok, Margosatubig, Zamboanga del Sur",
      "source_code": "2027DPWH-Proposal-38260",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Tulapok, Municipality of Margosatubig, Zamboanga del Sur",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527765",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38260",
        "nepTitle": "Construction of Road, Brgy. Tulapok, Margosatubig, Zamboanga del Sur",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0605-009753",
        "hgabTitle": "Construction of Road, Barangay Tulapok, Margosatubig, Zamboanga del Sur",
        "hgabPesos": 20000000,
        "nepPage": "547",
        "hgabPage": "605",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Caduang Tete, Macabebe, Pampanga",
      "source_code": "2027DPWH-Proposal-35528",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Road, Barangay Caduang Tete, Macabebe, Pampanga",
      "prior_amount": 7000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499244",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35528",
        "nepTitle": "Construction of Road, Caduang Tete, Macabebe, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0526-008041",
        "hgabTitle": "Construction of Road, Caduang Tete, Macabebe, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "498",
        "hgabPage": "526",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Caduang Tete, Macabebe, Pampanga",
      "source_code": "2027DPWH-Proposal-35528",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Road, Barangay Caduang Tete, Macabebe, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522335",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35528",
        "nepTitle": "Construction of Road, Caduang Tete, Macabebe, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0526-008041",
        "hgabTitle": "Construction of Road, Caduang Tete, Macabebe, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "498",
        "hgabPage": "526",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Caduang Tete, Macabebe, Pampanga",
      "source_code": "2027DPWH-Proposal-35528",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Caduang Tete, Macabebe, Pampanga, Sta. 0+000 - Sta. 0+230",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21688",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+230.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35528",
        "nepTitle": "Construction of Road, Caduang Tete, Macabebe, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0526-008041",
        "hgabTitle": "Construction of Road, Caduang Tete, Macabebe, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "498",
        "hgabPage": "526",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Caduang Tete, Macabebe, Pampanga",
      "source_code": "2027DPWH-Proposal-35528",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Road, Barangay Caduang Tete,  Macabebe, Pampanga",
      "prior_amount": 3000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307446",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35528",
        "nepTitle": "Construction of Road, Caduang Tete, Macabebe, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0526-008041",
        "hgabTitle": "Construction of Road, Caduang Tete, Macabebe, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "498",
        "hgabPage": "526",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Candelaria, Macabebe, Pampanga",
      "source_code": "2027DPWH-Proposal-35530",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Road, Barangay Candelaria, Macabebe, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526647",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35530",
        "nepTitle": "Construction of Road, Candelaria, Macabebe, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0526-008043",
        "hgabTitle": "Construction of Road, Candelaria, Macabebe, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "498",
        "hgabPage": "526",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Dalayap, Candaba, Pampanga",
      "source_code": "2027DPWH-Proposal-35519",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation/Improvement of Dalayap Barangay Road, Candaba, Pampanga",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428050",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35519",
        "nepTitle": "Construction of Road, Dalayap, Candaba, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0526-008053",
        "hgabTitle": "Construction of Road, Dalayap, Candaba, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "526",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, F-Rafols Road, Sta. 00+504 - Sta. 00+979, Barangay Sta. Monica, Puerto Princesa City, Palawan",
      "source_code": "2027DPWH-Proposal-06079",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 60000000,
      "comparison_year": 2022,
      "prior_project": "Road Construction at F-Rafols Road, Barangay Sta. Monica, City of Puerto Princesa, Palawan",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527121",
      "similarity_pct": 100,
      "current_chainage": "0+504.00–0+979.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gil Acosta Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-06079",
        "nepTitle": "Construction of Road, F-Rafols Road, Sta. 00+504 - Sta. 00+979, Barangay Sta. Monica, Puerto Princesa City, Palawan",
        "nepPesos": 60000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0429-006041",
        "hgabTitle": "Construction of Road, F-Rafols Road, Sta. 00+504 - Sta. 00+979, Barangay Sta. Monica, Puerto Princesa City, Palawan",
        "hgabPesos": 60000000,
        "nepPage": "443",
        "hgabPage": "429",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Gabriela Silang, Diffun, Quirino",
      "source_code": "2027DPWH-Proposal-35135",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. Gabriela Silang, Diffun, Quirino",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499055",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35135",
        "nepTitle": "Construction of Road, Gabriela Silang, Diffun, Quirino",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007599",
        "hgabTitle": "Construction of Road, Gabriela Silang, Diffun, Quirino",
        "hgabPesos": 10000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Gabriela Silang, Diffun, Quirino",
      "source_code": "2027DPWH-Proposal-35135",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Improvement of Gabriela Silang Road, Barangay Gabriela Silang, Diffun, Quirino",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522186",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35135",
        "nepTitle": "Construction of Road, Gabriela Silang, Diffun, Quirino",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007599",
        "hgabTitle": "Construction of Road, Gabriela Silang, Diffun, Quirino",
        "hgabPesos": 10000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Gabriela Silang, Diffun, Quirino",
      "source_code": "2027DPWH-Proposal-35135",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Improvement of Gabriela Silang Road, Barangay Gabriela Silang, Diffun, Quirino",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 525881",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35135",
        "nepTitle": "Construction of Road, Gabriela Silang, Diffun, Quirino",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007599",
        "hgabTitle": "Construction of Road, Gabriela Silang, Diffun, Quirino",
        "hgabPesos": 10000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Gabriela Silang, Diffun, Quirino",
      "source_code": "2027DPWH-Proposal-35135",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Gabriela Silang Road, Gabriela Silang, Diffun, Quirino - Sta. 0+000 - Sta. 0+300",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21213",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+300.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35135",
        "nepTitle": "Construction of Road, Gabriela Silang, Diffun, Quirino",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007599",
        "hgabTitle": "Construction of Road, Gabriela Silang, Diffun, Quirino",
        "hgabPesos": 10000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Guribang, Diffun, Quirino",
      "source_code": "2027DPWH-Proposal-35131",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Brgy. Guribang, Diffun, Quirino",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535407",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35131",
        "nepTitle": "Construction of Road, Guribang, Diffun, Quirino",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007600",
        "hgabTitle": "Construction of Road, Guribang, Diffun, Quirino",
        "hgabPesos": 10000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Guribang, Diffun, Quirino",
      "source_code": "2027DPWH-Proposal-35131",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Guribang Road, Barangay Guribang, Diffun, Quirino",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574845",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35131",
        "nepTitle": "Construction of Road, Guribang, Diffun, Quirino",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007600",
        "hgabTitle": "Construction of Road, Guribang, Diffun, Quirino",
        "hgabPesos": 10000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Guribang, Diffun, Quirino",
      "source_code": "2027DPWH-Proposal-35131",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Guribang Road, Barangay Guribang, Diffun, Quirino - Sta. 0+000 - Sta. 0+369",
      "prior_amount": 4900000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21267",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+369.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35131",
        "nepTitle": "Construction of Road, Guribang, Diffun, Quirino",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007600",
        "hgabTitle": "Construction of Road, Guribang, Diffun, Quirino",
        "hgabPesos": 10000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Labina Street, Barangay Talimundoc, Orani, Bataan",
      "source_code": "2027DPWH-Proposal-35802",
      "office": "Bataan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road at Labiña Street, Barangay Talimundoc, Orani, Bataan, Sta. 0+000 -Sta. 0+385",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21358",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+385.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35802",
        "nepTitle": "Construction of Road, Labina Street, Barangay Talimundoc, Orani, Bataan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0506-007621",
        "hgabTitle": "Construction of Road, Labina Street, Barangay Talimundoc, Orani, Bataan",
        "hgabPesos": 5000000,
        "nepPage": "484",
        "hgabPage": "506",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Langub Barangay Road, Barangay Langub, Argao, Cebu",
      "source_code": "2027DPWH-Proposal-37739",
      "office": "Cebu 2nd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Langub, Argao, Cebu",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551076",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37739",
        "nepTitle": "Construction of Road, Langub Barangay Road, Barangay Langub, Argao, Cebu",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0585-009336",
        "hgabTitle": "Construction of Road, Langub Barangay Road, Barangay Langub, Argao, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "535",
        "hgabPage": "585",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Mabbayad To Benguet, Barangay Mabbayad And Barangay Benguet, Echague, Isabela",
      "source_code": "2027DPWH-Proposal-35354",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Barangay Mabbayad to Barangay Benguet Road, Echague, Isabela",
      "prior_amount": 12500000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551637",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35354",
        "nepTitle": "Construction of Road, Mabbayad To Benguet, Barangay Mabbayad And Barangay Benguet, Echague, Isabela",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0502-007544",
        "hgabTitle": "Construction of Road, Mabbayad To Benguet, Barangay Mabbayad And Barangay Benguet, Echague, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "483",
        "hgabPage": "502",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Mandasig, Candaba, Pampanga",
      "source_code": "2027DPWH-Proposal-35521",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation / Concreting of Road, Mandasig, Candaba, Pampanga",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499259",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35521",
        "nepTitle": "Construction of Road, Mandasig, Candaba, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0526-008056",
        "hgabTitle": "Construction of Road, Mandasig, Candaba, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "526",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Mandasig, Candaba, Pampanga",
      "source_code": "2027DPWH-Proposal-35521",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Mandasig Road, Barangay Mandasig, Candaba, Pampanga",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522325",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35521",
        "nepTitle": "Construction of Road, Mandasig, Candaba, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0526-008056",
        "hgabTitle": "Construction of Road, Mandasig, Candaba, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "526",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Mataddi, Nagtipunan, Quirino",
      "source_code": "2027DPWH-Proposal-35127",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Mataddi, Nagtipunan, Quirino",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535393",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35127",
        "nepTitle": "Construction of Road, Mataddi, Nagtipunan, Quirino",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007601",
        "hgabTitle": "Construction of Road, Mataddi, Nagtipunan, Quirino",
        "hgabPesos": 15000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Mataddi, Nagtipunan, Quirino",
      "source_code": "2027DPWH-Proposal-35127",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 15000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Mataddi, Nagtipunan, Quirino",
      "prior_amount": 2000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540356",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35127",
        "nepTitle": "Construction of Road, Mataddi, Nagtipunan, Quirino",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007601",
        "hgabTitle": "Construction of Road, Mataddi, Nagtipunan, Quirino",
        "hgabPesos": 15000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Mataguiti, Macabebe, Pampanga",
      "source_code": "2027DPWH-Proposal-35531",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Mataguiti Barangay Road, Brgy. Mataguiti, Macabebe, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526652",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35531",
        "nepTitle": "Construction of Road, Mataguiti, Macabebe, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0526-008057",
        "hgabTitle": "Construction of Road, Mataguiti, Macabebe, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "526",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Moras Dela Paz, Sto. Tomas, Pampanga",
      "source_code": "2027DPWH-Proposal-35510",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Moras Dela Paz Barangay Road, Brgy. Moras Dela Paz, Sto. Tomas, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526663",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Anna York Bondoc"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35510",
        "nepTitle": "Construction of Road, Moras Dela Paz, Sto. Tomas, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0526-008058",
        "hgabTitle": "Construction of Road, Moras Dela Paz, Sto. Tomas, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "526",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Panansalan, (Sta. 5+820 - Sta. 6+620), Compostela, Davao de Oro",
      "source_code": "2027DPWH-Proposal-21337",
      "office": "Davao de Oro 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Panansalan, Compostela, Davao de Oro",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 527484",
      "similarity_pct": 100,
      "current_chainage": "5+820.00–6+620.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maricar Zamora"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21337",
        "nepTitle": "Construction of Road, Panansalan, (Sta. 5+820 - Sta. 6+620), Compostela, Davao de Oro",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0617-010006",
        "hgabTitle": "Construction of Road, Panansalan, (Sta. 5+820 - Sta. 6+620), Compostela, Davao de Oro",
        "hgabPesos": 50000000,
        "nepPage": "553",
        "hgabPage": "617",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Panansalan, (Sta. 5+820 - Sta. 6+620), Compostela, Davao de Oro",
      "source_code": "2027DPWH-Proposal-21337",
      "office": "Davao de Oro 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 50000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Panansalan, Compostela, Davao de Oro",
      "prior_amount": 30000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 538642",
      "similarity_pct": 100,
      "current_chainage": "5+820.00–6+620.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maricar Zamora"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21337",
        "nepTitle": "Construction of Road, Panansalan, (Sta. 5+820 - Sta. 6+620), Compostela, Davao de Oro",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0617-010006",
        "hgabTitle": "Construction of Road, Panansalan, (Sta. 5+820 - Sta. 6+620), Compostela, Davao de Oro",
        "hgabPesos": 50000000,
        "nepPage": "553",
        "hgabPage": "617",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Panansalan, (Sta. 5+820 - Sta. 6+620), Compostela, Davao de Oro",
      "source_code": "2027DPWH-Proposal-21337",
      "office": "Davao de Oro 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Panansalan, Compostela, Davao de Oro",
      "prior_amount": 150000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 556347",
      "similarity_pct": 100,
      "current_chainage": "5+820.00–6+620.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Maricar Zamora"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21337",
        "nepTitle": "Construction of Road, Panansalan, (Sta. 5+820 - Sta. 6+620), Compostela, Davao de Oro",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0617-010006",
        "hgabTitle": "Construction of Road, Panansalan, (Sta. 5+820 - Sta. 6+620), Compostela, Davao de Oro",
        "hgabPesos": 50000000,
        "nepPage": "553",
        "hgabPage": "617",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Purok Pagkakaisa, Forbes Hill, Barangay Santa Monica, Puerto Princesa City, Palawan",
      "source_code": "2027DPWH-Proposal-37017",
      "office": "Palawan 3rd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Purok Pagkakaisa, Forbes Hill, Sta. 00+000 - Sta. 00+320, Barangay Santa Monica, Puerto Princesa City, Palawan",
      "prior_amount": 9622000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 22418",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+320.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gil Acosta Jr."
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37017",
        "nepTitle": "Construction of Road, Purok Pagkakaisa, Forbes Hill, Barangay Santa Monica, Puerto Princesa City, Palawan",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0556-008709",
        "hgabTitle": "Construction of Road, Purok Pagkakaisa, Forbes Hill, Barangay Santa Monica, Puerto Princesa City, Palawan",
        "hgabPesos": 15000000,
        "nepPage": "517",
        "hgabPage": "556",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Rambo Drive, Buyun, Santa Teresita, Cagayan",
      "source_code": "2027DPWH-Proposal-35113",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road in Barangay Buyun (Rambo Drive), Santa Teresita, Cagayan",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574718",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Ramon Nolasco"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35113",
        "nepTitle": "Construction of Road, Rambo Drive, Buyun, Santa Teresita, Cagayan",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0485-007175",
        "hgabTitle": "Construction of Road, Rambo Drive, Buyun, Santa Teresita, Cagayan",
        "hgabPesos": 20000000,
        "nepPage": "475",
        "hgabPage": "485",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Rizal, Diffun, Quirino",
      "source_code": "2027DPWH-Proposal-35133",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. Rizal, Diffun, Quirino",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499066",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35133",
        "nepTitle": "Construction of Road, Rizal, Diffun, Quirino",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007603",
        "hgabTitle": "Construction of Road, Rizal, Diffun, Quirino",
        "hgabPesos": 10000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Rizal, Diffun, Quirino",
      "source_code": "2027DPWH-Proposal-35133",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Rizal Road, Barangay Rizal, Diffun, Quirino",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574847",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35133",
        "nepTitle": "Construction of Road, Rizal, Diffun, Quirino",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007603",
        "hgabTitle": "Construction of Road, Rizal, Diffun, Quirino",
        "hgabPesos": 10000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sagrada, Masantol, Pampanga",
      "source_code": "2027DPWH-Proposal-35507",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sagrada, Masantol, Pampanga, Sta. 0+000 - Sta. 0+247",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21696",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+247.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35507",
        "nepTitle": "Construction of Road, Sagrada, Masantol, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008064",
        "hgabTitle": "Construction of Road, Sagrada, Masantol, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Dionisio II, Nagtipunan, Quirino",
      "source_code": "2027DPWH-Proposal-35126",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 40000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. San Dionisio II, Nagtipunan, Quirino",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499069",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35126",
        "nepTitle": "Construction of Road, San Dionisio II, Nagtipunan, Quirino",
        "nepPesos": 40000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007604",
        "hgabTitle": "Construction of Road, San Dionisio II, Nagtipunan, Quirino",
        "hgabPesos": 40000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Dionisio II, Nagtipunan, Quirino",
      "source_code": "2027DPWH-Proposal-35126",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 40000000,
      "comparison_year": 2022,
      "prior_project": "Improvement of San Dionisio II Road, Barangay San Dionisio II, Nagtipunan, Quirino",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526509",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35126",
        "nepTitle": "Construction of Road, San Dionisio II, Nagtipunan, Quirino",
        "nepPesos": 40000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007604",
        "hgabTitle": "Construction of Road, San Dionisio II, Nagtipunan, Quirino",
        "hgabPesos": 40000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Dionisio II, Nagtipunan, Quirino",
      "source_code": "2027DPWH-Proposal-35126",
      "office": "Quirino District Engineering Office",
      "region": "Region II",
      "amount_2027": 40000000,
      "comparison_year": 2025,
      "prior_project": "Construction of San Dionisio II Road, Barangay San Dionisio II, Nagtipunan, Quirino",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574857",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35126",
        "nepTitle": "Construction of Road, San Dionisio II, Nagtipunan, Quirino",
        "nepPesos": 40000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0505-007604",
        "hgabTitle": "Construction of Road, San Dionisio II, Nagtipunan, Quirino",
        "hgabPesos": 40000000,
        "nepPage": "484",
        "hgabPage": "505",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Fernando, Sta Cruz, Zambales, Sta. 1+500.00 - Sta. 2+500.00",
      "source_code": "2027DPWH-Proposal-33653",
      "office": "Zambales 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 150000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road in Barangay San Fernando, Sta. Cruz, Zambales Sta. 0+000.00 - Sta. 2+000.00",
      "prior_amount": 94143000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 25969",
      "similarity_pct": 100,
      "current_chainage": "1+500.00–2+500.00",
      "prior_chainage": "0+000.00–2+000.00",
      "chainage_overlap": "1+500.00–2+000.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33653",
        "nepTitle": "Construction of Road, San Fernando, Sta Cruz, Zambales, Sta. 1+500.00 - Sta. 2+500.00",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Francisco, Macabebe, Pampanga",
      "source_code": "2027DPWH-Proposal-35529",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, San Francisco, Macabebe, Pampanga, Sta. 0+000 - Sta. 0+400",
      "prior_amount": 7531000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21700",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+400.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35529",
        "nepTitle": "Construction of Road, San Francisco, Macabebe, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008065",
        "hgabTitle": "Construction of Road, San Francisco, Macabebe, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Isidro, Minalin, Pampanga",
      "source_code": "2027DPWH-Proposal-35481",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Brgy San Isidro, Minalin, Pampanga",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574987",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35481",
        "nepTitle": "Construction of Road, San Isidro, Minalin, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008067",
        "hgabTitle": "Construction of Road, San Isidro, Minalin, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Jose, San Luis, Pampanga",
      "source_code": "2027DPWH-Proposal-35537",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Brgy. San Jose, San Luis, Pampanga",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535593",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Anna York Bondoc"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35537",
        "nepTitle": "Construction of Road, San Jose, San Luis, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008068",
        "hgabTitle": "Construction of Road, San Jose, San Luis, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Juan, San Luis, Pampanga",
      "source_code": "2027DPWH-Proposal-35539",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, San Juan, San Luis, Pampanga, Sta. 0+000 - Sta. 0+320",
      "prior_amount": 6590000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21708",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+320.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Anna York Bondoc"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35539",
        "nepTitle": "Construction of Road, San Juan, San Luis, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008070",
        "hgabTitle": "Construction of Road, San Juan, San Luis, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Matias, Sto. Tomas, Pampanga",
      "source_code": "2027DPWH-Proposal-35509",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of San Matias Barangay Road, Sto. Tomas, Pampanga",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 492528",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Anna York Bondoc"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35509",
        "nepTitle": "Construction of Road, San Matias, Sto. Tomas, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008071",
        "hgabTitle": "Construction of Road, San Matias, Sto. Tomas, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Matias, Sto. Tomas, Pampanga",
      "source_code": "2027DPWH-Proposal-35509",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of San Matias Barangay Road, Brgy. San Matias, Sto. Tomas, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526662",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Anna York Bondoc"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35509",
        "nepTitle": "Construction of Road, San Matias, Sto. Tomas, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008071",
        "hgabTitle": "Construction of Road, San Matias, Sto. Tomas, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Miguel, San Simon, Pampanga",
      "source_code": "2027DPWH-Proposal-35491",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Road, Barangay San Miguel, San Simon, Pampanga",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428059",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35491",
        "nepTitle": "Construction of Road, San Miguel, San Simon, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008072",
        "hgabTitle": "Construction of Road, San Miguel, San Simon, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Nicolas, Minalin, Pampanga",
      "source_code": "2027DPWH-Proposal-35484",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, San Nicolas, Minalin, Pampanga, Sta. 0+000 - Sta. 0+295",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21710",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+295.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35484",
        "nepTitle": "Construction of Road, San Nicolas, Minalin, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008073",
        "hgabTitle": "Construction of Road, San Nicolas, Minalin, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Pablo Libutad, San Simon, Pampanga",
      "source_code": "2027DPWH-Proposal-35488",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of San Pablo Libutad Road, Barangay San Pablo Libutad, San Simon, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522338",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35488",
        "nepTitle": "Construction of Road, San Pablo Libutad, San Simon, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008075",
        "hgabTitle": "Construction of Road, San Pablo Libutad, San Simon, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Roque, Macabebe, Pampanga",
      "source_code": "2027DPWH-Proposal-35535",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Road, Barangay San Roque, Macabebe, Pampanga",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499249",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35535",
        "nepTitle": "Construction of Road, San Roque, Macabebe, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008076",
        "hgabTitle": "Construction of Road, San Roque, Macabebe, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Roque, Macabebe, Pampanga",
      "source_code": "2027DPWH-Proposal-35535",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of San Roque Barangay Road, Brgy. San Roque, Macabebe, Pampanga",
      "prior_amount": 7000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526651",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35535",
        "nepTitle": "Construction of Road, San Roque, Macabebe, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008076",
        "hgabTitle": "Construction of Road, San Roque, Macabebe, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Vicente, Apalit, Pampanga",
      "source_code": "2027DPWH-Proposal-35495",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Improvement of Brgy. Road, San Vicente Apalit, Pampanga",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499272",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35495",
        "nepTitle": "Construction of Road, San Vicente, Apalit, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008077",
        "hgabTitle": "Construction of Road, San Vicente, Apalit, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, San Vicente, Apalit, Pampanga",
      "source_code": "2027DPWH-Proposal-35495",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Improvement of Road in Barangay San Vicente, Apalit, Pampanga",
      "prior_amount": 1500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 425718",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35495",
        "nepTitle": "Construction of Road, San Vicente, Apalit, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008077",
        "hgabTitle": "Construction of Road, San Vicente, Apalit, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sitio Atras Barangay Liliongan, to Sitio Casia, Barangay Kibudtungan, Carmen, Cotabato",
      "source_code": "2027DPWH-Proposal-38619",
      "office": "Cotabato 3rd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 37000000,
      "comparison_year": 2024,
      "prior_project": "Concreting of Road From Sitio Atras - Liliongan - Sitio Casia, Kibudtungan, Carmen, Cotabato",
      "prior_amount": 20000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 539960",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Samantha Santos"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38619",
        "nepTitle": "Construction of Road, Sitio Atras Barangay Liliongan, to Sitio Casia, Barangay Kibudtungan, Carmen, Cotabato",
        "nepPesos": 37000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0621-010071",
        "hgabTitle": "Construction of Road, Sitio Atras Barangay Liliongan, to Sitio Casia, Barangay Kibudtungan, Carmen, Cotabato",
        "hgabPesos": 37000000,
        "nepPage": "555",
        "hgabPage": "621",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sitio Canubat, Barangay San Jose, Caba, La Union",
      "source_code": "2027DPWH-Proposal-34401",
      "office": "La Union 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 11490000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road in Sitio Canubat, Barangay San Jose, Caba, La Union, Sta.10+866-Sta.11+366",
      "prior_amount": 11117000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 26480",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "10+866.00–11+366.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Dante Garcia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34401",
        "nepTitle": "Construction of Road, Sitio Canubat, Barangay San Jose, Caba, La Union",
        "nepPesos": 11490000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0467-006781",
        "hgabTitle": "Construction of Road, Sitio Canubat, Barangay San Jose, Caba, La Union",
        "hgabPesos": 11490000,
        "nepPage": "465",
        "hgabPage": "467",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sitio Macayas, Barangay Mandhi, Sindangan to Sitio Suminugod, Barangay Guibo, Siayan, Zamboanga del Norte",
      "source_code": "2027DPWH-Proposal-21460",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 100000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Sitio Macayas, Brgy. Mandhi, Sindangan to Sitio Suminugod, Brgy. Guibo, Siayan, Zamboanga del Norte",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522995",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21460",
        "nepTitle": "Construction of Road, Sitio Macayas, Barangay Mandhi, Sindangan to Sitio Suminugod, Barangay Guibo, Siayan, Zamboanga del Norte",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0438-006212",
        "hgabTitle": "Construction of Road, Sitio Macayas, Barangay Mandhi, Sindangan to Sitio Suminugod, Barangay Guibo, Siayan, Zamboanga del Norte",
        "hgabPesos": 100000000,
        "nepPage": "449",
        "hgabPage": "438",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sitio Macayas, Barangay Mandhi, Sindangan to Sitio Suminugod, Barangay Guibo, Siayan, Zamboanga del Norte",
      "source_code": "2027DPWH-Proposal-21460",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Sitio Macayas, Brgy. Mandhi, Sindangan to Sitio Suminugod, Brgy. Guibo, Siayan, Zamboanga del Norte",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 526690",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21460",
        "nepTitle": "Construction of Road, Sitio Macayas, Barangay Mandhi, Sindangan to Sitio Suminugod, Barangay Guibo, Siayan, Zamboanga del Norte",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0438-006212",
        "hgabTitle": "Construction of Road, Sitio Macayas, Barangay Mandhi, Sindangan to Sitio Suminugod, Barangay Guibo, Siayan, Zamboanga del Norte",
        "hgabPesos": 100000000,
        "nepPage": "449",
        "hgabPage": "438",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sitio Macayas, Barangay Mandhi, Sindangan to Sitio Suminugod, Barangay Guibo, Siayan, Zamboanga del Norte",
      "source_code": "2027DPWH-Proposal-21460",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 100000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sitio Macayas, Barangay Mandhi, Sindangan to Sitio Suminugod, Barangay Guibo, Siayan, Zamboanga del Norte - Sta. 11+880 - Sta. 15+030",
      "prior_amount": 96471000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 19716",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "11+880.00–15+030.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21460",
        "nepTitle": "Construction of Road, Sitio Macayas, Barangay Mandhi, Sindangan to Sitio Suminugod, Barangay Guibo, Siayan, Zamboanga del Norte",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0438-006212",
        "hgabTitle": "Construction of Road, Sitio Macayas, Barangay Mandhi, Sindangan to Sitio Suminugod, Barangay Guibo, Siayan, Zamboanga del Norte",
        "hgabPesos": 100000000,
        "nepPage": "449",
        "hgabPage": "438",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sitio Pandan, Barangay Bay-ang, Batan, Aklan",
      "source_code": "2027DPWH-Proposal-37239",
      "office": "Aklan District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Sitio Pandan Barangay Bay - Ang, Batan, Aklan",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552508",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jess Marquez"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37239",
        "nepTitle": "Construction of Road, Sitio Pandan, Barangay Bay-ang, Batan, Aklan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0567-008955",
        "hgabTitle": "Construction of Road, Sitio Pandan, Barangay Bay-ang, Batan, Aklan",
        "hgabPesos": 5000000,
        "nepPage": "524",
        "hgabPage": "567",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sitio Tamurong, Barangay San Lorenzo, San Nicolas, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-34126",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Sitio Tamurong, Barangay San Lorenzo, San Nicolas, Ilocos Norte",
      "prior_amount": 3000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560211",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Eugenio Angelo Barba"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34126",
        "nepTitle": "Construction of Road, Sitio Tamurong, Barangay San Lorenzo, San Nicolas, Ilocos Norte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0465-006722",
        "hgabTitle": "Construction of Road, Sitio Tamurong, Barangay San Lorenzo, San Nicolas, Ilocos Norte",
        "hgabPesos": 5000000,
        "nepPage": "464",
        "hgabPage": "465",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sta. 0+000 - Sta. 1+238, Tambubong, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-03404",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction (concreting) of Roads Barangay Tambubong, Bocaue, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535469",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+238.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03404",
        "nepTitle": "Construction of Road, Sta. 0+000 - Sta. 1+238, Tambubong, Bocaue, Bulacan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0509-007677",
        "hgabTitle": "Construction of Road, Sta. 0+000 - Sta. 1+238, Tambubong, Bocaue, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "486",
        "hgabPage": "509",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sta. 0+000 - Sta. 1+238, Tambubong, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-03404",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Tambubong, Bocaue, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574919",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+238.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03404",
        "nepTitle": "Construction of Road, Sta. 0+000 - Sta. 1+238, Tambubong, Bocaue, Bulacan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0509-007677",
        "hgabTitle": "Construction of Road, Sta. 0+000 - Sta. 1+238, Tambubong, Bocaue, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "486",
        "hgabPage": "509",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sta. 0+763 - Sta. 2+013, Abulalas, Hagonoy, Bulacan",
      "source_code": "2027DPWH-Proposal-03472",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Road at Barangay Abulalas, Hagonoy, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560428",
      "similarity_pct": 100,
      "current_chainage": "0+763.00–2+013.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03472",
        "nepTitle": "Construction of Road, Sta. 0+763 - Sta. 2+013, Abulalas, Hagonoy, Bulacan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0509-007678",
        "hgabTitle": "Construction of Road, Sta. 0+763 - Sta. 2+013, Abulalas, Hagonoy, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "486",
        "hgabPage": "509",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sta. Rita, Minalin, Pampanga",
      "source_code": "2027DPWH-Proposal-35483",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. Rita, Minalin, Pampanga, Sta. 0+000 - Sta. 0+290",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21720",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+290.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35483",
        "nepTitle": "Construction of Road, Sta. Rita, Minalin, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008082",
        "hgabTitle": "Construction of Road, Sta. Rita, Minalin, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sta. Rita, Minalin, Pampanga",
      "source_code": "2027DPWH-Proposal-35483",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Sta. Rita Road, Minalin, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307447",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35483",
        "nepTitle": "Construction of Road, Sta. Rita, Minalin, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008082",
        "hgabTitle": "Construction of Road, Sta. Rita, Minalin, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sta. Rita, San Luis, Pampanga",
      "source_code": "2027DPWH-Proposal-35538",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Road, Barangay Sta. Rita, San Luis, Pampanga",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428062",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Anna York Bondoc"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35538",
        "nepTitle": "Construction of Road, Sta. Rita, San Luis, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008083",
        "hgabTitle": "Construction of Road, Sta. Rita, San Luis, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sta.Cruz, San Simon, Pampanga",
      "source_code": "2027DPWH-Proposal-35490",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sta. Cruz, San Simon, Pampanga, Sta. 0+000 - Sta. 0+250",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21716",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+250.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35490",
        "nepTitle": "Construction of Road, Sta.Cruz, San Simon, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008084",
        "hgabTitle": "Construction of Road, Sta.Cruz, San Simon, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sta.Monica, San Simon, Pampanga",
      "source_code": "2027DPWH-Proposal-35489",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Road, Barangay Sta. Monica, San Simon, Pampanga",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428061",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35489",
        "nepTitle": "Construction of Road, Sta.Monica, San Simon, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008085",
        "hgabTitle": "Construction of Road, Sta.Monica, San Simon, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sto. Rosario, Minalin, Pampanga",
      "source_code": "2027DPWH-Proposal-35482",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Sto. Rosario, Minalin, Pampanga, Sta. 0+000 - Sta. 0+280",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21726",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+280.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35482",
        "nepTitle": "Construction of Road, Sto. Rosario, Minalin, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008086",
        "hgabTitle": "Construction of Road, Sto. Rosario, Minalin, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sucad, Apalit, Pampanga",
      "source_code": "2027DPWH-Proposal-35497",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation/Improvement of Sucad Barangay Road, Apalit, Pampanga",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428051",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35497",
        "nepTitle": "Construction of Road, Sucad, Apalit, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0527-008087",
        "hgabTitle": "Construction of Road, Sucad, Apalit, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "499",
        "hgabPage": "527",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Tagulod, Candaba, Pampanga",
      "source_code": "2027DPWH-Proposal-35524",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation / Concreting of Road, Tagulod, Candaba, Pampanga",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499277",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35524",
        "nepTitle": "Construction of Road, Tagulod, Candaba, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0528-008089",
        "hgabTitle": "Construction of Road, Tagulod, Candaba, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "500",
        "hgabPage": "528",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Tagulod, Candaba, Pampanga",
      "source_code": "2027DPWH-Proposal-35524",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Tagulod Barangay Road, Brgy. Tagulod, Candaba, Pampanga",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526658",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35524",
        "nepTitle": "Construction of Road, Tagulod, Candaba, Pampanga",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0528-008089",
        "hgabTitle": "Construction of Road, Tagulod, Candaba, Pampanga",
        "hgabPesos": 5000000,
        "nepPage": "500",
        "hgabPage": "528",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Tebag, Mangaldan, Pangasinan",
      "source_code": "2027DPWH-Proposal-34526",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road at Barangay Tebag, Mangaldan, Pangasinan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560225",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34526",
        "nepTitle": "Construction of Road, Tebag, Mangaldan, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0472-006897",
        "hgabTitle": "Construction of Road, Tebag, Mangaldan, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "468",
        "hgabPage": "472",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Roads, Barangay Mansilingan, Bacolod City",
      "source_code": "2027DPWH-Proposal-37655",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 25000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Mansilingan, Bacolod City",
      "prior_amount": 15000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540662",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37655",
        "nepTitle": "Construction of Roads, Barangay Mansilingan, Bacolod City",
        "nepPesos": 25000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0574-009096",
        "hgabTitle": "Construction of Roads, Barangay Mansilingan, Bacolod City",
        "hgabPesos": 25000000,
        "nepPage": "528",
        "hgabPage": "574",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Roads, Barangay Mansilingan, Bacolod City",
      "source_code": "2027DPWH-Proposal-37655",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 25000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Barangay Road, Brgy. Mansilingan, Bacolod City",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050308008",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37655",
        "nepTitle": "Construction of Roads, Barangay Mansilingan, Bacolod City",
        "nepPesos": 25000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0574-009096",
        "hgabTitle": "Construction of Roads, Barangay Mansilingan, Bacolod City",
        "hgabPesos": 25000000,
        "nepPage": "528",
        "hgabPage": "574",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Roads, Barangay Mansilingan, Bacolod City",
      "source_code": "2027DPWH-Proposal-37655",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 25000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Road, Brgy. Mansilingan, Bacolod City",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201567000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37655",
        "nepTitle": "Construction of Roads, Barangay Mansilingan, Bacolod City",
        "nepPesos": 25000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0574-009096",
        "hgabTitle": "Construction of Roads, Barangay Mansilingan, Bacolod City",
        "hgabPesos": 25000000,
        "nepPage": "528",
        "hgabPage": "574",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Roads, Barangay Sagrada to Barangay Pag-asa, Tinambac, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39273",
      "office": "Camarines Sur 4th District Engineering Office",
      "region": "Region V",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Sagrada - Barangay Pag-asa, Tinambac, Camarines Sur, Sta.0+286.20 - Sta1+520.20",
      "prior_amount": 24500000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 22528",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+286.20–1+520.20",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39273",
        "nepTitle": "Construction of Roads, Barangay Sagrada to Barangay Pag-asa, Tinambac, Camarines Sur",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0563-008857",
        "hgabTitle": "Construction of Roads, Barangay Sagrada to Barangay Pag-asa, Tinambac, Camarines Sur",
        "hgabPesos": 15000000,
        "nepPage": "521",
        "hgabPage": "563",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Roads, Barangay Singcang-Airport, Bacolod City",
      "source_code": "2027DPWH-Proposal-37654",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction/Rehabilitation of Road, Singcang-Airport, Bacolod City",
      "prior_amount": 3000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117204241000 · PDF p. 1328 · printed p. 2793",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37654",
        "nepTitle": "Construction of Roads, Barangay Singcang-Airport, Bacolod City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0574-009097",
        "hgabTitle": "Construction of Roads, Barangay Singcang-Airport, Bacolod City",
        "hgabPesos": 10000000,
        "nepPage": "528",
        "hgabPage": "574",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of San Fernando Road, San Fernando, Sta Cruz, Zambales Sta. 0+000.00 - Sta. 1+500.00",
      "source_code": "2027DPWH-Proposal-04055",
      "office": "Zambales 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 135000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road in Barangay San Fernando, Sta. Cruz, Zambales Sta. 0+000.00 - Sta. 2+000.00",
      "prior_amount": 94143000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 25969",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+500.00",
      "prior_chainage": "0+000.00–2+000.00",
      "chainage_overlap": "0+000.00–1+500.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-04055",
        "nepTitle": "Construction of San Fernando Road, San Fernando, Sta Cruz, Zambales Sta. 0+000.00 - Sta. 1+500.00",
        "nepPesos": 135000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0422-005900",
        "hgabTitle": "Construction of San Fernando Road, San Fernando, Sta Cruz, Zambales Sta. 0+000.00 - Sta. 1+500.00",
        "hgabPesos": 135000000,
        "nepPage": "439",
        "hgabPage": "422",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of San Francisco Barangay Road, Mabini, Batangas",
      "source_code": "2027DPWH-Proposal-23368",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay San Francisco, Mabini, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552002",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gerville Luistro"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23368",
        "nepTitle": "Construction of San Francisco Barangay Road, Mabini, Batangas",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008288",
        "hgabTitle": "Construction of San Francisco Barangay Road, Mabini, Batangas",
        "hgabPesos": 20000000,
        "nepPage": "505",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 15+940 – Sta. 16+200",
      "source_code": "2027DPWH-Proposal-23851",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Tingloy Circumferential Road, Tingloy, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568242",
      "similarity_pct": 100,
      "current_chainage": "15+940.00–16+200.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23851",
        "nepTitle": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 15+940 – Sta. 16+200",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0427-005998",
        "hgabTitle": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 15+940 – Sta. 16+200",
        "hgabPesos": 70000000,
        "nepPage": "442",
        "hgabPage": "427",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 15+940 – Sta. 16+200",
      "source_code": "2027DPWH-Proposal-23851",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Tingloy Circumferential Road, Tingloy, Batangas",
      "prior_amount": 40000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633717",
      "similarity_pct": 100,
      "current_chainage": "15+940.00–16+200.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23851",
        "nepTitle": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 15+940 – Sta. 16+200",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0427-005998",
        "hgabTitle": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 15+940 – Sta. 16+200",
        "hgabPesos": 70000000,
        "nepPage": "442",
        "hgabPage": "427",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 4+523 – Sta. 4+900",
      "source_code": "2027DPWH-Proposal-23847",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 145000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Tingloy Circumferential Road, Tingloy, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568242",
      "similarity_pct": 100,
      "current_chainage": "4+523.00–4+900.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23847",
        "nepTitle": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 4+523 – Sta. 4+900",
        "nepPesos": 145000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0427-005999",
        "hgabTitle": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 4+523 – Sta. 4+900",
        "hgabPesos": 145000000,
        "nepPage": "442",
        "hgabPage": "427",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 4+523 – Sta. 4+900",
      "source_code": "2027DPWH-Proposal-23847",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 145000000,
      "comparison_year": 2025,
      "prior_project": "Tingloy Circumferential Road, Tingloy, Batangas",
      "prior_amount": 40000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633717",
      "similarity_pct": 100,
      "current_chainage": "4+523.00–4+900.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23847",
        "nepTitle": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 4+523 – Sta. 4+900",
        "nepPesos": 145000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0427-005999",
        "hgabTitle": "Construction of Tingloy Circumferential Road, Tingloy, Batangas – Sta. 4+523 – Sta. 4+900",
        "hgabPesos": 145000000,
        "nepPage": "442",
        "hgabPage": "427",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Upper Lapu-Lapu Road, Barangay Poblacion, Narra, Palawan",
      "source_code": "2027DPWH-Proposal-05816",
      "office": "Palawan 2nd District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 115000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Upper Lapu-Lapu Road, Sta. 3+280 - Sta. 3+685, Barangay Poblacion, Narra, Palawan",
      "prior_amount": 8302000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 22377",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "3+280.00–3+685.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-05816",
        "nepTitle": "Construction of Upper Lapu-Lapu Road, Barangay Poblacion, Narra, Palawan",
        "nepPesos": 115000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0429-006043",
        "hgabTitle": "Construction of Upper Lapu-Lapu Road, Barangay Poblacion, Narra, Palawan",
        "hgabPesos": 115000000,
        "nepPage": "444",
        "hgabPage": "429",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Vigan-Cabugao Coastal/Diversion Road, Ilocos Sur",
      "source_code": "2027DPWH-Proposal-32764",
      "office": "Ilocos Sur 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 195000000,
      "comparison_year": 2021,
      "prior_project": "Vigan-Cabugao Coastal/Diversion Road, Ilocos Sur",
      "prior_amount": 110000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436603",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32764",
        "nepTitle": "Construction of Vigan-Cabugao Coastal/Diversion Road, Ilocos Sur",
        "nepPesos": 195000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001880",
        "hgabTitle": "Construction of Vigan-Cabugao Coastal/Diversion Road, Ilocos Sur",
        "hgabPesos": 195000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction/Concreting of Road, Barangay Mayang, La Paz, Tarlac",
      "source_code": "2027DPWH-Proposal-35741",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Mayang, La Paz, Tarlac",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551930",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bong Rivera"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35741",
        "nepTitle": "Construction/Concreting of Road, Barangay Mayang, La Paz, Tarlac",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0534-008205",
        "hgabTitle": "Construction/Concreting of Road, Barangay Mayang, La Paz, Tarlac",
        "hgabPesos": 5000000,
        "nepPage": "502",
        "hgabPage": "534",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction/Rehabilitation of Road, Barangay Road, Barangay Binlod, Argao, Cebu",
      "source_code": "2027DPWH-Proposal-37760",
      "office": "Cebu 2nd District Engineering Office",
      "region": "Region VII",
      "amount_2027": 9000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Brgy. Binlod Barangay Road, Argao, Cebu",
      "prior_amount": 40000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575702",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37760",
        "nepTitle": "Construction/Rehabilitation of Road, Barangay Road, Barangay Binlod, Argao, Cebu",
        "nepPesos": 9000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0585-009341",
        "hgabTitle": "Construction/Rehabilitation of Road, Barangay Road, Barangay Binlod, Argao, Cebu",
        "hgabPesos": 5000000,
        "nepPage": "535",
        "hgabPage": "585",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cordon Bypass Road, Sta. 3+555 - Sta. 3+582, Isabela",
      "source_code": "2027DPWH-Proposal-24013",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 6000000,
      "comparison_year": 2024,
      "prior_project": "Cordon Bypass Road, Isabela",
      "prior_amount": 102125000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595853",
      "similarity_pct": 100,
      "current_chainage": "3+555.00–3+582.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24013",
        "nepTitle": "Cordon Bypass Road, Sta. 3+555 - Sta. 3+582, Isabela",
        "nepPesos": 6000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Dagupan-Mangaldan Diversion Road, Dagupan City-Mangaldan, Sta. 0+861-Sta.1+512, Sta.5+280-Sta.-Sta.6+089.9 Pangasinan",
      "source_code": "2027DPWH-Proposal-20648",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 427765000,
      "comparison_year": 2020,
      "prior_project": "Dagupan-Mangaldan Diversion Road, Pangasinan",
      "prior_amount": 50000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512398",
      "similarity_pct": 100,
      "current_chainage": "0+861.00–1+512.00 · 5+280.00 · 6+089.90",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20648",
        "nepTitle": "Dagupan-Mangaldan Diversion Road, Dagupan City-Mangaldan, Sta. 0+861-Sta.1+512, Sta.5+280-Sta.-Sta.6+089.9 Pangasinan",
        "nepPesos": 427765000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Dagupan-Mangaldan Diversion Road, Dagupan City-Mangaldan, Sta. 0+861-Sta.1+512, Sta.5+280-Sta.-Sta.6+089.9 Pangasinan",
      "source_code": "2027DPWH-Proposal-20648",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 427765000,
      "comparison_year": 2022,
      "prior_project": "Dagupan-Mangaldan Diversion Road, Pangasinan",
      "prior_amount": 75000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547271",
      "similarity_pct": 100,
      "current_chainage": "0+861.00–1+512.00 · 5+280.00 · 6+089.90",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20648",
        "nepTitle": "Dagupan-Mangaldan Diversion Road, Dagupan City-Mangaldan, Sta. 0+861-Sta.1+512, Sta.5+280-Sta.-Sta.6+089.9 Pangasinan",
        "nepPesos": 427765000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Dagupan-Mangaldan Diversion Road, Dagupan City-Mangaldan, Sta. 0+861-Sta.1+512, Sta.5+280-Sta.-Sta.6+089.9 Pangasinan",
      "source_code": "2027DPWH-Proposal-20648",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 427765000,
      "comparison_year": 2023,
      "prior_project": "Dagupan - Mangaldan Diversion Road, Pangasinan",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566149",
      "similarity_pct": 100,
      "current_chainage": "0+861.00–1+512.00 · 5+280.00 · 6+089.90",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20648",
        "nepTitle": "Dagupan-Mangaldan Diversion Road, Dagupan City-Mangaldan, Sta. 0+861-Sta.1+512, Sta.5+280-Sta.-Sta.6+089.9 Pangasinan",
        "nepPesos": 427765000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Dagupan-Mangaldan Diversion Road, Dagupan City-Mangaldan, Sta. 0+861-Sta.1+512, Sta.5+280-Sta.-Sta.6+089.9 Pangasinan",
      "source_code": "2027DPWH-Proposal-20648",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 427765000,
      "comparison_year": 2024,
      "prior_project": "Dagupan - Mangaldan Diversion Road, Pangasinan",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595465",
      "similarity_pct": 100,
      "current_chainage": "0+861.00–1+512.00 · 5+280.00 · 6+089.90",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20648",
        "nepTitle": "Dagupan-Mangaldan Diversion Road, Dagupan City-Mangaldan, Sta. 0+861-Sta.1+512, Sta.5+280-Sta.-Sta.6+089.9 Pangasinan",
        "nepPesos": 427765000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Dagupan-Mangaldan Diversion Road, Dagupan City-Mangaldan, Sta. 0+861-Sta.1+512, Sta.5+280-Sta.-Sta.6+089.9 Pangasinan",
      "source_code": "2027DPWH-Proposal-20648",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 427765000,
      "comparison_year": 2025,
      "prior_project": "Dagupan-Mangaldan Diversion Road, Pangasinan",
      "prior_amount": 70000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631744",
      "similarity_pct": 100,
      "current_chainage": "0+861.00–1+512.00 · 5+280.00 · 6+089.90",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20648",
        "nepTitle": "Dagupan-Mangaldan Diversion Road, Dagupan City-Mangaldan, Sta. 0+861-Sta.1+512, Sta.5+280-Sta.-Sta.6+089.9 Pangasinan",
        "nepPesos": 427765000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Datu Paglas - Columbio - Matanao Road, Sta. 0+000 - Sta. 0+165, Sta. 2+030 - Sta. 2+290, Sta. 2+370 - Sta. 4+060, Sta. 7+885 - Sta. 9+065, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-20477",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "region": "Region XII",
      "amount_2027": 150000000,
      "comparison_year": 2023,
      "prior_project": "Datu Paglas - Columbio - Matanao Road, Sultan Kudarat",
      "prior_amount": 150000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568208",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+165.00 · 2+030.00–2+290.00 · 2+370.00–4+060.00 · 7+885.00–9+065.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20477",
        "nepTitle": "Datu Paglas - Columbio - Matanao Road, Sta. 0+000 - Sta. 0+165, Sta. 2+030 - Sta. 2+290, Sta. 2+370 - Sta. 4+060, Sta. 7+885 - Sta. 9+065, Sultan Kudarat",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0241-002383",
        "hgabTitle": "Datu Paglas - Columbio - Matanao Road, Sta. 0+000 - Sta. 0+165, Sta. 2+030 - Sta. 2+290, Sta. 2+370 - Sta. 4+060, Sta. 7+885 - Sta. 9+065, Sultan Kudarat",
        "hgabPesos": 150000000,
        "nepPage": "300",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Datu Paglas - Columbio - Matanao Road, Sta. 0+165 - Sta. 2+030, Sta. 2+290 - Sta. 2+370, Sta. 4+150 - Sta. 7+885, Sultan Kudarat",
      "source_code": "2027DPWH-Proposal-20478",
      "office": "Sultan Kudarat 1st District Engineering Office",
      "region": "Region XII",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Datu Paglas - Columbio - Matanao Road, Sultan Kudarat",
      "prior_amount": 150000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568208",
      "similarity_pct": 100,
      "current_chainage": "0+165.00–2+030.00 · 2+290.00–2+370.00 · 4+150.00–7+885.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20478",
        "nepTitle": "Datu Paglas - Columbio - Matanao Road, Sta. 0+165 - Sta. 2+030, Sta. 2+290 - Sta. 2+370, Sta. 4+150 - Sta. 7+885, Sultan Kudarat",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0241-002384",
        "hgabTitle": "Datu Paglas - Columbio - Matanao Road, Sta. 0+165 - Sta. 2+030, Sta. 2+290 - Sta. 2+370, Sta. 4+150 - Sta. 7+885, Sultan Kudarat",
        "hgabPesos": 100000000,
        "nepPage": "300",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Davao City Coastal Road (Talomo Section) - Davao Bukidnon Road (Catalunan Pequeño - Mintal Section-Calinan Section) Bypass Road (Viaduct), Brgy. Catalunan Pequeño - Brgy. Talomo, Sta. 1514+070 - Sta. 1517+128.43, Davao City",
      "source_code": "2027DPWH-Proposal-33035",
      "office": "Davao City District Engineering Office",
      "region": "Region XI",
      "amount_2027": 158605000,
      "comparison_year": 2020,
      "prior_project": "Construction of Davao City Coastal Road (Talomo Section) - Davao Bukidnon Road (Catalunan Pequeño - Mintal Section - Calinan Section) Bypass Road (Viaduct), Davao City",
      "prior_amount": 400000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 491909",
      "similarity_pct": 100,
      "current_chainage": "1514+070.00–1517+128.43",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33035",
        "nepTitle": "Davao City Coastal Road (Talomo Section) - Davao Bukidnon Road (Catalunan Pequeño - Mintal Section-Calinan Section) Bypass Road (Viaduct), Brgy. Catalunan Pequeño - Brgy. Talomo, Sta. 1514+070 - Sta. 1517+128.43, Davao City",
        "nepPesos": 158605000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Doroluman-President Roxas-Kadingilan Road, Sta. 10+354 - Sta. 12+354, Cotabato",
      "source_code": "2027DPWH-Proposal-20464",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 165000000,
      "comparison_year": 2021,
      "prior_project": "Doroluman-President Roxas-Kadingilan Road, Cotabato",
      "prior_amount": 100000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437266",
      "similarity_pct": 100,
      "current_chainage": "10+354.00–12+354.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20464",
        "nepTitle": "Doroluman-President Roxas-Kadingilan Road, Sta. 10+354 - Sta. 12+354, Cotabato",
        "nepPesos": 165000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0241-002385",
        "hgabTitle": "Doroluman-President Roxas-Kadingilan Road, Sta. 10+354 - Sta. 12+354, Cotabato",
        "hgabPesos": 165000000,
        "nepPage": "300",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Doroluman-President Roxas-Kadingilan Road, Sta. 10+354 - Sta. 12+354, Cotabato",
      "source_code": "2027DPWH-Proposal-20464",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 165000000,
      "comparison_year": 2025,
      "prior_project": "Doroluman-President Roxas-Kadingilan Road, Cotabato",
      "prior_amount": 80000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633685",
      "similarity_pct": 100,
      "current_chainage": "10+354.00–12+354.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20464",
        "nepTitle": "Doroluman-President Roxas-Kadingilan Road, Sta. 10+354 - Sta. 12+354, Cotabato",
        "nepPesos": 165000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0241-002385",
        "hgabTitle": "Doroluman-President Roxas-Kadingilan Road, Sta. 10+354 - Sta. 12+354, Cotabato",
        "hgabPesos": 165000000,
        "nepPage": "300",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Dr. Damian Reyes Memorial Road, Sta. 29+695.00 - Sta. 30+095.00, Sta. 32+026.00 - Sta. 32+826.00, Sta. 38+880.00 - Sta. 39+380.00, Boac, Marinduque,",
      "source_code": "2027DPWH-Proposal-20300",
      "office": "Marinduque District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 100000000,
      "comparison_year": 2022,
      "prior_project": "Dr. Damian Reyes Memorial Road, Boac, Marinduque",
      "prior_amount": 100000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548552",
      "similarity_pct": 100,
      "current_chainage": "29+695.00–30+095.00 · 32+026.00–32+826.00 · 38+880.00–39+380.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20300",
        "nepTitle": "Dr. Damian Reyes Memorial Road, Sta. 29+695.00 - Sta. 30+095.00, Sta. 32+026.00 - Sta. 32+826.00, Sta. 38+880.00 - Sta. 39+380.00, Boac, Marinduque,",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0237-002317",
        "hgabTitle": "Dr. Damian Reyes Memorial Road, Sta. 29+695.00 - Sta. 30+095.00, Sta. 32+026.00 - Sta. 32+826.00, Sta. 38+880.00 - Sta. 39+380.00, Boac, Marinduque,",
        "hgabPesos": 100000000,
        "nepPage": "296",
        "hgabPage": "237",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "East-West Lateral Road Connecting Agusan del Sur / Agusan del Norte to Bukidnon, Sampaguita - Makilos (Agusan del Sur/ Bukidnon Boundary), (Sta. 72+020 - Sta. 74+520),Agusan del Sur",
      "source_code": "2027DPWH-Proposal-31642",
      "office": "Agusan del Sur 2nd District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 250000000,
      "comparison_year": 2022,
      "prior_project": "East-West lateral road connecting Agusan Del Sur/ Agusan del Norte to Bukidnon, Sampaguita-Makilos (Agusan del Sur/Bukidnon Boundary), Agusan del Sur",
      "prior_amount": 77000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548705",
      "similarity_pct": 100,
      "current_chainage": "72+020.00–74+520.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31642",
        "nepTitle": "East-West Lateral Road Connecting Agusan del Sur / Agusan del Norte to Bukidnon, Sampaguita - Makilos (Agusan del Sur/ Bukidnon Boundary), (Sta. 72+020 - Sta. 74+520),Agusan del Sur",
        "nepPesos": 250000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Estaka Road leading to Naga Valley (NAVA) Industrial Park, Cebu",
      "source_code": "2027DPWH-Proposal-33470",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 300000000,
      "comparison_year": 2026,
      "prior_project": "Estaka Road leading to Naga Valley (NAVA) Industrial Park, Sta. 0+000 - Sta. 4+300, Naga City, Cebu",
      "prior_amount": 193800000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 16964",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–4+300.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33470",
        "nepTitle": "Estaka Road leading to Naga Valley (NAVA) Industrial Park, Cebu",
        "nepPesos": 300000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0435-006159",
        "hgabTitle": "Estaka Road leading to Naga Valley (NAVA) Industrial Park, Cebu",
        "hgabPesos": 300000000,
        "nepPage": "447",
        "hgabPage": "435",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Gattaran Diversion Road, Sta. 6+000 - Sta. 7+250, Sta. 7+757 - Sta. 8+530, Cagayan",
      "source_code": "2027DPWH-Proposal-32769",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 110002000,
      "comparison_year": 2023,
      "prior_project": "Gattaran Diversion Road, Cagayan",
      "prior_amount": 60000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566627",
      "similarity_pct": 100,
      "current_chainage": "6+000.00–7+250.00 · 7+757.00–8+530.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32769",
        "nepTitle": "Gattaran Diversion Road, Sta. 6+000 - Sta. 7+250, Sta. 7+757 - Sta. 8+530, Cagayan",
        "nepPesos": 110002000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0216-001920",
        "hgabTitle": "Gattaran Diversion Road, Sta. 6+000 - Sta. 7+250, Sta. 7+757 - Sta. 8+530, Cagayan",
        "hgabPesos": 110002000,
        "nepPage": "278",
        "hgabPage": "216",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Gattaran Diversion Road, Sta. 6+000 - Sta. 7+250, Sta. 7+757 - Sta. 8+530, Cagayan",
      "source_code": "2027DPWH-Proposal-32769",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 110002000,
      "comparison_year": 2024,
      "prior_project": "Gattaran Diversion Road, Cagayan",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 594986",
      "similarity_pct": 100,
      "current_chainage": "6+000.00–7+250.00 · 7+757.00–8+530.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32769",
        "nepTitle": "Gattaran Diversion Road, Sta. 6+000 - Sta. 7+250, Sta. 7+757 - Sta. 8+530, Cagayan",
        "nepPesos": 110002000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0216-001920",
        "hgabTitle": "Gattaran Diversion Road, Sta. 6+000 - Sta. 7+250, Sta. 7+757 - Sta. 8+530, Cagayan",
        "hgabPesos": 110002000,
        "nepPage": "278",
        "hgabPage": "216",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Gattaran Diversion Road, Sta. 7+250 - Sta. 7+757, Cagayan",
      "source_code": "2027DPWH-Proposal-32768",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 52500000,
      "comparison_year": 2023,
      "prior_project": "Gattaran Diversion Road, Cagayan",
      "prior_amount": 60000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566627",
      "similarity_pct": 100,
      "current_chainage": "7+250.00–7+757.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32768",
        "nepTitle": "Gattaran Diversion Road, Sta. 7+250 - Sta. 7+757, Cagayan",
        "nepPesos": 52500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0216-001921",
        "hgabTitle": "Gattaran Diversion Road, Sta. 7+250 - Sta. 7+757, Cagayan",
        "hgabPesos": 52500000,
        "nepPage": "278",
        "hgabPage": "216",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Gattaran Diversion Road, Sta. 7+250 - Sta. 7+757, Cagayan",
      "source_code": "2027DPWH-Proposal-32768",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 52500000,
      "comparison_year": 2024,
      "prior_project": "Gattaran Diversion Road, Cagayan",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 594986",
      "similarity_pct": 100,
      "current_chainage": "7+250.00–7+757.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32768",
        "nepTitle": "Gattaran Diversion Road, Sta. 7+250 - Sta. 7+757, Cagayan",
        "nepPesos": 52500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0216-001921",
        "hgabTitle": "Gattaran Diversion Road, Sta. 7+250 - Sta. 7+757, Cagayan",
        "hgabPesos": 52500000,
        "nepPage": "278",
        "hgabPage": "216",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
      "source_code": "2027DPWH-Proposal-24022",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 130000000,
      "comparison_year": 2021,
      "prior_project": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Indang East Section, Cavite",
      "prior_amount": 125000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437163",
      "similarity_pct": 100,
      "current_chainage": "56+753.00–56+863.00 · 60+555.00–60+595.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24022",
        "nepTitle": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
        "nepPesos": 130000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0236-002290",
        "hgabTitle": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
        "hgabPesos": 130000000,
        "nepPage": "295",
        "hgabPage": "236",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
      "source_code": "2027DPWH-Proposal-24022",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 130000000,
      "comparison_year": 2022,
      "prior_project": "General Aguinaldo - Magallanes - Nasugbu Road (East-West Road), Indang-West Section, Cavite",
      "prior_amount": 130000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548536",
      "similarity_pct": 100,
      "current_chainage": "56+753.00–56+863.00 · 60+555.00–60+595.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24022",
        "nepTitle": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
        "nepPesos": 130000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0236-002290",
        "hgabTitle": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
        "hgabPesos": 130000000,
        "nepPage": "295",
        "hgabPage": "236",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
      "source_code": "2027DPWH-Proposal-24022",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 130000000,
      "comparison_year": 2023,
      "prior_project": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Indang-West Section, Cavite",
      "prior_amount": 110000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568119",
      "similarity_pct": 100,
      "current_chainage": "56+753.00–56+863.00 · 60+555.00–60+595.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24022",
        "nepTitle": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
        "nepPesos": 130000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0236-002290",
        "hgabTitle": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
        "hgabPesos": 130000000,
        "nepPage": "295",
        "hgabPage": "236",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
      "source_code": "2027DPWH-Proposal-24022",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 130000000,
      "comparison_year": 2024,
      "prior_project": "General Aguinaldo - Magallanes - Nasugbu Road ( East - West Road ) , Indang West Section, Cavite",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597134",
      "similarity_pct": 100,
      "current_chainage": "56+753.00–56+863.00 · 60+555.00–60+595.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24022",
        "nepTitle": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
        "nepPesos": 130000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0236-002290",
        "hgabTitle": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
        "hgabPesos": 130000000,
        "nepPage": "295",
        "hgabPage": "236",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
      "source_code": "2027DPWH-Proposal-24022",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 130000000,
      "comparison_year": 2019,
      "prior_project": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Indang Section, Cavite",
      "prior_amount": 100000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310205100237000 · PDF p. 205 · printed p. 1670",
      "similarity_pct": 100,
      "current_chainage": "56+753.00–56+863.00 · 60+555.00–60+595.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24022",
        "nepTitle": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
        "nepPesos": 130000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0236-002290",
        "hgabTitle": "General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Sta. 56+753 - Sta. 56+863, Sta. 60+555 - STA. 60+595, Indang East Section, Cavite",
        "hgabPesos": 130000000,
        "nepPage": "295",
        "hgabPage": "236",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Gingoog Bypass Road, Brgy. 26 Section, Sta. 4+278 - Sta. 4+348, Gingoog City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-33463",
      "office": "Misamis Oriental 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Gingoog Bypass Road, Brgy. 26 Section, Sta. 4+278 - Sta. 4+348, Gingoog City, Misamis Oriental",
      "prior_amount": 45822000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12398",
      "similarity_pct": 100,
      "current_chainage": "4+278.00–4+348.00",
      "prior_chainage": "4+278.00–4+348.00",
      "chainage_overlap": "4+278.00–4+348.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Karen Lagbas"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33463",
        "nepTitle": "Gingoog Bypass Road, Brgy. 26 Section, Sta. 4+278 - Sta. 4+348, Gingoog City, Misamis Oriental",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002243",
        "hgabTitle": "Gingoog Bypass Road, Barangay 26 Section, Sta. 4+278 - Sta. 4+348, Gingoog City, Misamis Oriental",
        "hgabPesos": 20000000,
        "nepPage": "292",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Iguig Bypass Road, Sta. 0+100 - Sta. 0+274, Sta. 3+500 - Sta. 3+680, Cagayan",
      "source_code": "2027DPWH-Proposal-32775",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 60000000,
      "comparison_year": 2020,
      "prior_project": "Iguig Bypass Road , Cagayan",
      "prior_amount": 19099000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512657",
      "similarity_pct": 100,
      "current_chainage": "0+100.00–0+274.00 · 3+500.00–3+680.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32775",
        "nepTitle": "Iguig Bypass Road, Sta. 0+100 - Sta. 0+274, Sta. 3+500 - Sta. 3+680, Cagayan",
        "nepPesos": 60000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0216-001922",
        "hgabTitle": "Iguig Bypass Road, Sta. 0+100 - Sta. 0+274, Sta. 3+500 - Sta. 3+680, Cagayan",
        "hgabPesos": 60000000,
        "nepPage": "278",
        "hgabPage": "216",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Iguig Bypass Road, Sta. 0+100 - Sta. 0+274, Sta. 3+500 - Sta. 3+680, Cagayan",
      "source_code": "2027DPWH-Proposal-32775",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 60000000,
      "comparison_year": 2021,
      "prior_project": "Iguig Bypass Road , Cagayan",
      "prior_amount": 1910000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436564",
      "similarity_pct": 100,
      "current_chainage": "0+100.00–0+274.00 · 3+500.00–3+680.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32775",
        "nepTitle": "Iguig Bypass Road, Sta. 0+100 - Sta. 0+274, Sta. 3+500 - Sta. 3+680, Cagayan",
        "nepPesos": 60000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0216-001922",
        "hgabTitle": "Iguig Bypass Road, Sta. 0+100 - Sta. 0+274, Sta. 3+500 - Sta. 3+680, Cagayan",
        "hgabPesos": 60000000,
        "nepPage": "278",
        "hgabPage": "216",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Iloilo Circumferential Road 3, Sta. 3+580 - Sta. 4+780, Iloilo",
      "source_code": "2027DPWH-Proposal-32880",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 200000000,
      "comparison_year": 2020,
      "prior_project": "Iloilo Circumferential Road 3, Iloilo",
      "prior_amount": 130000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512199",
      "similarity_pct": 100,
      "current_chainage": "3+580.00–4+780.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32880",
        "nepTitle": "Iloilo Circumferential Road 3, Sta. 3+580 - Sta. 4+780, Iloilo",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0222-002047",
        "hgabTitle": "Iloilo Circumferential Road 3, Sta. 3+330.50 - Sta. 3+993.50, Iloilo",
        "hgabPesos": 150000000,
        "nepPage": "283",
        "hgabPage": "222",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Iloilo Circumferential Road 3, Sta. 3+580 - Sta. 4+780, Iloilo",
      "source_code": "2027DPWH-Proposal-32880",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 200000000,
      "comparison_year": 2021,
      "prior_project": "Iloilo Circumferential Road 3, Iloilo",
      "prior_amount": 40000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436706",
      "similarity_pct": 100,
      "current_chainage": "3+580.00–4+780.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32880",
        "nepTitle": "Iloilo Circumferential Road 3, Sta. 3+580 - Sta. 4+780, Iloilo",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0222-002047",
        "hgabTitle": "Iloilo Circumferential Road 3, Sta. 3+330.50 - Sta. 3+993.50, Iloilo",
        "hgabPesos": 150000000,
        "nepPage": "283",
        "hgabPage": "222",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Iloilo Circumferential Road 3, Sta. 3+580 - Sta. 4+780, Iloilo",
      "source_code": "2027DPWH-Proposal-32880",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 200000000,
      "comparison_year": 2022,
      "prior_project": "Iloilo Circumferential Road 3, Iloilo",
      "prior_amount": 120000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 546921",
      "similarity_pct": 100,
      "current_chainage": "3+580.00–4+780.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32880",
        "nepTitle": "Iloilo Circumferential Road 3, Sta. 3+580 - Sta. 4+780, Iloilo",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0222-002047",
        "hgabTitle": "Iloilo Circumferential Road 3, Sta. 3+330.50 - Sta. 3+993.50, Iloilo",
        "hgabPesos": 150000000,
        "nepPage": "283",
        "hgabPage": "222",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Iloilo Circumferential Road 3, Sta. 3+580 - Sta. 4+780, Iloilo",
      "source_code": "2027DPWH-Proposal-32880",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 200000000,
      "comparison_year": 2023,
      "prior_project": "Iloilo Circumferential Road 3, Iloilo",
      "prior_amount": 120000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 565799",
      "similarity_pct": 100,
      "current_chainage": "3+580.00–4+780.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32880",
        "nepTitle": "Iloilo Circumferential Road 3, Sta. 3+580 - Sta. 4+780, Iloilo",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0222-002047",
        "hgabTitle": "Iloilo Circumferential Road 3, Sta. 3+330.50 - Sta. 3+993.50, Iloilo",
        "hgabPesos": 150000000,
        "nepPage": "283",
        "hgabPage": "222",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Iloilo Circumferential Road 3, Sta. 3+580 - Sta. 4+780, Iloilo",
      "source_code": "2027DPWH-Proposal-32880",
      "office": "Iloilo 4th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 200000000,
      "comparison_year": 2019,
      "prior_project": "Iloilo Circumferential Road 3, Iloilo",
      "prior_amount": 101000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100471000 · PDF p. 191 · printed p. 1656",
      "similarity_pct": 100,
      "current_chainage": "3+580.00–4+780.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32880",
        "nepTitle": "Iloilo Circumferential Road 3, Sta. 3+580 - Sta. 4+780, Iloilo",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0222-002047",
        "hgabTitle": "Iloilo Circumferential Road 3, Sta. 3+330.50 - Sta. 3+993.50, Iloilo",
        "hgabPesos": 150000000,
        "nepPage": "283",
        "hgabPage": "222",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Iloilo R-1 Bypass Road, Oton, Iloilo - Sta. 10+206.35 - Sta. 10+599.59",
      "source_code": "2027DPWH-Proposal-20715",
      "office": "Iloilo 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Iloilo R-1 Bypass Road, Oton, Iloilo",
      "prior_amount": 105000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566774",
      "similarity_pct": 100,
      "current_chainage": "10+206.35–10+599.59",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20715",
        "nepTitle": "Iloilo R-1 Bypass Road, Oton, Iloilo - Sta. 10+206.35 - Sta. 10+599.59",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0222-002048",
        "hgabTitle": "Iloilo R-1 Bypass Road, Oton, Iloilo - Sta. 10+206.35 - Sta. 10+599.59",
        "hgabPesos": 50000000,
        "nepPage": "283",
        "hgabPage": "222",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Iloilo R-1 Bypass Road, Oton, Iloilo - Sta. 10+206.35 - Sta. 10+599.59",
      "source_code": "2027DPWH-Proposal-20715",
      "office": "Iloilo 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 50000000,
      "comparison_year": 2024,
      "prior_project": "Iloilo R - 1 Bypass Road, Oton, Iloilo",
      "prior_amount": 105000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595133",
      "similarity_pct": 100,
      "current_chainage": "10+206.35–10+599.59",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20715",
        "nepTitle": "Iloilo R-1 Bypass Road, Oton, Iloilo - Sta. 10+206.35 - Sta. 10+599.59",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0222-002048",
        "hgabTitle": "Iloilo R-1 Bypass Road, Oton, Iloilo - Sta. 10+206.35 - Sta. 10+599.59",
        "hgabPesos": 50000000,
        "nepPage": "283",
        "hgabPage": "222",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Iloilo River North Bank Road, Sta. 4+700 - Sta. 5+000, Oton, Iloilo",
      "source_code": "2027DPWH-Proposal-20717",
      "office": "Iloilo 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 30000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Iloilo River North Bank Road, Oton, Iloilo",
      "prior_amount": 110000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 521367",
      "similarity_pct": 100,
      "current_chainage": "4+700.00–5+000.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20717",
        "nepTitle": "Iloilo River North Bank Road, Sta. 4+700 - Sta. 5+000, Oton, Iloilo",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0222-002049",
        "hgabTitle": "Iloilo River North Bank Road, Sta. 4+700 - Sta. 5+000, Oton, Iloilo",
        "hgabPesos": 30000000,
        "nepPage": "283",
        "hgabPage": "222",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Iloilo River North Bank Road, Sta. 4+700 - Sta. 5+000, Oton, Iloilo",
      "source_code": "2027DPWH-Proposal-20717",
      "office": "Iloilo 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Iloilo River North Bank Road, Oton, Iloilo",
      "prior_amount": 30000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566775",
      "similarity_pct": 100,
      "current_chainage": "4+700.00–5+000.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20717",
        "nepTitle": "Iloilo River North Bank Road, Sta. 4+700 - Sta. 5+000, Oton, Iloilo",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0222-002049",
        "hgabTitle": "Iloilo River North Bank Road, Sta. 4+700 - Sta. 5+000, Oton, Iloilo",
        "hgabPesos": 30000000,
        "nepPage": "283",
        "hgabPage": "222",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Barangay Lanao Road, at Barangay Lanao, Moalboal, Cebu",
      "source_code": "2027DPWH-Proposal-37680",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 7000000,
      "comparison_year": 2016,
      "prior_project": "Road Improvement of Lanao, Moalboal, Cebu",
      "prior_amount": 2000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050305627",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37680",
        "nepTitle": "Improvement of Barangay Lanao Road, at Barangay Lanao, Moalboal, Cebu",
        "nepPesos": 7000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0589-009438",
        "hgabTitle": "Improvement of Barangay Lanao Road, at Barangay Lanao, Moalboal, Cebu",
        "hgabPesos": 7000000,
        "nepPage": "538",
        "hgabPage": "589",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Barangay Lanao Road, at Barangay Lanao, Moalboal, Cebu",
      "source_code": "2027DPWH-Proposal-37680",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 7000000,
      "comparison_year": 2017,
      "prior_project": "Road Improvement of Lanao, Moalboal, Cebu",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050305627",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37680",
        "nepTitle": "Improvement of Barangay Lanao Road, at Barangay Lanao, Moalboal, Cebu",
        "nepPesos": 7000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0589-009438",
        "hgabTitle": "Improvement of Barangay Lanao Road, at Barangay Lanao, Moalboal, Cebu",
        "hgabPesos": 7000000,
        "nepPage": "538",
        "hgabPage": "589",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Calabigan-Cagandungan Road, Barangay Calabigan and Cagandungan, Luna, Apayao",
      "source_code": "2027DPWH-Proposal-34747",
      "office": "Apayao 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 123000000,
      "comparison_year": 2024,
      "prior_project": "Improvement of Cagandungan - Calabigan Road, Luna, Apayao",
      "prior_amount": 6000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540260",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Eleanor Begtang"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34747",
        "nepTitle": "Improvement of Calabigan-Cagandungan Road, Barangay Calabigan and Cagandungan, Luna, Apayao",
        "nepPesos": 123000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0417-005801",
        "hgabTitle": "Improvement of Calabigan-Cagandungan Road, Barangay Calabigan and Cagandungan, Luna, Apayao",
        "hgabPesos": 123000000,
        "nepPage": "435",
        "hgabPage": "417",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Calabigan-Cagandungan Road, Barangay Calabigan and Cagandungan, Luna, Apayao",
      "source_code": "2027DPWH-Proposal-34747",
      "office": "Apayao 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 123000000,
      "comparison_year": 2025,
      "prior_project": "Construction/Improvement of Calabigan-Cagandungan Road, Barangay Cagandungan and Barangay Calabigan, Luna, Apayao",
      "prior_amount": 70000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574051",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Eleanor Begtang"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34747",
        "nepTitle": "Improvement of Calabigan-Cagandungan Road, Barangay Calabigan and Cagandungan, Luna, Apayao",
        "nepPesos": 123000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0417-005801",
        "hgabTitle": "Improvement of Calabigan-Cagandungan Road, Barangay Calabigan and Cagandungan, Luna, Apayao",
        "hgabPesos": 123000000,
        "nepPage": "435",
        "hgabPage": "417",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Malolos Paombong Hagonoy Calumpit Road, Municipality of Calumpit, Bulacan",
      "source_code": "2027DPWH-Proposal-33592",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 100000000,
      "comparison_year": 2016,
      "prior_project": "Concreting/Improvement of Malolos - Paombong - Hagonoy - Calumpit Road, Calumpit, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303492",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33592",
        "nepTitle": "Improvement of Malolos Paombong Hagonoy Calumpit Road, Municipality of Calumpit, Bulacan",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0422-005904",
        "hgabTitle": "Improvement of Malolos Paombong Hagonoy Calumpit Road, Municipality of Calumpit, Bulacan",
        "hgabPesos": 100000000,
        "nepPage": "439",
        "hgabPage": "422",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Malolos Paombong Hagonoy Calumpit Road, Municipality of Calumpit, Bulacan",
      "source_code": "2027DPWH-Proposal-33592",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 100000000,
      "comparison_year": 2017,
      "prior_project": "Concreting / Improvement of Malolos - Paombong - Hagonoy - Calumpit Road, Calumpit, Bulacan",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050303492",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33592",
        "nepTitle": "Improvement of Malolos Paombong Hagonoy Calumpit Road, Municipality of Calumpit, Bulacan",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0422-005904",
        "hgabTitle": "Improvement of Malolos Paombong Hagonoy Calumpit Road, Municipality of Calumpit, Bulacan",
        "hgabPesos": 100000000,
        "nepPage": "439",
        "hgabPage": "422",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Panlaan-Balaygtiki Road at Barangay Panlaan and Balaygtiki, Dumanjug, Cebu",
      "source_code": "2027DPWH-Proposal-37695",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 7000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Panlaan-Balaygtiki Road at Brgy. Panlaan & Balaygtiki, Dumanjug, Cebu",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 500124",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37695",
        "nepTitle": "Improvement of Panlaan-Balaygtiki Road at Barangay Panlaan and Balaygtiki, Dumanjug, Cebu",
        "nepPesos": 7000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0589-009441",
        "hgabTitle": "Construction of Panlaan-Balaygtiki Road at Barangay Panlaan and Balaygtiki, Dumanjug, Cebu",
        "hgabPesos": 9000000,
        "nepPage": "538",
        "hgabPage": "589",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Rissing to Paratong No.4 Road leading to Paratong District Beach, Bangar, La Union",
      "source_code": "2027DPWH-Proposal-33548",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 75000000,
      "comparison_year": 2024,
      "prior_project": "Rehabilitation / Improvement of Rissing to Paratong No.4 Road leading to Paratong District Beach, Bangar, La Union",
      "prior_amount": 20000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 529713",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33548",
        "nepTitle": "Improvement of Rissing to Paratong No.4 Road leading to Paratong District Beach, Bangar, La Union",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0416-005770",
        "hgabTitle": "Improvement of Rissing to Paratong No.4 Road leading to Paratong District Beach, Bangar, La Union",
        "hgabPesos": 75000000,
        "nepPage": "435",
        "hgabPage": "416",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Rissing to Paratong No.4 Road leading to Paratong District Beach, Bangar, La Union",
      "source_code": "2027DPWH-Proposal-33548",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 75000000,
      "comparison_year": 2025,
      "prior_project": "Rissing to Paratong No.4 Road leading to Paratong District Beach, Bangar, La Union",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 546116",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33548",
        "nepTitle": "Improvement of Rissing to Paratong No.4 Road leading to Paratong District Beach, Bangar, La Union",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0416-005770",
        "hgabTitle": "Improvement of Rissing to Paratong No.4 Road leading to Paratong District Beach, Bangar, La Union",
        "hgabPesos": 75000000,
        "nepPage": "435",
        "hgabPage": "416",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Rissing to Paratong No.4 Road leading to Paratong District Beach, Bangar, La Union",
      "source_code": "2027DPWH-Proposal-33548",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 75000000,
      "comparison_year": 2026,
      "prior_project": "Rissing to Paratong No. 4 Road leading to Paratong District Beach, Bangar, La Union, Sta 1+509 - Sta 1+634",
      "prior_amount": 4350000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 16163",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "1+509.00–1+634.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33548",
        "nepTitle": "Improvement of Rissing to Paratong No.4 Road leading to Paratong District Beach, Bangar, La Union",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0416-005770",
        "hgabTitle": "Improvement of Rissing to Paratong No.4 Road leading to Paratong District Beach, Bangar, La Union",
        "hgabPesos": 75000000,
        "nepPage": "435",
        "hgabPage": "416",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road At Barangay Bulacnin, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33852",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Bulacnin, Lipa City, Batangas",
      "prior_amount": 45000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526867",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33852",
        "nepTitle": "Improvement of Road At Barangay Bulacnin, Lipa City, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008378",
        "hgabTitle": "Improvement of Road At Barangay Bulacnin, Lipa City, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road At Barangay Bulacnin, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33852",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Construction/Repair/Rehabilitation/Improvement of  Road, Brgy. Bulacnin, Lipa City, Batangas",
      "prior_amount": 4000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306541",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33852",
        "nepTitle": "Improvement of Road At Barangay Bulacnin, Lipa City, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008378",
        "hgabTitle": "Improvement of Road At Barangay Bulacnin, Lipa City, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road along Balimbing Road, San Pascual, Batangas",
      "source_code": "2027DPWH-Proposal-00002",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Road, Barangay Balimbing, San Pascual, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428254",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-00002",
        "nepTitle": "Improvement of Road along Balimbing Road, San Pascual, Batangas",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008290",
        "hgabTitle": "Improvement of Road along Balimbing Road, San Pascual, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "505",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road along Barangay 15, Ilawod East, Legazpi City, Albay",
      "source_code": "2027DPWH-Proposal-39370",
      "office": "Albay 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 7000000,
      "comparison_year": 2024,
      "prior_project": "Improvement of Road along Barangay 15 - Ilawod East, Legazpi City, Albay",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540569",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39370",
        "nepTitle": "Improvement of Road along Barangay 15, Ilawod East, Legazpi City, Albay",
        "nepPesos": 7000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0558-008748",
        "hgabTitle": "Improvement of Road along Barangay 15, Ilawod East, Legazpi City, Albay",
        "hgabPesos": 7000000,
        "nepPage": "518",
        "hgabPage": "558",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road along Barangay Gabawan, Daraga, Albay",
      "source_code": "2027DPWH-Proposal-39378",
      "office": "Albay 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 6000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road along Barangay Gabawan, Daraga, Albay",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540565",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Caloy Loria"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39378",
        "nepTitle": "Improvement of Road along Barangay Gabawan, Daraga, Albay",
        "nepPesos": 6000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0558-008761",
        "hgabTitle": "Improvement of Road along Barangay Gabawan, Daraga, Albay",
        "hgabPesos": 6000000,
        "nepPage": "518",
        "hgabPage": "558",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road along Barangay Namantao, Daraga, Albay",
      "source_code": "2027DPWH-Proposal-39373",
      "office": "Albay 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Namantao Road, Daraga, Albay",
      "prior_amount": 60000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 521319",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Caloy Loria"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39373",
        "nepTitle": "Improvement of Road along Barangay Namantao, Daraga, Albay",
        "nepPesos": 6000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0558-008763",
        "hgabTitle": "Improvement of Road along Barangay Namantao, Daraga, Albay",
        "hgabPesos": 6000000,
        "nepPage": "518",
        "hgabPage": "558",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road along Macbas-Botiao Road, Cattubo, Atok, Benguet",
      "source_code": "2027DPWH-Proposal-30002",
      "office": "Benguet 2nd District Engineering Office",
      "region": "CAR",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Road in Macbas-Botiao Sta. 0+000 - Sta. 0+130, Brgy. Cattubo, Atok, Benguet",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 26643",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+130.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-30002",
        "nepTitle": "Improvement of Road along Macbas-Botiao Road, Cattubo, Atok, Benguet",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0478-007008",
        "hgabTitle": "Improvement of Road along Macbas-Botiao Road, Cattubo, Atok, Benguet",
        "hgabPesos": 30000000,
        "nepPage": "470",
        "hgabPage": "478",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay Antipolo del Sur, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33849",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Construction/Repair/Rehabilitation/Improvement of Road  Brgy. Antipolo Del Sur, Lipa City, Batangas",
      "prior_amount": 4000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306518",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33849",
        "nepTitle": "Improvement of Road at Barangay Antipolo del Sur, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008376",
        "hgabTitle": "Improvement of Road at Barangay Antipolo del Sur, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay Balagbag, San Juan, Batangas",
      "source_code": "2027DPWH-Proposal-36294",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, Brgy. Balagbag, San Juan, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499444",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36294",
        "nepTitle": "Improvement of Road at Barangay Balagbag, San Juan, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008377",
        "hgabTitle": "Improvement of Road at Barangay Balagbag, San Juan, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay Fairview, Quezon City",
      "source_code": "2027DPWH-Proposal-02353",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Improvement of Road at Barangay Fairview, Quezon City",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 558688",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02353",
        "nepTitle": "Improvement of Road at Barangay Fairview, Quezon City",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0458-006579",
        "hgabTitle": "Improvement of Road at Barangay Fairview, Quezon City",
        "hgabPesos": 30000000,
        "nepPage": "462",
        "hgabPage": "458",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay Latag, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28792",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2020,
      "prior_project": "Construction/Rehabilitation/Improvement of Road at Brgy. Latag, Lipa City, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499475",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28792",
        "nepTitle": "Improvement of Road at Barangay Latag, Lipa City, Batangas",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008379",
        "hgabTitle": "Improvement of Road at Barangay Latag, Lipa City, Batangas",
        "hgabPesos": 15000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay Latag, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28792",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation/Improvement of Road at Brgy. Latag, Lipa City, Batangas",
      "prior_amount": 7700000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 426671",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28792",
        "nepTitle": "Improvement of Road at Barangay Latag, Lipa City, Batangas",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008379",
        "hgabTitle": "Improvement of Road at Barangay Latag, Lipa City, Batangas",
        "hgabPesos": 15000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay Latag, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28792",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Road at Barangay Latag, Lipa City, Batangas",
      "prior_amount": 28000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560649",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28792",
        "nepTitle": "Improvement of Road at Barangay Latag, Lipa City, Batangas",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008379",
        "hgabTitle": "Improvement of Road at Barangay Latag, Lipa City, Batangas",
        "hgabPesos": 15000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay Latag, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28792",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2018,
      "prior_project": "Concreting of Road, Barangay Latag, Lipa City, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200750000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28792",
        "nepTitle": "Improvement of Road at Barangay Latag, Lipa City, Batangas",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008379",
        "hgabTitle": "Improvement of Road at Barangay Latag, Lipa City, Batangas",
        "hgabPesos": 15000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28801",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2020,
      "prior_project": "Construction/Rehabilitation/Improvement of Road at  Brgy. Rizal, Lipa City, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499471",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28801",
        "nepTitle": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008381",
        "hgabTitle": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
        "hgabPesos": 20000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28801",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation/Improvement of Road at Brgy. Rizal, Lipa City, Batangas",
      "prior_amount": 7700000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 426669",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28801",
        "nepTitle": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008381",
        "hgabTitle": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
        "hgabPesos": 20000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28801",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction/Rehabilitation of Road at Barangay Rizal, Lipa City Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526838",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28801",
        "nepTitle": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008381",
        "hgabTitle": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
        "hgabPesos": 20000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28801",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Road at Barangay Rizal, Lipa City, Batangas",
      "prior_amount": 25000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560655",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28801",
        "nepTitle": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008381",
        "hgabTitle": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
        "hgabPesos": 20000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28801",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2017,
      "prior_project": "Construction/Repair/Rehabilitation/Improvement of Road, Brgy. Rizal, Lipa City, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306531",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28801",
        "nepTitle": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008381",
        "hgabTitle": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
        "hgabPesos": 20000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28801",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Road, Barangay Rizal, Lipa City, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200803000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28801",
        "nepTitle": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008381",
        "hgabTitle": "Improvement of Road at Barangay Rizal, Lipa City, Batangas",
        "hgabPesos": 20000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay Sabang - Barangay Marawoy, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28821",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 35000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road Marawoy-Sabang, Lipa City, Batangas",
      "prior_amount": 55000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 527187",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28821",
        "nepTitle": "Improvement of Road at Barangay Sabang - Barangay Marawoy, Lipa City, Batangas",
        "nepPesos": 35000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008382",
        "hgabTitle": "Improvement of Road at Barangay Sabang - Barangay Marawoy, Lipa City, Batangas",
        "hgabPesos": 35000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33848",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2020,
      "prior_project": "Construction/Rehabilitation/Improvement of Road at Brgy. San Isidro, Lipa City, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499469",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33848",
        "nepTitle": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0542-008383",
        "hgabTitle": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
        "hgabPesos": 20000000,
        "nepPage": "508",
        "hgabPage": "542",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33848",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation/Improvement of Road at Brgy. San Isidro, Lipa City, Batangas",
      "prior_amount": 7700000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 426667",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33848",
        "nepTitle": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0542-008383",
        "hgabTitle": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
        "hgabPesos": 20000000,
        "nepPage": "508",
        "hgabPage": "542",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33848",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay San Isidro, Lipa City, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575127",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33848",
        "nepTitle": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0542-008383",
        "hgabTitle": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
        "hgabPesos": 20000000,
        "nepPage": "508",
        "hgabPage": "542",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33848",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
      "prior_amount": 20000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 22007",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33848",
        "nepTitle": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0542-008383",
        "hgabTitle": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
        "hgabPesos": 20000000,
        "nepPage": "508",
        "hgabPage": "542",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33848",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2016,
      "prior_project": "Concreting/Rehabilitation/Improvement of Barangay Road, Brgy. San Isidro, Lipa City, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050305037",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33848",
        "nepTitle": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0542-008383",
        "hgabTitle": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
        "hgabPesos": 20000000,
        "nepPage": "508",
        "hgabPage": "542",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33848",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2017,
      "prior_project": "Concreting / Rehabilitation / Improvement of Barangay Road, Brgy. San Isidro, Lipa City, Batangas",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050305037",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33848",
        "nepTitle": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0542-008383",
        "hgabTitle": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
        "hgabPesos": 20000000,
        "nepPage": "508",
        "hgabPage": "542",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33848",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Road, Barangay San Isidro, Lipa City, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200806000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33848",
        "nepTitle": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0542-008383",
        "hgabTitle": "Improvement of Road at Barangay San Isidro, Lipa City, Batangas",
        "hgabPesos": 20000000,
        "nepPage": "508",
        "hgabPage": "542",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay San Lucas, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33851",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Road, Barangay San Lucas, Lipa City, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200807000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33851",
        "nepTitle": "Improvement of Road at Barangay San Lucas, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0542-008384",
        "hgabTitle": "Improvement of Road at Barangay San Lucas, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "508",
        "hgabPage": "542",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Balete, Batangas City",
      "source_code": "2027DPWH-Proposal-36153",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Roads, Balete, Batangas",
      "prior_amount": 6000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 492567",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36153",
        "nepTitle": "Improvement of Road, Barangay Balete, Batangas City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008295",
        "hgabTitle": "Improvement of Road, Barangay Balete, Batangas City",
        "hgabPesos": 15000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Balete, Batangas City",
      "source_code": "2027DPWH-Proposal-36153",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Roads, Balete, Batangas",
      "prior_amount": 4620000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 424782",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36153",
        "nepTitle": "Improvement of Road, Barangay Balete, Batangas City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008295",
        "hgabTitle": "Improvement of Road, Barangay Balete, Batangas City",
        "hgabPesos": 15000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Balete, Batangas City",
      "source_code": "2027DPWH-Proposal-36153",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Roads, Balete, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575106",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36153",
        "nepTitle": "Improvement of Road, Barangay Balete, Batangas City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008295",
        "hgabTitle": "Improvement of Road, Barangay Balete, Batangas City",
        "hgabPesos": 15000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Balete, Batangas City",
      "source_code": "2027DPWH-Proposal-36153",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2018,
      "prior_project": "Barangay road in Barangay Balete, Batangas City",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201023000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36153",
        "nepTitle": "Improvement of Road, Barangay Balete, Batangas City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008295",
        "hgabTitle": "Improvement of Road, Barangay Balete, Batangas City",
        "hgabPesos": 15000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Balete, Batangas City",
      "source_code": "2027DPWH-Proposal-36153",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2019,
      "prior_project": "Concreting/Rehabilitation of Road, Brgy. Balete, Batangas City, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203445000 · PDF p. 1280 · printed p. 2745",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36153",
        "nepTitle": "Improvement of Road, Barangay Balete, Batangas City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008295",
        "hgabTitle": "Improvement of Road, Barangay Balete, Batangas City",
        "hgabPesos": 15000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Bilogo, Batangas City",
      "source_code": "2027DPWH-Proposal-36156",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Road, Barangay Bilogo, Batangas City",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428255",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36156",
        "nepTitle": "Improvement of Road, Barangay Bilogo, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008297",
        "hgabTitle": "Improvement of Road, Barangay Bilogo, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Bilogo, Batangas City",
      "source_code": "2027DPWH-Proposal-36156",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Barangay Bilogo, Batangas City, Batangas",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526779",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36156",
        "nepTitle": "Improvement of Road, Barangay Bilogo, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008297",
        "hgabTitle": "Improvement of Road, Barangay Bilogo, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Bilogo, Batangas City",
      "source_code": "2027DPWH-Proposal-36156",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Bilogo, Batangas City, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27420",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36156",
        "nepTitle": "Improvement of Road, Barangay Bilogo, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008297",
        "hgabTitle": "Improvement of Road, Barangay Bilogo, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Bilogo, Batangas City",
      "source_code": "2027DPWH-Proposal-36156",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Construction/Rehabilitation of Road, Barangay Bilogo, Batangas City",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203485000 · PDF p. 1283 · printed p. 2748",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36156",
        "nepTitle": "Improvement of Road, Barangay Bilogo, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008297",
        "hgabTitle": "Improvement of Road, Barangay Bilogo, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Dumantay, Batangas City",
      "source_code": "2027DPWH-Proposal-36157",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting/Rehabilitation of Road, Brgy. Dumantay, Batangas City, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203451000 · PDF p. 1280 · printed p. 2745",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36157",
        "nepTitle": "Improvement of Road, Barangay Dumantay, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008298",
        "hgabTitle": "Improvement of Road, Barangay Dumantay, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Haligue Kanluran, Batangas City",
      "source_code": "2027DPWH-Proposal-36159",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Improvement of Road, Sta.0+000 - Sta.0+938, Barangay Haligue Kanluran, Batangas City, Batangas",
      "prior_amount": 8018000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21878",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+938.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36159",
        "nepTitle": "Improvement of Road, Barangay Haligue Kanluran, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0538-008289",
        "hgabTitle": "Improvement of Road, Barangay Alangilan, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Haligue Kanluran, Batangas City",
      "source_code": "2027DPWH-Proposal-36159",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Construction/Rehabilitation of Road, Brgy. Haligue Kanluran, Batangas City",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201006000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36159",
        "nepTitle": "Improvement of Road, Barangay Haligue Kanluran, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0538-008289",
        "hgabTitle": "Improvement of Road, Barangay Alangilan, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Haligue Kanluran, Batangas City",
      "source_code": "2027DPWH-Proposal-36159",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting/Rehabilitation of Road, Brgy. Haligue Kanluran, Batangas City, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203454000 · PDF p. 1281 · printed p. 2746",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36159",
        "nepTitle": "Improvement of Road, Barangay Haligue Kanluran, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0538-008289",
        "hgabTitle": "Improvement of Road, Barangay Alangilan, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Maruclap, Batangas City",
      "source_code": "2027DPWH-Proposal-36308",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Improvement of Road, Sta.0+000 - Sta.0+936, Barangay Maruclap, Batangas City, Batangas",
      "prior_amount": 8018000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21880",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+936.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36308",
        "nepTitle": "Improvement of Road, Barangay Maruclap, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0538-008300",
        "hgabTitle": "Improvement of Road, Barangay Sorosoro Ilaya, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Maruclap, Batangas City",
      "source_code": "2027DPWH-Proposal-36308",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Road, Brgy. Maruclap, Batangas City",
      "prior_amount": 4000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200996000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36308",
        "nepTitle": "Improvement of Road, Barangay Maruclap, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0538-008300",
        "hgabTitle": "Improvement of Road, Barangay Sorosoro Ilaya, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Paharang Kanluran, Batangas City",
      "source_code": "2027DPWH-Proposal-36160",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2019,
      "prior_project": "Concreting/Rehabilitation of Road, Brgy. Paharang Kanluran, Batangas City, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203461000 · PDF p. 1281 · printed p. 2746",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36160",
        "nepTitle": "Improvement of Road, Barangay Paharang Kanluran, Batangas City",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008301",
        "hgabTitle": "Improvement of Road, Barangay Paharang Kanluran, Batangas City",
        "hgabPesos": 20000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Pinamucan Silangan, Batangas City",
      "source_code": "2027DPWH-Proposal-36161",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2016,
      "prior_project": "Construction of Road, Brgy. Pinamucan Silangan, Batangas City, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050304968",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36161",
        "nepTitle": "Improvement of Road, Barangay Pinamucan Silangan, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008302",
        "hgabTitle": "Improvement of Road, Barangay Pinamucan Silangan, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Pinamucan Silangan, Batangas City",
      "source_code": "2027DPWH-Proposal-36161",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Road, Brgy. Pinamucan Silangan, Batangas City, Batangas",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050304968",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36161",
        "nepTitle": "Improvement of Road, Barangay Pinamucan Silangan, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008302",
        "hgabTitle": "Improvement of Road, Barangay Pinamucan Silangan, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Pinamucan Silangan, Batangas City",
      "source_code": "2027DPWH-Proposal-36161",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting/Rehabilitation of Road, Brgy. Pinamucan Silangan, Batangas City, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203465000 · PDF p. 1281 · printed p. 2746",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36161",
        "nepTitle": "Improvement of Road, Barangay Pinamucan Silangan, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008302",
        "hgabTitle": "Improvement of Road, Barangay Pinamucan Silangan, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay San Miguel, Batangas City",
      "source_code": "2027DPWH-Proposal-36162",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction/Rehabilitation of Road, Brgy. San Miguel, Batangas City, Batangas",
      "prior_amount": 2500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499380",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36162",
        "nepTitle": "Improvement of Road, Barangay San Miguel, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008303",
        "hgabTitle": "Improvement of Road, Barangay San Miguel, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay San Miguel, Batangas City",
      "source_code": "2027DPWH-Proposal-36162",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Brgy. San Miguel, Batangas City",
      "prior_amount": 15000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552022",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36162",
        "nepTitle": "Improvement of Road, Barangay San Miguel, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008303",
        "hgabTitle": "Improvement of Road, Barangay San Miguel, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay San Miguel, Batangas City",
      "source_code": "2027DPWH-Proposal-36162",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Construction/Rehabilitation of Road, Brgy. San Miguel, Batangas City",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201012000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36162",
        "nepTitle": "Improvement of Road, Barangay San Miguel, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008303",
        "hgabTitle": "Improvement of Road, Barangay San Miguel, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Talumpok Kanluran, Batangas City",
      "source_code": "2027DPWH-Proposal-36316",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Barangay Talumpok Kanluran, Batangas City, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428248",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36316",
        "nepTitle": "Improvement of Road, Barangay Talumpok Kanluran, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Talumpok Kanluran, Batangas City",
      "source_code": "2027DPWH-Proposal-36316",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Road, Talumpok Kanluran, Batangas City",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201001000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36316",
        "nepTitle": "Improvement of Road, Barangay Talumpok Kanluran, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Talumpok Kanluran, Batangas City",
      "source_code": "2027DPWH-Proposal-36316",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting/Rehabilitation of Road, Brgy. Talumpok Kanluran, Batangas City, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203472000 · PDF p. 1282 · printed p. 2747",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36316",
        "nepTitle": "Improvement of Road, Barangay Talumpok Kanluran, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
      "source_code": "2027DPWH-Proposal-36163",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction/Rehabilitation of Road, Brgy. Talumpok Silangan, Batangas City, Batangas",
      "prior_amount": 10000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499361",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36163",
        "nepTitle": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008305",
        "hgabTitle": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
      "source_code": "2027DPWH-Proposal-36163",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Road, Brgy. Talumpok Silangan, Batangas City, Batangas",
      "prior_amount": 7700000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 426633",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36163",
        "nepTitle": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008305",
        "hgabTitle": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
      "source_code": "2027DPWH-Proposal-36163",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Concreting of Barangay Road, Talumpok Silangan, Batangas City, Batangas",
      "prior_amount": 35000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540467",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36163",
        "nepTitle": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008305",
        "hgabTitle": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
      "source_code": "2027DPWH-Proposal-36163",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2016,
      "prior_project": "Construction of Road, Barangay Talumpok Silangan, Batangas City",
      "prior_amount": 2000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050304942",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36163",
        "nepTitle": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008305",
        "hgabTitle": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
      "source_code": "2027DPWH-Proposal-36163",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Road, Barangay Talumpok Silangan, Batangas City",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050304942",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36163",
        "nepTitle": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008305",
        "hgabTitle": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
      "source_code": "2027DPWH-Proposal-36163",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Construction/Rehabilitation of Road, Brgy. Talumpok Silangan, Batangas City",
      "prior_amount": 20000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201018000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36163",
        "nepTitle": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008305",
        "hgabTitle": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
      "source_code": "2027DPWH-Proposal-36163",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting/Rehabilitation of Road, Brgy. Talumpok Silangan, Batangas City, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203473000 · PDF p. 1282 · printed p. 2747",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36163",
        "nepTitle": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008305",
        "hgabTitle": "Improvement of Road, Barangay Talumpok Silangan, Batangas City",
        "hgabPesos": 10000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Roads at Barangay Lagro, Quezon City",
      "source_code": "2027DPWH-Proposal-02355",
      "office": "Quezon City 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Improvement of Roads at Barangay Lagro, Quezon City",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574001",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02355",
        "nepTitle": "Improvement of Roads at Barangay Lagro, Quezon City",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0458-006581",
        "hgabTitle": "Improvement of Roads at Barangay Lagro, Quezon City",
        "hgabPesos": 30000000,
        "nepPage": "462",
        "hgabPage": "458",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Tubod-Bitoon - Kanghumaod Road at Barangay Tubod- Bitoon, Dumanjug, Cebu",
      "source_code": "2027DPWH-Proposal-37670",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 12000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Tubod-Bitoon-Kanghumaod Road, Brgy. Tubod, Bitoon & Kanghumaod, Dumanjug, Cebu",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 492837",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37670",
        "nepTitle": "Improvement of Tubod-Bitoon - Kanghumaod Road at Barangay Tubod- Bitoon, Dumanjug, Cebu",
        "nepPesos": 12000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0590-009444",
        "hgabTitle": "Improvement of Tubod-Bitoon - Kanghumaod Road at Barangay Tubod- Bitoon, Dumanjug, Cebu",
        "hgabPesos": 12000000,
        "nepPage": "539",
        "hgabPage": "590",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Tubod-Bitoon - Kanghumaod Road at Barangay Tubod- Bitoon, Dumanjug, Cebu",
      "source_code": "2027DPWH-Proposal-37670",
      "office": "Cebu 7th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 12000000,
      "comparison_year": 2024,
      "prior_project": "Improvement of Kanghumaod - Tubod - Bitoon Road at Barangay Kanghumaod and Tubod - Bitoon, Dumanjug, Cebu",
      "prior_amount": 7500000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552770",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37670",
        "nepTitle": "Improvement of Tubod-Bitoon - Kanghumaod Road at Barangay Tubod- Bitoon, Dumanjug, Cebu",
        "nepPesos": 12000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0590-009444",
        "hgabTitle": "Improvement of Tubod-Bitoon - Kanghumaod Road at Barangay Tubod- Bitoon, Dumanjug, Cebu",
        "hgabPesos": 12000000,
        "nepPage": "539",
        "hgabPage": "590",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Inayagan-Cantao-an Road leading to Naga Valley (NAVA) Industrial Park, Naga City, Cebu",
      "source_code": "2027DPWH-Proposal-33471",
      "office": "Cebu 1st District Engineering Office",
      "region": "Region VII",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Inayagan-Cantao-an Road leading to Naga Valley (NAVA) Industrial Park, Sta. 0+000 - Sta. 1+190, Naga City, Cebu",
      "prior_amount": 36822000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 16966",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–1+190.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33471",
        "nepTitle": "Inayagan-Cantao-an Road leading to Naga Valley (NAVA) Industrial Park, Naga City, Cebu",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0435-006160",
        "hgabTitle": "Inayagan-Cantao-an Road leading to Naga Valley (NAVA) Industrial Park, Naga City, Cebu",
        "hgabPesos": 20000000,
        "nepPage": "447",
        "hgabPage": "435",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Infanta Bypass Road, Sta. 0+000 - Sta. 2+468.15, Infanta, Quezon",
      "source_code": "2027DPWH-Proposal-20532",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 268862000,
      "comparison_year": 2023,
      "prior_project": "Infanta Bypass Road, Quezon",
      "prior_amount": 55000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566703",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–2+468.15",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20532",
        "nepTitle": "Infanta Bypass Road, Sta. 0+000 - Sta. 2+468.15, Infanta, Quezon",
        "nepPesos": 268862000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0219-001988",
        "hgabTitle": "Infanta Bypass Road, Sta. 0+000 - Sta. 1+380, Infanta, Quezon",
        "hgabPesos": 100000000,
        "nepPage": "280",
        "hgabPage": "219",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Infanta Bypass Road, Sta. 0+000 - Sta. 2+468.15, Infanta, Quezon",
      "source_code": "2027DPWH-Proposal-20532",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 268862000,
      "comparison_year": 2019,
      "prior_project": "Infanta Bypass Road, Quezon",
      "prior_amount": 50000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100632000 · PDF p. 201 · printed p. 1666",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–2+468.15",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20532",
        "nepTitle": "Infanta Bypass Road, Sta. 0+000 - Sta. 2+468.15, Infanta, Quezon",
        "nepPesos": 268862000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0219-001988",
        "hgabTitle": "Infanta Bypass Road, Sta. 0+000 - Sta. 1+380, Infanta, Quezon",
        "hgabPesos": 100000000,
        "nepPage": "280",
        "hgabPage": "219",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
      "source_code": "2027DPWH-Proposal-20676",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 120000000,
      "comparison_year": 2021,
      "prior_project": "Iriga City Rapid Exit Bypass Road, Camarines Sur",
      "prior_amount": 15000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436941",
      "similarity_pct": 100,
      "current_chainage": "1+660.00–2+441.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20676",
        "nepTitle": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
        "nepPesos": 120000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002031",
        "hgabTitle": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
        "hgabPesos": 120000000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
      "source_code": "2027DPWH-Proposal-20676",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 120000000,
      "comparison_year": 2022,
      "prior_project": "Iriga City Rapid Exit Bypass Road, Camarines Sur",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547156",
      "similarity_pct": 100,
      "current_chainage": "1+660.00–2+441.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20676",
        "nepTitle": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
        "nepPesos": 120000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002031",
        "hgabTitle": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
        "hgabPesos": 120000000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
      "source_code": "2027DPWH-Proposal-20676",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 120000000,
      "comparison_year": 2023,
      "prior_project": "Iriga City Rapid Exit Bypass Road, Camarines Sur",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566034",
      "similarity_pct": 100,
      "current_chainage": "1+660.00–2+441.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20676",
        "nepTitle": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
        "nepPesos": 120000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002031",
        "hgabTitle": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
        "hgabPesos": 120000000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
      "source_code": "2027DPWH-Proposal-20676",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 120000000,
      "comparison_year": 2024,
      "prior_project": "Iriga City Rapid Exit Bypass Road, Camarines Sur",
      "prior_amount": 110000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 594393",
      "similarity_pct": 100,
      "current_chainage": "1+660.00–2+441.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20676",
        "nepTitle": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
        "nepPesos": 120000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002031",
        "hgabTitle": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
        "hgabPesos": 120000000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
      "source_code": "2027DPWH-Proposal-20676",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 120000000,
      "comparison_year": 2025,
      "prior_project": "Iriga City Rapid Exit Bypass Road, Camarines Sur",
      "prior_amount": 85000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631885",
      "similarity_pct": 100,
      "current_chainage": "1+660.00–2+441.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20676",
        "nepTitle": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
        "nepPesos": 120000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002031",
        "hgabTitle": "Iriga City Rapid Exit Bypass Road, Iriga City, Sta. 1+660.00 - Sta. 2+441.00, Camarines Sur",
        "hgabPesos": 120000000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet",
      "source_code": "2027DPWH-Proposal-20286",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 195000000,
      "comparison_year": 2022,
      "prior_project": "Itogon-Dalupirip-San Nicolas Road, Itogon, Benguet",
      "prior_amount": 200000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548520",
      "similarity_pct": 100,
      "current_chainage": "7+771.00–7+893.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20286",
        "nepTitle": "Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet",
        "nepPesos": 195000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002268",
        "hgabTitle": "Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet",
        "hgabPesos": 195000000,
        "nepPage": "295",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet",
      "source_code": "2027DPWH-Proposal-20286",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 195000000,
      "comparison_year": 2023,
      "prior_project": "Itogon - Dalupirip - San Nicolas Road, Itogon, Benguet",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 567888",
      "similarity_pct": 100,
      "current_chainage": "7+771.00–7+893.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20286",
        "nepTitle": "Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet",
        "nepPesos": 195000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002268",
        "hgabTitle": "Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet",
        "hgabPesos": 195000000,
        "nepPage": "295",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet",
      "source_code": "2027DPWH-Proposal-20286",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 195000000,
      "comparison_year": 2024,
      "prior_project": "Itogon - Dalupirip - San Nicolas Road, Itogon, Benguet",
      "prior_amount": 13503000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597238",
      "similarity_pct": 100,
      "current_chainage": "7+771.00–7+893.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20286",
        "nepTitle": "Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet",
        "nepPesos": 195000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002268",
        "hgabTitle": "Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet",
        "hgabPesos": 195000000,
        "nepPage": "295",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet",
      "source_code": "2027DPWH-Proposal-20286",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 195000000,
      "comparison_year": 2025,
      "prior_project": "Itogon-Dalupirip-San Nicolas Road, Itogon, Benguet",
      "prior_amount": 113660000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633578",
      "similarity_pct": 100,
      "current_chainage": "7+771.00–7+893.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20286",
        "nepTitle": "Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet",
        "nepPesos": 195000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002268",
        "hgabTitle": "Itogon-Dalupirip-San Nicolas Road - Sta. 7+771 - Sta. 7+893, Benguet",
        "hgabPesos": 195000000,
        "nepPage": "295",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
      "source_code": "2027DPWH-Proposal-20278",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 100000000,
      "comparison_year": 2022,
      "prior_project": "Itogon-Dalupirip-San Nicolas Road, Itogon, Benguet",
      "prior_amount": 200000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548520",
      "similarity_pct": 100,
      "current_chainage": "4+995.00–6+795.00 · 7+893.00–12+093.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20278",
        "nepTitle": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002269",
        "hgabTitle": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
        "hgabPesos": 100000000,
        "nepPage": "295",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
      "source_code": "2027DPWH-Proposal-20278",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Itogon - Dalupirip - San Nicolas Road, Itogon, Benguet",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 567888",
      "similarity_pct": 100,
      "current_chainage": "4+995.00–6+795.00 · 7+893.00–12+093.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20278",
        "nepTitle": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002269",
        "hgabTitle": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
        "hgabPesos": 100000000,
        "nepPage": "295",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
      "source_code": "2027DPWH-Proposal-20278",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 100000000,
      "comparison_year": 2024,
      "prior_project": "Itogon - Dalupirip - San Nicolas Road, Itogon, Benguet",
      "prior_amount": 13503000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597238",
      "similarity_pct": 100,
      "current_chainage": "4+995.00–6+795.00 · 7+893.00–12+093.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20278",
        "nepTitle": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002269",
        "hgabTitle": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
        "hgabPesos": 100000000,
        "nepPage": "295",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
      "source_code": "2027DPWH-Proposal-20278",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Itogon-Dalupirip-San Nicolas Road, Itogon, Benguet",
      "prior_amount": 113660000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633578",
      "similarity_pct": 100,
      "current_chainage": "4+995.00–6+795.00 · 7+893.00–12+093.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20278",
        "nepTitle": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002269",
        "hgabTitle": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
        "hgabPesos": 100000000,
        "nepPage": "295",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
      "source_code": "2027DPWH-Proposal-20278",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 100000000,
      "comparison_year": 2026,
      "prior_project": "Itogon-Dalupirip-San Nicolas Road - Sta. 6+108 - Sta. 6+795, Sta. 6+941 - Sta. 7+437, Sta. 7+714 - Sta. 7+771, Itogon, Benguet",
      "prior_amount": 46920000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 13053",
      "similarity_pct": 100,
      "current_chainage": "4+995.00–6+795.00 · 7+893.00–12+093.00",
      "prior_chainage": "6+108.00–6+795.00 · 6+941.00–7+437.00 · 7+714.00–7+771.00",
      "chainage_overlap": "6+108.00–6+795.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20278",
        "nepTitle": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002269",
        "hgabTitle": "Itogon-Dalupirip-San Nicolas Road, Sta. 4+995 - Sta. 6+795, Sta. 7+893 - Sta. 12+093, Itogon, Benguet",
        "hgabPesos": 100000000,
        "nepPage": "295",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
      "source_code": "2027DPWH-Proposal-20544",
      "office": "Rizal 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2024,
      "prior_project": "Jct Batasan - Sn Mateo - Rodriguez Bypass Link Road, Rizal",
      "prior_amount": 150000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595541",
      "similarity_pct": 100,
      "current_chainage": "24+400.00–24+700.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20544",
        "nepTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0231-002206",
        "hgabTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
        "hgabPesos": 50000000,
        "nepPage": "291",
        "hgabPage": "231",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
      "source_code": "2027DPWH-Proposal-20544",
      "office": "Rizal 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Rizal",
      "prior_amount": 150000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631839",
      "similarity_pct": 100,
      "current_chainage": "24+400.00–24+700.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20544",
        "nepTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0231-002206",
        "hgabTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
        "hgabPesos": 50000000,
        "nepPage": "291",
        "hgabPage": "231",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
      "source_code": "2027DPWH-Proposal-20545",
      "office": "Rizal 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2024,
      "prior_project": "Jct Batasan - Sn Mateo - Rodriguez Bypass Link Road, Rizal",
      "prior_amount": 150000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595541",
      "similarity_pct": 100,
      "current_chainage": "27+700.00–28+500.00 · 30+450.00–30+620.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20545",
        "nepTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0219-001989",
        "hgabTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
        "hgabPesos": 100000000,
        "nepPage": "280",
        "hgabPage": "219",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
      "source_code": "2027DPWH-Proposal-20545",
      "office": "Rizal 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Rizal",
      "prior_amount": 150000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631839",
      "similarity_pct": 100,
      "current_chainage": "27+700.00–28+500.00 · 30+450.00–30+620.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20545",
        "nepTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0219-001989",
        "hgabTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
        "hgabPesos": 100000000,
        "nepPage": "280",
        "hgabPage": "219",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-20305",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 215000000,
      "comparison_year": 2020,
      "prior_project": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Nueva Era, Ilocos Norte",
      "prior_amount": 15000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 513086",
      "similarity_pct": 100,
      "current_chainage": "563+690.60–574+435.60",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20305",
        "nepTitle": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
        "nepPesos": 215000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002253",
        "hgabTitle": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
        "hgabPesos": 215000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "incomplete",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-20305",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 215000000,
      "comparison_year": 2022,
      "prior_project": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Nueva Era, Ilocos Norte",
      "prior_amount": 45000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548498",
      "similarity_pct": 100,
      "current_chainage": "563+690.60–574+435.60",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20305",
        "nepTitle": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
        "nepPesos": 215000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002253",
        "hgabTitle": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
        "hgabPesos": 215000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "incomplete",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-20305",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 215000000,
      "comparison_year": 2024,
      "prior_project": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Nueva Era, Ilocos Norte",
      "prior_amount": 15000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597082",
      "similarity_pct": 100,
      "current_chainage": "563+690.60–574+435.60",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20305",
        "nepTitle": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
        "nepPesos": 215000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002253",
        "hgabTitle": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
        "hgabPesos": 215000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "incomplete",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-20305",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 215000000,
      "comparison_year": 2025,
      "prior_project": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Nueva Era, Ilocos Norte",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633366",
      "similarity_pct": 100,
      "current_chainage": "563+690.60–574+435.60",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20305",
        "nepTitle": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
        "nepPesos": 215000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002253",
        "hgabTitle": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
        "hgabPesos": 215000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "incomplete",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-20305",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 215000000,
      "comparison_year": 2019,
      "prior_project": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Ilocos Norte",
      "prior_amount": 30000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310205100214000 · PDF p. 203 · printed p. 1668",
      "similarity_pct": 100,
      "current_chainage": "563+690.60–574+435.60",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20305",
        "nepTitle": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
        "nepPesos": 215000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002253",
        "hgabTitle": "Jct Ilocos Norte Abra Road - Nueva Era - Tineg Road, Sta. 563+690.6 Sta. 574+435.6 Nueva Era, Ilocos Norte",
        "hgabPesos": 215000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "incomplete",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
      "source_code": "2027DPWH-Proposal-18785",
      "office": "Quezon City 2nd District Engineering Office",
      "region": "NCR",
      "amount_2027": 38000000,
      "comparison_year": 2020,
      "prior_project": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
      "prior_amount": 15000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 515313",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-18785",
        "nepTitle": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
        "nepPesos": 38000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0267-002831",
        "hgabTitle": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
        "hgabPesos": 38000000,
        "nepPage": "321",
        "hgabPage": "267",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
      "source_code": "2027DPWH-Proposal-18785",
      "office": "Quezon City 2nd District Engineering Office",
      "region": "NCR",
      "amount_2027": 38000000,
      "comparison_year": 2021,
      "prior_project": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
      "prior_amount": 15000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 438116",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-18785",
        "nepTitle": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
        "nepPesos": 38000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0267-002831",
        "hgabTitle": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
        "hgabPesos": 38000000,
        "nepPage": "321",
        "hgabPage": "267",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
      "source_code": "2027DPWH-Proposal-18785",
      "office": "Quezon City 2nd District Engineering Office",
      "region": "NCR",
      "amount_2027": 38000000,
      "comparison_year": 2022,
      "prior_project": "Katipunan Viaduct (SB) (B03323LZ) along C - 5 Road",
      "prior_amount": 20000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 552668",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-18785",
        "nepTitle": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
        "nepPesos": 38000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0267-002831",
        "hgabTitle": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
        "hgabPesos": 38000000,
        "nepPage": "321",
        "hgabPage": "267",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
      "source_code": "2027DPWH-Proposal-18785",
      "office": "Quezon City 2nd District Engineering Office",
      "region": "NCR",
      "amount_2027": 38000000,
      "comparison_year": 2025,
      "prior_project": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
      "prior_amount": 75000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 640121",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-18785",
        "nepTitle": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
        "nepPesos": 38000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0267-002831",
        "hgabTitle": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
        "hgabPesos": 38000000,
        "nepPage": "321",
        "hgabPage": "267",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
      "source_code": "2027DPWH-Proposal-18785",
      "office": "Quezon City 2nd District Engineering Office",
      "region": "NCR",
      "amount_2027": 38000000,
      "comparison_year": 2017,
      "prior_project": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
      "prior_amount": 5000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003016200541",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-18785",
        "nepTitle": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
        "nepPesos": 38000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0267-002831",
        "hgabTitle": "Katipunan Viaduct (SB) (B03323LZ) along C-5 Road",
        "hgabPesos": 38000000,
        "nepPage": "321",
        "hgabPage": "267",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City",
      "source_code": "2027DPWH-Proposal-32753",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 22000000,
      "comparison_year": 2022,
      "prior_project": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Baguio City",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547542",
      "similarity_pct": 100,
      "current_chainage": "1+594.00–2+012.19",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32753",
        "nepTitle": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City",
        "nepPesos": 22000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002185",
        "hgabTitle": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City",
        "hgabPesos": 22000000,
        "nepPage": "290",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City",
      "source_code": "2027DPWH-Proposal-32753",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 22000000,
      "comparison_year": 2023,
      "prior_project": "Kennon Road to Military Cut - off Road And Loakan Road Bypass Road, Baguio City",
      "prior_amount": 25000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566420",
      "similarity_pct": 100,
      "current_chainage": "1+594.00–2+012.19",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32753",
        "nepTitle": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City",
        "nepPesos": 22000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002185",
        "hgabTitle": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City",
        "hgabPesos": 22000000,
        "nepPage": "290",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City",
      "source_code": "2027DPWH-Proposal-32753",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 22000000,
      "comparison_year": 2024,
      "prior_project": "Kennon Road to Military Cut - off Road And Loakan Road Bypass Road, Baguio City",
      "prior_amount": 25000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595843",
      "similarity_pct": 100,
      "current_chainage": "1+594.00–2+012.19",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32753",
        "nepTitle": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City",
        "nepPesos": 22000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002185",
        "hgabTitle": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City",
        "hgabPesos": 22000000,
        "nepPage": "290",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City",
      "source_code": "2027DPWH-Proposal-32753",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 22000000,
      "comparison_year": 2025,
      "prior_project": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Baguio City",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 632119",
      "similarity_pct": 100,
      "current_chainage": "1+594.00–2+012.19",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32753",
        "nepTitle": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City",
        "nepPesos": 22000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002185",
        "hgabTitle": "Kennon Road to Military Cut-off Road And Loakan Road Bypass Road, Sta. 1+594 - Sta. 2+012.19, Baguio City",
        "hgabPesos": 22000000,
        "nepPage": "290",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao",
      "source_code": "2027DPWH-Proposal-20495",
      "office": "Ifugao 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 16845000,
      "comparison_year": 2021,
      "prior_project": "Kiangan-Asipulo-Ambaguio - Bayombong Road, Ifugao",
      "prior_amount": 50000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437279",
      "similarity_pct": 100,
      "current_chainage": "32+514.00–32+551.21",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20495",
        "nepTitle": "Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao",
        "nepPesos": 16845000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0241-002396",
        "hgabTitle": "Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao",
        "hgabPesos": 16845000,
        "nepPage": "301",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao",
      "source_code": "2027DPWH-Proposal-20495",
      "office": "Ifugao 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 16845000,
      "comparison_year": 2023,
      "prior_project": "Kiangan-Asipulo-Ambaguio-Bayombong Road, Ifugao",
      "prior_amount": 139744000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568089",
      "similarity_pct": 100,
      "current_chainage": "32+514.00–32+551.21",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20495",
        "nepTitle": "Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao",
        "nepPesos": 16845000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0241-002396",
        "hgabTitle": "Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao",
        "hgabPesos": 16845000,
        "nepPage": "301",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao",
      "source_code": "2027DPWH-Proposal-20495",
      "office": "Ifugao 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 16845000,
      "comparison_year": 2024,
      "prior_project": "Kiangan - Asipulo - Ambaguio - Bayombong Road, Ifugao",
      "prior_amount": 22167000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 596908",
      "similarity_pct": 100,
      "current_chainage": "32+514.00–32+551.21",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20495",
        "nepTitle": "Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao",
        "nepPesos": 16845000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0241-002396",
        "hgabTitle": "Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao",
        "hgabPesos": 16845000,
        "nepPage": "301",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao",
      "source_code": "2027DPWH-Proposal-20495",
      "office": "Ifugao 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 16845000,
      "comparison_year": 2025,
      "prior_project": "Kiangan-Asipulo-Ambaguio-Bayombong Road, Ifugao",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633707",
      "similarity_pct": 100,
      "current_chainage": "32+514.00–32+551.21",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20495",
        "nepTitle": "Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao",
        "nepPesos": 16845000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0241-002396",
        "hgabTitle": "Kiangan-Asipulo-Ambaguio-Bayombong Road - Sta. 32+514 - Sta. 32+551.21, Ifugao",
        "hgabPesos": 16845000,
        "nepPage": "301",
        "hgabPage": "241",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
      "source_code": "2027DPWH-Proposal-20359",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 105000000,
      "comparison_year": 2020,
      "prior_project": "Labangan-Midsalip Road, Zamboanga Del Sur",
      "prior_amount": 105000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512988",
      "similarity_pct": 100,
      "current_chainage": "25+610.00–28+610.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20359",
        "nepTitle": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
        "nepPesos": 105000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0239-002356",
        "hgabTitle": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
        "hgabPesos": 105000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
      "source_code": "2027DPWH-Proposal-20359",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 105000000,
      "comparison_year": 2021,
      "prior_project": "Labangan-Midsalip Road, Zamboanga Del Sur",
      "prior_amount": 102000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437219",
      "similarity_pct": 100,
      "current_chainage": "25+610.00–28+610.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20359",
        "nepTitle": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
        "nepPesos": 105000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0239-002356",
        "hgabTitle": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
        "hgabPesos": 105000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
      "source_code": "2027DPWH-Proposal-20359",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 105000000,
      "comparison_year": 2023,
      "prior_project": "Labangan-Midsalip Road, Zamboanga del Sur",
      "prior_amount": 30000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568161",
      "similarity_pct": 100,
      "current_chainage": "25+610.00–28+610.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20359",
        "nepTitle": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
        "nepPesos": 105000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0239-002356",
        "hgabTitle": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
        "hgabPesos": 105000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
      "source_code": "2027DPWH-Proposal-20359",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 105000000,
      "comparison_year": 2017,
      "prior_project": "Labangan-Midsalip Road, Zamboanga del Sur",
      "prior_amount": 150000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015400175",
      "similarity_pct": 100,
      "current_chainage": "25+610.00–28+610.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20359",
        "nepTitle": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
        "nepPesos": 105000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0239-002356",
        "hgabTitle": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
        "hgabPesos": 105000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
      "source_code": "2027DPWH-Proposal-20359",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 105000000,
      "comparison_year": 2019,
      "prior_project": "Labangan-Midsalip Road, Zamboanga Del Sur",
      "prior_amount": 60000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310205100264000 · PDF p. 206 · printed p. 1671",
      "similarity_pct": 100,
      "current_chainage": "25+610.00–28+610.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20359",
        "nepTitle": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
        "nepPesos": 105000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0239-002356",
        "hgabTitle": "Labangan-Midsalip Road, Labangan, Zamboanga del Sur Sta 25+610 - Sta 28+610",
        "hgabPesos": 105000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20763",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 180000000,
      "comparison_year": 2021,
      "prior_project": "Lanuza- Tandag Bypass Road (SDCR Alternate Route), Surigao del Sur",
      "prior_amount": 105000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436872",
      "similarity_pct": 100,
      "current_chainage": "17+580.90–17+581.49",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20763",
        "nepTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
        "nepPesos": 180000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002172",
        "hgabTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
        "hgabPesos": 180000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20763",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 180000000,
      "comparison_year": 2022,
      "prior_project": "Lanuza- Tandag Bypass Road (SDCR Alternate Route),Surigao del Sur",
      "prior_amount": 102000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547534",
      "similarity_pct": 100,
      "current_chainage": "17+580.90–17+581.49",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20763",
        "nepTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
        "nepPesos": 180000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002172",
        "hgabTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
        "hgabPesos": 180000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20763",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 180000000,
      "comparison_year": 2023,
      "prior_project": "Lanuza- Tandag Bypass Road (SDCR Alternate Route),Surigao del Sur",
      "prior_amount": 101000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566981",
      "similarity_pct": 100,
      "current_chainage": "17+580.90–17+581.49",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20763",
        "nepTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
        "nepPesos": 180000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002172",
        "hgabTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
        "hgabPesos": 180000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20763",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 180000000,
      "comparison_year": 2024,
      "prior_project": "Lanuza - Tandag Bypass Road ( SDCR Alternate Route ) , Surigao del Sur",
      "prior_amount": 152892000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595827",
      "similarity_pct": 100,
      "current_chainage": "17+580.90–17+581.49",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20763",
        "nepTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
        "nepPesos": 180000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002172",
        "hgabTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
        "hgabPesos": 180000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20763",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 180000000,
      "comparison_year": 2025,
      "prior_project": "Lanuza- Tandag Bypass Road (SDCR Alternate Route),Surigao del Sur",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 632114",
      "similarity_pct": 100,
      "current_chainage": "17+580.90–17+581.49",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20763",
        "nepTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
        "nepPesos": 180000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002172",
        "hgabTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
        "hgabPesos": 180000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
      "source_code": "2027DPWH-Proposal-31731",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 101240000,
      "comparison_year": 2020,
      "prior_project": "Laoag-San Nicolas Bypass Road (Laoag City Section), Ilocos Norte",
      "prior_amount": 31242000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512404",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31731",
        "nepTitle": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
        "nepPesos": 101240000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001883",
        "hgabTitle": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
        "hgabPesos": 101240000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
      "source_code": "2027DPWH-Proposal-31731",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 101240000,
      "comparison_year": 2021,
      "prior_project": "Laoag-San Nicolas Bypass Road (Laoag City Section), Ilocos Norte",
      "prior_amount": 6873000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436468",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31731",
        "nepTitle": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
        "nepPesos": 101240000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001883",
        "hgabTitle": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
        "hgabPesos": 101240000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
      "source_code": "2027DPWH-Proposal-31731",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 101240000,
      "comparison_year": 2022,
      "prior_project": "Laoag - San Nicolas Bypass Road (San Nicolas Section), Ilocos Norte",
      "prior_amount": 350000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 546488",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31731",
        "nepTitle": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
        "nepPesos": 101240000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001883",
        "hgabTitle": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
        "hgabPesos": 101240000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
      "source_code": "2027DPWH-Proposal-31731",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 101240000,
      "comparison_year": 2023,
      "prior_project": "Laoag-San Nicolas Bypass Road (San Nicolas Section), Ilocos Norte",
      "prior_amount": 300000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566620",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31731",
        "nepTitle": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
        "nepPesos": 101240000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001883",
        "hgabTitle": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
        "hgabPesos": 101240000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
      "source_code": "2027DPWH-Proposal-31731",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 101240000,
      "comparison_year": 2024,
      "prior_project": "Laoag - San Nicolas Bypass Road ( San Nicolas Section ) , Ilocos Norte",
      "prior_amount": 285000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 594979",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31731",
        "nepTitle": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
        "nepPesos": 101240000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001883",
        "hgabTitle": "Laoag-San Nicolas Bypass Road, (San Nicolas Section), Ilocos Norte",
        "hgabPesos": 101240000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
      "source_code": "2027DPWH-Proposal-23974",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 120000000,
      "comparison_year": 2020,
      "prior_project": "Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur",
      "prior_amount": 129660000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512330",
      "similarity_pct": 100,
      "current_chainage": "3+143.24–4+214.34",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23974",
        "nepTitle": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
        "nepPesos": 120000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002174",
        "hgabTitle": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
        "hgabPesos": 120000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
      "source_code": "2027DPWH-Proposal-23974",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 120000000,
      "comparison_year": 2021,
      "prior_project": "Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur",
      "prior_amount": 105000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436873",
      "similarity_pct": 100,
      "current_chainage": "3+143.24–4+214.34",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23974",
        "nepTitle": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
        "nepPesos": 120000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002174",
        "hgabTitle": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
        "hgabPesos": 120000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
      "source_code": "2027DPWH-Proposal-23974",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 120000000,
      "comparison_year": 2022,
      "prior_project": "Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur",
      "prior_amount": 100000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547088",
      "similarity_pct": 100,
      "current_chainage": "3+143.24–4+214.34",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23974",
        "nepTitle": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
        "nepPesos": 120000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002174",
        "hgabTitle": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
        "hgabPesos": 120000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
      "source_code": "2027DPWH-Proposal-23974",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 120000000,
      "comparison_year": 2023,
      "prior_project": "Lianga Coastal Bypass Road (SDCR Alternate Route), Lianga, Surigao del Sur",
      "prior_amount": 101000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566982",
      "similarity_pct": 100,
      "current_chainage": "3+143.24–4+214.34",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23974",
        "nepTitle": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
        "nepPesos": 120000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002174",
        "hgabTitle": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
        "hgabPesos": 120000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
      "source_code": "2027DPWH-Proposal-23974",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 120000000,
      "comparison_year": 2024,
      "prior_project": "Lianga Coastal Bypass Road ( SDCR Alternate Route ) , Surigao del Sur",
      "prior_amount": 53280000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595828",
      "similarity_pct": 100,
      "current_chainage": "3+143.24–4+214.34",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23974",
        "nepTitle": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
        "nepPesos": 120000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002174",
        "hgabTitle": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
        "hgabPesos": 120000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
      "source_code": "2027DPWH-Proposal-23974",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 120000000,
      "comparison_year": 2025,
      "prior_project": "Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur",
      "prior_amount": 35000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 632115",
      "similarity_pct": 100,
      "current_chainage": "3+143.24–4+214.34",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23974",
        "nepTitle": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
        "nepPesos": 120000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002174",
        "hgabTitle": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
        "hgabPesos": 120000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
      "source_code": "2027DPWH-Proposal-23974",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 120000000,
      "comparison_year": 2019,
      "prior_project": "Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur",
      "prior_amount": 55375000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100602000 · PDF p. 199 · printed p. 1664",
      "similarity_pct": 100,
      "current_chainage": "3+143.24–4+214.34",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23974",
        "nepTitle": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
        "nepPesos": 120000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002174",
        "hgabTitle": "Lianga Coastal Bypass Road (SDCR Alternate Route), Sta. 3+143.239 - Sta. 4+214.34 Surigao del Sur",
        "hgabPesos": 120000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lingayen Baywalk-Bonuan Road, Pangasinan",
      "source_code": "2027DPWH-Proposal-20649",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 250000000,
      "comparison_year": 2022,
      "prior_project": "Lingayen Baywalk-Bonuan Road, Pangasinan",
      "prior_amount": 70000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547274",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20649",
        "nepTitle": "Lingayen Baywalk-Bonuan Road, Pangasinan",
        "nepPesos": 250000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001885",
        "hgabTitle": "Lingayen Baywalk-Bonuan Road, Pangasinan",
        "hgabPesos": 250000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lingayen Baywalk-Bonuan Road, Pangasinan",
      "source_code": "2027DPWH-Proposal-20649",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 250000000,
      "comparison_year": 2023,
      "prior_project": "Lingayen Baywalk - Bonuan Road, Pangasinan",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566152",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20649",
        "nepTitle": "Lingayen Baywalk-Bonuan Road, Pangasinan",
        "nepPesos": 250000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001885",
        "hgabTitle": "Lingayen Baywalk-Bonuan Road, Pangasinan",
        "hgabPesos": 250000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lingayen Baywalk-Bonuan Road, Pangasinan",
      "source_code": "2027DPWH-Proposal-20649",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 250000000,
      "comparison_year": 2024,
      "prior_project": "Lingayen Baywalk - Bonuan Road, Pangasinan",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595470",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20649",
        "nepTitle": "Lingayen Baywalk-Bonuan Road, Pangasinan",
        "nepPesos": 250000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001885",
        "hgabTitle": "Lingayen Baywalk-Bonuan Road, Pangasinan",
        "hgabPesos": 250000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lingayen Baywalk-Bonuan Road, Pangasinan",
      "source_code": "2027DPWH-Proposal-20649",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 250000000,
      "comparison_year": 2025,
      "prior_project": "Lingayen Baywalk-Bonuan Road, Pangasinan",
      "prior_amount": 60077000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631745",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20649",
        "nepTitle": "Lingayen Baywalk-Bonuan Road, Pangasinan",
        "nepPesos": 250000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001885",
        "hgabTitle": "Lingayen Baywalk-Bonuan Road, Pangasinan",
        "hgabPesos": 250000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lingayen Bypass Road, Pangasinan",
      "source_code": "2027DPWH-Proposal-20651",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 128155000,
      "comparison_year": 2025,
      "prior_project": "Lingayen Bypass Road, Pangasinan",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631741",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20651",
        "nepTitle": "Lingayen Bypass Road, Pangasinan",
        "nepPesos": 128155000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001886",
        "hgabTitle": "Lingayen Bypass Road, Pangasinan",
        "hgabPesos": 128155000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lipa City-Padre Garcia Diversion Road, Sta. 95+288 - Sta. 96+631.48, Batangas",
      "source_code": "2027DPWH-Proposal-20554",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 200000000,
      "comparison_year": 2018,
      "prior_project": "Lipa City-Padre Garcia Diversion Road, Batangas",
      "prior_amount": 250000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310204100319000",
      "similarity_pct": 100,
      "current_chainage": "95+288.00–96+631.48",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20554",
        "nepTitle": "Lipa City-Padre Garcia Diversion Road, Sta. 95+288 - Sta. 96+631.48, Batangas",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0219-001990",
        "hgabTitle": "Lipa City-Padre Garcia Diversion Road - Sta. 88 + 400 - Sta. 99 + 923, Batangas",
        "hgabPesos": 200000000,
        "nepPage": "280",
        "hgabPage": "219",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-20637",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 17500000,
      "comparison_year": 2022,
      "prior_project": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547616",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20637",
        "nepTitle": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
        "nepPesos": 17500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002238",
        "hgabTitle": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
        "hgabPesos": 17500000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-20637",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 17500000,
      "comparison_year": 2023,
      "prior_project": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
      "prior_amount": 40000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566494",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20637",
        "nepTitle": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
        "nepPesos": 17500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002238",
        "hgabTitle": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
        "hgabPesos": 17500000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-20637",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 17500000,
      "comparison_year": 2024,
      "prior_project": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 594853",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20637",
        "nepTitle": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
        "nepPesos": 17500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002238",
        "hgabTitle": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
        "hgabPesos": 17500000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-20637",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 17500000,
      "comparison_year": 2025,
      "prior_project": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
      "prior_amount": 60000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 630655",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20637",
        "nepTitle": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
        "nepPesos": 17500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002238",
        "hgabTitle": "Lower Baluran - Dumpoc Diversion Road, Zamboanga Sibugay",
        "hgabPesos": 17500000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Maasin Bypass Road, Sta. 0+00 - Sta. 3+316, Iloilo",
      "source_code": "2027DPWH-Proposal-32869",
      "office": "Iloilo 6th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 70484000,
      "comparison_year": 2025,
      "prior_project": "Maasin Bypass Road, Iloilo",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631913",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–3+316.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32869",
        "nepTitle": "Maasin Bypass Road, Sta. 0+00 - Sta. 3+316, Iloilo",
        "nepPesos": 70484000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0222-002051",
        "hgabTitle": "Maasin Bypass Road, Sta. 0+00 - Sta. 3+316, Iloilo",
        "hgabPesos": 70484000,
        "nepPage": "283",
        "hgabPage": "222",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz",
      "source_code": "2027DPWH-Proposal-23895",
      "office": "Capiz 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 1420000,
      "comparison_year": 2020,
      "prior_project": "Maayon By-Pass Road, Capiz",
      "prior_amount": 50000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512680",
      "similarity_pct": 100,
      "current_chainage": "0+230.00–0+365.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23895",
        "nepTitle": "Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz",
        "nepPesos": 1420000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0231-002213",
        "hgabTitle": "Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz",
        "hgabPesos": 1420000,
        "nepPage": "291",
        "hgabPage": "231",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz",
      "source_code": "2027DPWH-Proposal-23895",
      "office": "Capiz 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 1420000,
      "comparison_year": 2021,
      "prior_project": "Maayon - By-Pass Road, Capiz",
      "prior_amount": 50000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436943",
      "similarity_pct": 100,
      "current_chainage": "0+230.00–0+365.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23895",
        "nepTitle": "Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz",
        "nepPesos": 1420000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0231-002213",
        "hgabTitle": "Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz",
        "hgabPesos": 1420000,
        "nepPage": "291",
        "hgabPage": "231",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz",
      "source_code": "2027DPWH-Proposal-23895",
      "office": "Capiz 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 1420000,
      "comparison_year": 2023,
      "prior_project": "Maayon By-Pass Road, Capiz",
      "prior_amount": 75000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566771",
      "similarity_pct": 100,
      "current_chainage": "0+230.00–0+365.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23895",
        "nepTitle": "Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz",
        "nepPesos": 1420000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0231-002213",
        "hgabTitle": "Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz",
        "hgabPesos": 1420000,
        "nepPage": "291",
        "hgabPage": "231",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz",
      "source_code": "2027DPWH-Proposal-23895",
      "office": "Capiz 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 1420000,
      "comparison_year": 2025,
      "prior_project": "Maayon By-Pass Road, Capiz",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 632149",
      "similarity_pct": 100,
      "current_chainage": "0+230.00–0+365.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23895",
        "nepTitle": "Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz",
        "nepPesos": 1420000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0231-002213",
        "hgabTitle": "Maayon By-Pass Road, Sta. 0+230 - Sta.0+365, Capiz",
        "hgabPesos": 1420000,
        "nepPage": "291",
        "hgabPage": "231",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Mabolo - Almeda Bypass Road - Sta. 433+951 - Sta. 436+073.13, Camarines Sur",
      "source_code": "2027DPWH-Proposal-20955",
      "office": "Camarines Sur 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 14100000,
      "comparison_year": 2025,
      "prior_project": "Mabolo-Almeda Bypass Road, Camarines Sur",
      "prior_amount": 90000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631901",
      "similarity_pct": 100,
      "current_chainage": "433+951.00–436+073.13",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20955",
        "nepTitle": "Mabolo - Almeda Bypass Road - Sta. 433+951 - Sta. 436+073.13, Camarines Sur",
        "nepPesos": 14100000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
      "source_code": "2027DPWH-Proposal-19483",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 30000000,
      "comparison_year": 2021,
      "prior_project": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
      "prior_amount": 50000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 438081",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-19483",
        "nepTitle": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0270-002904",
        "hgabTitle": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
        "hgabPesos": 30000000,
        "nepPage": "324",
        "hgabPage": "270",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
      "source_code": "2027DPWH-Proposal-19483",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
      "prior_amount": 150000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 571938",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-19483",
        "nepTitle": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0270-002904",
        "hgabTitle": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
        "hgabPesos": 30000000,
        "nepPage": "324",
        "hgabPage": "270",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
      "source_code": "2027DPWH-Proposal-19483",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
      "prior_amount": 200000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 640211",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-19483",
        "nepTitle": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0270-002904",
        "hgabTitle": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
        "hgabPesos": 30000000,
        "nepPage": "324",
        "hgabPage": "270",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
      "source_code": "2027DPWH-Proposal-19483",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 30000000,
      "comparison_year": 2018,
      "prior_project": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
      "prior_amount": 15000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310303100383000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-19483",
        "nepTitle": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0270-002904",
        "hgabTitle": "Magsaysay Br. (B01723MN) along Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd)",
        "hgabPesos": 30000000,
        "nepPage": "324",
        "hgabPage": "270",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
      "source_code": "2027DPWH-Proposal-20513",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 15000000,
      "comparison_year": 2021,
      "prior_project": "Major Mane to Kennon Road Bypass Road, Baguio City",
      "prior_amount": 50000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436887",
      "similarity_pct": 100,
      "current_chainage": "1+917.00–2+059.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20513",
        "nepTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0229-002186",
        "hgabTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1 + 917 - Sta. 2 + 202",
        "hgabPesos": 40000000,
        "nepPage": "290",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
      "source_code": "2027DPWH-Proposal-20513",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Major Mane to Kennon Road Bypass Road, Baguio City",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547102",
      "similarity_pct": 100,
      "current_chainage": "1+917.00–2+059.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20513",
        "nepTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0229-002186",
        "hgabTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1 + 917 - Sta. 2 + 202",
        "hgabPesos": 40000000,
        "nepPage": "290",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
      "source_code": "2027DPWH-Proposal-20513",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Major Mane to Kennon Road Bypass Road, Baguio City",
      "prior_amount": 95000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566626",
      "similarity_pct": 100,
      "current_chainage": "1+917.00–2+059.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20513",
        "nepTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0229-002186",
        "hgabTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1 + 917 - Sta. 2 + 202",
        "hgabPesos": 40000000,
        "nepPage": "290",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
      "source_code": "2027DPWH-Proposal-20513",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 15000000,
      "comparison_year": 2024,
      "prior_project": "Major Mane to Kennon Road Bypass Road, Baguio City",
      "prior_amount": 95947000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 594985",
      "similarity_pct": 100,
      "current_chainage": "1+917.00–2+059.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20513",
        "nepTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0229-002186",
        "hgabTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1 + 917 - Sta. 2 + 202",
        "hgabPesos": 40000000,
        "nepPage": "290",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
      "source_code": "2027DPWH-Proposal-20513",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Major Mane to Kennon Road Bypass Road, Baguio City",
      "prior_amount": 56987000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 630787",
      "similarity_pct": 100,
      "current_chainage": "1+917.00–2+059.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20513",
        "nepTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0229-002186",
        "hgabTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1 + 917 - Sta. 2 + 202",
        "hgabPesos": 40000000,
        "nepPage": "290",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
      "source_code": "2027DPWH-Proposal-20656",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 60257000,
      "comparison_year": 2020,
      "prior_project": "Malasiqui Diversion Road, Malasiqui, Pangasinan",
      "prior_amount": 50000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512407",
      "similarity_pct": 100,
      "current_chainage": "7+680.50–8+198.74",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20656",
        "nepTitle": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
        "nepPesos": 60257000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001887",
        "hgabTitle": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
        "hgabPesos": 60257000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
      "source_code": "2027DPWH-Proposal-20656",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 60257000,
      "comparison_year": 2021,
      "prior_project": "Malasiqui Diversion Road, Pangasinan",
      "prior_amount": 80000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436596",
      "similarity_pct": 100,
      "current_chainage": "7+680.50–8+198.74",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20656",
        "nepTitle": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
        "nepPesos": 60257000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001887",
        "hgabTitle": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
        "hgabPesos": 60257000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
      "source_code": "2027DPWH-Proposal-20656",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 60257000,
      "comparison_year": 2022,
      "prior_project": "Malasiqui Diversion Road, Malasiqui, Pangasinan",
      "prior_amount": 120000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547275",
      "similarity_pct": 100,
      "current_chainage": "7+680.50–8+198.74",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20656",
        "nepTitle": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
        "nepPesos": 60257000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001887",
        "hgabTitle": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
        "hgabPesos": 60257000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
      "source_code": "2027DPWH-Proposal-20656",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 60257000,
      "comparison_year": 2023,
      "prior_project": "Malasiqui Diversion Road, Malasiqui, Pangasinan",
      "prior_amount": 127000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566153",
      "similarity_pct": 100,
      "current_chainage": "7+680.50–8+198.74",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20656",
        "nepTitle": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
        "nepPesos": 60257000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001887",
        "hgabTitle": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
        "hgabPesos": 60257000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
      "source_code": "2027DPWH-Proposal-20656",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 60257000,
      "comparison_year": 2024,
      "prior_project": "Malasiqui Diversion Road, Malasiqui, Pangasinan",
      "prior_amount": 120000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 594512",
      "similarity_pct": 100,
      "current_chainage": "7+680.50–8+198.74",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20656",
        "nepTitle": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
        "nepPesos": 60257000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001887",
        "hgabTitle": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
        "hgabPesos": 60257000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
      "source_code": "2027DPWH-Proposal-20656",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 60257000,
      "comparison_year": 2025,
      "prior_project": "Malasiqui Diversion Road, Malasiqui, Pangasinan",
      "prior_amount": 156000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 630314",
      "similarity_pct": 100,
      "current_chainage": "7+680.50–8+198.74",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20656",
        "nepTitle": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
        "nepPesos": 60257000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001887",
        "hgabTitle": "Malasiqui Diversion Road, Sta 7+680.5 - Sta 8+198.74, Malasiqui, Pangasinan",
        "hgabPesos": 60257000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malilipot Bypass Road, Sta. 1+020 - Sta. 1+363, Sta. 1+726 - Sta. 2+151, Sta. 3+097.5 - Sta. 3+183.3, Sta. 3+413.3 - Sta. 3+795.3, Sta. 3+940.3 - Sta. 4+282.3, Albay",
      "source_code": "2027DPWH-Proposal-20659",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 51190000,
      "comparison_year": 2021,
      "prior_project": "Malilipot Bypass Road , Albay",
      "prior_amount": 50000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436931",
      "similarity_pct": 100,
      "current_chainage": "1+020.00–1+363.00 · 1+726.00–2+151.00 · 3+097.50–3+183.30 · 3+413.30–3+795.30 · 3+940.30–4+282.30",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20659",
        "nepTitle": "Malilipot Bypass Road, Sta. 1+020 - Sta. 1+363, Sta. 1+726 - Sta. 2+151, Sta. 3+097.5 - Sta. 3+183.3, Sta. 3+413.3 - Sta. 3+795.3, Sta. 3+940.3 - Sta. 4+282.3, Albay",
        "nepPesos": 51190000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malilipot Bypass Road, Sta. 1+020 - Sta. 1+363, Sta. 1+726 - Sta. 2+151, Sta. 3+097.5 - Sta. 3+183.3, Sta. 3+413.3 - Sta. 3+795.3, Sta. 3+940.3 - Sta. 4+282.3, Albay",
      "source_code": "2027DPWH-Proposal-20659",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 51190000,
      "comparison_year": 2022,
      "prior_project": "Malilipot Bypass Road , Albay",
      "prior_amount": 75000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547146",
      "similarity_pct": 100,
      "current_chainage": "1+020.00–1+363.00 · 1+726.00–2+151.00 · 3+097.50–3+183.30 · 3+413.30–3+795.30 · 3+940.30–4+282.30",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20659",
        "nepTitle": "Malilipot Bypass Road, Sta. 1+020 - Sta. 1+363, Sta. 1+726 - Sta. 2+151, Sta. 3+097.5 - Sta. 3+183.3, Sta. 3+413.3 - Sta. 3+795.3, Sta. 3+940.3 - Sta. 4+282.3, Albay",
        "nepPesos": 51190000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malilipot Bypass Road, Sta. 1+020 - Sta. 1+363, Sta. 1+726 - Sta. 2+151, Sta. 3+097.5 - Sta. 3+183.3, Sta. 3+413.3 - Sta. 3+795.3, Sta. 3+940.3 - Sta. 4+282.3, Albay",
      "source_code": "2027DPWH-Proposal-20659",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 51190000,
      "comparison_year": 2023,
      "prior_project": "Malilipot Bypass Road, Albay",
      "prior_amount": 40000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 567035",
      "similarity_pct": 100,
      "current_chainage": "1+020.00–1+363.00 · 1+726.00–2+151.00 · 3+097.50–3+183.30 · 3+413.30–3+795.30 · 3+940.30–4+282.30",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20659",
        "nepTitle": "Malilipot Bypass Road, Sta. 1+020 - Sta. 1+363, Sta. 1+726 - Sta. 2+151, Sta. 3+097.5 - Sta. 3+183.3, Sta. 3+413.3 - Sta. 3+795.3, Sta. 3+940.3 - Sta. 4+282.3, Albay",
        "nepPesos": 51190000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malilipot Bypass Road, Sta. 1+020 - Sta. 1+363, Sta. 1+726 - Sta. 2+151, Sta. 3+097.5 - Sta. 3+183.3, Sta. 3+413.3 - Sta. 3+795.3, Sta. 3+940.3 - Sta. 4+282.3, Albay",
      "source_code": "2027DPWH-Proposal-20659",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 51190000,
      "comparison_year": 2024,
      "prior_project": "Malilipot Bypass Road, Albay",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595394",
      "similarity_pct": 100,
      "current_chainage": "1+020.00–1+363.00 · 1+726.00–2+151.00 · 3+097.50–3+183.30 · 3+413.30–3+795.30 · 3+940.30–4+282.30",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20659",
        "nepTitle": "Malilipot Bypass Road, Sta. 1+020 - Sta. 1+363, Sta. 1+726 - Sta. 2+151, Sta. 3+097.5 - Sta. 3+183.3, Sta. 3+413.3 - Sta. 3+795.3, Sta. 3+940.3 - Sta. 4+282.3, Albay",
        "nepPesos": 51190000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 6+275, Albay",
      "source_code": "2027DPWH-Proposal-32844",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 150000000,
      "comparison_year": 2021,
      "prior_project": "Malinao-Paraputo-San Antonio Diversion Road, Albay",
      "prior_amount": 25000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436932",
      "similarity_pct": 100,
      "current_chainage": "3+960.00–6+275.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32844",
        "nepTitle": "Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 6+275, Albay",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0231-002207",
        "hgabTitle": "Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 5+000, Albay",
        "hgabPesos": 50000000,
        "nepPage": "282",
        "hgabPage": "231",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 6+275, Albay",
      "source_code": "2027DPWH-Proposal-32844",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 150000000,
      "comparison_year": 2022,
      "prior_project": "Malinao - Paraputo - San Antonio Diversion Road, Albay",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547147",
      "similarity_pct": 100,
      "current_chainage": "3+960.00–6+275.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32844",
        "nepTitle": "Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 6+275, Albay",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0231-002207",
        "hgabTitle": "Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 5+000, Albay",
        "hgabPesos": 50000000,
        "nepPage": "282",
        "hgabPage": "231",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 6+275, Albay",
      "source_code": "2027DPWH-Proposal-32844",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 150000000,
      "comparison_year": 2023,
      "prior_project": "Malinao-Paraputo-San Antonio Diversion Road, Albay",
      "prior_amount": 40000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 567037",
      "similarity_pct": 100,
      "current_chainage": "3+960.00–6+275.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32844",
        "nepTitle": "Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 6+275, Albay",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0231-002207",
        "hgabTitle": "Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 5+000, Albay",
        "hgabPesos": 50000000,
        "nepPage": "282",
        "hgabPage": "231",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 6+275, Albay",
      "source_code": "2027DPWH-Proposal-32844",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 150000000,
      "comparison_year": 2024,
      "prior_project": "Malinao - Paraputo - San Antonio Diversion Road, Albay",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595396",
      "similarity_pct": 100,
      "current_chainage": "3+960.00–6+275.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32844",
        "nepTitle": "Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 6+275, Albay",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0231-002207",
        "hgabTitle": "Malinao-Paraputo-San Antonio Diversion Road, Sta. 3+960 - Sta. 5+000, Albay",
        "hgabPesos": 50000000,
        "nepPage": "282",
        "hgabPage": "231",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-31744",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 55000000,
      "comparison_year": 2020,
      "prior_project": "Malolos City Circumferential Road, Bulacan",
      "prior_amount": 95535000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512435",
      "similarity_pct": 100,
      "current_chainage": "0+879.00–1+054.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Danny Domingo"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31744",
        "nepTitle": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
        "nepPesos": 55000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0217-001954",
        "hgabTitle": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
        "hgabPesos": 55000000,
        "nepPage": "279",
        "hgabPage": "217",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-31744",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 55000000,
      "comparison_year": 2021,
      "prior_project": "Malolos City Circumferential Road, Bulacan",
      "prior_amount": 74626000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436630",
      "similarity_pct": 100,
      "current_chainage": "0+879.00–1+054.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Danny Domingo"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31744",
        "nepTitle": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
        "nepPesos": 55000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0217-001954",
        "hgabTitle": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
        "hgabPesos": 55000000,
        "nepPage": "279",
        "hgabPage": "217",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-31744",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 55000000,
      "comparison_year": 2022,
      "prior_project": "Malolos City Circumferential Road, Bulacan",
      "prior_amount": 64224000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 546845",
      "similarity_pct": 100,
      "current_chainage": "0+879.00–1+054.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Danny Domingo"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31744",
        "nepTitle": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
        "nepPesos": 55000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0217-001954",
        "hgabTitle": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
        "hgabPesos": 55000000,
        "nepPage": "279",
        "hgabPage": "217",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-31744",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 55000000,
      "comparison_year": 2024,
      "prior_project": "Malolos City Circumferential Road, Bulacan",
      "prior_amount": 70000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595513",
      "similarity_pct": 100,
      "current_chainage": "0+879.00–1+054.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Danny Domingo"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31744",
        "nepTitle": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
        "nepPesos": 55000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0217-001954",
        "hgabTitle": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
        "hgabPesos": 55000000,
        "nepPage": "279",
        "hgabPage": "217",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-31744",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 55000000,
      "comparison_year": 2018,
      "prior_project": "Malolos City Circumferential Road, Bulacan",
      "prior_amount": 64620000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310204100183000",
      "similarity_pct": 100,
      "current_chainage": "0+879.00–1+054.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31744",
        "nepTitle": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
        "nepPesos": 55000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0217-001954",
        "hgabTitle": "Malolos City Circumferential Road, Sta. 0+879 - Sta. 1+054, City of Malolos, Bulacan",
        "hgabPesos": 55000000,
        "nepPage": "279",
        "hgabPage": "217",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
      "source_code": "2027DPWH-Proposal-24194",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 100000000,
      "comparison_year": 2020,
      "prior_project": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate",
      "prior_amount": 100000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512975",
      "similarity_pct": 100,
      "current_chainage": "7+700.00–8+322.00 · 9+400.00–9+514.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24194",
        "nepTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002331",
        "hgabTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
        "hgabPesos": 100000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
      "source_code": "2027DPWH-Proposal-24194",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 100000000,
      "comparison_year": 2021,
      "prior_project": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate",
      "prior_amount": 100000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437194",
      "similarity_pct": 100,
      "current_chainage": "7+700.00–8+322.00 · 9+400.00–9+514.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24194",
        "nepTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002331",
        "hgabTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
        "hgabPesos": 100000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
      "source_code": "2027DPWH-Proposal-24194",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 100000000,
      "comparison_year": 2022,
      "prior_project": "Malubi - Cabangcalan - Dayhagan - Tinigban - Mataba Road, Masbate",
      "prior_amount": 100000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548331",
      "similarity_pct": 100,
      "current_chainage": "7+700.00–8+322.00 · 9+400.00–9+514.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24194",
        "nepTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002331",
        "hgabTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
        "hgabPesos": 100000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
      "source_code": "2027DPWH-Proposal-24194",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568258",
      "similarity_pct": 100,
      "current_chainage": "7+700.00–8+322.00 · 9+400.00–9+514.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24194",
        "nepTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002331",
        "hgabTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
        "hgabPesos": 100000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
      "source_code": "2027DPWH-Proposal-24195",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2020,
      "prior_project": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate",
      "prior_amount": 100000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512975",
      "similarity_pct": 100,
      "current_chainage": "8+322.00–9+300.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24195",
        "nepTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002333",
        "hgabTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
        "hgabPesos": 75000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
      "source_code": "2027DPWH-Proposal-24195",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2021,
      "prior_project": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate",
      "prior_amount": 100000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437194",
      "similarity_pct": 100,
      "current_chainage": "8+322.00–9+300.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24195",
        "nepTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002333",
        "hgabTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
        "hgabPesos": 75000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
      "source_code": "2027DPWH-Proposal-24195",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2022,
      "prior_project": "Malubi - Cabangcalan - Dayhagan - Tinigban - Mataba Road, Masbate",
      "prior_amount": 100000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548331",
      "similarity_pct": 100,
      "current_chainage": "8+322.00–9+300.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24195",
        "nepTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002333",
        "hgabTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
        "hgabPesos": 75000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
      "source_code": "2027DPWH-Proposal-24195",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2023,
      "prior_project": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568258",
      "similarity_pct": 100,
      "current_chainage": "8+322.00–9+300.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24195",
        "nepTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002333",
        "hgabTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
        "hgabPesos": 75000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malvar-Sto. Tomas Road, Sta. 5+636 - Sta. 6+105.02, Batangas",
      "source_code": "2027DPWH-Proposal-20524",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Malvar-Sto. Tomas Road, Batangas",
      "prior_amount": 75000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566695",
      "similarity_pct": 100,
      "current_chainage": "5+636.00–6+105.02",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20524",
        "nepTitle": "Malvar-Sto. Tomas Road, Sta. 5+636 - Sta. 6+105.02, Batangas",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0230-002199",
        "hgabTitle": "Malvar-Sto. Tomas Road, Sta. 5+636 - Sta. 5+889, Batangas",
        "hgabPesos": 40000000,
        "nepPage": "280",
        "hgabPage": "230",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malvar-Sto. Tomas Road, Sta. 5+636 - Sta. 6+105.02, Batangas",
      "source_code": "2027DPWH-Proposal-20524",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2024,
      "prior_project": "Malvar - Sto. Tomas Road, Batangas",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595054",
      "similarity_pct": 100,
      "current_chainage": "5+636.00–6+105.02",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20524",
        "nepTitle": "Malvar-Sto. Tomas Road, Sta. 5+636 - Sta. 6+105.02, Batangas",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0230-002199",
        "hgabTitle": "Malvar-Sto. Tomas Road, Sta. 5+636 - Sta. 5+889, Batangas",
        "hgabPesos": 40000000,
        "nepPage": "280",
        "hgabPage": "230",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malvar-Sto. Tomas Road, Sta. 5+636 - Sta. 6+105.02, Batangas",
      "source_code": "2027DPWH-Proposal-20524",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Malvar-Sto. Tomas Road, Batangas",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631831",
      "similarity_pct": 100,
      "current_chainage": "5+636.00–6+105.02",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20524",
        "nepTitle": "Malvar-Sto. Tomas Road, Sta. 5+636 - Sta. 6+105.02, Batangas",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0230-002199",
        "hgabTitle": "Malvar-Sto. Tomas Road, Sta. 5+636 - Sta. 5+889, Batangas",
        "hgabPesos": 40000000,
        "nepPage": "280",
        "hgabPage": "230",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300",
      "source_code": "2027DPWH-Proposal-20369",
      "office": "Camarines Sur 4th District Engineering Office",
      "region": "Region V",
      "amount_2027": 47000000,
      "comparison_year": 2024,
      "prior_project": "Managnag ( Tigaon - Goa - Sn Jose - Lagonoy - Guijalo via Sn Vicente Rd ) - Himanag Road, Camarines Sur",
      "prior_amount": 55000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597161",
      "similarity_pct": 100,
      "current_chainage": "11+052.00–12+300.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20369",
        "nepTitle": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300",
        "nepPesos": 47000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0242-002408",
        "hgabTitle": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300",
        "hgabPesos": 47000000,
        "nepPage": "301",
        "hgabPage": "242",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300",
      "source_code": "2027DPWH-Proposal-20369",
      "office": "Camarines Sur 4th District Engineering Office",
      "region": "Region V",
      "amount_2027": 47000000,
      "comparison_year": 2018,
      "prior_project": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd) - Himanag Road, Lagonoy, Camarines Sur",
      "prior_amount": 50000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310205100199000",
      "similarity_pct": 100,
      "current_chainage": "11+052.00–12+300.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20369",
        "nepTitle": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300",
        "nepPesos": 47000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0242-002408",
        "hgabTitle": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300",
        "hgabPesos": 47000000,
        "nepPage": "301",
        "hgabPage": "242",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
      "source_code": "2027DPWH-Proposal-24196",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2021,
      "prior_project": "Mandaon-Dayhagan Road, Masbate",
      "prior_amount": 100000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437196",
      "similarity_pct": 100,
      "current_chainage": "7+380.00–8+271.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24196",
        "nepTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002335",
        "hgabTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
        "hgabPesos": 75000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
      "source_code": "2027DPWH-Proposal-24196",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2022,
      "prior_project": "Mandaon - Dayhagan Road, Masbate",
      "prior_amount": 100000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548333",
      "similarity_pct": 100,
      "current_chainage": "7+380.00–8+271.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24196",
        "nepTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002335",
        "hgabTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
        "hgabPesos": 75000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
      "source_code": "2027DPWH-Proposal-24196",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2023,
      "prior_project": "Mandaon-Dayhagan Road, Masbate",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568259",
      "similarity_pct": 100,
      "current_chainage": "7+380.00–8+271.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24196",
        "nepTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002335",
        "hgabTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
        "hgabPesos": 75000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
      "source_code": "2027DPWH-Proposal-24196",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2019,
      "prior_project": "Mandaon-Dayhagan Road, Masbate",
      "prior_amount": 100000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310205100252000 · PDF p. 206 · printed p. 1671",
      "similarity_pct": 100,
      "current_chainage": "7+380.00–8+271.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24196",
        "nepTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002335",
        "hgabTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
        "hgabPesos": 75000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
      "source_code": "2027DPWH-Proposal-24197",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2021,
      "prior_project": "Mandaon-Dayhagan Road, Masbate",
      "prior_amount": 100000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437196",
      "similarity_pct": 100,
      "current_chainage": "8+271.00–9+468.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24197",
        "nepTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002336",
        "hgabTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
        "hgabPesos": 75000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
      "source_code": "2027DPWH-Proposal-24197",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2022,
      "prior_project": "Mandaon - Dayhagan Road, Masbate",
      "prior_amount": 100000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548333",
      "similarity_pct": 100,
      "current_chainage": "8+271.00–9+468.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24197",
        "nepTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002336",
        "hgabTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
        "hgabPesos": 75000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
      "source_code": "2027DPWH-Proposal-24197",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2023,
      "prior_project": "Mandaon-Dayhagan Road, Masbate",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568259",
      "similarity_pct": 100,
      "current_chainage": "8+271.00–9+468.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24197",
        "nepTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002336",
        "hgabTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
        "hgabPesos": 75000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
      "source_code": "2027DPWH-Proposal-24197",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2019,
      "prior_project": "Mandaon-Dayhagan Road, Masbate",
      "prior_amount": 100000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310205100252000 · PDF p. 206 · printed p. 1671",
      "similarity_pct": 100,
      "current_chainage": "8+271.00–9+468.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24197",
        "nepTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002336",
        "hgabTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
        "hgabPesos": 75000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Mauban Bypass Road, Sta. 1+829 - Sta. 3+829, Mauban, Quezon",
      "source_code": "2027DPWH-Proposal-20528",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Mauban Bypass Road, Quezon",
      "prior_amount": 55000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566702",
      "similarity_pct": 100,
      "current_chainage": "1+829.00–3+829.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20528",
        "nepTitle": "Mauban Bypass Road, Sta. 1+829 - Sta. 3+829, Mauban, Quezon",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0219-001999",
        "hgabTitle": "Mauban Bypass Road, Sta. 1+829 - Sta. 3+829, Mauban, Quezon",
        "hgabPesos": 100000000,
        "nepPage": "281",
        "hgabPage": "219",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Mauban Bypass Road, Sta. 1+829 - Sta. 3+829, Mauban, Quezon",
      "source_code": "2027DPWH-Proposal-20528",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2024,
      "prior_project": "Mauban Bypass Road, Quezon",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595061",
      "similarity_pct": 100,
      "current_chainage": "1+829.00–3+829.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20528",
        "nepTitle": "Mauban Bypass Road, Sta. 1+829 - Sta. 3+829, Mauban, Quezon",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0219-001999",
        "hgabTitle": "Mauban Bypass Road, Sta. 1+829 - Sta. 3+829, Mauban, Quezon",
        "hgabPesos": 100000000,
        "nepPage": "281",
        "hgabPage": "219",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Mauban Bypass Road, Sta. 1+829 - Sta. 3+829, Mauban, Quezon",
      "source_code": "2027DPWH-Proposal-20528",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Mauban Bypass Road, Quezon",
      "prior_amount": 76000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 630863",
      "similarity_pct": 100,
      "current_chainage": "1+829.00–3+829.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20528",
        "nepTitle": "Mauban Bypass Road, Sta. 1+829 - Sta. 3+829, Mauban, Quezon",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0219-001999",
        "hgabTitle": "Mauban Bypass Road, Sta. 1+829 - Sta. 3+829, Mauban, Quezon",
        "hgabPesos": 100000000,
        "nepPage": "281",
        "hgabPage": "219",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Mawab - Maragusan - Caraga Road, Sta. 1664+180 - Sta. 1664+577, Sta. 1664+622 - Sta. 1665+475",
      "source_code": "2027DPWH-Proposal-20463",
      "office": "Davao Oriental 1st District Engineering Office",
      "region": "Region XI",
      "amount_2027": 100000000,
      "comparison_year": 2021,
      "prior_project": "Mawab-Maragusan-Caraga Road",
      "prior_amount": 11000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437260",
      "similarity_pct": 100,
      "current_chainage": "1664+180.00–1664+577.00 · 1664+622.00–1665+475.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20463",
        "nepTitle": "Mawab - Maragusan - Caraga Road, Sta. 1664+180 - Sta. 1664+577, Sta. 1664+622 - Sta. 1665+475",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
      "source_code": "2027DPWH-Proposal-20360",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 105000000,
      "comparison_year": 2020,
      "prior_project": "Midsalip-Buboan Road, Zamboanga Del Sur",
      "prior_amount": 105000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512989",
      "similarity_pct": 100,
      "current_chainage": "15+715.00–18+715.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20360",
        "nepTitle": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
        "nepPesos": 105000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0239-002359",
        "hgabTitle": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
        "hgabPesos": 105000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
      "source_code": "2027DPWH-Proposal-20360",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 105000000,
      "comparison_year": 2021,
      "prior_project": "Midsalip-Buboan Road, Zamboanga Del Sur",
      "prior_amount": 25000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437308",
      "similarity_pct": 100,
      "current_chainage": "15+715.00–18+715.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20360",
        "nepTitle": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
        "nepPesos": 105000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0239-002359",
        "hgabTitle": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
        "hgabPesos": 105000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
      "source_code": "2027DPWH-Proposal-20360",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 105000000,
      "comparison_year": 2022,
      "prior_project": "Midsalip - Buboan Road, Zamboanga Del Sur",
      "prior_amount": 102000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548445",
      "similarity_pct": 100,
      "current_chainage": "15+715.00–18+715.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20360",
        "nepTitle": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
        "nepPesos": 105000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0239-002359",
        "hgabTitle": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
        "hgabPesos": 105000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
      "source_code": "2027DPWH-Proposal-20360",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 105000000,
      "comparison_year": 2023,
      "prior_project": "Midsalip - Buboan Road, Zamboanga Del Sur",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 567813",
      "similarity_pct": 100,
      "current_chainage": "15+715.00–18+715.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20360",
        "nepTitle": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
        "nepPesos": 105000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0239-002359",
        "hgabTitle": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
        "hgabPesos": 105000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
      "source_code": "2027DPWH-Proposal-20360",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 105000000,
      "comparison_year": 2017,
      "prior_project": "Midsalip-Buboan Road, Zamboanga del Sur",
      "prior_amount": 150000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015400194",
      "similarity_pct": 100,
      "current_chainage": "15+715.00–18+715.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20360",
        "nepTitle": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
        "nepPesos": 105000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0239-002359",
        "hgabTitle": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
        "hgabPesos": 105000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
      "source_code": "2027DPWH-Proposal-20360",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 105000000,
      "comparison_year": 2019,
      "prior_project": "Midsalip-Buboan Road, Zamboanga Del Sur",
      "prior_amount": 60000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310205100265000 · PDF p. 206 · printed p. 1671",
      "similarity_pct": 100,
      "current_chainage": "15+715.00–18+715.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20360",
        "nepTitle": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
        "nepPesos": 105000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0239-002359",
        "hgabTitle": "Midsalip-Buboan Road, Midsalip, Zamboanga del Sur Sta. 15+715 - Sta 18+715",
        "hgabPesos": 105000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Morong Bypass Road, Sta 0+000 - Sta 1+860, Rizal",
      "source_code": "2027DPWH-Proposal-20543",
      "office": "Rizal 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 150000000,
      "comparison_year": 2022,
      "prior_project": "Morong Bypass Road , Rizal",
      "prior_amount": 100000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547331",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+860.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20543",
        "nepTitle": "Morong Bypass Road, Sta 0+000 - Sta 1+860, Rizal",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Morong Bypass Road, Sta 0+000 - Sta 1+860, Rizal",
      "source_code": "2027DPWH-Proposal-20543",
      "office": "Rizal 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 150000000,
      "comparison_year": 2023,
      "prior_project": "Morong Bypass Road, Rizal",
      "prior_amount": 90000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566707",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+860.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20543",
        "nepTitle": "Morong Bypass Road, Sta 0+000 - Sta 1+860, Rizal",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Morong Bypass Road, Sta 0+000 - Sta 1+860, Rizal",
      "source_code": "2027DPWH-Proposal-20543",
      "office": "Rizal 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 150000000,
      "comparison_year": 2024,
      "prior_project": "Morong Bypass Road, Rizal",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595066",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+860.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20543",
        "nepTitle": "Morong Bypass Road, Sta 0+000 - Sta 1+860, Rizal",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Morong Bypass Road, Sta 0+000 - Sta 1+860, Rizal",
      "source_code": "2027DPWH-Proposal-20543",
      "office": "Rizal 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 150000000,
      "comparison_year": 2025,
      "prior_project": "Morong Bypass Road, Rizal",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 630868",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+860.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20543",
        "nepTitle": "Morong Bypass Road, Sta 0+000 - Sta 1+860, Rizal",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ Agusan-Malaybalay Road-Brgy. Ambacon-Brgy. Malicato-NRJ Daang Maharlika, (Sta. 7+630 - Sta. 7+852.29), Agusan del Norte",
      "source_code": "2027DPWH-Proposal-20751",
      "office": "Agusan del Norte District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 20000000,
      "comparison_year": 2020,
      "prior_project": "Construction Of NRJ Agusan-Malaybalay Road  Brgy. Ambacon  Brgy. Malicato  Nrj Daang Maharlika, Agusan del Norte",
      "prior_amount": 20000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 493085",
      "similarity_pct": 100,
      "current_chainage": "7+630.00–7+852.29",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20751",
        "nepTitle": "NRJ Agusan-Malaybalay Road-Brgy. Ambacon-Brgy. Malicato-NRJ Daang Maharlika, (Sta. 7+630 - Sta. 7+852.29), Agusan del Norte",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002175",
        "hgabTitle": "NRJ Agusan-Malaybalay Road-Barangay Ambacon-Barangay Malicato-NRJ Daang Maharlika, (Sta. 7+630 - Sta. 7+852.29), Agusan del Norte",
        "hgabPesos": 20000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ Baluno - La Paz (Sitio Pole) Diversion Road, Zamboanga City",
      "source_code": "2027DPWH-Proposal-20641",
      "office": "Zamboanga City 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 38932000,
      "comparison_year": 2021,
      "prior_project": "NRJ Baluno - La Paz (Sitio Pole) Diversion Road, Zamboanga City",
      "prior_amount": 38634000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436966",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20641",
        "nepTitle": "NRJ Baluno - La Paz (Sitio Pole) Diversion Road, Zamboanga City",
        "nepPesos": 38932000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0224-002097",
        "hgabTitle": "NRJ Baluno - La Paz (Sitio Pole) Diversion Road, Zamboanga City",
        "hgabPesos": 38932000,
        "nepPage": "284",
        "hgabPage": "224",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ Baluno - La Paz (Sitio Pole) Diversion Road, Zamboanga City",
      "source_code": "2027DPWH-Proposal-20641",
      "office": "Zamboanga City 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 38932000,
      "comparison_year": 2024,
      "prior_project": "NRJ Baluno - La Paz ( Sitio Pole ) Diversion Road, Zamboanga City",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595682",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20641",
        "nepTitle": "NRJ Baluno - La Paz (Sitio Pole) Diversion Road, Zamboanga City",
        "nepPesos": 38932000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0224-002097",
        "hgabTitle": "NRJ Baluno - La Paz (Sitio Pole) Diversion Road, Zamboanga City",
        "hgabPesos": 38932000,
        "nepPage": "284",
        "hgabPage": "224",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ Dipolo - NRJ San Isidro Bypass Road (NRJ Dipolo - Rizal - Miligan - NRJ San Isidro Bypass Road) By-Pass Road, Zamboanga del Sur",
      "source_code": "2027DPWH-Proposal-23967",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 130792000,
      "comparison_year": 2025,
      "prior_project": "NRJ Dipolo - NRJ San Isidro Bypass Road (NRJ Dipolo - Rizal - Miligan - NRJ San Isidro Bypass Road) By-Pass Road, Zamboanga del Sur",
      "prior_amount": 40000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 632163",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23967",
        "nepTitle": "NRJ Dipolo - NRJ San Isidro Bypass Road (NRJ Dipolo - Rizal - Miligan - NRJ San Isidro Bypass Road) By-Pass Road, Zamboanga del Sur",
        "nepPesos": 130792000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0224-002098",
        "hgabTitle": "NRJ Dipolo - NRJ San Isidro Bypass Road (NRJ Dipolo - Rizal - Miligan - NRJ San Isidro Bypass Road) By-Pass Road, Zamboanga del Sur",
        "hgabPesos": 130792000,
        "nepPage": "285",
        "hgabPage": "224",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-25377",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "NRJ Guilawa-Palalian-Brgy. Poblacion Malangas By-Pass Road, Zamboanga Sibugay",
      "prior_amount": 15000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436984",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-25377",
        "nepTitle": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002241",
        "hgabTitle": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
        "hgabPesos": 10000000,
        "nepPage": "292",
        "hgabPage": "233",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-25377",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "NRJ Guilawa - Palalian - Brgy. Poblacion Malangas By - Pass Road, Zamboanga Sibugay",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547199",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-25377",
        "nepTitle": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002241",
        "hgabTitle": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
        "hgabPesos": 10000000,
        "nepPage": "292",
        "hgabPage": "233",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-25377",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "NRJ Guilawa-Palalian-Brgy. Poblacion Malangas By-Pass Road, Zamboanga Sibugay",
      "prior_amount": 40000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 567088",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-25377",
        "nepTitle": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002241",
        "hgabTitle": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
        "hgabPesos": 10000000,
        "nepPage": "292",
        "hgabPage": "233",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-25377",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "NRJ Guilawa - Palalian - Brgy. Poblacion Malangas By - Pass Road, Zamboanga Sibugay",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595447",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-25377",
        "nepTitle": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002241",
        "hgabTitle": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
        "hgabPesos": 10000000,
        "nepPage": "292",
        "hgabPage": "233",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-25377",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "NRJ Guilawa-Palalian-Brgy. Poblacion Malangas By-Pass Road, Zamboanga Sibugay",
      "prior_amount": 60000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631964",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-25377",
        "nepTitle": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002241",
        "hgabTitle": "NRJ Guilawa-Palalian-Barangay Población, Malangas, By-Pass Road, Zamboanga Sibugay",
        "hgabPesos": 10000000,
        "nepPage": "292",
        "hgabPage": "233",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur Sta. 6+738 - Sta. 7+988",
      "source_code": "2027DPWH-Proposal-20630",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 43750000,
      "comparison_year": 2024,
      "prior_project": "NRJ Lantian - San Isidro - Balimbingan - Luy - A - Tabuan - NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595684",
      "similarity_pct": 100,
      "current_chainage": "6+738.00–7+988.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20630",
        "nepTitle": "NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur Sta. 6+738 - Sta. 7+988",
        "nepPesos": 43750000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002230",
        "hgabTitle": "NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur Sta. 6+738 - Sta. 7+988",
        "hgabPesos": 43750000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur Sta. 6+738 - Sta. 7+988",
      "source_code": "2027DPWH-Proposal-20630",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 43750000,
      "comparison_year": 2025,
      "prior_project": "NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631962",
      "similarity_pct": 100,
      "current_chainage": "6+738.00–7+988.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20630",
        "nepTitle": "NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur Sta. 6+738 - Sta. 7+988",
        "nepPesos": 43750000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002230",
        "hgabTitle": "NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur Sta. 6+738 - Sta. 7+988",
        "hgabPesos": 43750000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ Poblacion Bayog Bypass Road, Zamboanga del Sur",
      "source_code": "2027DPWH-Proposal-20634",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "NRJ Poblacion Bayog Bypass Road, Zamboanga del Sur",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 567087",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20634",
        "nepTitle": "NRJ Poblacion Bayog Bypass Road, Zamboanga del Sur",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002233",
        "hgabTitle": "NRJ Poblacion Bayog Bypass Road, Zamboanga del Sur",
        "hgabPesos": 30000000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ Poblacion Bayog Bypass Road, Zamboanga del Sur",
      "source_code": "2027DPWH-Proposal-20634",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 30000000,
      "comparison_year": 2025,
      "prior_project": "NRJ Poblacion Bayog Bypass Road, Zamboanga del Sur",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 632166",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20634",
        "nepTitle": "NRJ Poblacion Bayog Bypass Road, Zamboanga del Sur",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002233",
        "hgabTitle": "NRJ Poblacion Bayog Bypass Road, Zamboanga del Sur",
        "hgabPesos": 30000000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Sta. 1719+980 - Sta. 1720+646.5, Zamboanga del Sur",
      "source_code": "2027DPWH-Proposal-20635",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 30000000,
      "comparison_year": 2021,
      "prior_project": "NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Zamboanga del Sur",
      "prior_amount": 15000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436983",
      "similarity_pct": 100,
      "current_chainage": "1719+980.00–1720+646.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20635",
        "nepTitle": "NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Sta. 1719+980 - Sta. 1720+646.5, Zamboanga del Sur",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002235",
        "hgabTitle": "NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Sta. 1719+980 - Sta. 1720+646.5, Zamboanga del Sur",
        "hgabPesos": 30000000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Sta. 1719+980 - Sta. 1720+646.5, Zamboanga del Sur",
      "source_code": "2027DPWH-Proposal-20635",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Zamboanga del Sur",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 567084",
      "similarity_pct": 100,
      "current_chainage": "1719+980.00–1720+646.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20635",
        "nepTitle": "NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Sta. 1719+980 - Sta. 1720+646.5, Zamboanga del Sur",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002235",
        "hgabTitle": "NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Sta. 1719+980 - Sta. 1720+646.5, Zamboanga del Sur",
        "hgabPesos": 30000000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Sta. 1719+980 - Sta. 1720+646.5, Zamboanga del Sur",
      "source_code": "2027DPWH-Proposal-20635",
      "office": "Zamboanga del Sur 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 30000000,
      "comparison_year": 2024,
      "prior_project": "NRJ - Bogayo - Kitaan Dagat - Mahayahay Road, Zamboanga del Sur",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595443",
      "similarity_pct": 100,
      "current_chainage": "1719+980.00–1720+646.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20635",
        "nepTitle": "NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Sta. 1719+980 - Sta. 1720+646.5, Zamboanga del Sur",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002235",
        "hgabTitle": "NRJ-Bogayo-Kitaan Dagat-Mahayahay Road, Sta. 1719+980 - Sta. 1720+646.5, Zamboanga del Sur",
        "hgabPesos": 30000000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
      "source_code": "2027DPWH-Proposal-20735",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 301120000,
      "comparison_year": 2020,
      "prior_project": "Nabua Bypass Road, Camarines Sur",
      "prior_amount": 41843000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512485",
      "similarity_pct": 100,
      "current_chainage": "470+970.00–471+700.00 · 471+700.00–472+400.00 · 472+400.00–472+974.63 · 472+974.63–474+085.85",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20735",
        "nepTitle": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
        "nepPesos": 301120000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002038",
        "hgabTitle": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
        "hgabPesos": 301120000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
      "source_code": "2027DPWH-Proposal-20735",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 301120000,
      "comparison_year": 2022,
      "prior_project": "Nabua Bypass Road, Camarines Sur",
      "prior_amount": 101000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547358",
      "similarity_pct": 100,
      "current_chainage": "470+970.00–471+700.00 · 471+700.00–472+400.00 · 472+400.00–472+974.63 · 472+974.63–474+085.85",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20735",
        "nepTitle": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
        "nepPesos": 301120000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002038",
        "hgabTitle": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
        "hgabPesos": 301120000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
      "source_code": "2027DPWH-Proposal-20735",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 301120000,
      "comparison_year": 2023,
      "prior_project": "Nabua Bypass Road, Camarines Sur",
      "prior_amount": 110000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566236",
      "similarity_pct": 100,
      "current_chainage": "470+970.00–471+700.00 · 471+700.00–472+400.00 · 472+400.00–472+974.63 · 472+974.63–474+085.85",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20735",
        "nepTitle": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
        "nepPesos": 301120000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002038",
        "hgabTitle": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
        "hgabPesos": 301120000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
      "source_code": "2027DPWH-Proposal-20735",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 301120000,
      "comparison_year": 2024,
      "prior_project": "Nabua Bypass Road, Camarines Sur",
      "prior_amount": 220000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 594595",
      "similarity_pct": 100,
      "current_chainage": "470+970.00–471+700.00 · 471+700.00–472+400.00 · 472+400.00–472+974.63 · 472+974.63–474+085.85",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20735",
        "nepTitle": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
        "nepPesos": 301120000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002038",
        "hgabTitle": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
        "hgabPesos": 301120000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
      "source_code": "2027DPWH-Proposal-20735",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 301120000,
      "comparison_year": 2025,
      "prior_project": "Nabua Bypass Road, Camarines Sur",
      "prior_amount": 85000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 630397",
      "similarity_pct": 100,
      "current_chainage": "470+970.00–471+700.00 · 471+700.00–472+400.00 · 472+400.00–472+974.63 · 472+974.63–474+085.85",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20735",
        "nepTitle": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
        "nepPesos": 301120000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002038",
        "hgabTitle": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
        "hgabPesos": 301120000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
      "source_code": "2027DPWH-Proposal-20735",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 301120000,
      "comparison_year": 2018,
      "prior_project": "Nabua Bypass Road, Camarines Sur",
      "prior_amount": 83000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310204100210000",
      "similarity_pct": 100,
      "current_chainage": "470+970.00–471+700.00 · 471+700.00–472+400.00 · 472+400.00–472+974.63 · 472+974.63–474+085.85",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20735",
        "nepTitle": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
        "nepPesos": 301120000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002038",
        "hgabTitle": "Nabua Bypass Road, Sta. 470+970 - Sta. 471+700, Sta. 471+700 - Sta. 472+400, Sta. 472+400 - Sta. 472+974.63, Sta. 472+974.63 - Sta. 474+085.85, Camarines Sur",
        "hgabPesos": 301120000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Naga-Jct. Magarao-Canaman- Libmanan Jct. PPH Road (Skybridge) - Sta. 418+490 - Sta. 418+762, Barangay Umalo Section, Libmanan, Camarines Sur",
      "source_code": "2027DPWH-Proposal-20671",
      "office": "Camarines Sur 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Naga-Jct. Magarao-Canaman- Libmanan Jct. PPH Road (Skybridge) - Sta. 418+489.26 - Sta. 491.26, Barangay Umalo Section, Libmanan, Camarines Sur",
      "prior_amount": 49000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12615",
      "similarity_pct": 100,
      "current_chainage": "418+490.00–418+762.00",
      "prior_chainage": "418+489.26",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20671",
        "nepTitle": "Naga-Jct. Magarao-Canaman- Libmanan Jct. PPH Road (Skybridge) - Sta. 418+490 - Sta. 418+762, Barangay Umalo Section, Libmanan, Camarines Sur",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0231-002210",
        "hgabTitle": "Naga-Jct. Magarao-Canaman- Libmanan Jct. PPH Road (Skybridge) - Sta. 418+490 - Sta. 418+762, Barangay Umalo Section, Libmanan, Camarines Sur",
        "hgabPesos": 20000000,
        "nepPage": "291",
        "hgabPage": "231",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur, Sta 419+082.25 - Sta 420+882.25",
      "source_code": "2027DPWH-Proposal-20732",
      "office": "Camarines Sur 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 393217000,
      "comparison_year": 2020,
      "prior_project": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur",
      "prior_amount": 50000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512187",
      "similarity_pct": 100,
      "current_chainage": "419+082.25–420+882.25",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20732",
        "nepTitle": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur, Sta 419+082.25 - Sta 420+882.25",
        "nepPesos": 393217000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur, Sta 419+082.25 - Sta 420+882.25",
      "source_code": "2027DPWH-Proposal-20732",
      "office": "Camarines Sur 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 393217000,
      "comparison_year": 2021,
      "prior_project": "Naga-Jct Magarao-Canaman-Libmanan Jct PPH Road (Skybridge), Camarines Sur",
      "prior_amount": 30000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436688",
      "similarity_pct": 100,
      "current_chainage": "419+082.25–420+882.25",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20732",
        "nepTitle": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur, Sta 419+082.25 - Sta 420+882.25",
        "nepPesos": 393217000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur, Sta 419+082.25 - Sta 420+882.25",
      "source_code": "2027DPWH-Proposal-20732",
      "office": "Camarines Sur 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 393217000,
      "comparison_year": 2022,
      "prior_project": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur",
      "prior_amount": 100000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547359",
      "similarity_pct": 100,
      "current_chainage": "419+082.25–420+882.25",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20732",
        "nepTitle": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur, Sta 419+082.25 - Sta 420+882.25",
        "nepPesos": 393217000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur, Sta 419+082.25 - Sta 420+882.25",
      "source_code": "2027DPWH-Proposal-20732",
      "office": "Camarines Sur 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 393217000,
      "comparison_year": 2023,
      "prior_project": "Naga - Jct. Magarao - Canaman - Libmanan Jct. PPH Road ( Skybridge ), Camarines Sur",
      "prior_amount": 105000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566237",
      "similarity_pct": 100,
      "current_chainage": "419+082.25–420+882.25",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20732",
        "nepTitle": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur, Sta 419+082.25 - Sta 420+882.25",
        "nepPesos": 393217000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur, Sta 419+082.25 - Sta 420+882.25",
      "source_code": "2027DPWH-Proposal-20732",
      "office": "Camarines Sur 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 393217000,
      "comparison_year": 2025,
      "prior_project": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur",
      "prior_amount": 90000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631900",
      "similarity_pct": 100,
      "current_chainage": "419+082.25–420+882.25",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20732",
        "nepTitle": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur, Sta 419+082.25 - Sta 420+882.25",
        "nepPesos": 393217000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur, Sta 419+082.25 - Sta 420+882.25",
      "source_code": "2027DPWH-Proposal-20732",
      "office": "Camarines Sur 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 393217000,
      "comparison_year": 2019,
      "prior_project": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur",
      "prior_amount": 150000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100459000 · PDF p. 190 · printed p. 1655",
      "similarity_pct": 100,
      "current_chainage": "419+082.25–420+882.25",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20732",
        "nepTitle": "Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur, Sta 419+082.25 - Sta 420+882.25",
        "nepPesos": 393217000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Ormoc City Diversion Road,Brgy. San Juan-Lao-Naungan Section, Sta. 0+000 - Sta. 4+380, Leyte",
      "source_code": "2027DPWH-Proposal-20960",
      "office": "Leyte 4th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 100000000,
      "comparison_year": 2020,
      "prior_project": "Ormoc City Diversion Road , (Brgy. San Juan-Lao-Naungan Section), Leyte",
      "prior_amount": 150000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512514",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–4+380.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20960",
        "nepTitle": "Ormoc City Diversion Road,Brgy. San Juan-Lao-Naungan Section, Sta. 0+000 - Sta. 4+380, Leyte",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0224-002087",
        "hgabTitle": "Ormoc City Diversion Road,Barangay San Juan-Lao-Naungan Section, Sta. 0+000 - Sta. 4+380, Leyte",
        "hgabPesos": 100000000,
        "nepPage": "284",
        "hgabPage": "224",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Ormoc City Diversion Road,Brgy. San Juan-Lao-Naungan Section, Sta. 0+000 - Sta. 4+380, Leyte",
      "source_code": "2027DPWH-Proposal-20960",
      "office": "Leyte 4th District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 100000000,
      "comparison_year": 2021,
      "prior_project": "Ormoc City Diversion Road , (Brgy. San Juan-Lao-Naungan Section), Leyte",
      "prior_amount": 79915000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436505",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–4+380.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20960",
        "nepTitle": "Ormoc City Diversion Road,Brgy. San Juan-Lao-Naungan Section, Sta. 0+000 - Sta. 4+380, Leyte",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0224-002087",
        "hgabTitle": "Ormoc City Diversion Road,Barangay San Juan-Lao-Naungan Section, Sta. 0+000 - Sta. 4+380, Leyte",
        "hgabPesos": 100000000,
        "nepPage": "284",
        "hgabPage": "224",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Padre Garcia-Rosario Diversion Road, Sta. 113+000 - Sta. 116+388.99, Padre Garcia, Batangas",
      "source_code": "2027DPWH-Proposal-20551",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 200000000,
      "comparison_year": 2023,
      "prior_project": "Padre Garcia - Rosario Diversion Road, Batangas",
      "prior_amount": 75000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566709",
      "similarity_pct": 100,
      "current_chainage": "113+000.00–116+388.99",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20551",
        "nepTitle": "Padre Garcia-Rosario Diversion Road, Sta. 113+000 - Sta. 116+388.99, Padre Garcia, Batangas",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0219-002002",
        "hgabTitle": "Padre Garcia-Rosario Diversion Road, Sta. 113+000 - Sta. 116+388.99, Padre Garcia, Batangas",
        "hgabPesos": 200000000,
        "nepPage": "281",
        "hgabPage": "219",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Padre Garcia-Rosario Diversion Road, Sta. 116+400 - Sta. 117+470.27, Padre Garcia, Batangas",
      "source_code": "2027DPWH-Proposal-20552",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 200000000,
      "comparison_year": 2023,
      "prior_project": "Padre Garcia - Rosario Diversion Road, Batangas",
      "prior_amount": 75000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566709",
      "similarity_pct": 100,
      "current_chainage": "116+400.00–117+470.27",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20552",
        "nepTitle": "Padre Garcia-Rosario Diversion Road, Sta. 116+400 - Sta. 117+470.27, Padre Garcia, Batangas",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Pagnamitan Br. along Guiuan-Sulangan Peninsula Road",
      "source_code": "2027DPWH-Proposal-19595",
      "office": "Eastern Samar District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 150000000,
      "comparison_year": 2025,
      "prior_project": "Pagnamitan Br. along Guiuan-Sulangan Peninsula Road",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 643177",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-19595",
        "nepTitle": "Pagnamitan Br. along Guiuan-Sulangan Peninsula Road",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0295-003434",
        "hgabTitle": "Pagnamitan Br. Along Guiuan-Sulangan Peninsula Road",
        "hgabPesos": 50000000,
        "nepPage": "345",
        "hgabPage": "295",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Pandi By-pass Road, Sta.6+040 - Sta.6+640, Pandi, Bulacan",
      "source_code": "2027DPWH-Proposal-20581",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 90000000,
      "comparison_year": 2020,
      "prior_project": "Construction Of Pandi By-Pass Road, Pandi, Bulacan",
      "prior_amount": 100000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 492023",
      "similarity_pct": 100,
      "current_chainage": "6+040.00–6+640.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20581",
        "nepTitle": "Pandi By-pass Road, Sta.6+040 - Sta.6+640, Pandi, Bulacan",
        "nepPesos": 90000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0217-001960",
        "hgabTitle": "Pandi By-pass Road, Sta.6+040 - Sta.6+640, Pandi, Bulacan",
        "hgabPesos": 90000000,
        "nepPage": "280",
        "hgabPage": "217",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Pangasinan-Nueva Vizcaya Road connecting TPLEX, Rosales, Pangasinan",
      "source_code": "2027DPWH-Proposal-31740",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 239681000,
      "comparison_year": 2022,
      "prior_project": "Pangasinan-Nueva Vizcaya Road connecting TPLEX, Rosales, Pangasinan",
      "prior_amount": 30000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547276",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31740",
        "nepTitle": "Pangasinan-Nueva Vizcaya Road connecting TPLEX, Rosales, Pangasinan",
        "nepPesos": 239681000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001888",
        "hgabTitle": "Pangasinan-Nueva Vizcaya Road connecting TPLEX, Rosales, Pangasinan",
        "hgabPesos": 239681000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Pangasinan-Nueva Vizcaya Road connecting TPLEX, Rosales, Pangasinan",
      "source_code": "2027DPWH-Proposal-31740",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 239681000,
      "comparison_year": 2024,
      "prior_project": "Pangasinan - Nueva Vizcaya Road connecting TPLEX, Rosales, Pangasinan",
      "prior_amount": 30000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595472",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31740",
        "nepTitle": "Pangasinan-Nueva Vizcaya Road connecting TPLEX, Rosales, Pangasinan",
        "nepPesos": 239681000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001888",
        "hgabTitle": "Pangasinan-Nueva Vizcaya Road connecting TPLEX, Rosales, Pangasinan",
        "hgabPesos": 239681000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Panguil Bay Access Road (Tangub - Business Section), Sta. 0+000 - Sta. 2+560, Tangub City, Misamis Occidental",
      "source_code": "2027DPWH-Proposal-32993",
      "office": "Misamis Occidental 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 100000000,
      "comparison_year": 2022,
      "prior_project": "Panguil Bay Access Road (Tangub - Business Section), Tangub City, Misamis Occidental",
      "prior_amount": 60000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547457",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–2+560.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Ando Oaminal"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32993",
        "nepTitle": "Panguil Bay Access Road (Tangub - Business Section), Sta. 0+000 - Sta. 2+560, Tangub City, Misamis Occidental",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna",
      "source_code": "2027DPWH-Proposal-36815",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 158845000,
      "comparison_year": 2020,
      "prior_project": "Parian - San Jose-Bucal Diversion Road, Laguna",
      "prior_amount": 100000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512463",
      "similarity_pct": 100,
      "current_chainage": "11+068.99–19+327.86",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36815",
        "nepTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna",
        "nepPesos": 158845000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0220-002006",
        "hgabTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna",
        "hgabPesos": 158845000,
        "nepPage": "281",
        "hgabPage": "220",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna",
      "source_code": "2027DPWH-Proposal-36815",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 158845000,
      "comparison_year": 2021,
      "prior_project": "Parian - San Jose-Bucal Diversion Road, Laguna",
      "prior_amount": 42000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436491",
      "similarity_pct": 100,
      "current_chainage": "11+068.99–19+327.86",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36815",
        "nepTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna",
        "nepPesos": 158845000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0220-002006",
        "hgabTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna",
        "hgabPesos": 158845000,
        "nepPage": "281",
        "hgabPage": "220",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna",
      "source_code": "2027DPWH-Proposal-36815",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 158845000,
      "comparison_year": 2022,
      "prior_project": "Parian-San Jose-Bucal Diversion Road, Laguna",
      "prior_amount": 105000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547338",
      "similarity_pct": 100,
      "current_chainage": "11+068.99–19+327.86",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36815",
        "nepTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna",
        "nepPesos": 158845000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0220-002006",
        "hgabTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna",
        "hgabPesos": 158845000,
        "nepPage": "281",
        "hgabPage": "220",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna",
      "source_code": "2027DPWH-Proposal-36815",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 158845000,
      "comparison_year": 2023,
      "prior_project": "Parian - San Jose - Bucal Diversion Road, Laguna",
      "prior_amount": 75000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566216",
      "similarity_pct": 100,
      "current_chainage": "11+068.99–19+327.86",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36815",
        "nepTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna",
        "nepPesos": 158845000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0220-002006",
        "hgabTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 11+068.99 - Sta. 19+327.86, Laguna",
        "hgabPesos": 158845000,
        "nepPage": "281",
        "hgabPage": "220",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna",
      "source_code": "2027DPWH-Proposal-32832",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 300000000,
      "comparison_year": 2020,
      "prior_project": "Parian - San Jose-Bucal Diversion Road, Laguna",
      "prior_amount": 100000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512463",
      "similarity_pct": 100,
      "current_chainage": "5+900.00–8+100.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32832",
        "nepTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna",
        "nepPesos": 300000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0220-002014",
        "hgabTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna",
        "hgabPesos": 300000000,
        "nepPage": "281",
        "hgabPage": "220",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna",
      "source_code": "2027DPWH-Proposal-32832",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 300000000,
      "comparison_year": 2021,
      "prior_project": "Parian - San Jose-Bucal Diversion Road, Laguna",
      "prior_amount": 42000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436491",
      "similarity_pct": 100,
      "current_chainage": "5+900.00–8+100.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32832",
        "nepTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna",
        "nepPesos": 300000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0220-002014",
        "hgabTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna",
        "hgabPesos": 300000000,
        "nepPage": "281",
        "hgabPage": "220",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna",
      "source_code": "2027DPWH-Proposal-32832",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 300000000,
      "comparison_year": 2022,
      "prior_project": "Parian-San Jose-Bucal Diversion Road, Laguna",
      "prior_amount": 105000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547338",
      "similarity_pct": 100,
      "current_chainage": "5+900.00–8+100.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32832",
        "nepTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna",
        "nepPesos": 300000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0220-002014",
        "hgabTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna",
        "hgabPesos": 300000000,
        "nepPage": "281",
        "hgabPage": "220",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna",
      "source_code": "2027DPWH-Proposal-32832",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 300000000,
      "comparison_year": 2023,
      "prior_project": "Parian - San Jose - Bucal Diversion Road, Laguna",
      "prior_amount": 75000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566216",
      "similarity_pct": 100,
      "current_chainage": "5+900.00–8+100.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32832",
        "nepTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna",
        "nepPesos": 300000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0220-002014",
        "hgabTitle": "Parian - San Jose - Bucal Diversion Road, Sta. 5+900 - Sta. 8+100, Laguna",
        "hgabPesos": 300000000,
        "nepPage": "281",
        "hgabPage": "220",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Passi Bypass Road, Sta. 3+676.10 - Sta. 4+573.94, Sta. 4+587.34 - Sta. 5+424.34, Iloilo",
      "source_code": "2027DPWH-Proposal-32878",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 191627000,
      "comparison_year": 2024,
      "prior_project": "Passi Bypass Road, Iloilo",
      "prior_amount": 105000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595631",
      "similarity_pct": 100,
      "current_chainage": "3+676.10–4+573.94 · 4+587.34–5+424.34",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32878",
        "nepTitle": "Passi Bypass Road, Sta. 3+676.10 - Sta. 4+573.94, Sta. 4+587.34 - Sta. 5+424.34, Iloilo",
        "nepPesos": 191627000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0222-002053",
        "hgabTitle": "Passi Bypass Road, Sta. 3+676.10 - Sta. 4+573.94, Sta. 4+587.34 - Sta. 5+424.34, Iloilo",
        "hgabPesos": 191627000,
        "nepPage": "283",
        "hgabPage": "222",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Passi Bypass Road, Sta. 3+676.10 - Sta. 4+573.94, Sta. 4+587.34 - Sta. 5+424.34, Iloilo",
      "source_code": "2027DPWH-Proposal-32878",
      "office": "Iloilo 2nd District Engineering Office",
      "region": "Region VI",
      "amount_2027": 191627000,
      "comparison_year": 2025,
      "prior_project": "Passi Bypass Road, Iloilo",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631433",
      "similarity_pct": 100,
      "current_chainage": "3+676.10–4+573.94 · 4+587.34–5+424.34",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32878",
        "nepTitle": "Passi Bypass Road, Sta. 3+676.10 - Sta. 4+573.94, Sta. 4+587.34 - Sta. 5+424.34, Iloilo",
        "nepPesos": 191627000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0222-002053",
        "hgabTitle": "Passi Bypass Road, Sta. 3+676.10 - Sta. 4+573.94, Sta. 4+587.34 - Sta. 5+424.34, Iloilo",
        "hgabPesos": 191627000,
        "nepPage": "283",
        "hgabPage": "222",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Piddig-Carasi (Ilocos Norte) - Calanasan (Apayao) Connecting Cabugao-Conner (Apayao)-Tuao (Cagayan) Road, Sta. 36+236 - Sta. 38+588, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-20496",
      "office": "Ilocos Norte 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 140000000,
      "comparison_year": 2022,
      "prior_project": "Piddig-Carasi (Ilocos Norte) - Calanasan (Apayao) Connecting Cabugao-Conner (Apayao)-Tuao (Cagayan) Road, Ilocos Norte",
      "prior_amount": 75000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548501",
      "similarity_pct": 100,
      "current_chainage": "36+236.00–38+588.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20496",
        "nepTitle": "Piddig-Carasi (Ilocos Norte) - Calanasan (Apayao) Connecting Cabugao-Conner (Apayao)-Tuao (Cagayan) Road, Sta. 36+236 - Sta. 38+588, Ilocos Norte",
        "nepPesos": 140000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002255",
        "hgabTitle": "Piddig-Carasi (Ilocos Norte) - Calanasan (Apayao) Connecting Cabugao-Conner (Apayao)-Tuao (Cagayan) Road, Sta. 36+236 - Sta. 38+588, Ilocos Norte",
        "hgabPesos": 140000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Piddig-Carasi (Ilocos Norte) - Calanasan (Apayao) Connecting Cabugao-Conner (Apayao)-Tuao (Cagayan) Road, Sta. 36+236 - Sta. 38+588, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-20496",
      "office": "Ilocos Norte 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 140000000,
      "comparison_year": 2023,
      "prior_project": "Piddig - Carasi ( Ilocos Norte ) - Calanasan ( Apayao ) Connecting Cabugao - Conner ( Apayao ) - Tuao ( Cagayan ) Road, Ilocos Norte",
      "prior_amount": 30000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 567869",
      "similarity_pct": 100,
      "current_chainage": "36+236.00–38+588.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20496",
        "nepTitle": "Piddig-Carasi (Ilocos Norte) - Calanasan (Apayao) Connecting Cabugao-Conner (Apayao)-Tuao (Cagayan) Road, Sta. 36+236 - Sta. 38+588, Ilocos Norte",
        "nepPesos": 140000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002255",
        "hgabTitle": "Piddig-Carasi (Ilocos Norte) - Calanasan (Apayao) Connecting Cabugao-Conner (Apayao)-Tuao (Cagayan) Road, Sta. 36+236 - Sta. 38+588, Ilocos Norte",
        "hgabPesos": 140000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Quezon - Alabat - Perez Circumferential Road - Sta. 21+070 - Sta. 21+709.67",
      "source_code": "2027DPWH-Proposal-20353",
      "office": "Quezon 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2020,
      "prior_project": "Quezon - Alabat - Perez Circumferential Road, Quezon",
      "prior_amount": 41279000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 513072",
      "similarity_pct": 100,
      "current_chainage": "21+070.00–21+709.67",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20353",
        "nepTitle": "Quezon - Alabat - Perez Circumferential Road - Sta. 21+070 - Sta. 21+709.67",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0236-002309",
        "hgabTitle": "Quezon - Alabat - Perez Circumferential Road - Sta. 20+110 - Sta. 21+910",
        "hgabPesos": 100000000,
        "nepPage": "301",
        "hgabPage": "236",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Quezon - Alabat - Perez Circumferential Road - Sta. 21+070 - Sta. 21+709.67",
      "source_code": "2027DPWH-Proposal-20353",
      "office": "Quezon 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2022,
      "prior_project": "Quezon - Alabat - Perez Circumferential Road, Quezon",
      "prior_amount": 30000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548664",
      "similarity_pct": 100,
      "current_chainage": "21+070.00–21+709.67",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20353",
        "nepTitle": "Quezon - Alabat - Perez Circumferential Road - Sta. 21+070 - Sta. 21+709.67",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0236-002309",
        "hgabTitle": "Quezon - Alabat - Perez Circumferential Road - Sta. 20+110 - Sta. 21+910",
        "hgabPesos": 100000000,
        "nepPage": "301",
        "hgabPage": "236",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Quezon - Alabat - Perez Circumferential Road - Sta. 21+070 - Sta. 21+709.67",
      "source_code": "2027DPWH-Proposal-20353",
      "office": "Quezon 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Quezon - Alabat - Perez Circumferential Road, Quezon",
      "prior_amount": 25000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568032",
      "similarity_pct": 100,
      "current_chainage": "21+070.00–21+709.67",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20353",
        "nepTitle": "Quezon - Alabat - Perez Circumferential Road - Sta. 21+070 - Sta. 21+709.67",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0236-002309",
        "hgabTitle": "Quezon - Alabat - Perez Circumferential Road - Sta. 20+110 - Sta. 21+910",
        "hgabPesos": 100000000,
        "nepPage": "301",
        "hgabPage": "236",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Quezon - Alabat - Perez Circumferential Road - Sta. 21+070 - Sta. 21+709.67",
      "source_code": "2027DPWH-Proposal-20353",
      "office": "Quezon 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2019,
      "prior_project": "Quezon - Alabat - Perez Circumferential Road, Quezon",
      "prior_amount": 50000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310205100348000 · PDF p. 212 · printed p. 1677",
      "similarity_pct": 100,
      "current_chainage": "21+070.00–21+709.67",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20353",
        "nepTitle": "Quezon - Alabat - Perez Circumferential Road - Sta. 21+070 - Sta. 21+709.67",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0236-002309",
        "hgabTitle": "Quezon - Alabat - Perez Circumferential Road - Sta. 20+110 - Sta. 21+910",
        "hgabPesos": 100000000,
        "nepPage": "301",
        "hgabPage": "236",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Radial Road (NRJ BCIR - NRJ Mayor Democrito D. Plaza II Ave.), (Libertad-Bonbon Section) (Sta. 0+000 - Sta. 0+481, Sta. 1+940 - Sta. 1+960, Sta. 2+000 - Sta. 2+122, Sta. 2+230 - Sta. 2+637), Butuan City",
      "source_code": "2027DPWH-Proposal-20746",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 45000000,
      "comparison_year": 2022,
      "prior_project": "Radial Road (NRJ BCIR - NRJ Mayor Democrito D. Plaza II Ave.), (Libertad-Bonbon Section), Butuan City",
      "prior_amount": 30000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547535",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+481.00 · 1+940.00–1+960.00 · 2+000.00–2+122.00 · 2+230.00–2+637.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Aquino II"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20746",
        "nepTitle": "Radial Road (NRJ BCIR - NRJ Mayor Democrito D. Plaza II Ave.), (Libertad-Bonbon Section) (Sta. 0+000 - Sta. 0+481, Sta. 1+940 - Sta. 1+960, Sta. 2+000 - Sta. 2+122, Sta. 2+230 - Sta. 2+637), Butuan City",
        "nepPesos": 45000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002248",
        "hgabTitle": "Radial Road (NRJ BCIR - NRJ Mayor Democrito D. Plaza II Ave.), (Libertad-Bonbon Section) (Sta. 0+000 - Sta. 0+481, Sta. 1+940 - Sta. 1+960, Sta. 2+000 - Sta. 2+122, Sta. 2+230 - Sta. 2+637), Butuan City",
        "hgabPesos": 35000000,
        "nepPage": "293",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Radial Road (NRJ BCIR-NRJ Mayor Democrito D. Plaza II Ave.), (Mahay - Baan) (Sta. 0+289 - Sta. 0+955.67), Butuan City",
      "source_code": "2027DPWH-Proposal-20745",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Radial Road (NRJ BCIR-NRJ Mayor Democrito D. Plaza II Ave.), (Mahay - Baan), Butuan City",
      "prior_amount": 105000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566976",
      "similarity_pct": 100,
      "current_chainage": "0+289.00–0+955.67",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Aquino II"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20745",
        "nepTitle": "Radial Road (NRJ BCIR-NRJ Mayor Democrito D. Plaza II Ave.), (Mahay - Baan) (Sta. 0+289 - Sta. 0+955.67), Butuan City",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002249",
        "hgabTitle": "Radial Road (NRJ BCIR-NRJ Mayor Democrito D. Plaza II Ave.), (Mahay - Baan) (Sta. 0+289 - Sta. 0+955.67), Butuan City",
        "hgabPesos": 40000000,
        "nepPage": "293",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Radial Road (NRJ BCIR-NRJ Mayor Democrito D. Plaza II Ave.), (Mahay - Baan) (Sta. 0+289 - Sta. 0+955.67), Butuan City",
      "source_code": "2027DPWH-Proposal-20745",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "Radial Road (NRJ BCIR-NRJ Mayor Democrito D. Plaza II Ave.), (Mahay - Baan) Butuan City",
      "prior_amount": 40000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 632189",
      "similarity_pct": 100,
      "current_chainage": "0+289.00–0+955.67",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Aquino II"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20745",
        "nepTitle": "Radial Road (NRJ BCIR-NRJ Mayor Democrito D. Plaza II Ave.), (Mahay - Baan) (Sta. 0+289 - Sta. 0+955.67), Butuan City",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002249",
        "hgabTitle": "Radial Road (NRJ BCIR-NRJ Mayor Democrito D. Plaza II Ave.), (Mahay - Baan) (Sta. 0+289 - Sta. 0+955.67), Butuan City",
        "hgabPesos": 40000000,
        "nepPage": "293",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation & Improvement of Road at San Isidro Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36070",
      "office": "Nueva Ecija 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Road, San Isidro, Nueva Ecija",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499227",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36070",
        "nepTitle": "Rehabilitation & Improvement of Road at San Isidro Nueva Ecija",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0525-008014",
        "hgabTitle": "Rehabilitation & Improvement of Road at San Isidro Nueva Ecija",
        "hgabPesos": 10000000,
        "nepPage": "498",
        "hgabPage": "525",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation & Improvement of Road at San Isidro Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36070",
      "office": "Nueva Ecija 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, San Isidro, Nueva Ecija",
      "prior_amount": 6000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526640",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36070",
        "nepTitle": "Rehabilitation & Improvement of Road at San Isidro Nueva Ecija",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0525-008014",
        "hgabTitle": "Rehabilitation & Improvement of Road at San Isidro Nueva Ecija",
        "hgabPesos": 10000000,
        "nepPage": "498",
        "hgabPage": "525",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation & Improvement of Road at San Isidro Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36070",
      "office": "Nueva Ecija 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, San Isidro, Nueva Ecija",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551860",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36070",
        "nepTitle": "Rehabilitation & Improvement of Road at San Isidro Nueva Ecija",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0525-008014",
        "hgabTitle": "Rehabilitation & Improvement of Road at San Isidro Nueva Ecija",
        "hgabPesos": 10000000,
        "nepPage": "498",
        "hgabPage": "525",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "source_code": "2027DPWH-Proposal-34088",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Road Network, Barangay Marikina Heights, Marikina City",
      "prior_amount": 8000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 498566",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34088",
        "nepTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0449-006429",
        "hgabTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "hgabPesos": 10000000,
        "nepPage": "456",
        "hgabPage": "449",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "source_code": "2027DPWH-Proposal-34088",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Road Network, Barangay Marikina Heights, Marikina City",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427190",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34088",
        "nepTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0449-006429",
        "hgabTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "hgabPesos": 10000000,
        "nepPage": "456",
        "hgabPage": "449",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "source_code": "2027DPWH-Proposal-34088",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Improvement of Marikina Heights Road Network, Marikina City",
      "prior_amount": 20000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 521676",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34088",
        "nepTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0449-006429",
        "hgabTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "hgabPesos": 10000000,
        "nepPage": "456",
        "hgabPage": "449",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "source_code": "2027DPWH-Proposal-34088",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Rehabilitation of Road Network, Barangay Marikina Heights, Marikina City",
      "prior_amount": 15000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 525375",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34088",
        "nepTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0449-006429",
        "hgabTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "hgabPesos": 10000000,
        "nepPage": "456",
        "hgabPage": "449",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "source_code": "2027DPWH-Proposal-34088",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "prior_amount": 20000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551234",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34088",
        "nepTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0449-006429",
        "hgabTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "hgabPesos": 10000000,
        "nepPage": "456",
        "hgabPage": "449",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "source_code": "2027DPWH-Proposal-34088",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 10000000,
      "comparison_year": 2016,
      "prior_project": "Construction / Rehabilitation of Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "prior_amount": 3500000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050304150",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34088",
        "nepTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0449-006429",
        "hgabTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "hgabPesos": 10000000,
        "nepPage": "456",
        "hgabPage": "449",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "source_code": "2027DPWH-Proposal-34088",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Construction / Rehabilitation of Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050304150",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34088",
        "nepTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0449-006429",
        "hgabTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "hgabPesos": 10000000,
        "nepPage": "456",
        "hgabPage": "449",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "source_code": "2027DPWH-Proposal-34088",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation of Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "prior_amount": 4000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200272000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34088",
        "nepTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0449-006429",
        "hgabTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "hgabPesos": 10000000,
        "nepPage": "456",
        "hgabPage": "449",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
      "source_code": "2027DPWH-Proposal-34088",
      "office": "Metro Manila 1st District Engineering Office",
      "region": "NCR",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Repair/Rehabilitation of Road Network, Brgy. Marikina Heights, Marikina City",
      "prior_amount": 20000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300116201411000 · PDF p. 1161 · printed p. 2626",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34088",
        "nepTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0449-006429",
        "hgabTitle": "Rehabilitation of Barangay Marikina Heights Road Network, Barangay Marikina Heights, Marikina City",
        "hgabPesos": 10000000,
        "nepPage": "456",
        "hgabPage": "449",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Barangay Road, Barangay Masicong, City of San Fernando, La Union",
      "source_code": "2027DPWH-Proposal-33549",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 15000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Road, Barangay Masicong, City of San Fernando, La Union",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526156",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Paolo Ortega"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33549",
        "nepTitle": "Rehabilitation of Barangay Road, Barangay Masicong, City of San Fernando, La Union",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Barangay Road, Barangay Maugat, Sta. 0+000 - Sta. 0+800, San Antonio, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-03655",
      "office": "Nueva Ecija 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2016,
      "prior_project": "Rehabilitation of Brgy. Road, Sta. 0+000  -  Sta. 1+500, Maugat, San Antonio, Nueva Ecija",
      "prior_amount": 10000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303526",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+800.00",
      "prior_chainage": "0+000.00–1+500.00",
      "chainage_overlap": "0+000.00–0+800.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03655",
        "nepTitle": "Rehabilitation of Barangay Road, Barangay Maugat, Sta. 0+000 - Sta. 0+800, San Antonio, Nueva Ecija",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Barangay Road, Barangay Maugat, Sta. 0+000 - Sta. 0+800, San Antonio, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-03655",
      "office": "Nueva Ecija 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Rehabilitation of Brgy. Road, Sta. 0+000  -  Sta. 1+500, Maugat, San Antonio, Nueva Ecija",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050303526",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+800.00",
      "prior_chainage": "0+000.00–1+500.00",
      "chainage_overlap": "0+000.00–0+800.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03655",
        "nepTitle": "Rehabilitation of Barangay Road, Barangay Maugat, Sta. 0+000 - Sta. 0+800, San Antonio, Nueva Ecija",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Barangay Road, Barangay San Mariano, Sta. 0+000 - Sta. 0+800, San Antonio, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-03657",
      "office": "Nueva Ecija 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 14000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Brgy. Road at Brgy. San Mariano, San Antonio, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200864000",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+800.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03657",
        "nepTitle": "Rehabilitation of Barangay Road, Barangay San Mariano, Sta. 0+000 - Sta. 0+800, San Antonio, Nueva Ecija",
        "nepPesos": 14000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Colony Road, Sta. 0+000 - Sta. 0+350, Barangay Libertad, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-22137",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Concreting of Barangay Road, Colony Road, Brgy. Libertad, Abulug, Cagayan",
      "prior_amount": 20000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 498908",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+350.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22137",
        "nepTitle": "Rehabilitation of Colony Road, Sta. 0+000 - Sta. 0+350, Barangay Libertad, Abulug, Cagayan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0485-007188",
        "hgabTitle": "Rehabilitation of Colony Road, Sta. 0+000 - Sta. 0+350, Barangay Libertad, Abulug, Cagayan",
        "hgabPesos": 10000000,
        "nepPage": "476",
        "hgabPage": "485",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Colony Road, Sta. 0+000 - Sta. 0+350, Barangay Libertad, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-22137",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Colony Road , Libertad, Abulug, Cagayan",
      "prior_amount": 20000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 425674",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+350.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22137",
        "nepTitle": "Rehabilitation of Colony Road, Sta. 0+000 - Sta. 0+350, Barangay Libertad, Abulug, Cagayan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0485-007188",
        "hgabTitle": "Rehabilitation of Colony Road, Sta. 0+000 - Sta. 0+350, Barangay Libertad, Abulug, Cagayan",
        "hgabPesos": 10000000,
        "nepPage": "476",
        "hgabPage": "485",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Colony Road, Sta. 0+000 - Sta. 0+350, Barangay Libertad, Abulug, Cagayan",
      "source_code": "2027DPWH-Proposal-22137",
      "office": "Cagayan 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Colony Road, Brgy. Libertad, Abulug, Cagayan",
      "prior_amount": 20000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117202872000 · PDF p. 1247 · printed p. 2712",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+350.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22137",
        "nepTitle": "Rehabilitation of Colony Road, Sta. 0+000 - Sta. 0+350, Barangay Libertad, Abulug, Cagayan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0485-007188",
        "hgabTitle": "Rehabilitation of Colony Road, Sta. 0+000 - Sta. 0+350, Barangay Libertad, Abulug, Cagayan",
        "hgabPesos": 10000000,
        "nepPage": "476",
        "hgabPage": "485",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Malolos - Paombong - Hagonoy - Calumpit Road, Sta. 0+000 - Sta. 2+800, Calumpit, Bulacan",
      "source_code": "2027DPWH-Proposal-03527",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 150000000,
      "comparison_year": 2016,
      "prior_project": "Concreting/Improvement of Malolos - Paombong - Hagonoy - Calumpit Road, Calumpit, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303492",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–2+800.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03527",
        "nepTitle": "Rehabilitation of Malolos - Paombong - Hagonoy - Calumpit Road, Sta. 0+000 - Sta. 2+800, Calumpit, Bulacan",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0423-005910",
        "hgabTitle": "Rehabilitation of Malolos - Paombong - Hagonoy - Calumpit Road, Sta. 0+000 - Sta. 2+800, Calumpit, Bulacan",
        "hgabPesos": 150000000,
        "nepPage": "439",
        "hgabPage": "423",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Malolos - Paombong - Hagonoy - Calumpit Road, Sta. 0+000 - Sta. 2+800, Calumpit, Bulacan",
      "source_code": "2027DPWH-Proposal-03527",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 150000000,
      "comparison_year": 2017,
      "prior_project": "Concreting / Improvement of Malolos - Paombong - Hagonoy - Calumpit Road, Calumpit, Bulacan",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050303492",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–2+800.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03527",
        "nepTitle": "Rehabilitation of Malolos - Paombong - Hagonoy - Calumpit Road, Sta. 0+000 - Sta. 2+800, Calumpit, Bulacan",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0423-005910",
        "hgabTitle": "Rehabilitation of Malolos - Paombong - Hagonoy - Calumpit Road, Sta. 0+000 - Sta. 2+800, Calumpit, Bulacan",
        "hgabPesos": 150000000,
        "nepPage": "439",
        "hgabPage": "423",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Malolos - San Marcos via Bulihan Road, Sta. 0+000 - Sta. 0+230, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-03529",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 40000000,
      "comparison_year": 2016,
      "prior_project": "Concreting/Improvement of Malolos - San Marcos via Bulihan Road, Municipality of Malolos, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303494",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+230.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03529",
        "nepTitle": "Rehabilitation of Malolos - San Marcos via Bulihan Road, Sta. 0+000 - Sta. 0+230, City of Malolos, Bulacan",
        "nepPesos": 40000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0509-007687",
        "hgabTitle": "Rehabilitation of Malolos - San Marcos via Bulihan Road, Sta. 0+000 - Sta. 0+230, City of Malolos, Bulacan",
        "hgabPesos": 40000000,
        "nepPage": "487",
        "hgabPage": "509",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Malolos - San Marcos via Bulihan Road, Sta. 0+000 - Sta. 0+230, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-03529",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 40000000,
      "comparison_year": 2017,
      "prior_project": "Concreting / Improvement of Malolos - San Marcos via Bulihan Road, Municipality of Malolos, Bulacan",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050303494",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+230.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03529",
        "nepTitle": "Rehabilitation of Malolos - San Marcos via Bulihan Road, Sta. 0+000 - Sta. 0+230, City of Malolos, Bulacan",
        "nepPesos": 40000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0509-007687",
        "hgabTitle": "Rehabilitation of Malolos - San Marcos via Bulihan Road, Sta. 0+000 - Sta. 0+230, City of Malolos, Bulacan",
        "hgabPesos": 40000000,
        "nepPage": "487",
        "hgabPage": "509",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Pilar South Road, Sta. 0+000-Sta. 1+100, Pilar, Abra",
      "source_code": "2027DPWH-Proposal-34781",
      "office": "Abra District Engineering Office",
      "region": "CAR",
      "amount_2027": 75800000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Pilar South Road, Pilar, Abra",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560256",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+100.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Bernos"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34781",
        "nepTitle": "Rehabilitation of Pilar South Road, Sta. 0+000-Sta. 1+100, Pilar, Abra",
        "nepPesos": 75800000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0417-005803",
        "hgabTitle": "Rehabilitation of Pilar South Road, Sta. 0+000-Sta. 1+100, Pilar, Abra",
        "hgabPesos": 75800000,
        "nepPage": "435",
        "hgabPage": "417",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Polo - Obando - Bulakan Road, Sta. 0+000 - Sta. 0+700, Bulakan, Bulacan",
      "source_code": "2027DPWH-Proposal-03526",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2016,
      "prior_project": "Concreting/Improvement of Polo - Obando - Bulakan Road, Municipality of Bulacan, Bulacan",
      "prior_amount": 30000000,
      "prior_source": "FY2016 GAA Explorer · DPWH.xls · #Sheet 1 · UACS PAP 165004050303496",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+700.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03526",
        "nepTitle": "Rehabilitation of Polo - Obando - Bulakan Road, Sta. 0+000 - Sta. 0+700, Bulakan, Bulacan",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0509-007690",
        "hgabTitle": "Rehabilitation of Polo - Obando - Bulakan Road, Sta. 0+000 - Sta. 0+700, Bulakan, Bulacan",
        "hgabPesos": 30000000,
        "nepPage": "487",
        "hgabPage": "509",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Polo - Obando - Bulakan Road, Sta. 0+000 - Sta. 0+700, Bulakan, Bulacan",
      "source_code": "2027DPWH-Proposal-03526",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2017,
      "prior_project": "Concreting / Improvement of Polo - Obando - Bulakan Road, Municipality of Bulacan, Bulacan",
      "prior_amount": 0,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050303496",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+700.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03526",
        "nepTitle": "Rehabilitation of Polo - Obando - Bulakan Road, Sta. 0+000 - Sta. 0+700, Bulakan, Bulacan",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0509-007690",
        "hgabTitle": "Rehabilitation of Polo - Obando - Bulakan Road, Sta. 0+000 - Sta. 0+700, Bulakan, Bulacan",
        "hgabPesos": 30000000,
        "nepPage": "487",
        "hgabPage": "509",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road (Sta. 0+000 - Sta. 0+550), Barangay Garita, Cabagan, Isabela",
      "source_code": "2027DPWH-Proposal-34850",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 6300000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road (Sta. 0+410 - Sta. 1+490), Barangay Garita, Cabagan, Isabela",
      "prior_amount": 9088000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 26770",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+550.00",
      "prior_chainage": "0+410.00–1+490.00",
      "chainage_overlap": "0+410.00–0+550.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34850",
        "nepTitle": "Rehabilitation of Road (Sta. 0+000 - Sta. 0+550), Barangay Garita, Cabagan, Isabela",
        "nepPesos": 6300000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0491-007294",
        "hgabTitle": "Rehabilitation of Road (Sta. 0+000 - Sta. 0+550), Barangay Garita, Cabagan, Isabela",
        "hgabPesos": 6300000,
        "nepPage": "477",
        "hgabPage": "491",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road (Sta. 0+000 - Sta.0+600) at Barangay Magassi, Cabagan, Isabela",
      "source_code": "2027DPWH-Proposal-35218",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 6600000,
      "comparison_year": 2024,
      "prior_project": "Rehabilitation of Road, Barangay Magassi, Cabagan, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551541",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+600.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35218",
        "nepTitle": "Rehabilitation of Road (Sta. 0+000 - Sta.0+600) at Barangay Magassi, Cabagan, Isabela",
        "nepPesos": 6600000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0487-007219",
        "hgabTitle": "Rehabilitation of Road (Sta. 0+000 - Sta.0+600) at Barangay Magassi, Cabagan, Isabela",
        "hgabPesos": 6600000,
        "nepPage": "476",
        "hgabPage": "487",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road (Sta. 0+000-Sta. 0+800) at Barangay Catabayungan, Cabagan, Isabela",
      "source_code": "2027DPWH-Proposal-35214",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 8300000,
      "comparison_year": 2020,
      "prior_project": "Road concreting of Brgy. Catabayungan, Cabagan, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 498945",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+800.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35214",
        "nepTitle": "Rehabilitation of Road (Sta. 0+000-Sta. 0+800) at Barangay Catabayungan, Cabagan, Isabela",
        "nepPesos": 8300000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0491-007298",
        "hgabTitle": "Rehabilitation of Road (Sta. 0+000-Sta. 0+800) at Barangay Catabayungan, Cabagan, Isabela",
        "hgabPesos": 8300000,
        "nepPage": "477",
        "hgabPage": "491",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road (Sta. 0+000-Sta. 0+800) at Barangay Catabayungan, Cabagan, Isabela",
      "source_code": "2027DPWH-Proposal-35214",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 8300000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Road, Barangay Catabayungan, Cabagan, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574739",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+800.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35214",
        "nepTitle": "Rehabilitation of Road (Sta. 0+000-Sta. 0+800) at Barangay Catabayungan, Cabagan, Isabela",
        "nepPesos": 8300000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0491-007298",
        "hgabTitle": "Rehabilitation of Road (Sta. 0+000-Sta. 0+800) at Barangay Catabayungan, Cabagan, Isabela",
        "hgabPesos": 8300000,
        "nepPage": "477",
        "hgabPage": "491",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road (Sta. 0+040 - Sta. 1+140) at Barangay San Mateo, Tumauini, Isabela",
      "source_code": "2027DPWH-Proposal-35223",
      "office": "Isabela 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 11600000,
      "comparison_year": 2018,
      "prior_project": "Concreting of Brgy. San Mateo Road, Tumauini, Isabela",
      "prior_amount": 2500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200584000",
      "similarity_pct": 100,
      "current_chainage": "0+040.00–1+140.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35223",
        "nepTitle": "Rehabilitation of Road (Sta. 0+040 - Sta. 1+140) at Barangay San Mateo, Tumauini, Isabela",
        "nepPesos": 11600000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0491-007299",
        "hgabTitle": "Rehabilitation of Road (Sta. 0+040 - Sta. 1+140) at Barangay San Mateo, Tumauini, Isabela",
        "hgabPesos": 11600000,
        "nepPage": "478",
        "hgabPage": "491",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road at Barangay Caluluan, Concepcion, Tarlac",
      "source_code": "2027DPWH-Proposal-33496",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 100000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Roads, Barangay Caluluan, Concepcion, Tarlac",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551936",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bong Rivera"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33496",
        "nepTitle": "Rehabilitation of Road at Barangay Caluluan, Concepcion, Tarlac",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0423-005911",
        "hgabTitle": "Rehabilitation of Road at Barangay Caluluan, Concepcion, Tarlac",
        "hgabPesos": 100000000,
        "nepPage": "439",
        "hgabPage": "423",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road at Barangay Calumpang Cerca, Indang, Cavite",
      "source_code": "2027DPWH-Proposal-09702",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Concreting of Road at Barangay Calumpang Cerca, Indang, Cavite",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526911",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09702",
        "nepTitle": "Rehabilitation of Road at Barangay Calumpang Cerca, Indang, Cavite",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0545-008454",
        "hgabTitle": "Rehabilitation of Road at Barangay Calumpang Cerca, Indang, Cavite",
        "hgabPesos": 5000000,
        "nepPage": "509",
        "hgabPage": "545",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road at Barangay Escribano, San Juan, Batangas",
      "source_code": "2027DPWH-Proposal-36298",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Road, Escribano, San Juan, Batangas",
      "prior_amount": 2000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499426",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36298",
        "nepTitle": "Rehabilitation of Road at Barangay Escribano, San Juan, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0542-008395",
        "hgabTitle": "Rehabilitation of Road at Barangay Escribano, San Juan, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "508",
        "hgabPage": "542",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road at Barangay Langgam, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-09784",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Repair of Road, Brgy. Langgam, San Pedro City, Laguna",
      "prior_amount": 1500000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 499525",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09784",
        "nepTitle": "Rehabilitation of Road at Barangay Langgam, San Pedro City, Laguna",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0546-008490",
        "hgabTitle": "Rehabilitation of Road at Barangay Langgam, San Pedro City, Laguna",
        "hgabPesos": 10000000,
        "nepPage": "511",
        "hgabPage": "546",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road at Barangay Langgam, San Pedro City, Laguna",
      "source_code": "2027DPWH-Proposal-09784",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Rehabilitation of Road, Barangay Langgam, San Pedro City, Laguna",
      "prior_amount": 10000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552127",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09784",
        "nepTitle": "Rehabilitation of Road at Barangay Langgam, San Pedro City, Laguna",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0546-008490",
        "hgabTitle": "Rehabilitation of Road at Barangay Langgam, San Pedro City, Laguna",
        "hgabPesos": 10000000,
        "nepPage": "511",
        "hgabPage": "546",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road at Barangay Macalamcam B, Rosario, Batangas",
      "source_code": "2027DPWH-Proposal-36289",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Improvement of Road at Barangay Macalamcam B, Rosario, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 526876",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36289",
        "nepTitle": "Rehabilitation of Road at Barangay Macalamcam B, Rosario, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0542-008396",
        "hgabTitle": "Rehabilitation of Road at Barangay Macalamcam B, Rosario, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "508",
        "hgabPage": "542",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road at Barangay Parulung, Concepcion, Tarlac",
      "source_code": "2027DPWH-Proposal-33498",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Brgy. Parulung, Concepcion, Tarlac",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535652",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bong Rivera"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33498",
        "nepTitle": "Rehabilitation of Road at Barangay Parulung, Concepcion, Tarlac",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0423-005915",
        "hgabTitle": "Rehabilitation of Road at Barangay Parulung, Concepcion, Tarlac",
        "hgabPesos": 100000000,
        "nepPage": "439",
        "hgabPage": "423",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road at Barangay San Agustin, Concepcion, Tarlac",
      "source_code": "2027DPWH-Proposal-33497",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay San Agustin, Concepcion, Tarlac",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535640",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bong Rivera"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33497",
        "nepTitle": "Rehabilitation of Road at Barangay San Agustin, Concepcion, Tarlac",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0423-005916",
        "hgabTitle": "Rehabilitation of Road at Barangay San Agustin, Concepcion, Tarlac",
        "hgabPesos": 100000000,
        "nepPage": "439",
        "hgabPage": "423",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road at Barangay San Agustin, Concepcion, Tarlac",
      "source_code": "2027DPWH-Proposal-33497",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay San Agustin, Concepcion, Tarlac",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575007",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bong Rivera"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33497",
        "nepTitle": "Rehabilitation of Road at Barangay San Agustin, Concepcion, Tarlac",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0423-005916",
        "hgabTitle": "Rehabilitation of Road at Barangay San Agustin, Concepcion, Tarlac",
        "hgabPesos": 100000000,
        "nepPage": "439",
        "hgabPage": "423",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road at Barangay San Agustin, Concepcion, Tarlac",
      "source_code": "2027DPWH-Proposal-33497",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 100000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay San Agustin, Concepcion, Tarlac, Sta. 0+000.00 - 0+135.00, Sta. 0+000.00 - 0+205.00, Sta. 0+000.00 - 0+047.50",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27314",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+135.00 · 0+000.00–0+205.00 · 0+000.00–0+047.50",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bong Rivera"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33497",
        "nepTitle": "Rehabilitation of Road at Barangay San Agustin, Concepcion, Tarlac",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0423-005916",
        "hgabTitle": "Rehabilitation of Road at Barangay San Agustin, Concepcion, Tarlac",
        "hgabPesos": 100000000,
        "nepPage": "439",
        "hgabPage": "423",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road at Barangay San Nicolas Balas, Concepcion, Tarlac",
      "source_code": "2027DPWH-Proposal-33494",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 100000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay San Nicolas Balas, Concepcion, Tarlac",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551925",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bong Rivera"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33494",
        "nepTitle": "Rehabilitation of Road at Barangay San Nicolas Balas, Concepcion, Tarlac",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0423-005917",
        "hgabTitle": "Rehabilitation of Road at Barangay San Nicolas Balas, Concepcion, Tarlac",
        "hgabPesos": 100000000,
        "nepPage": "439",
        "hgabPage": "423",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road at Barangay San Nicolas Balas, Concepcion, Tarlac",
      "source_code": "2027DPWH-Proposal-33494",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 100000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay San Nicolas Balas, Concepcion, Tarlac, Sta. 0+000.00 - Sta. 0+123.26, Sta. 0+000.00 - Sta. 0+134.94, Sta. 0+000.00 - Sta. 0+042.49, Sta. 0+000.00 - Sta. 0+141.01, Sta. 0+000.00 - Sta. 0+075.22, Sta. 0+000.00 - Sta. 0+068.97",
      "prior_amount": 4707000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 27318",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+123.26 · 0+000.00–0+134.94 · 0+000.00–0+042.49 · 0+000.00–0+141.01 · 0+000.00–0+075.22 · 0+000.00–0+068.97",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bong Rivera"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33494",
        "nepTitle": "Rehabilitation of Road at Barangay San Nicolas Balas, Concepcion, Tarlac",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0423-005917",
        "hgabTitle": "Rehabilitation of Road at Barangay San Nicolas Balas, Concepcion, Tarlac",
        "hgabPesos": 100000000,
        "nepPage": "439",
        "hgabPage": "423",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road at Barangay Sta. Rosa, Concepcion, Tarlac",
      "source_code": "2027DPWH-Proposal-33493",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 100000000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Barangay Road, Sta. Rosa Concepcion, Tarlac",
      "prior_amount": 10000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306479",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33493",
        "nepTitle": "Rehabilitation of Road at Barangay Sta. Rosa, Concepcion, Tarlac",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0423-005920",
        "hgabTitle": "Rehabilitation of Road at Barangay Sta. Rosa, Concepcion, Tarlac",
        "hgabPesos": 100000000,
        "nepPage": "439",
        "hgabPage": "423",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road at Barangay Tinang, Concepcion, Tarlac",
      "source_code": "2027DPWH-Proposal-33492",
      "office": "Tarlac 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 100000000,
      "comparison_year": 2018,
      "prior_project": "Concreting of Tinang Road, Concepcion, Tarlac",
      "prior_amount": 6900000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200921000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33492",
        "nepTitle": "Rehabilitation of Road at Barangay Tinang, Concepcion, Tarlac",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0423-005922",
        "hgabTitle": "Rehabilitation of Road at Barangay Tinang, Concepcion, Tarlac",
        "hgabPesos": 100000000,
        "nepPage": "439",
        "hgabPage": "423",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road at Fort Del Pilar Barangay, Sta. 0+000 - Sta. 0+502, Baguio City",
      "source_code": "2027DPWH-Proposal-34716",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 40320000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Road, Barangay Fort del Pilar, Baguio City",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 558828",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+502.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34716",
        "nepTitle": "Rehabilitation of Road at Fort Del Pilar Barangay, Sta. 0+000 - Sta. 0+502, Baguio City",
        "nepPesos": 40320000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0477-006988",
        "hgabTitle": "Rehabilitation of Road at Fort Del Pilar Barangay, Sta. 0+000 - Sta. 0+502, Baguio City",
        "hgabPesos": 40320000,
        "nepPage": "469",
        "hgabPage": "477",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Aya, Talisay, Batangas",
      "source_code": "2027DPWH-Proposal-36634",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Brgy. Aya, Talisay Batangas",
      "prior_amount": 15000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552038",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36634",
        "nepTitle": "Rehabilitation of Road, Barangay Aya, Talisay, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0540-008350",
        "hgabTitle": "Rehabilitation of Road, Barangay Aya, Talisay, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "507",
        "hgabPage": "540",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Aya, Talisay, Batangas",
      "source_code": "2027DPWH-Proposal-36634",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Aya, Talisay, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575099",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36634",
        "nepTitle": "Rehabilitation of Road, Barangay Aya, Talisay, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0540-008350",
        "hgabTitle": "Rehabilitation of Road, Barangay Aya, Talisay, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "507",
        "hgabPage": "540",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Aya, Talisay, Batangas",
      "source_code": "2027DPWH-Proposal-36634",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Concreting of Road, Brgy. Aya, Talisay, Batangas",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201034000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36634",
        "nepTitle": "Rehabilitation of Road, Barangay Aya, Talisay, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0540-008350",
        "hgabTitle": "Rehabilitation of Road, Barangay Aya, Talisay, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "507",
        "hgabPage": "540",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Bato to Sitio Bantilan, Biliran, Biliran (Sta. 0+000 - Sta. 0+500)",
      "source_code": "2027DPWH-Proposal-37875",
      "office": "Biliran District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Road, Sitio Bantilan, Barangay Bato, Biliran, Biliran",
      "prior_amount": 9000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 492869",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+500.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37875",
        "nepTitle": "Rehabilitation of Road, Barangay Bato to Sitio Bantilan, Biliran, Biliran (Sta. 0+000 - Sta. 0+500)",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0591-009464",
        "hgabTitle": "Rehabilitation of Road, Barangay Bato to Sitio Bantilan, Biliran, Biliran (Sta. 0+000 - Sta. 0+500)",
        "hgabPesos": 10000000,
        "nepPage": "539",
        "hgabPage": "591",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Bato to Sitio Bantilan, Biliran, Biliran (Sta. 0+000 - Sta. 0+500)",
      "source_code": "2027DPWH-Proposal-37875",
      "office": "Biliran District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Road, Sitio Bantilan, Barangay Bato, Biliran, Biliran",
      "prior_amount": 6930000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 424932",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+500.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37875",
        "nepTitle": "Rehabilitation of Road, Barangay Bato to Sitio Bantilan, Biliran, Biliran (Sta. 0+000 - Sta. 0+500)",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0591-009464",
        "hgabTitle": "Rehabilitation of Road, Barangay Bato to Sitio Bantilan, Biliran, Biliran (Sta. 0+000 - Sta. 0+500)",
        "hgabPesos": 10000000,
        "nepPage": "539",
        "hgabPage": "591",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Dalumpinas Oeste, City of San Fernando, La Union",
      "source_code": "2027DPWH-Proposal-34387",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Brgy. Dalumpinas Oeste, San Fernando City, La Union",
      "prior_amount": 1100000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117202488000 · PDF p. 1225 · printed p. 2690",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34387",
        "nepTitle": "Rehabilitation of Road, Barangay Dalumpinas Oeste, City of San Fernando, La Union",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0465-006738",
        "hgabTitle": "Rehabilitation of Road, Barangay Dalumpinas Oeste, City of San Fernando, La Union",
        "hgabPesos": 10000000,
        "nepPage": "464",
        "hgabPage": "465",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Kanluran, Calauan, Laguna",
      "source_code": "2027DPWH-Proposal-36755",
      "office": "Laguna 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Road, Brgy. Kanluran, Calauan, Laguna",
      "prior_amount": 9000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575206",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36755",
        "nepTitle": "Rehabilitation of Road, Barangay Kanluran, Calauan, Laguna",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0547-008500",
        "hgabTitle": "Rehabilitation of Road, Barangay Kanluran, Calauan, Laguna",
        "hgabPesos": 10000000,
        "nepPage": "511",
        "hgabPage": "547",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Luquin, Liliw, Laguna",
      "source_code": "2027DPWH-Proposal-36754",
      "office": "Laguna 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Luquin, Liliw, Laguna",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 537238",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36754",
        "nepTitle": "Rehabilitation of Road, Barangay Luquin, Liliw, Laguna",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0547-008501",
        "hgabTitle": "Rehabilitation of Road, Barangay Luquin, Liliw, Laguna",
        "hgabPesos": 20000000,
        "nepPage": "511",
        "hgabPage": "547",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Maabud South, San Nicolas, Batangas",
      "source_code": "2027DPWH-Proposal-36579",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Road, Maabud South, San Nicolas, Batangas",
      "prior_amount": 1000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201055000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36579",
        "nepTitle": "Rehabilitation of Road, Barangay Maabud South, San Nicolas, Batangas",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0540-008353",
        "hgabTitle": "Rehabilitation of Road, Barangay Maabud South, San Nicolas, Batangas",
        "hgabPesos": 5000000,
        "nepPage": "507",
        "hgabPage": "540",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Maligaya, Cauayan City, Isabela",
      "source_code": "2027DPWH-Proposal-35257",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road of Barangay Maligaya, Cauayan City, Isabela",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427799",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35257",
        "nepTitle": "Rehabilitation of Road, Barangay Maligaya, Cauayan City, Isabela",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0503-007551",
        "hgabTitle": "Rehabilitation of Road, Barangay Maligaya, Cauayan City, Isabela",
        "hgabPesos": 20000000,
        "nepPage": "483",
        "hgabPage": "503",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Maligaya, Cauayan City, Isabela",
      "source_code": "2027DPWH-Proposal-35257",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Maligaya, Cauayan City, Isabela",
      "prior_amount": 20000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 550893",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35257",
        "nepTitle": "Rehabilitation of Road, Barangay Maligaya, Cauayan City, Isabela",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0503-007551",
        "hgabTitle": "Rehabilitation of Road, Barangay Maligaya, Cauayan City, Isabela",
        "hgabPesos": 20000000,
        "nepPage": "483",
        "hgabPage": "503",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Maligaya, Cauayan City, Isabela",
      "source_code": "2027DPWH-Proposal-35257",
      "office": "Isabela 4th District Engineering Office",
      "region": "Region II",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Road, Barangay Maligaya,Sta. 0+000 - Sta. 0+968, City of Cauayan, Isabela",
      "prior_amount": 14700000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 20990",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+968.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Bojie Dy"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35257",
        "nepTitle": "Rehabilitation of Road, Barangay Maligaya, Cauayan City, Isabela",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0503-007551",
        "hgabTitle": "Rehabilitation of Road, Barangay Maligaya, Cauayan City, Isabela",
        "hgabPesos": 20000000,
        "nepPage": "483",
        "hgabPage": "503",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Manlabang, Caibiran, Biliran (Sta. 0+000 - Sta. 0+177)",
      "source_code": "2027DPWH-Proposal-37873",
      "office": "Biliran District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Road, Barangay Manlabang, Caibiran, Biliran (Sta. 0+000- Sta. 0+410)",
      "prior_amount": 9648000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 23128",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+177.00",
      "prior_chainage": "0+000.00–0+410.00",
      "chainage_overlap": "0+000.00–0+177.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37873",
        "nepTitle": "Rehabilitation of Road, Barangay Manlabang, Caibiran, Biliran (Sta. 0+000 - Sta. 0+177)",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0591-009468",
        "hgabTitle": "Rehabilitation of Road, Barangay Manlabang, Caibiran, Biliran (Sta. 0+000 - Sta. 0+177)",
        "hgabPesos": 5000000,
        "nepPage": "539",
        "hgabPage": "591",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Maruclap, Batangas City",
      "source_code": "2027DPWH-Proposal-36175",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2026,
      "prior_project": "Improvement of Road, Sta.0+000 - Sta.0+936, Barangay Maruclap, Batangas City, Batangas",
      "prior_amount": 8018000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 21880",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+936.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36175",
        "nepTitle": "Rehabilitation of Road, Barangay Maruclap, Batangas City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008306",
        "hgabTitle": "Rehabilitation of Road, Barangay Maruclap, Batangas City",
        "hgabPesos": 15000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Maruclap, Batangas City",
      "source_code": "2027DPWH-Proposal-36175",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 15000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Road, Brgy. Maruclap, Batangas City",
      "prior_amount": 4000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200996000",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36175",
        "nepTitle": "Rehabilitation of Road, Barangay Maruclap, Batangas City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0538-008306",
        "hgabTitle": "Rehabilitation of Road, Barangay Maruclap, Batangas City",
        "hgabPesos": 15000000,
        "nepPage": "506",
        "hgabPage": "538",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Migara, Sta. 0+000 - Sta. 0+200, Calbayog City, Samar",
      "source_code": "2027DPWH-Proposal-38084",
      "office": "Samar 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Rehabilitation of Calbayog-Migara Road in Calbayog City, Samar",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 527635",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+200.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Stephen James Tan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38084",
        "nepTitle": "Rehabilitation of Road, Barangay Migara, Sta. 0+000 - Sta. 0+200, Calbayog City, Samar",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0599-009629",
        "hgabTitle": "Rehabilitation of Road, Barangay Migara, Sta. 0+000 - Sta. 0+200, Calbayog City, Samar",
        "hgabPesos": 5000000,
        "nepPage": "543",
        "hgabPage": "599",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Niyugan, Laurel, Batangas",
      "source_code": "2027DPWH-Proposal-36593",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5500000,
      "comparison_year": 2020,
      "prior_project": "Rehabilitation of Roads in Brgy. Niyugan, Laurel, Batangas",
      "prior_amount": 1000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 492562",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36593",
        "nepTitle": "Rehabilitation of Road, Barangay Niyugan, Laurel, Batangas",
        "nepPesos": 5500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0540-008354",
        "hgabTitle": "Rehabilitation of Road, Barangay Niyugan, Laurel, Batangas",
        "hgabPesos": 5500000,
        "nepPage": "507",
        "hgabPage": "540",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Poblacion, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
      "source_code": "2027DPWH-Proposal-35942",
      "office": "Bulacan 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Poblacion, San Ildefonso, Bulacan",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427950",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+400.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35942",
        "nepTitle": "Rehabilitation of Road, Barangay Poblacion, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0518-007855",
        "hgabTitle": "Rehabilitation of Road, Barangay Poblacion, San Ildefonso, Bulacan Sta. 00+000 - 00+400",
        "hgabPesos": 5000000,
        "nepPage": "494",
        "hgabPage": "518",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay San Marcos, San Nicolas, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-34190",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 15000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Road at Barangay San Marcos, San Nicolas, Ilocos Norte",
      "prior_amount": 6000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427365",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Eugenio Angelo Barba"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34190",
        "nepTitle": "Rehabilitation of Road, Barangay San Marcos, San Nicolas, Ilocos Norte",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0465-006725",
        "hgabTitle": "Rehabilitation of Road, Barangay San Marcos, San Nicolas, Ilocos Norte",
        "hgabPesos": 15000000,
        "nepPage": "464",
        "hgabPage": "465",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay San Marcos, San Nicolas, Ilocos Norte",
      "source_code": "2027DPWH-Proposal-34190",
      "office": "Ilocos Norte 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Barangay Road, Barangay, San Marcos, San Nicolas, Ilocos Norte",
      "prior_amount": 6500000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535034",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Eugenio Angelo Barba"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34190",
        "nepTitle": "Rehabilitation of Road, Barangay San Marcos, San Nicolas, Ilocos Norte",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0465-006725",
        "hgabTitle": "Rehabilitation of Road, Barangay San Marcos, San Nicolas, Ilocos Norte",
        "hgabPesos": 15000000,
        "nepPage": "464",
        "hgabPage": "465",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay San Miguel, Luna Isabela",
      "source_code": "2027DPWH-Proposal-35190",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 25000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Barangay San Miguel, Luna, Isabela",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 425684",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35190",
        "nepTitle": "Rehabilitation of Road, Barangay San Miguel, Luna Isabela",
        "nepPesos": 25000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0494-007359",
        "hgabTitle": "Rehabilitation of Road, Barangay San Miguel, Luna Isabela",
        "hgabPesos": 25000000,
        "nepPage": "479",
        "hgabPage": "494",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Tandu Patong, Maimbung, Sulu Sta. 00+300 to Sta. 02+000",
      "source_code": "2027DPWH-Proposal-38317",
      "office": "Sulu 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Concreting of Road at Brgy. Tandu Patong, Maimbung, Sulu",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 534865",
      "similarity_pct": 100,
      "current_chainage": "0+300.00–2+000.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Samier Tan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38317",
        "nepTitle": "Rehabilitation of Road, Barangay Tandu Patong, Maimbung, Sulu Sta. 00+300 to Sta. 02+000",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0600-009654",
        "hgabTitle": "Rehabilitation of Road, Barangay Tandu Patong, Maimbung, Sulu Sta. 00+300 to Sta. 02+000",
        "hgabPesos": 50000000,
        "nepPage": "544",
        "hgabPage": "600",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Tapuyan, Gasan, Marinduque",
      "source_code": "2027DPWH-Proposal-36828",
      "office": "Marinduque District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 20000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Tapuyan, Gasan, Marinduque",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 552271",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36828",
        "nepTitle": "Rehabilitation of Road, Barangay Tapuyan, Gasan, Marinduque",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0552-008607",
        "hgabTitle": "Rehabilitation of Road, Barangay Tapuyan, Gasan, Marinduque",
        "hgabPesos": 20000000,
        "nepPage": "514",
        "hgabPage": "552",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Tawiran, City of Calapan, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36879",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Road at Brgy. Tawiran, Calapan, Oriental Mindoro",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300116201816000 · PDF p. 1187 · printed p. 2652",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36879",
        "nepTitle": "Rehabilitation of Road, Barangay Tawiran, City of Calapan, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Tubig Samin, Maimbung, Sulu Sta. 00+000 to Sta. 01+700",
      "source_code": "2027DPWH-Proposal-38316",
      "office": "Sulu 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Concreting of Road at Brgy. Tubig Samin, Maimbung, Sulu",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 534866",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+700.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Samier Tan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38316",
        "nepTitle": "Rehabilitation of Road, Barangay Tubig Samin, Maimbung, Sulu Sta. 00+000 to Sta. 01+700",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0600-009655",
        "hgabTitle": "Rehabilitation of Road, Barangay Tubig Samin, Maimbung, Sulu Sta. 00+000 to Sta. 01+700",
        "hgabPesos": 50000000,
        "nepPage": "544",
        "hgabPage": "600",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Tubig Samin, Maimbung, Sulu Sta. 00+000 to Sta. 01+700",
      "source_code": "2027DPWH-Proposal-38316",
      "office": "Sulu 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 50000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Barangay Tubig Samin, Maimbung, Sulu",
      "prior_amount": 35000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551122",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+700.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Samier Tan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38316",
        "nepTitle": "Rehabilitation of Road, Barangay Tubig Samin, Maimbung, Sulu Sta. 00+000 to Sta. 01+700",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0600-009655",
        "hgabTitle": "Rehabilitation of Road, Barangay Tubig Samin, Maimbung, Sulu Sta. 00+000 to Sta. 01+700",
        "hgabPesos": 50000000,
        "nepPage": "544",
        "hgabPage": "600",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Ugong Norte Quezon City",
      "source_code": "2027DPWH-Proposal-33999",
      "office": "Quezon City 2nd District Engineering Office",
      "region": "NCR",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Roads, Barangay Ugong Norte, Quezon City",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574486",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33999",
        "nepTitle": "Rehabilitation of Road, Barangay Ugong Norte Quezon City",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0458-006592",
        "hgabTitle": "Rehabilitation of Road, Barangay Ugong Norte Quezon City",
        "hgabPesos": 50000000,
        "nepPage": "462",
        "hgabPage": "458",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Soldiers Hills, Barangay Putatan, Muntinlupa City",
      "source_code": "2027DPWH-Proposal-33933",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "region": "NCR",
      "amount_2027": 20000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Road at Soldiers Hills, Sta. 0+000 to Sta. 0+450, Barangay Putatan, Muntinlupa City",
      "prior_amount": 18011000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 20147",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+450.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33933",
        "nepTitle": "Rehabilitation of Road, Soldiers Hills, Barangay Putatan, Muntinlupa City",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0449-006421",
        "hgabTitle": "Rehabilitation of Road, Soldiers Hills, Barangay Putatan, Muntinlupa City",
        "hgabPesos": 20000000,
        "nepPage": "455",
        "hgabPage": "449",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-35568",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Lolomboy Road, Barangay Lolomboy, Bocaue, Bulacan",
      "prior_amount": 25000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427879",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+135.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35568",
        "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0510-007712",
        "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan",
        "hgabPesos": 20000000,
        "nepPage": "488",
        "hgabPage": "510",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-35568",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Lolomboy, Bocaue, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522248",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+135.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35568",
        "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0510-007712",
        "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan",
        "hgabPesos": 20000000,
        "nepPage": "488",
        "hgabPage": "510",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-35568",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 20000000,
      "comparison_year": 2023,
      "prior_project": "Rehabilitation of Road, Barangay Lolomboy, Bocaue, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535467",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+135.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35568",
        "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0510-007712",
        "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan",
        "hgabPesos": 20000000,
        "nepPage": "488",
        "hgabPage": "510",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-35568",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 20000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Lolomboy, Bocaue, Bulacan",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 559001",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+135.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35568",
        "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0510-007712",
        "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+135, Lolomboy, Bocaue, Bulacan",
        "hgabPesos": 20000000,
        "nepPage": "488",
        "hgabPage": "510",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+142.60, San Vicente, Paombong, Bulacan",
      "source_code": "2027DPWH-Proposal-03519",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Road at Barangay San Vicente, Paombong, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427903",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+142.60",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03519",
        "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+142.60, San Vicente, Paombong, Bulacan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0510-007713",
        "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+142.60, San Vicente, Paombong, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "488",
        "hgabPage": "510",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+142.60, San Vicente, Paombong, Bulacan",
      "source_code": "2027DPWH-Proposal-03519",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road at Barangay San Vicente, Paombong, Bulacan",
      "prior_amount": 7000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551752",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+142.60",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03519",
        "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+142.60, San Vicente, Paombong, Bulacan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0510-007713",
        "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+142.60, San Vicente, Paombong, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "488",
        "hgabPage": "510",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+640.53, Sulivan, Baliuag, Bulacan",
      "source_code": "2027DPWH-Proposal-03565",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2017,
      "prior_project": "Construction of barangay road, Sulivan, Baliuag, Bulacan",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307317",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+640.53",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03565",
        "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+640.53, Sulivan, Baliuag, Bulacan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0510-007717",
        "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+640.53, Sulivan, Baliuag, Bulacan",
        "hgabPesos": 5000000,
        "nepPage": "488",
        "hgabPage": "510",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+862, Barangay Dagum, Calbayog City, Samar",
      "source_code": "2027DPWH-Proposal-02729",
      "office": "Samar 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 25000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Dagum, Sta. 0+000 - Sta. 0+295, Calbayog City, Samar",
      "prior_amount": 95515000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 26136",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–0+862.00",
      "prior_chainage": "0+000.00–0+295.00",
      "chainage_overlap": "0+000.00–0+295.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Stephen James Tan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02729",
        "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+862, Barangay Dagum, Calbayog City, Samar",
        "nepPesos": 25000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0599-009641",
        "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 0+862, Barangay Dagum, Calbayog City, Samar",
        "hgabPesos": 25000000,
        "nepPage": "543",
        "hgabPage": "599",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+092, Iba-Ibayo, Hagonoy, Bulacan",
      "source_code": "2027DPWH-Proposal-03473",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Road at Barangay Iba-Ibayo, Hagonoy, Bulacan",
      "prior_amount": 8000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560388",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+092.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03473",
        "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+092, Iba-Ibayo, Hagonoy, Bulacan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0511-007722",
        "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+092, Iba-Ibayo, Hagonoy, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "488",
        "hgabPage": "511",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+320, Bagong Silang, Plaridel, Bulacan",
      "source_code": "2027DPWH-Proposal-03541",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Road, Bagong Silang, Plaridel, Bulacan",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427934",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+320.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03541",
        "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+320, Bagong Silang, Plaridel, Bulacan",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0511-007723",
        "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+320, Bagong Silang, Plaridel, Bulacan",
        "hgabPesos": 30000000,
        "nepPage": "488",
        "hgabPage": "511",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+320, Bagong Silang, Plaridel, Bulacan",
      "source_code": "2027DPWH-Proposal-03541",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 30000000,
      "comparison_year": 2017,
      "prior_project": "Construction/Improvement Road, Brgy. Bagong Silang, Plaridel, Bulacan",
      "prior_amount": 3000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050307295",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+320.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03541",
        "nepTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+320, Bagong Silang, Plaridel, Bulacan",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0511-007723",
        "hgabTitle": "Rehabilitation of Road, Sta. 0+000 - Sta. 1+320, Bagong Silang, Plaridel, Bulacan",
        "hgabPesos": 30000000,
        "nepPage": "488",
        "hgabPage": "511",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Sta. 2+627 - Sta. 2+927, Iba O' Este, Calumpit, Bulacan",
      "source_code": "2027DPWH-Proposal-03491",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Road at Barangay Iba O' Este, Calumpit, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 560418",
      "similarity_pct": 100,
      "current_chainage": "2+627.00–2+927.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03491",
        "nepTitle": "Rehabilitation of Road, Sta. 2+627 - Sta. 2+927, Iba O' Este, Calumpit, Bulacan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0511-007725",
        "hgabTitle": "Rehabilitation of Road, Sta. 2+627 - Sta. 2+927, Iba O' Este, Calumpit, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "488",
        "hgabPage": "511",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Roads in Barangay Canitoan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39198",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Canitoan Road, Canitoan, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574361",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39198",
        "nepTitle": "Rehabilitation of Roads in Barangay Canitoan, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0608-009814",
        "hgabTitle": "Rehabilitation of Roads in Barangay Canitoan, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 10000000,
        "nepPage": "549",
        "hgabPage": "608",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Roads in Barangay Canitoan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39198",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2026,
      "prior_project": "Rehabilitation of Road at Barangay Canitoan (Sta. 0+000 - Sta. 2+000), Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 37754000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 23554",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–2+000.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39198",
        "nepTitle": "Rehabilitation of Roads in Barangay Canitoan, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0608-009814",
        "hgabTitle": "Rehabilitation of Roads in Barangay Canitoan, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 10000000,
        "nepPage": "549",
        "hgabPage": "608",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation/Improvement of Cabalantian Road, Bacolor Pampanga",
      "source_code": "2027DPWH-Proposal-36072",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Roads, Cabalantian, Bacolor, Pampanga",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574983",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36072",
        "nepTitle": "Rehabilitation/Improvement of Cabalantian Road, Bacolor Pampanga",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0528-008093",
        "hgabTitle": "Rehabilitation/Improvement of Cabalantian Road, Bacolor Pampanga",
        "hgabPesos": 15000000,
        "nepPage": "500",
        "hgabPage": "528",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation/Improvement of Road at Barangay Balayong, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-35575",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Road at Barangay Balayong, Malolos, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574914",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Danny Domingo"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35575",
        "nepTitle": "Rehabilitation/Improvement of Road at Barangay Balayong, City of Malolos, Bulacan",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0511-007730",
        "hgabTitle": "Rehabilitation/Improvement of Road at Barangay Balayong, City of Malolos, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "488",
        "hgabPage": "511",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation/Improvement of Road at Barangay Bangkal, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-35577",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Road, Barangay Bangkal, Malolos City, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574900",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Danny Domingo"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35577",
        "nepTitle": "Rehabilitation/Improvement of Road at Barangay Bangkal, City of Malolos, Bulacan",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0511-007731",
        "hgabTitle": "Rehabilitation/Improvement of Road at Barangay Bangkal, City of Malolos, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "489",
        "hgabPage": "511",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation/Improvement of Road at Barangay Caingin, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-35584",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Improvement of Road at Barangay Caingin, Malolos City, Bulacan",
      "prior_amount": 6000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 551756",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Danny Domingo"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35584",
        "nepTitle": "Rehabilitation/Improvement of Road at Barangay Caingin, City of Malolos, Bulacan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0511-007733",
        "hgabTitle": "Rehabilitation/Improvement of Road at Barangay Caingin, City of Malolos, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "489",
        "hgabPage": "511",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation/Improvement of Road at Barangay Caingin, City of Malolos, Bulacan",
      "source_code": "2027DPWH-Proposal-35584",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road at Barangay Caingin, Malolos City, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 559008",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Danny Domingo"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35584",
        "nepTitle": "Rehabilitation/Improvement of Road at Barangay Caingin, City of Malolos, Bulacan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0511-007733",
        "hgabTitle": "Rehabilitation/Improvement of Road at Barangay Caingin, City of Malolos, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "489",
        "hgabPage": "511",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Road Concreting in Brgy. Caracol, Salug, Zamboanga del Norte",
      "source_code": "2027DPWH-Proposal-38149",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 8000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road, Caracol, Salug, Zamboanga del Norte",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522999",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38149",
        "nepTitle": "Road Concreting in Brgy. Caracol, Salug, Zamboanga del Norte",
        "nepPesos": 8000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0603-009704",
        "hgabTitle": "Road Concreting in Barangay Caracol, Salug, Zamboanga del Norte",
        "hgabPesos": 8000000,
        "nepPage": "545",
        "hgabPage": "603",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Road Concreting in Brgy. Caracol, Salug, Zamboanga del Norte",
      "source_code": "2027DPWH-Proposal-38149",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 8000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road, Barangay Caracol, Salug, Zamboanga del Norte (Sta. 0+000 - Sta. 0+420)",
      "prior_amount": 5788000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 28788",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "0+000.00–0+420.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38149",
        "nepTitle": "Road Concreting in Brgy. Caracol, Salug, Zamboanga del Norte",
        "nepPesos": 8000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0603-009704",
        "hgabTitle": "Road Concreting in Barangay Caracol, Salug, Zamboanga del Norte",
        "hgabPesos": 8000000,
        "nepPage": "545",
        "hgabPage": "603",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Road Connecting Santa-Rancho Road (S00089LZ) and Santa-Caoayan Road, Caoayan, Ilocos Sur",
      "source_code": "2027DPWH-Proposal-20307",
      "office": "Ilocos Sur 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 50000000,
      "comparison_year": 2024,
      "prior_project": "Road Connecting Santa - Rancho Road ( S00089LZ ) and Santa - Caoayan Road, Ilocos Sur",
      "prior_amount": 155100000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597094",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20307",
        "nepTitle": "Road Connecting Santa-Rancho Road (S00089LZ) and Santa-Caoayan Road, Caoayan, Ilocos Sur",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Road Connecting Santa-Rancho Road (S00089LZ) and Santa-Caoayan Road, Sta. 1+045.80 - Sta. 1+501.70, Ilocos Sur",
      "source_code": "2027DPWH-Proposal-20308",
      "office": "Ilocos Sur 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 100162000,
      "comparison_year": 2024,
      "prior_project": "Road Connecting Santa - Rancho Road ( S00089LZ ) and Santa - Caoayan Road, Ilocos Sur",
      "prior_amount": 155100000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597094",
      "similarity_pct": 100,
      "current_chainage": "1+045.80–1+501.70",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20308",
        "nepTitle": "Road Connecting Santa-Rancho Road (S00089LZ) and Santa-Caoayan Road, Sta. 1+045.80 - Sta. 1+501.70, Ilocos Sur",
        "nepPesos": 100162000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002256",
        "hgabTitle": "Road Connecting Santa-Rancho Road (S00089LZ) and Santa-Caoayan Road, Sta. 1+045.80 - Sta. 1+501.70, Ilocos Sur",
        "hgabPesos": 100162000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Villasis-Urdaneta City, Pangasinan",
      "source_code": "2027DPWH-Proposal-31739",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 70000000,
      "comparison_year": 2022,
      "prior_project": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Pangasinan",
      "prior_amount": 60000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547277",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31739",
        "nepTitle": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Villasis-Urdaneta City, Pangasinan",
        "nepPesos": 70000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001891",
        "hgabTitle": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Villasis- Urdaneta City, Pangasinan",
        "hgabPesos": 70000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Villasis-Urdaneta City, Pangasinan",
      "source_code": "2027DPWH-Proposal-31739",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 70000000,
      "comparison_year": 2023,
      "prior_project": "Road connecting Villasis - Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Pangasinan",
      "prior_amount": 95000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566155",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31739",
        "nepTitle": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Villasis-Urdaneta City, Pangasinan",
        "nepPesos": 70000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001891",
        "hgabTitle": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Villasis- Urdaneta City, Pangasinan",
        "hgabPesos": 70000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Villasis-Urdaneta City, Pangasinan",
      "source_code": "2027DPWH-Proposal-31739",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 70000000,
      "comparison_year": 2024,
      "prior_project": "Road connecting Villasis - Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Pangasinan",
      "prior_amount": 80000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595473",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31739",
        "nepTitle": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Villasis-Urdaneta City, Pangasinan",
        "nepPesos": 70000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001891",
        "hgabTitle": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Villasis- Urdaneta City, Pangasinan",
        "hgabPesos": 70000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Villasis-Urdaneta City, Pangasinan",
      "source_code": "2027DPWH-Proposal-31739",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 70000000,
      "comparison_year": 2025,
      "prior_project": "Road connecting Villasis-Sto. Tomas Bypass Road to Urdaneta City Bypass Road, Pangasinan",
      "prior_amount": 105000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631748",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31739",
        "nepTitle": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Villasis-Urdaneta City, Pangasinan",
        "nepPesos": 70000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001891",
        "hgabTitle": "Road connecting Villasis-Sto.Tomas Bypass Road to Urdaneta City Bypass Road, Villasis- Urdaneta City, Pangasinan",
        "hgabPesos": 70000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Roxas City Circumferential Road, C2 Section, Capiz - Sta. 0+000 - Sta. 1+300",
      "source_code": "2027DPWH-Proposal-32871",
      "office": "Capiz 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 150000000,
      "comparison_year": 2022,
      "prior_project": "Roxas City Circumferential Road, C2 Section, Capiz",
      "prior_amount": 105000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547376",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+300.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32871",
        "nepTitle": "Roxas City Circumferential Road, C2 Section, Capiz - Sta. 0+000 - Sta. 1+300",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Roxas City Circumferential Road, C2 Section, Capiz - Sta. 0+000 - Sta. 1+300",
      "source_code": "2027DPWH-Proposal-32871",
      "office": "Capiz 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 150000000,
      "comparison_year": 2024,
      "prior_project": "Roxas City Circumferential Road, C2 Section, Capiz",
      "prior_amount": 80000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595639",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+300.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32871",
        "nepTitle": "Roxas City Circumferential Road, C2 Section, Capiz - Sta. 0+000 - Sta. 1+300",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Roxas City Circumferential Road, C2 Section, Capiz - Sta. 0+000 - Sta. 1+300",
      "source_code": "2027DPWH-Proposal-32871",
      "office": "Capiz 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 150000000,
      "comparison_year": 2025,
      "prior_project": "Roxas City Circumferential Road, C2 Section, Capiz",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631441",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–1+300.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32871",
        "nepTitle": "Roxas City Circumferential Road, C2 Section, Capiz - Sta. 0+000 - Sta. 1+300",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Roxas City Circumferential Road, C3 Section, Capiz - Sta. 2+766 - Sta. 3+180, Sta. 3+500 - Sta. 5+228.5",
      "source_code": "2027DPWH-Proposal-32872",
      "office": "Capiz 1st District Engineering Office",
      "region": "Region VI",
      "amount_2027": 250000000,
      "comparison_year": 2025,
      "prior_project": "Roxas City Circumferential Road, C3 Section, Capiz",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631921",
      "similarity_pct": 100,
      "current_chainage": "2+766.00–3+180.00 · 3+500.00–5+228.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32872",
        "nepTitle": "Roxas City Circumferential Road, C3 Section, Capiz - Sta. 2+766 - Sta. 3+180, Sta. 3+500 - Sta. 5+228.5",
        "nepPesos": 250000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sagada-Besao-Quirino (via Laylaya) Road, Sta. 28+985 - Sta. 30+635, Besao, Mt. Province",
      "source_code": "2027DPWH-Proposal-20281",
      "office": "Mountain Province 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 100000000,
      "comparison_year": 2018,
      "prior_project": "Sagada-Besao-Quirino (via Laylaya) Road, Mt. Province",
      "prior_amount": 20000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310205100193000",
      "similarity_pct": 100,
      "current_chainage": "28+985.00–30+635.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20281",
        "nepTitle": "Sagada-Besao-Quirino (via Laylaya) Road, Sta. 28+985 - Sta. 30+635, Besao, Mt. Province",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Carlos City Bypass Road, Pangasinan",
      "source_code": "2027DPWH-Proposal-20657",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 346000000,
      "comparison_year": 2020,
      "prior_project": "San Carlos City Bypass Road, San Carlos City, Pangasinan",
      "prior_amount": 85000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512412",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20657",
        "nepTitle": "San Carlos City Bypass Road, Pangasinan",
        "nepPesos": 346000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001892",
        "hgabTitle": "San Carlos City Bypass Road, Pangasinan",
        "hgabPesos": 346000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Jose City Bypass Road, Sta. 5+200 - Sta. 5+600, Sta. 5+651 - Sta. 6+060, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-20583",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 175000000,
      "comparison_year": 2019,
      "prior_project": "San Jose City Bypass Road, Nueva Ecija",
      "prior_amount": 100000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100415000 · PDF p. 188 · printed p. 1653",
      "similarity_pct": 100,
      "current_chainage": "5+200.00–5+600.00 · 5+651.00–6+060.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20583",
        "nepTitle": "San Jose City Bypass Road, Sta. 5+200 - Sta. 5+600, Sta. 5+651 - Sta. 6+060, Nueva Ecija",
        "nepPesos": 175000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0218-001962",
        "hgabTitle": "San Jose City Bypass Road, Sta. 5+200 - Sta. 5+600, Sta. 5+651 - Sta. 6+060, Nueva Ecija",
        "hgabPesos": 175000000,
        "nepPage": "280",
        "hgabPage": "218",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Jose City Bypass Road, Sta. 7+003 - Sta. 7+094, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-20584",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 87500000,
      "comparison_year": 2019,
      "prior_project": "San Jose City Bypass Road, Nueva Ecija",
      "prior_amount": 100000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100415000 · PDF p. 188 · printed p. 1653",
      "similarity_pct": 100,
      "current_chainage": "7+003.00–7+094.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20584",
        "nepTitle": "San Jose City Bypass Road, Sta. 7+003 - Sta. 7+094, Nueva Ecija",
        "nepPesos": 87500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0218-001963",
        "hgabTitle": "San Jose City Bypass Road, Sta. 7+003 - Sta. 7+094, Nueva Ecija",
        "hgabPesos": 87500000,
        "nepPage": "280",
        "hgabPage": "218",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Sta. 141+530 - Sta. 143+770, Sta. 143+830 – Sta. 145+240, Batangas",
      "source_code": "2027DPWH-Proposal-20553",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Batangas",
      "prior_amount": 58197000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566710",
      "similarity_pct": 100,
      "current_chainage": "141+530.00–143+770.00 · 143+830.00–145+240.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20553",
        "nepTitle": "San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Sta. 141+530 - Sta. 143+770, Sta. 143+830 – Sta. 145+240, Batangas",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0220-002015",
        "hgabTitle": "San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Sta. 141+530 - Sta. 143+770, Sta. 143+830 – Sta. 145+240, Batangas",
        "hgabPesos": 100000000,
        "nepPage": "281",
        "hgabPage": "220",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Sta. 141+530 - Sta. 143+770, Sta. 143+830 – Sta. 145+240, Batangas",
      "source_code": "2027DPWH-Proposal-20553",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2024,
      "prior_project": "San Juan Bypass ( Rosario - San Juan - Laiya Tourism Bypass Road ) , Batangas",
      "prior_amount": 60000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595069",
      "similarity_pct": 100,
      "current_chainage": "141+530.00–143+770.00 · 143+830.00–145+240.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20553",
        "nepTitle": "San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Sta. 141+530 - Sta. 143+770, Sta. 143+830 – Sta. 145+240, Batangas",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0220-002015",
        "hgabTitle": "San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Sta. 141+530 - Sta. 143+770, Sta. 143+830 – Sta. 145+240, Batangas",
        "hgabPesos": 100000000,
        "nepPage": "281",
        "hgabPage": "220",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Sta. 141+530 - Sta. 143+770, Sta. 143+830 – Sta. 145+240, Batangas",
      "source_code": "2027DPWH-Proposal-20553",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Batangas",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631843",
      "similarity_pct": 100,
      "current_chainage": "141+530.00–143+770.00 · 143+830.00–145+240.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20553",
        "nepTitle": "San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Sta. 141+530 - Sta. 143+770, Sta. 143+830 – Sta. 145+240, Batangas",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0220-002015",
        "hgabTitle": "San Juan Bypass (Rosario-San Juan-Laiya Tourism Bypass Road), Sta. 141+530 - Sta. 143+770, Sta. 143+830 – Sta. 145+240, Batangas",
        "hgabPesos": 100000000,
        "nepPage": "281",
        "hgabPage": "220",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Lorenzo-Salvacion-Fatima-Tagas-San Roque-Tabaco Wharf Road, Tabaco City, Sta. 2+820.80- Sta. 3+020.80, Albay",
      "source_code": "2027DPWH-Proposal-32845",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "San Lorenzo-Salvacion-Fatima-Tagas-San Roque-Tabaco Wharf Road, Albay",
      "prior_amount": 20000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436933",
      "similarity_pct": 100,
      "current_chainage": "2+820.80–3+020.80",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32845",
        "nepTitle": "San Lorenzo-Salvacion-Fatima-Tagas-San Roque-Tabaco Wharf Road, Tabaco City, Sta. 2+820.80- Sta. 3+020.80, Albay",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Lorenzo-Salvacion-Fatima-Tagas-San Roque-Tabaco Wharf Road, Tabaco City, Sta. 2+820.80- Sta. 3+020.80, Albay",
      "source_code": "2027DPWH-Proposal-32845",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 20000000,
      "comparison_year": 2022,
      "prior_project": "San Lorenzo-Salvacion-Fatima-Tagas-San Roque-Tabaco Wharf Road , Albay",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547574",
      "similarity_pct": 100,
      "current_chainage": "2+820.80–3+020.80",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32845",
        "nepTitle": "San Lorenzo-Salvacion-Fatima-Tagas-San Roque-Tabaco Wharf Road, Tabaco City, Sta. 2+820.80- Sta. 3+020.80, Albay",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Lorenzo-Salvacion-Fatima-Tagas-San Roque-Tabaco Wharf Road, Tabaco City, Sta. 2+820.80- Sta. 3+020.80, Albay",
      "source_code": "2027DPWH-Proposal-32845",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 20000000,
      "comparison_year": 2023,
      "prior_project": "San Lorenzo-Salvacion-Fatima-Tagas-San Roque-Tabaco Wharf Road, Tabaco City, Albay",
      "prior_amount": 40000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 567036",
      "similarity_pct": 100,
      "current_chainage": "2+820.80–3+020.80",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32845",
        "nepTitle": "San Lorenzo-Salvacion-Fatima-Tagas-San Roque-Tabaco Wharf Road, Tabaco City, Sta. 2+820.80- Sta. 3+020.80, Albay",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Lorenzo-Salvacion-Fatima-Tagas-San Roque-Tabaco Wharf Road, Tabaco City, Sta. 2+820.80- Sta. 3+020.80, Albay",
      "source_code": "2027DPWH-Proposal-32845",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 20000000,
      "comparison_year": 2024,
      "prior_project": "San Lorenzo - Salvacion - Fatima - Tagas - San Roque - Tabaco Wharf Road, Albay",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595880",
      "similarity_pct": 100,
      "current_chainage": "2+820.80–3+020.80",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32845",
        "nepTitle": "San Lorenzo-Salvacion-Fatima-Tagas-San Roque-Tabaco Wharf Road, Tabaco City, Sta. 2+820.80- Sta. 3+020.80, Albay",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020",
      "source_code": "2027DPWH-Proposal-20314",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 170000000,
      "comparison_year": 2021,
      "prior_project": "San Manuel (Pangasinan) - Itogon (Benguet) Road, Pangasinan",
      "prior_amount": 50000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437139",
      "similarity_pct": 100,
      "current_chainage": "11+760.00–13+725.00 · 16+140.00–18+020.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20314",
        "nepTitle": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020",
        "nepPesos": 170000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002258",
        "hgabTitle": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020",
        "hgabPesos": 170000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020",
      "source_code": "2027DPWH-Proposal-20314",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 170000000,
      "comparison_year": 2022,
      "prior_project": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Pangasinan",
      "prior_amount": 60000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548503",
      "similarity_pct": 100,
      "current_chainage": "11+760.00–13+725.00 · 16+140.00–18+020.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20314",
        "nepTitle": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020",
        "nepPesos": 170000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002258",
        "hgabTitle": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020",
        "hgabPesos": 170000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020",
      "source_code": "2027DPWH-Proposal-20314",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 170000000,
      "comparison_year": 2023,
      "prior_project": "San Manuel ( Pangasinan ) - Itogon ( Benguet ) Road, Pangasinan",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 567871",
      "similarity_pct": 100,
      "current_chainage": "11+760.00–13+725.00 · 16+140.00–18+020.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20314",
        "nepTitle": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020",
        "nepPesos": 170000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002258",
        "hgabTitle": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020",
        "hgabPesos": 170000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020",
      "source_code": "2027DPWH-Proposal-20314",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 170000000,
      "comparison_year": 2024,
      "prior_project": "San Manuel ( Pangasinan ) - Itogon ( Benguet ) Road, Pangasinan",
      "prior_amount": 30000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597091",
      "similarity_pct": 100,
      "current_chainage": "11+760.00–13+725.00 · 16+140.00–18+020.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20314",
        "nepTitle": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020",
        "nepPesos": 170000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002258",
        "hgabTitle": "San Manuel (Pangasinan)-Itogon (Benguet) Road, Sta 11+760-Sta 13+725, Sta 16+140 - Sta 18+020",
        "hgabPesos": 170000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union",
      "source_code": "2027DPWH-Proposal-20310",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 96579000,
      "comparison_year": 2021,
      "prior_project": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, La Union",
      "prior_amount": 30000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437141",
      "similarity_pct": 100,
      "current_chainage": "5+182.00–17+780.00 · 24+980.00–25+487.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20310",
        "nepTitle": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union",
        "nepPesos": 96579000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002259",
        "hgabTitle": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union",
        "hgabPesos": 96579000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union",
      "source_code": "2027DPWH-Proposal-20310",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 96579000,
      "comparison_year": 2022,
      "prior_project": "Santol - San Gabriel (La Union) - Kapangan (Benguet) Road, La Union",
      "prior_amount": 60000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548278",
      "similarity_pct": 100,
      "current_chainage": "5+182.00–17+780.00 · 24+980.00–25+487.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20310",
        "nepTitle": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union",
        "nepPesos": 96579000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002259",
        "hgabTitle": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union",
        "hgabPesos": 96579000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union",
      "source_code": "2027DPWH-Proposal-20310",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 96579000,
      "comparison_year": 2023,
      "prior_project": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, La Union",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568082",
      "similarity_pct": 100,
      "current_chainage": "5+182.00–17+780.00 · 24+980.00–25+487.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20310",
        "nepTitle": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union",
        "nepPesos": 96579000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002259",
        "hgabTitle": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union",
        "hgabPesos": 96579000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union",
      "source_code": "2027DPWH-Proposal-20310",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 96579000,
      "comparison_year": 2024,
      "prior_project": "Santol - San Gabriel ( La Union ) - Kapangan ( Benguet ) Road, La Union",
      "prior_amount": 160000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 596901",
      "similarity_pct": 100,
      "current_chainage": "5+182.00–17+780.00 · 24+980.00–25+487.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20310",
        "nepTitle": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union",
        "nepPesos": 96579000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002259",
        "hgabTitle": "Santol-San Gabriel (La Union) - Kapangan (Benguet) Road, Sta 5+182 - Sta 17+780, Sta 24+980 - Sta 25+487, La Union",
        "hgabPesos": 96579000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sayre Highway Bypass Road-Carmen Puerto Section (Climbing Lanes), Barangay Puerto, Sta. 1+680-Sta. 2+805.71, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-32958",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 80000000,
      "comparison_year": 2022,
      "prior_project": "Sayre Highway Bypass Road - Carmen Puerto Section (Climbing Lanes), Cagayan de Oro City",
      "prior_amount": 75000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547460",
      "similarity_pct": 100,
      "current_chainage": "1+680.00–2+805.71",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32958",
        "nepTitle": "Sayre Highway Bypass Road-Carmen Puerto Section (Climbing Lanes), Barangay Puerto, Sta. 1+680-Sta. 2+805.71, Cagayan de Oro City",
        "nepPesos": 80000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0227-002140",
        "hgabTitle": "Sayre Highway Bypass Road-Carmen Puerto Section (Climbing Lanes), Barangay Puerto, Sta. 1+680-Sta. 2+805.71, Cagayan de Oro City",
        "hgabPesos": 80000000,
        "nepPage": "287",
        "hgabPage": "227",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sayre Highway Bypass Road-Carmen Puerto Section (Climbing Lanes), Barangay Puerto, Sta. 1+680-Sta. 2+805.71, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-32958",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 80000000,
      "comparison_year": 2018,
      "prior_project": "Sayre Highway Bypass Road, Carmen Puerto Section (Climbing Lanes), Cagayan de Oro City",
      "prior_amount": 100000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310204100250000",
      "similarity_pct": 100,
      "current_chainage": "1+680.00–2+805.71",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32958",
        "nepTitle": "Sayre Highway Bypass Road-Carmen Puerto Section (Climbing Lanes), Barangay Puerto, Sta. 1+680-Sta. 2+805.71, Cagayan de Oro City",
        "nepPesos": 80000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0227-002140",
        "hgabTitle": "Sayre Highway Bypass Road-Carmen Puerto Section (Climbing Lanes), Barangay Puerto, Sta. 1+680-Sta. 2+805.71, Cagayan de Oro City",
        "hgabPesos": 80000000,
        "nepPage": "287",
        "hgabPage": "227",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
      "source_code": "2027DPWH-Proposal-20632",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 22540000,
      "comparison_year": 2020,
      "prior_project": "Sominot-Mahayag Road, Zamboanga del Sur",
      "prior_amount": 105000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 511988",
      "similarity_pct": 100,
      "current_chainage": "14+196.00–14+810.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20632",
        "nepTitle": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
        "nepPesos": 22540000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002232",
        "hgabTitle": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
        "hgabPesos": 22540000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
      "source_code": "2027DPWH-Proposal-20632",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 22540000,
      "comparison_year": 2021,
      "prior_project": "Sominot-Mahayag Road, Zamboanga del Sur",
      "prior_amount": 102000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436747",
      "similarity_pct": 100,
      "current_chainage": "14+196.00–14+810.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20632",
        "nepTitle": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
        "nepPesos": 22540000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002232",
        "hgabTitle": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
        "hgabPesos": 22540000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
      "source_code": "2027DPWH-Proposal-20632",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 22540000,
      "comparison_year": 2022,
      "prior_project": "Sominot - Mahayag Road, Zamboanga del Sur",
      "prior_amount": 45000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 546962",
      "similarity_pct": 100,
      "current_chainage": "14+196.00–14+810.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20632",
        "nepTitle": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
        "nepPesos": 22540000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002232",
        "hgabTitle": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
        "hgabPesos": 22540000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
      "source_code": "2027DPWH-Proposal-20632",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 22540000,
      "comparison_year": 2023,
      "prior_project": "Sominot-Mahayag Road, Zamboanga del Sur",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 567077",
      "similarity_pct": 100,
      "current_chainage": "14+196.00–14+810.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20632",
        "nepTitle": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
        "nepPesos": 22540000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002232",
        "hgabTitle": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
        "hgabPesos": 22540000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
      "source_code": "2027DPWH-Proposal-20632",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 22540000,
      "comparison_year": 2024,
      "prior_project": "Sominot - Mahayag Road, Zamboanga del Sur",
      "prior_amount": 55000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595436",
      "similarity_pct": 100,
      "current_chainage": "14+196.00–14+810.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20632",
        "nepTitle": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
        "nepPesos": 22540000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002232",
        "hgabTitle": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
        "hgabPesos": 22540000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
      "source_code": "2027DPWH-Proposal-20632",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 22540000,
      "comparison_year": 2025,
      "prior_project": "Sominot-Mahayag Road, Zamboanga del Sur",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631970",
      "similarity_pct": 100,
      "current_chainage": "14+196.00–14+810.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20632",
        "nepTitle": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
        "nepPesos": 22540000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002232",
        "hgabTitle": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
        "hgabPesos": 22540000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
      "source_code": "2027DPWH-Proposal-20632",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 22540000,
      "comparison_year": 2018,
      "prior_project": "Sominot-Mahayag Road, Zamboanga del Sur",
      "prior_amount": 67500000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310204100260000",
      "similarity_pct": 100,
      "current_chainage": "14+196.00–14+810.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20632",
        "nepTitle": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
        "nepPesos": 22540000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002232",
        "hgabTitle": "Sominot-Mahayag Road, Mahayag, Zamboanga del Sur Sta 14+196 - Sta 14+810",
        "hgabPesos": 22540000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 2+580 - Sta. 3+805.61",
      "source_code": "2027DPWH-Proposal-35978",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 150000000,
      "comparison_year": 2025,
      "prior_project": "Sto. Rosario - Carmen Road, Zaragoza By-pass, Nueva Ecija",
      "prior_amount": 60000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631797",
      "similarity_pct": 100,
      "current_chainage": "2+580.00–3+805.61",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35978",
        "nepTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 2+580 - Sta. 3+805.61",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0218-001964",
        "hgabTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 2+580 - Sta. 3+805.61",
        "hgabPesos": 150000000,
        "nepPage": "280",
        "hgabPage": "218",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 2+580 - Sta. 3+805.61",
      "source_code": "2027DPWH-Proposal-35978",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 150000000,
      "comparison_year": 2026,
      "prior_project": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 1+409 - Sta. 3+228",
      "prior_amount": 147000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12104",
      "similarity_pct": 100,
      "current_chainage": "2+580.00–3+805.61",
      "prior_chainage": "1+409.00–3+228.00",
      "chainage_overlap": "2+580.00–3+228.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35978",
        "nepTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 2+580 - Sta. 3+805.61",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0218-001964",
        "hgabTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 2+580 - Sta. 3+805.61",
        "hgabPesos": 150000000,
        "nepPage": "280",
        "hgabPage": "218",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 3+805.61 - Sta. 5+031.30",
      "source_code": "2027DPWH-Proposal-35979",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 150000000,
      "comparison_year": 2025,
      "prior_project": "Sto. Rosario - Carmen Road, Zaragoza By-pass, Nueva Ecija",
      "prior_amount": 60000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631797",
      "similarity_pct": 100,
      "current_chainage": "3+805.61–5+031.30",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35979",
        "nepTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 3+805.61 - Sta. 5+031.30",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0218-001965",
        "hgabTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija Sta. 3+805.61 - Sta. 5+031.30",
        "hgabPesos": 150000000,
        "nepPage": "280",
        "hgabPage": "218",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 1+580 - Sta. 2+580",
      "source_code": "2027DPWH-Proposal-20585",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 200000000,
      "comparison_year": 2025,
      "prior_project": "Sto. Rosario - Carmen Road, Zaragoza By-pass, Nueva Ecija",
      "prior_amount": 60000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631797",
      "similarity_pct": 100,
      "current_chainage": "1+580.00–2+580.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20585",
        "nepTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 1+580 - Sta. 2+580",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0218-001966",
        "hgabTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 1+580 - Sta. 2+580",
        "hgabPesos": 150000000,
        "nepPage": "280",
        "hgabPage": "218",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 1+580 - Sta. 2+580",
      "source_code": "2027DPWH-Proposal-20585",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 200000000,
      "comparison_year": 2026,
      "prior_project": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 1+409 - Sta. 3+228",
      "prior_amount": 147000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12104",
      "similarity_pct": 100,
      "current_chainage": "1+580.00–2+580.00",
      "prior_chainage": "1+409.00–3+228.00",
      "chainage_overlap": "1+580.00–2+580.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20585",
        "nepTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 1+580 - Sta. 2+580",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0218-001966",
        "hgabTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 1+580 - Sta. 2+580",
        "hgabPesos": 150000000,
        "nepPage": "280",
        "hgabPage": "218",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 6+395 - Sta. 8+000",
      "source_code": "2027DPWH-Proposal-24191",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 220000000,
      "comparison_year": 2025,
      "prior_project": "Sto. Rosario - Carmen Road, Zaragoza By-pass, Nueva Ecija",
      "prior_amount": 60000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631797",
      "similarity_pct": 100,
      "current_chainage": "6+395.00–8+000.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24191",
        "nepTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 6+395 - Sta. 8+000",
        "nepPesos": 220000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0218-001971",
        "hgabTitle": "Sto. Rosario - Carmen Road, Zaragoza By-Pass, Nueva Ecija, Sta. 6+395 - Sta. 8+000",
        "hgabPesos": 150000000,
        "nepPage": "280",
        "hgabPage": "218",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
      "source_code": "2027DPWH-Proposal-20269",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 200000000,
      "comparison_year": 2023,
      "prior_project": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
      "prior_amount": 150000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568346",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20269",
        "nepTitle": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0243-002415",
        "hgabTitle": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
        "hgabPesos": 200000000,
        "nepPage": "302",
        "hgabPage": "243",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
      "source_code": "2027DPWH-Proposal-20269",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 200000000,
      "comparison_year": 2024,
      "prior_project": "Sto. Tomas Interchange including Roads and Bridges from NLEX ( North Luzon Expressway ) - Manila North Road, Pampanga",
      "prior_amount": 120000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597342",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20269",
        "nepTitle": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0243-002415",
        "hgabTitle": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
        "hgabPesos": 200000000,
        "nepPage": "302",
        "hgabPage": "243",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sulangan Br. (B00596SM) along Guiuan-Sulangan Peninsula Road",
      "source_code": "2027DPWH-Proposal-20112",
      "office": "Eastern Samar District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 3000000,
      "comparison_year": 2021,
      "prior_project": "Sulangan Br. (B00596SM) along Guiuan-Sulangan Peninsula Road",
      "prior_amount": 7000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 438220",
      "similarity_pct": 100,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20112",
        "nepTitle": "Sulangan Br. (B00596SM) along Guiuan-Sulangan Peninsula Road",
        "nepPesos": 3000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay",
      "source_code": "2027DPWH-Proposal-20661",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 150000000,
      "comparison_year": 2021,
      "prior_project": "Tabaco City Bypass Road, Albay",
      "prior_amount": 50000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436934",
      "similarity_pct": 100,
      "current_chainage": "3+883.73–6+198.73",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20661",
        "nepTitle": "Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002042",
        "hgabTitle": "Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay",
        "hgabPesos": 150000000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay",
      "source_code": "2027DPWH-Proposal-20661",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 150000000,
      "comparison_year": 2022,
      "prior_project": "Tabaco City Bypass Road, Albay",
      "prior_amount": 75000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547149",
      "similarity_pct": 100,
      "current_chainage": "3+883.73–6+198.73",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20661",
        "nepTitle": "Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002042",
        "hgabTitle": "Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay",
        "hgabPesos": 150000000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay",
      "source_code": "2027DPWH-Proposal-20661",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 150000000,
      "comparison_year": 2023,
      "prior_project": "Tabaco City Bypass Road, Albay",
      "prior_amount": 80000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566027",
      "similarity_pct": 100,
      "current_chainage": "3+883.73–6+198.73",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20661",
        "nepTitle": "Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002042",
        "hgabTitle": "Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay",
        "hgabPesos": 150000000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay",
      "source_code": "2027DPWH-Proposal-20661",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 150000000,
      "comparison_year": 2024,
      "prior_project": "Tabaco City Bypass Road, Albay",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 594386",
      "similarity_pct": 100,
      "current_chainage": "3+883.73–6+198.73",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20661",
        "nepTitle": "Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002042",
        "hgabTitle": "Tabaco City Bypass Road, Sta. 3+883.73 - Sta. 6+198.73, Albay",
        "hgabPesos": 150000000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tabaco City-Malinao-Buhi-Iriga City Road, Camarines Sur, Sta. 40+300.00 - Sta. 41+100.00",
      "source_code": "2027DPWH-Proposal-20377",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 85000000,
      "comparison_year": 2024,
      "prior_project": "Tabaco City - Malinao - Buhi - Iriga City Road, Camarines Sur",
      "prior_amount": 110000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597166",
      "similarity_pct": 100,
      "current_chainage": "40+300.00–41+100.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20377",
        "nepTitle": "Tabaco City-Malinao-Buhi-Iriga City Road, Camarines Sur, Sta. 40+300.00 - Sta. 41+100.00",
        "nepPesos": 85000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002344",
        "hgabTitle": "Tabaco City-Malinao-Buhi-Iriga City Road, Camarines Sur, Sta. 40+300.00 - Sta. 41+100.00",
        "hgabPesos": 85000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tabaco City-Malinao-Buhi-Iriga City Road, Camarines Sur, Sta. 40+300.00 - Sta. 41+100.00",
      "source_code": "2027DPWH-Proposal-20377",
      "office": "Camarines Sur 5th District Engineering Office",
      "region": "Region V",
      "amount_2027": 85000000,
      "comparison_year": 2025,
      "prior_project": "Tabaco City-Malinao-Buhi-Iriga City Road, Camarines Sur",
      "prior_amount": 85000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633631",
      "similarity_pct": 100,
      "current_chainage": "40+300.00–41+100.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20377",
        "nepTitle": "Tabaco City-Malinao-Buhi-Iriga City Road, Camarines Sur, Sta. 40+300.00 - Sta. 41+100.00",
        "nepPesos": 85000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002344",
        "hgabTitle": "Tabaco City-Malinao-Buhi-Iriga City Road, Camarines Sur, Sta. 40+300.00 - Sta. 41+100.00",
        "hgabPesos": 85000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tacloban City Bypass Road Extension (Sta. 0+910 - Sta. 1+00, Sta. 1+040 - Sta. 1+169.35), Tacloban City",
      "source_code": "2027DPWH-Proposal-20703",
      "office": "Tacloban City District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 100000000,
      "comparison_year": 2020,
      "prior_project": "Tacloban City Bypass Road Extension, Tacloban City",
      "prior_amount": 200000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512515",
      "similarity_pct": 100,
      "current_chainage": "0+910.00–1+000.00 · 1+040.00–1+169.35",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20703",
        "nepTitle": "Tacloban City Bypass Road Extension (Sta. 0+910 - Sta. 1+00, Sta. 1+040 - Sta. 1+169.35), Tacloban City",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0224-002090",
        "hgabTitle": "Tacloban City Bypass Road Extension (Sta. 0+910 - Sta. 1+00, Sta. 1+040 - Sta. 1+169.35), Tacloban City",
        "hgabPesos": 100000000,
        "nepPage": "284",
        "hgabPage": "224",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20747",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 100000000,
      "comparison_year": 2022,
      "prior_project": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Surigao del Sur",
      "prior_amount": 78950000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547541",
      "similarity_pct": 100,
      "current_chainage": "1+866.50–2+800.00 · 4+554.50–6+621.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20747",
        "nepTitle": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002181",
        "hgabTitle": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur",
        "hgabPesos": 100000000,
        "nepPage": "290",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20747",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Surigao del Sur",
      "prior_amount": 70000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566970",
      "similarity_pct": 100,
      "current_chainage": "1+866.50–2+800.00 · 4+554.50–6+621.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20747",
        "nepTitle": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002181",
        "hgabTitle": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur",
        "hgabPesos": 100000000,
        "nepPage": "290",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20747",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 100000000,
      "comparison_year": 2024,
      "prior_project": "Tagongon - Sta. Juana - Maputi - Dreamland - Bingcongan - San Roque Bypass Road, Surigao del Sur",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595329",
      "similarity_pct": 100,
      "current_chainage": "1+866.50–2+800.00 · 4+554.50–6+621.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20747",
        "nepTitle": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002181",
        "hgabTitle": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur",
        "hgabPesos": 100000000,
        "nepPage": "290",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20747",
      "office": "Surigao del Sur 2nd District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 100000000,
      "comparison_year": 2025,
      "prior_project": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Surigao del Sur",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 632191",
      "similarity_pct": 100,
      "current_chainage": "1+866.50–2+800.00 · 4+554.50–6+621.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20747",
        "nepTitle": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002181",
        "hgabTitle": "Tagongon-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road, Sta. 1+866.5 - Sta. 2+800, Sta. 4+554.5 - Sta. 6+621, Surigao del Sur",
        "hgabPesos": 100000000,
        "nepPage": "290",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
      "source_code": "2027DPWH-Proposal-20645",
      "office": "Ilocos Sur 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 33628000,
      "comparison_year": 2020,
      "prior_project": "Tagudin Bypass Road, Ilocos Sur",
      "prior_amount": 120000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512413",
      "similarity_pct": 100,
      "current_chainage": "1+415.00–1+830.00 · 4+040.00–4+080.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20645",
        "nepTitle": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
        "nepPesos": 33628000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001893",
        "hgabTitle": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
        "hgabPesos": 33628000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
      "source_code": "2027DPWH-Proposal-20645",
      "office": "Ilocos Sur 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 33628000,
      "comparison_year": 2021,
      "prior_project": "Tagudin Bypass Road, Ilocos Sur",
      "prior_amount": 105000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436601",
      "similarity_pct": 100,
      "current_chainage": "1+415.00–1+830.00 · 4+040.00–4+080.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20645",
        "nepTitle": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
        "nepPesos": 33628000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001893",
        "hgabTitle": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
        "hgabPesos": 33628000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
      "source_code": "2027DPWH-Proposal-20645",
      "office": "Ilocos Sur 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 33628000,
      "comparison_year": 2022,
      "prior_project": "Tagudin Bypass Road, Ilocos Sur",
      "prior_amount": 80000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 546816",
      "similarity_pct": 100,
      "current_chainage": "1+415.00–1+830.00 · 4+040.00–4+080.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20645",
        "nepTitle": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
        "nepPesos": 33628000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001893",
        "hgabTitle": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
        "hgabPesos": 33628000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
      "source_code": "2027DPWH-Proposal-20645",
      "office": "Ilocos Sur 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 33628000,
      "comparison_year": 2023,
      "prior_project": "Tagudin Bypass Road, Ilocos Sur",
      "prior_amount": 40000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 565694",
      "similarity_pct": 100,
      "current_chainage": "1+415.00–1+830.00 · 4+040.00–4+080.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20645",
        "nepTitle": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
        "nepPesos": 33628000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001893",
        "hgabTitle": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
        "hgabPesos": 33628000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
      "source_code": "2027DPWH-Proposal-20645",
      "office": "Ilocos Sur 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 33628000,
      "comparison_year": 2024,
      "prior_project": "Tagudin Bypass Road, Ilocos Sur",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 594053",
      "similarity_pct": 100,
      "current_chainage": "1+415.00–1+830.00 · 4+040.00–4+080.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20645",
        "nepTitle": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
        "nepPesos": 33628000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001893",
        "hgabTitle": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
        "hgabPesos": 33628000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
      "source_code": "2027DPWH-Proposal-20645",
      "office": "Ilocos Sur 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 33628000,
      "comparison_year": 2025,
      "prior_project": "Tagudin Bypass Road, Ilocos Sur",
      "prior_amount": 60000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 629855",
      "similarity_pct": 100,
      "current_chainage": "1+415.00–1+830.00 · 4+040.00–4+080.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20645",
        "nepTitle": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
        "nepPesos": 33628000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001893",
        "hgabTitle": "Tagudin Bypass Road, Sta.1+415-Sta.1+830, Sta.4+040-Sta.4+080, Tagudin, Ilocos Sur",
        "hgabPesos": 33628000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay",
      "source_code": "2027DPWH-Proposal-20662",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 150000000,
      "comparison_year": 2020,
      "prior_project": "Tiwi By-pass Road (Alternate Route), Tiwi, Albay",
      "prior_amount": 99045000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512491",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–2+315.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20662",
        "nepTitle": "Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002044",
        "hgabTitle": "Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay",
        "hgabPesos": 150000000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay",
      "source_code": "2027DPWH-Proposal-20662",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 150000000,
      "comparison_year": 2021,
      "prior_project": "Tiwi By-pass Road (Alternate Route), Tiwi, Albay",
      "prior_amount": 41599000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436499",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–2+315.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20662",
        "nepTitle": "Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002044",
        "hgabTitle": "Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay",
        "hgabPesos": 150000000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay",
      "source_code": "2027DPWH-Proposal-20662",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 150000000,
      "comparison_year": 2023,
      "prior_project": "Tiwi By-pass Road (Alternate Route), Albay",
      "prior_amount": 40000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 567033",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–2+315.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20662",
        "nepTitle": "Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002044",
        "hgabTitle": "Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay",
        "hgabPesos": 150000000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay",
      "source_code": "2027DPWH-Proposal-20662",
      "office": "Albay 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 150000000,
      "comparison_year": 2024,
      "prior_project": "Tiwi By - pass Road ( Alternate Route ) , Albay",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595392",
      "similarity_pct": 100,
      "current_chainage": "0+000.00–2+315.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20662",
        "nepTitle": "Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002044",
        "hgabTitle": "Tiwi By-pass Road (Alternate Route), Sta. 0+000 - Sta. 2+315, Albay",
        "hgabPesos": 150000000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Valencia City - Pangantucan Diversion Road, Brgy. La Roxas - Brgy. Bagong Silang, Sta. 16+600 - Sta. 20+600, Maramag, Bukidnon",
      "source_code": "2027DPWH-Proposal-20825",
      "office": "Bukidnon 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 265000000,
      "comparison_year": 2026,
      "prior_project": "Valencia City-Pangantucan Diversion Road, Brgy. La Roxas - Brgy. Bagong Silang, Sta. 16+100 - Sta. 20+100,  Maramag, Bukidnon",
      "prior_amount": 192762000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12448",
      "similarity_pct": 100,
      "current_chainage": "16+600.00–20+600.00",
      "prior_chainage": "16+100.00–20+100.00",
      "chainage_overlap": "16+600.00–20+100.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20825",
        "nepTitle": "Valencia City - Pangantucan Diversion Road, Brgy. La Roxas - Brgy. Bagong Silang, Sta. 16+600 - Sta. 20+600, Maramag, Bukidnon",
        "nepPesos": 265000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0227-002152",
        "hgabTitle": "Valencia City - Pangantucan Diversion Road, Barangay La Roxas - Barangay Bagong Silang, Sta. 16+600 - Sta. 20+600, Maramag, Bukidnon",
        "hgabPesos": 265000000,
        "nepPage": "288",
        "hgabPage": "227",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
      "source_code": "2027DPWH-Proposal-20655",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 280000000,
      "comparison_year": 2021,
      "prior_project": "Villasis Bypass Road, Pangasinan",
      "prior_amount": 70000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436604",
      "similarity_pct": 100,
      "current_chainage": "2+300.00–3+000.00 · 4+109.00–4+509.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20655",
        "nepTitle": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
        "nepPesos": 280000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001894",
        "hgabTitle": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
        "hgabPesos": 280000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
      "source_code": "2027DPWH-Proposal-20655",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 280000000,
      "comparison_year": 2022,
      "prior_project": "Villasis Bypass Road, Pangasinan",
      "prior_amount": 70000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 546819",
      "similarity_pct": 100,
      "current_chainage": "2+300.00–3+000.00 · 4+109.00–4+509.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20655",
        "nepTitle": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
        "nepPesos": 280000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001894",
        "hgabTitle": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
        "hgabPesos": 280000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
      "source_code": "2027DPWH-Proposal-20655",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 280000000,
      "comparison_year": 2023,
      "prior_project": "Villasis Bypass Road, Pangasinan",
      "prior_amount": 85000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 565697",
      "similarity_pct": 100,
      "current_chainage": "2+300.00–3+000.00 · 4+109.00–4+509.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20655",
        "nepTitle": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
        "nepPesos": 280000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001894",
        "hgabTitle": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
        "hgabPesos": 280000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
      "source_code": "2027DPWH-Proposal-20655",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 280000000,
      "comparison_year": 2024,
      "prior_project": "Villasis Bypass Road, Pangasinan",
      "prior_amount": 80000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 594056",
      "similarity_pct": 100,
      "current_chainage": "2+300.00–3+000.00 · 4+109.00–4+509.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20655",
        "nepTitle": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
        "nepPesos": 280000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001894",
        "hgabTitle": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
        "hgabPesos": 280000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
      "source_code": "2027DPWH-Proposal-20655",
      "office": "Pangasinan 3rd District Engineering Office",
      "region": "Region I",
      "amount_2027": 280000000,
      "comparison_year": 2025,
      "prior_project": "Villasis Bypass Road, Pangasinan",
      "prior_amount": 45000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 629858",
      "similarity_pct": 100,
      "current_chainage": "2+300.00–3+000.00 · 4+109.00–4+509.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20655",
        "nepTitle": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
        "nepPesos": 280000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001894",
        "hgabTitle": "Villasis Bypass Road, Sta 2+300 - Sta 3+000 Sta 4+109 - Sta 4+509, Pangasinan",
        "hgabPesos": 280000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75",
      "source_code": "2027DPWH-Proposal-20285",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 192237000,
      "comparison_year": 2022,
      "prior_project": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road), Benguet",
      "prior_amount": 157000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548517",
      "similarity_pct": 95,
      "current_chainage": "0+805.00–0+937.75",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "same tranche",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20285",
        "nepTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75",
        "nepPesos": 192237000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002265",
        "hgabTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75",
        "hgabPesos": 192237000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "same tranche",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75",
      "source_code": "2027DPWH-Proposal-20285",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 192237000,
      "comparison_year": 2023,
      "prior_project": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang- Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road), Benguet",
      "prior_amount": 110000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568092",
      "similarity_pct": 95,
      "current_chainage": "0+805.00–0+937.75",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "same tranche",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20285",
        "nepTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75",
        "nepPesos": 192237000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002265",
        "hgabTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75",
        "hgabPesos": 192237000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "same tranche",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75",
      "source_code": "2027DPWH-Proposal-20285",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 192237000,
      "comparison_year": 2024,
      "prior_project": "Baguio - La Trinidad - Itogon - Sablan - Tuba and Tublay, Poblacion Jct. - Batuang - Carantes Jct - Balatoc Jct. ( Section 6 of BLISTT Outer Ring Circumferential Road ) , Benguet",
      "prior_amount": 110000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597111",
      "similarity_pct": 95,
      "current_chainage": "0+805.00–0+937.75",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "same tranche",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20285",
        "nepTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75",
        "nepPesos": 192237000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002265",
        "hgabTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75",
        "hgabPesos": 192237000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "same tranche",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75",
      "source_code": "2027DPWH-Proposal-20285",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 192237000,
      "comparison_year": 2025,
      "prior_project": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road), Benguet",
      "prior_amount": 55000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633581",
      "similarity_pct": 95,
      "current_chainage": "0+805.00–0+937.75",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "same tranche",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20285",
        "nepTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75",
        "nepPesos": 192237000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002265",
        "hgabTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Poblacion Jct.-Batuang-Carantes Jct-Balatoc Jct. (Section 6 of BLISTT Outer Ring Circumferential Road) - Sta. 0+805 - Sta. 0+937.75",
        "hgabPesos": 192237000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "same tranche",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cagayan de Oro Diversion Road Extension (Jct. Sayre Highway (Balubal)-Manolo Fortich-Malitbog-Claveria-Eureka, Gingoog City Road), Mantibugao-Lunocan Section, Sta. 1+739 - Sta. Sta. 2+578.11, Manolo Fortich, Bukidnon",
      "source_code": "2027DPWH-Proposal-33023",
      "office": "Bukidnon 3rd District Engineering Office",
      "region": "Region X",
      "amount_2027": 80000000,
      "comparison_year": 2026,
      "prior_project": "Cagayan de Oro Diversion Road Extension (Jct. Sayre Highway (Balubal)-Manolo Fortich-Malitbog-Claveria-Eureka, Gingoog City Road), Brgy. Lunocan Section, Sta. 8+000 - Sta. 9+000, Manolo Fortich, Bukidnon",
      "prior_amount": 48191000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12376",
      "similarity_pct": 95,
      "current_chainage": "1+739.00 · 2+578.11",
      "prior_chainage": "8+000.00–9+000.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33023",
        "nepTitle": "Cagayan de Oro Diversion Road Extension (Jct. Sayre Highway (Balubal)-Manolo Fortich-Malitbog-Claveria-Eureka, Gingoog City Road), Mantibugao-Lunocan Section, Sta. 1+739 - Sta. Sta. 2+578.11, Manolo Fortich, Bukidnon",
        "nepPesos": 80000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Brgy. Taglimao - Brgy. Bagocboc, Sta. 8+084 - Sta. 9+620, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-32942",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 200000000,
      "comparison_year": 2020,
      "prior_project": "Cagayan de Oro (PCE) Bypass/Alternate Road Extension (Jct. Lumbia/CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), (Taglimao-Bagocboc Section), Cagayan de Oro City",
      "prior_amount": 150000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512528",
      "similarity_pct": 94,
      "current_chainage": "8+084.00–9+620.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32942",
        "nepTitle": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Brgy. Taglimao - Brgy. Bagocboc, Sta. 8+084 - Sta. 9+620, Cagayan de Oro City",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0225-002104",
        "hgabTitle": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Barangay Taglimao - Barangay Bagocboc, Sta. 8+084 - Sta. 9+620, Cagayan de Oro City",
        "hgabPesos": 200000000,
        "nepPage": "285",
        "hgabPage": "225",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Brgy. Taglimao - Brgy. Bagocboc, Sta. 8+084 - Sta. 9+620, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-32942",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 200000000,
      "comparison_year": 2021,
      "prior_project": "Cagayan de Oro (PCE) Bypass/Alternate Road Extension (Jct. Lumbia/CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), (Taglimao-Bagocboc Section), Cagayan de Oro City",
      "prior_amount": 79915000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436509",
      "similarity_pct": 94,
      "current_chainage": "8+084.00–9+620.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32942",
        "nepTitle": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Brgy. Taglimao - Brgy. Bagocboc, Sta. 8+084 - Sta. 9+620, Cagayan de Oro City",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0225-002104",
        "hgabTitle": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Barangay Taglimao - Barangay Bagocboc, Sta. 8+084 - Sta. 9+620, Cagayan de Oro City",
        "hgabPesos": 200000000,
        "nepPage": "285",
        "hgabPage": "225",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Brgy. Taglimao - Brgy. Bagocboc, Sta. 8+084 - Sta. 9+620, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-32942",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 200000000,
      "comparison_year": 2023,
      "prior_project": "Cagayan de Oro (PCE) Bypass/Alternate Road Extension (Jct. Lumbia/CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Taglimao -Bagocboc Section, Cagayan de Oro City",
      "prior_amount": 100000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566911",
      "similarity_pct": 94,
      "current_chainage": "8+084.00–9+620.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32942",
        "nepTitle": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Brgy. Taglimao - Brgy. Bagocboc, Sta. 8+084 - Sta. 9+620, Cagayan de Oro City",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0225-002104",
        "hgabTitle": "Cagayan de Oro (PCE) Bypass/ Alternate Road Extension (Jct. Lumbia/ CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Barangay Taglimao - Barangay Bagocboc, Sta. 8+084 - Sta. 9+620, Cagayan de Oro City",
        "hgabPesos": 200000000,
        "nepPage": "285",
        "hgabPage": "225",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Magpet (Pangao-An - Don Panaca) to Davao City Via Salaysay (Indawhong-Ballah-Masawang) to Lumondao (Junction Bukidnon to Davao) Road, Cotabato",
      "source_code": "2027DPWH-Proposal-09265",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 36000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Magpet (Pangao-an - Don Panaca) to Davao City via Salaysay (Indawhong-Ballah-Masawang) to Lumondao (Junction Bukidnon to Davao) Road, Cotabato, Magpet, North Cotabato",
      "prior_amount": 150000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 559646",
      "similarity_pct": 94,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09265",
        "nepTitle": "Construction of Magpet (Pangao-An - Don Panaca) to Davao City Via Salaysay (Indawhong-Ballah-Masawang) to Lumondao (Junction Bukidnon to Davao) Road, Cotabato",
        "nepPesos": 36000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0620-010060",
        "hgabTitle": "Construction of Magpet (Pangao-An - Don Panaca) to Davao City Via Salaysay (Indawhong-Ballah-Masawang) to Lumondao (Junction Bukidnon to Davao) Road, Cotabato",
        "hgabPesos": 36000000,
        "nepPage": "554",
        "hgabPage": "620",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Manuel S. Agyao Boulevard-Ileb junc.-Dilag-San Julian-Balong-Tuao Circumferential Road, Tabuk City, Kalinga",
      "source_code": "2027DPWH-Proposal-09115",
      "office": "Lower Kalinga District Engineering Office",
      "region": "CAR",
      "amount_2027": 150000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Manuel S. Agyao Boulevard-Ileb Junc. -Dilag-San Julian-Balong-Tuao, Tabuk City, Kalinga",
      "prior_amount": 30000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 561556",
      "similarity_pct": 93,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Caroline Agyao"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09115",
        "nepTitle": "Construction of Manuel S. Agyao Boulevard-Ileb junc.-Dilag-San Julian-Balong-Tuao Circumferential Road, Tabuk City, Kalinga",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0417-005795",
        "hgabTitle": "Construction of Manuel S. Agyao Boulevard-Ileb junc.-Dilag-San Julian-Balong-Tuao Circumferential Road, Tabuk City, Kalinga",
        "hgabPesos": 150000000,
        "nepPage": "435",
        "hgabPage": "417",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300",
      "source_code": "2027DPWH-Proposal-20369",
      "office": "Camarines Sur 4th District Engineering Office",
      "region": "Region V",
      "amount_2027": 47000000,
      "comparison_year": 2023,
      "prior_project": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via San Vicente Rd) - Himanag Road, Camarines Sur",
      "prior_amount": 95000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 568142",
      "similarity_pct": 93,
      "current_chainage": "11+052.00–12+300.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20369",
        "nepTitle": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300",
        "nepPesos": 47000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0242-002408",
        "hgabTitle": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300",
        "hgabPesos": 47000000,
        "nepPage": "301",
        "hgabPage": "242",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur Sta. 6+738 - Sta. 7+988",
      "source_code": "2027DPWH-Proposal-20630",
      "office": "Zamboanga del Sur 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 43750000,
      "comparison_year": 2021,
      "prior_project": "Construction of NRJ Lantian û San Isidro û Balimbingan û Luy-A û Tabuan û NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur",
      "prior_amount": 46000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 426170",
      "similarity_pct": 93,
      "current_chainage": "6+738.00–7+988.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20630",
        "nepTitle": "NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur Sta. 6+738 - Sta. 7+988",
        "nepPesos": 43750000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0232-002230",
        "hgabTitle": "NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Diversion Road, Labangan, Zamboanga del Sur Sta. 6+738 - Sta. 7+988",
        "hgabPesos": 43750000,
        "nepPage": "292",
        "hgabPage": "232",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Francisco (NRJ Hubang-Sta. Ana-San Isidro) Bypass Road (Daang Maharlika Alternate Route), Sta. 5 + 610 - Sta. 5+866.04, Agusan del Sur",
      "source_code": "2027DPWH-Proposal-20741",
      "office": "Agusan del Sur 2nd District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 20000000,
      "comparison_year": 2020,
      "prior_project": "San Francisco (NRJ Hubang - Sta. Ana - San Isidro) Bypass Road (Daang Maharlika Alternate Route), Agusan del Sur",
      "prior_amount": 100000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512647",
      "similarity_pct": 93,
      "current_chainage": "5+610.00–5+866.04",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20741",
        "nepTitle": "San Francisco (NRJ Hubang-Sta. Ana-San Isidro) Bypass Road (Daang Maharlika Alternate Route), Sta. 5 + 610 - Sta. 5+866.04, Agusan del Sur",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Francisco (NRJ Hubang-Sta. Ana-San Isidro) Bypass Road (Daang Maharlika Alternate Route), Sta. 5 + 610 - Sta. 5+866.04, Agusan del Sur",
      "source_code": "2027DPWH-Proposal-20741",
      "office": "Agusan del Sur 2nd District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "San Francisco (NRJ Hubang - Sta. Ana - San Isidro) Bypass Road (Daang Maharlika Alternate Route), Agusan del Sur",
      "prior_amount": 90000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436878",
      "similarity_pct": 93,
      "current_chainage": "5+610.00–5+866.04",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20741",
        "nepTitle": "San Francisco (NRJ Hubang-Sta. Ana-San Isidro) Bypass Road (Daang Maharlika Alternate Route), Sta. 5 + 610 - Sta. 5+866.04, Agusan del Sur",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, part of Sibuguey River, Barangay Pilar, Diplahan, Zamboanga Sibugay",
      "source_code": "2027DPWH-Proposal-21554",
      "office": "Zamboanga Sibugay 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 120000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Flood Control Structure along Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd, part of Sibuguey River, Barangay Pilar, Diplahan, Zamboanga Sibugay",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 662523",
      "similarity_pct": 92,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21554",
        "nepTitle": "Construction of Flood Control along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, part of Sibuguey River, Barangay Pilar, Diplahan, Zamboanga Sibugay",
        "nepPesos": 120000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0315-003810",
        "hgabTitle": "Construction of Flood Control along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, part of Sibuguey River, Barangay Pilar, Diplahan, Zamboanga Sibugay",
        "hgabPesos": 85000000,
        "nepPage": "361",
        "hgabPage": "315",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "CDOC-Iligan City Hinterland Road (Jct. CDO Camp Kibaritan Road-Dominorog Road, Dansolihon-Jct. IBR, Rogongon, Iligan City) Alternate Road, Brgy. Rogongon, Sta. 2+200-Sta. 5+000, Iligan City",
      "source_code": "2027DPWH-Proposal-32988",
      "office": "Iligan City District Engineering Office",
      "region": "Region X",
      "amount_2027": 300000000,
      "comparison_year": 2026,
      "prior_project": "CDOC-Iligan City Hinterland Road (Jct. CDO Camp Kibaritan Road-Dominorog Road, Dansolihon-Jct. IBR, Rogongon, Iligan City) Alternate Road, Barangay Rogongon Section, Iligan City",
      "prior_amount": 43371000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12753",
      "similarity_pct": 92,
      "current_chainage": "2+200.00–5+000.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32988",
        "nepTitle": "CDOC-Iligan City Hinterland Road (Jct. CDO Camp Kibaritan Road-Dominorog Road, Dansolihon-Jct. IBR, Rogongon, Iligan City) Alternate Road, Brgy. Rogongon, Sta. 2+200-Sta. 5+000, Iligan City",
        "nepPesos": 300000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0225-002110",
        "hgabTitle": "CDOC-Iligan City Hinterland Road (Jct. CDO Camp Kibaritan Road-Dominorog Road, Dansolihon-Jct. IBR, Rogongon, Iligan City) Alternate Road, Barangay Rogongon, Sta. 2+200-Sta. 5+000, Iligan City",
        "hgabPesos": 300000000,
        "nepPage": "285",
        "hgabPage": "225",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction (Completion) of National Bureau of Investigation (NBI) - Cordillera Administrative Region (NBI-CAR) Office Building, Upper Session Road, Baguio City",
      "source_code": "2027DPWH-Proposal-09172",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 200000000,
      "comparison_year": 2025,
      "prior_project": "Construction of National Bureau of Investigation (NBI) - Cordillera Administrative Region (NBI-CAR) Office Building, Phase I, Upper Session Road, Baguio City",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 520454",
      "similarity_pct": 92,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 1 only",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09172",
        "nepTitle": "Construction (Completion) of National Bureau of Investigation (NBI) - Cordillera Administrative Region (NBI-CAR) Office Building, Upper Session Road, Baguio City",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0634-010333",
        "hgabTitle": "Construction (Completion) of National Bureau of Investigation (NBI) - Cordillera Administrative Region (NBI-CAR) Office Building, Upper Session Road, Baguio City",
        "hgabPesos": 200000000,
        "nepPage": "562",
        "hgabPage": "634",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300",
      "source_code": "2027DPWH-Proposal-20369",
      "office": "Camarines Sur 4th District Engineering Office",
      "region": "Region V",
      "amount_2027": 47000000,
      "comparison_year": 2019,
      "prior_project": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Road) - Himanag Road, Camarines Sur",
      "prior_amount": 29601000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310205100354000 · PDF p. 212 · printed p. 1677",
      "similarity_pct": 92,
      "current_chainage": "11+052.00–12+300.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20369",
        "nepTitle": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300",
        "nepPesos": 47000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0242-002408",
        "hgabTitle": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd)- Himanag Road, Lagonoy, Camarines Sur, Sta.11+052 - Sta.12+300",
        "hgabPesos": 47000000,
        "nepPage": "301",
        "hgabPage": "242",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Managnag(Tigaon-Goa-Sn Jose-Lagonoy via Sn Vicente Rd)-Himanag Road, Lagonoy, Camarines Sur, Sta.13+484 - Sta.15+360.7",
      "source_code": "2027DPWH-Proposal-20364",
      "office": "Camarines Sur 4th District Engineering Office",
      "region": "Region V",
      "amount_2027": 141801000,
      "comparison_year": 2024,
      "prior_project": "Managnag ( Tigaon - Goa - Sn Jose - Lagonoy - Guijalo via Sn Vicente Rd ) - Himanag Road, Camarines Sur",
      "prior_amount": 55000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597161",
      "similarity_pct": 92,
      "current_chainage": "13+484.00–15+360.70",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20364",
        "nepTitle": "Managnag(Tigaon-Goa-Sn Jose-Lagonoy via Sn Vicente Rd)-Himanag Road, Lagonoy, Camarines Sur, Sta.13+484 - Sta.15+360.7",
        "nepPesos": 141801000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002334",
        "hgabTitle": "Managnag(Tigaon-Goa-Sn Jose-Lagonoy via Sn Vicente Rd)-Himanag Road, Lagonoy, Camarines Sur, Sta.13+484 - Sta.15+360.7",
        "hgabPesos": 141801000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Managnag(Tigaon-Goa-Sn Jose-Lagonoy via Sn Vicente Rd)-Himanag Road, Lagonoy, Camarines Sur, Sta.13+484 - Sta.15+360.7",
      "source_code": "2027DPWH-Proposal-20364",
      "office": "Camarines Sur 4th District Engineering Office",
      "region": "Region V",
      "amount_2027": 141801000,
      "comparison_year": 2018,
      "prior_project": "Managnag (Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd) - Himanag Road, Lagonoy, Camarines Sur",
      "prior_amount": 50000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310205100199000",
      "similarity_pct": 92,
      "current_chainage": "13+484.00–15+360.70",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20364",
        "nepTitle": "Managnag(Tigaon-Goa-Sn Jose-Lagonoy via Sn Vicente Rd)-Himanag Road, Lagonoy, Camarines Sur, Sta.13+484 - Sta.15+360.7",
        "nepPesos": 141801000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002334",
        "hgabTitle": "Managnag(Tigaon-Goa-Sn Jose-Lagonoy via Sn Vicente Rd)-Himanag Road, Lagonoy, Camarines Sur, Sta.13+484 - Sta.15+360.7",
        "hgabPesos": 141801000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ Daang Maharlika Bunawan Proper - San Isidro - Kiotoy - Mabunao - Kauswagan - Jct. Panabo City Fatima - Malabog Road, Panabo City, Davo del Norte - Sta. 0+000 - Sta. 2+500",
      "source_code": "2027DPWH-Proposal-21355",
      "office": "Davao del Norte 2nd District Engineering Office",
      "region": "Region XI",
      "amount_2027": 41250000,
      "comparison_year": 2021,
      "prior_project": "Construction of Road, NRJ Daang Maharlika Bunawan Proper - Barangay San Isidro - Kiotoy - Mabunao - Kauswagan - Jct. Panabo City Fatima - Malabog Road, Panabo City, Davao del Norte",
      "prior_amount": 92000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 425319",
      "similarity_pct": 92,
      "current_chainage": "0+000.00–2+500.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21355",
        "nepTitle": "NRJ Daang Maharlika Bunawan Proper - San Isidro - Kiotoy - Mabunao - Kauswagan - Jct. Panabo City Fatima - Malabog Road, Panabo City, Davo del Norte - Sta. 0+000 - Sta. 2+500",
        "nepPesos": 41250000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0618-010018",
        "hgabTitle": "NRJ Daang Maharlika Bunawan Proper - San Isidro - Kiotoy - Mabunao - Kauswagan - Jct. Panabo City Fatima - Malabog Road, Panabo City, Davao del Norte - Sta. 0+000 - Sta. 1+000, Sta. 1+100 - Sta. 1+895",
        "hgabPesos": 41250000,
        "nepPage": "553",
        "hgabPage": "618",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Barren River (Downstream) Flood Control along Chico River Basin, Sta. 37 + 738 - Sta. 38 + 838 (L/S), Barangay Malama, Conner, Apayao",
      "source_code": "2027DPWH-Proposal-09016",
      "office": "Apayao 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 46000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Barren River (Downstream) Flood Control along Chico River Basin, Sta. 37 + 738 - Sta. 38 + 938 (L/S), Barangay Malama, Conner, Apayao",
      "prior_amount": 75000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 588131",
      "similarity_pct": 91,
      "current_chainage": "37+738.00–38+838.00",
      "prior_chainage": "37+738.00–38+938.00",
      "chainage_overlap": "37+738.00–38+838.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09016",
        "nepTitle": "Construction of Barren River (Downstream) Flood Control along Chico River Basin, Sta. 37 + 738 - Sta. 38 + 838 (L/S), Barangay Malama, Conner, Apayao",
        "nepPesos": 46000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0335-004188",
        "hgabTitle": "Construction of Barren River (Downstream) Flood Control along Chico River Basin, Sta. 37 + 738 - Sta. 38 + 838 (L/S), Barangay Malama, Conner, Apayao",
        "hgabPesos": 46000000,
        "nepPage": "372",
        "hgabPage": "335",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Mitigation Structure along Peñaranda River, Barangay Rio Chico, General Tinio, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-03641",
      "office": "Nueva Ecija 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 72500000,
      "comparison_year": 2021,
      "prior_project": "Construction/Improvement of Flood Mitigation Structures (Flood Control) along Pe±aranda River in Barangay Rio Chico, General Tinio, Nueva Ecija",
      "prior_amount": 60000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 440648",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Emeng Pascual"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03641",
        "nepTitle": "Construction of Flood Mitigation Structure along Peñaranda River, Barangay Rio Chico, General Tinio, Nueva Ecija",
        "nepPesos": 72500000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0367-004797",
        "hgabTitle": "Construction of Flood Mitigation Structure along Peñaranda River, Barangay Rio Chico, General Tinio, Nueva Ecija",
        "hgabPesos": 72500000,
        "nepPage": "397",
        "hgabPage": "367",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Rehabilitation of Drainage Canal, Barangay UEP Zone III, Sta. 000+000 - Sta. 000+309, Catarman, Northern Samar",
      "source_code": "2027DPWH-Proposal-02666",
      "office": "Northern Samar 1st District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 2300000,
      "comparison_year": 2022,
      "prior_project": "Construction of Drainage Canal, Brgy UEP Zone II, Catarman Northern Samar",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 528976",
      "similarity_pct": 91,
      "current_chainage": "0+000.00–0+309.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Niko Raul Daza"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-02666",
        "nepTitle": "Rehabilitation of Drainage Canal, Barangay UEP Zone III, Sta. 000+000 - Sta. 000+309, Catarman, Northern Samar",
        "nepPesos": 2300000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0358-004640",
        "hgabTitle": "Rehabilitation of Drainage Canal, Barangay UEP Zone III, Sta. 000+000 - Sta. 000+309, Catarman, Northern Samar",
        "hgabPesos": 2300000,
        "nepPage": "390",
        "hgabPage": "358",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Nappaccu Pequeño, Reina Mercedes, Isabela",
      "source_code": "2027DPWH-Proposal-35122",
      "office": "Isabela 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 150000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Napaccu Pequeño, Reina Mercedes, Isabela",
      "prior_amount": 70000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 480625",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35122",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Nappaccu Pequeño, Reina Mercedes, Isabela",
        "nepPesos": 150000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0635-010339",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Nappaccu Pequeño, Reina Mercedes, Isabela",
        "hgabPesos": 150000000,
        "nepPage": "563",
        "hgabPage": "635",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay South West Poblacion, Nampicuan, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35855",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi Purpose Building, Barangay Southwest Poblacion, Nampicuan, Nueva Ecija, 15.730992, 120.633310",
      "prior_amount": 6000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33833",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 15.730992,
        "longitude": 120.63331,
        "raw": "15.730992, 120.633310",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35855",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay South West Poblacion, Nampicuan, Nueva Ecija",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Buenavista III, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-36380",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building (Barangay Hall), Barangay Buenavista II, General Trias City, Cavite",
      "prior_amount": 1500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 417252",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36380",
        "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Buenavista III, General Trias City, Cavite",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0766-012918",
        "hgabTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Buenavista III, General Trias City, Cavite",
        "hgabPesos": 20000000,
        "nepPage": "613",
        "hgabPage": "766",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Buenavista III, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-36380",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2019,
      "prior_project": "Rehabilitation of Multi-Purpose Building (Barangay Hall), Barangay Buenavista II, General Trias City, Cavite",
      "prior_amount": 1000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104208174000 · PDF p. 706 · printed p. 2171",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36380",
        "nepTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Buenavista III, General Trias City, Cavite",
        "nepPesos": 20000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0766-012918",
        "hgabTitle": "Construction of Multi-Purpose Building (Barangay Hall), Barangay Buenavista III, General Trias City, Cavite",
        "hgabPesos": 20000000,
        "nepPage": "613",
        "hgabPage": "766",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Cataggaman Viejo, Tuguegarao City, Cagayan",
      "source_code": "2027DPWH-Proposal-34992",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Cattagaman Viejo, Tuguegarao City, Cagayan",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597890",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Lara"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34992",
        "nepTitle": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Cataggaman Viejo, Tuguegarao City, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0704-011661",
        "hgabTitle": "Construction of Multi-Purpose Building (Convertible to Evacuation Center), Barangay Cataggaman Viejo, Tuguegarao City, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "588",
        "hgabPage": "704",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Covered Court), Barangay Zone I, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37480",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay Zone II, Cadiz City, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 418928",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37480",
        "nepTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Zone I, Cadiz City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0832-014241",
        "hgabTitle": "Construction of Multi-Purpose Building (Covered Court), Barangay Zone I, Cadiz City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "642",
        "hgabPage": "832",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building Barangay Gadongan, Ditsaan Ramain Lanao del Sur",
      "source_code": "2027DPWH-Proposal-26612",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 15000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi Purpose Building, Brgy. Gadongan, Ditsa-an Ramain, Lanao del Sur",
      "prior_amount": 1500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104211533000 · PDF p. 941 · printed p. 2406",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-26612",
        "nepTitle": "Construction of Multi-Purpose Building Barangay Gadongan, Ditsaan Ramain Lanao del Sur",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0651-010614",
        "hgabTitle": "Construction of Multi-Purpose Building Barangay Gadongan, Ditsaan Ramain Lanao del Sur",
        "hgabPesos": 15000000,
        "nepPage": "569",
        "hgabPage": "651",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Welcome Village, Barangay San Antonio, Parañaque City (14.466670, 121.022711)",
      "source_code": "2027DPWH-Proposal-22782",
      "office": "Metro Manila 2nd District Engineering Office",
      "region": "NCR",
      "amount_2027": 7000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building at Welcome Village Barangay San Antonio, Para±aque City",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 543906",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 14.46667,
        "longitude": 121.022711,
        "raw": "14.466670, 121.022711",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-22782",
        "nepTitle": "Construction of Multi-Purpose Building at Welcome Village, Barangay San Antonio, Parañaque City (14.466670, 121.022711)",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0658-010749",
        "hgabTitle": "Construction of Multi-Purpose Building at Welcome Village, Barangay San Antonio, Parañaque City (14.466670, 121.022711)",
        "hgabPesos": 7000000,
        "nepPage": "573",
        "hgabPage": "658",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Estefania, Bacolod City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37570",
      "office": "Bacolod City District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building in Brgy. Esttefania, Bacolod, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531619",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albee Benitez"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37570",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Estefania, Bacolod City, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0831-014204",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Estefania, Bacolod City, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "641",
        "hgabPage": "831",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building in Barangay Igmaya-an, Salvador Benedicto, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37580",
      "office": "Negros Occidental 5th District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Igmayaan, Salvador Benedicto, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010312301",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37580",
        "nepTitle": "Construction of Multi-Purpose Building in Barangay Igmaya-an, Salvador Benedicto, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0836-014312",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Igmaya-an, Salvador Benedicto, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "644",
        "hgabPage": "836",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Caduha-an, Cadiz City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37477",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Caduhaan, Cadiz City, Negros Occidental",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 531881",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37477",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Caduha-an, Cadiz City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0833-014253",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Caduha-an, Cadiz City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "642",
        "hgabPage": "833",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
      "source_code": "2027DPWH-Proposal-36379",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Pasong Camachile I, General Trias City, Cavite",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545499",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36379",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0768-012953",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Pasong Camachile II, General Trias City, Cavite",
        "hgabPesos": 10000000,
        "nepPage": "614",
        "hgabPage": "768",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Poblacion II, Sagay City, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37465",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay Poblacion I, Sagay City, Negros Occidental (10.889210, 123.416781)",
      "prior_amount": 2200000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 37820",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Alfredo Marañon III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 10.88921,
        "longitude": 123.416781,
        "raw": "10.889210, 123.416781",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37465",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Poblacion II, Sagay City, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0833-014257",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Poblacion II, Sagay City, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "643",
        "hgabPage": "833",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sinkatulan, Makilala, North Cotabato",
      "source_code": "2027DPWH-Proposal-38702",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Singkatulan, Makilala, North Cotabato",
      "prior_amount": 3500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104212526000 · PDF p. 1015 · printed p. 2480",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38702",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sinkatulan, Makilala, North Cotabato",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sta. Rita I, Del Gallego, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39306",
      "office": "Camarines Sur 1st District Engineering Office",
      "region": "Region V",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Brgy. Sta. Rita II, Del Gallego, Camarines Sur",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104209011000 · PDF p. 765 · printed p. 2230",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39306",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sta. Rita I, Del Gallego, Camarines Sur",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0798-013571",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sta. Rita I, Del Gallego, Camarines Sur",
        "hgabPesos": 5000000,
        "nepPage": "630",
        "hgabPage": "798",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Tomongtong, EB Magalona, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37403",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 6000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-purpose Building, Brgy. Tomontong, EB Magalona, Negros Occidental",
      "prior_amount": 10000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525699",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37403",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Tomongtong, EB Magalona, Negros Occidental",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0833-014259",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Tomongtong, EB Magalona, Negros Occidental",
        "hgabPesos": 6000000,
        "nepPage": "643",
        "hgabPage": "833",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Bataan Convention Center, Provincial Capitol Compound, Barangay San Jose, Balanga City, Bataan (14.674898, 120.529098)",
      "source_code": "2027DPWH-Proposal-35613",
      "office": "Bataan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 40000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Bataan Convention Center, Provincial Capitol Compound, Barangay San Jose, Balanga City, Bataan, Phase 8, 14.674898, 120.529098",
      "prior_amount": 100000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 24420",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 8 only",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Albert Garcia"
      ],
      "distanceMeters": 0.0,
      "distanceBand": "Under 50 meters",
      "leftCoordinates": {
        "latitude": 14.674898,
        "longitude": 120.529098,
        "raw": "14.674898, 120.529098",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "latitude": 14.674898,
        "longitude": 120.529098,
        "raw": "14.674898, 120.529098",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Likely same-site reference · building identity requires verification",
      "proximityReview": "Compare funded scope, phase and quantities at the likely same site",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35613",
        "nepTitle": "Construction of Multi-Purpose Building, Bataan Convention Center, Provincial Capitol Compound, Barangay San Jose, Balanga City, Bataan (14.674898, 120.529098)",
        "nepPesos": 40000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0727-012124",
        "hgabTitle": "Construction of Multi-Purpose Building, Bataan Convention Center, Provincial Capitol Compound, Barangay San Jose, Balanga City, Bataan (14.674898, 120.529098)",
        "hgabPesos": 40000000,
        "nepPage": "595",
        "hgabPage": "727",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
      "source_code": "2027DPWH-Proposal-20282",
      "office": "Upper Kalinga District Engineering Office",
      "region": "CAR",
      "amount_2027": 150000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga) Phase I, Kalinga",
      "prior_amount": 92894000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300116201309000 · PDF p. 1154 · printed p. 2619",
      "similarity_pct": 91,
      "current_chainage": "17+951.00–19+451.00 · 21+775.00–23+600.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 1 only",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20282",
        "nepTitle": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
        "nepPesos": 150000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002261",
        "hgabTitle": "Abra-Kalinga-Apayao Road along Aciga (Pinukpuk)-Tawang-Buaya-Mabaca (Balbalan Section, Kalinga), Sta. 17+951 - Sta. 19+451, Sta. 21+775 - Sta. 23+600, Kalinga",
        "hgabPesos": 150000000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573",
      "source_code": "2027DPWH-Proposal-20284",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 74500000,
      "comparison_year": 2020,
      "prior_project": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct.-Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of BLISTT Outer Ring Circumferential Road), Package 2, Benguet",
      "prior_amount": 140000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 513094",
      "similarity_pct": 91,
      "current_chainage": "6+913.00–8+200.00 · 10+560.00–10+650.00 · 19+320.00–19+400.00 · 20+500.00–20+573.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "same tranche",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20284",
        "nepTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573",
        "nepPesos": 74500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002264",
        "hgabTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong- Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573",
        "hgabPesos": 74500000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "same tranche",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573",
      "source_code": "2027DPWH-Proposal-20284",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 74500000,
      "comparison_year": 2021,
      "prior_project": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct.-Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of BLISTT Outer Ring Circumferential Road), Package 2, Benguet",
      "prior_amount": 74588000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437085",
      "similarity_pct": 91,
      "current_chainage": "6+913.00–8+200.00 · 10+560.00–10+650.00 · 19+320.00–19+400.00 · 20+500.00–20+573.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "same tranche",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20284",
        "nepTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573",
        "nepPesos": 74500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002264",
        "hgabTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong- Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573",
        "hgabPesos": 74500000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "same tranche",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573",
      "source_code": "2027DPWH-Proposal-20284",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 74500000,
      "comparison_year": 2022,
      "prior_project": "Baguio - La Trinidad - Itogon - Sablan - Tuba and Tublay, Kamog Jct. - Calot - Pappa - Bagong - Balluay - Tuel Jct. (Section 2 of BLISTT Outer Ring Circumferential Road), Package 2, Benguet",
      "prior_amount": 177000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548120",
      "similarity_pct": 91,
      "current_chainage": "6+913.00–8+200.00 · 10+560.00–10+650.00 · 19+320.00–19+400.00 · 20+500.00–20+573.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "same tranche",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20284",
        "nepTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573",
        "nepPesos": 74500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002264",
        "hgabTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong- Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573",
        "hgabPesos": 74500000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "same tranche",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573",
      "source_code": "2027DPWH-Proposal-20284",
      "office": "Benguet 1st District Engineering Office",
      "region": "CAR",
      "amount_2027": 74500000,
      "comparison_year": 2024,
      "prior_project": "Baguio - La Trinidad - Itogon - Sablan - Tuba - and Tublay, Kamog Jct. - Calot - Pappa - Bagong - Balluay - Tuel Jct. ( Section 2 of BLISTT Outer Ring Circumferential Road ) , Completion, Package 2, Benguet",
      "prior_amount": 70000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597109",
      "similarity_pct": 91,
      "current_chainage": "6+913.00–8+200.00 · 10+560.00–10+650.00 · 19+320.00–19+400.00 · 20+500.00–20+573.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "same tranche",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20284",
        "nepTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong-Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573",
        "nepPesos": 74500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002264",
        "hgabTitle": "Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Kamog Jct. - Calot-Pappa-Bagong- Balluay-Tuel Jct. (Section 2 of the BLISTT Outer Ring Circumferential Road) - Sta. 6+913 - Sta. 8+200, Sta. 10+560 - Sta. 10+650, Sta. 19+320 - Sta. 19+400, Sta. 20+500 - Sta. 20+573",
        "hgabPesos": 74500000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "same tranche",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bantay-San Ildefonso Bypass Road, Ilocos Sur",
      "source_code": "2027DPWH-Proposal-20644",
      "office": "Ilocos Sur 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2020,
      "prior_project": "Bantay-San Ildefonso By-Pass Road, Ilocos Sur",
      "prior_amount": 30000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512114",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20644",
        "nepTitle": "Bantay-San Ildefonso Bypass Road, Ilocos Sur",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bantay-San Ildefonso Bypass Road, Ilocos Sur",
      "source_code": "2027DPWH-Proposal-20644",
      "office": "Ilocos Sur 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2021,
      "prior_project": "Bantay-San Ildefonso By-Pass Road, Ilocos Sur",
      "prior_amount": 60000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436581",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20644",
        "nepTitle": "Bantay-San Ildefonso Bypass Road, Ilocos Sur",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Bantay-San Ildefonso Bypass Road, Ilocos Sur",
      "source_code": "2027DPWH-Proposal-20644",
      "office": "Ilocos Sur 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 100000000,
      "comparison_year": 2019,
      "prior_project": "Bantay-San Ildefonso By-Pass Road, Ilocos Sur",
      "prior_amount": 120000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100386000 · PDF p. 186 · printed p. 1651",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20644",
        "nepTitle": "Bantay-San Ildefonso Bypass Road, Ilocos Sur",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "CDO-New Western Diversion Road (Kauswagan-Bonbon Section), Barangay Bonbon-Barangay Bayabas, Sta. 0+000 - Sta. 0+160, Sta. 0+224 - Sta. 0+271, Sta. 0+400 - Sta. 1+110, Sta. 1+540 - Sta. 1+970, Cagayan de Oro City",
      "source_code": "2027DPWH-Proposal-20869",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 60000000,
      "comparison_year": 2022,
      "prior_project": "CDO-New Western Diversion Road (Kauswagan-Bonbon Section), Cagayan de Oro City",
      "prior_amount": 69000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547691",
      "similarity_pct": 91,
      "current_chainage": "0+000.00–0+160.00 · 0+224.00–0+271.00 · 0+400.00–1+110.00 · 1+540.00–1+970.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20869",
        "nepTitle": "CDO-New Western Diversion Road (Kauswagan-Bonbon Section), Barangay Bonbon-Barangay Bayabas, Sta. 0+000 - Sta. 0+160, Sta. 0+224 - Sta. 0+271, Sta. 0+400 - Sta. 1+110, Sta. 1+540 - Sta. 1+970, Cagayan de Oro City",
        "nepPesos": 60000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0225-002112",
        "hgabTitle": "CDO-New Western Diversion Road (Kauswagan-Bonbon Section), Barangay Bonbon- Barangay Bayabas, Sta. 0+000 - Sta. 0+160, Sta. 0+224 - Sta. 0+271, Sta. 0+400 - Sta. 1+110, Sta. 1+540 - Sta. 1+970, Cagayan de Oro City",
        "hgabPesos": 60000000,
        "nepPage": "285",
        "hgabPage": "225",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Quezon to Magsaysasy Road (Sta. 1+700 - Sta. 2+250), Mapanas, Northern Samar",
      "source_code": "2027DPWH-Proposal-38059",
      "office": "Northern Samar 2nd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 25000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Quezon - Magsaysay Road, Mapanas, Northern Samar",
      "prior_amount": 5000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 429442",
      "similarity_pct": 91,
      "current_chainage": "1+700.00–2+250.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38059",
        "nepTitle": "Construction of Quezon to Magsaysasy Road (Sta. 1+700 - Sta. 2+250), Mapanas, Northern Samar",
        "nepPesos": 25000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0596-009586",
        "hgabTitle": "Construction of Quezon to Magsaysasy Road (Sta. 1+700 - Sta. 2+250), Mapanas, Northern Samar",
        "hgabPesos": 25000000,
        "nepPage": "542",
        "hgabPage": "596",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Quezon to Magsaysasy Road (Sta. 1+700 - Sta. 2+250), Mapanas, Northern Samar",
      "source_code": "2027DPWH-Proposal-38059",
      "office": "Northern Samar 2nd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 25000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Quezon to Magsaysay Road, Mapanas, Northern Samar",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575829",
      "similarity_pct": 91,
      "current_chainage": "1+700.00–2+250.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38059",
        "nepTitle": "Construction of Quezon to Magsaysasy Road (Sta. 1+700 - Sta. 2+250), Mapanas, Northern Samar",
        "nepPesos": 25000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0596-009586",
        "hgabTitle": "Construction of Quezon to Magsaysasy Road (Sta. 1+700 - Sta. 2+250), Mapanas, Northern Samar",
        "hgabPesos": 25000000,
        "nepPage": "542",
        "hgabPage": "596",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road (Sta. 3+353 - Sta. 5+669) at Barangay Canlusong, E.B. Magalona, Negros Occidental (10.7556040, 123.1613220)",
      "source_code": "2027DPWH-Proposal-37389",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 32424000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Canlusong, EB Magalona, Negros Occidental",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 536345",
      "similarity_pct": 91,
      "current_chainage": "3+353.00–5+669.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37389",
        "nepTitle": "Construction of Road (Sta. 3+353 - Sta. 5+669) at Barangay Canlusong, E.B. Magalona, Negros Occidental (10.7556040, 123.1613220)",
        "nepPesos": 32424000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0575-009121",
        "hgabTitle": "Construction of Road (Sta. 3+353 - Sta. 5+669) at Barangay Canlusong, E.B. Magalona, Negros Occidental (10.7556040, 123.1613220)",
        "hgabPesos": 32424000,
        "nepPage": "529",
        "hgabPage": "575",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road Slope Protection Structure, Barangay Tagba-o, Cebu City, Cebu",
      "source_code": "2027DPWH-Proposal-37791",
      "office": "Cebu City District Engineering Office",
      "region": "Region VII",
      "amount_2027": 30000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Road with Slope Protection Structure, Sta. 9+100.00 - Sta. 9+350.00 Barangay Tagbao, Cebu City, Cebu",
      "prior_amount": 29070000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 23084",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "9+100.00–9+350.00",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37791",
        "nepTitle": "Construction of Road Slope Protection Structure, Barangay Tagba-o, Cebu City, Cebu",
        "nepPesos": 30000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0590-009458",
        "hgabTitle": "Construction of Road Slope Protection Structure, Barangay Tagba-o, Cebu City, Cebu",
        "hgabPesos": 30000000,
        "nepPage": "539",
        "hgabPage": "590",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Cababto-an (Sta. 0+214.50 - Sta. 0+274.50), Pambujan, Northern Samar",
      "source_code": "2027DPWH-Proposal-38058",
      "office": "Northern Samar 2nd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 5000000,
      "comparison_year": 2019,
      "prior_project": "Road Concreting, Brgy. Cababtoan, Pambujan, Northern Samar",
      "prior_amount": 15000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117204847000 · PDF p. 1363 · printed p. 2828",
      "similarity_pct": 91,
      "current_chainage": "0+214.50–0+274.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38058",
        "nepTitle": "Construction of Road, Barangay Cababto-an (Sta. 0+214.50 - Sta. 0+274.50), Pambujan, Northern Samar",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0597-009596",
        "hgabTitle": "Construction of Road, Barangay Cababto-an (Sta. 0+214.50 - Sta. 0+274.50), Pambujan, Northern Samar",
        "hgabPesos": 5000000,
        "nepPage": "542",
        "hgabPage": "597",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Goma, Digos City-Sitio Bagong Silang, Managa, Sta. 8+841.896 - Sta. 9+841.896, Bansalan, Davao del Sur",
      "source_code": "2027DPWH-Proposal-21286",
      "office": "Davao del Sur District Engineering Office",
      "region": "Region XI",
      "amount_2027": 50000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Road, Brgy. Goma, Digos City - Sitio Bagong Silang ( Phase II ) , Managa, Bansalan, Davao del Sur",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 539949",
      "similarity_pct": 91,
      "current_chainage": "8+841.90–9+841.90",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 2 only",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21286",
        "nepTitle": "Construction of Road, Barangay Goma, Digos City-Sitio Bagong Silang, Managa, Sta. 8+841.896 - Sta. 9+841.896, Bansalan, Davao del Sur",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0619-010038",
        "hgabTitle": "Construction of Road, Barangay Goma, Digos City-Sitio Bagong Silang, Managa, Sta. 8+841.896 - Sta. 9+841.896, Bansalan, Davao del Sur",
        "hgabPesos": 50000000,
        "nepPage": "554",
        "hgabPage": "619",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Man-ogob, San Vicente, Camarines Norte",
      "source_code": "2027DPWH-Proposal-39416",
      "office": "Camarines Norte Sub District Engineering Office",
      "region": "Region V",
      "amount_2027": 8000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Road, Brgy. Mang-ogob, San Vicente, Camarines Norte",
      "prior_amount": 2000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117203897000 · PDF p. 1308 · printed p. 2773",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39416",
        "nepTitle": "Construction of Road, Barangay Man-ogob, San Vicente, Camarines Norte",
        "nepPesos": 8000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0431-006092",
        "hgabTitle": "Construction of Road, Barangay Man-ogob, San Vicente, Camarines Norte",
        "hgabPesos": 8000000,
        "nepPage": "445",
        "hgabPage": "431",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Talakag-Baungon Section), Brgy. Lacolac Section, Sta. 12+750 - Sta. 13+275.33, Baungon, Bukidnon",
      "source_code": "2027DPWH-Proposal-20449",
      "office": "Bukidnon 3rd District Engineering Office",
      "region": "Region X",
      "amount_2027": 40000000,
      "comparison_year": 2026,
      "prior_project": "East-West lateral Road Connecting Agusan del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road ) TALAKAG-BAUNGON Section), Barangay Sagaran Section, Baungon, Bukidnon",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12440",
      "similarity_pct": 91,
      "current_chainage": "12+750.00–13+275.33",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20449",
        "nepTitle": "East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Talakag-Baungon Section), Brgy. Lacolac Section, Sta. 12+750 - Sta. 13+275.33, Baungon, Bukidnon",
        "nepPesos": 40000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0239-002360",
        "hgabTitle": "East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Talakag- Baungon Section), Barangay Lacolac Section, Sta. 12+750 - Sta. 13+275.33, Baungon, Bukidnon",
        "hgabPesos": 40000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Talakag-Baungon Section), Brgy. Langaon Section, Sta. 24+360 - Sta. 25+894, Baungon, Bukidnon",
      "source_code": "2027DPWH-Proposal-20445",
      "office": "Bukidnon 3rd District Engineering Office",
      "region": "Region X",
      "amount_2027": 65000000,
      "comparison_year": 2026,
      "prior_project": "East-West lateral Road Connecting Agusan del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road ) TALAKAG-BAUNGON Section), Barangay Sagaran Section, Baungon, Bukidnon",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12440",
      "similarity_pct": 91,
      "current_chainage": "24+360.00–25+894.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20445",
        "nepTitle": "East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Talakag-Baungon Section), Brgy. Langaon Section, Sta. 24+360 - Sta. 25+894, Baungon, Bukidnon",
        "nepPesos": 65000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
      "source_code": "2027DPWH-Proposal-20544",
      "office": "Rizal 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2022,
      "prior_project": "Jct Batasan-San Mateo-Rodriguez Bypass Link Road, Rizal",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547573",
      "similarity_pct": 91,
      "current_chainage": "24+400.00–24+700.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20544",
        "nepTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0231-002206",
        "hgabTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
        "hgabPesos": 50000000,
        "nepPage": "291",
        "hgabPage": "231",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
      "source_code": "2027DPWH-Proposal-20544",
      "office": "Rizal 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2023,
      "prior_project": "Jct Batasan - San Mateo - Rodriguez Bypass Link Road, Rizal",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566451",
      "similarity_pct": 91,
      "current_chainage": "24+400.00–24+700.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20544",
        "nepTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0231-002206",
        "hgabTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
        "hgabPesos": 50000000,
        "nepPage": "291",
        "hgabPage": "231",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
      "source_code": "2027DPWH-Proposal-20545",
      "office": "Rizal 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2022,
      "prior_project": "Jct Batasan-San Mateo-Rodriguez Bypass Link Road, Rizal",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 547573",
      "similarity_pct": 91,
      "current_chainage": "27+700.00–28+500.00 · 30+450.00–30+620.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20545",
        "nepTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0219-001989",
        "hgabTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
        "hgabPesos": 100000000,
        "nepPage": "280",
        "hgabPage": "219",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
      "source_code": "2027DPWH-Proposal-20545",
      "office": "Rizal 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2023,
      "prior_project": "Jct Batasan - San Mateo - Rodriguez Bypass Link Road, Rizal",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 566451",
      "similarity_pct": 91,
      "current_chainage": "27+700.00–28+500.00 · 30+450.00–30+620.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20545",
        "nepTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0219-001989",
        "hgabTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
        "hgabPesos": 100000000,
        "nepPage": "280",
        "hgabPage": "219",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lubao -Guagaua-Minalin-Sto Tomas Road, (Sta 019+070.80 - Sta 019+340.38), Pampanga",
      "source_code": "2027DPWH-Proposal-31755",
      "office": "Pampanga 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 50000000,
      "comparison_year": 2018,
      "prior_project": "Lubao-Guagua-Minalin-Sto. Tomas Road, Pampanga",
      "prior_amount": 50000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200694000",
      "similarity_pct": 91,
      "current_chainage": "19+070.80–19+340.38",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-31755",
        "nepTitle": "Lubao -Guagaua-Minalin-Sto Tomas Road, (Sta 019+070.80 - Sta 019+340.38), Pampanga",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Brgy. Bal-ason - Brgy. Hindangon, Sta. 125+958 - Sta. 127+158, Gingoog City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-20452",
      "office": "Misamis Oriental 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 100000000,
      "comparison_year": 2026,
      "prior_project": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Brgy. Bal-ason - Brgy. Hindangon Section, Sta. 126+151 - Sta. 126+211, Gingoog City, Misamis Oriental",
      "prior_amount": 54987000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 12990",
      "similarity_pct": 91,
      "current_chainage": "125+958.00–127+158.00",
      "prior_chainage": "126+151.00–126+211.00",
      "chainage_overlap": "126+151.00–126+211.00",
      "chainage_status": "overlap",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Karen Lagbas"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20452",
        "nepTitle": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Brgy. Bal-ason - Brgy. Hindangon, Sta. 125+958 - Sta. 127+158, Gingoog City, Misamis Oriental",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0240-002367",
        "hgabTitle": "Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Barangay Bal-ason - Barangay Hindangon, Sta. 125+958 - Sta. 127+158, Gingoog City, Misamis Oriental",
        "hgabPesos": 100000000,
        "nepPage": "299",
        "hgabPage": "240",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
      "source_code": "2027DPWH-Proposal-24194",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 100000000,
      "comparison_year": 2019,
      "prior_project": "Malubi-Cabangcalan-Dayhagan-Tinigban-M ataba Road, Masbate",
      "prior_amount": 100000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310205100251000 · PDF p. 206 · printed p. 1671",
      "similarity_pct": 91,
      "current_chainage": "7+700.00–8+322.00 · 9+400.00–9+514.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24194",
        "nepTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002331",
        "hgabTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 7+700 - Sta. 8+322, Sta. 9+400 - Sta. 9+514",
        "hgabPesos": 100000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
      "source_code": "2027DPWH-Proposal-24195",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2019,
      "prior_project": "Malubi-Cabangcalan-Dayhagan-Tinigban-M ataba Road, Masbate",
      "prior_amount": 100000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310205100251000 · PDF p. 206 · printed p. 1671",
      "similarity_pct": 91,
      "current_chainage": "8+322.00–9+300.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24195",
        "nepTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002333",
        "hgabTitle": "Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, Masbate, Sta. 8+322 to Sta. 9+300",
        "hgabPesos": 75000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Binmaley, Pangasinan",
      "source_code": "2027DPWH-Proposal-32765",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 438930000,
      "comparison_year": 2020,
      "prior_project": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road (Binmaley Section), Pangasinan",
      "prior_amount": 30000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512408",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32765",
        "nepTitle": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Binmaley, Pangasinan",
        "nepPesos": 438930000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001889",
        "hgabTitle": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Binmaley, Pangasinan",
        "hgabPesos": 438930000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Binmaley, Pangasinan",
      "source_code": "2027DPWH-Proposal-32765",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 438930000,
      "comparison_year": 2021,
      "prior_project": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road (Binmaley Section), Pangasinan",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436597",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32765",
        "nepTitle": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Binmaley, Pangasinan",
        "nepPesos": 438930000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001889",
        "hgabTitle": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Binmaley, Pangasinan",
        "hgabPesos": 438930000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Binmaley, Pangasinan",
      "source_code": "2027DPWH-Proposal-32765",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 438930000,
      "comparison_year": 2022,
      "prior_project": "Pangasinan - Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road (Binmaley Section), Pangasinan",
      "prior_amount": 70000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 546812",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32765",
        "nepTitle": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Binmaley, Pangasinan",
        "nepPesos": 438930000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001889",
        "hgabTitle": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Binmaley, Pangasinan",
        "hgabPesos": 438930000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-32766",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 250000000,
      "comparison_year": 2020,
      "prior_project": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road (Dagupan City Section), Pangasinan",
      "prior_amount": 50000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512409",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32766",
        "nepTitle": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Dagupan City, Pangasinan",
        "nepPesos": 250000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001890",
        "hgabTitle": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Dagupan City, Pangasinan",
        "hgabPesos": 250000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-32766",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 250000000,
      "comparison_year": 2021,
      "prior_project": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road (Dagupan City Section), Pangasinan",
      "prior_amount": 40000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436598",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32766",
        "nepTitle": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Dagupan City, Pangasinan",
        "nepPesos": 250000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001890",
        "hgabTitle": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Dagupan City, Pangasinan",
        "hgabPesos": 250000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Dagupan City, Pangasinan",
      "source_code": "2027DPWH-Proposal-32766",
      "office": "Pangasinan 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 250000000,
      "comparison_year": 2022,
      "prior_project": "Pangasinan - Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road (Dagupan City Section), Pangasinan",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 546813",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gina de Venecia"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32766",
        "nepTitle": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Dagupan City, Pangasinan",
        "nepPesos": 250000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001890",
        "hgabTitle": "Pangasinan-Zambales Road to Judge Jose De Venecia Boulevard Ext'n Road, Dagupan City, Pangasinan",
        "hgabPesos": 250000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Quezon Hill Road 1 to Magsaysay West Service Bypass Road, Sta. 1+524 - Sta. 1+742, Baguio City",
      "source_code": "2027DPWH-Proposal-20516",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 15000000,
      "comparison_year": 2025,
      "prior_project": "Quezon Hill Road 1 to Magsaysay West Service By-Pass Road, Baguio City",
      "prior_amount": 25000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631753",
      "similarity_pct": 91,
      "current_chainage": "1+524.00–1+742.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20516",
        "nepTitle": "Quezon Hill Road 1 to Magsaysay West Service Bypass Road, Sta. 1+524 - Sta. 1+742, Baguio City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0230-002189",
        "hgabTitle": "Quezon Hill Road 1 to Magsaysay West Service Bypass Road, Sta. 1+524 - Sta. 1+742, Baguio City",
        "hgabPesos": 15000000,
        "nepPage": "290",
        "hgabPage": "230",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Quezon Hill Road 1 to Magsaysay West Service Bypass Road, Sta. 1+524 - Sta. 1+742, Baguio City",
      "source_code": "2027DPWH-Proposal-20516",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 15000000,
      "comparison_year": 2017,
      "prior_project": "Quezon Hill Road 1 to Magsaysay West Service By-Pass Road, Baguio City",
      "prior_amount": 49900000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015300271",
      "similarity_pct": 91,
      "current_chainage": "1+524.00–1+742.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20516",
        "nepTitle": "Quezon Hill Road 1 to Magsaysay West Service Bypass Road, Sta. 1+524 - Sta. 1+742, Baguio City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0230-002189",
        "hgabTitle": "Quezon Hill Road 1 to Magsaysay West Service Bypass Road, Sta. 1+524 - Sta. 1+742, Baguio City",
        "hgabPesos": 15000000,
        "nepPage": "290",
        "hgabPage": "230",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Barangay Dalumpinas Este, City of San Fernando, La Union",
      "source_code": "2027DPWH-Proposal-34388",
      "office": "La Union 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 10000000,
      "comparison_year": 2019,
      "prior_project": "Concreting of Road, Brgy. Dalumpinas Oeste, San Fernando City, La Union",
      "prior_amount": 1100000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300117202488000 · PDF p. 1225 · printed p. 2690",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34388",
        "nepTitle": "Rehabilitation of Road, Barangay Dalumpinas Este, City of San Fernando, La Union",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0465-006737",
        "hgabTitle": "Rehabilitation of Road, Barangay Dalumpinas Este, City of San Fernando, La Union",
        "hgabPesos": 10000000,
        "nepPage": "464",
        "hgabPage": "465",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Soldiers Hills, Barangay Putatan, Muntinlupa City",
      "source_code": "2027DPWH-Proposal-33933",
      "office": "Las Piñas Muntinlupa District Engineering Office",
      "region": "NCR",
      "amount_2027": 20000000,
      "comparison_year": 2018,
      "prior_project": "Construction of Road at Soldier's Hills, Putatan, Muntinlupa City",
      "prior_amount": 15000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200220000",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33933",
        "nepTitle": "Rehabilitation of Road, Soldiers Hills, Barangay Putatan, Muntinlupa City",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0449-006421",
        "hgabTitle": "Rehabilitation of Road, Soldiers Hills, Barangay Putatan, Muntinlupa City",
        "hgabPesos": 20000000,
        "nepPage": "455",
        "hgabPage": "449",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Roads in Barangay Canitoan, Cagayan de Oro City, Misamis Oriental",
      "source_code": "2027DPWH-Proposal-39198",
      "office": "Cagayan de Oro City 1st District Engineering Office",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Road, Brgy. Canito-An, Cagayan de Oro City, Misamis Oriental",
      "prior_amount": 5000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 500453",
      "similarity_pct": 91,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39198",
        "nepTitle": "Rehabilitation of Roads in Barangay Canitoan, Cagayan de Oro City, Misamis Oriental",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0608-009814",
        "hgabTitle": "Rehabilitation of Roads in Barangay Canitoan, Cagayan de Oro City, Misamis Oriental",
        "hgabPesos": 10000000,
        "nepPage": "549",
        "hgabPage": "608",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System Along Jct. BCIR-Jct. Eastern Interior Bypass Road (Access Road), Barangay Tablon, Sta.0+000 - Sta. 0+530, Cagayan De Oro City",
      "source_code": "2027DPWH-Proposal-01099",
      "office": "Cagayan de Oro City 2nd District Engineering Office",
      "region": "Region X",
      "amount_2027": 180000000,
      "comparison_year": 2023,
      "prior_project": "Construction of drainage system along Jct. BCIR-Jct. Eastern Interior Bypass Road (Access Road), Cagayan De Oro City",
      "prior_amount": 50000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 530339",
      "similarity_pct": 90,
      "current_chainage": "0+000.00–0+530.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-01099",
        "nepTitle": "Construction of Drainage System Along Jct. BCIR-Jct. Eastern Interior Bypass Road (Access Road), Barangay Tablon, Sta.0+000 - Sta. 0+530, Cagayan De Oro City",
        "nepPesos": 180000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0369-004830",
        "hgabTitle": "Construction of Drainage System Along Jct. BCIR-Jct. Eastern Interior Bypass Road (Access Road), Barangay Tablon, Sta.0+000 - Sta. 0+530, Cagayan De Oro City",
        "hgabPesos": 180000000,
        "nepPage": "399",
        "hgabPage": "369",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System along Caritan- Balzain Creek, Caritan, Tuguegarao City, Cagayan",
      "source_code": "2027DPWH-Proposal-35142",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 50000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Drainage System along Caritan - Balzain Creek Phase V, Caritan, Tuguegarao City, Cagayan",
      "prior_amount": 54884000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 615760",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 5 only",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Lara"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35142",
        "nepTitle": "Construction of Drainage System along Caritan- Balzain Creek, Caritan, Tuguegarao City, Cagayan",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0336-004206",
        "hgabTitle": "Construction of Drainage System along Caritan-Balzain Creek, Caritan, Tuguegarao City, Cagayan",
        "hgabPesos": 70000000,
        "nepPage": "373",
        "hgabPage": "336",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage System at Barangay Muntingpulo, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-28794",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 8000000,
      "comparison_year": 2024,
      "prior_project": "Rehabilitation of Drainage System at Barangay Munting Pulo, Lipa City, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 544338",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28794",
        "nepTitle": "Construction of Drainage System at Barangay Muntingpulo, Lipa City, Batangas",
        "nepPesos": 8000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0346-004392",
        "hgabTitle": "Construction of Drainage System at Barangay Muntingpulo, Lipa City, Batangas",
        "hgabPesos": 8000000,
        "nepPage": "381",
        "hgabPage": "346",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage at Barangay Malinta, Los Baños, Laguna",
      "source_code": "2027DPWH-Proposal-09803",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 20000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road and Drainage, Barangay Malinta, Los Ba±os, Laguna",
      "prior_amount": 10000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535872",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Ramil Hernandez"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09803",
        "nepTitle": "Construction of Drainage at Barangay Malinta, Los Baños, Laguna",
        "nepPesos": 20000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Drainage, Barangay Pulungbulu, Angeles City, Pampanga, Sta. 0+000 - Sta. 0+530, Sta. 0+000 - Sta. 0+140, Sta. 0+000 - Sta. 0+360, Sta. 0+000 - Sta. 0+193",
      "source_code": "2027DPWH-Proposal-10788",
      "office": "Pampanga 3rd District Engineering Office",
      "region": "Region III",
      "amount_2027": 5114000,
      "comparison_year": 2017,
      "prior_project": "Concreting of Drainage at Brgy. Pulung bulu, Angeles, Pampanga",
      "prior_amount": 2000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 292004020100498",
      "similarity_pct": 90,
      "current_chainage": "0+000.00–0+530.00 · 0+000.00–0+140.00 · 0+000.00–0+360.00 · 0+000.00–0+193.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10788",
        "nepTitle": "Construction of Drainage, Barangay Pulungbulu, Angeles City, Pampanga, Sta. 0+000 - Sta. 0+530, Sta. 0+000 - Sta. 0+140, Sta. 0+000 - Sta. 0+360, Sta. 0+000 - Sta. 0+193",
        "nepPesos": 5114000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure at Aguada River, Aguada Br. Section (B00001BL) with Esplanade along Basilan Circumferential Road (S00002BL), Isabela City",
      "source_code": "2027DPWH-Proposal-21596",
      "office": "Isabela City District Engineering Office",
      "region": "Region IX",
      "amount_2027": 155000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Flood Control Structure at Aguada River, Aguada Br. Section ( B00001BL ) along Basilan Circumferential Road ( S00002BL ) , Isabela City",
      "prior_amount": 100000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 621539",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-21596",
        "nepTitle": "Construction of Flood Control Structure at Aguada River, Aguada Br. Section (B00001BL) with Esplanade along Basilan Circumferential Road (S00002BL), Isabela City",
        "nepPesos": 155000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure, Binayoyo River (Downstream), sta 03+279 - sta 03+739, Barangay Calawis, Antipolo City, Rizal",
      "source_code": "2027DPWH-Proposal-10093",
      "office": "Rizal 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Flood Control Structure, Binayoyo River ( Downstream ) Phase 5, Barangay Calawis, Antipolo City, Rizal",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 617155",
      "similarity_pct": 90,
      "current_chainage": "3+279.00–3+739.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 5 only",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10093",
        "nepTitle": "Construction of Flood Control Structure, Binayoyo River (Downstream), sta 03+279 - sta 03+739, Barangay Calawis, Antipolo City, Rizal",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0349-004471",
        "hgabTitle": "Construction of Flood Control Structure, Binayoyo River (Downstream), sta 03+279 - sta 03+739, Barangay Calawis, Antipolo City, Rizal",
        "hgabPesos": 50000000,
        "nepPage": "383",
        "hgabPage": "349",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure, Binayoyo River (Downstream), sta 03+279 - sta 03+739, Barangay Calawis, Antipolo City, Rizal",
      "source_code": "2027DPWH-Proposal-10093",
      "office": "Rizal 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Flood Control Structure, Binayoyo River (Downstream), Phase 7, Barangay Calawis, Antipolo City, Rizal",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 656810",
      "similarity_pct": 90,
      "current_chainage": "3+279.00–3+739.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 7 only",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10093",
        "nepTitle": "Construction of Flood Control Structure, Binayoyo River (Downstream), sta 03+279 - sta 03+739, Barangay Calawis, Antipolo City, Rizal",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0349-004471",
        "hgabTitle": "Construction of Flood Control Structure, Binayoyo River (Downstream), sta 03+279 - sta 03+739, Barangay Calawis, Antipolo City, Rizal",
        "hgabPesos": 50000000,
        "nepPage": "383",
        "hgabPage": "349",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure, Calawis River (Upstream), sta 02+134 - sta 02+594, Barangay Calawis, Antipolo City, Rizal",
      "source_code": "2027DPWH-Proposal-10094",
      "office": "Rizal 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Flood Control Structure, Calawis River ( Upstream ) Phase 3, Barangay Calawis, Antipolo City, Rizal",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 617160",
      "similarity_pct": 90,
      "current_chainage": "2+134.00–2+594.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 3 only",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10094",
        "nepTitle": "Construction of Flood Control Structure, Calawis River (Upstream), sta 02+134 - sta 02+594, Barangay Calawis, Antipolo City, Rizal",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0349-004473",
        "hgabTitle": "Construction of Flood Control Structure, Calawis River (Upstream), sta 02+134 - sta 02+594, Barangay Calawis, Antipolo City, Rizal",
        "hgabPesos": 50000000,
        "nepPage": "383",
        "hgabPage": "349",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure, Calawis River (Upstream), sta 02+134 - sta 02+594, Barangay Calawis, Antipolo City, Rizal",
      "source_code": "2027DPWH-Proposal-10094",
      "office": "Rizal 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Flood Control Structure, Calawis River (Upstream), Phase 5, Barangay Calawis, Antipolo City, Rizal",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 656809",
      "similarity_pct": 90,
      "current_chainage": "2+134.00–2+594.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 5 only",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10094",
        "nepTitle": "Construction of Flood Control Structure, Calawis River (Upstream), sta 02+134 - sta 02+594, Barangay Calawis, Antipolo City, Rizal",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0349-004473",
        "hgabTitle": "Construction of Flood Control Structure, Calawis River (Upstream), sta 02+134 - sta 02+594, Barangay Calawis, Antipolo City, Rizal",
        "hgabPesos": 50000000,
        "nepPage": "383",
        "hgabPage": "349",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure, Cupang River (Downstream), sta 01+779 - sta 02+239, Barangay Cupang, Antipolo City, Rizal",
      "source_code": "2027DPWH-Proposal-10095",
      "office": "Rizal 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2024,
      "prior_project": "Construction of Flood Control Structure, Cupang River ( Downstream ) Phase 3, Barangay Cupang, Antipolo City, Rizal",
      "prior_amount": 50000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 617162",
      "similarity_pct": 90,
      "current_chainage": "1+779.00–2+239.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 3 only",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10095",
        "nepTitle": "Construction of Flood Control Structure, Cupang River (Downstream), sta 01+779 - sta 02+239, Barangay Cupang, Antipolo City, Rizal",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0349-004475",
        "hgabTitle": "Construction of Flood Control Structure, Cupang River (Downstream), sta 01+779 - sta 02+239, Barangay Cupang, Antipolo City, Rizal",
        "hgabPesos": 50000000,
        "nepPage": "383",
        "hgabPage": "349",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Flood Control Structure, Cupang River (Downstream), sta 01+779 - sta 02+239, Barangay Cupang, Antipolo City, Rizal",
      "source_code": "2027DPWH-Proposal-10095",
      "office": "Rizal 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Flood Control Structure, Cupang River (Downstream), Phase 4, Barangay Cupang, Antipolo City, Rizal",
      "prior_amount": 50000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 656812",
      "similarity_pct": 90,
      "current_chainage": "1+779.00–2+239.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 4 only",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10095",
        "nepTitle": "Construction of Flood Control Structure, Cupang River (Downstream), sta 01+779 - sta 02+239, Barangay Cupang, Antipolo City, Rizal",
        "nepPesos": 50000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0349-004475",
        "hgabTitle": "Construction of Flood Control Structure, Cupang River (Downstream), sta 01+779 - sta 02+239, Barangay Cupang, Antipolo City, Rizal",
        "hgabPesos": 50000000,
        "nepPage": "383",
        "hgabPage": "349",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Revetment Wall along Butuanon River, Barangay Tabok, Mandaue City, Cebu",
      "source_code": "2027DPWH-Proposal-08104",
      "office": "Cebu 6th District Engineering Office",
      "region": "Region VII",
      "amount_2027": 43000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Revetment Wall along Butuanon River, Barangay Tabok (Phase 7), Mandaue City, Cebu",
      "prior_amount": 26000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 605663",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 7 only",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-08104",
        "nepTitle": "Construction of Revetment Wall along Butuanon River, Barangay Tabok, Mandaue City, Cebu",
        "nepPesos": 43000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0356-004602",
        "hgabTitle": "Construction of Revetment Wall along Butuanon River, Barangay Tabok, Mandaue City, Cebu",
        "hgabPesos": 43000000,
        "nepPage": "388",
        "hgabPage": "356",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Revetment along Carmona River, Barangay Cabilang Baybay, Carmona City, Cavite",
      "source_code": "2027DPWH-Proposal-28844",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 450000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Revetment along Carmona River, Phase 1, Barangay Cabilang Baybay, Carmona City, Cavite",
      "prior_amount": 87000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 655748",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 1 only",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28844",
        "nepTitle": "Construction of Revetment along Carmona River, Barangay Cabilang Baybay, Carmona City, Cavite",
        "nepPesos": 450000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0307-003661",
        "hgabTitle": "Construction of Revetment along Carmona River, Barangay Cabilang Baybay, Carmona City, Cavite",
        "hgabPesos": 150000000,
        "nepPage": "354",
        "hgabPage": "307",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Revetment along Julian River, Barangay Anabu I-B, Imus, Cavite",
      "source_code": "2027DPWH-Proposal-28940",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 82000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Revetment along Julian River, Phase 1, Barangay Anabu I-B, Imus, Cavite",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 661990",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 1 only",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-28940",
        "nepTitle": "Construction of Revetment along Julian River, Barangay Anabu I-B, Imus, Cavite",
        "nepPesos": 82000000,
        "category": "Flood control",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0308-003665",
        "hgabTitle": "Construction of Revetment along Julian River, Barangay Anabu I-B, Imus, Cavite",
        "hgabPesos": 82000000,
        "nepPage": "354",
        "hgabPage": "308",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road and Drainage System at Barangay San Antonio, Binan City, Laguna",
      "source_code": "2027DPWH-Proposal-09797",
      "office": "Laguna 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 30000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road with Drainage, San Antonio, Bi±an, Laguna",
      "prior_amount": 30000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 535866",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09797",
        "nepTitle": "Construction of Road and Drainage System at Barangay San Antonio, Binan City, Laguna",
        "nepPesos": 30000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Flood control",
      "project": "Construction of Road with Drainage, Barangay Balite I, Silang, Cavite",
      "source_code": "2027DPWH-Proposal-36535",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Drainage System , Barangay Balite II, Silang, Cavite",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 428464",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36535",
        "nepTitle": "Construction of Road with Drainage, Barangay Balite I, Silang, Cavite",
        "nepPesos": 10000000,
        "category": "Flood control",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building at Barangay Guintigiban, Corcuera, Romblon",
      "source_code": "2027DPWH-Proposal-37023",
      "office": "Romblon District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Guintiguiban, Corcuera, Romblon",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545959",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37023",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Guintigiban, Corcuera, Romblon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0793-013470",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building at Barangay Guintigiban, Corcuera, Romblon",
        "hgabPesos": 5000000,
        "nepPage": "627",
        "hgabPage": "793",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Bakal I, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36042",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2025,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Brgy.Bakal II, Talavera, Nueva Ecija",
      "prior_amount": 4000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598547",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36042",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bakal I, Talavera, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0735-012298",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bakal I, Talavera, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "600",
        "hgabPage": "735",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Bakal I, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-36042",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6000000,
      "comparison_year": 2019,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Bakal II, Talavera, Nueva Ecija",
      "prior_amount": 3500000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 300104207397000 · PDF p. 652 · printed p. 2117",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36042",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bakal I, Talavera, Nueva Ecija",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0735-012298",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Bakal I, Talavera, Nueva Ecija",
        "hgabPesos": 6000000,
        "nepPage": "600",
        "hgabPage": "735",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Can-asagan, San Juan, Siquijor",
      "source_code": "2027DPWH-Proposal-37621",
      "office": "Siquijor District Engineering Office",
      "region": "NIR",
      "amount_2027": 5300000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Barangay Canasagan, San Juan, Siquijor",
      "prior_amount": 500000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 420005",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Zaldy Villa"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37621",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Can-asagan, San Juan, Siquijor",
        "nepPesos": 5300000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0841-014411",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Can-asagan, San Juan, Siquijor",
        "hgabPesos": 5300000,
        "nepPage": "645",
        "hgabPage": "841",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Muñoz West, Roxas, Isabela",
      "source_code": "2027DPWH-Proposal-34872",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mu±oz West, Roxas, Isabela",
      "prior_amount": 10000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 414867",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Mike Dy III"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34872",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Muñoz West, Roxas, Isabela",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0707-011715",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Muñoz West, Roxas, Isabela",
        "hgabPesos": 10000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Peñbatan, Pulilan, Bulacan",
      "source_code": "2027DPWH-Proposal-33636",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 35000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan (14.927881, 120.841578)",
      "prior_amount": 50000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 33580",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.927881,
        "longitude": 120.841578,
        "raw": "14.927881, 120.841578",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33636",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Peñbatan, Pulilan, Bulacan",
        "nepPesos": 35000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Norte I, Mallig, Isabela",
      "source_code": "2027DPWH-Proposal-34887",
      "office": "Isabela 2nd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-purpose Building, Brgy. San Jose Norte II, Mallig, Isabela",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 597919",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34887",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Norte I, Mallig, Isabela",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0707-011722",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose Norte I, Mallig, Isabela",
        "hgabPesos": 5000000,
        "nepPage": "589",
        "hgabPage": "707",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Barangay Sisim, Peñablanca, Cagayan",
      "source_code": "2027DPWH-Proposal-34991",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Rehabilitation of Multi-Purpose Building, Sisim, Pe±ablanca, Cagayan",
      "prior_amount": 600000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 415896",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Lara"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34991",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sisim, Peñablanca, Cagayan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0703-011648",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Barangay Sisim, Peñablanca, Cagayan",
        "hgabPesos": 10000000,
        "nepPage": "587",
        "hgabPage": "703",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Brgy Baraas, Municipality of Picong, Lanao del Sur",
      "source_code": "2027DPWH-Proposal-38948",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2020,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Bara-as, Picong, Lanao del Sur",
      "prior_amount": 20000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 484940",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Yasser Balindong"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38948",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Brgy Baraas, Municipality of Picong, Lanao del Sur",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0647-010547",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Baraas, Municipality of Picong, Lanao del Sur",
        "hgabPesos": 10000000,
        "nepPage": "569",
        "hgabPage": "647",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction (Completion) of Multi-Purpose Building, Brgy Baraas, Municipality of Picong, Lanao del Sur",
      "source_code": "2027DPWH-Proposal-38948",
      "office": "Regional Office X BARMM",
      "region": "Region X",
      "amount_2027": 10000000,
      "comparison_year": 2021,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Bara-as, Picong, Lanao del Sur",
      "prior_amount": 16600000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 414699",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Yasser Balindong"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38948",
        "nepTitle": "Construction (Completion) of Multi-Purpose Building, Brgy Baraas, Municipality of Picong, Lanao del Sur",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0647-010547",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building, Baraas, Municipality of Picong, Lanao del Sur",
        "hgabPesos": 10000000,
        "nepPage": "569",
        "hgabPage": "647",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building (Museo de Bacoor) at Barangay Poblacion, formerly Tabing Dagat, Camposanto and Daaang Bukid, Bacoor City, Cavite",
      "source_code": "2027DPWH-Proposal-36423",
      "office": "Cavite 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 296500000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building (Museo de Bacoor, Phase 5), Barangay Poblacion (Formerly Tabing Dagat, Camposanto and Daang Bukid), Bacoor City, Cavite (14.459233°, 120.939805°)",
      "prior_amount": 92669000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 30392",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 5 only",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 14.459233,
        "longitude": 120.939805,
        "raw": "14.459233°, 120.939805",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": true,
      "sameBarangayLabels": true,
      "barangay": "poblacion · bacoor · cavite",
      "barangayEvidence": "Qualified barangay, municipality and province agree",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36423",
        "nepTitle": "Construction of Multi-Purpose Building (Museo de Bacoor) at Barangay Poblacion, formerly Tabing Dagat, Camposanto and Daaang Bukid, Bacoor City, Cavite",
        "nepPesos": 296500000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0640-010407",
        "hgabTitle": "Construction (Completion) of Multi-Purpose Building (Museo de Bacoor) at Barangay Poblacion, formerly Tabing Dagat, Camposanto and Daaang Bukid, Bacoor City, Cavite",
        "hgabPesos": 334500000,
        "nepPage": "567",
        "hgabPage": "640",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Maligaya, General Nakar, Quezon",
      "source_code": "2027DPWH-Proposal-36346",
      "office": "Quezon 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Maligay, General Nakar, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 525531",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36346",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Maligaya, General Nakar, Quezon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0778-013169",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Maligaya, General Nakar, Quezon",
        "hgabPesos": 7000000,
        "nepPage": "620",
        "hgabPage": "778",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan",
      "source_code": "2027DPWH-Proposal-35588",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 15000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building at Barangay Pe±abatan, Pulilan, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544875",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35588",
        "nepTitle": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan",
        "nepPesos": 15000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0730-012190",
        "hgabTitle": "Construction of Multi-Purpose Building at Barangay Peñabatan, Pulilan, Bulacan",
        "hgabPesos": 15000000,
        "nepPage": "597",
        "hgabPage": "730",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building including Facilities, Land Transportation Regional Office, Region 4A, Barangay Marawoy, Lipa City, Batangas (13.959513, 121.173809)",
      "source_code": "2027DPWH-Proposal-09638",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building Including Facilities, Land Transportation Regional Office - Region 4A, Lipa City, Batangas",
      "prior_amount": 150000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 529093",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "latitude": 13.959513,
        "longitude": 121.173809,
        "raw": "13.959513, 121.173809",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-09638",
        "nepTitle": "Construction of Multi-Purpose Building including Facilities, Land Transportation Regional Office, Region 4A, Barangay Marawoy, Lipa City, Batangas (13.959513, 121.173809)",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0641-010430",
        "hgabTitle": "Construction of Multi-Purpose Building including Facilities, Land Transportation Regional Office, Region 4A, Barangay Marawoy, Lipa City, Batangas (13.959513, 121.173809)",
        "hgabPesos": 50000000,
        "nepPage": "567",
        "hgabPage": "641",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Bongolanon, Magpet, North Cotabato",
      "source_code": "2027DPWH-Proposal-38685",
      "office": "Cotabato 2nd District Engineering Office",
      "region": "Region XII",
      "amount_2027": 6000000,
      "comparison_year": 2017,
      "prior_project": "Construction of Multi-Purpose Building, Brgy. Bongolano, Magpet, North Cotabato",
      "prior_amount": 2500000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 103004010313682",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38685",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Bongolanon, Magpet, North Cotabato",
        "nepPesos": 6000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0896-015472",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Bongolanon, Magpet, North Cotabato",
        "hgabPesos": 6000000,
        "nepPage": "668",
        "hgabPage": "896",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Guintigiban, Corcuera, Romblon",
      "source_code": "2027DPWH-Proposal-06359",
      "office": "Romblon District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Guintiguiban, Corcuera, Romblon",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545959",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-06359",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Guintigiban, Corcuera, Romblon",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay I-A, Municipality of Manapla, Negros Occidental",
      "source_code": "2027DPWH-Proposal-37447",
      "office": "Negros Occidental 1st District Engineering Office",
      "region": "NIR",
      "amount_2027": 5000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay II-A, Manapla, Negros Occidental",
      "prior_amount": 2000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 546731",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37447",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay I-A, Municipality of Manapla, Negros Occidental",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0833-014254",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay I-A, Municipality of Manapla, Negros Occidental",
        "hgabPesos": 5000000,
        "nepPage": "642",
        "hgabPage": "833",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Mala Weste, Buguey, Cagayan",
      "source_code": "2027DPWH-Proposal-35072",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2026,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Mala Este, Buguey, Cagayan (18.280440°, 121.857185°)",
      "prior_amount": 5000000,
      "prior_source": "FY2026 DPWH GAA Details Enrolled Copy, row 32741",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "latitude": 18.28044,
        "longitude": 121.857185,
        "raw": "18.280440°, 121.857185",
        "orientation": "latitude, longitude",
        "decimalPlaces": 6,
        "status": "Usable printed point"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35072",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Mala Weste, Buguey, Cagayan",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0702-011620",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Mala Weste, Buguey, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "587",
        "hgabPage": "702",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Muzon I, Rosario, Cavite",
      "source_code": "2027DPWH-Proposal-36172",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Multi-Purpose Building in Barangay Muzon II, Rosario, Cavite",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 545494",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jolo Revilla"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36172",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Muzon I, Rosario, Cavite",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0768-012952",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Muzon I, Rosario, Cavite",
        "hgabPesos": 10000000,
        "nepPage": "614",
        "hgabPage": "768",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Prenza I, Marilao, Bulacan",
      "source_code": "2027DPWH-Proposal-35894",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 8000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi Purpose Building at Barangay Prenza II, Marilao, Bulacan",
      "prior_amount": 20000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 598500",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35894",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Prenza I, Marilao, Bulacan",
        "nepPesos": 8000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0734-012268",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Prenza I, Marilao, Bulacan",
        "hgabPesos": 8000000,
        "nepPage": "599",
        "hgabPage": "734",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Barangay Sapa III, Rosario, Cavite",
      "source_code": "2027DPWH-Proposal-36449",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Sapa II, Rosario, Cavite",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530669",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jolo Revilla"
      ],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": false,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36449",
        "nepTitle": "Construction of Multi-Purpose Building, Barangay Sapa III, Rosario, Cavite",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0768-012957",
        "hgabTitle": "Construction of Multi-Purpose Building, Barangay Sapa III, Rosario, Cavite",
        "hgabPesos": 10000000,
        "nepPage": "614",
        "hgabPage": "768",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Construction of Multi-Purpose Building, Calabanga, Camarines Sur",
      "source_code": "2027DPWH-Proposal-39347",
      "office": "Camarines Sur 3rd District Engineering Office",
      "region": "Region V",
      "amount_2027": 50000000,
      "comparison_year": 2021,
      "prior_project": "Construction/Rehabilitation of Multi-Purpose Building, Calabangga, Camarines Sur",
      "prior_amount": 4980000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 414567",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-39347",
        "nepTitle": "Construction of Multi-Purpose Building, Calabanga, Camarines Sur",
        "nepPesos": 50000000,
        "category": "Multi-purpose building",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0801-013615",
        "hgabTitle": "Construction of Multi-Purpose Building in Barangay Sibobo, Calabanga, CamarinesSur",
        "hgabPesos": 50000000,
        "nepPage": "631",
        "hgabPage": "801",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay San Bartolome, Sto. Tomas City, Batangas",
      "source_code": "2027DPWH-Proposal-36588",
      "office": "Batangas 3rd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 7000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Multi-Purpose Building (Covered Court), Barangay San Bartolome, Santo Tomas City, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 599118",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36588",
        "nepTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay San Bartolome, Sto. Tomas City, Batangas",
        "nepPesos": 7000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0757-012736",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building (Covered Court), Barangay San Bartolome, Sto. Tomas City, Batangas",
        "hgabPesos": 7000000,
        "nepPage": "611",
        "hgabPage": "757",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building Biñang 1st, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33605",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Multi-Purpose Building, Barangay Bi±ang 1st, Bocaue, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530057",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33605",
        "nepTitle": "Rehabilitation of Multi-Purpose Building Biñang 1st, Bocaue, Bulacan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012216",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building Biñang 1st, Bocaue, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "598",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building Biñang 1st, Bocaue, Bulacan",
      "source_code": "2027DPWH-Proposal-33605",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction (Completion) Of Multi-Purpose Building, Barangay Bi±ang 1st, Bocaue, Bulacan",
      "prior_amount": 5000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 544838",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33605",
        "nepTitle": "Rehabilitation of Multi-Purpose Building Biñang 1st, Bocaue, Bulacan",
        "nepPesos": 10000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0731-012216",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building Biñang 1st, Bocaue, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "598",
        "hgabPage": "731",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Multi-purpose building",
      "project": "Rehabilitation of Multi-Purpose Building, Barangay San Jose II, Noveleta, Cavite",
      "source_code": "2027DPWH-Proposal-36456",
      "office": "Cavite 1st District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction (Completion) of Multi-Purpose Building, Barangay San Jose I, Noveleta, Cavite",
      "prior_amount": 3000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 530650",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not applicable",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "distanceMeters": null,
      "distanceBand": "Unknown distance",
      "leftCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "rightCoordinates": {
        "status": "No unambiguous decimal coordinate pair recovered"
      },
      "sameBarangayVerified": false,
      "sameBarangayLabels": false,
      "barangay": "Same barangay not established",
      "barangayEvidence": "Same barangay not established",
      "continuationWording": true,
      "siteInterpretation": "Unresolved site identity",
      "proximityReview": "Coordinates unavailable or require review · completion/repair/improvement wording present",
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36456",
        "nepTitle": "Rehabilitation of Multi-Purpose Building, Barangay San Jose II, Noveleta, Cavite",
        "nepPesos": 5000000,
        "category": "Multi-purpose building",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0768-012966",
        "hgabTitle": "Rehabilitation of Multi-Purpose Building, Barangay San Jose II, Noveleta, Cavite",
        "hgabPesos": 5000000,
        "nepPage": "615",
        "hgabPage": "768",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22+183 - Sta. 24+733), Eastern Samar",
      "source_code": "2027DPWH-Proposal-20406",
      "office": "Eastern Samar District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 59349000,
      "comparison_year": 2018,
      "prior_project": "Arteche-Brgy. Catumsan-Jipapad-Las Navas-Catubig-Rawis Road (Eastern Samar Side), Eastern Samar",
      "prior_amount": 100000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310205100003000",
      "similarity_pct": 90,
      "current_chainage": "22+183.00–24+733.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20406",
        "nepTitle": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22+183 - Sta. 24+733), Eastern Samar",
        "nepPesos": 59349000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0239-002352",
        "hgabTitle": "Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 22 + 783 - Sta. 24 + 733), Eastern Samar",
        "hgabPesos": 265000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 9+560 - Sta. 9+640, Sta. 16+103 - Sta. 16+340, Sta. 16+340 - Sta. 16+420, Sta. 16+420 - Sta. 16+425), Northern Samar",
      "source_code": "2027DPWH-Proposal-20408",
      "office": "Northern Samar 2nd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 448380000,
      "comparison_year": 2024,
      "prior_project": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road, Northern Samar Side",
      "prior_amount": 81206000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 597175",
      "similarity_pct": 90,
      "current_chainage": "9+560.00–9+640.00 · 16+103.00–16+340.00 · 16+340.00–16+420.00 · 16+420.00–16+425.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20408",
        "nepTitle": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 9+560 - Sta. 9+640, Sta. 16+103 - Sta. 16+340, Sta. 16+340 - Sta. 16+420, Sta. 16+420 - Sta. 16+425), Northern Samar",
        "nepPesos": 448380000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0239-002353",
        "hgabTitle": "Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 16+103 - Sta. 16+340, Sta. 16+340 - Sta. 16+420, Sta. 16+420 - Sta. 16+425), Northern Samar",
        "hgabPesos": 448380000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 9+560 - Sta. 9+640, Sta. 16+103 - Sta. 16+340, Sta. 16+340 - Sta. 16+420, Sta. 16+420 - Sta. 16+425), Northern Samar",
      "source_code": "2027DPWH-Proposal-20408",
      "office": "Northern Samar 2nd District Engineering Office",
      "region": "Region VIII",
      "amount_2027": 448380000,
      "comparison_year": 2025,
      "prior_project": "Arteche, Brgy. Catumsan - Jipapad -Las Navas-Catubig-Rawis Road, Northern Samar Side",
      "prior_amount": 91294000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633643",
      "similarity_pct": 90,
      "current_chainage": "9+560.00–9+640.00 · 16+103.00–16+340.00 · 16+340.00–16+420.00 · 16+420.00–16+425.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20408",
        "nepTitle": "Arteche, Brgy. Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 9+560 - Sta. 9+640, Sta. 16+103 - Sta. 16+340, Sta. 16+340 - Sta. 16+420, Sta. 16+420 - Sta. 16+425), Northern Samar",
        "nepPesos": 448380000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0239-002353",
        "hgabTitle": "Arteche, Barangay Catumsan - Jipapad - Las Navas - Catubig - Rawis Road (Sta. 16+103 - Sta. 16+340, Sta. 16+340 - Sta. 16+420, Sta. 16+420 - Sta. 16+425), Northern Samar",
        "hgabPesos": 448380000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Concreting of Barangay Road, Barangay Ganzano, Gattran, Cagayan",
      "source_code": "2027DPWH-Proposal-35393",
      "office": "Cagayan 1st District Engineering Office",
      "region": "Region II",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Ganzano, Gattaran, Cagayan",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574719",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35393",
        "nepTitle": "Concreting of Barangay Road, Barangay Ganzano, Gattran, Cagayan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0484-007161",
        "hgabTitle": "Concreting of Barangay Road, Barangay Ganzano, Gattran, Cagayan",
        "hgabPesos": 10000000,
        "nepPage": "475",
        "hgabPage": "484",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Bacag - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub Abra",
      "source_code": "2027DPWH-Proposal-34779",
      "office": "Abra District Engineering Office",
      "region": "CAR",
      "amount_2027": 142837000,
      "comparison_year": 2022,
      "prior_project": "Construction of Bacag - Lana - ag Road, Lacub, Abra",
      "prior_amount": 50000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 521979",
      "similarity_pct": 90,
      "current_chainage": "0+000.00–5+000.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34779",
        "nepTitle": "Construction of Bacag - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub Abra",
        "nepPesos": 142837000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0416-005779",
        "hgabTitle": "Construction of Bacag - Lan-ag Road, Sta. 0+000 - Sta. 5+000, Lacub Abra",
        "hgabPesos": 142837000,
        "nepPage": "435",
        "hgabPage": "416",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Barangay Road of Malimatoc I, Mabini, Batangas",
      "source_code": "2027DPWH-Proposal-23347",
      "office": "Batangas 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2023,
      "prior_project": "Construction of Road, Barangay Malimatoc II, Mabini, Batangas",
      "prior_amount": 20000000,
      "prior_source": "FY2023 GAA · docs/GAA-2023.xlsx · row 527902",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Gerville Luistro"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-23347",
        "nepTitle": "Construction of Barangay Road of Malimatoc I, Mabini, Batangas",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0536-008250",
        "hgabTitle": "Construction of Barangay Road of Malimatoc I, Mabini, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "504",
        "hgabPage": "536",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Diversion Road, Brgy. Alvenda, Mutia - Pob. Sergio Osmeña Sr. Road, Zamboanga del Norte - Sta. 7+872 - Sta. 8+308, Sta. 9+540 - Sta. 9+660.84",
      "source_code": "2027DPWH-Proposal-32897",
      "office": "Zamboanga del Norte 1st District Engineering Office",
      "region": "Region IX",
      "amount_2027": 131900000,
      "comparison_year": 2025,
      "prior_project": "Brgy. Alvenda, Mutia - Pob. Sergio Osmeña Sr. Road, Zamboanga del Norte",
      "prior_amount": 60000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 631958",
      "similarity_pct": 90,
      "current_chainage": "7+872.00–8+308.00 · 9+540.00–9+660.84",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32897",
        "nepTitle": "Construction of Diversion Road, Brgy. Alvenda, Mutia - Pob. Sergio Osmeña Sr. Road, Zamboanga del Norte - Sta. 7+872 - Sta. 8+308, Sta. 9+540 - Sta. 9+660.84",
        "nepPesos": 131900000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0224-002094",
        "hgabTitle": "Construction of Diversion Road, Barangay Alvenda, Mutia - Pob. Sergio Osmeña Sr. Road, Zamboanga del Norte - Sta. 7+872 - Sta. 8+308, Sta. 9+540 - Sta. 9+660.84",
        "hgabPesos": 131900000,
        "nepPage": "284",
        "hgabPage": "224",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bakal II, Talavera, Nueva Ecija",
      "source_code": "2027DPWH-Proposal-35872",
      "office": "Nueva Ecija 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 6050000,
      "comparison_year": 2018,
      "prior_project": "Construction of Roads, Bakal I, Talavera, Nueva Ecija",
      "prior_amount": 2000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117200818000",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-35872",
        "nepTitle": "Construction of Road, Barangay Bakal II, Talavera, Nueva Ecija",
        "nepPesos": 6050000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0520-007897",
        "hgabTitle": "Construction of Road, Barangay Bakal II, Talavera, Nueva Ecija",
        "hgabPesos": 6050000,
        "nepPage": "494",
        "hgabPage": "520",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Bical, Peñablanca, Cagayan",
      "source_code": "2027DPWH-Proposal-34984",
      "office": "Cagayan 3rd District Engineering Office",
      "region": "Region II",
      "amount_2027": 5000000,
      "comparison_year": 2022,
      "prior_project": "Construction of Road at Barangay Bical, Pe±ablanca, Cagayan",
      "prior_amount": 8000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 522123",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Joseph Lara"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34984",
        "nepTitle": "Construction of Road, Barangay Bical, Peñablanca, Cagayan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0486-007191",
        "hgabTitle": "Construction of Road, Barangay Bical, Peñablanca, Cagayan",
        "hgabPesos": 5000000,
        "nepPage": "476",
        "hgabPage": "486",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Guisguis Talon, Sariaya, Quezon",
      "source_code": "2027DPWH-Proposal-36666",
      "office": "Quezon 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 12000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Guis-guis Talon, Sariaya, Quezon",
      "prior_amount": 5000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 574166",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36666",
        "nepTitle": "Construction of Road, Barangay Guisguis Talon, Sariaya, Quezon",
        "nepPesos": 12000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0548-008536",
        "hgabTitle": "Construction of Road, Barangay Guisguis Talon, Sariaya, Quezon",
        "hgabPesos": 12000000,
        "nepPage": "512",
        "hgabPage": "548",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Janipa-an East, Mina, Iloilo",
      "source_code": "2027DPWH-Proposal-37109",
      "office": "Iloilo 6th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Janipaan East, Mina, Iloilo",
      "prior_amount": 10000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575572",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37109",
        "nepTitle": "Construction of Road, Barangay Janipa-an East, Mina, Iloilo",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0573-009065",
        "hgabTitle": "Construction of Road, Barangay Janipa-an East, Mina, Iloilo",
        "hgabPesos": 10000000,
        "nepPage": "527",
        "hgabPage": "573",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Janipa-an West, Mina, Iloilo",
      "source_code": "2027DPWH-Proposal-37115",
      "office": "Iloilo 6th District Engineering Office",
      "region": "Region VI",
      "amount_2027": 10000000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road, Barangay Janipaan West, Mina, Iloilo",
      "prior_amount": 15000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 575574",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-37115",
        "nepTitle": "Construction of Road, Barangay Janipa-an West, Mina, Iloilo",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0573-009066",
        "hgabTitle": "Construction of Road, Barangay Janipa-an West, Mina, Iloilo",
        "hgabPesos": 10000000,
        "nepPage": "527",
        "hgabPage": "573",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sablig, Anda, Pangasinan",
      "source_code": "2027DPWH-Proposal-34152",
      "office": "Pangasinan 1st District Engineering Office",
      "region": "Region I",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Road Concreting, Brgy Sabilig, Anda, Pangasinan",
      "prior_amount": 3000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 427476",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arthur Celeste"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-34152",
        "nepTitle": "Construction of Road, Barangay Sablig, Anda, Pangasinan",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0470-006835",
        "hgabTitle": "Construction of Road, Barangay Sablig, Anda, Pangasinan",
        "hgabPesos": 5000000,
        "nepPage": "466",
        "hgabPage": "470",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Barangay Sta. Rosa I, Baco, Oriental Mindoro",
      "source_code": "2027DPWH-Proposal-36886",
      "office": "Mindoro Oriental District Engineering Office",
      "region": "MIMAROPA",
      "amount_2027": 5000000,
      "comparison_year": 2021,
      "prior_project": "Concreting of Road, Brgy. Sta. Rosa II, Baco, Oriental Mindoro",
      "prior_amount": 25000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 425872",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnan Panaligan"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-36886",
        "nepTitle": "Construction of Road, Barangay Sta. Rosa I, Baco, Oriental Mindoro",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0554-008669",
        "hgabTitle": "Construction of Road, Barangay Sta. Rosa I, Baco, Oriental Mindoro",
        "hgabPesos": 5000000,
        "nepPage": "516",
        "hgabPage": "554",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sitio Purok Bato, Brgy. Punta Blanca, Manukan, Zamboanga del Norte",
      "source_code": "2027DPWH-Proposal-38221",
      "office": "Zamboanga del Norte 2nd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 5000000,
      "comparison_year": 2018,
      "prior_project": "Concreting of Road from Sitio Patunan to Purok Bato, Punta Blanca, Manukan, Zamboanga del Norte",
      "prior_amount": 1750000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300117201994000",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38221",
        "nepTitle": "Construction of Road, Sitio Purok Bato, Brgy. Punta Blanca, Manukan, Zamboanga del Norte",
        "nepPesos": 5000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0602-009694",
        "hgabTitle": "Construction of Road, Sitio Purok Bato, Barangay Punta Blanca, Manukan, Zamboanga del Norte",
        "hgabPesos": 5000000,
        "nepPage": "545",
        "hgabPage": "602",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Construction of Road, Sta. 1+727 - Sta. 1+877, Iba Este, Calumpit, Bulacan",
      "source_code": "2027DPWH-Proposal-03489",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Improvement of Road at Barangay Iba O’Este, Calumpit, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540368",
      "similarity_pct": 90,
      "current_chainage": "1+727.00–1+877.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03489",
        "nepTitle": "Construction of Road, Sta. 1+727 - Sta. 1+877, Iba Este, Calumpit, Bulacan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0509-007679",
        "hgabTitle": "Construction of Road, Sta. 1+727 - Sta. 1+877, Iba Este, Calumpit, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "486",
        "hgabPage": "509",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Talakag-Baungon Section), Brgy. Lacolac Section, Sta. 12+750 - Sta. 13+275.33, Baungon, Bukidnon",
      "source_code": "2027DPWH-Proposal-20449",
      "office": "Bukidnon 3rd District Engineering Office",
      "region": "Region X",
      "amount_2027": 40000000,
      "comparison_year": 2021,
      "prior_project": "Construction of East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Libona-Baungon Section), Bukidnon",
      "prior_amount": 60000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437230",
      "similarity_pct": 90,
      "current_chainage": "12+750.00–13+275.33",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20449",
        "nepTitle": "East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Talakag-Baungon Section), Brgy. Lacolac Section, Sta. 12+750 - Sta. 13+275.33, Baungon, Bukidnon",
        "nepPesos": 40000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0239-002360",
        "hgabTitle": "East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Talakag- Baungon Section), Barangay Lacolac Section, Sta. 12+750 - Sta. 13+275.33, Baungon, Bukidnon",
        "hgabPesos": 40000000,
        "nepPage": "298",
        "hgabPage": "239",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Talakag-Baungon Section), Brgy. Langaon Section, Sta. 24+360 - Sta. 25+894, Baungon, Bukidnon",
      "source_code": "2027DPWH-Proposal-20445",
      "office": "Bukidnon 3rd District Engineering Office",
      "region": "Region X",
      "amount_2027": 65000000,
      "comparison_year": 2021,
      "prior_project": "Construction of East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Libona-Baungon Section), Bukidnon",
      "prior_amount": 60000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 437230",
      "similarity_pct": 90,
      "current_chainage": "24+360.00–25+894.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20445",
        "nepTitle": "East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominorog Road to Jct. Manolo Fortich-Libona-Indahag Road) (Talakag-Baungon Section), Brgy. Langaon Section, Sta. 24+360 - Sta. 25+894, Baungon, Bukidnon",
        "nepPesos": 65000000,
        "category": "Road",
        "status": "No selected or cited counterpart",
        "hgabId": null,
        "hgabTitle": null,
        "hgabPesos": null,
        "nepPage": null,
        "hgabPage": null,
        "chainageStatus": null,
        "trancheStatus": null,
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay Muntingpulo, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33850",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2017,
      "prior_project": "Construction/Repair/Rehabilitation/Improvement of Road, Brgy. Munting Pulo, Lipa City, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165004050306519",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33850",
        "nepTitle": "Improvement of Road at Barangay Muntingpulo, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008380",
        "hgabTitle": "Improvement of Road at Barangay Muntingpulo, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Improvement of Road at Barangay Muntingpulo, Lipa City, Batangas",
      "source_code": "2027DPWH-Proposal-33850",
      "office": "Batangas 4th District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 10000000,
      "comparison_year": 2018,
      "prior_project": "Rehabilitation/Improvement of Road, Barangay Munting Pulo, Lipa City, Batangas",
      "prior_amount": 5000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 300116200796000",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-33850",
        "nepTitle": "Improvement of Road at Barangay Muntingpulo, Lipa City, Batangas",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0541-008380",
        "hgabTitle": "Improvement of Road at Barangay Muntingpulo, Lipa City, Batangas",
        "hgabPesos": 10000000,
        "nepPage": "508",
        "hgabPage": "541",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
      "source_code": "2027DPWH-Proposal-20544",
      "office": "Rizal 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2020,
      "prior_project": "Jct. Batasan-San Mateo-Rodriguez By-Pass Link Road, Rizal",
      "prior_amount": 42000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512373",
      "similarity_pct": 90,
      "current_chainage": "24+400.00–24+700.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20544",
        "nepTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0231-002206",
        "hgabTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
        "hgabPesos": 50000000,
        "nepPage": "291",
        "hgabPage": "231",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
      "source_code": "2027DPWH-Proposal-20544",
      "office": "Rizal 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 50000000,
      "comparison_year": 2019,
      "prior_project": "Jct. Batasan-San Mateo-Rodriguez By-Pass Link Road, Rizal",
      "prior_amount": 36854000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100645000 · PDF p. 201 · printed p. 1666",
      "similarity_pct": 90,
      "current_chainage": "24+400.00–24+700.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20544",
        "nepTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0231-002206",
        "hgabTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 24+400 - Sta. 24+700, Rizal",
        "hgabPesos": 50000000,
        "nepPage": "291",
        "hgabPage": "231",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
      "source_code": "2027DPWH-Proposal-20545",
      "office": "Rizal 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2020,
      "prior_project": "Jct. Batasan-San Mateo-Rodriguez By-Pass Link Road, Rizal",
      "prior_amount": 42000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512373",
      "similarity_pct": 90,
      "current_chainage": "27+700.00–28+500.00 · 30+450.00–30+620.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20545",
        "nepTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0219-001989",
        "hgabTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
        "hgabPesos": 100000000,
        "nepPage": "280",
        "hgabPage": "219",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
      "source_code": "2027DPWH-Proposal-20545",
      "office": "Rizal 2nd District Engineering Office",
      "region": "Region IV-A",
      "amount_2027": 100000000,
      "comparison_year": 2019,
      "prior_project": "Jct. Batasan-San Mateo-Rodriguez By-Pass Link Road, Rizal",
      "prior_amount": 36854000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100645000 · PDF p. 201 · printed p. 1666",
      "similarity_pct": 90,
      "current_chainage": "27+700.00–28+500.00 · 30+450.00–30+620.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20545",
        "nepTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
        "nepPesos": 100000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0219-001989",
        "hgabTitle": "Jct Batasan-Sn Mateo-Rodriguez Bypass Link Road, Sta. 27+700 - 28+500, Sta. 30+450 - 30+620, Rizal",
        "hgabPesos": 100000000,
        "nepPage": "280",
        "hgabPage": "219",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct. Nato-Sabang Coastal Road, Dolo Section, San Jose, Camarines Sur, Sta.9+627 - Sta.10+368",
      "source_code": "2027DPWH-Proposal-32864",
      "office": "Camarines Sur 4th District Engineering Office",
      "region": "Region V",
      "amount_2027": 145500000,
      "comparison_year": 2025,
      "prior_project": "Jct. Nato - Sabang Coastal Road, San Jose Section, Camarines Sur",
      "prior_amount": 120000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 632144",
      "similarity_pct": 90,
      "current_chainage": "9+627.00–10+368.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnulf Bryan Fuentebella"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32864",
        "nepTitle": "Jct. Nato-Sabang Coastal Road, Dolo Section, San Jose, Camarines Sur, Sta.9+627 - Sta.10+368",
        "nepPesos": 145500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002032",
        "hgabTitle": "Jct. Nato-Sabang Coastal Road, Dolo Section, San Jose, Camarines Sur, Sta.9+627 - Sta.10+368",
        "hgabPesos": 145500000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct. Nato-Sabang Coastal Road, Manzana Section, San Jose , Camarines Sur, Sta.8+877 - Sta.9+627",
      "source_code": "2027DPWH-Proposal-32863",
      "office": "Camarines Sur 4th District Engineering Office",
      "region": "Region V",
      "amount_2027": 147000000,
      "comparison_year": 2025,
      "prior_project": "Jct. Nato - Sabang Coastal Road, San Jose Section, Camarines Sur",
      "prior_amount": 120000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 632144",
      "similarity_pct": 90,
      "current_chainage": "8+877.00–9+627.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnulf Bryan Fuentebella"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32863",
        "nepTitle": "Jct. Nato-Sabang Coastal Road, Manzana Section, San Jose , Camarines Sur, Sta.8+877 - Sta.9+627",
        "nepPesos": 147000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002034",
        "hgabTitle": "Jct. Nato-Sabang Coastal Road, Manzana Section, San Jose , Camarines Sur, Sta.8+877 - Sta.9+627",
        "hgabPesos": 147000000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Jct. Nato-Sabang Coastal Road, Telegrafo Section, San Jose, Camarines Sur, Sta.8+127 - Sta.8+877",
      "source_code": "2027DPWH-Proposal-32862",
      "office": "Camarines Sur 4th District Engineering Office",
      "region": "Region V",
      "amount_2027": 147000000,
      "comparison_year": 2025,
      "prior_project": "Jct. Nato - Sabang Coastal Road, San Jose Section, Camarines Sur",
      "prior_amount": 120000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 632144",
      "similarity_pct": 90,
      "current_chainage": "8+127.00–8+877.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Arnulf Bryan Fuentebella"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-32862",
        "nepTitle": "Jct. Nato-Sabang Coastal Road, Telegrafo Section, San Jose, Camarines Sur, Sta.8+127 - Sta.8+877",
        "nepPesos": 147000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0221-002037",
        "hgabTitle": "Jct. Nato-Sabang Coastal Road, Telegrafo Section, San Jose, Camarines Sur, Sta.8+127 - Sta.8+877",
        "hgabPesos": 147000000,
        "nepPage": "282",
        "hgabPage": "221",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20763",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 180000000,
      "comparison_year": 2020,
      "prior_project": "Lanuza- Tandag  Bypass Road (SDCR Alternate Route), Tandag Section, Surigao del Sur",
      "prior_amount": 120000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512641",
      "similarity_pct": 90,
      "current_chainage": "17+580.90–17+581.49",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20763",
        "nepTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
        "nepPesos": 180000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002172",
        "hgabTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
        "hgabPesos": 180000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20763",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 180000000,
      "comparison_year": 2018,
      "prior_project": "Lanuza-Tandag Bypass Road (SDCR Alternate Route), Tandag Section, Surigao del Sur",
      "prior_amount": 140000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310204100164000",
      "similarity_pct": 90,
      "current_chainage": "17+580.90–17+581.49",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20763",
        "nepTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
        "nepPesos": 180000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002172",
        "hgabTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
        "hgabPesos": 180000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
      "source_code": "2027DPWH-Proposal-20763",
      "office": "Surigao del Sur 1st District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 180000000,
      "comparison_year": 2019,
      "prior_project": "Lanuza- Tandag Bypass Road (SDCR Alternate Route), Tandag Section, Surigao del Sur",
      "prior_amount": 105000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100601000 · PDF p. 199 · printed p. 1664",
      "similarity_pct": 90,
      "current_chainage": "17+580.90–17+581.49",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20763",
        "nepTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
        "nepPesos": 180000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002172",
        "hgabTitle": "Lanuza - Tandag Bypass Road (SDCR Alternate Route), Sta. 17+580.9 - Sta. 17+581.487, Surigao del Sur",
        "hgabPesos": 180000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
      "source_code": "2027DPWH-Proposal-20513",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 15000000,
      "comparison_year": 2020,
      "prior_project": "Major Mane to Kennon Road By-Pass Road, Baguio City",
      "prior_amount": 30000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0006.json · row 512123",
      "similarity_pct": 90,
      "current_chainage": "1+917.00–2+059.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20513",
        "nepTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0229-002186",
        "hgabTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1 + 917 - Sta. 2 + 202",
        "hgabPesos": 40000000,
        "nepPage": "290",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
      "source_code": "2027DPWH-Proposal-20513",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 15000000,
      "comparison_year": 2017,
      "prior_project": "Major Mane to Kennon Road  By-Pass Road, Baguio City",
      "prior_amount": 35384000,
      "prior_source": "FY2017 GAA Explorer · A.xls · #Sheet 1 · UACS PAP 165003015300272",
      "similarity_pct": 90,
      "current_chainage": "1+917.00–2+059.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20513",
        "nepTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0229-002186",
        "hgabTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1 + 917 - Sta. 2 + 202",
        "hgabPesos": 40000000,
        "nepPage": "290",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
      "source_code": "2027DPWH-Proposal-20513",
      "office": "Baguio City District Engineering Office",
      "region": "CAR",
      "amount_2027": 15000000,
      "comparison_year": 2019,
      "prior_project": "Major Mane to Kennon Road By-Pass Road, Baguio City",
      "prior_amount": 65000000,
      "prior_source": "FY2019 DPWH Technical GAA · UACS 310204100395000 · PDF p. 187 · printed p. 1652",
      "similarity_pct": 90,
      "current_chainage": "1+917.00–2+059.50",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20513",
        "nepTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1+917 - Sta. 2+059.5, Baguio City",
        "nepPesos": 15000000,
        "category": "Road",
        "status": "Potential retained link",
        "hgabId": "HB10858-3-0229-002186",
        "hgabTitle": "Major Mane to Kennon Road Bypass Road, Sta. 1 + 917 - Sta. 2 + 202",
        "hgabPesos": 40000000,
        "nepPage": "290",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
      "source_code": "2027DPWH-Proposal-24196",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2018,
      "prior_project": "Mandaon-Dayhangan Road, Masbate",
      "prior_amount": 50000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310205100202000",
      "similarity_pct": 90,
      "current_chainage": "7+380.00–8+271.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24196",
        "nepTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002335",
        "hgabTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 7+380 to Sta. 8+271",
        "hgabPesos": 75000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
      "source_code": "2027DPWH-Proposal-24197",
      "office": "Masbate 2nd District Engineering Office",
      "region": "Region V",
      "amount_2027": 75000000,
      "comparison_year": 2018,
      "prior_project": "Mandaon-Dayhangan Road, Masbate",
      "prior_amount": 50000000,
      "prior_source": "FY2018 GAA Explorer · GAA2018.xls · #Sheet 7 · UACS PAP 310205100202000",
      "similarity_pct": 90,
      "current_chainage": "8+271.00–9+468.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-24197",
        "nepTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
        "nepPesos": 75000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0238-002336",
        "hgabTitle": "Mandaon-Dayhagan Road, Masbate, Sta. 8+271 to Sta. 9+468",
        "hgabPesos": 75000000,
        "nepPage": "297",
        "hgabPage": "238",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "NRJ Agusan-Malaybalay Road-Brgy. Ambacon-Brgy. Malicato-NRJ Daang Maharlika, (Sta. 7+630 - Sta. 7+852.29), Agusan del Norte",
      "source_code": "2027DPWH-Proposal-20751",
      "office": "Agusan del Norte District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 20000000,
      "comparison_year": 2021,
      "prior_project": "Construction of NRJ Agusan-Malaybalay Road û Brgy. Ambacon û Brgy. Malicato û NRJ Daang Maharlika, Agusan del Norte",
      "prior_amount": 50000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 425261",
      "similarity_pct": 90,
      "current_chainage": "7+630.00–7+852.29",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20751",
        "nepTitle": "NRJ Agusan-Malaybalay Road-Brgy. Ambacon-Brgy. Malicato-NRJ Daang Maharlika, (Sta. 7+630 - Sta. 7+852.29), Agusan del Norte",
        "nepPesos": 20000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0229-002175",
        "hgabTitle": "NRJ Agusan-Malaybalay Road-Barangay Ambacon-Barangay Malicato-NRJ Daang Maharlika, (Sta. 7+630 - Sta. 7+852.29), Agusan del Norte",
        "hgabPesos": 20000000,
        "nepPage": "289",
        "hgabPage": "229",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Radial Road (NRJ BCIR-NRJ Mayor Democrito D. Plaza II Ave.), (Mahay - Baan) (Sta. 0+289 - Sta. 0+955.67), Butuan City",
      "source_code": "2027DPWH-Proposal-20745",
      "office": "Butuan City District Engineering Office",
      "region": "Region XIII",
      "amount_2027": 50000000,
      "comparison_year": 2024,
      "prior_project": "Radial Road ( NRJ BCIR - NRJ Mayor Democrito D. Plaza II Avenue ) , Mahay - Baan, Butuan City",
      "prior_amount": 105000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 595831",
      "similarity_pct": 90,
      "current_chainage": "0+289.00–0+955.67",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [
        "Jose Aquino II"
      ],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20745",
        "nepTitle": "Radial Road (NRJ BCIR-NRJ Mayor Democrito D. Plaza II Ave.), (Mahay - Baan) (Sta. 0+289 - Sta. 0+955.67), Butuan City",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0233-002249",
        "hgabTitle": "Radial Road (NRJ BCIR-NRJ Mayor Democrito D. Plaza II Ave.), (Mahay - Baan) (Sta. 0+289 - Sta. 0+955.67), Butuan City",
        "hgabPesos": 40000000,
        "nepPage": "293",
        "hgabPage": "233",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Area B, Barangay Bagong Buhay City of San Jose Del Monte, Bulacan (121.057753, 14.853254)",
      "source_code": "2027DPWH-Proposal-10571",
      "office": "Bulacan 2nd District Engineering Office",
      "region": "Region III",
      "amount_2027": 50000000,
      "comparison_year": 2025,
      "prior_project": "Rehabilitation of Road (Phase 1), Area B, Barangay Bagong Buhay, City of San Jose del Monte, Bulacan",
      "prior_amount": 53381000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 558984",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 1 only",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-10571",
        "nepTitle": "Rehabilitation of Road, Area B, Barangay Bagong Buhay City of San Jose Del Monte, Bulacan (121.057753, 14.853254)",
        "nepPesos": 50000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0516-007827",
        "hgabTitle": "Rehabilitation of Road, Area B, Barangay Bagong Buhay City of San Jose Del Monte, Bulacan (121.057753, 14.853254)",
        "hgabPesos": 50000000,
        "nepPage": "493",
        "hgabPage": "516",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Rehabilitation of Road, Sta. 2+627 - Sta. 2+927, Iba O' Este, Calumpit, Bulacan",
      "source_code": "2027DPWH-Proposal-03491",
      "office": "Bulacan 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 10000000,
      "comparison_year": 2024,
      "prior_project": "Improvement of Road at Barangay Iba O’Este, Calumpit, Bulacan",
      "prior_amount": 10000000,
      "prior_source": "FY2024 GAA · docs/GAA-2024.xlsx · row 540368",
      "similarity_pct": 90,
      "current_chainage": "2+627.00–2+927.00",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-03491",
        "nepTitle": "Rehabilitation of Road, Sta. 2+627 - Sta. 2+927, Iba O' Este, Calumpit, Bulacan",
        "nepPesos": 10000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0511-007725",
        "hgabTitle": "Rehabilitation of Road, Sta. 2+627 - Sta. 2+927, Iba O' Este, Calumpit, Bulacan",
        "hgabPesos": 10000000,
        "nepPage": "488",
        "hgabPage": "511",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Road Concreting in Brgy. Tiniguiban, Leon T. Postigo, Zamboanga del Norte",
      "source_code": "2027DPWH-Proposal-38140",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 14500000,
      "comparison_year": 2020,
      "prior_project": "Road Concreting, Tiniguiban, Leon B. Postigo, Zamboanga del Norte",
      "prior_amount": 10000000,
      "prior_source": "FY2020 GAA · gaa_2020_batch_0005.json · row 492917",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38140",
        "nepTitle": "Road Concreting in Brgy. Tiniguiban, Leon T. Postigo, Zamboanga del Norte",
        "nepPesos": 14500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0603-009705",
        "hgabTitle": "Road Concreting in Barangay Tiniguiban, Leon T. Postigo, Zamboanga del Norte",
        "hgabPesos": 14500000,
        "nepPage": "545",
        "hgabPage": "603",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Road Concreting in Brgy. Tiniguiban, Leon T. Postigo, Zamboanga del Norte",
      "source_code": "2027DPWH-Proposal-38140",
      "office": "Zamboanga del Norte 3rd District Engineering Office",
      "region": "Region IX",
      "amount_2027": 14500000,
      "comparison_year": 2021,
      "prior_project": "Road Concreting, Tiniguiban, Leon B. Postigo, Zamboanga del Norte",
      "prior_amount": 7700000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 424959",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-38140",
        "nepTitle": "Road Concreting in Brgy. Tiniguiban, Leon T. Postigo, Zamboanga del Norte",
        "nepPesos": 14500000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0603-009705",
        "hgabTitle": "Road Concreting in Barangay Tiniguiban, Leon T. Postigo, Zamboanga del Norte",
        "hgabPesos": 14500000,
        "nepPage": "545",
        "hgabPage": "603",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Road Connecting Santa-Rancho Road (S00089LZ) and Santa-Caoayan Road, Sta. 1+045.80 - Sta. 1+501.70, Ilocos Sur",
      "source_code": "2027DPWH-Proposal-20308",
      "office": "Ilocos Sur 2nd District Engineering Office",
      "region": "Region I",
      "amount_2027": 100162000,
      "comparison_year": 2025,
      "prior_project": "Construction of Road Connecting to Santa-Rancho (S00089LZ) to Santa-Caoayan Road (Phase 2), Ilocos Sur",
      "prior_amount": 100000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 558783",
      "similarity_pct": 90,
      "current_chainage": "1+045.80–1+501.70",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "incomplete",
      "tranche_status": "one side stated",
      "tranche_detail": "Prior Phase 2 only",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20308",
        "nepTitle": "Road Connecting Santa-Rancho Road (S00089LZ) and Santa-Caoayan Road, Sta. 1+045.80 - Sta. 1+501.70, Ilocos Sur",
        "nepPesos": 100162000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0234-002256",
        "hgabTitle": "Road Connecting Santa-Rancho Road (S00089LZ) and Santa-Caoayan Road, Sta. 1+045.80 - Sta. 1+501.70, Ilocos Sur",
        "hgabPesos": 100162000,
        "nepPage": "294",
        "hgabPage": "234",
        "chainageStatus": "overlap",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "San Carlos City Bypass Road, Pangasinan",
      "source_code": "2027DPWH-Proposal-20657",
      "office": "Pangasinan 4th District Engineering Office",
      "region": "Region I",
      "amount_2027": 346000000,
      "comparison_year": 2021,
      "prior_project": "San Carlos City By-Pass Road, Pangasinan",
      "prior_amount": 80000000,
      "prior_source": "FY2021 GAA · docs/2021-GAA.xlsx · row 436600",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20657",
        "nepTitle": "San Carlos City Bypass Road, Pangasinan",
        "nepPesos": 346000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0214-001892",
        "hgabTitle": "San Carlos City Bypass Road, Pangasinan",
        "hgabPesos": 346000000,
        "nepPage": "277",
        "hgabPage": "214",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
      "source_code": "2027DPWH-Proposal-20269",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 200000000,
      "comparison_year": 2022,
      "prior_project": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway) - Manila North Road",
      "prior_amount": 150000000,
      "prior_source": "FY2022 GAA · docs/GAA-2022.xlsx · row 548775",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20269",
        "nepTitle": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0243-002415",
        "hgabTitle": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
        "hgabPesos": 200000000,
        "nepPage": "302",
        "hgabPage": "243",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    },
    {
      "category": "Road",
      "project": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
      "source_code": "2027DPWH-Proposal-20269",
      "office": "Pampanga 1st District Engineering Office",
      "region": "Region III",
      "amount_2027": 200000000,
      "comparison_year": 2025,
      "prior_project": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road",
      "prior_amount": 150000000,
      "prior_source": "FY2025 GAA · docs/GAA-2025.xlsx · row 633829",
      "similarity_pct": 90,
      "current_chainage": "",
      "prior_chainage": "",
      "chainage_overlap": "",
      "chainage_status": "not stated",
      "tranche_status": "not stated",
      "tranche_detail": "",
      "tranche_conflict": false,
      "congressional_representatives": [],
      "hgabRetention": {
        "sourceCode": "2027DPWH-Proposal-20269",
        "nepTitle": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
        "nepPesos": 200000000,
        "category": "Road",
        "status": "Clear retained link",
        "hgabId": "HB10858-3-0243-002415",
        "hgabTitle": "Sto. Tomas Interchange including Roads and Bridges from NLEX (North Luzon Expressway)-Manila North Road, Pampanga",
        "hgabPesos": 200000000,
        "nepPage": "302",
        "hgabPage": "243",
        "chainageStatus": "not stated",
        "trancheStatus": "not stated",
        "unselectedCandidateIds": []
      }
    }
  ],
  "sources": [
    {
      "file": "dpwh-data.json",
      "sha256": "e305de67dd9062c2f51afc5f895be90b7677e921ffebfbae6e54b4fd4ca94431"
    },
    {
      "file": "hb_nep_comparison_3rd.csv",
      "sha256": "6358f901c9416f7c6cde9328e5a65ac05f6d8962f0bdf6bab3c5f0ef124d36c9"
    },
    {
      "file": "2027.json",
      "sha256": "dd57319349db0174fb59ae2a1939274a6ee072f889a48e85712818980a480e2e"
    }
  ]
}
